Top Banner
A Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning Administrator David Pulay, Transportation Engineer October 2015
35

A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Sep 04, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

A Diet that WorksAMATS Road Diet Analysis

Curtis Baker, Planning AdministratorDavid Pulay, Transportation Engineer

October 2015

Page 2: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Overview

• What is a Road Diet?

• The Big Picture– Why does an MPO care about Road Diets?

• AMATS Road Diet Analysis/Examples

Page 3: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

What is a Road Diet?

• Reduces the number lanes on a roadway• Most common conversion is four lanes to three

lanes• One lane in each direction with a continuous

turn lane• Dropped lane width is allocated to other users• Same pavement width, new lane configuration• Very little additional infrastructure cost

Page 4: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Typical Configuration

Page 5: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Benefits of a Road Diet• Safety

– Overall crash reduction of 19 to 47 percent– Less rear-end and left turn crashes through use of a

dedicated left turn lane– Calming effect on speed

• Fewer lanes for pedestrians to cross

• Extra width can accommodate other transportation modes such as bikes

Page 6: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Benefits of a Road Diet

• Smoother traffic flow, less slow and go flow

• Best use of pavement when the capacity of a roadway is greater than the demand– Highways designed in 50’s and 60’s based on the

current growth patterns– Population projections never materialized

Page 7: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Why We Care About Road Diets

• Transportation Funding Difficulties

• Regional Demographics

• Connecting Communities/Complete Streets

• Re-imagining Spaces

Page 8: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Transportation Funding Difficulties

• Funding has remained unchanged while project costs continue to rise

• Bike and pedestrian connections often foiled by right-of-way/acquisition costs

• We can create important connections with minimal cost

Page 9: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

• Loss of population

• Lower traffic counts

Page 10: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Connecting Communities and the Importance of Complete Streets

Page 11: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Complete Streets

Page 12: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Re-imagining Our Community

N Main St Akron - Existing

Page 13: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Re-imagining Our Community

Photo: Tim FitzwaterN Main St Akron – During Better Block

Page 14: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Re-imagining Our Community

N Main St Akron - Existing

Page 15: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

N Main St Akron – During Better Block

Page 16: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

StreetMix.com

Tempera Paint & Duct Tape

Tools

Baton Rouge

Page 17: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

The AMATS Road Diet Analysis

• Goal was to compile a list of streets where a road diet could be applied

• Start with an accurate inventory of roadways– GIS Database

– ODOT Office of Technical Services

– Highway Maintenance

Wolf Ledges Pkwy Akron

Page 18: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

The AMATS Road Diet Analysis

• Reduce the inventory by eliminating – Interstates and freeways

– Divided roadways (freeway look-alikes)

– Roadways with only two lanes

• In rare cases three lane roads and five lane roads can receive a road diet

Wolf Ledges Pkwy Akron

Page 19: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

The AMATS Road Diet Analysis

• Three lane roads must have unusually wide lanes– Reduce width of each lane– Allocate space for bike lane

Page 20: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

The AMATS Road Diet Analysis

• Road diet applied to five lane roads has to have extra space well defined

Page 21: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

The AMATS Road Diet Analysis

• Find average daily traffic (ADT)– Tier One: less than 10,000

– Tier Two: 10,000 to 15,000

– Tier Three: 15,000 to 20,000

– Over 20,000 is probably not a good choice

Wolf Ledges Pkwy Akron

Page 22: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

The AMATS Road Diet Analysis

• Determine peak hour volume– If this is not provided it is usually 8-12% of the ADT

• Determine directional peak hour volume– If this is not provided use “engineering judgment”– Peak hour directional volume less than 800-900

Page 23: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

The AMATS Road Diet Analysis

• Additional Analysis Recommended

– Tier 2 roadways (ADT 10,000-15,000) key intersections should to be analyzed, intersection spacing and length of queues considered

– Tier 3 roadways (ADT 15,000-20,000) key intersections should to be analyzed and corridor analysis for overall level of service

Page 24: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

The AMATS Road Diet Analysis

• Additional Considerations– Roadway function and it’s environment

– Continuity

– Railroad tracks - queues twice as long with less lanes

– Grades and slow moving vehicles

– Frequently stopping vehicles, especially buses

– Population and traffic volume trends

Opportunity Pkwy Akron

Page 25: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

The AMATS Road Diet Analysis

• Successful Implementation

– All stakeholders are part of the planning process

– Coordinate with resurfacing projects/schedules

– Community support

Page 26: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Road Diet Examples

Copley Rd (SR 162) in Akron, ADT = 13,300

Page 27: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

South St in Akron, ADT = 1,920

Road Diet Examples

Page 28: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

South Main St in Summit Co., ADT ≈ 12,000

Road Diet Examples

Page 29: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Road Diet Projects Planned

• E. Tallmadge Ave in Akron, ADT = 16,610

Page 30: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Road Diet Projects Planned

• Cedar St/Exchange St in Akron, four one-way lanes, ADT = 10,390

Page 31: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Maple St in Akron, ADT = 5,760

High Ranking Candidates

Page 32: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Wolf Ledges Pkwy in Akron, ADT = 8,400

High Ranking Candidates

Page 33: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

E. Exchange St in Akron, ADT ≈ 10,000

High Ranking Candidates

Page 34: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

High Ranking Candidates

N. Main St in Akron, ADT ≈ 10,000

Page 35: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Questions?

Curtis BakerPlanning Administrator, AMATSEmail: [email protected]

David Pulay, PETransportation Engineer, AMATS Email: [email protected]