A47 North Tuddenham to Easton Examination Library Updated – 25/11/2021 This Examination Library relates to the A47 North Tuddenham to Easton application. The library lists each document that has been submitted to the examination by any party and documents that have been issued by the Planning Inspectorate. All documents listed have been published to the National Infrastructure’s Planning website and a hyperlink is provided for each document. A unique reference is given to each document; these references will be used within the Report on the Implications for European Sites and will be used in the Examining Authority’s Recommendation Report. The documents within the library are categorised either by document type or by the deadline to which they are submitted. Please note the following: • This is a working document and will be updated periodically as the examination progresses. • Advice under Section 51 of the Planning Act 2008 that has been issued by the Inspectorate, is published to the National Infrastructure Website but is not included within the Examination Library as such advice is not an examination document. • This document contains references to documents from the point the application was submitted. • The order of documents within each sub-section is either chronological, numerical, or alphabetical and confers no priority or higher status on those that have been listed first.
36
Embed
A47 North Tuddenham to Easton Examination Library Updated ...
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
A47 North Tuddenham to Easton Examination Library
Updated – 25/11/2021
This Examination Library relates to the A47 North Tuddenham to Easton application. The library lists each document that has been submitted to the examination by any party and documents that have been issued by the Planning Inspectorate. All documents listed have been published to the National Infrastructure’s Planning website and a hyperlink is provided for each document. A unique reference is given to each document; these references will be used within the Report on the Implications for European Sites and will be used in the Examining Authority’s Recommendation Report. The documents within the library are categorised either by document type or by the deadline to which they are submitted.
Please note the following:
• This is a working document and will be updated periodically as the examination progresses.
• Advice under Section 51 of the Planning Act 2008 that has been issued by the Inspectorate, is published to the National Infrastructure Website but is not included within the Examination Library as such advice is not an examination document.
• This document contains references to documents from the point the application was submitted.
• The order of documents within each sub-section is either chronological, numerical, or alphabetical and confers no priority or higher status on those that have been listed first.
Document Index
TR010038 – A47 North Tuddenham to Easton Examination Library - Index
Category Reference
Application Documents As submitted and amended version received before the PM. Any amended version received during the Examination stage to be saved under the Deadline received
APP-xxx
Adequacy of Consultation responses AoC-xxx
Relevant Representations RR-xxx
Procedural Decisions and Notifications from the Examining Authority
Includes Examining Authority’s questions, s55, and post acceptance s51
PD-xxx
Additional Submissions Includes anything accepted at the Preliminary Meeting and correspondence that is either relevant to a procedural decision or contains factual information pertaining to the examination including responses to Rule 6 and Rule 8 letters
AS-xxx
Events and Hearings Includes agendas for hearings and site inspections, audio recordings, responses to notifications and applicant’s hearing notices
EV-xxx
Representations – by Deadline
Procedural Deadline A PDA-xxx
Procedural Deadline B PDB-xxx
Deadline 1: REP1-xxx
Deadline 2: REP2-xxx
Document Index
Deadline 3: REP3-xxx
Deadline 4:
REP4-xxx
Deadline 5:
REP5-xxx
Other Documents Includes s127/131/138 information, s56, s58 and s59 certificates, and transboundary documents
OD-xxx
Document Index
TR010038 – A47 North Tuddenham to Easton Examination Library
Application Documents
APP-001 Highways England 1.1 Application Form
APP-002 Highways England 1.2 Covering Letter and Section 55 Checklist
APP-003 Highways England 1.3 Introduction to the Application
APP-004 Highways England 2.1 Location Plan
APP-005 Highways England 2.2 General Arrangement Plans
APP-006 Highways England 2.3 Land Plans
APP-007 Highways England 2.4 Works Plans
APP-008 Highways England 2.5 Rights of Way and Access Plans
APP-009 Highways England 2.6 Traffic Regulation Plans
