Sheridan Institute of Technology and Advanced Learning B227 INSTRUMENTATION LAB Davis Campus 7899 McLauglin Rd. Brampton, ON (905) 459-7533 SHERIDAN COLLEGE PROJECT MANAGER CHAD MANSELL, FACILITIES PROJECTS (905) 845-9430 x2232 SHERIDAN COLLEGE PROJECT COORDINATORS - DAVIS BETH WEYMOUTH/ ALEX SZYMAKOWSKA, FACILITIES PROJECTS (905) 459-7533 x5133 SHERIDAN COLLEGE PROJECT COORDINATORS - TRAFALGAR NATHAN CASE, FACILITIES PROJECTS (905) 945-9430 x2269 DRAWING LIST A1 - SITE PLAN & KEY PLAN A2 - O.B.C DATA MATRIX & CONSTRUCTION NOTES A3 - EXISTING FLOOR PLAN A4 - PROPOSED FLOOR PLAN A5 - ELEVATIONS A6 - CENTER COUNTER MILLWORK ELEVATIONS A7 - HALLWAY ELEVATIONS A8 - MILLWORK DETAILS A9 - WINDOW SECTION/DETAILS A10 - SCHEDULES SK-S1 - GENERAL NOTE SK-S2 - KEY LAYOUT PLAN SK-S3 - NEW OPENING ELEVATION SK-S4 - SECTION 1-1 M1 - LEGEND & SCHEDULES M2 - DEMO PLAN M3 - HVAC PLAN (NEW) M4 - ROOF HVAC PLAN (NEW) M5 - HEATING PIPING PLAN M6 - GASES, PLUMBING & DRAINAGE PLAN M7 - SPRINKLER PLAN M8 - DETAILS (1) M9 - DETAILS (2) M10 - DETAILS (3) M11 - DETAILS (4) M12 - DETAILS (5) Tel (905) 607-8284 Fax (905) 607-8290 MISSISSAUGA, ONTARIO L5L 4M1 HOSSACK & ASSOCIATES 5-2155 DUNWIN DRIVE GENERAL NOTES 1. ALL CONTRACTORS MUST MAKE AN ON SITE INSPECTION WITH SHERIDAN COLLEGE'S PROJECT COORDINATOR PRIOR TO SUBMITTING ANY TENDERS. NO EXTRAS WILL BE ALLOWED AFTER THE LETTING OF THE CONTRACT FOR ANY EVENTUALITIES WHICH MAY HAVE BEEN FORESEEN BY SUCH PRIOR INSPECTION. 2. THE WORK SITE IS LOCATED AT THE DAVIS CAMPUS IN BRAMPTON. 3. THE CONTRACTOR IS TO VERIFY ALL DIMENSIONS ON SITE AND REPORT ANY DISCREPANCIES TO SHERIDAN P.C. PRIOR TO TENDER CLOSING. WRITTEN DIMENSIONS ARE TO TAKE PRECEDENCE OVER SCALED DIMENSIONS. 4. ALL CONTRACTORS AND SUBCONTRACTORS SHALL ADHERE TO LATEST EDITION OF THE PLUMBING CODE, ONTARIO ELECTRICAL SAFETY CODE, ONTARIO BUILDING CODE AND MUNICIPAL REGULATIONS. 5. PERSONAL PROTECTIVE EQUIPMENT MUST BE WORN BY WORKERS AT ALL TIMES (IE. SAFETY FOOTWEAR, HATS, GLASSES, ETC.) WHERE APPLICABLE. FAILURE TO DO SO MAY RESULT IN SUSPENSION OR CONTRACT TERMINATION. 6. SHERIDAN COLLEGE BUILDING AND PROPERTIES CONTAIN HAZARDOUS ELECTRICAL LINES & EQUIPMENT. SHERIDAN COLLEGE MUST BE INFORMED AHEAD OF TIME OF ANY SITE VISITS, INSPECTIONS OR WORK BY CONTRACTORS AT ALL TIMES IN OR AROUND COLLEGE. PRIOR TO CONSTRUCTION, UNDER NO CIRCUMSTANCES SHALL A CONTRACTOR, THEIR REPRESENTATIVES OR WORKERS ENTER COLLEGE PROPERTY WITHOUT SIGNING IN WITH SECURITY. THESE RESTRICTIONS APPLY TO ALL SUBCONTRACTORS EMPLOYED BY THE GENERAL CONTRACTOR. PLEASE CONTACT SHERIDAN COLLEGE'S PROJECT COORDINATOR TO MAKE ARRANGEMENTS. 