Drinking Water in Nepal Issues for Nepal Water Supply Corporation Submitted in partial fulfillment of the requirements for Masters of Business Administration (MBA) By ARJUN NIROULA Register No 1011301006 Batch of 2011-2013 SONA COLLEGE OF TECHNOLOGY Affiliated to Anna University of Technology, Coimbatore SALEM – 636 005 1
81
Embed
a report on analysis of nepal water supply corporation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Drinking Water in Nepal
Issues for Nepal Water Supply Corporation
Submitted in partial fulfillment of the requirements for
Masters of Business Administration (MBA)
By
ARJUN NIROULA
Register No 1011301006
Batch of 2011-2013
SONA COLLEGE OF TECHNOLOGY
Affiliated to Anna University of Technology, Coimbatore
SALEM – 636 005
JULY 2012
1
SONA COLLEGE OF TECHNOLOGY
SALEM – 636 005
PROJECT WORK
JULY 2012
This is to certify that the project entitled
Drinking Water in Nepal; Issues for Nepal Water Supply
Corporation
is the bonafide record of project work done by
ARJUN NIROULA
Register No: 1011301006
Of MBA during the year 2011-2013.
………………….. …………………………
Project Guide Head of the Department
Submitted for the Project Viva-Voce examination held on ……………………….
................................. ……………………..
Internal Examiner External Examiner
2
ACKNOWLEDGEMENT
This paper has grown and has been enriched with the contributions of many, and I am
grateful to them all. I express my hearth felt gratitude to our beloved Principal, Dr. C.V.
Koushik, M.Sc, Ph.D Sona College of Technology, and the management for providing us
an opportunity to undertake the project work. Especially, to Dr. M. Selvaraj, Professor
and Joint Director, my project guide for guiding me through this entire process. His
encouragement, knowledge and inputs have been always valuable. I have been motivated
and challenged and hopefully, as a result, become a better researcher through this
experience.
I would also like to express my gratitude to our director, Dr. Latha Krishnan, M.Com.,
Ph.D., Post Doctoral Fellowship (IIT-M) whose comments have always been detailed and
insightful, highlighting areas which I have often overlooked.
I am also thankful to Mr. Shankar Guragain, Assistant Manager Nepal Water Supply
Corporation (NWSC) for his valued suggestions, proper guidelines and personal interest
during the course of my project work period.
I am thankful to all the staff members of NWSC for their cooperation, support and
willingness to share information and their experiences.
3
DECLARATION
I, Arjun Niroula, Register No, 1011301006, of 2011-2013, a full-time bonafide student of
first year of Master of Business Administration (MBA) Program of Sona college of
Technology (An Autonomous Institution). I hereby certify that this project work carried
out by me at Nepal Water Supply Corporation, the report submitted in partial fulfillment
of the requirements of the program is an original work of mine under the guidance of the
faculty, Dr.M Selvaraj and is not based or reproduced from any existing work of any
other person or on any earlier work undertaken at any other time or for any other purpose,
and has not been submitted anywhere else at any time.
(Student’s Signature)
Date:
(Faculty Signature)
Date:
4
Executive summary
Climate change impacts are observed in several sectors of Nepal among which water
resources is one of the hardest hit sectors. Evaluating the impacts in water resources is
challenging because water availability, quality and stream flow are sensitive to changes in
temperature and precipitation. Increased demand for water caused by population growth,
changes in the economy, development of new technologies, changes in watershed
characteristics and water management decisions are some of the other factors to be taken
into consideration. Nepal is rich in water resources. There are about 6000 rivers in Nepal
having drainage area of 191000 sq. km, 74 % of which lies in Nepal alone. There are 33
rivers having their drainage areas exceeding 1000 sq. km. Only about 72% of the
country’s population has access to basic water supply and only 25% of the whole
population has sanitation facility.
In this regard, Nepal Water Supply Corporation is a government based corporation
involved in delivering safe drinking water in urban areas of Nepal. So, the issues of
drinking water, its challenges and opportunities in the context of Nepal Water Supply
Corporation (NWSC), specifying on its Mahendranagar branch are the subject matter of
this report.