APP-010 Highways England 2.7 Engineering Drawings and Sections
APP-011 Highways England 2.8 Drainage and Surface Water Plans
APP-012 Highways England 2.9 Crown Land Plans
APP-013 Highways England 2.10 Special Category Land Plans
APP-014 Highways England 2.11 Classification of Roads Plans
APP-015 Highways England 2.12 Hedgerow Plans
APP-016 Highways England 2.13 De-trunking Plans
APP-017 Highways England 3.1 Draft Development Consent Order
APP-018 Highways England 3.1 Draft Development Consent Order Validation Confirmation
APP-019 Highways England 3.2 Explanatory Memorandum
APP-020 Highways England 3.3 Consents and Agreements Position Statement
RR-005 Anne Robinson RR-006 Ben Hooker RR-007 Breckland Council RR-008 Broadland District Council RR-009 Brown and Co on behalf of AL Alston and Sons Ltd RR-010 Brown and Co on behalf of Honingham Aktieselskab RR-011 Brown and Co on behalf of Alson Farms Ltd RR-012 Browns and Co on behalf of Food Enterprise Park Ltd RR-013 Browns and Co on behalf of Mr Neil Alston RR-014 Bryan Robinson RR-015 Catharine Hooker RR-016 Childhood First RR-017 Christine Way RR-018 Climate Emergency Planning and Policy (CEPP) RR-019 CPRE Norfolk RR-020 D G M Kenney RR-021 David Hooker RR-022 David Hooker on behalf of Mrs Anne Gowing RR-023 David Lewis RR-024 David Morton RR-025 David Pett on behalf of Stop Wensum Link RR-026 Deepak Rughani RR-027 Dr Larch Maxey RR-028 Dr Matt Tomlinson RR-029 Easton Parish Council RR-030 Edward Brown RR-031 Edward Kevin OHara RR-032 Emma Tristram RR-033 Environment Agency RR-034 Gil Murray RR-035 Glebe House RR-036 Graham Everett RR-037 Hannah Hoechner RR-038 Hanne Lene Schierff RR-039 Heather Brennecke RR-040 Historic England RR-041 Hockering Parish Council RR-042 Honingham Parish Council RR-043 Howard James Rees RR-044 James Brown RR-045 Jamie Osborn RR-046 Jean Bishop RR-047 Joe McCarney RR-048 John Cummings RR-049 John Greenaway RR-050 Jonathan Maynard RR-051 Laura Blake RR-052 Lesley Grahame RR-053 Mair Bain RR-054 Mattishall Parish Council
RR-055 Mireille Heald RR-056 Mr Joshua Hooker RR-057 National Grid Gas Plc RR-058 Nick Bishop-Clark RR-059 Norfolk Barbastelle Study Group RR-060 Norfolk Constabulary RR-061 Norfolk County Council RR-062 North Tuddenham Parish Council RR-063 Norwich and Norfolk Friends of the Earth RR-064 Norwich Green Party Group of City and County Councillors RR-065 Olivia Hanks RR-066 Orsted Hornsea Project Three (UK) RR-067 Patricia Day RR-068 Peter Milliken
RR-069 Pinsent Masons on behalf of Norfolk County Council as promoter of Norwich Western Link
RR-070 Public Health England RR-071 Richard Hawker RR-072 Ringland Parish Council RR-073 Robert Palgrave RR-074 Roc Sandford RR-075 Savills (UK) Ltd on behalf of Anthony Meynell RR-076 South Norfolk Council RR-077 Steve Hale RR-078 Transport Action Network RR-079 Transport Planning Associates on behalf of Clarion Housing Group RR-080 Vattenfall Wind Power Ltd RR-081 Victoria Rance RR-082 Wensum Valley Alliance RR-083 Weston Longville Parish Council RR-084 Wild Wings Ecology Procedural Decisions and Notifications from the Examining Authority
PD-001 Notification of Decision to Accept Application PD-002 Section 55 Checklist PD-003 Section 51 advice to the Applicant PD-004 Appointment of the Examining Authority
Notice of appointment of the Examining Authority PD-005 Rule 6 Letter
Notice of appointment of the Examining Authority and date and time of the Preliminary Meeting
PD-006 Rule 8 letter - notification of timetable for the examination
PD-007 Examining Authority’s Written Questions (ExQ1)
PD-008 Rules 13 and 16 – Notification of Hearings and Accompanied Site Inspection (ASI)
PD-009 Examining Authority’s Further Written Questions (ExQ2)
AS-001 Highways England Additional Submission - Cover Letter - Response to S51 advice - Accepted at the discretion of the Examining Authority
AS-002 Highways England Additional Submission - 2.6 Traffic Regulation Plans - Revision 1 - Accepted at the discretion of the Examining Authority
AS-003 Highways England Additional Submission - 4.3 Book of Reference (Clean) - Revision 1 - Accepted at the discretion of the Examining Authority
AS-004 Highways England Additional Submission - 4.3 Book of Reference (Tracked Changes) - Revision 1 - Accepted at the discretion of the Examining Authority
AS-005 Highways England Additional Submission - 6.1 Environmental Statement Chapter 2 – The Proposed Scheme (Clean) - Revision 1- Accepted at the discretion of the Examining Authority
AS-006 Highways England Additional Submission - 6.1 Environmental Statement Chapter 2 - The Proposed Scheme (Tracked Changes) - Revision 1 - Accepted at the discretion of the Examining Authority
