7/25/2019 9FA Details
1/25
GAS TURBINE
9FA GE MAKE GAS TURBINE
DLN COMBUSTION SYSTEM
7/25/2019 9FA Details
2/25
GAS TURBINE
CONFIGURATION
COMPRESSOR: 18 SATGES
: 18 STAGES OF ROTATINGBLADES(R0-R17)
: 18 STAGES OF STATIONARYVANES(S0-S17
AND 2 STAGES OF EIT GUIDEVANES)
COMPRESSOR AND TURBINE ARE
7/25/2019 9FA Details
3/25
GAS TURBINE CONFIGURATION
TURBINE: ! STAGES
: ! ROTATING BLADES (BUCKETS)
: ! STATIONARY BLADES
(NO""LES)
: ! S#ROUDS (FOR TIP CLEARANCE
AND T#ERMAL
INSULATION)
7/25/2019 9FA Details
4/25
ARRANGEMENT WITH UPPER
CASINGS OPEN
7/25/2019 9FA Details
5/25
GAS TURBINE
CONFIGURATION T#E FOLLO$ING COMPONENTS ARE
AIR COOLED FOR #IG# TEMP SERVICE%
BUCKETS:
-1ST AND 2NDSTAGE
NO""LES:
- 1ST& 2NDAND !RDSTAGES
S#ROUDS
- 1STSTAGE
7/25/2019 9FA Details
6/25
GAS TURBINE
CONFIGURATION
T#E COMPRESSOR PROVIDES AIR
RE'UIRED -COMBUSTION
-COOLING
7/25/2019 9FA Details
7/25
AIR FLO$ DIRECTION
7/25/2019 9FA Details
8/25
7/25/2019 9FA Details
9/25
COMBUSTION AIR
COMPRESSOR DISC#ARGE AIR FLO$S INTO
DISC#ARGE PLENUM%
AIR ENTERS T#ROUG# FLO$ SLEEVE #OLES
AIR TRAVELS T#ROUG# ANNULUS BET$EEN
FLO$ SLEEVE AND LINER
T#EN AIR ENTERS COMBUSTION "ONE
7/25/2019 9FA Details
10/25
FIRST
STAGE
NOZZLE
7/25/2019 9FA Details
11/25
7/25/2019 9FA Details
12/25
COOLING AIR CIRCUIT
INTERNAL CIRCUIT
INTERNAL CIRCUIT-1 (SUPPLIED FROM
COMPRESSOR DISC#ARGE PLENUM) PROVIDESCOOLING OF
: 1STSTAGE NO""LE
: 1STSTAGE S#ROUD
AFTER COOLING T#E AIR MIES $IT# #OT GASES
AND TRAVEL ONTO 1STSTAGE BUCKETS%
7/25/2019 9FA Details
13/25
COOLING AIR CIRCUIT
INTERNAL CIRCUIT
- INTERNAL CIRCUIT (SUPPLIED FROM
COMPRESSOR 17T#STAGE $#EEL
T#ROUG# DISTANCE PIECE) PROVIDESFOR COOLING OF
- 1STSTAGE BUCKET
- 2NDSTAGE BUCKET- ROTOR COOLING ($#EEL SPACE )
7/25/2019 9FA Details
14/25
COOLING AIR CIRCUIT
ETERNAL CIRCUIT
- PIPING FROM 9T#AND 1!T#STAGEBLEED PIPING TO TURBINE CASING FOR
COOLING
: 2NDSTAGE NO""LES
: !RDSTAGE NO""LE
7/25/2019 9FA Details
15/25
EXTERNAL
COOLING AIR
7/25/2019 9FA Details
16/25
7/25/2019 9FA Details
17/25
#OLLO$ TURBINE DISTANCE
PIECE FOR CARRYING COOLING
AIR
7/25/2019 9FA Details
18/25
TURBINE
WHEELS
WITH SLOTS
FOR
BUCKET
FIXING
COOLING
AIR
7/25/2019 9FA Details
19/25
AIR COMES FROMHOLLOW SHAFT
THROUGH WHEEL SLOT
7/25/2019 9FA Details
20/25
COOLING
AIR
ENTRY
PATH
7/25/2019 9FA Details
21/25
7/25/2019 9FA Details
22/25
7/25/2019 9FA Details
23/25
7/25/2019 9FA Details
24/25
EXTERNAL
COOLING AIR
7/25/2019 9FA Details
25/25
CUT A$AY VIE$ : COOLING AIR FLO$