7. UPON AWARD OF CONTRACT, CONTRACTOR TO PROVIDE DETAILED CONSTRUCTION SCHEDULE. 8. SUBMIT ALL SHOP DWGS + SPECIFICATIONS TO SHERIDAN P.C. FOR REVIEW AND APPROVAL 9. SHERIDAN TO BE NOTIFIED OF ALL NOISY ACTIVITIES WHICH MAY DISTURB SURROUNDING; STUDENTS, FACULTY + STAFF. COORDINATE W/ SHERIDAN. 10. WORK SHALL BE EXECUTED BY EXPERIENCED WORKERS WITH RESPECT TO THE DUTIES FOR WHICH THEY ARE EMPLOYED. 11. KEEP PREMISES FREE FROM ACCUMULATION OF WASTE MATERIALS & RUBBISH. UPON COMPLETION OF WORK, CLEAN AND REMOVE FROM WORK SITE ALL DEBRIS, SURPLUS MATERIAL, TOOLS & EQUIPMENT OF THE TRADES. LEAVE THE BUILDING AND THE SITE IN A NEAT AND TIDY CONDITION TO THE SATISFACTION OF THE PROJECT COORDINATOR. 12. ANY FINISHES THAT MAY BE DAMAGED DURING THE COURSE OF THIS WORK TO BE MADE GOOD AS PER EXISTING AND THE SATISFACTION OF SHERIDAN COLLEGE'S PROJECT COORDINATOR. 13. REFER TO THE TECHNICAL REQUIREMENTS ON DRAWINGS. E01 - ELECTRICAL LEGEND & DETAILS E02 - ELECTRICAL DEMOLITION E03 - ELECTRICAL LIGHTING LAYOUT E04 - ELECTRICAL POWER LAYOUT E05 - ELECTRICAL DETAILS E06 - ELECTRICAL SCHEDULES E07 - ELECTRICAL SPECIFICATIONS E08 - ELECTRICAL SPECIFICATIONS E09 - ELECTRICAL SPECIFICATIONS
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Sheridan
Institute of Technology
and Advanced Learning
B227 INSTRUMENTATION LAB
Davis Campus
7899 McLauglin Rd.
Brampton, ON
(905) 459-7533
SHERIDAN COLLEGE PROJECT MANAGER
CHAD MANSELL, FACILITIES PROJECTS
(905) 845-9430 x2232
SHERIDAN COLLEGE PROJECT COORDINATORS - DAVIS
BETH WEYMOUTH/ ALEX SZYMAKOWSKA, FACILITIES PROJECTS
(905) 459-7533 x5133
SHERIDAN COLLEGE PROJECT COORDINATORS - TRAFALGAR
NATHAN CASE, FACILITIES PROJECTS
(905) 945-9430 x2269
DRAWING LIST
A1 - SITE PLAN & KEY PLAN
A2 - O.B.C DATA MATRIX & CONSTRUCTION NOTES
A3 - EXISTING FLOOR PLAN
A4 - PROPOSED FLOOR PLAN
A5 - ELEVATIONS
A6 - CENTER COUNTER MILLWORK ELEVATIONS
A7 - HALLWAY ELEVATIONS
A8 - MILLWORK DETAILS
A9 - WINDOW SECTION/DETAILS
A10 - SCHEDULES
SK-S1 - GENERAL NOTE
SK-S2 - KEY LAYOUT PLAN
SK-S3 - NEW OPENING ELEVATION
SK-S4 - SECTION 1-1
M1 - LEGEND & SCHEDULES
M2 - DEMO PLAN
M3 - HVAC PLAN (NEW)
M4 - ROOF HVAC PLAN (NEW)
M5 - HEATING PIPING PLAN
M6 - GASES, PLUMBING & DRAINAGE PLAN
M7 - SPRINKLER PLAN
M8 - DETAILS (1)
M9 - DETAILS (2)
M10 - DETAILS (3)
M11 - DETAILS (4)
M12 - DETAILS (5)
Tel (905) 607-8284 Fax (905) 607-8290
MISSISSAUGA, ONTARIO L5L 4M1
HOSSACK
& ASSOCIATES
5-2155 DUNWIN DRIVE
GENERAL NOTES
1. ALL CONTRACTORS MUST MAKE AN ON SITE INSPECTION WITH SHERIDAN COLLEGE'S PROJECT COORDINATOR PRIOR TO
SUBMITTING ANY TENDERS. NO EXTRAS WILL BE ALLOWED AFTER THE LETTING OF THE CONTRACT FOR ANY EVENTUALITIES
WHICH MAY HAVE BEEN FORESEEN BY SUCH PRIOR INSPECTION.