AS-007 Highways England Additional Submission - 6.8 Environmental Masterplan - Revision 1 - Accepted at the discretion of the Examining Authority
AS-008 Highways England Additional Submission - 7.3 Scheme Design Report (Clean) - Revision 1 - Accepted at the discretion of the Examining Authority
AS-009 Highways England Additional Submission - 7.3 Scheme Design Report (Tracked Changes) - Revision 1 - Accepted at the discretion of the Examining Authority
AS-010 Highways England Additional Submission - 9.1 Guide to the Application - Revision 0- Accepted at the discretion of the Examining Authority
AS-011 Mr Josselyn on behalf of Mr Meynell
Additional Submission - Accepted at the discretion of the Examining Authority
AS-012 Chris Curson (T J Curson & Partners) Non-IP Submission accepted at the discretion of the Examining Authority
AS-013 Dr Iain Robinson Non-IP Submission accepted at the discretion of the Examining Authority
AS-014 Bryan Robinson Additional Submission - Accepted at the discretion of the Examining Authority
AS-015 David Pett on behalf of Stop Wensum Link Additional Submission - Accepted at the discretion of the Examining Authority
AS-016 Climate Emergency Policy and Planning (CEPP) Additional Submission - Accepted at the discretion of the Examining Authority
AS-017 Highways England Additional Submission - 9.1 Guide to the Application (Clean) - Rev 4 - Accepted at the discretion of the Examining Authority
AS-018 Highways England Additional Submission - 9.1 Guide to the Application (Tracked Changes) - Rev 4 - Accepted at the discretion of the Examining Authority
AS-019 Highways England Additional Submission - 9.7 Compulsory Acquisition Schedule (Clean) - Rev 1 - Accepted at the discretion of the Examining Authority
AS-020 Highways England Additional Submission - 9.7 Compulsory Acquisition Schedule (Tracked Changes) - Rev 1 - Accepted at the discretion of the Examining Authority
AS-021 Highways England Additional Submission - 9.14 Applicant’s Response to Examining Authority’s Further Written Questions - October 2021 - Accepted at the discretion of the Examining Authority
AS-022 Highways England Additional Submission - 9.15 Alternative Wood Lane Junction Options Appraisal - Accepted at the discretion of the Examining Authority
AS-023 Highways England Additional Submission - 9.15 Alternative Wood Lane Junction Options Appraisal - Appendix B - Alternative Option Departures - Accepted at the discretion of the Examining Authority
AS-024 Highways England Additional Submission - 9.15 Alternative Wood Lane Junction Options Appraisal Appendix C - Alternative Option Land Take - Accepted at the discretion of the Examining Authority
AS-025 Highways England Additional Submission - Confidential badger Information to Support Alternative Wood Lane Junction Options Appraisal - Accepted at the discretion of the Examining Authority This document contains confidential information and is only available on request to those who have a legitimate need to view it.
Events and Hearings
Unaccompanied Site Inspection – 12/13 July 2021 EV-001 Unaccompanied Site Inspection
Pre-examination/Unaccompanied Site Inspection EV-001a Note of Unaccompanied Site Inspection (USI 2) on 10 and 11
EV-003 Transcript of Preliminary Meeting Part 1 - 3 August 2021 This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
EV-004 Preliminary Meeting Note
EV-005 Reference Not In Use EV-006 Reference Not In Use
Open Floor Hearing – 12 August 2021 EV-007 Agenda for Open Floor Hearing 1 (OFH1) - 12 August 2021
EV-008 Recording of Open Floor Hearing 1 (OFH1) – 12 August 2021
EV-009 Open Floor Hearing 1 (OFH1) - Transcript - 12 August 2021 This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
Issue Specific Hearing 1: Draft Development Consent Order - 2 November 2021 Compulsory Acquisition Hearing 1 (CAH1) – 3 November 2021 Compulsory Acquisition Hearing 2 (CAH2) – 3 November 2021 Issue Specific Hearing 2 (ISH2) – 4 November 2021 EV-010 Highways England
Notice of November Hearings
EV-011 Agenda for Issue Specific Hearing 1 dealing with matters relating to the draft Development Consent Order - 2 November 2021
EV-012 Agenda for Compulsory Acquisition Hearing 1 and 2 - Wednesday 3 November 2021
EV-013 Agenda for Issue Specific Hearing 2 dealing with environmental matters - 4 November 2021
EV-014 Recording of Issue Specific Hearing 1 (ISH1) - Draft Development Consent Order – Session 1 - 2 November 2021
EV-015 Recording of Issue Specific Hearing 1 (ISH1) - Draft Development Consent Order – Session 2 - 2 November 2021
EV-016 Issue Specific Hearing 1 (ISH1) - Draft Development Consent Order – Session 1 - Transcript - 2 November 2021 This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice
to text and is unedited. The video recording remains as the primary record of the event.
