Top Banner
1 Accelerator Physics and Engineering Josef Frisch Tonee Smith Clive Field Alan Fisher Henrik Loos Jeff Rzepiela Mark Petree Steve Smith Jim Welch Glen White Walter Wittmer Mark Woodley Gerald Yocky
42

A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

Jul 21, 2018

Download

Documents

lamnguyet
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

1

Accelerator Physics and Engineering

Josef FrischTonee Smith

Clive FieldAlan FisherHenrik Loos

Jeff RzepielaMark PetreeSteve SmithJim WelchGlen WhiteWalter WittmerMark WoodleyGerald Yocky

Page 2: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

2

APE – What do we do?Mission: Make accelerators work

Work in the intersection between physics, engineering and operations

Hardware design, construction and commissioning

High level software for beam modeling, diagnostics and controls

Machine operations and commissioning and experiments

Non-experts, non-specialists

Page 3: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

3

Types of ProjectsLong-term projects:ATF2 tuning, THz source

Fast and simple:X-ray diagnostics, RF interlocks

Cutting-edge systems:10fs timing, Proton synchrotron light monitor

Simple brute-force: X-ray shutter, RF interlocks

Fast clean-up of systems that were delayed or non-functional: Get it working, make it pretty later.

Page 4: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

4

Involvement in Major Projects● ATF2 - Linear Collider final focus test, Located at KEK – Japan

● Modeling, Beam Position Monitors● CTF3 - Test facility for a linear collider located at CERN

● Beam Position monitors● FACET - Plasma wakefield accelerator test at SLAC

● Installation management, commissioning, diagnostics● LCLS - Worlds first hard X-ray laser at SLAC

● Modeling, High level controls, Diagnostics, THz source● LHC - High energy proton collider located at CERN

● Proton Synchrotron light monitor, Experiment timing.APE works in collaboration with other groups – no APE-only projects

Will just present a few selected projects

Page 5: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

5

TCAV Bunch Length MeasurementTransverse cavity provides time dependent kick

Optics for 90 degree phase advance

Longitudinal transformed to transverse

Profile monitor

- 1 5 0 0 - 1 0 0 0 - 5 0 0 0 5 0 0 1 0 0 0 1 5 0 01 0 0 0

1 5 0 0

2 0 0 0

2 5 0 0

3 0 0 0

3 5 0 0

4 0 0 0

4 5 0 0x a r e a = 0 . 4 6 ± 0 . 0 0 M c t sx m e a n = 0 . 0 2 ± 0 . 0 0 m mx r m s = 1 5 9 . 7 ± 0 . 0 0 µ m

y a r e a = 0 . 4 2 ± 0 . 0 0 M c t sy m e a n = - 0 . 0 2 ± 0 . 0 0 m my r m s = 5 0 . 5 ± 0 . 0 0 µ m

P o s i t i o n ( µ m )

Cou

nts

()

- 1 - 0 . 5 0 0 . 5 10

5

1 0

1 5

2 0

2 5

3 0

3 5

4 0

4 5

T C A V : L I 2 4 : 8 0 0 : T C 3 : A A C T ( n o r m )

Bea

m S

ize

( µm)

T C A V b u n c h l e n g t h o n W I R E : L I 2 8 : 7 4 4 1 5 - J u n - 2 0 1 0 1 7 : 5 8 : 0 4 S u p e r

σ y = 3 6 . 9 3 ± 2 . 0 0 µ m

σ z = 2 . 5 1 6 ± 0 . 6 4 7 µ m

c a l = 7 . 6 8 5 ± 0 . 3 4 7 µ m / µ m

LCLS uses a wire scanner to measure the profile

<10 fs bunch length measurement

TCAV + phase, - phase and off

TCAV on / off

15MV 2856MHz at LCLS

H. LoosH. Loos

Page 6: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

6

LCLS Short BunchesOperate with 20pC, near max compression, bunch length below TCAV resolution

Simulations (Genesis) indicate ~7fs FWHM bunch length (Yuantao Ding)

20pC, 160uJ, 9 KeV

Indirect bunch length measurement: FEL operates 1° L2 phase either side of full compression, but not at full compression (believed due to emittance growth)

0° phase 1°phase

No Lasing Good lasing

Page 7: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

7

Precision Timing● LCLS produces few-femtosecond X-ray pulses● Experiment laser produces ~40fs pulses

● Commercial lasers available to ~20fs● HHG can generate <1 fs XUV pulses.

● Pump-probe experiments could use fs timing● LCLS LINAC jitter (shot to shot relative to a

perfect clock) is ~60fs RMS● Probably limited by high power RF system – very

expensive to improve● Need to measure beam time and correlate with

experiments

Page 8: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

8

Beam arrival time cavity (LCLS)Similar to a cavity BPM but use the monopole mode

Phase drift from cavity temperature is the most significant problem

1us time constant, 10-5 /C° temperature coefficient -> 10ps/C° (!)

