PLANT PRENTEC SEWER TREATMENT SLUDGE DRYING BEDS EVAPORATION PAN ACCESS ROAD TO SLUDGE DRYING BEDS PROPOSED NEW 75mm HDPE PUMPING LINE 2 1 3 3 NEW PUMP CHAMBER POSITION TURNING CIRCLE ES2 W3 E15 1 x 3c /35mm² XLPE 1 x 1c /70mm² BCEW NOTE 1 EH16 30m R=15m STOP ACCESS RAMP FARM ROAD L12 L13 L14 PROPOSED NEW HAUL ROAD (NOT CONSTRUCTED) 110mm dia HDPE Class 12 110mm dia HDPE Class 12 s 12 W-12A W-12B W-12C W-12D W-13 GV 5 END CAP 110Ø HDPe Sample Prep Weigh Bridge Offices Sample Prep Weigh Bridge Offices Weigh Bridge FToil FToil R=118m 15m WIDE ACCESS ROAD TO TEMPORARY FEEDERS R=20m W2 R=20m A A 15m ACCESS WIDE ROAD TO TEMPORARY FEEDERS x x x x x x x x x x x x x x x x x x x x x x CH80 CH100 CH120 CH140 CH160 CH180 CH200 CH220 CH240 CH260 CH280 CH300 CH320 CH340 CH360 CH380 CH440 CH460 CH480 CH500 CH520 CH540 CH560 CH580 CH600 CH620 CH640 6.6m WIDE ROAD 6.6m WIDE ROAD 6.6m WIDE ROAD 6.6m WIDE ROAD 6.6m WIDE ROAD 8m. WATER TANK MINE SITE OFFICE BATH ROOM 8m. WATER TANK MINE SITE OFFICE BATH ROOM P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 R2 = 20m R1 = 20m R3 = 20m P13 R4 = 11m WASTE AREA PIPELINE RESERVOIR AREA 5 NEW HAUL ROAD AREA 10 AREA 14 AREA 15 AREA 18 AREA 11 AREA 13 24-10-2008 1076.79 1076.14 1067.36 1067.48 24-09-2008 24-09-2008 1065.10 1066.36 1065.90 12-12-2008 12-12-2008 1076.83 24-11-2008 24-02-2009 1076.6 1076.53 1070.08 24-07-2009 1061.10 1057.22 1057.17 1081.38 1081.62 1082.15 1082.40 1081.86 1081.77 1081.88 1081.83 1081.57 1076.31 1076.41 1076.74 24-08-2009 24-08-2009 24-08-2009 1066.25 1070.62 1070.89 1070.11 1070.29 1056.9 1056.92 24-08-2009 1069.46 24-09-2009 1069.52 1069.90 107129 24-09-2009 1080.70 1080.36 1080.40 1076.78 1081.75 24-09-2009 24-07-2009 1063.60 27-10-2009 1079.95 1080.23 1077.09 1077.95 1072.33 1073.36 27-10-2009 1070.55 1071.44 1070.43 1070.57 1070.75 27-10-2009 27-10-2009 27-10-2009 1081.24 1081.49 1079.55 24-12-2009 24-12-2009 24-12-2009 1083.80 1079.83 1082.99 1079.32 1082.25 1082.34 1082.38 1078.45 1082.42 1082.62 1083.68 24-12-2009 1071.53 1076.76 24-12-2009 1077.40 24-12-2009 24-12-2009 1068.46 1066.69 1065.13 1067.89 24-01-2010 1069.03 24-02-2010 1074.03 24-03-2010 1061.85 1064.39 1074.61 1075.83 24-03-2010 1077.16 1076.51 1076.53 24-03-2010 24-03-2010 24-04-2010 24-04-2010 1077.3 1078.8 24-04-2010 24-12-2009 1077.71 25-05-2010 25-05-2010 25-05-2010 1071.36 1075.06 1073.27 1076.28 1067.52 Blasted 1066.52 1056.14 24-06-2010 24-06-2010 1073.50 1068.81 1084.68 1073.44 1060.02 1067.63 1056.02 1067.05 1071.10 1073.30 1082.65 24-10-2010 1057.90 1056.02 1070.33 1069.12 24-10-2010 24-11-2010 24-11-2010 1078.62 1078.51 1056.87 1055.11 1068.08 1064.05 1077.04 1077.02 1077.48 24-01-2011 24-01-2011 1054.47 1056.88 1066.45 1066.50 1073.10 24-01-2011 