GORETTI_VALORIZACION 01 JUNIO 2012
ACERO AULA PRIMARIASUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO
DEL SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE
CASTILLA - PIURA"AULA PRIMARIA (ADOSADA)05.00.00 OBRAS DE CONCRETO
ARMADO05.01.03 ACERO PARA ZAPATASELEMENTON
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"Z11221.5033.00Z2251.3013.002100.6012.00Z3241.108.80280.508.00Z41201.3026.00TOTAL
LONGITUD0.000.00100.80PESO POR M0.250.561.27TOTAL KG POR
DIMETRO0.000.00128.02TOTAL METRADO128.0205.03.03 ACERO PARA VIGAS
DE CIMENTACINELEMENTON
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"VC149.0036.00129.0018.001461.8082.80TOTAL
LONGITUD0.00100.800.0036.00PESO POR M0.250.561.271.56TOTAL KG POR
DIMETRO0.0056.450.0056.16TOTAL METRADO112.6105.04.03 ACERO PARA
SOBRECIMIENTOSELEMENTON ELEM.CANTIDADLONGITUD1/4"3/8"1/2"CORTE
1-11312.0636.181301.2036.001121.1013.20CORTE
2-2138.6025.801291.2034.80CORTE 3-3139.0027.001301.2036.00TOTAL
LONGITUD0.00208.980.00PESO POR M0.250.561.27TOTAL KG POR
DIMETRO0.00117.030.00TOTAL METRADO117.0305.05.03 ACERO PARA
COLUMNASELEMENTON
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"C12124.75114.002401.70136.002401.60128.00C2284.7576.002761.30197.60C3164.7528.501381.3049.40C4244.7538.002361.0072.00TOTAL
LONGITUD0.00583.000.00256.50PESO POR M0.250.561.001.56TOTAL KG POR
DIMETRO0.00326.480.00400.14726.6205.06.03 ACERO PARA COLUMNAS DE
CONFINAMIENTOELEMENTON
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"C5441.8028.80440.7011.20C4442.8044.80440.7011.20TOTAL
LONGITUD22.4073.600.000.00PESO POR M0.250.561.001.56TOTAL KG POR
DIMETRO5.6041.220.000.0046.8205.07.03 ACERO PARA VIGASEJEN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"3/4"VIGA
V-101129.0018.00136.3018.90124.509.001212.6025.20122.204.40113.003.001451.8081.001181.4025.20VIGA
V-A1412.4049.601681.3088.40VIGA
V-B148.3033.201411.3053.30148.6034.401421.3054.60VIGA
V-C148.1532.601430.8034.40TOTAL
LONGITUD34.40194.60121.60210.204.40PESO POR
M0.250.561.001.562.25TOTAL KG POR
DIMETRO8.60108.98121.60327.919.90567.0905.08.03 ACERO PARA VIGAS DE
CONFINAMIENTOEJEN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"FACHADA
PRINC.123.306.601190.305.70122.605.201140.304.20FACHADA
POST.123.707.401180.305.40123.807.601200.306.00TOTAL
LONGITUD21.3026.800.000.00PESO POR M0.250.561.001.56TOTAL KG POR
DIMETRO5.3315.010.000.0020.3405.09.03 ACERO PARA LOSA
ALIGERADAELEMENTON ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"AULAS
INIC.1208.20164.001201.0521.001202.3046.00178.0056.00171.057.35172.3016.10TEMPERATURA330.00TOTAL
LONGITUD330.00248.3562.100.00PESO POR M0.250.561.001.56TOTAL KG POR
DIMETRO82.50139.0862.100.00283.68
AULAINICSUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO
EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA -
PIURA"AULAS INICIAL + SS.HH02.00.00 TRABAJOS PRELIMINARES02.27.00
TRAZO, NIVELACIN Y REPLANTEOAMBIENTEABCANTIDADAREA (M2)AULAS +
SS.HH20.927.652320.08320.0803.00.00 MOVIMIENTO DE TIERRAS03.01.00
EXCAVACIN DE ZANJAS PARA CIMIENTOS Y
ZAPATASTIPOCANTIDADAHB/LVOLUMEN
(M3)ZAPATA42.401.502.4023.0441.400.501.407.84EJES A,C,F y
H41.600.507.9150.6240.601.407.9118.98EJES 19 y
1741.600.504.4028.1640.601.404.4010.56VC11.300.754.856.3110.301.004.851.46SECCIN
B'-B'31.600.502.1710.4230.601.402.173.91SECCIN
E-E10.400.604.201.68162.9803.03.00 RELLENO Y COMPACTAC. C/ HORMIGN
PARA FONDO DE ZAPATAS Y CIMIENTOSAMBIENTECANTIDADAB/LHAREA
(M2)ZAPATA21.401.400.401.57EJES J y P20.607.910.403.80EJES 8 y
1120.606.400.403.07VC20.306.650.401.60SECCIN
B'-B'30.603.170.402.28SECCIN E-E10.400.204.200.3412.6603.04.00
RELLENO DE ZANJAS CON MATERIAL PROPIOTIPOCANTIDADA/AREAB/LHVOLUMEN
(M3)PARA ZAPATASZAPATA43.800.507.6045.5351.0022.14PARA
CIMIENTOSEJES A,C,F y H41.450.507.9145.88EJES 19 y
1741.450.504.4025.52VC11.000.754.853.6411.301.004.856.31SECCIN
B'-B'31.450.502.174.72111.0903.05.00 RELLENO CON MATERIAL PROPIO
HASTA NIVEL DE SUBRASANTETIPOCANTIDADA/AREAB/LHVOLUMEN (M3)AULA +
SS.HH1144.910.13519.5619.5603.07.00 RELLENO Y COMPACTACIN CON
AFIRMADO PARA FALSOS PISOS, e= 0.15 mAMBIENTEABCANTIDADAREA
(M2)AULAS8.257.152117.98SS.HH3.827.05126.93144.9103.09.00 ACARREO
DE MATERIAL EXCEDENTE03.10.00 ELIMINACIN DE MATERIAL
EXCEDENTEPARTIDAVOLUMEN (M3)FACT. ESPONJ.VOLUMEN (M3)METRADO DE
EXCAVACIN162.98METRADO DE RELLENO256.00-93.021.20-111.6204.00.00
OBRAS DE CONCRETO SIMPLE04.01.00 SOLADO PARA ZAPATAS Y VIGAS DE
CIMENTACIN, E= 0.10MTIPOCANTIDADLBREA
(M2)ZAPATA41.401.407.84VC20.306.653.9911.8304.02.01 CIMIENTOS
CORRIDOS 1:10 + 30% P.G.TIPOCANTIDADA/AREAB/LHVOLUMEN (M3)EJES A y
H20.601.007.859.42EJES C y F20.801.007.8512.56EJES 19 y
1740.601.004.6311.11SECCION B'-B'30.603.171.005.71SECCIN
E-E10.404.200.400.6739.4704.04.00 FALSO PISOAMBIENTEABCANTIDADAREA
(M2)ID. NIVELAC. INT. Y APISONADO144.91144.9105.00.00 OBRAS DE
CONCRETO ARMADO05.01.01 ZAPATAS- CONCRETO F'C= 210
KG/CM2TIPOCANTIDADABHVOLUMEN
(M3)ZAPATAS41.401.400.503.923.9205.01.02 ZAPATAS- ENCOFRADO Y
DESENCOFRADOTIPOCANTIDADPERMETROHREA
(M2)ZAPATAS45.600.5011.2011.2005.03.01 VIGAS DE CIMENTACIN -
CONCRETO F'C= 210 KG/CM2TIPOCANTIDADALHVOLUMEN
(M3)VC40.300.606.654.794.7905.03.02 VIGAS DE CIMENTACIN - ENCOFRADO
Y DESENCOFRADOTIPOCANTIDADPERMETROLREA
(M2)VC20.606.657.987.9805.04.01 SOBRECIMIENTOS- CONCRETO F'C= 175
KG/CM2TIPOCANTIDADAHLVOLUMEN (M3)EJES A,C,F y
H40.151.006.904.14EJES 17 y 1940.151.007.124.27SECCIN
B'-B'30.151.003.921.7610.1705.04.02 SOBRECIMIENTOS-ENCOFRADO Y
DESENCOFRADOTIPOCANTIDADN VECESHLREA (M2)EJES A,C,F y
H421.006.9055.20EJES 17 y 19421.007.1256.96SECCIN
B'-B'321.003.9223.52135.6805.05.01 COLUMNAS - CONCRETO F'C= 210
KG/CM2TIPOCANTIDADABHVOLUMEN
(M3)C140.250.403.501.40C240.600.253.301.9840.300.253.300.99C340.150.253.700.56C440.330.403.501.856.7805.05.02
COLUMNAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERIMETROHAREA
(M2)C141.153.5016.10C242.203.3029.04C340.503.707.40C441.313.5018.3470.8805.06.01
COLUMNAS DE CONFINAMIENTO - CONCRETO F'C= 175
KG/CM2TIPOCANTIDADABHVOLUMEN
(M3)C480.150.251.900.57C480.150.251.000.30C440.150.252.800.421.2905.06.02
COLUMNAS DE CONFINAMIENTO - ENCOFRADO Y
DESENCOFRADOTIPOCANTIDADPERIMETROHAREA
(M2)C480.501.907.6010.151.900.29C480.501.004.00C440.652.807.2819.1705.07.01
VIGAS - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABLVOLUMEN (M3)VIGA
V-10120.250.607.652.30VIGA V-A40.250.407.853.14VIGA
V-B40.250.207.651.53VIGA V-A (SS.HH)20.250.403.820.76VIGA V-B
(SS.HH)10.250.203.820.19VIGA V-CH20.150.203.820.238.1505.07.02
VIGAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROLREA (M2)VIGA
V-10111.107.157.87VIGA V-A20.857.8513.35VIGA V-B20.207.653.06VIGA
V-A (SS.HH)20.853.826.49VIGA V-B (SS.HH)10.253.820.96VIGA
V-CH20.153.801.1432.8705.08.01 VIGAS DE CONFINAMIENTO - CONCRETO
F'C= 210 KG/CM2TIPOCANTIDADABLVOLUMEN (M3)FACHADA
PRINC.20.150.102.460.0720.150.103.550.11FACHADA
POST.40.150.103.550.210.3905.08.02 VIGAS DE CONFINAMIENTO -
ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROLREA (M2)FACHADA
PRINC.20.202.460.9820.203.551.42FACHADA
POST.40.203.552.845.2405.09.01 LOSA ALIGERADA - CONCRETO F'C= 210
KG/CM2AMBIENTEABFACTORCANTIDADVOLUMEN
(M3)AULAS8.057.150.0875210.07SS.HH3.946.600.087512.2812.3505.09.02
LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADOAMBIENTEABCANTIDADVOLUMEN
(M3)AULAS8.057.152115.12SS.HH3.946.60126.00141.1205.09.03 LOSA
ALIGERADA - LADRILLO HUECOAMBIENTEABFACTORCANTIDADVOLUMEN
(M3)AULAS8.057.158.331479.45SS.HH3.946.608.331216.61696.06
ACEROAULAINICSUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL
SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA
- PIURA"AULA INICIAL + SS.HH - ACERO05.00.00 OBRAS DE CONCRETO
ARMADO05.01.03 ACERO PARA ZAPATASELEMENTON
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"ZAPATAS2201.3052.00TOTAL
LONGITUD0.000.0052.00PESO POR M0.250.561.00TOTAL KG POR
DIMETRO0.000.0052.00TOTAL METRADO52.0005.03.03 ACERO PARA VIGAS DE
CIMENTACINELEMENTON
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"VC248.1565.202401.80144.00228.1532.60TOTAL
LONGITUD0.00176.600.0065.20PESO POR M0.250.561.271.56TOTAL KG POR
DIMETRO0.0098.900.00101.71TOTAL METRADO200.6105.04.03 ACERO PARA
SOBRECIMIENTOSELEMENTON ELEM.CANTIDADLONGITUD1/4"3/8"1/2"EJES 17 y
19449.00144.004301.40168.00EJES A,C,F y
H448.15130.404281.40156.80SECCIN B'-B'344.7056.403161.4067.20TOTAL
LONGITUD0.00722.800.00PESO POR M0.250.561.27TOTAL KG POR
DIMETRO0.00404.770.00TOTAL METRADO404.7705.05.03 ACERO PARA
COLUMNASELEMENTON
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"C1465.40129.604401.30208.00C24105.40108.004421.70285.604421.80302.40C3845.4043.208360.70201.60C4465.40129.604401.45232.00TOTAL
LONGITUD0.001229.6043.20367.20PESO POR M0.250.561.001.56TOTAL KG
POR DIMETRO0.00688.5843.20572.831304.6105.06.03 ACERO PARA COLUMNAS
DE CONFINAMIENTOELEMENTON
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"C4842.7086.408150.7084.00C4841.8057.608120.7067.20C4443.3052.808150.7084.00TOTAL
LONGITUD235.20196.800.000.00PESO POR M0.250.561.001.56TOTAL KG POR
DIMETRO58.80110.210.000.00169.0105.07.03 ACERO PARA VIGASEJEN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"3/4"VIGA
V-101248.1565.20225.4521.80222.309.20222.309.202421.80151.20VA448.85141.604501.30260.00260VB447.60121.604400.80128.00VA
(SS.HH)244.5036.002251.3065.00VB
(SS.HH)144.5018.001220.8017.60V-CH224.5018.00224.5018.002220.6026.40TOTAL
LONGITUD172.00494.20193.60507.00PESO POR M0.250.561.001.56TOTAL KG
POR DIMETRO43.00276.75193.60790.92TOTAL METRADO1304.2705.08.03
ACERO PARA VIGAS DE CONFINAMIENTOEJEN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"VC222.6010.402130.256.50VC623.6543.806190.2528.50TOTAL
LONGITUD35.0054.200.000.00PESO POR M0.250.561.001.56TOTAL KG POR
DIMETRO8.7530.350.000.0039.1005.09.03 ACERO PARA LOSA
ALIGERADAELEMENTON ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"AULAS +
SS.HH2188.45304.202361.0575.604182.30165.601174.3073.10TEMPERATURA565.00TOTAL
LONGITUD565.00618.500.000.00PESO POR M0.250.561.001.56TOTAL KG POR
DIMETRO141.25346.360.000.00487.61
PATIOINICIALSUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL
SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA
- PIURA"PATIO INICIAL02.27.00 TRAZO, NIVELACIN Y
REPLANTEOELEMENTOREA (M2)PLATAFORMADEL PLANO144.41144.4103.00.00
MOVIMIENTO DE TIERRAS03.01.00 EXCAVACIN DE ZANJAS PARA
SARDINELESTIPOCANTIDADabLVOLUMEN (M3)EN LADO
CURVO10.150.1514.650.330.3303.02.00 CORTE A NIVEL DE SUBRASANTE
MANUALTIPOCANTIDADAREAHVOLUMEN
(M3)PLATAFORMA1156.050.1015.6115.6103.08.00 BASE DE AFIRMADO PARA
LOSA DE CONCRETOTIPOREA (M2)PLATAFORMADEL PLANO156.05156.0503.09.00
ACARREO DE MATERIAL EXCEDENTE03.10.00 ELIMINACIN DE MATERIAL
EXCEDENTEPARTIDAVOLUMEN (M3)FACT. ESPONJ.VOLUMEN (M3)METRADO DE
EXCAVACIN15.94METRADO DE RELLENO0.0015.941.2019.13
ACEROCERCOSUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL
SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA
- PIURA"CERCO INICIAL - ACERO05.00.00 OBRAS DE CONCRETO
ARMADO05.04.03 ACERO PARA SOBRECIMIENTOSELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"TRAMO
21420.5082.001960.8076.80TOTAL LONGITUD76.8082.000.00PESO POR
M0.250.561.27TOTAL KG POR DIMETRO19.2045.920.00TOTAL
METRADO65.1205.05.03 ACERO PARA COLUMNASELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"TRAMO
1442.3036.804100.7028.00TRAMO 2844.20134.408220.70123.20TRAMO
3742.3064.407100.7049.00164.5027.001221.3028.60TOTAL
