FOR TENDER PURPOSES ONLY PRELIMINARY (not for construction) Permission to proceed does not release contractor of the obligation to carry out works in accordance with contract specifications; any variations are to be reported to the architect/engineer as soon as they are noted. FOR INFORMATION PURPOSES ONLY FOR REVIEW & APPROVAL FOR CONSTRUCTION PLANNING & PERMITTING DRAWING ISSUE - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - By Rev REVISIONS Description Date No part of this document may be reproduced, stored or transmitted in any form or by any means, without the previous written permission of the author. Copyright © THE CONTRACTOR IS OBLIGED TO INFORM THE CONSULTANT OF DISCREPANCIES, IF ANY, BETWEEN THESE DRAWINGS AND THE WORKS. THE CONTRACTOR SHALL NOT PROCEED WITH THE RELEVANT WORKS UNTIL RECEIPT OF AN INSTRUCTION, IN WRITING, BY THE CONSULTANT. Sheet Title Project Design Drawn Checked Approved Sheet Size Scale Date Client Job No. Type Doc No. Rev Bldg No. - Author Code Project Descrip�on - - - - The Shoreline 1602 - CAS - - A3 1:100 11/06/2019 - - - Apartment A01 Render Plan - - --- -- --- DG -- 0000 00 1 2 3 4 5 6 7 8 8 7 6 3 2 1 A A B B C C D D E E F F ARCHITECT & STRUCTURAL ENGINEER INTERIORS COMMERCIAL ARCHITECT BUILDING SERVICES ACOUSTICS LIGHTING PROJECT & COST MANAGEMENT LEED CLIENT Studio Apartment GF Area: 57 sq.m External Area: 20 sq.m A01 N B D E F G C A