2. THE WORK SITE IS LOCATED AT THE DAVIS CAMPUS IN BRAMPTON.
3. THE CONTRACTOR IS TO VERIFY ALL DIMENSIONS ON SITE AND REPORT ANY DISCREPANCIES TO SHERIDAN P.C. PRIOR TO
TENDER CLOSING. WRITTEN DIMENSIONS ARE TO TAKE PRECEDENCE OVER SCALED DIMENSIONS.
4. ALL CONTRACTORS AND SUBCONTRACTORS SHALL ADHERE TO LATEST EDITION OF THE PLUMBING CODE, ONTARIO ELECTRICAL
SAFETY CODE, ONTARIO BUILDING CODE AND MUNICIPAL REGULATIONS.
5. PERSONAL PROTECTIVE EQUIPMENT MUST BE WORN BY WORKERS AT ALL TIMES (IE. SAFETY FOOTWEAR, HATS, GLASSES, ETC.)
WHERE APPLICABLE. FAILURE TO DO SO MAY RESULT IN SUSPENSION OR CONTRACT TERMINATION.
6. SHERIDAN COLLEGE BUILDING AND PROPERTIES CONTAIN HAZARDOUS ELECTRICAL LINES & EQUIPMENT. SHERIDAN COLLEGE
MUST BE INFORMED AHEAD OF TIME OF ANY SITE VISITS, INSPECTIONS OR WORK BY CONTRACTORS AT ALL TIMES IN OR AROUND
COLLEGE. PRIOR TO CONSTRUCTION, UNDER NO CIRCUMSTANCES SHALL A CONTRACTOR, THEIR REPRESENTATIVES OR WORKERS
ENTER COLLEGE PROPERTY WITHOUT SIGNING IN WITH SECURITY. THESE RESTRICTIONS APPLY TO ALL SUBCONTRACTORS
EMPLOYED BY THE GENERAL CONTRACTOR. PLEASE CONTACT SHERIDAN COLLEGE'S PROJECT COORDINATOR TO MAKE
ARRANGEMENTS.
7. UPON AWARD OF CONTRACT, CONTRACTOR TO PROVIDE DETAILED CONSTRUCTION SCHEDULE.
8. SUBMIT ALL SHOP DWGS + SPECIFICATIONS TO SHERIDAN P.C. FOR REVIEW AND APPROVAL
9. SHERIDAN TO BE NOTIFIED OF ALL NOISY ACTIVITIES WHICH MAY DISTURB SURROUNDING; STUDENTS, FACULTY + STAFF.
COORDINATE W/ SHERIDAN.
10. WORK SHALL BE EXECUTED BY EXPERIENCED WORKERS WITH RESPECT TO THE DUTIES FOR WHICH THEY ARE EMPLOYED.
11. KEEP PREMISES FREE FROM ACCUMULATION OF WASTE MATERIALS & RUBBISH. UPON COMPLETION OF WORK, CLEAN AND
REMOVE FROM WORK SITE ALL DEBRIS, SURPLUS MATERIAL, TOOLS & EQUIPMENT OF THE TRADES. LEAVE THE BUILDING AND
THE SITE IN A NEAT AND TIDY CONDITION TO THE SATISFACTION OF THE PROJECT COORDINATOR.
12. ANY FINISHES THAT MAY BE DAMAGED DURING THE COURSE OF THIS WORK TO BE MADE GOOD AS PER EXISTING AND THE
SATISFACTION OF SHERIDAN COLLEGE'S PROJECT COORDINATOR.
13. REFER TO THE TECHNICAL REQUIREMENTS ON DRAWINGS.
E01 - ELECTRICAL LEGEND & DETAILS
E02 - ELECTRICAL DEMOLITION
E03 - ELECTRICAL LIGHTING LAYOUT
E04 - ELECTRICAL POWER LAYOUT
E05 - ELECTRICAL DETAILS
E06 - ELECTRICAL SCHEDULES
E07 - ELECTRICAL SPECIFICATIONS
E08 - ELECTRICAL SPECIFICATIONS
E09 - ELECTRICAL SPECIFICATIONS
ANNEX
BUILDING
BUILDINGMcLA
UG
HLIN
RO
AD
MA
INTEN
AN
CE
YA
RD
Sheridan
Institute of Technology and
Advanced Learning
SITE PLAN & KEY PLAN
AS NOTED
A1
-
NC/BWPSH
B227 INSTRUMENTATION LAB
B-WING
11/2012
Drawings are meant to be read, and not
scaled
Dimensions to be verified on site
Contractors must check and verify all
dimensions and report discrepancies to the
Project Coordinator before commencing with
work
All drawings remain the property of Sheridan
College and shall not be reproduced or
reused without written consent.