EV-017 Issue Specific Hearing 1 (ISH1) - Draft Development Consent Order - Session 2 - Transcript - 2 November 2021 This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
EV-018 Recording of Compulsory Acquisition Hearing 1 (CAH1) - The Applicant’s case for Compulsory Acquisition and Temporary Possession – 3 November 2021
EV-019 Compulsory Acquisition Hearing 1 (CAH1) - The Applicant’s case for Compulsory Acquisition and Temporary Possession - Transcript - 3 November 2021 This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
EV-020 Recording of Compulsory Acquisition Hearing 2 (CAH2)- Site/plot specific issues – 3 November 2021
EV-021 Compulsory Acquisition Hearing 2 (CAH2)- Site/plot specific issues - Transcript - 3 November 2021 This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
EV-022 Recording of Issue Specific Hearing 2 (ISH2)- Environmental Matters – Part 1 - Session 1 - 4 November 2021
EV-023 Recording of Issue Specific Hearing 2 (ISH2)- Environmental Matters – Part 1 - Session 2 - 4 November 2021
EV-024 Recording of Issue Specific Hearing 2 (ISH2)- Environmental Matters – Part 1 - Session 3 - 4 November 2021
EV-024a Recording of Issue Specific Hearing 2 (ISH2)- Environmental Matters – Part 1 - Session 4 - 4 November 2021
EV-025 Issue Specific Hearing 2 (ISH2)- Environmental Matters – Part 1 - Session 1 - Transcript - 4 November 2021 This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
EV-026 Issue Specific Hearing 2 (ISH2)- Environmental Matters – Part 1 - Session 2 - Transcript - 4 November 2021 This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
EV-027 Issue Specific Hearing 2 (ISH2)- Environmental Matters – Part 1 - Session 3 - Transcript - 4 November 2021 This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
EV-028 Issue Specific Hearing 2 (ISH2)- Environmental Matters – Part 1 - Session 4 - Transcript - 4 November 2021 This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
EV-029 Recording of Issue Specific Hearing 2 (ISH2)- Environmental Matters – Part 2 - Session 1 - 5 November 2021
EV-030 Recording of Issue Specific Hearing 2 (ISH2)- Environmental Matters – Part 2 - Session 2 - 5 November 2021
EV-031 Issue Specific Hearing 2 (ISH2)- Environmental Matters – Part 2 - Session 1 - Transcript - 5 November 2021 This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
EV-032 Issue Specific Hearing 2 (ISH2)- Environmental Matters – Part 2 - Session 2 - Transcript - 5 November 2021 This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event
EV-033 Action Points from Issue Specific Hearing 1 ,Compulsory Acquisition Hearings 1 and 2 and Issue Specific Hearing 2
Representations
Procedural Deadline A – 20 July 2021 Deadline for receipt by the ExA of: • Written submissions on the examination procedure, including any submissions about the use of virtual procedures; and • Requests to be heard orally at the Preliminary Meeting Part 1
Procedural Deadline B – 9 August 2021 Deadline for receipt by the ExA of: • Written submissions on the examination procedure, including responses to matters raised orally at the Preliminary Meeting Part 1; and • Requests to be heard orally at the Preliminary Meeting Part 2 and/or at Open Floor Hearing 1 (OFH1).
PDB-001 Highways England Procedural Deadline B Submission
PDB-002 Brown & Co Procedural Deadline B Submission
PDB-003 Climate Emergency Planning and Policy (CEPP) Procedural Deadline B Submission
PDB-004 David Lewis Procedural Deadline B Submission
PDB-005 Easton Parish council Procedural Deadline B Submission
PDB-006 Lisa J Tomlin Procedural Deadline B Submission
PDB-007
Peter Milliken Procedural Deadline B Submission
PDB-008 Richard Hawker Procedural Deadline B Submission
PDB-009 Stop Wensum Link Procedural Deadline B Submission
PDB-010 Weston Longville Parish Council Procedural Deadline B Submission
Deadline 1 – 01 September 2021
Deadline for the receipt by the ExA of: - Comments on Additional Documents submitted by the Applicant since the application was accepted - Comments on Relevant Representations (RRs) - Summaries of all RRs exceeding 1500 words - Written Representations (WRs) - Summaries of all WRs exceeding 1500 words - Written summaries of oral submissions made at OFH1 - Submission by Applicant of draft Accompanied Site Inspection (ASI) itinerary - Draft Statements of Common Ground (SoCG) requested by the ExA - An updated version of the draft Development Consent Order (dDCO) in clean and tracked versions - A schedule of changes to the dDCO - Any further information requested by the ExA under Rule 17 of the Examination Rules
REP1-015 Highways England Deadline 1 Submission – 9.4 dDCO - Schedule of Drafting Changes for Deadline 1
REP1-016 Highways England Deadline 1 Submission – 9.5 Accompanied Site Inspection (ASI) Itinerary (DRAFT)
REP1-017 Highways England Deadline 1 Submission - Confidential Badger Information - This document contains confidential information and is only available on request to those who have a legitimate need to view it.