LONGITUD228.80235.600.00PESO POR M0.250.561.00TOTAL KG POR
DIMETRO57.20131.940.00TOTAL METRADO189.1405.07.03 ACERO PARA
VIGASEJEMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"TRAMO
1147.1028.401360.6021.60TRAMO 21420.5082.001960.6057.60TRAMO
3149.7038.801510.6030.60141.004.00160.603.60TOTAL
LONGITUD113.40153.200.00PESO POR M0.250.561.27TOTAL KG POR
DIMETRO28.3585.790.00TOTAL METRADO114.14
CERCOSUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO
EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA -
PIURA"CERCO INICIAL02.27.00 TRAZO, NIVELACIN Y
REPLANTEOELEMENTOLACANTIDADAREA (M2)TRAMO 16.760.5016.76TRAMO
220.770.60120.77TRAMO 37.630.5017.6335.1603.00.00 MOVIMIENTO DE
TIERRAS03.01.00 EXCAVACIN DE ZANJA PARA
CIMIENTOSTRAMOBHLCANTIDADVOLUMEN (M3)TRAMO 10.501.206.7614.06TRAMO
20.601.4020.77117.45TRAMO 30.501.207.6314.5826.0903.03.00 RELLENO
CON MATERIAL DE PRSTAMO HORMIGN E= 0.40 mELEMENTOBHLCANTIDADVOLUMEN
(M3)TRAMO 10.500.406.7611.35TRAMO 20.600.4020.7714.98TRAMO
30.500.407.6311.537.8603.04.00 RELLENO COMPACTADO DE ZANJAS CON
MATERIAL PROPIOELEMENTOBHLCANTIDADVOLUMEN (M3)TRAMO
10.350.206.7610.47TRAMO 20.450.2020.7711.87TRAMO
30.350.207.6310.532.8703.09.00 ACARREO DE MATERIAL DE
EXCAVACIONES03.10.00 ELIMINACIN DE MATERIAL EXCEDENTE Dp= 5
kmELEMENTOMETRADODIFERENCIAFACT, ESPONJ.VOLUMEN
(M3)EXCXAVACIN26.09RELLENO2.8723.221.2027.8627.8604.00.00 OBRAS DE
CONCRETO SIMPLE04.01.00 SOLADO MEZCLA 1:12 PARA
COLUMNASELEMENTOABCANTIDADAREA (M2)TRAMO
10.500.6020.600.501.0010.50TRAMO 20.500.6061.800.501.0010.50TRAMO
30.500.6030.900.501.0010.504.8004.02.01 CIMIENTO CORRIDO CONCRETO
1:10 + 30 % P.G.ELEMENTOBHLCANTIDADVOLUMEN (M3)TRAMO
10.500.606.7612.03TRAMO 20.600.8020.7719.97TRAMO
30.500.607.6312.2914.2904.03.01 SOBRECIMIENTO - CONCRETO 1:8 + 25%
P.M.ELEMENTOBHLCANTIDADVOLUMEN (M3)TRAMO 10.150.406.9510.42TRAMO
30.150.406.9510.420.8404.03.02 SOBRECIMIENTO REFORZADO ENCOFRADO Y
DESENCOFRADOELEMENTOHLCANTIDADAREA (M2)TRAMO 10.406.9525.56TRAMO
30.406.9525.5611.1205.00.00 OBRAS DE CONCRETO ARMADO05.04.01
SOBRECIMIENTO REFORZADO CONCRETO F'c= 175
kg/cm2ELEMENTOBHLCANTIDADVOLUMEN (M3)TRAMO
20.150.4020.7711.251.2505.04.02 SOBRECIMIENTO REFORZADO ENCOFRADO Y
DESENCOFRADOELEMENTOHLCANTIDADAREA (M2)TRAMO
20.4020.77216.6216.6205.05.02 COLUMNAS CONCRETO F'c= 175 kg/cm2 -
CERCOELEMENTOBTHCANTIDADVOLUMEN (M3)TRAMO 10.150.250.7040.11TRAMO
20.150.252.5080.75TRAMO
30.150.300.7040.130.150.552.7010.221.2105.05.03 COLUMNAS ENCOFRADO
Y DESENCOFRADOELEMENTOPERIMETROHCANTIDADAREA (M2)TRAMO
10.500.7041.40TRAMO 20.652.5023.250.502.5067.50TRAMO
30.500.7041.401.252.7013.3816.9305.07.02 VIGAS CONCRETO F'c= 175
kg/cm2ELEMENTOABLCANTIDADVOLUMEN (M3)TRAMO 10.150.206.9510.21TRAMO
20.150.2020.7710.62TRAMO 30.150.206.9510.211.0405.07.03 VIGAS
ENCOFRADO Y DESENCOFRADOELEMENTOHLCANTIDADAREA (M2)TRAMO
10.206.9522.78TRAMO 20.2020.7728.31TRAMO 30.206.9522.7813.87
PATIOSUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO
EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA -
PIURA"TECHADO PATIO DE FORMACIN02.27.00 TRAZO, NIVELACIN Y
REPLANTEOTIPOCANTIDADABREA
(M2)PLATAFORMA116.0033.00528.00528.00ESTRUCTURAS03.00.00 MOVIMIENTO
DE TIERRAS03.01.00 EXCAVACIN DE ZANJAS PARA
ZAPATASTIPOCANTIDADABHVOLUMEN
(M3)Z1140.601.202.0020.1620.1603.03.00 RELLENO CON HORMIGN PARA
CIMIENTOSTIPOCANTIDADABHVOLUMEN
(M3)Z1140.601.200.404.034.0303.04.00 RELLENO CON MATERIAL
PROPIOTIPOCANTIDADABHVOLUMEN (M3)Z1140.601.200.909.079.0703.05.00
RELLENO CON MATERIAL PROPIO HASTA NIVELES DE
SUBRASANTETIPOCANTIDADAREAHVOLUMEN
(M3)PATIO1703.290.1070.3370.3303.08.00 RELLENO CON AFIRMADO PARA
LOSA. E= 0.20 mTIPOCANTIDADABAREA
(M2)LOSA119.7035.70703.29703.2903.09.00 ACARREO DE MATERIAL
EXCEDENTE03.10.00 ELIMINACIN DE MATERIAL EXCEDENTEPARTIDAVOLUMEN
(M3)FACT. ESPONJ.VOLUMEN (M3)METRADO DE EXCAVACIN22.67METRADO DE
RELLENO C/MAT. PROPIO79.40-56.731.20-68.08-68.0803.11.00 EXCAVACIN
DE ZANJAS PARA SARDINELESTIPOCANTIDADABLVOLUMEN
(M3)20.150.1520.000.9020.150.1535.701.612.5104.00.00 OBRAS DE
CONCRETO SIMPLE04.01.00 SOLADO DE CONCRETO PARA
ZAPATASTIPOCANTIDADABAREA (M2)Z1140.801.2013.4413.4405.00.00 OBRAS
DE CONCRETO ARMADO05.01.01 ZAPATAS - CONCRETO F'C= 210
KG/CM2TIPOCANTIDADABHVOLUMEN (M3)Z1140.801.200.506.726.7205.01.02
ZAPATAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERIMETROHVOLUMEN
(M3)Z1144.000.5028.0028.00ZAPATAS - ACEROTIPON
ELEMENTOSCANTIDADLKILOS
(KG)ACERO1461.1092.40148.000.7078.40170.8005.02.01 COLUMNAS -
CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABHVOLUMEN
(M3)COLUMNA140.300.505.8012.18140.300.650.300.82140.300.800.301.0114.0105.01.02
COLUMNAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERIMETROHVOLUMEN
(M3)COLUMNA141.605.80129.92141.900.307.98142.200.309.24147.14COLUMNAS
- ACEROTIPON ELEMENTOSCANTIDADLKG/MLKILOS
(KG)ACERO1468.301.561087.631448.301.00464.8014461.600.56577.02MNSULA1432.301.56150.701431.801.0075.601422.200.5634.501411.900.5614.902405.1506.00.00
ESTRUCTURAS METALICAS06.02.00 TIJERAL TIPO ARCOTIPOCANTIDADLUNIDAD
(UND)TIJERAL716.00112.00112.0006.03.00 VIGUETA METLICA CON FIERRO
LISOTIPOCANTIDADLLONGITUD (M)VIGUETA731.90223.30223.3006.04.00
APOYO FIJO DE TIJERALTIPOCANTIDADUNIDAD (UND)APOYO
FIJO77.007.0006.05.00 APOYO MVIL DE TIJERALTIPOCANTIDADUNIDAD
(UND)APOYO MVIL77.007.0006.06.00 ARRIOSTRE DE TIJERAL D=
1/2"TIPOCANTIDADUNIDAD (UND)TIRANTE169.40150.40150.4006.07.00
TIRANTE DE TIJERAL, D= 5/8"TIPOCANTIDADLLONGITUD
(M)TIRANTE716.00112.00112.0006.08.00 PNDOLAS D=
1/2"TIPOCANTIDADUNIDAD
(UND)CENTRAL72.6018.20INTERMEDIAS141.9226.8845.0806.09.00 ARRIOSTRE
DE VIGUETAS, D= 3/8"TIPOCANTIDADLLONGITUD
(M)485.60268.80268.8006.12.00 COBERTURA CON
CALAMINONTIPOCANTIDADALAREA
(M2)COBERTURA117.6033.00580.80580.8006.14.00 CANALETA DE EVACUACIN
PLUVIALTIPOCANTIDADLLONGITUD (M)CANALETA231.9063.8063.8006.15.00
DRENAJE PLUVIALTIPOCANTIDADCANTIDAD (U)44.004.00
PABAULASUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO
EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA -
PIURA"PABELLN AULAS PRIMARIA02.27.00 TRAZO Y
REPLANTEOAMBIENTEABCANTIDADAREA
(M2)AULAS15.857.902250.43250.43ESTRUCTURAS03.00.00 MOVIMIENTO DE
TIERRAS03.01.00 EXCAVACIN DE ZANJAS PARA CIMIENTOS CORRIDOS Y VIGA
DE CIMENTACINTIPOCANTIDADA/AREAHLVOLUMEN
(M3)1-121.801.009.0032.4020.801.009.0014.401'-1'21.801.009.0032.4020.801.009.0014.404-422.201.009.0039.6021.201.009.0021.602-222.201.0013.0057.2021.201.0014.0033.603-322.401.0013.0062.4021.401.0014.0039.20VC41.302.006.4033.28380.4803.04.00
DENSIFICACIN DE FONDO DE CIMENTACIN HASTA 0.60 M DE
PROFUNDIDADTIPOCANTIDADA/AREAB/LLVOLUMEN
(M3)CC-160.606.1822.25CC-221.2031.5075.60V-C40.305.186.22104.0703.05.00
RELLENO COMPACTADO CON HORMIGN P/FONDO DE
CIMIENTOSAMBIENTEAHCANTIDADLVOLUMEN
(M3)1-10.800.4029.005.761'-1'0.800.4029.005.764-41.200.4029.008.642-21.200.40213.9413.383-31.400.40213.9415.61VC0.300.4046.853.2952.4403.03.00
RELLENO DE ZANJAS CON HORMIGNTIPOCANTIDADA/AREAHLVOLUMEN
(M3)1-120.800.409.0014.401'-1'20.800.409.0014.404-421.200.409.0021.602-221.200.4013.0031.203-321.400.4013.0036.40VC40.300.406.407.68125.6803.04.00
RELLENO DE ZANJAS CON MATERIAL PROPIOTIPOCANTIDADAHLVOLUMEN
(M3)1-121.651.009.0029.701'-1'21.651.009.0029.704-441.901.009.0068.402-222.051.0013.0053.303-322.251.0013.0058.50VC41.000.606.4025.6041.301.406.4033.28298.4803.05.00
RELLENO CON MATERIAL PROPIO HASTA ALCANZAR NIVELES DE
SUBRASANTETIPOCANTIDADAREAHVOLUMEN
(M3)AULAS1231.030.13531.1931.1903.07.00 RELLENO Y COMPACTACIN CON
MATERIAL DE AFIRMADO. E= 0.15 MAMBIENTEABCANTIDADAREA
(M2)AULAS15.307.552231.03231.0303.09.00 ACARREO DE MATERIAL
EXCEDENTE Dp= 80 m03.10.00 ELIMINACIN DE MATERIAL
EXCEDENTEPARTIDAVOLUMEN (M3)FACT. ESPONJ.VOLUMEN (M3)METRADO DE
EXCAVACIN380.48METRADO DE RELLENO298.4882.001.2098.4004.00.00 OBRAS
DE CONCRETO SIMPLE04.01.00 SOLADO PARA CIMIENTOS CORRIDOS Y VIGAS
DE CIMENTACINTIPOAACANTIDADLREA
(M2)1-10.8029.0014.401'-1'0.8029.0014.404-41.2029.0021.602-21.20213.9433.463-31.40213.9439.03VC0.3046.858.22131.1104.03.01
SOBRECIMIENTOS - CONCRETO 1:8 + 25% P.M.EJESAHLN VECESVOLUMEN
(M3)EJE 60.150.506.6521.00EJE 90.150.506.6521.00EJE
120.150.506.6521.000.150.503.9520.59EJES A y
C0.150.5013.2043.967.5504.03.02 SOBRECIMIENTOS - ENCOFRADO Y
DESENCOFRADOAMBIENTECANTIDADHLN VECESREA (M2)EJE
620.506.65213.30EJE 920.506.65213.30EJE
1220.506.65213.3020.503.9513.95EJES A y
C40.5013.20252.8096.6504.04.00 FALSO PISOAMBIENTEABCANTIDADAREA
(M2)AULAS15.307.552231.03231.0305.00.00 OBRAS DE CONCRETO
ARMADO05.02.01 CIMIENTO CORRIDO - CONCRETO F'C= 210
KG/CM2TIPOCANTIDADALHVOLUMEN
(M3)CC-120.809.000.507.2020.257.901.003.95CC-1'20.809.000.507.2020.257.901.003.95CC-421.209.000.5010.8020.257.901.003.9520.154.851.001.46CC-221.2013.940.5016.7320.2513.941.006.97CC-321.4013.940.5019.5220.2513.941.006.9788.7005.03.01
VIGAS DE CIMENTACIN - CONCRETO F'C= 210
KG/CM2AMBIENTECANTIDADAHLVOLUMEN
(M3)V-C40.300.606.404.6140.300.100.460.064.6705.03.02 VIGAS DE
CIMENTACIN - ENCOFRADO Y DESENCOFRADOAMBIENTECANTIDADHLN VECESREA
(M2)V-C40.606.4027.6840.100.4620.097.7705.05.01 COLUMNAS - CONCRETO
F'C= 210 KG/CM2TIPOCANTIDADABHVOLUMEN (M3)C1EJES 6,12,15 y
2180.250.407.105.6880.150.257.102.13C2EJES
7,10.16.1980.600.256.708.0480.300.256.704.02C3EJES
9,12,17,2140.500.257.103.5540.250.257.101.78C4EJE
A1,A3,A4,A1060.250.407.104.2660.250.407.104.2633.7205.05.02
COLUMNAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROHAREA
(M2)C1EJES 6,12,15 y 2181.607.1090.88C2EJES
7,10.16.1982.206.70117.92C3EJES 9,12,17,2182.007.10113.60C4EJE
A1,A3,A4,A1041.307.10322.4005.06.01 COLUMNAS DE CONFINAMIENTO -
CONCRETO F'C= 175 KG/CM2TIPOCANTIDADABHVOLUMEN (M3)FACHADA
PRINCIPALC5320.150.251.301.56FACHADA
POSTERIORC5320.150.251.672.00FACHADAS
LATERALESC5480.150.252.955.31PARAPETOC5120.150.250.900.419.2805.06.02
COLUMNAS DE CONFINAMIENTO - ENCOFRADO Y
DESENCOFRADOTIPOCANTIDADPERMETROHAREA (M2)FACHADA
PRINCIPALC5320.501.3020.80FACHADA
POSTERIORC5320.501.6726.72FACHADAS
LATERALESC5480.502.9570.80PARAPETO0.00C5120.500.905.40123.7205.07.01
VIGAS - CONCRETOTIPOCANTIDADABLVOLUMEN (M3)PRIMERA PLANTAEJES A y
C40.250.4014.505.80EJES 6,12,15 y 2140.250.4010.004.00EJES 7,10,16
y 1940.300.6010.007.20EJES 9 y
1720.250.4010.002.00VS20.150.2014.500.87SEGUNDA PLANTAEJES A y
C40.250.4014.505.80EJES 6,12,15 y 2140.250.4010.004.00EJES 7,10,16
y 1940.300.6010.007.20EJES 9 y
1720.250.4010.002.00VS10.150.2014.500.4439.3105.07.02 VIGAS -
ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROLAREA (M2)PRIMERA
PLANTAEJES A y C40.4015.8525.3640.4514.5026.10EJES 6,12,15 y
2140.6010.0024.0040.258.808.80EJES 7,10,16 y
1940.307.408.8880.407.9025.28VS20.1514.504.3520.2015.856.34SEGUNDA
PLANTAEJES A y C40.4015.8525.3640.4514.5026.10EJES 6,12,15 y
2140.6010.0024.0040.258.808.80EJES 7,10,16 y
1940.307.408.8880.407.9025.28VS20.1514.504.3520.2015.856.34258.2205.08.01
VIGAS DE CONFINAMIENTO - CONCRETO F'C= 175
KG/CM2TIPOCANTIDADABLVOLUMEN (M3)FACHADA
PRINCIPAL80.150.102.700.3280.150.101.600.19FACHADA
POSTERIOR160.150.102.700.65FACHADAS
LATERALES120.150.206.602.38PARAPETO20.150.102.100.0620.150.1015.850.484.0805.08.02
VIGAS DE CONFINAMIENTO - ENCOFRADO Y
DESENCOFRADOTIPOCANTIDADPERMETROLAREA (M2)FACHADA
PRINCIPAL80.202.704.3280.201.602.56FACHADA
POSTERIOR160.202.708.64FACHADAS
LATERALES120.406.6031.68PARAPETO20.202.100.8420.2015.856.3454.3805.09.01
LOSA ALIGERADA - CONCRETO F'C= 210 KG/CM2AMBIENTEFACTORABN
VECESVOLUMEN (M3)AULAS 1ra. PLANTA0.087514.609.35223.89AULA 2da.