5
TABLE OF CONTENTS
Title Page
Acknowledgement
Declaration
Company Certificate
Executive summary
Abbreviations
Table of Content
List of tables
List of figures
Bibliography
CHAPTER 1
INTRODUCTION
1.1 Introduction of the study …………………………… 11.2 Industry Analysis (Nepal Background) …………………………… 31.3 Need and Scope of the Study ……………………………. 51.4 Objectives ……………………………. 51.5 Limitations ……………………………. 5
CHAPTER 2
ORGANIZATION ANALYSIS
2.1 Introduction to the organization ............................................. 72.2 Establishment ............................................. 92.2.1 Statutory Provision ............................................. 92.2.2 Provision regarding Capital city ............................................. 112.3 NWSC Service Areas ……………………………. 142.4 Technical Status ……………………………. 152.4.1 Water Supply ……………………………. 152.4.2 Comparative Chart of last three years ……………………………. 162.4.3 Completed Projects in the Fiscal Year ……………………………. 182.5 General Assessment of the service system of NWSC…………………………. 192.6 Water Quality Unit …………………………….. 202.6.1 Sources of Water Supply ……………………………. 212.7 Human Resources ……………………………. 212.8 Analysis of Financial Performance ……………………………. 222.9 Summary of Mahendranagar Drinking Water Supply system ………………. 282.9.1 Description of the WSS intervention ……………………………. 292.9.2 Organizational and Institutional Aspects ……………………………. 312.9.3 Financial Aspects ……………………………. 34
6
2.9.4 Sustainability of the Water Supply System ……………………………. 36
Net Profit/Loss (43004910.49) (118164431.9) (67450320.04)
Last Year's Adjustment upto
Previous Year 9866018.85 (124295.29) (962621.65)
Accumulated Loss (391521331.73) (273159854.5) (204746912.84)
Accumulated Loss Carried to B/S (424660223.37) (391448581.73) (273159854.53)
23
Based on the information given in the profit & loss a/c and the balance sheet attached to it, we can interpret the financial performance in the following way:
INTERPRETATION OF P&L A/C
PARTICULARS YEAR 2010-11 AS COMPAREDTO 2009-10
YEAR 2009-10 AS COMPAREDTO 2008-09
REVENUE1. WATER REVENUE 3.85% increase 5.56% decrease2. OTHER INCOME 22.54% increase 20.33% increase
EXPENSES1. PRODUCTION 2.52% increase 13.33% increase2. DISTRIBUTION 7.05% decrease 45.87% increase3. QUALITY CONTROL 9.43% increase 0.1% decrease4. CONSUMERS A/C 4.01% decrease 20.36% increase5. ADMINISTRATIVE EXPS 3.16% decrease 27.21% increase6. STOCK SALE EXPENSES 170.60% increase 228.37% increase7. PROVISION FOR D/DEBTS NO PROVISION IN
and JanakiTolBikasSanstha) can be referred as an indicator of community level
initiatives. Significant behavioral changes in regard to people perception are noted on
health-hygiene practices. This can be linked with the increasing demand of pipeline water
supply which is expensive (costs about NRs.3000) in comparison to the costs of hand-
pump (NRs.2000) for ground water. However, sanitation is still a big challenge as there is
no sewerage and drainage system and particular dumping site for solid waste disposal.
Social inclusion
34
Existing water supply system does not have any special provision and facilities to socially
disadvantaged section of the community. The major caste/ethnic group of the area living
within the municipality includes Tharu, Thakuri, Brahmin, Chhetri, Newar and Dalit.
Dalit (disadvantaged and secluded groups) population in the area is about 12%. NWSC
has no particular consideration to these people. There is no preference and provision
applicable on providing private line connection; it serves first come first service basis.
Similarly, there is no discount on the connection charge for new line connection and tariff
on water usage for this section.
The availability of Pubic Stand Posts (PSPs) and public toilets are very limited and not
enough for the accessibility of the poor and disadvantaged people in the municipality.
There is issue of debate on equal distribution of water, distribution of water in PSPs and
its regular maintenance. Some of the harassing situation can also be noted for Dalit on
using water from PSPs. Sometimes, they are mistreated and prevented from fetching
water from the PSPs as they are regarded as un-touchable castes by the so-called upper-
caste people; this is still prevalent in some part of the community.
2.9.3. Financial Aspects
Income and expenditure
As all other branch offices, the major source of income of NWSC Mahendranagar Branch
Office is the water tariff, its fine on delay payment and connection fees from new
consumers which is NRs.2, 265 including deposit for meter.
The annual income of NWSC Mahendranagar Branch is not quite enough to cover-up its
annual expenses. It depends on the annual budget from NWSC central office.
