Julie Glassmeyer
Value Pie: Current State
Value
Non-Value
Added
Waste43%
57%
History of Lean
Toyota Production System (1948)
History of Lean Toyota Production System (1948)
Two Non-Negotiables:
CONTINUOUS IMPROVEMENTRESPECT FOR PEOPLE
1
2
3
4
5
6
Respect for people
Optimize the Whole
Generate Value
Eliminate Waste
Focus on Flow
Continuous Improvement
Six Tenets of Lean Construction