A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions Environmental Remediation Strategies and Alternatives
Apr 02, 2015
A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions
Environmental Remediation Strategies and Alternatives
Houston, Texas Moderately performing asset owned from
1993-1999. Scheduled for sale in 1998 Contamination from gas station held
process Concerns about retention of liability A solution to sell with a fixed fee
remediation plan and an “insurance” policy
Retail Strip Center Investment
The Issue:
Northwestern obtained a fixed fee remediation contract to affect the free product contamination on the site and obtain closure from the TCEQ (using LUST fund)
A “Cost Cap” Environmental Insurance policy was obtained to “guarantee” the remediation contract.
The property transacted and was sold in 1999.
Within one year, it became clear that the remediation plan would not work…
Fixed Fee Remediation Plus Cost Cap Environmental Insurance Policy
Remedial Action Plan projected 6-12 months to clear free product from wells.
After 18 months the Contractor became difficult to work with and non-responsive.
At 24 months, chlorinated solvents were detected on the east half of the property (somewhat away from the petroleum contamination).
At 30 months, the contractor found an exit to the contract…
Project Difficulties…Free Product Recharge?
The Contractor discovered, via historical city directory search, that the property had formerly had a dry cleaner listed as occupying the site. (No evidence that this was anything more than a pick-up/drop off location).
Contractor notified TCEQ of chlorinated solvent contamination, causing the site to be kicked out of LUST fund.
Contractor claimed breach of contract terms and abandoned the project and files bankruptcy.
Contractor Abandons Project
As the Buyer (new Owner) becomes vocal, Northwestern moves forward and inserts new consultant on the project.
Environmental Insurance carrier was notified, very slow to respond.
After 12 months of monitoring and holding the TCEQ at bay, Kemper Environmental Insurance notifies policy holders that they can no longer cover losses on existing policies.
Northwestern begins to manage the project on a sold asset…
Environmental Insurance Fails
My first advice: just sell the property as contaminated and take the monetary write-down.
If you’re going to enter the site in a Fixed Fee contract, hire a reputable, high net worth contractor and ensure that all contracts absolve your firm and ownership interest.
If you’re going to use Environmental Insurance for Bonding, make certain all contracts tie to new Buyer.
Don’t stay involved after sale. If things fail, refer the project to your legal
department and stay away from it.
Before Discussing Remediation, Let’s Discuss Lessons Learned
When you manage a general fund, your name is on title…dictates action plan.
Northwestern has 9 remediation projects on assets not owned. Projects held through sale or lawsuit.
Tendency is long term monitoring. This project drifted for five years… Finally, in 2008 we started taking action
after demands from current owner.
Sold Assets with Retained Liability
Understand Your Issue
Understand Your Issue…and other people’s contribution to it…
Cross Section Maps & StratigraphyTell Yet Another Story
Cross Section Maps & Stratigraphy
Cross Section Maps & Stratigraphy
Cross Section Maps & Stratigraphy
Cross Section Maps & Stratigraphy
More Complicated Stratigraphy
Electronic Stratigraphy Model
Regulatory Solutions
Quarterly monitoring and natural attenuation
Site has been enrolled in LNAPL Risk Based Closure Program
Very few sites have been closed “Progress” alleviates contractual obligations May or may not be a good long term
solution for long term invested assets Risky for short term invested assets
Remedial Action Plan 2014