The income and expenditure statements of NWSC Mahendranagar give a financial
overview of the branch office of last Fiscal Years. Upon consultation of staffs it is
revealed that NWSC Mahendranagar Branch Office has been running with operating loss
since 2000/01. Further, the loss seems to be increasing in the subsequent years. Lack of
increase in the water production and new connections on the one hand and on the other an
increase in expenditure on repairing and maintenance are the major factors responsible for
degrading financial position of the branch office. Slight increase in income is noted due to
increase in the water tariff.
3.4.1.1. Arrears
Total arrears to be recovered by the office generally consist of delayed or unpaid water
bills by the defaulters. The arrears are mainly from the government and public taps.
35
According to the NWSC Mahendranagar till the end of fiscal year, total arrears were
about NRs.3,123.5 thousands. This includes arrears from government office with
NRs.880.48 thousands and NRs.2243.04 thousands from general public.
Water Tariff
New tariff regulation is applicable for all NWSC branches from November 2004.
Water Tariff Consumption Level Rate/month
Connection with Meter:
< 10 m3 NRs.50
> 10 m3 NRs.15/ each additional m3
Non-metered connection NRs.360
Table: Water Tariff Structure
The applicable tariff for up to 10 m3 is NRs.50, when the consumption exceeds the limit
of 10 m3 each additional unit is applicable to the rate of NRs.15 per m3. In the case of
non-meter connection a monthly charge of NRs.360 is collected each month.
Water tariff is determined by the NWSC Central Office in Kathmandu and it is applicable
to all 22-branch offices including Kathmandu. In the process of the determination of the
tariff local branch office has no role at all.
Budgetary provision and financial transparency
Total annual budget of Mahendranagar branch is NRs.4.2 million consisting of (NRs.3.7
million) regular and (NRs.0.5 million) development budget. Out of which, annual
maintenance cost is NRs.0.7-0.8 million. All the budgetary payment is transferred
through bank check. And two separate bank accounts are maintained for operational and
non-operational purposes. All local revenue collected locally is to be deposited in non-
operational accounts. Mahendranagar NWSC cannot use this deposit. The budgetary
transfer from Central Office is maintained in operational accounts for all budgetary
expenses including administrative, development and operation and maintenance
expenditure. Branch office is accountable for its central office for all its revenues and the
budget it receives.
The branch office has limited rights in regard to expenditure without approval from
central office and the limit is NRs.25,000. It needs to take approval to expend above the
allocated budget.
36
Internal and external auditing is performed for maintaining the financial transparency.
However, annual program budgets are formulated with the limited participation of office
staff. The collection of cash against the service charge is reported to NWSC head office.
The information on the financial position of the office is not made to other stakeholders
including consumers. The NWSC Mahendranagar is accountable to head office in all
respects where it is also accountable with the consumers in terms of providing services.
Attempts have been made to make the office more accountable to the service delivery
including new connection, disconnection, reconnection, water delivery, water charges,
due date of meter reading, collection of charges, etc.
2.9.4. Sustainability of the Water Supply System
Sustainability of water supply would not be a big issue if it was timely planned and
necessary initiatives were taken. Only about 25,000 people have access to drinking water
supply system while 70% population of municipality is still deprived of receiving NWSC
services. NWSC needs to increase drastically the capacity of the existing system to cover
the non-served population.
Currently, only two tube-wells constructed in 1992 under Japanese grant are functional.
Water production from these two tube-wells is about 4300 lit/min along with 3 pumps.
According to the production and consumption record pattern per day, the unaccounted for
water (UFW) comes in the range of 31% of the total production. As per the record of
NWSC Mahendranagar Branch Office, the total production and consumption per day are
as follows:
Total Production/day: 648 m3
Total Consumption/day: 447.16m3
Water Loss: 200.84 m3
The quality of the water supplied by NWSC is not to the recommended level of standard,
although it is better than the normal ground water. The level of calcium carbonate is
extremely high (about 600/ppm) compared to normally recommended range of 150-
225/ppm. The initial treatment facilities constructed by DWSS in 1973 are no more in
operation at present. Current operational treatment facilities with rapid sand filter, pre-
chlorination unit and clear water reservoir were constructed under Japanese grant aid
support in 1992. However, some of the treatment facilities such as pre-chlorination plant
are not in operation today and therefore chlorination is done manually. Consequently, the
supplied water may not be disinfected regularly. Because of high rate of leakage problems
37
and no proper system of sewerage and drainage there is also likelihood of water
contamination.