DAVIS CAMPUS SITE PLAN1
A1 N.T.S.
Davis Campus
7899 McLaughlin Rd.,
Brampton, Ontario L6Y 5H9
905-459-7533
B-WING SECOND FLOOR KEY PLAN2
A1 N.T.S.
FIRE ACCESS ROUTE3
A1
KEY SITE PLAN4
A1 N.T.S.
3
A1
N.T.S.
4
A1
443
CERTIFICATE OF PRACTICE #4292
Tel (905) 607-8284 Fax (905) 607-8290
MISSISSAUGA, ONTARIO L5L 4M1
HOSSACK
& ASSOCIATES
5-2155 DUNWIN DRIVE
MATRIX & CONSTR. NOTE
AS NOTED
A2
-
GENERAL NOTES / SPECIFICATIONS
1. MATERIALS, CONSTRUCTION & INSTALLATION METHODS SHALL COMPLY WITH
THE LATEST EDITION OF THE ONTARIO BUILDING CODE CONTAINING O. REG.
350/06, REGIONAL MUNICIPALITY PUBLIC WORKS DEPARTMENT AND THE
LOCAL BUILDING DEPARTMENT AND FIRE DEPARTMENT BY-LAWS DESIGN
CRITERIA, CONSTRUCTION STANDARDS AND SPECIFICATIONS. ALL WORK
SHALL ALSO COMPLY WITH OTHER CODES, STANDARDS AND REGULATIONS
REFERRED TO IN THE ABOVE DOCUMENTS AND ADOPTED BY THE AUTHORITIES
HAVING JURISDICTION.
2. IF DRAWINGS & SPECIFICATIONS CONFLICT WITH REGULATIONS & BY-LAWS,
CONTRACTOR(S) SHALL NOTIFY CONSULTANT IN WRITING FOR CLARIFICATION.
IN NO INSTANCE REDUCE STANDARDS OF DRAWINGS BY APPLYING ANY
CODES OR STANDARDS. ALL MATERIALS AND METHODS MUST AT LEAST
MATCH EXISTING BASE BUILDING STANDARDS - BUILDING OWNER /
OPERATOR TENANT MECHANICAL REQUIREMENTS FORM AN INTEGRAL PART OF
THESE SPECIFICATIONS.
3. DRAWINGS ONLY SHOW GENERAL INTENT AND SCOPE OF WORK AND NOT
EXACT DETAILS OF INSTALLATION. CONTRACTOR SHALL PROVIDE ALL
MATERIALS & ACCESSORIES NECESSARY FOR COMPLETE AND FULLY
OPERATIONAL MECHANICAL SYSTEMS SHOWN. BEFORE SUBMITTING PRICES,
CONTRACTORS SHALL REVIEW ALL PERTINENT DRAWINGS & ANY RELEVANT
ON-SITE CONDITIONS TO VERIFY THAT WORK CAN BE CARRIED OUT AS
SHOWN ON DRAWINGS. NO CLAIMS FOR EXTRA PAYMENTS WILL BE
CONSIDERED FOR FAILURE TO DO SO. CONTRACTOR(S) WILL ALSO MAKE
ALLOWANCES IN TENDERING FOR SPACE LIMITATIONS & THE SIMULTANEOUS
WORKING OF DIFFERENT TRADES. ANY DRAWING OF FLOOR SLABS MUST BE
CARRIED OUT AS PER BUILDING MANAGER'S STANDARDS, WITH X-RAY IF
REQUIRED.
4. THE CONSULTANT RESERVES THE RIGHT TO MAKE REASONABLE CHANGES
REQUIRED TO ACCOMMODATE CONDITIONS ARISING DURING THE PROGRESS OF
THE WORK, AT NO EXTRA COST TO THE OWNER.
