A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad
32

A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Mar 31, 2015

Download

Documents

Sergio Doherty
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

A Decision Support System for Improving Railway Line Capacity

G RaghuramVV Rao

Indian Institute of Management, Ahmedabad

Page 2: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

• Planning Model– Not on line– Objective: Maximize line capacity

• Operational Model– On line– Objective: Minimize train detentions

Page 3: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Planning Model

• Math Programming

– Can be formulated as a Max Flow Problem– Too large computationally– Time has to be discretized– Level of detail insufficient

Page 4: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

• “Daily” period• A node per minute• 1440 nodes per station• 20 stations in a section• 28800 nodes

n=1 n=2 ................................ n=20

2

2

2

1

1

2

1

1

1

1

1

0

0

1

2

Page 5: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Planning Model

• Regression

– Can only handle a macro measure of capacity– Level of detail insufficient

Page 6: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Planning Model

• Simulation

– Can handle a good level of detail– Brute force approach– System is opaque

Page 7: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Time Distance Diagram

Time

Dis

tan

ce

Freight Train

Page 8: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

(Planning) Model

• Passenger trains have absolute priority over freight trains• All freight trains are identical

ModelSchedule of Passenger Trains

Station Details & Track Details

Desired Starting Time of a Freight Train

Speed of Freight Trains

Block Working Time

Schedule of the Freight Train

Page 9: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Data

• Passenger train schedules

• Tracks between two stations (single line or double line)

• Station configuration– Accessibility of tracks from left side– Accessibility of tracks from right side– Platform, main or loop

Page 10: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Representation of Stations

Up Up

L R

Dn Dn

Matrix ACL Matrix ACR Matrix STR

Track No

1 2 3 4 Track No

1 2 3 4 Track No 1 2 3 4

U 1 1 0 0 U 1 1 0 0 Signalling B U D D

D 1 1 1 1 D 1 1 1 1 Siding/Main S M M S

Platform P P P P

Accessibility Matrix

Page 11: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Prohibited Interval (for Departure)Track Release Time (for Arrival)

• Ts = Block Working Time• TT= Travel Time

TT Ts Ts

Prohibited Interval

Track Release Time

Page 12: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Moving a Freight Train from Origin to Destination

• Departure Rules (Only one train in between two control points at a time)

• Arrival Rules (Track availability)

• Combination of forward and backward moves

Page 13: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Case A TD=TA

i

ST(J) ET(J) ST(J+1) ET(J+1)

Case B TA TD

i

ST(J) ET(J) ST(J+1) ET(J+1)

Case C

i

ST(J) ET(J) ST(J+1) ET(J+1)

TA TAF=Min(TR(J+1, K))

i-1

ST(J) ET(J) ST(J’) ET(J’)TD TDF

Page 14: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Algorithm

• Start Ith train at station “origin” at desired time• Is it within prohibited interval (PI)?

– If no, proceed to next station– If yes, can it wait till end of PI?– If yes, depart at end of PI to next station– If no, determine first possible arrival time and

backtrack

• If cleared to next station, select track to occupy• Repeat for Ith train until end of section• Repeat for other trains until capacity

Page 15: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Measure of Capacity

• All trains fired at zero hours• Schedule each train in alternate directions• Find how many trains arrive at each

terminal within a 24 hour intervalTrain-1

Train-1

24 hrs

24 hrs

B

Distance

A

Time

Page 16: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Decision Areas

• Where to organize overtakes (and crossings in single track)?

• Which track to use at a station?

• Which track to use in a twin single? line/triple/quadruple section?

• Train stabling for crew change?

Page 17: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Experiments

1. Effect of average speed and block working time

2. Single track vs double track on a bridge

3. Effect of departure times on travel time

Page 18: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Experiment 1 (change speeds, block working time)

• BA performs better than AB

A B

20 Stations (100 km)

5 km (avg)

• Expected implications on capacity

Page 19: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Common Loop

• Inappropriate location• 6 stations out of 20 stations

• Track #3: common loop – unfavourable to up direction

UP UP

DOWN DOWN

1

2

3

Page 20: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Experiment 2

• Effect of changing the single track to double track

• No improvement in throughput

• Reduction in average travel time possibly due to other bottlenecks

Double track Double track

Single track (4 km)River

Page 21: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Experiment 3Arrival time at destination as a function of

departure time at origin

0

5

10

15

20

25

30

35

1 3 5 7 9 11 13 15 17 19 21 23

Departure time at origin

Arr

ival

tim

e at

d

esti

nat

ion

A to B

B to A

Expected(4 hourtransit)

Page 22: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Problem of Express Train Path due to Platform Location

Passenger train to overtake freight. Hence freight is on non-platform Main line

P

F

Time T

Express train has to run through siding (loop) because freight is on mainE: Express (fast moving)F: FreightP: Passenger (slow moving)

P

F

Time T+Δ

E

Page 23: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Use of Model

• Training

• Insights– Loop locations favouring one direction – Bridge not a serious bottleneck– Good departure times– Location of platforms

• Influence on commercial package

Page 24: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Policy Issue: Optimal length of Freight Train

Length of freight train: weight

Th

rou

gh

pu

t: t

on

s/d

ay;

C

apac

ity:

# o

f tr

ain

s

Throughput:tons/day

Capacity: # oftrains

Page 25: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Other Parameters

• Starting time

• Relative priority

• Number of sidings

• Speed of freight

• Slack time

• Change passenger train timings

Page 26: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Limitations and Opportunities for Extensions

• Acceleration, deceleration not considered

• A good path could be based on detention to freight trains

• Priority to passenger trains need not be absolute, but based on a weightage of detention to freight trains

• Resource constraints (loco, crew) can be considered

Page 27: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Operational Model

• Passenger train schedules + tracks to be ideally occupied

• Minimum stoppage time

• Station + section data

• Actual train timings (passenger + freight)[on line input]

Page 28: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Approaches

• A DSS – with graphics interface (absolutely essential)

• Algorithm– A branch and bound procedure with a look

ahead upto four hours or end of section, keeping response time in view

Page 29: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

DSS Approach

• Semi structured problem• Interactive: Given many parameters,

decision maker has a role to provide inputs

• Graphical – transparent• Sensitivity analysis – speed of response• In reality, manual charting is used. But

schedules cannot be planned ahead since difficult to try various alternatives quickly

Page 30: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

Given Complexity of IR

• Good response times may not be feasible

• But just “drawing support” with linear projections may still relieve the controller of a lot of tediousness

• Generation of statistics possible

Page 31: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.

DSS Approach

• Benefits of DSS approach for Static Model

– Training tool for schedulers and managers

– Sensitivity of parameters that can be altered – for example: passenger train schedules, slack time, number of sidings etc

– Contingency planning for maintenance etc

Page 32: A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.