A. Valassi – CERN Clouds 2 nd Price Inquiry LHCb brainstorming – 7 th Oct 2015 1 CERN Cloud 2 nd Price Inquiry Andrea Valassi (IT-SDC) Thanks to Andrew,
A. Valassi – CERN Clouds 2 nd Price Inquiry LHCb brainstorming – 7 th Oct Azure tests Successfully executed the first few MC jobs –Single-core VMs, 2GB memory limit –Vcycle infrastructure (now merged to LHCb code base) Submitted ~10 jobs, more than half failed –Not 100% clear why, but seems correlated to “upgrade” MC Submitting now ~100 jobs as a new test –Special MC production excluding “upgrade” MC (Vladimir) –Also solved ASM/ARM issues on IT-SDC side (3k VMs ok) Next steps if this test is successful –Ramp up to ~1000 jobs –Also test Andrew’s multi-core aware pilots
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
A. Valassi – CERN Clouds 2nd Price Inquiry LHCb brainstorming – 7th Oct 2015 1
CERN Cloud 2nd Price Inquiry
Andrea Valassi (IT-SDC)
Thanks to Andrew, Stefan, Vladimir, Federico, Chris and the IT-SDC cloud team for help and discussions!
LHCb brainstorming – 7th October 2015
A. Valassi – CERN Clouds 2nd Price Inquiry LHCb brainstorming – 7th Oct 2015 2
CERN Cloud Procurement Overview• Timeline for commercial procurement of clouds
– 2nd Price Inquiry (~MC simulation workflows)• 1000 cores for LHCb from ~1st Oct to 18th Dec 2015
• Submitted ~10 jobs, more than half failed– Not 100% clear why, but seems correlated to “upgrade” MC
• Submitting now ~100 jobs as a new test– Special MC production excluding “upgrade” MC (Vladimir)– Also solved ASM/ARM issues on IT-SDC side (3k VMs ok)
• Next steps if this test is successful– Ramp up to ~1000 jobs– Also test Andrew’s multi-core aware pilots
A. Valassi – CERN Clouds 2nd Price Inquiry LHCb brainstorming – 7th Oct 2015 4
Azure tests
• On second look: only mildly correlated to “upgrade”– 4 success: 2 upgrade, 2 not– 9 failures: 7 upgrade, 2 not– Need more statistics... will try more jobs and see
A. Valassi – CERN Clouds 2nd Price Inquiry LHCb brainstorming – 7th Oct 2015 5
2nd Price Inquiry – Overview
A. Valassi – CERN Clouds 2nd Price Inquiry LHCb brainstorming – 7th Oct 2015 6
2nd Price Inquiry – Status• Status
– Provider identified: consortium with 5 sites– Network connectivity to Geant being prepared (1 week?)– Minimal resources available and under tests in IT-SDC
• LHCb preparation– Plan to use this for MC simulation– Multi-core-aware pilots by Andrew are now ready– Agreed to set up 5 different sites– LHCb-GEOC will be added to communication list– VO sharing [resources will be paid for even if not used!]
A. Valassi – CERN Clouds 2nd Price Inquiry LHCb brainstorming – 7th Oct 2015 7