24-01-2011 1065.35 24-01-2011 24-02-2011 1073.55 1059.75 1058.72 24-02-2011 1059.84 1067.71 1064.32 1061.68 1060.88 1060.61 1052.87 24-03-2011 24-03-2011 1082.70 1082.25 1082.47 1082.66 24-03-2011 24-03-2011 1077.83 1077.06 24-03-2011 1063.71 1062.55 1060.35 1063.90 1078.58 1069.32 1073.55 24-04-2011 24-04-2011 1058.32 1057.56 1058.01 1059.75 1052.43 24-04-2011 1076.79 1076.98 1077.68 1079.03 24-05-2011 1072.05 1072.28 1072.37 1073.38 25-05-2011 25-05-2011 25-05-2011 top soil 1077.65 1077.86 1078.4 1078.74 1079.48 1079.88 1065.86 1062.96 24-07-2011 24-07-2011 1077.52 1076.83 1076.84 1078.00 24-08-2011 24-08-2011 1073.82 1075.51 1076.92 24-08-2011 1056.44 26-09-2011 26-09-2011 26-09-2011 26-09-2011 22-12-2011 22-12-2011 25-01-2012 25-01-2012 25-01-2012 25-01-2012 1080.07 1075.14 1080.77 1075.30 1081.75 1077.09 1069.57 1061.27 1057.32 1050.24 1050.15 1046.56 1059.83 1049.00 1054.88 1048.93 1060.37 1060.57 25/04/2012 1060.82 1046.52 1058.84 1048.26 1051.75 WATER 1080.16 1068.30 1079.94 1069.88 1067.39 1077.30 1068.01 1075.44 1051.66 24-08-2012 1076.31 1063.67 1077.25 1056.24 1057.46 1060.30 1049.21 1036.14 1046.77 1040.38 1044.75 24-08-2012 1066.38 1053.49 1050.17 1036.63 1049.75 1035.54 1055.66 1041.47 1052.70 4 1070.05 1069.76 1042.29 1073.03 1041.35 1050.11 1037.13 26-11-2012 1054.04 1045.57 18-12-2012 1074.78 1077.97 1076.93 1075.73 1071.21 1070.79 1078.45 1071.84 1080.02 1072.83 1080.56 1072.68 1043.50 1042.29 1045.62 1037.13 1072.91 1072.09 1072.74 1074.18 1081.42 24-10-2008 1076.79 1076.14 1067.36 1067.48 24-09-2008 24-09-2008 1065.10 1066.36 1065.90 12-12-2008 12-12-2008 1076.83 24-11-2008 24-02-2009 1076.6 1076.53 1070.08 24-07-2009 1061.10 1057.22 1057.17 1081.38 1081.62 1082.15 1082.40 1081.86 1081.77 1081.88 1081.83 1081.57 1076.31 1076.41 1076.74 24-08-2009 24-08-2009 24-08-2009 1066.25 1070.62 1070.89 1070.11 1070.29 1056.9 1056.92 24-08-2009 1069.46 24-09-2009 1069.52 1069.90 107129 24-09-2009 1080.70 1080.36 1080.40 1076.78 1081.75 24-09-2009 24-07-2009 1063.60 27-10-2009 1079.95 1080.23 1077.09 1077.95 1072.33 1073.36 27-10-2009 1070.55 1071.44 1070.43 1070.57 1070.75 27-10-2009 27-10-2009 27-10-2009 1081.24 1081.49 1079.55 24-12-2009 24-12-2009 24-12-2009 1083.80 1079.83 1082.99 1079.32 1082.25 1082.34 1082.38 1078.45 1082.42 1082.62 1083.68 24-12-2009 1071.53 1076.76 24-12-2009 1077.40 24-12-2009 24-12-2009 1068.46 1066.69 1065.13 1067.89 24-01-2010 1069.03 24-02-2010 1074.03 24-03-2010 1061.85 1064.39 1074.61 1075.83 24-03-2010 1077.16 1076.51 1076.53 24-03-2010 24-03-2010 24-04-2010 24-04-2010 1077.3 1078.8 1079.46 24-04-2010 24-12-2009 1077.71 25-05-2010 25-05-2010 25-05-2010 1071.36 1075.06 1073.27 1076.28 1067.52 Blasted 1066.52 1056.14 24-06-2010 24-06-2010 1073.50 