REP1-018 Brown & Co on behalf of Alston Farms Ltd Deadline 1 Submission - Written Representation
REP1-019 Brown & Co on behalf of Honingham Aktieselskab Deadline 1 Submission - Written Representation
REP1-020 Brown & Co on behalf of Honingham Aktieselskab Deadline 1 Submission - Summary of Written Representation
REP1-021 Bryan Robinson Deadline 1 Submission - Written Submissions
REP1-022 Childhood First Deadline 1 Submission - Written Representation
REP1-023 Climate Emergency Policy and Planning (CEPP) Deadline 1 Submission - Written Representation
REP1-024 D G M Kenney Deadline 1 Submission - Written Representation
REP1-025 David Hooker Deadline 1 Submission - Written Representation
REP1-026 David Lewis Deadline 1 Submission - Written Representations
REP1-027 David Pett Deadline 1 Submission - Written Representation
REP1-028 Easton Parish Council Deadline 1 Submission - Written summary of oral submissions made at Open Floor Hearing 1
REP1-029 Environment Agency Deadline 1 Submission - Written Representation
REP1-030 Historic England Deadline 1 Submission - Written Representation and Position Statement
REP1-031 National Grid Gas plc Deadline 1 Submission - Written Representation
REP1-032 Norfolk County Council Deadline 1 Submission - Written Representation
REP1-033 Norfolk County Council Deadline 1 Submission - Summary of Written Representation
REP1-034 Norfolk County Council (as Scheme Promoter of Norwich Western Link) Deadline 1 Submission - Written Representation and Comments on Relevant Representations
REP1-035 Norwich Green Party Group of City and County Councillors Deadline 1 Submission - Written Representation
REP1-036 Orsted Hornsea Project Three (UK) Limited Deadline 1 Submission - Position Statement
REP1-037 Richard Hawker Deadline 1 Submission - Written Representation
REP1-038 Richard Hawker Deadline 1 Submission - Written summary of oral submissions made at Open Floor Hearing 1
REP1-039 Weston Longville Parish Council Deadline 1 Submission - Comments on the Outline Traffic Management Plan
REP1-040 Weston Longville Parish Council Deadline 1 Submission - Written Representation and suggested Accompanied Site Inspection itinerary locations
REP1-041 Weston Longville Parish Council Deadline 1 Submission - Comments on the Outline Traffic Management Plan
REP1-042 Savills UK Ltd on behalf of Anthony Meynell Deadline 1 Submission - Summary of Written Representation ACM 00 - Accepted as a late submission at the discretion of the Examining Authority
REP1-043 Savills UK on behalf of Anthony Meynell Deadline 1 Submission - Written Representation ACM 01 Introduction and index - Accepted as a late submission at the discretion of the Examining Authority
REP1-044 Savills UK on behalf of Anthony Meynell Deadline 1 Submission - Written Representation ACM 02 - Accepted as a late submission at the discretion of the Examining Authority
REP1-045 Savills UK on behalf of Anthony Meynell Deadline 1 Submission - Written Representation ACM 03 Statement of A.C. Meynell - Accepted as a late submission at the discretion of the Examining Authority
REP1-046 Savills UK on behalf of Anthony Meynell Deadline 1 Submission - Written Representation ACM 03.1 Appendix 1 - Accepted as a late submission at the discretion of the Examining Authority
REP1-047 Savills UK on behalf of Anthony Meynell Deadline 1 Submission - Written Representation ACM 03.2 Appendix 2 - Accepted as a late submission at the discretion of the Examining Authority
REP1-048 Savills UK on behalf of Anthony Meynell Deadline 1 Submission - Written Representation ACM 03.3 Appendix 3 - Accepted as a late submission at the discretion of the Examining Authority
REP1-049 Savills UK on behalf of Anthony Meynell Deadline 1 Submission - Written Representation ACM 03.4 Appendix 4 - Accepted as a late submission at the discretion of the Examining Authority
REP1-050 Savills UK on behalf of Anthony Meynell Deadline 1 Submission - Written Representation ACM 03.5 Appendix 5 - Accepted as a late submission at the discretion of the Examining Authority
REP1-051 Savills UK on behalf of Anthony Meynell Deadline 1 Submission - Written Representation ACM 03.6 Appendix 6 - Accepted as a late submission at the discretion of the Examining Authority
REP1-052 Savills UK on behalf of Anthony Meynell Deadline 1 Submission - Written Representation ACM 03.7 Appendix 7 - Accepted as a late submission at the discretion of the Examining Authority
REP1-053 Savills UK on behalf of Anthony Meynell Deadline 1 Submission - Written Representation ACM 03.8 Appendix 8 - Accepted as a late submission at the discretion of the Examining Authority
REP1-054 Savills UK on behalf of Anthony Meynell Deadline 1 Submission - Written Representation ACM 03.9 Appendix 9 - Accepted as a late submission at the discretion of the Examining Authority
REP1-055 Savills UK on behalf of Anthony Meynell Deadline 1 Submission - Summary of Written Representation ACM 03.10 Appendix 10 - Accepted as a late submission at the discretion of the Examining Authority
REP1-056 Savills UK on behalf of Anthony Meynell Deadline 1 Submission - Written Representation ACM 03.11A Annex A to Appendix 11 - Accepted as a late submission at the discretion of the Examining Authority
REP1-057 Savills UK on behalf of Anthony Meynell Deadline 1 Submission - Written Representation ACM 04 Transport Consultant's Report - Accepted as a late submission at the discretion of the Examining Authority