PLANTA0.087514.609.35223.8947.7805.09.02 LOSA ALIGERADA - ENCOFRADO
Y DESENCOFRADOAMBIENTEABN VECESREA (M2)AULAS 1ra.
PLANTA14.609.352273.02AULA 2da.
PLANTA14.609.352273.02546.0405.09.03 LOSA ALIGERADA - LADRILLO
HUECOAMBIENTEFACTORABN VECESUNIDAD (UND)AULAS 1ra.
PLANTA8.3314.609.3522274.26AULA 2da.
PLANTA8.3314.609.3522274.264548.52
ACEROAULASUSTENTO DE METRADOS (OK)PROYECTO: "MEJORAMIENTO DEL
SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA
- PIURA"ACERO PABELLN AULAS PRIMARIA05.02.03 CIMIENTOS
CORRIDOSELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"AULASCORTE
1-1249.0072.00249.0072.002460.7064.40249.0072.002342.50170.00CORTE
1'-1'249.0072.00249.0072.002460.7064.40249.0072.002342.50170.00CORTE
4-4249.0072.00249.0072.002461.10101.20249.0072.002342.50170.00ZONA
ESCALERA249.0072.00249.0072.00249.0072.002342.50170.002242.30110.40CORTE
2-22417.25138.002617.15205.802461.10101.202417.25138.002342.50170.00CORTE
3-32417.25138.002617.15205.802461.30119.602417.25138.002342.50170.00TOTAL
LONGITUD0.001694.401714.40PESO POR M0.250.561.00TOTAL KG POR
DIMETRO0.00948.861714.40TOTAL METRADO2663.2605.03.03 VIGA DE
CIMENTACINELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"V-C469.00216.00429.0072.004421.80302.40TOTAL
LONGITUD0.00374.400.00216.00PESO POR M0.250.561.001.56TOTAL KG POR
DIMETRO0.00209.660.00336.96TOTAL METRADO546.6205.05.03
COLUMNASELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"C1889.00576.008641.30665.600.008641.30665.60C28129.00864.008641.70870.408641.60819.20C34109.00360.004641.50384.004641.50384.00C4669.00324.006641.30499.20TOTAL
LONGITUD0.004288.000.002124.00PESO POR M0.250.561.001.00TOTAL KG
POR DIMETRO0.002401.280.002124.00TOTAL METRADO4525.2805.06.03
COLUMNAS DE CONFINAMIENTOELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"1ra. Y 2da. PlantaFachada
Principal1641.80115.201690.70100.801642.20140.801690.70100.80Fachada
Posterior1642.60166.4016110.70123.201642.20140.8016110.70123.20Fachadas
laterales24410.20979.2024170.70285.602441.70163.2024180.70302.40Parapeto1241.5072.001280.7067.20TOTAL
LONGITUD1103.201777.600.000.00PESO POR M0.250.561.001.00TOTAL KG
POR DIMETRO275.80995.460.000.00TOTAL METRADO1271.2605.07.03
VIGASELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"3/4"1RA.
PLANTAVIGA V-1014416.65266.404241.30124.80VIGA
V-1024416.65266.404241.30124.80VIGA
V-103448.50136.00424.9039.20423.8030.40422.7021.604571.80410.40VIGA
V-104448.50136.00422.2518.00413.1012.404641.30332.80VIGA
V-105258.5085.00222.259.00222.259.00223.1012.40211.603.202641.30166.40VIGA
V-1062416.45131.602480.6057.602DA. PLANTAVIGA
V-2014416.65266.404241.30124.80VIGA
V-2024416.65266.40266.404241.30124.804601.80432.00VIGA
V-2034416.65266.40412.259.00412.259.00423.8030.40422.7021.604571.80410.40VIGA
V-204448.50136.004641.30332.80VIGA
V-205448.50136.00422.2518.00413.1012.40411.606.402641.30166.40VIGA
V-1062416.45131.602480.6057.60TOTAL
LONGITUD115.202750.40333.801925.20493.60PESO POR
M0.250.561.001.001.00TOTAL KG POR
DIMETRO28.801540.22333.801925.20493.60TOTAL METRADO4321.6205.08.03
VIGAS DE CONFINAMIENTOELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"3/4"Fachada
Principal823.2051.20822.1033.608170.4054.408110.4035.20Fachada
Posterior1623.20102.4016170.40108.80Fachadas
Laterales4847.701478.4048400.601152.00Parapeto222.409.602216.5066.002120.409.602920.4073.60TOTAL
LONGITUD1344.001830.800.000.000.00PESO POR
M0.250.561.001.001.00TOTAL KG POR
DIMETRO336.001025.250.000.000.00TOTAL METRADO1361.2505.09.03 LOSA
ALIGERADAELEMENTOM2N ELEM.CANTIDADLONGITUD1/4"3/8"1/2"1RA.
PLANTAAULA24216.00768.002441.0096.002462.70388.80TEMPERATURA1092.002DA.
PLANTAAULA24216.00768.002441.0096.002462.70388.80TEMPERATURA1092.00TOTAL
LONGITUD2184.001728.00777.60PESO POR M0.250.561.00TOTAL KG POR
DIMETRO546.00967.68777.60TOTAL METRADO2291.28
ESCALERASUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO
EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA -
PIURA"ESCALERA02.27.00 TRAZO, NIVELACIN Y
REPLANTEOELEMENTOABDSCTOSAREA
(M2)ESCALERA4.754.85023.0423.04ESTRUCTURAS03.00.00 MOVIMIENTO DE
TIERRAS03.01.00 EXCAVACIN DE ZANJAS PARA CIMIENTOS Y
ZAPATASTIPOCANTIDADABH/LVOLUMEN (M3)CORTE
B-B11.602.670.562.3911.601.030.560.92CORTE
C-C11.602.030.571.855.1603.02.00 CORTE DE TERRENO HASTA NIVELES DE
SUBRASANTETIPOCANTIDADAREAHVOLUMEN (M3)ZONA
ESCALERA119.400.5650.566.146.1403.03.00 RELLENO COMPACTADO CON
HORMIGNAMBIENTECANTIDADAB/LHAREA
(M2)B-B10.603.670.400.8811.002.130.400.85C-C10.252.130.400.211.9403.04.00
RELLENO DE ZANJAS CON MATERIAL PROPIOTIPOCANTIDADAREALHVOLUMEN
(M3)B-B11.452.670.563.8711.451.030.560.84C-C11.452.030.571.686.3903.06.00
NIVELACIN INTERIOR Y APISONADOAMBIENTECANTIDADABAREA (M2)ZONA
ESCALERA14.451.757.7922.152.7011.6119.4003.09.00 ACARREO DE
MATERIAL EXCEDENTE03.10.00 ELIMINACIN DE MATERIAL
EXCEDENTEPARTIDAVOLUMEN (M3)DIFERENCIAFACT. ESPONJ.VOLUMEN
(M3)METRADO DE EXCAVACIN11.30METRADO DE
RELLENO6.394.911.205.895.8904.00.00 OBRAS DE CONCRETO
SIMPLE04.01.00 SOLADO PARA COLUMNASAMBIENTEABLAREA (M2)PARA
C741.200.602.882.8804.02.01 CIMIENTOS- CONCRETO 1:10 + 25%
P.M.TIPOCANTIDADABLVOLUMEN
(M3)B-B10.600.803.671.7610.600.802.131.02C-C10.600.802.131.023.8005.00.00
OBRAS DE CONCRETO ARMADO05.04.01 SOBRECIMIENTOS REFORZADOS -
CONCRETO F'C= 210 KG/CM2TIPOCANTIDADAHLVOLUMEN (M3)De muro
posterior10.151.074.250.68De muro delantero10.151.072.000.32De muro
central10.250.382.050.191.1905.04.02 SOBRECIMIENTOS REFORZADOS -
ENCOFRADO Y DESENCOFRADOTIPOCANTIDADN VECESHLAREA (M2)De muro
posterior121.074.259.10De muro delantero121.072.004.28De muro
central120.382.051.5414.9205.05.01 COLUMNAS - CONCRETO F'C= 210
KG/CM2TIPOCANTIDADABHVOLUMEN
(M3)C740.250.256.701.68C810.150.252.500.0910.150.254.200.16C920.250.406.701.343.2705.05.02
COLUMNAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROHAREA
(M2)C740.456.7012.06C810.652.501.6310.654.202.73C920.656.708.7125.1305.07.01
VIGAS - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABLVOLUMEN
(M3)VE-110.150.404.250.26VE-210.250.404.250.43V-A20.250.404.850.9720.250.602.100.63V-B30.250.204.250.64VS10.150.204.250.133.0605.07.02
VIGAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROLAREA
(M2)VE-110.754.253.19VE-210.504.252.13V-A20.604.855.8220.852.103.57V-B20.254.252.1310.454.251.91VS10.354.251.4920.2405.09.01
LOSA ALIGERADA - CONCRETO F'C= 210
KG/CM2ELEMENTOFACTORENCOFRADOVOLUMEN (M3)LOSA
TECHO0.087525.712.252.2505.09.02 LOSA ALIGERADA - ENCOFRADO Y
DESENCOFRADOELEMENTOFACTORABREA (M2)LOSA
TECHO4.256.0525.7125.7105.09.03 LOSA ALIGERADA - LADRILLO
HUECOELEMENTOFACTORENCOFRADOBUNIDAD (UND)LOSA
TECHO8.3325.71214.16214.4605.10.01 ESCALERA - CONCRETO F'C= 210
KG/CM2ELEMENTOABLCANTIDADVOLUMEN
(M3)GRADAS0.150.172.10201.07LOSA6.890.152.1024.34DESCANSO1.900.204.4511.69PASADIZO2.10.204.4511.878.9705.10.02
ESCALERA - ENCOFRADO Y DESENCOFRADOAMBIENTEABCANTIDADREA
(M2)GRADAS0.172.10200.36FONDO6.892.10214.47DESCANSO1.754.4517.79LATERALES6.890.2021.3824.00
ACEROESCALERASUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL
SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA
- PIURA"ESCALERA - ACERO04.04.03 ACERO
SOBRECIMIENTOSELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"SOBRECIMIENTOSB-B246.0048.00245.5044.00244.6036.802226.00264.00B-B145.2521.001181.5027.00142.9011.60191.5013.50C-C142.6510.601121.0012.00TOTAL
LONGITUD12.0083.700.00PESO POR M0.250.561.00TOTAL KG POR
DIMETRO3.0046.870.00TOTAL METRADO49.8704.05.03 ACERO
COLUMNASELEMENTOSECCINN
ELEMENTOSCANTIDADLONGITUD1/4"3/8"1/2"5/8"COLUMNA
C7449.00144.004281.00112.00COLUMNA
C8143.6014.401200.9018.00145.7022.801270.9024.30COLUMNA
C9269.00108.002281.3072.80TOTAL LONGITUD0.00227.1037.20252.00PESO
POR M0.250.561.001.56TOTAL KG POR DIMETRO0.00127.1837.20393.12TOTAL
METRADO557.5004.07.03 ACERO VIGASELEMENTON
ELEMENTOSCANTIDADLONGITUD1/4"3/8"1/2"5/8"V-E3 -
V-A227.3529.40222.008.00225.0520.20223.0012.002161.7054.402291.3075.40V-B344.8558.203240.8057.60V-E1144.8519.401241.0024.00VE-2154.8524.251241.2028.80VS144.8519.401240.6014.40VS
(Muro central)143.9015.601200.60TOTAL
LONGITUD96.00205.60159.450.00PESO POR M0.250.561.001.56TOTAL KG POR
DIMETRO24.00115.14159.450.00TOTAL METRADO298.591/2"04.09.04 ACERO
LOSA ALIGERADAELEMENTOM2N
ELEMENTOSCANTIDADLONGITUD1/4"3/8"1/2"LOSA1164.6574.40121.102.20TEMPERATURA103.000.00TOTAL
LONGITUD103.0076.600.000.00PESO POR M0.250.561.001.56TOTAL KG POR
DIMETRO25.7542.900.000.00TOTAL METRADO68.6505.10.04 ACERO
ESCALERAELEMENTOM2N ELEMENTOSCANTIDADLONGITUD1/4"3/8"1/2"LOSA TRAMO
11114.2546.751112.0022.00161.106.60161.056.301113.0033.00DESCANSO1112.9031.901112.9031.901184.7585.50TRAMO
21114.6050.601112.0022.001113.0033.001112.8531.35PASADIZO1112.4026.401113.0033.001184.7585.50TOTAL
LONGITUD0.00545.800.000.00PESO POR M0.250.561.001.56TOTAL KG POR
DIMETRO0.00305.650.000.00TOTAL METRADO305.65
AULAINICIAL1SUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL
SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA
- PIURA"AULA INICIAL02.27.00 TRAZO Y REPLANTEOAMBIENTEABDSCTOSAREA
(M2)AULA8.557.65065.4165.4103.00.00 MOVIMIENTO DE TIERRAS03.01.00
EXCAVACIN DE ZANJAS PARA CIMIENTOS Y
ZAPATASTIPOCANTIDADAHB/LVOLUMEN
(M3)ZAPATA22.401.502.4011.5221.400.501.403.92EJES J y
P21.600.507.9125.3120.601.407.919.49EJES 8 y
1121.600.504.4014.0820.601.404.405.28VC11.300.754.856.3110.301.004.851.4677.3703.02.00
CORTE DE TERRENO HASTA NIVELES DE
SUBRASANTETIPOCANTIDADAREAHB/LVOLUMEN
(M3)AULA12.401.502.405.7621.400.501.403.92EJES J y
P21.600.507.9125.3103.03.00 RELLENO COMPACTADO CON HORMIGN PARA
CIMIENTOSAMBIENTEABHLVOLUMEN (M3)ZAPATA21.400.401.401.57EJES J y
P20.600.407.913.80EJES 8 y
1120.600.406.403.07VC10.300.406.650.809.2403.04.00 RELLENO DE
ZANJAS CON MATERIAL PROPIOTIPOCANTIDADAREA/AHLVOLUMEN
(M3)ZAPATA23.800.503.8025.5351.0011.07EJES J y
P21.450.507.9111.47EJES 8 y
1121.450.504.406.38VC11.000.754.853.6411.301.004.856.3132.7203.06.00
NIVELACIN INTERIOR Y APISONADO03.08.00 RELLENO COMPACTADO CON
AFIRMADO PARA FALSO PISO, e= 0.15 mAMBIENTEABDSCTOSAREA
(M2)AULA8.257.15058.9958.9903.10.00 ACARREO DE MATERIAL
EXCEDENTE03.11.00 ELIMINACIN DE MATERIAL EXCEDENTEPARTIDAVOLUMEN
(M3)FACT. ESPONJ.VOLUMEN (M3)METRADO DE EXCAVACIN102.68METRADO DE
RELLENO32.7269.961.2083.9504.00.00 OBRAS DE CONCRETO SIMPLE04.01.00
SOLADO PARA ZAPATASAMBIENTECANTIDADABAREA
(M2)ZAPATA21.401.403.92VC10.306.652.005.9204.02.01 CIMIENTOS-
CONCRETO 1:8 + 25% P.M.TIPOCANTIDADABLVOLUMEN (M3)EJES J y
P20.601.007.859.42EJES 8 y 1120.601.004.635.5614.9804.04.00 FALSO
PISOAMBIENTEABDSCTOSAREA (M2)AULA8.257.15058.9958.9905.00.00 OBRAS
DE CONCRETO ARMADO05.01.01 ZAPATAS - CONCRETO F'C= 210
KG/CM2TIPOCANTIDADABLVOLUMEN
(M3)ZAPATAS21.401.400.501.961.9605.01.02 ZAPATAS - ENCOFRADO Y
DESENCOFRADOTIPOCANTIDADAHAREA (M2)ZAPATAS25.600.505.605.6005.03.01
VIGA DE CIMENTACIN - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABLVOLUMEN
(M3)VC10.300.606.651.201.2005.03.02 VIGA DE CIMENTACIN - ENCOFRADO
Y DESENCOFRADOTIPOCANTIDADAHAREA (M2)VC10.606.653.993.9905.04.01
SOBRECIMIENTOS REFORZADOS - CONCRETO F'C= 210
KG/CM2TIPOCANTIDADABLVOLUMEN (M3)EJES J y P20.150.806.901.66EJES 8
y 1120.150.807.121.713.3705.04.02 SOBRECIMIENTOS REFORZADOS -
ENCOFRADO Y DESENCOFRADOTIPOCANTIDADN VECESHLAREA (M2)EJES J y
P220.806.9022.08EJES 8 y 11220.807.1222.7844.8605.05.01 COLUMNAS -
CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABHVOLUMEN
(M3)C140.250.403.501.40C220.600.253.300.9920.300.253.300.50C320.150.253.500.263.1505.05.02
COLUMNAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROHAREA
(M2)C141.153.5016.10C221.903.3012.54C320.503.503.5032.1405.06.01
COLUMNAS DE CONFINAMIENTO - CONCRETO F'C= 175
KG/CM2TIPOCANTIDADABHVOLUMEN
(M3)C440.150.251.900.29C440.150.251.000.150.4405.06.02 COLUMNAS DE
CONFINAMIENTO - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROHAREA
(M2)C440.501.903.8010.151.900.29C440.501.002.006.0905.07.01 VIGAS -
CONCRETO F'C= 210 KG/CM2ELEMENTOCANTIDADAHLVOLUMEN (M3)VIGA
V-10110.250.607.651.15VIGA V-A20.250.407.851.57VIGA
V-B20.250.207.650.773.4905.07.02 VIGAS - ENCOFRADO Y
DESENCOFRADOTIPOCANTIDADPERMETROLAREA (M2)VIGA
V-10111.107.157.87VIGA V-A20.857.8513.35VIGA
V-B20.207.653.0624.2805.08.01 VIGAS DE CONFINAMIENTO - CONCRETO
F'C= 175 KG/CM2ELEMENTOCANTIDADAHLVOLUMEN (M3)FACHADA
PRINC.10.150.102.460.0410.150.103.550.05FACHADA
POST.20.150.103.550.110.2005.08.02 VIGAS - ENCOFRADO Y
DESENCOFRADOTIPOCANTIDADPERMETROLAREA (M2)FACHADA
PRINC.10.202.460.4910.203.550.71FACHADA
POST.20.203.551.422.6205.09.01 LOSA ALIGERADA - CONCRETO F'C= 210
KG/CM2AMBIENTEFACTORENCOFRADOVOLUMEN
(M3)AULA0.087557.565.045.0405.09.02 LOSA ALIGERADA - ENCOFRADO Y
DESENCOFRADOAMBIENTEFACTORABREA (M2)AULA8.057.1557.5657.5605.09.03
LOSA ALIGERADA - LADRILLO HUECOAMBIENTEFACTORENCOFRADOBUNIDAD
(UND)AULA8.3357.56479.47207.00
ACEROAULAINICIAL1SUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL
SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA
- PIURA"AULA INICIAL-ACERO05.01.03 ACERO ZAPATASELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"ZAPATAS2201.3052.00TOTAL
LONGITUD0.0052.000.00PESO POR M0.250.561.00TOTAL KG POR
DIMETRO0.0029.120.00TOTAL METRADO29.1205.03.03 ACERO VIGA DE
CIMENTACINELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"VC148.1532.601401.8072.00128.1516.30TOTAL
LONGITUD0.0088.300.0032.60PESO POR M0.250.561.001.56TOTAL KG POR
DIMETRO0.0049.450.0050.86TOTAL METRADO100.3105.04.03 ACERO EN
SOBRECIMIENTOSELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"EJES 8 y
11249.0072.002301.4084.00EJES J y P248.1565.202281.4078.40TOTAL
LONGITUD0.00299.600.00PESO POR M0.250.561.00TOTAL KG POR
DIMETRO0.00167.780.00TOTAL METRADO167.7805.05.03 ACERO EN
COLUMNASELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"C1465.40129.604401.30208.00C22105.40108.002421.70142.802421.80151.20C3245.4043.202360.7050.40TOTAL
LONGITUD0.00552.4043.20237.60PESO POR M0.250.561.001.56TOTAL KG POR
DIMETRO0.00309.3443.20370.66TOTAL METRADO723.2005.06.03 ACERO EN
COLUMNETASELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"C4442.7043.204150.7042.00C4441.8028.804120.7033.60TOTAL
LONGITUD75.6072.000.000.00PESO POR M0.250.561.001.56TOTAL KG POR
DIMETRO18.9040.320.000.00TOTAL METRADO59.2205.07.03 ACERO EN
VIGASELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"VIGA
V-101148.1532.60125.4510.90122.304.60122.304.601421.8075.60VA248.8570.802501.30130.00130VB247.6060.802400.8064.00TOTAL
LONGITUD64.00205.6060.80253.50PESO POR M0.250.561.001.56TOTAL KG
POR DIMETRO16.00115.1460.80395.46TOTAL METRADO587.4005.08.03 ACERO
EN VIGAS DE CONFINAMIENTOELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"VC122.605.201130.253.25VC323.6521.903190.2514.25TOTAL
LONGITUD17.5027.100.000.00PESO POR M0.250.561.001.56TOTAL KG POR
DIMETRO4.3815.180.000.00TOTAL METRADO19.5605.09.03 ACERO EN LOSA
ALIGERADAELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"AULA1188.45152.101361.0537.801182.3041.40TEMPERATURA230.50TOTAL
LONGITUD230.50231.300.00PESO POR M0.250.561.00TOTAL KG POR
DIMETRO57.63129.530.00TOTAL METRADO187.16
ACEROCISTERNASUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL
SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA
- PIURA"ACERO - CISTERNA05.05.03 ACERO EN COLUMNASELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"C1447.50120.00427.5060.004521.00208.00TOTAL
LONGITUD0.00208.00180.000.00PESO POR M0.250.561.001.56TOTAL KG POR
DIMETRO0.00116.48180.000.00TOTAL METRADO296.4805.07.03 ACERO EN
VIGASELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"VA242.8022.40242.0016.002150.9027.002101.0020.00VB422.8022.40422.0016.004150.900.904100.900.90TOTAL
LONGITUD1.8047.0038.400.00PESO POR M0.250.561.001.56TOTAL KG POR
DIMETRO0.4526.3238.400.00TOTAL METRADO65.1705.11.03 ACERO EN
CISTERNAELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"5/8"TAPA1162.8044.801241.9045.60VIGA
SUPERIOR148.1032.401501.0050.00PAREDES2163.0096.002183.00108.002188.10291.602146.00168.00FONDO281.1017.60281.2019.20281.4022.40281.3521.601132.0026.00VIGA
DE FONDO148.1032.401501.0050.00TOTAL
LONGITUD0.00466.40559.200.00PESO POR M0.250.561.001.56TOTAL KG POR
DIMETRO0.00261.18559.200.00TOTAL METRADO820.3805.12.03 ACERO EN
LOSA MACIZAELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"SUPERIOR1342.4081.60INFERIOR1342.4081.60TOTAL
LONGITUD0.00163.200.00PESO POR M0.250.561.00TOTAL KG POR
DIMETRO0.0091.390.00TOTAL METRADO91.39
CISTERNASUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO
EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA -
PIURA"CISTERNA02.27.00 TRAZO Y REPLANTEOAMBIENTEABDSCTOSAREA
(M2)CISTERNA2.301.5003.453.4503.00.00 MOVIMIENTO DE TIERRAS03.01.00
EXCAVACIN DE ZANJAS PARA CISTERNA Y CIMENTACIN DE TANQUE
ELEVADOTIPOCANTIDADABHVOLUMEN
(M3)CISTERNA13.302.502.7022.2822.2803.03.00 RELLENO COMPACTADO CON
HORMIGN PARA FONDO DE CISTERNAN VECESBHH/LVOLUMEN
(M3)13.302.500.403.3020.3850.251.500.293.5903.04.00 RELLENO DE
ZANJAS CON MATERIAL PROPIOCANTIDADAREAHVOLUMEN
(M3)14.8002.7012.9612.9603.09.00 ACARREO DE MATERIAL
EXCEDENTE03.10.00 ELIMINACIN DE MATERIAL EXCEDENTEPARTIDAVOLUMEN
(M3)FACT. ESPONJ.VOLUMEN (M3)METRADO DE EXCAVACIN22.28METRADO DE
RELLENO12.969.321.2011.1804.00.00 OBRAS DE CONCRETO SIMPLE04.01.00
SOLADO PARA FONDO DE CISTERNAAMBIENTECANTIDADABAREA
(M2)12.301.503.453.4505.00.00 OBRAS DE CONCRETO ARMADO05.05.01
COLUMNAS - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABHVOLUMEN
(M3)C140.250.254.411.1040.250.102.250.2340.150.102.250.141.4705.05.02
COLUMNAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROHAREA
(M2)C141.004.4117.6440.602.255.4023.0405.07.01 VIGAS - CONCRETO
F'C= 210 KG/CM2ELEMENTOCANTIDADABLVOLUMEN
(M3)V-A20.250.202.000.2020.250.201.200.12V-B20.250.202.500.2520.250.202.000.200.770.7705.07.02
VIGAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROLAREA
(M2)V-A20.652.002.6020.651.201.56V-B20.252.001.0020.252.001.006.1605.11.01
CISTERNA - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABHVOLUMEN
(M3)FONDO20.650.650.400.3420.3950.151.500.1820.350.151.500.1610.6250.151.500.14VIGA
INF20.100.201.500.0620.100.202.000.08PAREDES20.151.502.050.9220.152.002.051.23VIGA
SUP.20.100.201.500.0620.100.202.000.08TAPA12.301.500.150.523.7705.11.02
CISTERNA - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADN VECESLHAREA
(M2)FONDO212.600.402.08211.810.150.54211.500.150.45VIGA
INF.210.201.500.60210.202.000.80PAREDES211.502.056.15211.501.905.70212.302.059.43212.301.908.74VIGA
SUP.210.301.500.90210.302.001.20TAPA212.300.150.69211.500.150.45212.001.204.8042.5305.12.01
LOSA DE APOYO DE TANQUE ELEVADO - CONCRETO F'C= 210
KG/CM2AMBIENTECANTIDADABHVOLUMEN
(M3)LOSA12.502.500.21.251.2505.12.02 LOSA DE APOYO TANQUE ELEVADO -
ENCOFRADO Y DESENCOFRADOAMBIENTEFACTORAHREA
(M2)LOSA12.502.506.2542.500.202.008.25
SSHHPROFSUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO
EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA -
PIURA"BAOS PROFESORES02.27.00 TRAZO Y REPLANTEOAMBIENTEABDSCTOSAREA
(M2)SS.HH2.901.8005.225.2203.00.00 MOVIMIENTO DE TIERRAS03.01.00
EXCAVACIN DE ZANJAS PARA CIMIENTOS Y ZAPATASTIPOCANTIDADABLVOLUMEN
(M3)EJES A y B21.600.503.3510.7220.601.403.354.02EJES 1 y
221.600.501.153.6820.601.402.152.5821.0003.03.00 RELLENO COMPACTADO
CON HORMIGN PARA CIMIENTOSAMBIENTEABHLVOLUMEN (M3)EJES A y
B20.600.403.351.61EJES 1 y 220.600.402.151.032.6403.04.00 RELLENO
DE ZANJAS CON MATERIAL PROPIOTIPOCANTIDADABLVOLUMEN (M3)EJES A y
B21.450.503.359.72EJES 1 y 221.450.501.153.3413.0603.07.00 RELLENO
COMPACTADO CON AFIRMADO PARA FALSO PISO, e=0.15
mAMBIENTEABDSCTOSAREA (M2)2.601.5003.903.9003.09.00 ACARREO DE
MATERIAL EXCEDENTE03.10.00 ELIMINACIN DE MATERIAL
EXCEDENTEPARTIDAVOLUMEN (M3)FACT. ESPONJ.VOLUMEN (M3)METRADO DE
EXCAVACIN21.00METRADO DE RELLENO13.067.941.209.5304.00.00 OBRAS DE
CONCRETO SIMPLE04.01.00 SOLADO PARA COLUMNASAMBIENTECANTIDADABAREA
(M2)SOLADO40.600.601.441.4404.02.01 CIMIENTOS- CONCRETO 1:10 + 30%
P.M.TIPOCANTIDADABLVOLUMEN (M3)EJES A y B20.601.003.354.02EJES 1 y
220.601.002.152.586.6004.04.00 FALSO PISOAMBIENTEABDSCTOSAREA
(M2)2.601.5003.903.9005.00.00 OBRAS DE CONCRETO ARMADO05.04.01
SOBRECIMIENTOS REFORZADOS - CONCRETO F'C= 210
KG/CM2TIPOCANTIDADABLVOLUMEN (M3)EJE A y B20.150.802.400.58EJES 1 y
220.150.801.500.360.9405.04.02 SOBRECIMIENTOS REFORZADOS -
ENCOFRADO Y DESENCOFRADOTIPOCANTIDADN VECESHLAREA (M2)EJES A y
B210.802.904.64210.802.403.84EJES 1 Y 2210.801.802.88EJE
1210.801.502.4013.7605.05.01 COLUMNAS - CONCRETO F'C= 210
KG/CM2TIPOCANTIDADABHVOLUMEN (M3)C140.150.253.700.560.5605.05.02
COLUMNAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROHAREA
(M2)EJE AC130.503.705.55C110.653.702.417.9605.07.01 VIGAS -
CONCRETO F'C= 210 KG/CM2ELEMENTOCANTIDADABLVOLUMEN (M3)EJES A y
B20.150.202.900.17EJES 1 Y 220.150.201.500.090.2605.07.02 VIGAS -
ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROLAREA (M2)EJES A y
B20.202.901.16EJES 1 y 220.201.800.7210.151.000.152.0305.09.01 LOSA
ALIGERADA - CONCRETO F'C= 210 KG/CM2AMBIENTEFACTORENCOFRADOVOLUMEN
(M3)SS.HH.0.08753.900.340.3405.09.02 LOSA ALIGERADA - ENCOFRADO Y
DESENCOFRADOAMBIENTEFACTORABREA (M2)SS.HH.2.601.503.903.9005.09.03
LOSA ALIGERADA - LADRILLO HUECOAMBIENTEFACTORENCOFRADOBUNIDAD
(UND)SS.HH.8.333.9032.4932.49
ACEROSSHHPROFSUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL
SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA
- PIURA"ACERO - SERVICIOS HIGINICOS05.04.03 ACERO EN
SOBRECIMIENTOSELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"EJES A y
B233.4020.401121.4016.80EJES 1 y 2232.3013.80171.409.80TOTAL
LONGITUD0.0060.800.00PESO POR M0.250.561.00TOTAL KG POR
DIMETRO0.0034.050.00TOTAL METRADO34.0505.05.03 ACERO EN
COLUMNASELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"C1445.0080.004250.7070.00TOTAL
LONGITUD70.000.0080.00PESO POR M0.250.561.00TOTAL KG POR
DIMETRO17.500.0080.00TOTAL METRADO97.5005.07.03 ACERO EN
VIGASELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"EJES A y
B243.4027.202160.6019.20EJES 1 y 2242.3018.402130.6015.60TOTAL
LONGITUD34.800.0045.60PESO POR M0.250.561.00TOTAL KG POR
DIMETRO8.700.0045.60TOTAL METRADO54.3005.09.03 ACERO EN LOSA
ALIGERADAELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"SS.HH171.7011.90120.651.30TEMPERATURA8.20TOTAL
LONGITUD8.2013.200.00PESO POR M0.250.561.00TOTAL KG POR
DIMETRO2.057.390.00TOTAL METRADO9.44
SSHHPRIMARIASUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL
SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA
- PIURA"SS.HH PRIMARIA02.27.00 TRAZO Y
REPLANTEOAMBIENTEABDSCTOSAREA (M2)SS.HH8.168.10066.0666.0603.00.00
MOVIMIENTO DE TIERRAS03.01.00 EXCAVACIN DE ZANJAS PARA CIMIENTOS Y
ZAPATASTIPOCANTIDADABLVOLUMEN (M3)EJE
A11.600.508.4513.5210.601.408.455.07EJE
E11.600.508.7614.0210.601.408.765.26EJE
C11.800.505.129.2210.801.405.124.10EJE
111.600.506.3510.1610.601.406.353.81EJE
411.600.505.408.6410.601.405.403.24EJE
511.600.501.201.9210.601.401.200.7211.600.500.951.5210.601.400.950.57P/MURETES30.400.601.271.5250.400.600.931.8650.400.600.260.5220.400.600.520.4286.0903.03.00
