Top Banner
A World of Solutions Pulling Resources How Communities in Dare County are Working Together to Construct Locally Funded Beach Projects Ken Willson CB&I North Carolina Water Resource Congress October 30 2014
14

A World of Solutions Pulling Resources How Communities in Dare County are Working Together to Construct Locally Funded Beach Projects Ken Willson CB&I.

Dec 16, 2015

Download

Documents

Janis Stevens
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: A World of Solutions Pulling Resources How Communities in Dare County are Working Together to Construct Locally Funded Beach Projects Ken Willson CB&I.

A World of Solutions

Pulling ResourcesHow Communities in Dare County are Working Together to Construct Locally

Funded Beach Projects

Ken Willson CB&I

North Carolina Water Resource CongressOctober 30 2014

Page 2: A World of Solutions Pulling Resources How Communities in Dare County are Working Together to Construct Locally Funded Beach Projects Ken Willson CB&I.

2A World of Solutions

Background

2000 - Dare County Shoreline Protection Project Authorized

2009 – Kill Devil Hills Feasibility Study

2011 – Nags Head Local Beach Nourishment Project

2012 – Town of Duck Feasibility Study

Page 3: A World of Solutions Pulling Resources How Communities in Dare County are Working Together to Construct Locally Funded Beach Projects Ken Willson CB&I.

3A World of Solutions

Coming Together

February 2013 – First Joint Meeting Kill Devil Hills / Kitty Hawk

June 2013 – Kitty Hawk Feasibility / Inter-Agency Meeting (3-Towns and County)

Initial Estimates – 10% - 17% Cost Savings by Combining Projects

Fall 2013 – County Formulates 1st Cost Sharing Model

Page 4: A World of Solutions Pulling Resources How Communities in Dare County are Working Together to Construct Locally Funded Beach Projects Ken Willson CB&I.

4A World of Solutions

Initial Cost Estimate - $41 Million

Equitable Cost Sharing (Towns)

County Funding Through Room Occupation Tax

Dare County Up Front Commitment - $24 Million

Local Communities to Finance (Special Obligation Bonds) Balance

County to Subsidize Locals to assist with Debt Payments

Preliminary Cost Sharing Model

Page 5: A World of Solutions Pulling Resources How Communities in Dare County are Working Together to Construct Locally Funded Beach Projects Ken Willson CB&I.

5A World of Solutions

Getting Buy In

County / Town Managers Present To Elected Officials

Working Together to Achieve Cost Savings

+

County Financial Support

Buy In from ALL 3 - Towns

Page 6: A World of Solutions Pulling Resources How Communities in Dare County are Working Together to Construct Locally Funded Beach Projects Ken Willson CB&I.

6A World of Solutions

Town of Duck: ~ 1.5 Miles Main Section Dune: Elevation 20 ft. NAVD / Crest Width

20 ft.

Design Berm Width: Variable 65 – 75 ft. Ave. Fill Density: 120 cy/ft.

Beach Fill Design

Page 7: A World of Solutions Pulling Resources How Communities in Dare County are Working Together to Construct Locally Funded Beach Projects Ken Willson CB&I.

7A World of Solutions

Town of Kitty Hawk: ~ 3.6 Miles Main Section Dune: “Starter Dune” 14 ft. NAVD

Design Berm: 60 ft. Ave. Fill Density: ???

Beach Fill Design

Page 8: A World of Solutions Pulling Resources How Communities in Dare County are Working Together to Construct Locally Funded Beach Projects Ken Willson CB&I.

8A World of Solutions

Town of Kill Devil Hills: ~ 2.4 Miles Main Section Dune: Elevation 15 ft. NAVD / Crest Width

20 ft.

Design Berm: Variable 40 cy/ft. Ave. Fill Density: 70 cy/ft.

Beach Fill Design

Page 9: A World of Solutions Pulling Resources How Communities in Dare County are Working Together to Construct Locally Funded Beach Projects Ken Willson CB&I.

9A World of Solutions

BOEM / USACE – Co-Lead Agencies (Borrow Source in Federal Waters)

Pre-Application Meeting – KEY

Individual Environmental Assessments (EA)

Batched Biological Assessment (BA) and Essential Fish Habitat (EFH) Documents

Permitting

Page 10: A World of Solutions Pulling Resources How Communities in Dare County are Working Together to Construct Locally Funded Beach Projects Ken Willson CB&I.

10A World of Solutions

Cooperative Sand Search Investigation

Total Cost Split 3 Ways

All 3 Communities will Hold Permits for All Resulting Borrow Areas

Borrow Area

Page 11: A World of Solutions Pulling Resources How Communities in Dare County are Working Together to Construct Locally Funded Beach Projects Ken Willson CB&I.

11A World of Solutions

Borrow Area

Page 12: A World of Solutions Pulling Resources How Communities in Dare County are Working Together to Construct Locally Funded Beach Projects Ken Willson CB&I.

12A World of Solutions

Borrow Area

Page 13: A World of Solutions Pulling Resources How Communities in Dare County are Working Together to Construct Locally Funded Beach Projects Ken Willson CB&I.

13A World of Solutions

Keys To Success

Established Working Relationships Between Participants

Honesty and Integrity

Communication: Open and Often

Page 14: A World of Solutions Pulling Resources How Communities in Dare County are Working Together to Construct Locally Funded Beach Projects Ken Willson CB&I.

14A World of Solutions

Questions?

Ken Willson(910) 791-9494 – Office

(910) 443-4471 – [email protected] - Email