REP1-058 Savills UK on behalf of Anthony Meynell Deadline 1 Submission - Written Representation ACM 05 Woodland Appraisal - Accepted as a late submission at the discretion of the Examining Authority
REP1-059 Savills UK on behalf of Anthony Meynell Deadline 1 (D1) Submission - Index of documents submitted - Accepted as a late submission at the discretion of the Examining Authority
REP1-060 Duplicate of REP1-045 – removed
REP1-061 Savills UK on behalf of Anthony Meynell Deadline 1 (D1) Submission - Written Representations ACM 03.11 Appendix 11 - Accepted as a late submission at the discretion of the Examining Authority
REP1-062 Norfolk County Council Norfolk County Council’s Further Written Representations - Accepted at the discretion of the Examination Authority
REP1-063 Norfolk Gardens Trust Deadline 1 Submission - Written Representation - Accepted at the discretion of the Examination Authority
REP1-064 Sally Watts Deadline 1 Submission - Written Representation - Accepted at the discretion of the Examining Authority
REP1-065 Bryan Robinson Deadline 1 Submission - Written Representation - Accepted at the discretion of the Examination Authority
Deadline 2 – 14 September 2021 Deadline for receipt by the ExA of: - Local Impact Reports (LIRs) - Responses to the ExA’s First Written Questions (ExQ1)
- Comments by IPs on the draft itinerary for the ASI and provision for IPs to suggest locations and justifications for ASI - Responses to comments on RRs - Comments on any additional information/submissions received by D1 - Comments on Applicant’s revised draft DCO (if any) - Any further information requested by the ExA under Rule 17 of the Examination Rules
REP2-001 Highways England Deadline 2 Submission - Cover Letter
REP2-002 Highways England Deadline 2 Submission - 9.1 Guide to the Application - Revision 2
REP2-003
Highways England Deadline 2 Submission - 9.1 Guide to the Application (Tracked Changes) - Revision 2
REP2-004
Highways England Deadline 2 Submission - 3.1 Draft Development Consent Order (Revision 1) Validation Report
REP2-005
Highways England Deadline 2 Submission - 3.1 Draft Development Consent Order - Revision 2
REP2-006
Highways England Deadline 2 Submission - 3.1 Draft Development Consent Order - Revision 2 (TRACKED CHANGES)
REP2-007
Highways England Deadline 2 Submission - 3.1 Draft Development Consent Order (Revision 2) Validation Report - late submission accepted at the discretion of the ExA
Breckland Council Deadline 2 Submission - Responses to the ExA’s First Written Questions (ExQ1)
REP2-017 Breckland Council Deadline 2 Submission - Local Impact Report
REP2-018
Broadland District Council Deadline 2 Submission - Responses to the ExA’s First Written Questions (ExQ1)
REP2-019 Environment Agency Deadline 2 Submission - Responses to comments on RRs
REP2-020
Environment Agency Deadline 2 Submission - Responses to the ExA’s First Written Questions (ExQ1)
REP2-021
Historic England Deadline 2 Submission - Responses to the ExA’s First Written Questions (ExQ1)
REP2-022 Norfolk County Council Deadline 2 Submission - Local Impact Report
REP2-023
South Norfolk Council Deadline 2 Submission - Responses to the ExA’s First Written Questions (ExQ1)
REP2-024
A C Meynell Deadline 2 Submission - suggested locations and justifications for ASI
REP2-025 A C Meynell Deadline 2 Submission - Notification of wish to attend the ASI
REP2-026 A C Meynell Deadline 2 Submission - Responses to comments on RRs
REP2-027
Bryan Robinson Deadline 2 Submission - Responses to the ExA’s First Written Questions (ExQ1)
REP2-028 Richard Hawker Deadline 2 Submission - Responses to comments on RRs
REP2-029
Richard Hawker Deadline 2 Submission - Comments by IPs on the draft itinerary for the ASI and provision for IPs to suggest locations and justifications for ASI
REP2-030
Weston Longville Parish Council Deadline 2 Submission - Comments on the draft itinerary for the ASI
REP2-031 Weston Longville Parish Council Deadline 2 Submission - Responses to comments on RRs
REP2-032
Weston Longville Parish Council Deadline 2 Submission - Responses to the ExA’s First Written Questions (ExQ1)
REP2-033 Weston Longville Parish Council Deadline 2 Submission - Comment on Deadline 1 Submissions
REP2-034
Anthony Clarke on behalf of Norwich Cycling Campaign Deadline 2 Submission - Highways England Licence - Late non-IP submission accepted at the discretion of the Examining Authority
Anthony Clarke on behalf of Norwich Cycling Campaign Deadline 2 Submission - Gear Change (Department for Transport Document) - Late non-IP submission accepted at the discretion of the Examining Authority
REP2-036
Anthony Clarke on behalf of Norwich Cycling Campaign Deadline 2 Submission - Review of Highways England’s engagement approach with local and regional partners June 2020 - Late non-IP submission accepted at the discretion of the Examining Authority
REP2-037
Anthony Clarke on behalf of Norwich Cycling Campaign Deadline 2 Submission - Proposed 2031 Cycling and walking infrastructure plan - Late non-IP submission accepted at the discretion of the Examining Authority
REP2-038
Anthony Clarke on behalf of Norwich Cycling Campaign Deadline 2 Submission - non-IP submission accepted at the discretion of the Examining Authority
REP2-039