Fig: wate r treatment plant constructed in Lime incrustation in distribution pipe
1973. Currently, not in operation
38
People have collective complaints over NWSC and raises questions of accountability and its
efficiency. NWSC Mahendranagar reported to be receiving around 70 complaints per month
from consumers. The major complaints are related with leakages from pipe joints, meter
blocks, etc. Replacement of meters is taking place with irregularities due to shortage of
meters in NWSC, Mahendranagar.
NWSC needs to go with immediate and long term planning to sort out its problems. It should
work in collaboration and partnership with municipality and other agencies and design a
mega project in the long run. And in the short term, NWSC can enhance its capacity working
with users to control leakages, reducing unnecessary consumption and encouraging timely
payment of bills and settling arrears. However, there are other aspects to be improved and
NWSC should give due priority on the following:
Replacing pipelines and controlling leakage of water;
Taking initiatives to repair non-operating two tube wells;
Putting in place operation and maintenance manual to avoid frequent damages of
infrastructures
Installing treatment plant such as pre-chlorination unit and other additional plant to
provide quality water supply.
Extension of pumping hours to increase the per capita supplied water and coverage
area.
39
SOCIAL INSTITUTIONAL
ECONOMIC TECHNOLOGICAL
ENVIRONMENTAL
ECONOMIC
Strengths Significant behavioral changes related to hygienic practices during last years.
Municipality is making efforts to provide water supply to deprived areas.
Weaknesses
Women’s participation is ignored at all levels of policymaking and implementation. NWSC has no any special considerations to disadvantaged groups.
Centralized planning and administration system in NWSC. Lack of coordination among concerning local stakeholders. The system is not transparent for consumers. Low level of local participation.
NWSC is facing financial constraints to improve existing system and carry out new projects. Under budgeting to carry out regular operation and maintenance. Lack of provisions for disadvantaged groups in NWSC facilities.
Unequal distribution of water due to irregular pressure. Bad condition of some of the pipes and high level of leakage. Risk of supplying water with bacterial contamination due to breakdown of chlorination plant.
Sanitation coverage is still very low in the municipality. Lack of appropriate sewerage and drain in the municipality.
Opportunities
Formation of community development interest groups, which are coming up with new initiatives.
Integration of public awareness and sanitation as part of the NWSC services. Higher degree of collaboration between NWSC and local institutions.
Users expressed their willingness to pay for improved water supply services.
Repair of non-operating tube wells. Provision of water supply to the deprived population.
Mahakali river is a potential source for the expansion of the system.
Threats High percentage of Mahendraganar population has no access to improved water supply and sanitation facilities.
Unpaid water bills from regular users and public institutions.
Lime incrustations in distribution pipes.
Overuse of groundwater. Many disadvantaged households use public place to defecate.
40
Table: SWOT ANALYSIS OF MAHENDRANAGAR BRANCH
CHAPTER: 3
Findings, Suggestions and
Conclusion
41
3.1. Suggestions
With the overall assessments of the water supply system of Mahendranagar Municipality,
some of the conclusive recommendation can be made to enhance its capacity and existing
service delivery system. NWSC and Mahendranagar Municipality should focus upon
collaboration and partnership building. On top of that, special consideration should be given
to the following areas:
Special initiative should be taken for proper representation of the consumers in the
management of NWSC;
Channel of collaboration and partnership should be enhanced with municipality,
NGOs and other agencies;
Issues of health and hygiene should be incorporated within NWSC and municipality
programmatic planning;
Financial incentives be offered for the promotion of toilet among the poor and dalit
households;
More PSPs be established and connection charge and water tariff be reduced for the
poor, dalit and ethnic minorities;
Public awareness, education and interaction are to be regularly performed in order to
held dialogue among NWSC, municipality and people in general. This could be
instrumental in partnership building.
42
NWSC need to look into and take appropriate measures for the improvements of the
following components:
Adopt the principles of decentralization by providing more authorities to branch
offices;
Encourage Branch Manager and other staff in taking decisions independently;
Develop Job Description of all staff and encourage the staff members to work
according to defined job description;
Conduct need-based training for the staff members, and make it a part of regular
strategies to enhance the skills of the staff;
Introduce computerized accounting system by providing adequate training to staff of
Account Section;
Update, document and disseminate Management Information System regularly and
make it use in management decision-making process;
Conduct regular monitoring and evaluation of staff effectively.