1068.81 1084.68 1073.44 1060.02 1067.63 1056.02 1067.05 1071.10 1073.30 1082.65 1084.46 1083.63 24-10-2010 24-10-2010 1057.90 1056.02 1070.33 1069.12 24-10-2010 24-11-2010 1083.8 24-11-2010 1078.62 1078.51 1056.87 1055.11 1068.08 1064.05 1077.04 1077.02 1077.48 24-01-2011 24-01-2011 1054.47 1056.88 1066.45 1066.50 1073.10 24-01-2011 24-01-2011 1065.35 24-01-2011 24-02-2011 1073.55 1059.75 1058.72 24-02-2011 1059.84 1067.71 1064.32 1061.68 1060.88 1060.61 1052.87 24-03-2011 24-03-2011 1082.70 1082.25 1082.47 1082.66 24-03-2011 24-03-2011 1077.83 1077.06 24-03-2011 1063.71 1062.55 1060.35 1063.90 25-04-2011 1075.13 1075.55 1074.78 1074.77 1078.58 1082.77 1069.32 1073.55 24-04-2011 24-04-2011 1058.32 1057.56 1058.01 1059.75 1052.43 24-04-2011 1076.79 1076.98 1077.68 1079.03 1082.65 1075.65 1071.3 1070.30 24-05-2011 1072.05 1072.28 1072.37 1073.38 25-05-2011 25-05-2011 25-05-2011 top soil 1077.65 1077.86 1078.4 1078.74 1079.48 1079.88 24-05-2011 1068.20 1068.70 1069.76 1070.60 24-05-2011 24-05-2011 1068.03 1065.86 1062.96 1072.89 1075.63 1076.19 1074.89 24-07-2011 24-07-2011 1077.52 1076.83 1076.84 1078.00 1082.24 24-08-2011 24-08-2011 1073.82 1075.51 1076.92 1070.68 24-08-2011 1056.44 26-09-2011 26-09-2011 26-09-2011 26-09-2011 22-12-2011 22-12-2011 25-01-2012 25-01-2012 25-01-2012 25-01-2012 25-01-2012 27-03-2012 1074.77 1068.98 1074.99 1068.01 1073.81 1066.63 1074.04 1066.69 1080.07 1075.14 1080.77 1075.30 1081.75 1077.09 1067.89 1069.57 1061.27 1057.32 1050.24 1050.15 1046.56 1059.83 1049.00 1054.88 1048.93 1060.37 1060.57 1067.06 1054.49 25/04/2012 1060.82 1046.52 1058.84 1048.26 1051.75 WATER 1080.16 1068.30 1079.94 1069.88 1073.95 CALCRETE 24-08-2012 24-08-2012 1069.25 1052.9 1066.97 1042.94 1066.7 1042.1 1066.82 1056.59 1067.39 1077.30 1068.01 1075.44 1051.66 24-08-2012 1076.31 1063.67 1077.25 1056.24 1057.46 1060.30 1055.11 1042.08 1060.79 1045.84 1049.21 1036.14 1046.77 1040.38 1044.75 24-08-2012 1066.38 1053.49 1050.17 1036.63 1049.75 1035.54 1055.66 1041.47 1052.70 R.O.M. Area HAUL ROAD EXT. 5.2Deg, Wide 16.2m +7.5 Deg +8.7 Deg BREAK TEST RAMP CLOSED CRUSHER REHAB AREA TOP SOIL DUMPS TOP SOIL DUMPS TOP SOIL DUMPS TOP SOIL DUMPS TREE AREA 1 2 3 4 26-11-2012 1075.22 1067.93 1066.46 1070.05 1069.76 1042.29 1073.03 1041.35 1046.09 1041.00 1058.27 1052.40 1064.13 1040.80 1029.17 1050.11 1037.13 26-11-2012 1054.04 1045.57 1053.88 1045.87 1065.52 1058.86 18-12-2012 CALCRETE 1074.78 1077.10 1077.97 1076.93 1075.73 1071.21 1070.79 1078.45 1071.84 1080.02 1072.83 1080.56 1072.68 1082.61 1076.85 1076.55 1062.32 1067.69 1064.19 1057.44 1043.50 1042.29 1045.62 1037.13 1072.91 1072.09 1072.74 1074.18 1054.07 18.3m 8.2 Deg WASTE DUMP HEIGHT 10M 10M 12M HEIGHT HEIGHT WASTE DUMP WASTE DUMP WASTE