Anthony Clarke on behalf of Norwich Cycling Campaign Deadline 2 Submission - Cycle Infrastructure Design - Late non-IP submission accepted at the discretion of the Examining Authority
REP2-040
Norfolk County Council Deadline 2 Submission - Responses to the ExA’s First Written Questions (ExQ1) Part 1 - Late submission accepted at the discretion of the Examining Authority
REP2-041
Broadland District Council and South Norfolk Council Deadline 2 Submission - Responses to the ExA’s First Written Questions (ExQ1) - Late submission accepted at the discretion of the Examining Authority
REP2-042
Norfolk County Council Deadline 2 Submission - Responses to the ExA’s First Written Questions (ExQ1) Part 2 - Late submission accepted at the discretion of the Examining Authority
Deadline 3 – 5 October 2021
Deadline for receipt by ExA of: - Comments on responses submitted for Deadline 2 - Comments on LIR(s) - Comments on WRs - An updated Guide to the Application - An updated Compulsory Acquisition Schedule in clean and tracked versions - Progressed Statement of Common Ground - Progressed Statement of Commonality for SoCG - Any further information requested by the ExA under Rule 17 of the Examination Rules - Responses to any further information requested by the ExA under Rule 17 of the Examination Rules (if required)
REP3-001 Highways England Deadline 3 (D3) Submission - Cover Letter
Highways England Deadline 3 (D3) Submission - 9.5 Accompanied Site Inspection (ASI) Itinerary (Clean) Rev 1
REP3-022
Highways England Deadline 3 (D3) Submission - 9.8 Applicant's Response to the Written Representations
REP3-023
Highways England Deadline 3 (D3) Submission - 9.9 Applicant’s Comments on Responses to the ExA's First Written Questions (ExQ1)
REP3-024
Highways England Deadline 3 (D3) Submission - 9.10 Applicant's Comments on Local Impact Reports
REP3-025
Highways England Deadline 3 (D3) Submission - 9.11 Applicant’s Comments on Other Third Party Comments
REP3-026
Highways England Deadline 3 (D3) Submission - 9.12 Additional Information for the Lead Local Flood Authority and the Environment Agency
REP3-027
Highways England Deadline 3 (D3) Submission - 9.13 Outline Water Management and Monitoring Plan
REP3-028
Brown & Co on behalf of A L Alston & Sons Ltd Deadline 3 (D3) Submission - Comments on any additional information/submissions received by Deadline 2
REP3-029
Brown & Co on behalf of Alston Farms Ltd Deadline 3 (D3) Submission - Written Representations in response to Applicant’s responses to Relevant Representations
REP3-030 Brown & Co on behalf of Honingham Aktieselskab Deadline 3 (D3) Submission - Sections Sheet 1 of 3
REP3-031 Brown & Co on behalf of Honingham Aktieselskab Deadline 3 (D3) Submission - Sections Sheet 2 of 3
REP3-032 Brown & Co on behalf of Honingham Aktieselskab Deadline 3 (D3) Submission - Sections Sheet 3 of 3
REP3-033 Brown & Co on behalf of Honingham Aktieselskab Deadline 3 (D3) Submission - Section Locations
REP3-034 Brown & Co on behalf of Honingham Aktieselskab Deadline 3 (D3) Submission - Section Locations with pdf underlay
REP3-035
Brown & Co on behalf of Honingham Aktieselskab Deadline 3 (D3) Submission - Aerial image of access to estate property at Lower Easton
REP3-036
Brown & Co on behalf of Honingham Aktieselskab Deadline 3 (D3) Submission - Comments in response to the Applicant’s response to Relevant Representations
REP3-037
Brown & Co on behalf of Honingham Aktieselskab Deadline 3 (D3) Submission - Request to participate in Hearings and to attend or part attend the Accompanied Site Inspection
REP3-038
Brown & Co on behalf of Mr Neil Alston Deadline 3 (D3) Submission - Written representations in response to Applicant’s responses to Relevant Representations
Anglian Water Deadline 3 Submission - Comments on responses to the ExAs First Written Questions
REP3-040
National Grid Gas plc Deadline 3 Submission - Comments on documents submitted at Deadline 2
REP3-041
James Alston on behalf of Food Enterprise Park Ltd & Honingham Thorpe Farms and Business park Deadline 3 (D3) Submission - Comments on responses to the ExAs First Written Questions
REP3-042
Orsted Hornsea Project Three (UK) Limited Deadline 3 (D3) Submission - Comments on Statement of Common Ground
REP3-043
A C Meynell Deadline 3 (D3) Submission - Comments on Applicant’s replies to ExA’s First Written Questions: Annex 4 - Late submission accepted at the discretion of the Examining Authority
REP3-044
A C Meynell Deadline 3 (D3) Submission - Comments on Applicant’s replies to ExA’s First Written Questions - Late submission accepted at the discretion of the Examining Authority
REP3-045
A C Meynell Deadline 3 (D3) Submission - Presentation of alternative options to the Applicant‘s proposed design - Late submission accepted at the discretion of the Examining Authority
REP3-046
Anthony Clarke on behalf of Norwich Cycling Campaign Deadline 3 (D3) Submission - Comments on the Broadland District Council and South Norfolk Council Response to Examining Authority’s Written Questions (ExQ1) - non-IP submission accepted at the discretion of the Examining Authority
REP3-047
Childhood First Deadline 3 (D3) Submission – Late submission accepted at the discretion of the Examining Authority
REP3-048
Highways England Deadline 3 Submission - 3.1 Draft Development Consent Order (Revision 3) Validation Report - late submission accepted at the discretion of the ExA