NC/BW
B227 INSTRUMENTATION LAB
B-WING
11/2012
O.B.C. DATA MATRIX & DESIGN SUMMARY1
A2
Name of Owner: Sheridan College - Facilities Projects
7899 MCLAUGHLIN Rd., Brampton, ON L6Y 5H9
Name of Project: B227 INSTRUMENTATION LAB
Location: Sheridan College, Davis Campus, B - Wing
7899 McLaughlin Rd., Brampton, ON L6Y 5H9
ONTARIO BUILDING CODE DATA MATRIX - PART 11 - RENOVATION OF EXISTING BUILDING OBC Reference
11.1 Existing Building Describe Existing Use: Assembly A2 11.2.1
Classification: Construction Index: N/A T 11.2.1.1A
Hazard Index: N/A T 11.2.1.1B to N
Not Applicable (no change of major occupancy)
11.2 Alteration to Existing Basic Renovation 11.3.3.1
Building Is: Extensive Renovation 11.3.3.2
11.3 Reduction in 11.4.2
Performance Level
Structural: No Yes 11.4.2.1
By increase in occupant load: No Yes 11.4.2.2
By change of major occupancy: No Yes 11.4.2.3
Plumbing: No Yes 11.4.2.5
11.4 Compensating 11.4.3
Construction:
Structural: No Yes (explain) 11.4.3.2
Increase in occupant load: No Yes (explain) 11.4.3.3
Change of major occupancy: No Yes (explain) 11.4.3.4
Plumbing: No Yes (explain) 11.4.3.5
Sewage-system: No Yes (explain) 11.4.3.6
11.5 Compliance No 11.5.1
Alternatives Yes (give number(s))
Proposed:
A - BRIEF DESCRIPTION
A.1 - LOCATION: Located in B-Wing Building, Davis Campus, Sheridan College. Existing rooms B227 and B227a on level 2.
A.2 - PROPOSAL: Existing office space to be renovated to suite new location for instrumentation lab.
A.3 - ASSESSMENT:
a) The work will be regulated by Part 11 of the OBC.
b) New layout of partitions and doors will comply with Part 3 of the OBC.
c) Existing B-wing is an A2 occupancy. Existing spaces of B-wing are used as labs, classrooms, faculty and administration offices and cafeteria.
B - PART 11 DATA
a) The performance level of the building after material alterations is equal to the performance level prior to material alterations. There is no change
in major occupancy A2. The occupant load of the building is not increased. The live load is not increased.
b) The existing construction is non-combustible. New construction will be non combustible. Existing floor assemblies and supporting structure are
1hr Fire Rated.
c) Area of work is not sprinklered. There is a standpipe and hose system. There is a fire alarm system. There is a voice and communication system.
New construction will maintain and extend existing systems.
d) All wall & floor assemblies will maintain 1hr fire separations as required.
e) New construction consists of drywall and glass partitions, new lighting & electrical, new data infrastructure and modifications to existing HVAC
systems.
C - ADDITIONAL DATA SUMMARY
a) Gross floor area of the building is approximately 194,000 sq.ft.
b) No. of storey's is three (3).
c) Approximate area of new construction/renovation is 1262 sq.ft on the second floor level.
EXISTING 'B' WING BUILDING STATISTICS
3 STOREYS
BUILDING HEIGHT: 15m
EXISTING BUILDING NOT SPRINKLERED. RENOVATION AREA IS
SPRINKLERED TO BE AS PART OF RENOVATION.
EXISTING GROSS FLOOR AREA IS 194,000 SQ.FT
EXTENT OF AREA OF WORK:
SECOND FLOOR 1262 SQ.FT
TOTAL AREA OF WORK 1262 SQ.FT
BUILDING CLASSIFICATION - A2 OCCUPANCY
FACILITY DOES NOT SUIT ANY CURRENT OBC
CLASSIFICATIONS, CLOSEST IS 3.2.2.24
TO BE CLASSIFIED AS PART 11 - EXTENSIVE RENOVATION
-ALL EXISTING 1HR FIRE SEPARATIONS ARE BEING MAINTAINED.
REFER TO PART 11 DATA MATRIX.
TRAVEL DISTANCE (REFER TO A1)
3.4.2.5(1)(c) - 45m EXIT TRAVEL DISTANCE REQUIREMENTS HAVE
BEEN MAINTAINED
PERMITTED/ACTUAL CONSTRUCTION: NON-COMBUSTIBLE
OCCUPANT LOAD FOR B227: 15 PERSONS
5. CONTRACTORS SHALL MAINTAIN MARKED-UP PRINTS OF "AS-BUILT"
CONDITIONS AS THE JOB PROGRESSES AND, AT THE END OF CONSTRUCTION,
CONTRACTOR SHALL OBTAIN & PAY FOR ONE SET OF REPRODUCIBLE
DRAWINGS AND TRANSFER ALL "AS-BUILT" CONDITIONS TO THESE DRAWINGS.