Raw Signal

Phase slope gives cavity temperature

Page 9: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

9

Beam Arrival Time System

Cavity system installed and used for all pump/probe experiment since the start of the LCLS experimental runs M. Petree

Page 10: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

10

Beam Arrival Time Cavity - NoiseCompare 2 independent cavity systems to estimate noise

Present system designed for 250pC, needs more gain to operate properly at low charge

20pC

RMS difference between cavities ~12 femtoseconds RMS at 250pC, ~25 femtoseconds at 20pCDrift is ~100 femtoseconds p-p over 1 day.

Page 11: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

11

Full Timing System

M. Petree, LBNL timing group. LCLS Laser group

Page 12: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

12

Timing System Performance 50fs RMS

From R. Coffee experiment. Pretty good, but need to eventually do much better

Page 13: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

13

Timing Upgrades

Phase Detector

Laser amplifier chain

●Laser timing jitter believed to be the largest noise source in the system

●Laser timing detection is one of the limits on system timing stability / noise.

●Photo-diode maximum signal limited by non-linear amplitude-to-phase conversion, Noise limits operation at low signal levels

●Will test etalon system soon

Add an etalon to multiply the laser rate from 70MHz to 2856MHz

Low signal is OK, have more than we can use

Page 14: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

14

Future TimingElectronic timing likely not possible below ~10fs, need direct measurement of X-ray vs. Laser time in the experimental chamber

GaAs or similar

Laser

X-rays Reflected optical beam measured on array sensor

X-rays generate carriers that change the index of refraction and change the reflectivity near Brewsters angle

Suggested by a many people, not sure who originiated the idea.Initial tests at SXR

Page 15: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

15

“Slotted Foil” short bunches

6 µm emittance

1 µm emittance

“V” Foil position scan

No direct pulse length measurement

Slotted foil designed by P. Emma, installed by C. Field, M. Petree, D. Karach

Page 16: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

16

Low Charge AND Slotted Foil

X-ray spectrum with 20pc operation – few spikes suggest ~5 fs pulses

With 20pc and slotted foil see single spike spectrum suggests very short pulses

No direct measurement but may be producing ~1fs X-ray pulses

Various combinations of high / low charge and slotted foil used by multiple experiments during the 2010 LCLS experiment run

Page 17: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

17

THz Generation at LCLSUse short pulse (~70fs), high peak current (3000A), electron beam from the LCLS accelerator to generate THz to far IR broadband light for experiments.

Partially motivated by very large (106 Enhancement) of light from coherent transition radiation.

Real color COTR image

Use Transition Radiation from thin (2um) Be foil installed after the undulator.

Non-invasive for X-ray energies above ~ 1.5 KeV

Eventually will run 2 bunches:High charge, ultra-short (poor emittance ) for THz pumpLow charge FEL bunch for X-ray probe

Page 18: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

18

THz System

bolometer

Pyro detector

Pyro cam.THzAuto-correlation

Sample stage/pinhole xyz stage

flip mirroriris

Motorized filter set

Laser

QWP

ZnTe

BS

EO samplingBalanced

Diodes/Andor

T2A

T,2A

T

2A

3T

2A

R

R

T

Alignmentlaser

2A

Delay stage

2A

BS

2A

Half wave plate R

flip mirror

e−

Simulation by H. LoosA. Fisher, A. Lindenberg (PULSE)

~3V/Å Electric FieldLab source: .01V/Å

Experiment laser800nm20fs pulses68 MHz, 150mW

Characterize THz, then use for experiments

Page 19: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

19

THz StatusOptics installed in tunnel, expect to test with beam soon

Page 20: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

20

X-ray Beam Diagnostic StationAfterthought in LCLS Design – constructed to replace the unfinished Front End Enclosure

Now used as a general purpose X-ray diagnostics chamber

Insert-able samples (15): materials tests, X-ray edge filters

YAG screen (upstream X-ray spot size monitor)

B4C MPS stopper to protect downstream PPS stoppers

BEAM

T. Smith, E, Kraft

First LCLS lasing seen with this system

Page 21: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

21

X-ray Diagnostic Station

Diagnostic station filter set

Thermal-acoustic sensor for calibrated X-ray measurements under development

X-rays → heat → acoustic wave → ultrasonic microphone

Page 22: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

22

LCLS Apps● Optimization: Correlation plot -> Emittance ->

(profile monitor, or wire scanner app).● Very powerful tool – for example can scan orbit

bump in the LINAC to minimize emittance● Analysis: Undulator K measurement,

wakefields, , Bunch length, profiles, etc. ● Modeling: Matlab, XAL, etc.

