GENERAL NOTES ALL LEVELS RELATIVE TO 'AUSTRALIAN HEIGHT DATUM' DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED AND VERIFIED BY THE CONTRACTOR BEFORE PROCEEDING WITH THE WORK fjmt studio architecture interiors landscape urban community sydney melbourne uk Level 5, 70 King Street t +61 2 9251 7077 w fjmtstudio.com legend C FRANCIS-JONES MOREHEN THORP PTY LTD 2020 ABN 28 101 197 219 NOMINATED ARCHITECT: RICHARD FRANCIS-JONES (REG NO 5301) project code sheet no. revision scale first issued title project 85 Harrington Street & 68-72 Gloucester Street Lot 1 in DP 777033 The Rocks NSW 2000 Plans Level Basement 1 GA85H 29/03/2018 As Noted @ A2 S A2 DA-2011 rev date name by chk A8 A1 03/04/2018 S4.55(1A) Coordination Package DN AH INDICATES CHANGES FORMING THIS APPLICATION A2 04/04/2018 S4.55(1A) Coordination Package DN AH A3 04/04/2018 S4.55(1A) Submission DN AH A4 11/05/2018 S4.55(1A) Submission AH DN INDICATES BUILDING OUTLINE "AS APPROVED" U 05/11/2018 S4.55 Submission Draft DN SH A5 20/11/2018 S4.55 Submission DN SH A6 13/12/2018 S4.55 Revised Submission DN SH A7 25/02/2020 S4.55 Revised Submission DS SH A8 02/04/2020 S4.55 Revised Submission SH SH 1 BED 2 BED 2 BATH 3 BED COMMERCIAL Terracotta Cladding 1 TC1 Terracotta Cladding 2 TC2 Operable Terracotta Baguette Screen SC2 Paving 1 PAV1 Aluminium Panel ALP Sandstone Cladding ST1 RETAIL LOBBY TOWNHOUSE LIVE/ WORK Glazed Balustrade 2 BAL2 Glazed Balustrade 1 BAL1 High Level Louvre (Retail) LV1 Aluminium Framed Retail Glazing GL1 Precast Concrete 1 PC1 Aluminium Framed Performance Glazing GL2 Adaptable Apartment Cross Ventilated Apartment Solar Compliant Apartment Solar Compliant Balcony Livable Apartment (Silver Level) Terracotta Cladding 3 TC3 Palisade Balustrade BAL3 Terracotta Cladding 4 TC4 Cross Ventilated Apartment Rendered Finish 1 RF1 Operable Bronze Screen SC1 Operable Exterior Venetian Blinds SC3 UP 1 2 3 4 5 STOP SIGN GARBAGE CHUTE ABOVE 9 8 10 12 11 15 14 13 16 17 18 20 19 22 23 24 25 26 2 3 4 5 6 7 1 GARBAGE CHUTE ABOVE 21 BLOCK 1 ENTRY BASEMENT 1 UNSURE OF SOIL CONDITIONS UNSURE OF SOIL CONDITIONS 1:5 RAMP (20% GRADIENT) 1:8 (12.5% GRADIENT) 1:8 (12.5% GRADIENT) LOADING BAY (1) (6) 26 Car parking Spaces GRD 4 1:20 RAMP (5% GRADIENT) FACE OF BAKERS TERRACE ABOVE FACE OF BAKERS TERRACE ABOVE SITE BOUNDARY SITE BOUNDARY SITE BOUNDARY SETOUT POINT BLOCK 1 SITE BOUNDARY SETOUT POINT BLOCK 2 SITE BOUNDARY SITE BOUNDARY SITE BOUNDARY DP DP DP DP DP DP DP DP DP DP DP DP DP DP DP DP DP DP DP LINE OF EXISTING EXCAVATION LINE OF EXISTING EXCAVATION LINE OF EXISTING EXCAVATION HB1.FS2B FS-2 SSL 13.400 RS-1 CPE E6 COMMS CB1.05 