DUMP WASTE DUMP HEIGHT HEIGHT HEIGHT HIGHT HIGHT HEIGHT HEIGHT HEIGHT HIGHT HIGHT HIGHT HIGHT HEIGHT HEIGHT HEIGHT 10.3M 12.1M 14M 11.3M 9.8M 10M 5.4M 6.6M 9.8M 13.7M 13.2M TOPSOIL AREA TOPSOIL AREA TOPSOIL AREA WASTE DUMP 3.3Deg 21.7m Berm 1.75m Berm 1.42m Berm 1.56m Berm 1.52m Berm 0.78m Berm 0.93m Berm 0.92m Berm 1.04m Berm 1.38m Berm 1.37m 6.5Deg 4.8Deg 16.6m 15.3m 16.3m 22.9m 24.0m 17.2m 17.2m Berm 1.6m Berm 0.87m Berm 0.83m Berm 1.41m Berm 1.64m Berm 1.37m Berm 2.4m Berm 1.11m Berm 1.5m Berm 1.21m Berm 1.7m Berm 1.41m Berm 1.51m Berm 1.65m WASTE DUMP HIGHT HIGHT 1046.6 BERM 1076.13 1070.94 1081.42 1077.86 1077.23 1061.75 1050.13 1062.90 CRUSHER AREA 25-05-2013 1074.87 1073.21 1069.11 1065.59 1052.69 1054.01 1051.19 1059.10 1051.64 1055.80 A B BACKFILL BACKFILL 1081.44 1075.55 1081.18 1073.56 082.39 075.33 16-09-2013 1073.71 1066.49 1068.86 1064.07 1074.12 1067.07 1075.83 16-09-2013 1060.33 1056. 1064.07 1048.62 1063.66 1048.32 16-09-2013 HIGHT 10.2M 1071.8 1066.5 1071.81 1065.60 1074.65 1067.69 1071.39 1062.70 1065.98 1056.60 1064.84 1052.20 1067.81 1064.11 1059.62 1055.58 1056.84 1047.21 1039.16 1054.48 1042.91 1051.47 1044.71 1032.29 1034.80 1028.20 1033.87 1025.23 1023.66 1031.87 1019.2 1054.26 1043.05 7.9 Deg CLOSED CLOSED A B C D E F G H J L M N P LINK ROAD BETWEEN HAUL ROAD & MAIN ACCESS ROAD PRIMARY STOCKPILE POND NO.:1 EARTH BERM DIRTY STORMWATER DRAINS PRENTEC SEWERAGE PLANT CONVEYOR ROADS & SERVICE ROADS EARTH BERM EARTH BERM DIRTY STORMWATER DRAINS HAUL ROAD WASTE YAR DOMESTIC/ GENERAL WASTE BUND WALL FOR HAZARDOUS WASTE BUND WALL FOR BULK OIL STORAGE TANK RECYCL COLLECTION SUMP COLLECTION SUMP SKIP RECYCLED WATER POND GOBA NORTH POND ROAD FROM HOLDING CAMP TER LINK ROAD BETWEEN HAUL ROAD & MAIN ACCESS ROAD PRIMARY STOCKPILE EARTH BERM POND NO.:4 DIRTY STORMWATER DRAINS POND NO.:3 PRENTEC PLANT DIRTY STORMWATER DRAINS CONVEYOR ROADS & SERVICE ROADS EARTH BERM EARTH BERM DIRTY STORMWATER DRAINS TER HAUL ROAD NEW HAUL ROAD EXTENSION EARTH BERM EARTH BERM DIRTY STORMWATER DRAINS EARTH BERM EARTH BERM EARTH BERM MOBILE CRUSHER AREA PRODUCT STOCKPILE AREA 2 WASTE YARD ADT PARKING HDV WASHBAY AND WORKSHOP ROM STOC 4 ARROWS YARD AND ADT PARKING PRODUCT STOCKPILE 1 AREA 12 DIRTY STORMWATER DRAINS EARTH BERM EARTH BERM EARTH BERM EARTH BERM EARTH BERM EARTH BERM EARTH BERM TREE PIT D-BLOCK PIT MN2 POND 6 POND 7 A0 UMK MANGANESE PROJECT - NORTHERN CAPE CATCHMENT AREAS ANNEXURE 2 THE MASTER HELD AT AECOM DURBAN BEARS THE ORIGINAL SIGNATURE OF APPROVAL FOR INFORMATION 00 15/10/14 ISSUED FOR INFORMATION SR DP CB DP 201270383 01 06/03/17 ISSUED FOR INFORMATION SR DP CB DP 201270383 PLAN LAYOUT 02 08/09/17 ISSUED FOR INFORMATION SR DP DP 201270383 DP LEGEND: NEW PONDS - EXISTING PONDS -