This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions.

A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions

Environmental Remediation Strategies and Alternatives

Page 2: A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions.

Houston, Texas Moderately performing asset owned from

1993-1999. Scheduled for sale in 1998 Contamination from gas station held

process Concerns about retention of liability A solution to sell with a fixed fee

remediation plan and an “insurance” policy

Retail Strip Center Investment

Page 3: A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions.

The Issue:

Page 4: A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions.

Northwestern obtained a fixed fee remediation contract to affect the free product contamination on the site and obtain closure from the TCEQ (using LUST fund)

A “Cost Cap” Environmental Insurance policy was obtained to “guarantee” the remediation contract.

The property transacted and was sold in 1999.

Within one year, it became clear that the remediation plan would not work…

Fixed Fee Remediation Plus Cost Cap Environmental Insurance Policy

Page 5: A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions.

Remedial Action Plan projected 6-12 months to clear free product from wells.

After 18 months the Contractor became difficult to work with and non-responsive.

At 24 months, chlorinated solvents were detected on the east half of the property (somewhat away from the petroleum contamination).

At 30 months, the contractor found an exit to the contract…

Project Difficulties…Free Product Recharge?

Page 6: A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions.

The Contractor discovered, via historical city directory search, that the property had formerly had a dry cleaner listed as occupying the site. (No evidence that this was anything more than a pick-up/drop off location).

Contractor notified TCEQ of chlorinated solvent contamination, causing the site to be kicked out of LUST fund.

Contractor claimed breach of contract terms and abandoned the project and files bankruptcy.

Contractor Abandons Project

Page 7: A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions.

As the Buyer (new Owner) becomes vocal, Northwestern moves forward and inserts new consultant on the project.

Environmental Insurance carrier was notified, very slow to respond.

After 12 months of monitoring and holding the TCEQ at bay, Kemper Environmental Insurance notifies policy holders that they can no longer cover losses on existing policies.

Northwestern begins to manage the project on a sold asset…

Environmental Insurance Fails

Page 8: A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions.

My first advice: just sell the property as contaminated and take the monetary write-down.

If you’re going to enter the site in a Fixed Fee contract, hire a reputable, high net worth contractor and ensure that all contracts absolve your firm and ownership interest.

If you’re going to use Environmental Insurance for Bonding, make certain all contracts tie to new Buyer.

Don’t stay involved after sale. If things fail, refer the project to your legal

department and stay away from it.

Before Discussing Remediation, Let’s Discuss Lessons Learned

Page 9: A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions.

When you manage a general fund, your name is on title…dictates action plan.

Northwestern has 9 remediation projects on assets not owned. Projects held through sale or lawsuit.

Tendency is long term monitoring. This project drifted for five years… Finally, in 2008 we started taking action

after demands from current owner.

Sold Assets with Retained Liability

Page 10: A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions.

Understand Your Issue

Page 11: A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions.

Understand Your Issue…and other people’s contribution to it…

Page 12: A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions.

Cross Section Maps & StratigraphyTell Yet Another Story

Page 13: A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions.

Cross Section Maps & Stratigraphy

Page 14: A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions.

Cross Section Maps & Stratigraphy

Page 15: A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions.

Cross Section Maps & Stratigraphy

Page 16: A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions.

Cross Section Maps & Stratigraphy

Page 17: A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions.

More Complicated Stratigraphy

Page 18: A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions.

Electronic Stratigraphy Model

Page 19: A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions.

Regulatory Solutions

Page 20: A Case Study in What Can Go Wrong, Thinking in 3D, and Alternative Solutions.

Quarterly monitoring and natural attenuation

Site has been enrolled in LNAPL Risk Based Closure Program

Very few sites have been closed “Progress” alleviates contractual obligations May or may not be a good long term

solution for long term invested assets Risky for short term invested assets

Remedial Action Plan 2014