RELLENO COMPACTADO CON HORMIGN PARA CIMIENTOSAMBIENTEABHLVOLUMEN
(M3)EJE A10.600.408.452.03EJE E10.600.408.762.10EJE
C10.800.406.121.96EJE 110.600.407.351.76EJE 410.600.405.401.30EJE
510.600.401.100.2610.600.400.850.20ENTRE A y
C20.600.400.700.34P/MURETES30.400.201.770.4250.400.201.430.5750.400.200.260.1020.400.200.520.0811.1203.04.00
RELLENO DE ZANJAS CON MATERIAL PROPIOTIPOCANTIDADABLVOLUMEN (M3)EJE
A11.450.508.4512.25EJE E11.450.508.7612.70EJE
C11.650.506.1210.10EJE 111.450.507.3510.66EJE 411.450.505.407.83EJE
511.450.501.101.6011.450.500.851.2356.3703.04.00 RELLENO C/MAT.
PROPIO HASTA NIVELES DE SUBRASANTETIPOCANTIDADAREAHVOLUMEN
(M3)SS.HH158.980.052.952.9503.07.00 RELLENO COMPACTADO CON AFIRMADO
PARA FALSO PISO, e=0.15 mAMBIENTEABDSCTOSAREA
(M2)7.717.65058.9858.9803.09.00 ACARREO DE MATERIAL
EXCEDENTE03.10.00 ELIMINACIN DE MATERIAL EXCEDENTEPARTIDAVOLUMEN
(M3)FACT. ESPONJ.VOLUMEN (M3)METRADO DE EXCAVACIN86.09METRADO DE
RELLENO59.3226.771.2032.1204.00.00 OBRAS DE CONCRETO SIMPLE04.01.00
SOLADO PARA COLUMNASAMBIENTECANTIDADABAREA
(M2)SOLADO180.600.606.486.4804.02.01 CIMIENTOS- CONCRETO 1:10 + 30%
P.M.TIPOCANTIDADABLVOLUMEN (M3)EJE A10.601.008.455.07EJE
E10.601.008.765.26EJE C10.801.006.124.90EJE 110.601.007.354.41EJE
410.601.005.403.24EJE 510.601.001.100.6610.601.000.850.51ENTRE A y
C20.601.000.700.84P/MURETES30.400.401.770.8550.400.401.431.1450.400.400.260.2120.400.400.520.1727.2604.04.00
FALSO PISOAMBIENTEAREAAREA (M2)58.9858.9858.9805.00.00 OBRAS DE
CONCRETO ARMADO05.04.01 SOBRECIMIENTOS REFORZADOS - CONCRETO F'C=
210 KG/CM2TIPOCANTIDADABLVOLUMEN (M3)EJE A10.150.907.300.99EJE
E10.150.907.010.95EJE C10.150.905.860.79EJE 110.150.907.601.03EJE
410.150.904.150.56EJE 510.150.902.650.364.6805.04.02 SOBRECIMIENTOS
REFORZADOS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADN VECESHLAREA
(M2)EJE A120.907.3013.14EJE E120.907.0112.62EJE C120.905.8610.55EJE
1120.907.6013.68EJE 4120.904.157.47EJE 5120.902.654.7749.9905.05.01
COLUMNAS - CONCRETO F'C= 210 KG/CM2TIPOCANTIDADABHVOLUMEN
(M3)C1110.150.254.751.96C130.150.254.250.48C120.150.253.550.27C210.150.454.250.29C310.150.504.250.3210.150.254.250.163.4805.05.02
COLUMNAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROHAREA
(M2)C110.354.751.6610.354.251.49100.504.7523.7520.504.254.2520.653.554.62C210.954.254.04C311.654.257.0146.8205.07.01
VIGAS - CONCRETO F'C= 210 KG/CM2ELEMENTOCANTIDADABLVOLUMEN (M3)EJE
A10.250.208.010.40EJE E10.250.208.300.42EJE C10.250.206.110.31EJE
110.250.208.050.40EJE 410.250.555.150.71EJE
510.250.207.600.38VB10.250.307.600.57VC20.250.551.150.323.5105.07.02
VIGAS - ENCOFRADO Y DESENCOFRADOTIPOCANTIDADPERMETROLAREA (M2)EJE
A10.458.013.60EJE E10.458.303.74EJE C10.256.111.53EJE
110.458.053.62EJE 410.955.154.89EJE
510.457.603.42VB10.657.604.94VC20.951.152.1927.9305.09.01 LOSA
ALIGERADA - CONCRETO F'C= 210 KG/CM2AMBIENTEFACTORENCOFRADOVOLUMEN
(M3)SS.HH.0.087556.264.924.9205.09.02 LOSA ALIGERADA - ENCOFRADO Y
DESENCOFRADOAMBIENTEFACTORABREA
(M2)SS.HH.7.667.3556.2656.2605.09.03 LOSA ALIGERADA - LADRILLO
HUECOAMBIENTEFACTORENCOFRADOBUNIDAD
(UND)SS.HH.8.3356.26468.65468.65
ACEROSSHHPRIMSUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL
SERVICIO EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA
- PIURA"ACERO - SERVICIOS HIGINICOS PRIMARIA05.04.03 ACERO EN
SOBRECIMIENTOSELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"EJE
A148.5034.001291.4040.60EJE C147.1028.401251.4035.00EJE
E148.8035.201331.4046.20EJE 1148.6534.601321.4044.80EJE
4145.5022.001181.4025.20EJE
5142.058.20141.807.201111.4015.40241.6513.20281.4022.40TOTAL
LONGITUD0.00412.400.00PESO POR M0.250.561.00TOTAL KG POR
DIMETRO0.00230.940.00TOTAL METRADO230.9405.05.03 ACERO EN
COLUMNASELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"C11146.35279.4011400.70308.00C1345.8670.273350.7073.50C1244.9039.202300.7042.00C2165.8635.161351.0035.00C31115.8564.351351.2042.001351.0035.00TOTAL
LONGITUD535.5064.35424.03PESO POR M0.250.561.00TOTAL KG POR
DIMETRO133.8836.04424.03TOTAL METRADO593.9505.07.03 ACERO EN
VIGASELEMENTOMEDIDASN ELEM.CANTIDADLONGITUD1/4"3/8"1/2"EJE
A148.2032.801490.8039.20EJE C148.2533.001520.8041.60EJE
E148.5034.001540.8043.20EJE 1148.3533.401560.8044.80EJE
3148.3033.201300.8024.00148.301441.0044.00EJE
4145.2020.80145.2020.801301.5045.00EJE
5148.3033.201440.8035.20VC241.9015.202100.8016.00TOTAL
LONGITUD333.0020.80235.60PESO POR M0.250.561.00TOTAL KG POR
DIMETRO83.2511.65235.60TOTAL METRADO330.5005.09.03 ACERO EN LOSA
ALIGERADAELEMENTOMEDIDASN
ELEM.CANTIDADLONGITUD1/4"3/8"1/2"SS.HH1198.00152.001191.1020.901191.0019.001192.1039.90TEMPERATURA225225.00TOTAL
LONGITUD225.00231.800.00PESO POR M0.250.561.00TOTAL KG POR
DIMETRO56.25129.810.00TOTAL METRADO186.06
VEREDASSUSTENTO DE METRADOSPROYECTO: "MEJORAMIENTO DEL SERVICIO
EDUCATIVO DE LA I.E.MARA GORETTI DEL DISTRITO DE CASTILLA -
PIURA"CONSTRUCCIN DE VEREDAS02.00.00 TRABAJOS PRELIMINARES02.27.00
TRAZO, NIVELACIN Y REPLANTEOELEMENTOCANTIDADACANTIDAD
(UND)VEREDASAREA DE AFIRMADO301.71LONGITUD DE
SARD.76.370.1511.46313.1703.00.00 MOVIMIENTO DE TIERRAS03.02.00
EXCAVACIN A NIVEL DE SUBRASANTE
MANUALAMBIENTE/LUGARAREAHCANTIDADDSCTOS.VOLUMEN (M3)DEL METRADO
DEAFIRMADO301.710.1130.1730.1703.06.00 NIVELACIN INTERIOR Y
APISONADOELEMENTOCANTIDADAREACANTIDAD
(UND)NIVELACIN1301.71301.71301.7103.09.00 RELLENO Y COMPACTACIN CON
MATERIAL DE AFIRMADO, E= 0.15 MAMBIENTE/LUGARABCANTIDADDSCTOS.AREA
(M2)INGRESO3.559.78134.728.873.00126.6117.702.13137.70PABELLON
AULAS2.0836.51175.94BAOS
PRIMARIA2.087.92116.471.944.6218.960.641.6811.08ACCESO A
INICIAL2.902.0615.972.805.50115.402.032.2014.472.959.75128.76CON
LADO CURVODEL PLANO24.88SS.HH INICIAL3.971.33210.56INGRESO A
INICIAL1.841.8013.31EN AULA AIRE LIBRE3.821.8016.88301.7103.09.00
ACARREO DE MATERIEL EXCEDENTE03.10.00 ELIMINACIN DE MATERIAL
EXCEDENTEAMBIENTE/LUGAREXCAVACIONFACTORVOLUMEN
(M3)EXCAVACIM31.571.2037.8837.8803.11.00 EXCAVACIN PARA
SARDINELESAMBIENTE/LUGARAREALCANTIDADDSCTOS.VOLUMEN
(M3)INGRESO0.0159.7820.290.0152.4910.040.0152.5120.080.0153.2710.050.01517.8510.27ACCESO
A
INICIAL0.0153.1010.050.0155.5010.080.0154.5310.070.01516.5410.250.0157.0010.110.0153.8020.1176.371.40*
Res Total"MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA INSTITUCION
EDUCATIVA MARIA GORETTI - AA.HH. MARIA GORETTI - CASTILLA-
PIURA"PRESUPUESTO CONTRATADO1839508.903Incluye IGVJULIO-2012PLAZO
DE EJECUCION: 240 DIAS CALENDARIOCONTRATISTA: CONSORCIO
GORETTIVALORIZACION : No. 02 - JULIO DEL 2012(1.0) VALORIZACION
BRUTA: (VB) = (V) + (R) - (D) =314203.43370,760.05(1.1) VALORIZACIN
DEL PERIODO: (V)314203.4334(1.2) REAJUSTES: (R)0(1.3) DEDUCCIN DE
REAJUSTES: (D)0(2.0) AMORTIZACION DE ADELANTOS: (A) =62840.69(2.1)
POR ADELANTO DIRECTO62840.6866922982(2.2) POR ADELANTO PARA
MATERIALES0(3.0) VALORIZACION NETA: (VN) = (VB) - (A)251362.74(4.0)
IMPUESTO IGV (18%) = 18% * (VN)45245.2932(5.0) MONTO A PAGAR AL
CONTRATISTA296608.0332
ReajustesCALCULO DE REINTEGROS Y DEDUCCIONES"MEJORAMIENTO DEL
SERVICIO EDUCATIVO DE LA INSTITUCION EDUCATIVA MARIA GORETTI -
AA.HH. MARIA GORETTI - CASTILLA- PIURA"LUGAR:CASTILLA - PIURA -
PIURAPRESUPUESTO CONTRATADO:1839508.90336(Inc. I.G.V)SUB
TOTALIGVTOTALFECHAPRESUPUESTO
CONTRATADO1558905.85280603.0531839508.903Jul-12ADELANTO DIRECTO
01311781.17006101756120.6106109831367901.7806727/4/12Ka =1.000Ka
Formula 1 (FEB -12) =1.000TOTAL DE ADELANTO
DIRECTO311781.17006101756120.6106109831367901.780672D=VxA/C*(Kr/Ka-1)A=AxV/CVALORIZACIONESAVANCE
PROGRAMADO SUB TOTAL (1)AVANCE EJECUTADO SUB TOTAL (2)Kr (3)MES
(r)REAJUSTE PROGRAM. (1)*(3) V*(K-1)REAJUSTE EJECUTADO (2)*(3)
V*(K-1)REAJUSTE RECONOCIDO (4)DEDUCCION ADEL DIR. 01 (5)REINTEGRO
DEL MES (7)VALORIZACION (2+7)AMORTIZACION ADELANTO
DIRECTONo.MESFORMULA
1ESTJUL-12360,581.98259,723.521.000JUL-120.000.000.000.000.00259,723.5251,944.70ARQJUL-1238,764.4452,192.261.000JUL-120.000.000.000.000.0052,192.2610,438.45SANJUL-125,210.482,287.661.000JUL-120.000.000.000.000.002,287.66457.53ELEJUL-1215,157.970.001.000JUL-120.000.000.000.000.000.000.00MOBJUL-1232,781.150.001.000JUL-120.000.000.000.000.000.000.00TOTAL
ACUM.452,496.02314,203.430.000.000.000.000.00314,203.4362,840.6930.56%RELACION
ENTRE LO PROGRAMADO Y LO EJECUTADO
FormulaCALCULO DEL FACTOR DE REAJUSTEOBRA"MEJORAMIENTO DEL
SERVICIO EDUCATIVO DE LA INSTITUCION EDUCATIVA MARIA GORETTI -
AA.HH. MARIA GORETTI - CASTILLA- PIURA"LUGAR: CASTILLA - PIURA -
PIURAPRESUPUESTO CONTRATADO S/. : 1839,508.90 (Inc. I.G.V)FECHA
BASE: FEBRERO 2012FECHA : JULIO DEL 2,012VALORIZACION : No.
