Reduced Corporate Liability by Eliminating Trip Hazards Eliminated Sales Downtime & Consumer Inconvenience with A-1’s “No Wait” Solution! Williamsville, NY – 08/05/07 Retail chains prioritize safety & convenience! Commercial before after
May 26, 2015
Reduced Corporate Liability by
Eliminating Trip Hazards
Eliminated Sales Downtime & Consumer
Inconvenience with A-1’s “No Wait”
Solution!
Williamsville, NY – 08/05/07
Retail chains prioritize safety & convenience!
Commercial
before after
Eliminated Wing Eating Downtime
& Consumer Inconvenience with A-1’s “No Wait” Solution!
Amherst, NY – 07/16/13
Local legend makes safety & convenience a priority!
Commercial
before afterbefore
after
Those are the holes… Whaaat?
Turned another Leap Back into a Step…
Re-Directed the Surface Drainage….
East Amherst, NY – 06/08/12Residential – Front Step
beforebefore after
Raised walkway
Raising entry slab forces early retirement for after-market step
East Amherst , NY - 11/04/09Residential – Entry
before after
National restaurant chain resolves entry slab trip hazard & keeps customers safe
Depew, NY – 11/10/09Commercial
before during
after open for business before 11am…
Raised Step & WalkwayImproved Safety & Curb Appeal
East Amherst , NY - 11/02/09
BEFORE AFTER
Residential – Entry
Our First Rescued Step in 2008!
Make Safety A Priority
Williamsville, NY – 04/01/08
BEFORE AFTER
Residential – Entry / Step
Saved a Patio for the Customer Helping Keep Medical Bills to a Minimum!
Amherst, NY – 10/25/08
BEFORE AFTER
Residential – Rear Patio
Turned another Leap into a Step…Re-Directed the Surface Drainage….
Lakeview, NY – 05/23/12Residential – Front Step
before after
Raised an Entry Slab from the Dead…
Created a Set of Standard Steps….
Wheatfield, NY – 07/01/13Residential – Front Step
before
after
Turned a Bumpy Ride into a Smooth Glide Enhanced the Safety on the Property
Amherst, NY – 05/22/12Commercial – Office
before afterBefore After
Eliminated apartment complex trip hazards drainage issues
Reduced corporate liability
Amherst, NY – 04/15/09
before after
Commercial – Prop. Mgmt
Eliminated an apartment complex trip hazard Reduced corporate liability
Amherst, NY – 10/01/08Commercial – Prop. Mgmt
before after
Turned another Leap into a Step…Re-Directed the Surface Drainage….
Amherst, NY – 06/15/10Residential – Walkway
before after
Sidewalk demonstration for highway departmentresulted in sidewalk leveling project
150 slabs completed during week of August 27th-31st
A-1’s patented equipment & process saves the town and residents time and money
Municipal
before after
Eliminated severe trip hazards
Transitioned slabs to accommodate walking!
Cheektowaga, NY – 07/15/08
Residential – Sidewalks
before after
Eliminated Trip Hazard! Make Safety A Priority
Akron, NY – 10/30/08
BEFORE AFTER
Residential /Municipal – Walkway
Eliminated a Trip Hazard…Created an Even Transition………….
Amherst, NY – 06/15/10Residential – Sidewalk
before after
Eliminated a Trip Hazard…Created a Smooth Transition for Neighbors
Amherst, NY – 05/09/11Residential – Sidewalk
before after
Eliminated a Trip Hazard…Created a Smooth Transition for Neighbors
Hamburg, NY – 06/14/10Residential – Sidewalk
before after
Eliminated Trip Hazards Create an transition to walk
over
Cheektowaga, NY – 07/15/08
BEFORE AFTER