3.2. Findings or Lesson learnt
The major lessons learned during the assessment process were as follows:
Decentralization is necessary to deliver optimum level of output and services. There
is centralized structure in the Nepal Water Supply Corporation. All the decisions are
taken at the central office, Kathmandu. There is little de-concentration in respect of
administrative functions, but there is no financial decentralization at all. As a result,
the branch office has to wait for long for any decisions. Moreover, they lack
autonomy to function like a corporate organization. This has led to financial loss to
the corporation on the one hand and lack of efficient delivery of water services on the
other.
People’s participation is the prerequisite for successful operation of a local institution.
Apart from the performance, the local development organization needs to involve the
local people to the extent possible. Involvement of people as end-users helps
sustainable use of resources and their preservation and sustainable management.
Public participation and contribution can be ensured if they are properly handled and
43
provided spaces for dialogue and discussion to justify the need of resources and
contribution. Ignorance of public participation leads to unequal distribution of the
resources and invite anger, unrest and conflict. However, there is no provision for
community participation at all in the NWSC system at the local level. This has
therefore neglected one of the principles of democracy. Perpetuating exclusion and
discrimination could lead either non-participation in all socio-economic and
development initiatives or lasting conflict for the share of resources, power and
positions.
Collaboration and partnership among concerning stakeholders and beneficiaries lead
greater amount of capacity and allow working in broader framework. Apart from
performance and participation, how effective the governance of an organization is,
also depends on the level of partnership that it has built at the local level. In fact,
because of the centralized structure, and lack of participation of community and other
stakeholders the partnership is lacking in the NWSC system.
44
PROBLEMS
FACED
Strategies to solve the
problems
Extent to
which the
problem
was solved
Lessons learned
FINANCIAL Delay in water
bill payment from
regular
households and
public institutions
Awareness sense
towards the system
efficient management
and a more participatory
approach. Incentives as
well as penalty sysment
would also contribute to
foster a more punctual
payment
Unpaid
bills still
share a
large
amount
Delay in bill payment is a
symptom of inefficient
management of the system and
dissatisfaction of the users.
Lack of participation of local
community in decision making
process causes lack of
ownership sense and careless
attitude of users towards the
system
INSTITUTIONAL Policies,
programmes and
budget are
decided in the
head office
leaving little
management
margin to the
branch office.
Decentralization system
would permit to make
decisions with the
involvement of
concerned stakeholders
Manageme
nt of
NWSC is
still
centralized
Centraliztion models restrain
the involvement of local
stakeholders and the efficient
exposure and fulfillment of
local needs
SUSTAINABILITY Large
proportion of
unaccounted
for water
(UFW) due
tohigh degree
of leakages
and ageing of
the system
Program of leakage
control. Regular
monitoring of
infrastructures
Problem
has not
been
solved
yet.
Regular monitoring and
maintenance tasks need
to be carefully planned in
order to avoid UFW.
Control of UFW will also
reduce the value of non-
revenue.
Table: Problems faced and Solutions
45
3.3. Conclusion
From the overall analysis of NWSC, it can be rightly said that NWSC is not being able to
perform as it should in delivering drinking water service to the public. NWSC has the
mandate to upgrade the water network of the country and also to tap alternative sources of
drinking water. But NWSC has come a cropper, not only in its attempts to tap alternative
water sources, but also in managing the existing water supply network, leading to a severe
crisis, as also to controversies. Despite the fact that NSWC is a corporation, it has not been
operating on economic and financial principles, and has been marred with poor management.
One of the reasons for the anomaly is the intervention from government and politicians in its
management. The repercussion of such a weak management, as reflected in poor service
delivery, is higher on poor than better off households.
In spite of reforms taken place in the corporation in the form of privatization of Kathmandu
based water supply, it is still financially unsustainable. Because of its growing deficit, it is
urgent that NWSC be run following sound financial principles so as to provide sustainable
water supply. So, in this regard, it has to further privatize its other branches for effective
management.
The tariff structure fixed by the corporation is fixed since decades, resulting low level of
earnings with respect to its expenses. This hints that long and sustainable effort is needed to
mitigate the loss of NWSC in the coming years. This puts to a great challenge to the
Corporation in view of growing cost of water in the days ahead. To make the Corporation
financially sound, it is necessary to increase tariff significantly or to pay the loss by the
government. The latter option of cost recovery is not a sustainable option.
Last but not the least; proper decentralization of authority in rural branches is the most for