02FORMULA
1k=0.319*(Mr/Mo)+0.096*(Cr/Co)+0.156*(Ar/Ao)+0.063*(MHMr/MHMo)+0.111*(ADr/ADo)+0.088*(Mr/Mo)+0.167*(Ir/Io)JUNIO
2012JULIO 2012ABRIL 2011MAYO
2011MONOMIOSIMB.IND.DESCRIPCIONCOEF.%Io Feb -
12KaIrKrIrKrIrKrIrKr1M47MANO DE OBRA INC. LEYES
SOCIALES0.319100.00%448.250.319448.250.319448.250.3190.000000.000002C21CEMENTO
PORTLAND TIPO
I0.096100.00%415.900.096418.260.097418.260.0960.000000.000003A3ACERO
DE CONSTRUCCION
CORRUGADO0.156100.00%517.800.156498.410.150498.410.1560.000000.00000448MAQUINARIA
Y EQUIPO
NACIONAL0.06325.40%328.230.016329.220.016329.220.0160.000000.00000MHM49MAQUINARIA
Y EQUIPO
IMPORTADO38.10%234.940.024234.590.024234.590.02438HORMIGON36.51%408.970.023418.030.024418.030.0235AD5AGREGADO
GRUESO0.11164.87%426.440.072433.490.073433.490.0720.000000.0000030DOLAR
( GENERAL
PONDERADO)35.14%354.430.039357.900.039357.900.0395M43MADERA
NACIONAL PARA ENCOF. Y
CARPINT.0.088100.00%605.380.088613.840.089613.840.0880.000000.000006I39AL
CONSUMIDOR0.167100.00%372.300.167377.300.169377.300.1670.000000.00000K=1.000K=1.000K=1.0000.000000.00000Nota
el Ik Vigente es el de Septiembre, publicado el 19 de Octubre del
2011
CAL. VAL. OBRAOBRA:"MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA
INSTITUCION EDUCATIVA MARIA GORETTI - AA.HH. MARIA GORETTI -
CASTILLA- PIURA"CONTRATISTA:CONSORCIO GORETTIMODALIDAD:A SUMA
ALZADAPARTIDASDESCRIPCIONCALENDARIO VALORIZADO DE
OBRAPresupuestoCosto UnitarioPrimer MesSegundo MesTercer MesCuarto
MesUnd.MetradoPrecio S/.Parcial S/.Mano de
obraMaterialesEquiposPrecio S/.1era S2da S3era S4ta S5ta S6ta S7ma
S8va S9na S10ma S11va S12va S13va S14va S15va S16va S17va
SPRESUPUESTO ESTRUCTURAS01OBRAS PROVISIONALES0.0001.01CARTEL PARA
LA OBRA DE 7.20 X
3.60Mund1.001,506.971,506.97851.04630.4025.531,506.971,506.971,506.97OK01.02ALQUILER
DE LOCAL PARA OFICINAS, ALMACN Y
GUARDIANAmes6.00200.001,200.00200.00200.0070.5970.5970.5970.5970.5970.5970.5970.5970.5970.5970.5970.5970.5970.5970.5970.5970.591,200.00OK01.03INSTALACION
PROVISIONAL PARA DEPOSITO DE
AGUAund1.00677.75677.75454.00223.75677.75677.75677.75OK01.04AGUA
PARA LA
CONSTRUCCIONGLB1.002,000.002,000.002,000.002,000.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.002,000.00OK01.05SERVICIOS
HIGIENICOS EN
OBRAGLB1.00300.00300.00300.00300.0075.0075.0075.0075.00300.00OK02TRABAJOS
PRELIMINARES0.00OK02.01DESMONTAJE DE PUERTAS DE
FIERROund7.0022.22155.5421.570.6522.22155.54155.54OK02.02DESMONTAJE
DE PUERTAS DE
MADERAund6.007.4044.407.180.227.4044.4044.40OK02.03DESMONTAJE
DEVENTANAS Y SOBREVENTANAS DE
FIERROund22.0022.22488.8421.570.6522.22488.84488.84OK02.04DESMONTAJE
DEVENTANAS DE
MADERAund5.007.4037.007.180.227.4037.0037.00OK02.05DESMONTAJE DE
COBERTURA DE ETERNIT Y ESTRUCTURA DE
TECHOm2186.146.651,237.836.460.196.651,237.831,237.83OK02.06DESMONTAJE
DE COBERTURA DE CALAMINA Y ESTRUCTURA DE
TECHOm2234.704.00938.803.880.124.00938.80938.80OK02.07DESMONTAJE DE
TABIQUES DE
CARTNm290.001.25112.501.210.041.25112.50112.50OK02.08DEMOLICION DE
SARDINEL PERIMETRAL DE AULAS
PROVISIONALESm70.101.2789.031.210.061.2789.0389.03OK02.09RETIRO DE
LADRILLOS DE PISOS DE
AULASm2209.311.66347.451.610.051.66347.45347.45OK02.10DESMONTAJE DE
APARATOS
SANITARIOSund5.0015.5177.5515.5115.5177.5577.55OK02.11DEMOLICION DE
MUROS DE CANTO,
MANUALm214.7012.47183.3112.110.3612.4791.6691.66183.31OK02.12DEMOLICION
DE MUROS DE SOGA,
MANUALm2314.119.983,134.829.690.299.981,567.411,567.413,134.82OK02.13DEMOLICION
DE MUROS DE
LADRILLO-CABEZA,m266.2512.47826.1412.110.3612.47413.07413.07826.14OK02.14DEMOLICION
DE COLUMNAS DE
CONCRETOm37.84199.571,564.63193.765.81199.57469.391,095.241,564.63OK02.15DEMOLICION
DE VIGAS DE
CONCRETOm36.4112.4779.9312.110.3612.4723.9855.9579.93OK02.16EXCAVACION
DE ZANJAS PARA DEMOLICIN DE
CIMIENTACIONm320.8124.95519.2124.220.7324.95519.21519.21OK02.17DEMOLICION
DE SOBRECIMIENTOS DE
CONCRETOm31.95124.73243.22121.103.63124.73243.22243.22OK02.18DEMOLICION
DE CIMIENTOS
CORRIDOSm316.9199.791,687.4596.882.9199.791,687.451,687.45OK02.19ACARREO
DE MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO
CARRETILLA)m3237.8616.633,955.6116.150.4816.631,318.541,318.541,318.543,955.61OK02.20ELIMINACION
MATERIAL EXCEDENTE DE DEMOLICIONES, Dp= 5
KMm3237.8612.793,042.230.8211.9712.793,042.233,042.23OK02.21DESMONTAJE
DE TABIQUES DE CALAMINA CON SU
COBERTURAm229.676.65197.316.460.196.65197.31197.31OK02.22TALA DE
RBOLESund4.006.6526.606.460.196.6526.6026.60OK02.23DEMOLICION DE
BEBEDERO
CORRIDOm24.9712.4761.9812.110.3612.4761.9861.98OK02.24DEMOLICION DE
URINARIO
CORRIDOm23.5212.4743.8912.110.3612.4743.8943.89OK02.25DESMONTAJE DE
SISTEMA
ELCTRICOGLB1.00155.10155.10155.10155.10155.10155.10OK02.26MOVILIZACION
Y DESMOVILIZACION DE
EQUIPOGLB1.00300.00300.00300.00300.00150.00150.00300.00OK02.27TRAZO
NIVEL Y
REPLANTEOm21,848.902.464,548.290.911.250.302.462,274.151,364.49909.654,548.29OK03MOVIMIENTO
DE TIERRAS0.00OK03.01EXCAVACION DE ZANJAS PARA
CIMIENTACIONm3868.5126.4522,972.0924.221.500.7326.455,743.025,743.023,445.813,445.812,297.212,297.2222,972.09OK03.02CORTE
TERRENO NATURAL A NIVEL DE
SUBRASANTEm388.0719.391,707.6819.380.0119.39426.92426.92256.15256.15170.77170.771,707.68OK03.03RELLENO
CON MATERIAL DE PRESTAMO
HORMIGONm3186.3599.0518,457.9730.1552.0016.9099.054,614.494,614.492,768.702,768.701,845.801,845.7918,457.97OK03.04RELLENO
COMPACTADO DE ZANJAS CON MATERIAL
PROPIOm3599.6616.639,972.3516.150.4816.633,988.942,991.712,991.709,972.35OK03.05RELLENO
COMPACTADO A NIVEL DE
SUBRASANTEm3124.0338.454,768.9525.1213.3338.451,669.131,430.69953.79715.344,768.95OK03.06NIVELACION
INTERIOR APISONADO
MANUALm2324.772.07672.271.840.170.062.07201.68201.68268.91672.27OK03.07RELLENO
Y COMPACTACIN CON MATERIAL DE AFIRAMDO, E= 0.15
Mm2889.8513.6212,119.766.725.631.2713.622,423.952,423.953,635.933,635.9312,119.76OK03.08RELLENO
Y COMPACTACION CON MATERIAL DE PRESTAMO AFIRMADO
e=0.20mm2859.3419.4716,731.3510.077.501.9019.477,529.119,202.2416,731.35OK03.09ACARREO
DE MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO
CARRETILLA)m3171.5616.632,853.0416.150.4816.63713.26713.26427.96427.96285.30285.302,853.04OK03.10ELIMINACION
MATERIAL EXCEDENTE, Dp= 5
KMm3171.5612.792,194.250.8211.9712.791,097.131,097.132,194.25OK03.11EXCAVACION
DE ZANJAS PARA
SARDINELESm34.2424.95105.7924.220.7324.9526.4526.4526.4526.45105.79OK04OBRAS
CONCRETO SIMPLE0.00OK04.01SOLADO 1:12
e=0.10m2191.2322.564,314.1511.728.492.3522.562,157.081,294.25862.824,314.15OK04.02CIMIENTOS
CORRIDOS0.00OK04.02.01CIMIENTOS CORRIDOS 1:10 +30%
P.Gm3119.84145.6017,448.7032.52108.254.83145.606,979.485,234.615,234.6117,448.70OK04.03SOBRECIMIENTOS0.00OK04.03.01CONCRETO
SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. ANCHO=0.15
MTm38.39279.822,347.69123.86120.2435.72279.82469.54469.54352.15469.54586.922,347.69OK04.03.02ENCOFRADO
Y DESENCOF.
SOBRECIMIENTOm2107.7737.694,061.8515.9921.220.4837.69812.37812.37609.28812.371,015.464,061.85OK04.04FALSO
PISO MEZCLA 1:8 E=
10cmm2588.1426.1615,385.7410.4615.260.4426.163,077.153,077.154,615.724,615.7215,385.74OK05OBRAS
DE CONCRETO ARMADO0.00OK05.01ZAPATAS0.00OK05.01.01CONCRETO F'C=210
KG/CM2,. PARA
ZAPATASm316.56316.975,249.0249.54253.1414.29316.971,749.671,749.671,749.675,249.02OK05.01.02ENCOFRADO
Y DESENCOFRADO PARA
ZAPATASm258.6037.722,210.3915.4521.810.4637.72729.43729.43751.532,210.39OK05.01.03ACERO
FY=4200 kg/cm2 PARA
ZAPATASkg379.944.161,580.550.933.200.034.16521.58521.58537.391,580.55OK05.02CIMIENTOS
CORRIDOS0.00OK05.02.01CONCRETO EN CIMIENTOS CORRIDOS F'C= 210
KG/CM2m388.70294.4226,115.0545.24235.0214.16294.427,834.5218,280.5326,115.05OK05.02.02ACERO
EN CIMIENTO CORRIDO GRADO
60kg2,663.264.1611,079.160.933.200.034.163,323.757,755.4111,079.16OK05.03VIGAS
DE CIMENTACION0.00OK05.03.01CONCRETO EN VIGAS DE CIMENTACION F'C=
210
KG/CM2m311.88335.113,981.1161.93255.3217.86335.112,269.23875.84836.043,981.11OK05.03.02ENCOFRADO
Y DESENCOFRADO VIGA DE
CIMENTACIONm223.9165.111,556.7830.9033.280.9365.11887.36342.49326.931,556.78OK05.03.03ACERO
EN VIGA DE CIMENTACION GRADO
60kg960.154.163,994.220.933.200.034.162,276.71878.73838.783,994.22OK05.04SOBRECIMIENTOS
ARMADOS0.00OK05.04.01CONCRETO F'C=210 KG/CM2. PARA
SOBRECIMIENTOm324.33389.629,479.45111.45258.8319.34389.622,843.841,895.892,369.862,369.869,479.45OK05.04.02ENCOFRADO
Y DESENCOFRADO DE
SOBRECIMIENTOm2312.2938.1611,916.9916.5521.110.5038.163,575.102,383.402,979.252,979.2411,916.99OK05.04.03ACERO
FY=4200 kg/cm2 PARA
SOBRECIMIENTOkg1,069.564.164,449.370.933.200.034.161,334.81889.871,112.341,112.354,449.37OK05.05COLUMNAS0.00OK05.05.01CONCRETO
F'C=210 KG/CM2. PARA
COLUMNAS.m369.84425.9529,748.35143.24246.4136.30425.955,205.965,205.962,231.132,231.1314,279.20594.9729,748.35OK05.05.02ENCOFRADO
Y DESENCOFRADO NORMAL DE
COLUMNASm2711.2355.2039,259.9028.0226.340.8455.206,870.486,870.482,944.492,944.4918,844.76785.2039,259.90OK05.05.03ACERO
FY=4200 kg/cm2 PARA
COLUMNASkg11,230.294.1646,718.010.933.200.034.1611,445.914,905.393,503.853,503.8522,424.65934.3646,718.01OK05.06COLUMNAS
DE CONFINAMIENTO0.00OK05.06.01CONCRETO F'C=175 KG/CM2. PARA
COLUMNETASm312.64375.474,745.94119.36225.8730.24375.471,186.49949.192,610.264,745.94OK05.06.02ENCOFRADO
Y DESENCOFRADO NORMAL PARA
COLUMNETASm2177.1146.078,159.4623.3522.020.7046.072,039.871,631.894,487.708,159.46OK05.06.03ACERO
FY=4200 kg/cm2 PARA
COLUMNETASkg1,735.454.167,219.470.933.200.034.161,804.871,443.892,887.791,082.927,219.47OK05.07VIGAS0.00OK05.07.01CONCRETO
F'C=210 KG/CM2. PARA
VIGASm364.85403.1426,143.63143.24227.9032.00403.149,150.275,228.735,228.736,222.18313.7226,143.63OK05.07.02ENCOFRADO
Y DESENCOFRADO NORMAL EN
VIGAS.m2414.5461.6725,564.6831.1329.610.9361.674,473.824,473.825,112.945,112.946,084.38306.7825,564.68OK05.07.03ACERO
FY=4200 kg/cm2 PARA
VIGASkg7,643.084.1631,795.210.933.200.034.164,769.284,769.288,902.668,203.164,769.29381.5431,795.21OK05.08VIGAS
DE CONFINAMIENTO0.00OK05.08.01CONCRETO F'C=175KG/CM2 VIGA
CONFINAMIENTOm35.16375.471,937.43119.36225.8730.24375.47484.36367.491,085.581,937.43OK05.08.02ENCOFRADO
Y DESENCOFRADO NORMAL EN VIGA DE
CONFINAMIENTOm269.2147.233,268.7922.0824.490.6647.23817.20653.761,797.833,268.79OK05.08.03ACERO
GRADO 60 EN VIGA DE
CONFINAMIENTOkg1,440.254.165,991.440.933.200.034.161,497.861,198.293,295.295,991.44OK05.09LOSAS
ALIGERADAS0.00OK05.09.01CONCRETO EN LOSAS ALIGERADAS F'C=210
KG/CM2m379.89323.8125,869.1866.13242.9014.78323.819,054.215,173.845,173.846,467.2925,869.18OK05.09.02ENCOFRADO
Y DESENCOFRADO EN LOSAS
ALIGERADASm2913.0341.8738,228.5719.5022.3741.876,690.006,690.007,645.717,645.719,557.1538,228.57OK05.09.03LADRILLO
HUECO DE ARCILLA 15 X 30 X 30 CM PARA TECHO
ALIGERADOund6,853.902.3215,901.050.741.582.322,385.162,385.164,452.294,293.282,385.1615,901.05OK05.09.04ACERO
GRADO 60 EN LOSAS
ALIGERADASkg3,513.884.1614,617.740.933.200.034.162,192.662,192.664,092.973,946.792,192.6614,617.74OK05.10ESCALERAS0.00OK05.10.01CONCRETO
EN ESCALERAS F'C=210
KG/CM2m38.97392.503,520.73119.36242.9030.24392.503,520.733,520.73OK05.10.02ENCOFRADO
Y DESENCOFRADO NORMAL EN
ESCALERASm224.0053.851,292.4019.3133.960.5853.85258.481,033.921,292.40OK05.10.03ACERO
GRADO 60 EN
ESCALERASkg305.654.161,271.500.933.200.034.16254.301,017.201,271.50OK05.11CISTERNA
SUBTERRANEA0.00OK05.11.01CONCRETO EN CISTERNA SUBTERRANEA F'C=210
KG/CM2m33.77426.861,609.26143.24255.3228.30426.861,609.261,609.26OK05.11.02ENCOFRADO
Y DESENCOFRADO NORMAL EN CISTERNA
SUBTERRANEAm242.5343.791,862.3921.1422.020.6343.791,396.79465.601,862.39OK05.11.03ACERO
GRADO 60 EN CISTERNA
SUBTERRANEAkg820.384.163,412.780.933.200.034.162,900.86511.923,412.78OK05.12LOSAS
MACIZA - APOYO PARA TANQUE ELEVADO0.00OK05.12.01CONCRETO EN LOSAS
MACIZAS F'C=210
KG/CM2m31.25337.92422.4071.62252.1514.15337.92422.40422.40OK05.12.02ENCOFRADO
Y DESENCOFRADO NORMAL DE LOSAS
MACIZASm28.2557.19471.8221.4435.110.6457.19471.82471.82OK05.12.03ACERO
GRADO 60 EN LOSAS
MACIZASkg91.394.16380.180.933.200.034.16380.18380.18OK06ESTRUCTURA
METALICA0.00OK06.01TIJERAL METALICO PATIO DE
FORMACINm112.0080.048,964.4827.6245.796.6380.044,482.244,482.248,964.48OK06.02VIGUETAS
METALICAS PATIO DE
FORMACINm223.3047.4010,584.4222.1021.843.4647.403,175.333,175.334,233.7610,584.42OK06.03APOYO
FIJOund7.00112.59788.1343.1354.1715.29112.59394.07394.07788.13OK06.04APOYO
