Top Banner
1 12 / t A SHORT TERM CAPACITY ADJUSTMENT POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS Henny P.G. van Ooijen J.Will M. Bertrand
18

A SHORT TERM CAPACITY ADJUSTMENT POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS

Dec 31, 2015

Download

Documents

A SHORT TERM CAPACITY ADJUSTMENT POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS. Henny P.G. van Ooijen J.Will M. Bertrand. Overview. Introduction Literature review Research question Policy for capacity adjustment Evaluation Future research. Introduction. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: A  SHORT TERM CAPACITY ADJUSTMENT  POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS

1

12

/ t

A SHORT TERM CAPACITY ADJUSTMENT POLICY FOR MINIMIZING LATENESS IN JOB

SHOP PODUCTION SYSTEMS

Henny P.G. van OoijenJ.Will M. Bertrand

Page 2: A  SHORT TERM CAPACITY ADJUSTMENT  POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS

2

12

/ t

Overview

• Introduction• Literature review• Research question• Policy for capacity adjustment• Evaluation• Future research

Page 3: A  SHORT TERM CAPACITY ADJUSTMENT  POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS

3

12

/ t

Introduction• Job shop (functionally organized work centers)

– Dynamic, stochastic arrival pattern– Stochastic behaviour on the shop floor

Highly fluctuating throughput times => Poor performance

• Fixed lead times– “Adjust” demand – Adjust available capacity

• Small change of capacity => big impact on the performance

• Setting cost optimal due dates– Prediction of throughput times

Page 4: A  SHORT TERM CAPACITY ADJUSTMENT  POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS

4

12

/ t

Literature (I)

• Palaka et al.– Customers sensitive to quoted lead times (fixed

capacity/ marginal expansion)• So and Song

– Demands are sensitive to both price and delivery time (optimal setting of price/delivery time/capacity expansion)

• Ray and Jewkes– Demand is function of delivery time and price, and

price is a function of delivery time

Page 5: A  SHORT TERM CAPACITY ADJUSTMENT  POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS

5

12

/ t

Literature (II)

• Barut and Shridharan– Allocation (dynamically) of capacity to multiple product

classes

• Van Mieghem– Review strategic capacity management literature

Setting capacity levels on medium or long term for “average” orders, based on average lead times and/or average delivery reliability

Page 6: A  SHORT TERM CAPACITY ADJUSTMENT  POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS

6

12

/ t

Research question

Given fixed, realistic short, lead times, and given dynamic,

stochastic demand, then how can we obtain an (economically

justified) as high as possible delivery reliability?

Page 7: A  SHORT TERM CAPACITY ADJUSTMENT  POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS

7

12

/ t

Research question

Given fixed, realistic short, lead times, and given dynamic, stochastic demand, then how can we obtain an

(economicallyjustified) as high as possible delivery reliability?

ADJUST THE CAPACITIES AROUND A GIVEN LEVEL

Page 8: A  SHORT TERM CAPACITY ADJUSTMENT  POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS

8

12

/ t

Research question

Given fixed, realistic short, lead times, and given dynamic, stochastic demand, then how can we obtain an

(economicallyjustified) as high as possible delivery reliability?

ADJUST THE CAPACITIES AROUND A GIVEN LEVEL

HOW MUCH?

Page 9: A  SHORT TERM CAPACITY ADJUSTMENT  POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS

9

12

/ t

Research question

Given fixed, realistic short, lead times, and given dynamic, stochastic demand, what can we do to obtain a

(economicallyjustified) high delivery reliability?

ADJUST THE CAPACITIES AROUND A GIVEN LEVEL

HOW MUCH? Estimate the lateness given certain capacity levels

Page 10: A  SHORT TERM CAPACITY ADJUSTMENT  POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS

10

12

/ t

Forecasting throughput times (I)

• Empirically constructed routing normalized waiting time distribution functions Fg(.) per order category g

• Upon arrival an order with g operations and a required reliability of gets due date:

wloadactual

loadnormwN

1

)(1

operations

gj Floadnorm

loadactualptDD

Page 11: A  SHORT TERM CAPACITY ADJUSTMENT  POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS

11

12

/ t

Forecasting throughput times (II)

In this research:

• Estimate of remaining waiting time of an order with g remaining operations, reliability :

gFloadnorm

loadactual 1

Page 12: A  SHORT TERM CAPACITY ADJUSTMENT  POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS

12

12

/ t

Policy for capacity adjustment (I)

• If ntj is the actual load at a certain work center j at time t, then the total expected lateness is:

)))(((

; ;

.;.

xg

xordersreleased

joperationsremaining

joperremsWorkcentertj

xjx Floadnorm

n

ptDD

Page 13: A  SHORT TERM CAPACITY ADJUSTMENT  POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS

13

12

/ t

Policy for capacity adjustment (II)

• Conjecture: the load at a certain work center can be interpreted as load in relation to the installed capacity

• “Adjusting” the load can be done by adjusting the capacity.

Page 14: A  SHORT TERM CAPACITY ADJUSTMENT  POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS

14

12

/ t

Policy for capacity adjustment (II)

• Conjecture: the load at a certain work center can be interpreted as load in relation to the installed capacity

• “Adjusting” the load can be done by adjusting the capacity.

)))(((

; ;

.;.

xg

xordersreleased

joperationsremaining

joperremsWorkcenter

tjj

xjx Floadnorm

n

ptDD

Page 15: A  SHORT TERM CAPACITY ADJUSTMENT  POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS

15

12

/ t

Policy for capacity adjustment (III)

• We assume : Capacity costs for adjusting the load with 1 unit is equal to c1; lateness costs is c2 per unit late.

))))((()1((min 2

; ;

.;.2

11

xg

xordersreleased

joperationsremaining

joperremsworkcenter

tjj

xjxti

m

ii F

loadnorm

n

ptDDcnc

Page 16: A  SHORT TERM CAPACITY ADJUSTMENT  POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS

16

12

/ t

Policy for capacity adjustment (IV)

• After some rewriting this leads to an equation of the form:

This is a Constrained Least Squares problem

)2

1(min

2

0aNcT

Page 17: A  SHORT TERM CAPACITY ADJUSTMENT  POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS

17

12

/ t

Evaluation

• Simulation study– Ideal job-shop; 5 work centers; 90%

utilization;First Come First Serve

– Capacities can be varied weekly or monthly– The same lead time for all orders/Different

lead times for orders of different categories

Page 18: A  SHORT TERM CAPACITY ADJUSTMENT  POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS

18

12

/ t

Future research

• Evaluation study• How to determine capacity adjustment costs• How to find the empirical distribution functions• Other priority rules