Top Banner
NONRENEWABLE ENERGY REMEMBER THE LAWS OF THERMODYNAMICS 1 ST LAW – ENERGY CANNOT BE CREATED OR DESTROYED, ONLY TRANSFORMED 2 ND LAW – WE ALWAYS END UP WITH LOWER QUALITY OR LESS USABLE ENERGY THAN WE STARTED WITH
10

A MPLE S UPPLY FOR 42-93 YEARS A MPLE S UPPLY FOR 42-93 YEARS L OW COST L OW COST H IGH NET ENERGY YIELD H IGH NET ENERGY YIELD E ASILY TRANSPORTED WITHIN.

Dec 22, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: A MPLE S UPPLY FOR 42-93 YEARS A MPLE S UPPLY FOR 42-93 YEARS L OW COST L OW COST H IGH NET ENERGY YIELD H IGH NET ENERGY YIELD E ASILY TRANSPORTED WITHIN.

NONRENEWABLE ENERGYREMEMBER THE LAWS OF THERMODYNAMICS

1ST LAW – ENERGY CANNOT BE CREATED OR DESTROYED, ONLY TRANSFORMED

2ND LAW – WE ALWAYS END UP WITH LOWER QUALITY OR LESS USABLE ENERGY THAN WE STARTED WITH

Page 2: A MPLE S UPPLY FOR 42-93 YEARS A MPLE S UPPLY FOR 42-93 YEARS L OW COST L OW COST H IGH NET ENERGY YIELD H IGH NET ENERGY YIELD E ASILY TRANSPORTED WITHIN.

CONVENTIONAL OIL

PROS• AMPLE SUPPLY FOR 42-93 YEARS

• LOW COST

• HIGH NET ENERGY YIELD

• EASILY TRANSPORTED WITHIN AND BETWEEN COUNTRIES

• LOW LAND USE

• TECHNOLOGY IS WELL DEVELOPED

• EFFICIENT DISTRIBUTION SYSTEM

CONS• NEED TO FIND SUBSTITUTES WITHIN 50 YEARS

• LARGE GOVERNMENT SUBSIDIES

• ENVIRONMENTAL COSTS NOT INCLUDED IN MARKET PRICE

• ARTIFICIALLY LOW PRICE ENCOURAGES WASTE AND DISCOURAGES SEARCH FOR ALTERNATIVES

• POLLUTES AIR WHEN PRODUCED AND BURNED

• CAN CAUSE WATER POLLUTION

Page 3: A MPLE S UPPLY FOR 42-93 YEARS A MPLE S UPPLY FOR 42-93 YEARS L OW COST L OW COST H IGH NET ENERGY YIELD H IGH NET ENERGY YIELD E ASILY TRANSPORTED WITHIN.

HEAVY OILS FROM OIL SHALE AND OIL SAND

PROS• MODERATE COST (OIL SAND)

• LARGE POTENTIAL SUPPLIES, ESPECIALLY OIL SANDS IN CANADA

• EASILY TRANSPORTED WITHIN AND BETWEEN COUNTRIES

• EFFICIENT DISTRIBUTION SYSTEM IN PLACE

• TECHNOLOGY WELL-DEVELOPED (OIL SAND)

CONS• HIGH COST (OIL SHALE)

• LOW NET ENERGY YIELD

• ENVIRONMENTAL COSTS NOT INCLUDED IN MARKET PRICE

• LARGE AMOUNTS OF WATER NEEDED FOR PROCESSING

• SEVERE LAND DISRUPTION

• SEVERE WATER POLLUTION

• AIR POLLUTION AND CO2 EMISSIONS WHEN PRODUCED AND BURNED

Page 4: A MPLE S UPPLY FOR 42-93 YEARS A MPLE S UPPLY FOR 42-93 YEARS L OW COST L OW COST H IGH NET ENERGY YIELD H IGH NET ENERGY YIELD E ASILY TRANSPORTED WITHIN.

NATURAL GAS

PROS• AMPLE SUPPLY

• HIGH NET ENERGY YIELD

• LOW COST

• LESS AIR POLLUTION THAN OTHER FOSSIL FUELS

• LOWER CO2 EMISSIONS THAN OTHER FOSSIL FUELS

• EASILY TRANSPORTED BY PIPELINE

• LOW LAND USE

• GOOD FUEL FOR FUEL CELLS, GAS TURBINES, AND MOTOR VEHICLES

CONS• NONRENEWABLE RESOURCE

• RELEASES CO2 WHEN BURNED

• GOVERNMENT SUBSIDIES

• ENVIRONMENTAL COSTS NOT INCLUDED IN MARKET PRICE

• METHANE(A GREEN HOUSE GAS) CAN LEAK FROM PIPELINES

• DIFFICULT TO TRANSFER FROM ONE COUNTRY TO ANOTHER

• CAN BE SHIPPED ACROSS OCEAN ONLY AS HIGHLY EXPLOSIVE LNG

Page 5: A MPLE S UPPLY FOR 42-93 YEARS A MPLE S UPPLY FOR 42-93 YEARS L OW COST L OW COST H IGH NET ENERGY YIELD H IGH NET ENERGY YIELD E ASILY TRANSPORTED WITHIN.