MOVILund7.00112.59788.1343.1354.1715.29112.59394.07394.07788.13OK06.05ARRIOSTRES
DE TIJERALES D=
1/2"m150.408.621,296.453.684.600.348.621,296.451,296.45OK06.06TIRANTES
DE TIJERALES D=
5/8"m112.0011.071,239.843.686.980.4111.071,239.841,239.84OK06.07PENDOLAS
DE
1/2"m45.089.64434.573.685.380.589.64434.57434.57OK06.08ARRIOSTRES
DE VIGUETAS D=
3/8"m268.8035.979,668.7427.625.772.5835.973,384.066,284.689,668.74OK06.09COBERTURA
CON CALAMINON CU-6
0.5MMm2580.8045.2326,269.583.6841.440.1145.2321,015.665,253.9226,269.58OK06.10CANALETA
METLICA PARA EVACUACIN
PLUVIALm63.8081.375,191.4111.0470.000.3381.375,191.415,191.41OK06.11DRENAJE
PLUVIALund4.00141.05564.2027.62112.600.83141.05564.20564.20OK07VARIOS0.00OK07.01REUBICACIN
DE ASTA DE BANDERA (INC. DEMOLICIN DE
LOSA)GLB1.0052.6752.6751.141.5352.6752.6752.67OK07.02SISTEMA EPXICO
PARA PEGAR CONCRETO NUEVO A
ANTIGUOGLB1.00224.14224.144.14220.00224.14224.14224.14OKPRESUPUESTO
ARQUITECTURA0.00OK01MUROS Y TABIQUES DE ALBAILERIA0.00OK01.01MURO
DE LADRILLO KK TIPO IV CANTO M:1:1:4 E=1.5
cmM256.9450.732,888.5721.5728.510.6550.732,888.572,888.57OK01.02MURO
DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5
cmM2708.9963.4945,013.7823.4839.310.7063.4911,253.4511,253.4522,506.8845,013.78OK02REVOQUES,
ENLUCIDOS Y MOLDURAS0.00OK02.01TARRAJEO PRIMARIO MEZCLA 1:5 e=
2cmM2183.4317.573,222.8710.796.460.3217.571,128.00483.431,611.443,222.87OK02.02TARRAJEO
EN MUROS0.00OK02.02.01ARRAJEO DE MUROS INTERIORES Y EXTERIORES
MEZCLA 1:5 E
=1.5M21,720.2818.5631,928.4011.506.710.3518.566,385.689,578.527,982.107,982.1031,928.40OK02.02.02TARRAJEO
RAYADO EN MUROS DE MESADA C:A
1:5M213.5517.20233.0610.796.090.3217.20233.06233.06OK02.02.03TARRAJEO
FROTACHADO EN MURETE
H=0.20M308.0410.863,345.313.207.560.1010.861,672.661,672.663,345.31OK02.03TARRAJEO
DE COLUMNAS0.00OK02.03.01TARRAJEO EN SUPERFICIE COLUMNAS C.A. 1:5
E=1:5M2313.6629.019,099.2821.576.790.6529.011,819.862,729.782,274.822,274.829,099.28OK02.04TARRAJEO
DE VIGAS0.00OK02.04.01TARRAJEO DE VIGAS C:A 1:5
E=1.5CMM2188.8342.398,004.5026.5415.050.8042.391,200.681,600.901,200.682,001.132,001.118,004.50OK02.05VESTIDURAS
DE DERRAMES0.00OK02.05.01VESTIDURA DE DERRAMES (1:5)
a=0.05mM87.9113.961,227.2211.502.110.3513.96245.44368.17306.81306.801,227.22OK02.05.02VESTIDURA
DE DERRAMES (1:5)
a=0.10mM95.4410.511,003.078.501.750.2610.51200.61300.92250.77250.771,003.07OK02.05.03VESTIDURA
DE DERRAMES (1:5)
a=0.15mM550.7114.808,150.5112.322.110.3714.801,630.102,445.152,037.632,037.638,150.51OK02.05.04VESTIDURA
DE DERRAMES CON BORDES BOLEADOS 1:2 PARA
DESNIVELM51.6014.44745.1012.761.300.3814.44149.02223.53186.28186.27745.10OK02.05.05TARRAJEO
CON IMPERMEABILIZANTE EN
CISTERNAM248.9424.811,214.2015.998.340.4824.811,214.201,214.20OK02.06BRUAS0.00OK02.06.01BRUAS
SEGUN DETALLE 1cm x
1cmM719.295.373,862.595.210.165.371,351.91579.38965.65965.653,862.59OK02.07ESCALERA0.00OK02.07.01REVESTIMIENTO
PULIDO EN PASO Y
CONTRAPASOM51.6025.571,319.4121.573.350.6525.571,319.411,319.41OK02.07.02TARRAJEO
EN FONDO DE
ESCALERAM15.4627.89431.1821.575.670.6527.89431.18431.18OK03CIELORRASO0.00OK03.01CIELO
RASO CON MEZCLA C:A
1:5M2795.4333.0326,273.0517.2515.260.5233.033,940.965,254.613,940.966,568.266,568.2626,273.05OK04PISOS
Y PAVIMENTOS0.00OK04.01CONTRAPISOS
E=20mmM267.9414.43980.378.514.861.0614.43343.13637.24980.37OK04.02PISO
DE CEMENTO PULIDO Y BRUADO CON
ENDURECEDORM2795.1228.5422,692.7212.7113.212.6228.549,077.099,077.094,538.5422,692.72OK04.03PISO
CERAMICO ANTIDESLIZANTE0.00OK04.03.01PISO DE CERMICA DE ALTO
TRNSITO PEI IV DE
30X30CMM267.9448.613,302.5614.3833.800.4348.611,155.902,146.663,302.56OK04.03.02CERAMICO
30cm x 30cm EN MESA DE CONCRETO
SHM213.5556.02759.0721.5733.800.6556.02759.07759.07OK04.04PATIOS Y
VEREDAS0.00OK04.04.01VEREDAS DE CONCRETO DE
140KG/CM2M2343.9645.4015,615.7818.2125.042.1545.405,205.265,205.265,205.2615,615.78OK04.04.02LOSA
Y PATIOS DE CONCRETO F'C=140KG/CM2 FROTACHADA Y BRUADA
e=6"M2974.9856.9655,534.8618.2136.602.1556.9627,767.4327,767.4355,534.86OK04.04.03ENCOFRADO
Y DESENCOFRADO DE
VEREDAM2379.7228.7310,909.3611.5816.800.3528.733,636.453,636.453,636.4510,909.36OK04.04.04CURADO
QUIMICO DE
LOSAM2865.272.221,920.900.541.630.052.22960.45960.451,920.90OK04.05RAMPAS0.00OK04.05.01RAMPA
DE CONCRETO F'C=140 kg/cm2 e=4'' BRUADO SEGUN
DISEOM24.2833.23142.2220.299.183.7633.23142.22142.22OK04.05.02ENCOFRADO
Y DESENCOFRADO DE
RAMPAM21.8127.3349.4710.2216.800.3127.3349.4749.47OK04.06SARDINEL0.00OK04.06.01SARDINEL
DE CONCRETO F'c=140 Kg/cm2 PARA RAMPAS (Inc. Acabado
1:2)M89.7622.662,033.969.1611.701.8022.662,033.962,033.96OK05CONTRAZOCALOS0.00OK05.01CONTRAZOCALOS
TARRAJEADO
H=10CMM485.987.363,576.816.500.660.207.361,430.721,430.72715.373,576.81OK05.02CONTRAZOCALOS
DE TARRAJEADO
H=30CMM128.539.741,251.889.010.460.279.74500.75500.75250.381,251.88OK06ZOCALOS0.00OK06.01ZOCALO
DE CERAMICA 30 X
30M2183.4355.7110,218.8921.5733.490.6555.715,109.455,109.4510,218.89OK07CUBIERTAS0.00OK07.01COBERTURA
DE MORTERO DE CEMENTO CON
IMPERMEABILIZANTEM2685.9818.1812,471.126.8411.130.2118.181,870.672,494.223,741.344,364.8912,471.12OK07.02CANALETA
A MEDIA CAA DE MORTERO EN TECHOS e=0.05
m.M275.3414.483,986.9210.213.960.3114.48598.04797.381,196.081,395.423,986.92OK07.03GARGOLASund22.00129.542,849.88112.0812.824.64129.54427.48569.98854.96997.462,849.88OK08CARPINTERIA
DE MADERA0.00OK08.01PUERTAS0.00OK08.01.01PUERTA APANELADAS CON
MARCO DE
CEDROM215.75286.574,513.48144.85137.374.35286.572,256.742,256.744,513.48OK08.01.02PUERTA
APANELADA CON MARCOS DE CEDRO Y SOBRE LUZ DE
FIERROM240.66400.0416,265.63128.03268.173.84400.048,132.828,132.8216,265.63OK08.01.03PUERTA
CONTRAPLACADAM28.40286.572,407.19144.85137.374.35286.571,203.601,203.602,407.19OK08.01.04PUERTA
EN CUBICULO DE
INODOROSM213.46202.352,723.6377.25122.782.32202.351,361.821,361.822,723.63OK08.02VARIOS,
MADERA0.00OK08.02.01TICERO DE MADERA TORNILLO (L=3.00M)
BARNIZADOund40.00189.747,589.6024.82164.180.74189.743,794.803,794.807,589.60OK09CARPINTERIA
METALICA0.00OK09.01VENTANAS0.00OK09.01.01VENTANA DE FIERRO
(BAJA)M2162.19123.0219,952.6149.8668.174.99123.029,976.319,976.3119,952.61OK09.01.02VENTANA
DE FIERRO
(ALTA)M2111.9190.1210,085.3319.9568.172.0090.125,042.675,042.6710,085.33OK09.02PUERTAS0.00OK09.02.01PUERTA
METALICAM23.36176.21592.0757.9486.8931.38176.21296.04296.04592.07OK09.03OTROS
METAL0.00OK09.03.01PASAMANOS DE TUBO DE FN 1
1/2"M15.6095.251,485.9038.6344.2212.4095.25742.95742.951,485.90OK09.03.02CERCO
METALICO CON TUBO DE FIERRO Y MALLA
COCADAM216.04298.094,781.36108.94156.4732.68298.091,673.483,107.884,781.36OK09.03.03PUERTA
METALICA CON TUBO DE FIERRO Y MALLA
COCADAM22.95160.55473.6245.44100.0215.09160.55473.62473.62OK09.03.04PLANCHA
ESTRIADA METALICA PARA BORDE DE
ESCALERAM258.04145.868,465.7138.6399.507.73145.868,465.718,465.71OK10CERRAJERIA0.00OK10.01CERRADURAS0.00OK10.01.01CERRADURA
P/PUERTA PRINCIPAL DE SOBRE PONER 2 GOLPES LLAVE
EXTERNAund19.0068.201,295.8015.5152.220.4768.20647.90647.901,295.80OK10.01.02PICAPORTE
DE SOBREPONER
3"und8.0019.28154.2415.513.300.4719.2877.1277.12154.24OK10.01.03BISAGRA
DE ACERO 3 1/2" x 3
1/2"und33.002.9898.341.241.700.042.9849.1749.1798.34OK11VIDRIOS
CRISTALES Y SIMILARES0.00OK11.01VIDRIOS SEMIDOBLE
INCOLOROP21,194.026.347,570.092.074.210.066.343,785.053,785.057,570.09OK11.02VIDRIO
CATEDRAL
INCOLOROP21,037.494.404,564.960.833.550.024.402,282.482,282.484,564.96OK12PINTURA0.00OK12.01PINTURA
LTEX INTERIORES Y
EXTERIORESM21,852.347.4713,836.984.312.730.437.474,612.334,612.334,612.3313,836.98OK12.02PINTURA
LATEX EN VIGAS Y
COLUMNASM2502.497.994,014.904.792.660.547.992,007.452,007.454,014.90OK12.03PINTURA
LATEX EN
CIELORRASOM2795.437.656,085.044.932.230.497.652,028.352,028.352,028.356,085.04OK12.04PINTURA
LTEX EN CONTRAZCALOS INTERIORES
H=0.10mM543.984.472,431.591.582.810.084.471,215.801,215.802,431.59OK12.05PINTURA
LTEX EN CONTRAZCALOS EXTERIORES
H=0.30mM159.922.74438.181.720.930.092.74219.09219.09438.18OK12.06PINTURA
DE CARPINTERA METLICA C/ANTICORR. Y
ESMALTEM351.1012.134,258.846.255.570.3112.132,129.422,129.424,258.84OK12.07PINTURA
DE CARPINTERA DE MADERA CON BARNIZ
MARINOM263.8516.711,066.9311.045.340.3316.71533.47533.471,066.93OK13VARIOS0.00OK13.01LIMPIEZA
PERMANENTE Y FINAL DE LA
OBRAglb1.002,250.002,250.00500.001,750.002,250.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00125.00250.002,250.00OK13.02ELABORACION
Y PINTADO DE PIZARRA DE
CONCRETOglb48.00186.378,945.76127.9354.603.84186.378,945.768,945.76OK13.03RELLENO
DE JUNTA CON ARENA Y ASFALTO
1M213.905.951,272.711.774.130.055.951,272.711,272.71OK13.04RELLENO
DE JUNTA CON ARENA Y ASFALTO
1/2M201.875.951,201.131.774.130.055.951,201.131,201.13OK13.05JUNTAS
DE DILATACION DE E=1" CON TECNOPOR y SELLADOR
ELASTOMRICOM115.6020.722,395.235.9314.610.1820.72598.81479.051,317.372,395.23OK13.06URINARIO
CORRIDO SEGUN DISEO REV.C/MAYOLICA 0.30 x
0.30M2.00160.40320.8069.0189.322.07160.40320.80320.80OK13.07MUROS
DE PANELES DRYWALL (ROCA DE YESO
STANDAR)M225.8655.991,447.9014.4941.070.4355.99723.95723.951,447.90OK13.08SEMBRIO
DE GRASS POR ESQUEJES O
MECHONESM2219.0013.833,028.774.099.620.1213.833,028.773,028.77OK13.09SEMBRIO
DE
ARBOLESund4.0011.0644.240.5810.460.0211.0644.2444.24OK13.10COLOCACION
DE ARENA
TAMIZADAM323.5916.63392.3016.150.4816.63392.30392.30OK13.11ASTA DE
BANDERAund1.001,158.021,158.02533.20607.7617.061,158.021,158.021,158.02OK13.12DESMONTAJE
Y MONTAJE DE
JUEGOSund5.00103.49517.45100.483.01103.49181.11336.34517.45OK13.13PICADO
DE PISOS Y
MUROSM2390.9338.2514,953.0736.431.8238.257,476.547,476.5414,953.07OKPRESUPUESTO
INST. SANITARIAS0.00OK1TRBAJOS PRELIMINARES0.00OK01.01TRAZO DE
NIVELES Y
REPLANTEOm243.601.51367.840.690.220.601.51367.84367.84OK2SISTEMA DE
DESAGUE0.00OK02.01SALIDAS DE PVC SAP PARA DESAGUE
4"pto26.0051.601,341.6036.8313.671.1051.60335.40335.40335.40335.401,341.60OK02.02SALIDA
DE DESAGUE EN PVC - SAP
2"pto26.0055.181,434.6836.8316.511.8455.18358.67358.67358.67358.671,434.68OK02.03SALIDAS
PVC SAP VENTILACION DE
2"pto9.0050.61455.4936.8312.681.1050.61113.87113.87113.87113.87455.49OK02.04TUBERIA
Y ACCE. DE REBOSE Y LIMPIEZA TANQUE
ELEVADOGLB1.00864.33864.33110.48750.543.31864.33864.33864.33OK02.05EXCAVACION
DE ZANJA, TUBERIA 2 - 4", H PROMD.
0.9m92.6010.67988.0410.360.3110.67988.04988.04OK02.06RELLENO Y
COMPACTACION DE
ZANJASm339.3625.01984.3918.841.105.0725.01984.39984.39OK02.07SUMINISTRO
E INST. DE TUBERIA 4" PVC
SAPm80.606.51524.714.421.960.136.51524.71524.71OK02.08SUMINISTRO E
INST. TUBERIA PVC SAP
2"m12.006.1473.683.682.350.116.1473.6873.68OK02.09PRUEBA HIDRAULICA
PARA TUBERIA DE
DESAGUEm92.602.63243.542.130.440.062.63243.54243.54OK02.10SUMINS. E
INSTAL.SUMIDERO DE BRONCE DE
2"und8.009.6977.526.203.300.199.6977.5277.52OK02.11SUMIN. E INSTL.
REGISTROS DE BRONCE DE
4"und13.0016.85219.058.278.330.2516.85219.05219.05OK02.12CAJA REG.
PREFABC. 30X60 INC
MARCO/TAPAund10.00153.331,533.3057.5194.091.73153.331,533.301,533.30OK3SISTEMA
DE AGUA0.00OK03.01SALIDA DE AGUA
FRIApto34.0060.802,067.2043.1316.381.2960.80516.80516.80516.80516.802,067.20OK03.02EXCAVACION
DE ZANJAS PARA TUBERIA
0.4x0.5m151.006.24942.246.060.186.24942.24942.24OK03.03RELLENO Y
COMPACTACION DE
ZANJASm330.2325.01756.0518.841.105.0725.01756.05756.05OK03.04SUMINISTRO
E INST.DE TUBERIA P.V. C. 7.5 DE
2"m31.008.57265.674.424.158.57265.67265.67OK03.05SUMI. E INST DE
TUBERIA PVC DE 1 1/2" CLASE
7.5m36.007.43267.484.422.880.137.43267.48267.48OK03.06SUMINISTRO E
INST. DE TUB. AGUA 1" PVC C.
7.5m84.006.38535.923.682.520.186.38535.92535.92OK03.07PRUEBA
HIDRAULICA PARA TUBERIA DE
AGUAm151.004.71711.212.211.151.354.71711.21711.21OK03.08ACCESORIOS
RED DE DISTRIBUCION DE
AGUAGLB1.001,361.891,361.89220.961,134.306.631,361.891,361.891,361.89OK03.09VALVULA
DE INTERRUPCION ESFERICA DE
1"und4.0079.85319.4020.6858.550.6279.85319.40319.40OK03.10VALVULA
DE INTERRUPCION ESFERICA DE
2"und3.00187.66562.9824.82162.100.74187.66562.98562.98OK03.11CAJA
DE VALVULAS, BY PASS, DE 0.4 X 0.5 X
0.5und2.00246.41492.82158.9282.724.77246.41492.82492.82OK4APARATOS
SANITARIOS0.00OK04.01INODORO TANQUE BAJO BLANCO, INC
PAPELERAund9.00167.631,508.6711.63156.00167.631,508.671,508.67OK04.02LAVATORIO
DE LOSA
BLANCAund2.0034.0068.0034.0034.0068.0068.00OK04.03LAVATORIOS DE
LOSA BLANCO TIPO OVALIN INC.