Deadline 4 – 12 November 2021 Deadline for receipt by the ExA of: - Written summaries of oral submissions made at hearings w/c 1 November 2021 - Any revised/updated SoCG - Responses to the ExA’s Further Written Questions (if issued) - Comments on any additional information/submissions received by D3 - Comments on Applicant’s revised draft DCO (if any) - Any further information requested by the ExA under Rule 17 of the Examination Rules
REP4-001 Highways England Deadline 4 Submission - Cover Letter
REP4-013 Highways England Deadline 4 Submission - 9.18 Applicant’s Written Summary of Oral Submissions at CAH1 and CAH2
REP4-014 Highways England Deadline 4 Submission - 9.19 Applicant's Written Summary of Oral Submissions at ISH1
REP4-015 Highways England (PDF, 1 MB) Deadline 4 Submission - 9.20 Applicant's Written Summary of Oral Submissions at ISH2
REP4-016 Highways England Deadline 4 Submission - 9.21 Applicant's Response to Examining Authority's Action List from ISH1, ISH2, CAH1 and CAH2
REP4-017
Environment Agency Deadline 4 Submission - Comments on Document 9.12 additional information for the lead local flood authority and the environment agency
REP4-020 Norfolk County Council Deadline 4 Submission - Written summaries of oral submissions made at hearings w/c 1 November 2021
REP4-021 Orsted Hornsea Project Three UK Deadline 4 Submission - Comments on Applicant’s revised draft DCO
REP4-022 A C Meynell Deadline 4 Submission - Written summary of oral submissions made at Compulsory Acquisition Hearing 1
REP4-023 A C Meynell Deadline 4 Submission - Written summary of oral submissions made at Issue Specific Hearing 2
REP4-024 A C Meynell Deadline 4 Submission - Written summary of oral submissions made at Compulsory Acquisition Hearing 2
REP4-025 A C Meynell Deadline 4 Submission - Comments on behalf of A.C. Meynell on the Applicant’s response to his Written Representations
REP4-026
Brown & Co on behalf of Alston Farms Ltd (James Alston and Honingham Thorpe Farms) Deadline 4 Submission - Written summaries of oral submissions made at hearings w/c 1 November 2021
REP4-027 Brown & Co on behalf of Food Enterprise Park Deadline 4 Submission - Written summaries of oral submissions made at Hearing
REP4-028 Brown & Co on behalf of Honingham Aktieselskab Deadline 4 Submission - Written summaries of oral submissions made at Hearings w/c 1 November 2021
REP4-029 Brown & Co on behalf of Mr Neil Alston Deadline 4 Submission - Written summaries of oral submissions made at hearings w/c 1 November 2021
REP4-030 Brown & Co on behalf of N. Alston and A. L Alston & Sons Ltd. Deadline 4 Submission - Written summaries of oral submissions made at hearings w/c 1 November 2021
REP4-031 Benefice of Honingham, Diocese of Norwich Deadline 4 Submission
REP4-032 Bryan Robinson Deadline 4 Submission - Other: Further comments on EXQ1 and ISH2
REP4-033 D G M Kenney Deadline 4 Submission - Comments on any additional information/submissions received by D3
REP4-034 D G M Kenney Deadline 4 Submission - Response 1 to Issue Specific Hearing 2
REP4-035 D G M Kenney Deadline 4 Submission - Response 2 to Issue Specific Hearing 2
REP4-036 David Hooker Deadline 4 Submission - part 1
REP4-037 David Hooker Deadline 4 Submission - part 2
REP4-038 Honingham Parish Council Deadline 4 Submission - Written summaries of oral submissions made at Issue Specific Hearing 2
REP4-039 Robert Wright (PDF, 100 KB) Deadline 4 Submission
REP4-040 Andrew M Cawdron on behalf of Wensum Valley Alliance Deadline 4 Submission
REP4-041 Weston Longville Parish Council Deadline 4 Submission - Written Summary of oral submission made at the Issue Specific Hearing 2
REP4-042 Andrew M Cawdron Deadline 4 Submission - Written summaries of oral submissions made at hearings w/c 1 November 2021 - Non-IP submission accepted at the discretion of the Examining Authority
REP4-043 Christopher Cockcroft Deadline 4 Submission - Non-IP submission accepted at the discretion of the Examining Authority
REP4-044 Highways England Deadline 4 Submission - Joint submission between the Applicant and Mr Meynell - Late submission accepted at the discretion of the Examining Authority
REP4-045 Mike Jones on behalf of Norfolk Wildlife Trust Deadline 4 Submission - Non-IP submission accepted at the discretion of the Examining Authority
Deadline 5 – 23 November 2021 Deadline for receipt by the ExA of: - Comments on any revised/updated SoCG (if any) - Applicant’s revised draft DCO (if required) - Comments on responses to ExA’s further written questions (if issued) - Comments on any additional information/submissions received by D4 - Any further information requested by the ExA under Rule 17 of the Examination Rules
REP5-001 Highways England Deadline 5 Submission - Cover Letter
REP5-002 Highways England Deadline 5 Submission - 2.3 Land Plans - Rev 2
REP5-003 Highways England Deadline 5 Submission - 2.7 Engineering Drawings and Sections - Rev 1
REP5-016 Highways England Deadline 5 Submission - 9.22 Applicant's Responses to Deadline 4 Comments
REP5-017 Richard Hawker Deadline 5 Submission
REP5-018
Weston Longville Parish Council Deadline 5 Submission - Comments on Issue Specific Hearing 2 Action Points - Late submission accepted at the discretion of the Examining Authority
Other Documents
OD-001 Highways England Section 56 Notice OD-002 Highways England