COAL

PROS• AMPLE SUPPLIES (225- 900YEARS)

• HIGH NET ENERGY YIELD

• LOW COST

• WELL-DEVELOPED TECHNOLOGY

• AIR POLLUTION CAN BE REDUCED WITH IMPROVED TECHNOLOGY

CONS• SEVERE LAND DISTURBANCE, WATER POLLUTION,

AIR POLLUTION

• SEVERE THREAT TO HUMAN HEALTH WHEN BURNED

• ENVIRONMENTAL COSTS NOT INCLUDED INTO MARKET PRICE

• LARGE GOVERNMENT SUBSIDIES

• HIGH CO2 EMISSIONS WHEN PRODUCED AND BURNED

• RADIOACTIVE PARTICLE AND TOXIC MERCURY EMISSIONS

Page 6: A MPLE S UPPLY FOR 42-93 YEARS A MPLE S UPPLY FOR 42-93 YEARS L OW COST L OW COST H IGH NET ENERGY YIELD H IGH NET ENERGY YIELD E ASILY TRANSPORTED WITHIN.

SYNTHETIC FUELS

PROS• LARGE POTENTIAL SUPPLY

• VEHICLE FUEL

• MODERATE COST

• LOWER AIR POLLUTION THAN COAL WHEN BURNED

CONS• LOW TO MODERATE NET ENERGY YIELD

• HIGHER COST THAN COAL

• REQUIRES MINING 50% MORE COAL

• ENVIRONMENTAL COSTS NOT INCLUDED IN MARKET PRICE

• HIGH ENVIRONMENTAL IMPACT

• LARGE GOVERNMENT SUBSIDIES

• HIGH WATER USE

• HIGHER CO2 EMISSION THAN COAL

Page 7: A MPLE S UPPLY FOR 42-93 YEARS A MPLE S UPPLY FOR 42-93 YEARS L OW COST L OW COST H IGH NET ENERGY YIELD H IGH NET ENERGY YIELD E ASILY TRANSPORTED WITHIN.

.

Page 8: A MPLE S UPPLY FOR 42-93 YEARS A MPLE S UPPLY FOR 42-93 YEARS L OW COST L OW COST H IGH NET ENERGY YIELD H IGH NET ENERGY YIELD E ASILY TRANSPORTED WITHIN.

NUCLEAR

PROS• LARGE FUEL SUPPLY

• LOW ENVIRONMENTAL IMPACT (WITHOUT ACCIDENTS)

• EMITS 1/6 AS MUCH CO2 AS COAL

• MODERATE LAND DISRUPTION AND WATER POLLUTION (WITHOUT ACCIDENTS)

• MODERATE LAND USE

• LOW RISK OF ACCIDENTS BECAUSE OF MULTIPLE SAFETY SYSTEMS (EXCEPT FOR CHERNOBYL-TYPE REACTORS)

CONS• CANNOT COMPETE WITH ECONOMICALLY

WITHOUT HUGE GOVERNMENT SUBSIDIES

• LOW NET ENERGY YIELD

• HIGH ENVIRONMENTAL IMPACT (WITH MAJOR ACCIDENTS)

• ENVIRONMENTAL COSTS NOT INCLUDED IN MARKET PRICE

• RISK OF CATASTROPHIC ACCIDENTS

• NO WIDELY ACCEPTABLE SOLUTION FOR LONG TERM STORAGE OF RADIOACTIVE WASTES

• SUBJECT TO TERRORIST ATTACKS

• SPREADS KNOWLEDGE AND TECHNOLOGY FOR BUILDING NUCLEAR WEAPONS

Page 9: A MPLE S UPPLY FOR 42-93 YEARS A MPLE S UPPLY FOR 42-93 YEARS L OW COST L OW COST H IGH NET ENERGY YIELD H IGH NET ENERGY YIELD E ASILY TRANSPORTED WITHIN.

Periodic removal and storage of

radioactive liquid wastes

Periodic removal and storage of

radioactive wastes and spent fuel assemblies.

Small amounts of radioactive gases

Useful electrical energy 25% - 30%

Waste Heat

Waste water discharge into a water source (lake, river, ocean)

Page 10: A MPLE S UPPLY FOR 42-93 YEARS A MPLE S UPPLY FOR 42-93 YEARS L OW COST L OW COST H IGH NET ENERGY YIELD H IGH NET ENERGY YIELD E ASILY TRANSPORTED WITHIN.

NUCLEAR DISASTERS

WORST US NUCLEAR DISASTER

• ATOMIC ENERGY ACT OF 1954

• THREE MILE ISLAND

• MARCH 29, 1979

• HARRISBURG, PENNSYLVANIA

• MECHANICAL FAILURE AND HUMAN ERROR LED TO LOSS OF COOLANT

• 50,000 EVACUATED 50,00 FLED

• $1.2 BILLION IN CLEANUP AND LAWSUITS

WORST WORLD NUCLEAR DISASTERS

• CHERNOBYL: APRIL 26, 1986: UKRAINE

• FUKUSHIMA: MARCH 11, 2011: JAPAN

• AND MANY OTHERS

Comanche Peak Nuclear Power PlantGlen Rose, Texas