Configuration in Mad / Oracle database

M. Woodley

Page 23: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

23

LCLS High Level AppsCorrelation plot

EmittanceApplication

Profile Monitor

Integrated set of applications for beam measurement and optimization H. Loos

J. Rzepiela

Page 24: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

24

LCLS Apps (Sample only)Matching, XAL or Matlab model

Emittance vs gun Solenoid

Transverse cavity bunch length measured with wire scanner vs phase

Page 25: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

25

X-ray Self Seeding at LCLS

Working in collaboration with photon science and ANL to make a self-seeding tests at LCLS at 1Å in spring of 2011

Page 26: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

26

LCLS_II

Calculations for wide range (200eV to 20 KeV) X-ray gas attenuator using variable apertures

Avoid speckle from Be attenuator. Investigating other materials

Page 27: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

27

J. Welch

Page 28: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

28

FACET

Lots of activity getting 2km of accelerator, 2 damping rings, a positron source and a new beamline ready. (W. Whittmer, J. Yocky)

Page 29: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

29

FACET

Fixed Foil

Pyro Detector

CCD Camera

Diamond Window

Si Beam Splitter

e-Beam

New Database, ModelM. Woodley

FACET bunch length monitors modified from LCLS designAlso used as OTR monitorH. Loos

Page 30: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

30

Page 31: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

31

ATF2

Page 32: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

32

ATF2 Tuning / Controls● Main system used = VSYSTEM + SAD online model

● Mainstay for accelerator operations, tested, maintained and stable.

● Alternate system developed based on EPICS+ Matlab + Lucretia beam dynamics code: ATF2 “flight-simulator”

● Portable for offsite code development and testing

● Same software runs either in production or simulation mode using simulation mode of low-level EPICS controls.

● Can interface to other code through tcp/ip socket layer or EPICS

DB interface.

Page 33: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

33

ATF2 Spot Size

Project goal is 30nm.Optimization of the non-linear final focus is very complex – needs sophisticated tuning tools.Spot size measurement is “Shintake” interference monitor, requires 10nm beam position measurement.

Page 34: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

34

ATF2 Cavity BPMs

ATF2 I/Q BPM system with 10nm RMS noise

Honda et. al.

LLNL cavity BPM support / mover system

Use 2 BPMS to predict measurement of 3rd

Prediction vs measured

20nm resolution15um range

50nm drif 1 hour

Page 35: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

35

Cavity BPM ElectronicsBPM signal6426 MHz

6.7 GHzLow Pass

Reject higher order modes

AmplifierImagerejectMixer

LO 6446 MHz

3 GHzLow pass

filter

Eliminate RF

20dBpre-

amplifier

Low Noise

20MHz

12dBamplifier

High IP3

40MHzlow pass

Anti-aliasfilter

100Ms/s14 bit digitizer

Low cost PC board construct for quantity production6dB noise figure, 70dB linearity measured27nm RMS noise at ATF2

Page 36: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

36

ATF2 Project Issues● Magnet Multipoles – may prevent operation

below 250nm with re-measure and shim. ● Need 10nm BPMs to demonstrate 30nm IPspot

size. Possible but this equals the best performance ever seen with BPMs

● ATF2 second goal of 1nm position stability would require 800 picometer cavity BPMS;● Happy to try – but very unlikely to be able to reach

this resolution!

Page 37: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

37

CTF3

BPM Signal RF Signals

Facility at CERN to test 2-beam acceleration for the CLIC colliderAPE (S. Smith) working on drive beam BPMs. this is considerably more difficult than it sounds! The drive beam is designed to produce 100s of MW in a power extraction structure – it couples an unmanagable amount of power into any BPM pickup.

One option: use an off-frequency narrow-band BPM and the statistical fluctuations on the drive beam.

power extraction structure

Page 38: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

38

LHC – Synchrotron Light Monitor● Two applications:

● BSRT: Imaging telescope, for transverse beam profiles● BSRA: Abort-gap monitor, to verify that the gap is empty

● Particles passing through the abort kickers during their rise get a partial kick and might quench a superconducting magnet.

● Two particle types:● Protons and lead ions

● Three light sources:● Undulator radiation at injection (0.45 to 1.2 TeV)● Dipole edge radiation at intermediate energy (1.2 to 3 TeV)● Central dipole radiation at collision energy (3 to 7 TeV)● Spectrum and focus change during ramp

A. Fisher

Page 39: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

39

LHC

To RF cavities and IP4To arc

Cryostat

Extracted light sent to an optical table

below the beamline

1.6 mrad

70 m

26 m 937 mm560 mm

420 mm

D3 U

10 mD4

194 mm

Page 40: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

40

LHC Synchrotron LIght monitor Works!

Horizontal0.68 mm 0.70 mm

Vertical0.56 mm 1.05 mm

Light from D3 dipole.Blue filter. Narrow slit.

This Fall: Synchtrotron light images from....LEAD!

Page 41: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

41

Other Stuff● Dark matter "Heavy Photon" search at Jeffreson

lab● Design / tests for thin high average power W target.

(C. Field)● Timing system for forward proton detector at

LHC● 1ps timing over 500M in high radiation environment.

● NLCTA: Obvious place for APE to work, but so far too manpower limited

Page 42: A ccelerator P hysics and E ngineering Josef Frisch Tonee ... · CTF3 - Test facility for a linear collider located at CERN Beam Position monitors FACET - Plasma wakefield accelerator

42

Future

● Expect to continue with a random collection of projects using a wide variety of technologies

● APE wouldn't be needed in a perfect lab – but has been valuable in a real one.