THESE DOCUMENTS, SHOWING APPROXIMATE FINAL LOCATIONS & ELEVATIONS
OF ALL MECHANICAL SYSTEMS, ESPECIALLY ANY BURIED & CONCEALED
WORKS, SHALL BE PROVIDED TO THE CONSULTANT FOR REVIEW & RECORD.
6. CONTRACTORS SHALL PROVIDE SIX COPIES OF CLEARLY IDENTIFIED, PROJECT
SPECIFIC, SHOP DRAWINGS FOR ALL FIXTURES AND EQUIPMENT FOR
APPROVAL BEFORE ORDERING. EQUIPMENT, DEVICES & FIXTURES SHALL BE
SUPPLIED WITH ALL ACCESSORIES REQUIRED FOR A COMPLETE INSTALLATION.
CONTRACTOR WILL REVIEW SHOP DRAWINGS PRIOR TO SUBMISSION, THUS
INDICATING THAT HE HAS DETERMINED & VERIFIED THAT ALL MATERIALS,
CATALOG NUMBERS ETC., PERFORMANCES, SIZES AND AVAILABLE SPACE AND
FIELD CONDITIONS MEET THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.
ALL MATERIALS USED MUST BE NEW, CLEAN AND FREE OF DEFECTS.
7. AT THE END OF THE PROJECT, CONTRACTORS SHALL PROVIDE 4 OPERATING
AND MAINTENANCE INSTRUCTION MANUALS WITH WARRANTIES, CERTIFICATIONS,
REPORTS, OPERATING INSTRUCTIONS AND A COPY OF CONSULTANT REVIEWED
SHOP DRAWINGS.
8. CONTRACTORS SHALL ONLY MAINTAIN QUALIFIED PERSONNEL & SUPPORTING
STAFF, AT THE SITE, WHO ARE EXPERIENCED IN COMPARABLE PROJECTS. IF
THE BUILDING MANAGER REQUIRES WORK TO BE DONE AFTER HOURS, THIS
MUST BE ALLOWED FOR AND ARRANGEMENTS MADE BY THE CONTRACTOR
FOR ACCESS. CONTRACTORS SHALL BE RESPONSIBLE FOR MAINTAINING
GOOD ORDER AND DISCIPLINE AMONG THEIR EMPLOYEES, AND FOR REMOVING
DEBRIS AND MAINTAINING A CLEAN WORK AREA, DURING, AND UPON
COMPLETION OF THE PROJECT.
9. CONTRACTORS SHALL WARRANTY HIS WORK, PARTS AND LABOR, FOR A
PERIOD OF 1 YEAR FROM THE DATE OF ACCEPTANCE BY THE OWNER.
Sheridan
Institute of Technology and
Advanced Learning
PSH
Drawings are meant to be read, and not
scaled
Dimensions to be verified on site
Contractors must check and verify all
dimensions and report discrepancies to the
Project Coordinator before commencing with
work
All drawings remain the property of Sheridan
College and shall not be reproduced or
reused without written consent.
Davis Campus
7899 McLaughlin Rd.,
Brampton, Ontario L6Y 5H9
905-459-7533
443
CERTIFICATE OF PRACTICE #4292
Tel (905) 607-8284 Fax (905) 607-8290
MISSISSAUGA, ONTARIO L5L 4M1
HOSSACK
& ASSOCIATES
5-2155 DUNWIN DRIVE
HAZARDOUS SUBSTANCES
NOTE THAT THIS NEW CLASSROOM WILL BE USED AS A INSTRUMENTATION
LAB FOR TEACHING PURPOSES ONLY.
STORAGE OF THE CHEMICALS:
VOLUME OF CHEMICALS BEING STORED WILL BE SUFFICIENT FOR
EXPERIMENTS ONLY.
CHEMICALS BEING STORED WILL NOT BE DISPENSED FOR ANY OTHER
PURPOSES OR USE.
ALL CHEMICALS WILL BE KEPT IN THE APPROPRIATE STORAGE, REFER TO
MECHANICAL DRAWINGS.
REFER TO LETTER OF USE (SEPARATE DOCUMENT) FOR SPECIFIC MATERIAL