ACCpza8.00155.001,240.00155.00155.001,240.001,240.00OK04.04INODORO
TIPO BABY, INC
PAPELERAund4.00284.431,137.7211.63272.80284.431,137.721,137.72OK04.05URINARIO
DE LOSA BCO TIPO PICO INC
ACCund4.00133.40533.60133.40133.40533.60533.60OK04.06COLOCACION DE
APARATOS
SANITARIOSund27.0056.341,521.1855.241.1056.341,521.181,521.18OK04.07ACCESORIOS
Y TUBERIA DE AGUA EN
CISTERNAGLB1.00477.19477.19220.96249.606.63477.19477.19477.19OK5VARIOS0.00OK05.01CONEXION
DOMICIL. A RED DE AGUA
EXTERIORund1.00841.37841.37578.92262.45841.37841.37841.37OK05.02TANQUE
DE PVC DE 2500 LTS. INC ACCES. E
INSTAL.und1.00956.85956.85110.48840.855.52956.85956.85956.85OK05.03CONEXION
A RED PUBLICA DE
DESAGUEund1.001,113.571,113.57835.84252.6525.081,113.571,113.571,113.57OK05.04ELIMINACION
DE MATERIAL EXCEDENTE, Dp=5
KM.m321.537.55162.550.537.027.55162.55162.55OK05.05PICADO /
TARRAJEO DE MURO S,H,
EXISTGLB1.0082.1182.1155.2424.112.7682.1182.1182.11OK05.06SELLADO
DE CAJAS DE REGISTRO
EXISTENTEm30.41253.97104.1388.17165.80253.97104.13104.13OKPRESUPUESTO
INST. ELECTRICAS0.00OK01INSTALACIONES ELECTRICAS0.00OK01.01CENTROS
DE LUZ, TOMACORRIENTES, TELEFONIA DATA0.00OK01.01.01SALIDA CENTRO
DE ALUMBRADO EN TECHO LOSA
ALIGERADAPTO89.0084.507,520.5021.0262.850.6384.501,316.091,316.091,504.101,504.101,880.127,520.50OK01.01.02SALIDA
CENTRO DE ALUMBRADO EN
PAREDPTO7.0092.96650.7224.5367.690.7492.96113.88113.88130.14130.14162.68650.72OK01.01.04SALIDA
TOMACORRIENTE DOBLE CON LINEA DE
TIERRAPTO79.00104.158,227.8524.5378.880.74104.152,056.962,056.962,056.962,056.968,227.85OK01.01.05SALIDA
PARA CARGAS
ESPECIALESPTO1.00182.74182.7436.80144.841.10182.7445.6945.6945.6945.69182.74OK01.01.06PICADO
Y RESANE DE PISO, PARED O TECHO P/INSTAL TUB
PVC-PML68.0017.271,174.3615.741.060.4717.27293.59293.59293.59293.591,174.36OK01.01.07SALIDA
PARA TELEFONIA Y
DATAPTO10.00126.501,265.0058.8865.851.77126.50316.25316.25316.25316.251,265.00OK01.02PUESTA
TIERRA TIPO VARILLA0.00OK01.02.01PUESTA A TIERRA TIPO
VARILLAund4.00732.212,928.84156.60570.914.70732.212,928.842,928.84OK01.03ARTEFACTOS
DE ALUMBRADO - ACCESORIOS - SOPORTES0.00OK01.03.01ARTEF FLUORES
RECTO 2/36W C/EQUIP D ARRANQUE Y BALAST SIM. BE.
JOSFELund54.00117.606,350.4028.4789.13117.603,175.203,175.206,350.40OK01.03.02ARTEF
FLUORESC CIRCULAR 1x32 W C/SOPORT REFLECT Y EQ D
ARRANQund2.0086.60173.2028.4758.1386.60173.20173.20OK01.03.03LAMP.
AHORRADORA 20 W C/REJILLA ALAM. GALV. SIM. JOSFEL WS-150
Rund33.0050.371,662.2112.6437.7350.37831.11831.111,662.21OK01.03.04BRAQUET-REFLECT
C/LAMP 2 x 18 W AHORRAD DIF POLICARB SIM A JOSFEL
RSP-2und1.0080.7780.7712.6468.1380.7780.7780.77OK01.03.05BRAQUETE
PARED CON LAMP AHORRADORA 1x20
Wund6.0060.37362.2214.2446.1360.37362.22362.22OK01.04ILUMINACION
VEREDAS CIRCULACION, PATIO FORMACIN0.00OK01.04.01FAROLA TP. HONGO
LPRA 70 W MOD PFH 1x70 W EN POSTE CAC 6
mjgo13.00557.567,248.2846.40509.771.39557.567,248.287,248.28OK01.04.02REFLECTOR
C/LAMP VAP SOD 70 W SIMIL
LUXIODPZA6.00378.322,269.9270.10306.122.10378.322,269.922,269.92OK01.04.03KIT
EMPALMES PARA CABLES ELECTRICOS NYY
(16/6)und13.0052.07676.9133.7718.3052.07676.91676.91OK01.05ALIMENTADORES
CABLES0.00OK01.05.01EXCAVACION ZANJA DE 0.60 x 1.00 m MANUAL
P/TENDIDO DE CABLE
NYYM3120.0023.062,767.2022.390.6723.062,767.202,767.20OK01.05.02RELLENO
DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20
M.M3120.0016.111,933.2015.640.4716.111,933.201,933.20OK01.05.03CAJA
BUZON DE CONCRETO FC 3/8" C/TAPA,
EMPARRILLADund3.00220.67662.0182.66135.532.48220.67662.01662.01OK01.05.04ALIMENTADOR
CABLE DE ENERGIA - NYY 3 - 1 x 25 + 1 x 16
mm2M21.0057.361,204.564.9452.4257.361,204.561,204.56OK01.05.05ALIMENTADOR
CABLE DE ENERGIA - NYY 3 - 1 x 10 + 1 x 6
mm2M113.0032.263,645.384.9427.3232.263,645.383,645.38OK01.05.06ALIMENTADOR
CABLE DE ENERGIA - NYY 2 - 1 x 16 + 1 x 10
mm2M42.0032.311,357.024.9427.3732.311,357.021,357.02OK01.05.07ALIMENTADOR
CABLE DE ENERGIA - NYY 2 -1 x 10 + 1 x 6
mm2M40.0023.98959.202.9621.0223.98959.20959.20OK01.05.08ALIMENTADOR
CABLE DE ENERGIA - NYY 2 -1 x 6 + 1 x 6
mm2M278.0025.026,955.562.9622.0625.026,955.566,955.56OK01.05.09ALIMENTADOR
CABLE DE ENERGIA - NYY 2 - 1 x 6
mm2M15.0019.97299.552.9617.0119.97299.55299.55OK01.06TABLEROS0.00OK01.06.01TABLERO
GENERAL 380 V, TRIFASICO (T
G)Cjt1.001,380.081,380.08135.081,245.001380.081,380.081,380.08OK01.06.02TABLERO
TD - 01 220 V,
MONOFASICOCjt1.001,089.081,089.08135.08954.001089.081,089.081,089.08OK01.06.03TABLERO
TD - 02 220 V,
MONOFASICOCjt1.00933.08933.08135.08798.00933.08933.08933.08OK01.06.04TABLERO
TD - 03 220 V,
MONOFASICOCjt1.001,482.081,482.08135.081,347.001482.081,482.081,482.08OK01.06.05TABLERO
TD - 04 380 V,
TRIFASICOCjt1.001,228.081,228.08135.081,093.001228.081,228.081,228.08OK01.06.06TABLERO
TD - 05 380 V,
TRIFASICOCjt1.001,715.081,715.08135.081,580.001715.081,715.081,715.08OK01.06.07MURETE
PARA TABLERO DE
DISTRIBUCIONund4.00367.081,468.32171.72190.215.15367.081,468.321,468.32OK01.08INSTALACIONES
ELECTRICAS REUTILIZABLES0.00OK01.08.01REINSTAL CABLE DE
TOMACORRIENT C/LINEA TIERRA EN AULAS 3 Y
4M150.003.85577.500.912.943.85577.50577.50OK01.09DESMONTAJE DE
INSTALACIONES ELCTRICAS NO REUTILIZABLES0.00OK01.09.01DESMONTAJ DE
TABL GENERAL EXIST EN Z.
ADMINISTRglb1.00144.61144.6196.6148.00144.61144.61144.61OK01.09.02DESMONT
DE ALIMENTAD Y SUB TABLER DISTRIB EXIST EN AULA
3glb1.00160.78160.78112.7848.00160.78160.78160.78OK01.09.03DESMONT
DE INSTALAC ELECTR Y CIRCUIT D ALAMBRADO DE AULAS A
DERRUIRglb1.00347.16347.16251.1696.00347.16347.16347.16OK01.09.04DESMONTAJ
DE INSTALAC ACOMETIDA AEREA MEDIDOR
EXISTENTEglb1.00173.58173.58125.5848.00173.58173.58173.58OK01.10PRUEBAS
Y PUESTA EN SERVICIO0.00OK01.10.01PRUEBAS DE PUESTA A TIERRA,
AISLAMIENTO Y
CONTINUIDADglb1.00424.70424.70218.16206.54424.70424.70424.70OK01.10.02PRUEBAS
DE ENCENDIDO DE
LUMINARIASglb1.00209.18209.18129.1880.00209.18209.18209.18OK01.10.03PUESTA
EN SERVICO DE LAS INSTALACIONES ELECTRICAS
INTERIORESglb1.00394.14394.14234.14160.00394.14394.14394.14OK01.11SISTEMA
DE MEDICION EN BAJA TENSION0.00OK01.11.01INSTALAC DE SISTEMA DE
MEDICION EN BAJA
TENSIONglb1.001,400.001,400.001,400.001400.001,400.001,400.00OK01.12TRANSPORTE
DE MATERIALES0.00OK01.12.01TRANSPORTE DE MATERIALES A I.E. MARIA
GORETTIglb1.001,550.001,550.001,550.001550.001,550.001,550.00OKCOSTO
DIRECTO1,214,699.4651,215.0981,426.7169,435.3098,478.90100,421.48104,776.4680,118.66103,460.4231,215.8276,687.7058,974.82110,524.7684,075.4364,781.0350,513.3125,113.5823,479.981,214,699.460.00Gastos
Generales
(10.00%)121,469.955,121.518,142.676,943.539,847.8910,042.1510,477.658,011.8710,346.043,121.587,668.775,897.4811,052.488,407.546,478.105,051.332,511.362,348.00121,469.950.00UTILIDAD
(10.00%)121,469.955,121.518,142.676,943.539,847.8910,042.1510,477.658,011.8710,346.043,121.587,668.775,897.4811,052.488,407.546,478.105,051.332,511.362,348.00121,469.950.00SUB
TOTAL1,457,639.3561,458.1197,712.0683,322.37118,174.68120,505.77125,731.7596,142.40124,152.5037,458.9992,025.2470,769.78132,629.71100,890.5177,737.2460,615.9730,136.3028,175.981,457,639.350.00IGV(18.00%)262,375.0811,062.4617,588.1714,998.0321,271.4421,691.0422,631.7217,305.6322,347.456,742.6216,564.5412,738.5623,873.3518,160.2913,992.7010,910.885,424.535,071.68262,375.080.00TOTAL
SUB
PRESUPUESTO1,720,014.4472,520.57115,300.2398,320.39139,446.12142,196.81148,363.47113,448.03146,499.9544,201.61108,589.7883,508.34156,503.06119,050.8091,729.9471,526.8535,560.8333,247.651,720,014.440.00
ResuValorRESUMEN DE VALORIZACION N 02, DE OBRA PRINCIPAL. JULIO
DEL 2012OBRA"MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA INSTITUCION
EDUCATIVA MARIA GORETTI - AA.HH. MARIA GORETTI - CASTILLA-
PIURA"LUGAR: CASTILLA - PIURA - PIURAPRESUPUESTO
CONTRATADO1839508.90336(Inc.
I.G.V)ORDENDESCRIPCIONPRESUPUESTOACUMULADO ANTERIORPRESENTE
VALORIZACIONACUMULADO ACTUALSALDO POR VALORIZAR% EJECUTADO DE
SUBPRESUPUESTO% SUBPRESUPUESTO TOTAL DEL PRESUPUESTO TOTAL%
EJECUTADO PRESUPUESTO
TOTAL001ESTRUCTURAS783,585.8043,133.15259,723.52302,856.67480,729.1338.65%50.27%19.43%002ARQUITECTURA551,205.930.0052,192.2652,192.26499,013.679.47%35.36%3.35%003INSTALACIONES
ELECTRICAS93,941.160.000.000.0093,941.16004INSTALACIONES
SANITARIAS32,565.570.002,287.662,287.6630,277.91005MOBILIARIO97,607.400.000.000.0097,607.41TOTAL
OBRA1,558,905.8643,133.15314,203.43357,336.591,201,569.29EXPEDIENTE
TECNICO0.000.000.000.000.000.00%0.00%0.00%SUB
TOTAL1,558,905.8543,133.15314,203.43357,336.591,201,569.2985.62%0.00%IGV
18%280,603.057,763.9756,556.6264,320.59216,282.47TOTAL
PRESUPUESTO1,839,508.9050,897.12370,760.05421,657.181,417,851.76AVANCE
%2.77%20.16%22.92%77.08%100.00%17.39%
ESTRUCTSUB PRESUPUESTO N 01 - ESTRUCTURASMETRADO DEL
PROYECTOMETRADO ACUMULADOOBRA:"MEJORAMIENTO DEL SERVICIO EDUCATIVO
DE LA INSTITUCION EDUCATIVA MARIA GORETTI - AA.HH. MARIA GORETTI -
CASTILLA- PIURA"CONTRATISTA:CONSORCIO GORETTIMODALIDAD:A SUMA
ALZADAItemDescripcinPRESUPUESTOAVANCESACUMULADO
ANTERIORACTUALACUMULADOSALDO POR
VALORIZARUnd.METPRECIOPARCIALMET.MONTO%MET.MONTO%MET.MONTO%MET.MONTO%JUNIOJULIOAGOSTOSETIEMBRE01OBRAS
PROVISIONALES01.01CARTEL PARA LA OBRA DE 7.20 X
3.60Mund1.001,506.971,506.971.001506.97100.00%0.000.000.00%1.001506.97100.00%0.000.000.00%01.02ALQUILER
DE LOCAL PARA OFICINAS, ALMACN Y
GUARDIANAmes6.00200.001,200.001.50300.0025.00%1.50300.0025.00%3.00600.0050.00%3.00600.0050.00%01.03INSTALACION
PROVISIONAL PARA DEPOSITO DE
AGUAund1.00677.75677.750.25169.4425.00%0.40271.1040.00%0.65440.5465.00%0.35237.2135.00%01.04AGUA
PARA LA
CONSTRUCCIONGLB1.002,000.002,000.000.25500.0025.00%0.40800.0040.00%0.651300.0065.00%0.35700.0035.00%01.05SERVICIOS
HIGIENICOS EN
OBRAGLB1.00300.00300.000.2575.0025.00%0.40120.0040.00%0.65195.0065.00%0.35105.0035.00%02TRABAJOS
PRELIMINARES02.01DESMONTAJE DE PUERTAS DE
FIERROund7.0022.22155.547.00155.54100.00%0.000.000.00%7.00155.54100.00%0.000.000.00%02.02DESMONTAJE
DE PUERTAS DE
MADERAund6.007.4044.406.0044.40100.00%0.000.000.00%6.0044.40100.00%0.000.000.00%02.03DESMONTAJE
DEVENTANAS Y SOBREVENTANAS DE
FIERROund22.0022.22488.8422.00488.84100.00%0.000.000.00%22.00488.84100.00%0.000.000.00%02.04DESMONTAJE
DEVENTANAS DE
MADERAund5.007.4037.005.0037.00100.00%0.000.000.00%5.0037.00100.00%0.000.000.00%02.05DESMONTAJE
DE COBERTURA DE ETERNIT Y ESTRUCTURA DE
TECHOm2186.146.651,237.83186.141237.83100.00%0.000.000.00%186.141237.83100.00%0.000.000.00%02.06DESMONTAJE
DE COBERTURA DE CALAMINA Y ESTRUCTURA DE
TECHOm2234.704.00938.80234.70938.80100.00%0.000.000.00%234.70938.80100.00%0.000.000.00%02.07DESMONTAJE
DE TABIQUES DE
CARTNm290.001.25112.5090.00112.50100.00%0.000.000.00%90.00112.50100.00%0.000.000.00%02.08DEMOLICION
DE SARDINEL PERIMETRAL DE AULAS
PROVISIONALESm70.101.2789.0370.1089.03100.00%0.000.000.00%70.1089.03100.00%0.000.000.00%02.09RETIRO
DE LADRILLOS DE PISOS DE
AULASm2209.311.66347.45209.31347.45100.00%0.000.000.00%209.31347.45100.00%0.000.000.00%02.10DESMONTAJE
DE APARATOS
SANITARIOSund5.0015.5177.555.0077.55100.00%0.000.000.00%5.0077.55100.00%0.000.000.00%02.11DEMOLICION
DE MUROS DE CANTO,
MANUALm214.7012.47183.3114.70183.31100.00%0.000.000.00%14.70183.31100.00%0.000.000.00%02.12DEMOLICION
DE MUROS DE SOGA,
MANUALm2314.119.983,134.82206.072056.5865.60%108.041078.2434.40%314.113134.82100.00%0.000.000.00%02.13DEMOLICION
DE MUROS DE
LADRILLO-CABEZA,m266.2512.47826.1457.32714.7886.52%8.93111.3613.48%66.25826.14100.00%0.000.000.00%02.14DEMOLICION
DE COLUMNAS DE
CONCRETOm37.84199.571,564.635.711139.5472.83%2.13425.0827.17%7.841564.63100.00%0.000.000.00%02.15DEMOLICION
DE VIGAS DE
CONCRETOm36.4112.4779.934.2553.0066.30%2.1626.9433.70%6.4179.93100.00%0.000.000.00%02.16EXCAVACION
DE ZANJAS PARA DEMOLICIN DE
CIMIENTACIONm320.8124.95519.210.000.000.00%20.81519.21100.00%20.81519.21100.00%0.000.000.00%02.17DEMOLICION
DE SOBRECIMIENTOS DE
CONCRETOm31.95124.73243.220.000.000.00%1.95243.22100.00%1.95243.22100.00%0.000.000.00%02.18DEMOLICION
DE CIMIENTOS
CORRIDOSm316.9199.791,687.450.000.000.00%16.911687.45100.00%16.911687.45100.00%0.000.000.00%02.19ACARREO
DE MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO
CARRETILLA)m