A Progressive Comparison of Conveyor Changeover Technologies
Jan 23, 2015
A Progressive Comparisonof Conveyor Changeover
Technologies
Cost versus Man Hours
100 Feet of Straight Conveyor
$30 / hour Labor Rate
250 Changeovers Per Year
This is the baseline
Cost versus Man Hours
100 Feet of Straight Conveyor
$30 / hour Labor Rate
250 Changeovers Per Year
Set Points
Note set points on each comparison
Standard: Baseline
BASELINE
108 Adjustment Points
$7,500 in labor
60 Min.
250 hrs. lost/year
Ratchet Handles / Manual Adjustment
Level 1: RATCHET HANDLE
108 Adjustment Points
$5,625 in labor
$1,000 for the ratchet handles
45 Min.
188 Hrs.Lost/Yr.
Ratchet Handles with Set Points
Level 2: RATCHET HANDLE
With Pre-Measured Points
108 Adjustment Points
$3,750 in labor
$2,000 for the ratchet handles andpre-measured set points
30 Min.
125 Hrs.Lost/Yr.
Ratchet Handles with Set Points on One Side
Level 3: RATCHET HANDLE
one side
54 Adjustment Points
$1,875 in labor
$1,500 for the ratchet handles andpre-measured set points
15 Min.
62 Hrs.Lost/Yr.
Hand Wheel Indicator
Level 4: HAND WHEEL DIAL INDICATOR
One Side
3 Adjustment Points
$625 in labor
$22,500 for rail system
5 Min.
20 Hrs.Lost/Yr.
Automatic Guide Rail Adjustment
Level 5: AUTOMATIC ADJUSTABLE
With Operator Push Button Station
1 Adjustment Point
$125 in labor
$27,500 for rail system
1 Min.
4 hrs.Lost/Yr.
Changeover White Paper
Click here for White Paper
Cost versus Man Hours
CHANGEOVER SOLUTIONS
10 YEAR Labor Cost Versus Purchase Cost
Manual Automatic
COST
$
1 2 3 4 5 60
10000
20000
30000
40000
50000
60000
70000
80000
COSTLABOR
BASE
MANUAL
SET POINTS
ONE SIDE
HANDWHEEL
AUTO-MATIC
Thank you for your time!For more information,
videos, webinars and white papers, visit our website
www.nercon.com
• Sign up for Knowledge CenterCheck out our blog!