COMMS SSL 13.050 C/E F6 CB1.07 GARBAGE 2 24 m2 SSL 13.050 HB1.06 WATER PUMP & GAS REGULATOR SSL 13.400 RS-3 CB1.06 SWITCHROOM SSL 13.050 H8a HB1.05 COMMERCIAL METERING HB1.04 GARBAGE 1 19 m2 RS-2 CP SUPPLY CB1.02 LIFT LOBBY FFL 13.050 HB1.02 LIFT LOBBY FFL 13.400 HB1.03 LIFT LOBBY FFL 13.400 CB1.04 GREASE ARRESTOR 1 SSL 13.050 CB1.08 CORRIDOR CB1.FS3B FS-3 FFL 13.050 RS 69 7 m2 Volume 14.8 m3 RS 68 10 m2 Volume 20.3 m3 RS 66 3 m2 Volume 6.5 m3 RS 67 3 m2 Volume 6.2 m3 RS 63 2 m2 Volume 5.1 m3 RS 35 Area 7 m2 Volume 14.9 m3 RS 37 Area 3 m2 Volume 6.5 m3 RS 47 Area 5 m2 Volume 9.6 m3 RS 49 Area 4 m2 Volume 7.7 m3 RS 40 Area 2 m2 Volume 4.5 m3 RS 36 Area 3 m2 Volume 5.8 m3 RS 55 Area 2 m2 Volume 4.2 m3 RS 44 Area 2 m2 Volume 4.5 m3 RS 73 Area 10 m2 Volume 20.3 m3 RS 48 Area 4 m2 Volume 8.9 m3 RS 70 7 m2 Volume 15.6 m3 RS 41 Area 2 m2 Volume 4.5 m3 RS 43 Area 2 m2 Volume 4.5 m3 RS 45 Area 2 m2 Volume 4.5 m3 RS 62 2 m2 Volume 5.1 m3 RS 59 7 m2 Volume 14.2 m3 RS 58 3 m2 Volume 7.3 m3 DRAIN 6 7 8 9 10 11 12 13 14 15 6 7 8 9 10 11 12 13 14 UP 1 2 3 4 5 CONVEX MIRROR CONVEX MIRROR CONVEX MIRROR BOLLARD BOLLARD BOLLARD BOLLARD BOLLARD ASSUMED ROCK CARPARK RAMP CARPARK RAMP ZONE FOR MAINTENANCE ZONE FOR MAINTENANCE (4) L1 L2 L3 L4 1:5 RAMP (20% GRADIENT) (4) ZONE FOR MAINTENANCE ZONE FOR MAINTENANCE (4) ZONE FOR MAINTENANCE (2) SECTION OF RAMP 200 THICK RS 72 Area 13 m2 Volume 27.5 m3 RS 71 Area 11 m2 Volume 23.9 m3 RS 57 Area 4 m2 Volume 7.6 m3 RS 46 Area 2 m2 Volume 4.6 m3 RS 53 Area 2 m2 Volume 4.8 m3 RS 52 Area 3 m2 Volume 6.3 m3 RS 56 Area 3 m2 Volume 6.4 m3 RS 54 Area 2 m2 Volume 4.3 m3 HB1.07 MAINTENANCE SSL 13.400 H10 H15 GAR-1 RS-1A DRY FIRE H10 DRY FIRE RS 61 2 m2 Volume 5.1 m3 RS 33 Area 12 m2 Volume 25.2 m3 RS 34 Area 5 m2 Volume 10.5 m3 RS 39 Area 2 m2 Volume 4.2 m3 RS 50 Area 2 m2 Volume 5.1 m3 RS 32 Area 3 m2 Volume 7.1 m3 RS 64 4 m2 Volume 8.6 m3 RS 38 Area 4 m2 Volume 8.1 m3 RS 65 5 m2 Volume 11.5 m3 RS 42 Area 2 m2 Volume 4.5 m3 RS 51 Area 1 m2 Volume 3.0 m3 RS 60 2 m2 Volume 5.1 m3 AMENDED CAR PARKING DISTRIBUTION REDISTRIBUTION OF ACCESSIBLE CAR SPACES GENERAL REDISTRIBUTION OF BASEMENT STORAGE TO IMPROVE ACCESS & EFFICIENCY B1 TOTAL CAR PARKING SPACES 32 INCLUDING 27 RESIDENTIAL SPACES 4 ACCESSIBLE SPACES 1 LOADING BAY 27 BICYCLE SPACES (IN RESIDENTIAL STORAGE CAGES) 35 BICYCLE SPACES FOR RETAIL/COMMERCIAL 30 BICYCLE SPACES FOR VISITORS OTHER B1 TOTAL CAR PARKING SPACES 26 INCLUDING 24 RESIDENTIAL SPACES 2 ACCESSIBLE RESIDENTIAL SPACES PLUS 1 LOADING BAY 34 BICYCLE SPACES (IN INDIVIDUAL RESIDENTIAL STORAGE CAGES) OTHER AMENDED CAR PARKING RATES APPROVED CAR PARKING RATES