    Espirito Santo FPSO

    Turret & Installation ChallengesSNAME/MTS Joint Meeting Texas A&M University March 26, 2010

    Chris Wibner

    Upstream Major Projects

    Shell International Exploration & Production, Inc.

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    2/26

    Contractor owned and operated FPSO (evolution of GFPSO project)

    Shell is operator (50%) with partners Petrobras (35%) & ONGC (15%)

    FPSO Contractor - BDFT (SBM & MISC JV)

    Major subcontractors:

    Keppel Shipyard (hull conversion, turret fabrication, topsides integration)

    Dynamac (topsides fabrication)

    BT Engineering (topsides fabrication)

    1780 m water depth at FPSO locationInternal turret with 21 riser/umbilical slots

    First turret moored FPSO to accept Steel Lazy Wave Risers

    Espirito Santo FPSO

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    3/26

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    4/26

    100 kbopd oil processing capacity (low API)

    50 mmscfpd gas compression

    150 kbpd total liquids processing capacity

    130 kbwpd produced water treating capacity75 kbwpd water injection w/ sulfate reduction for Phase II

    150 kbwpd additional water injection deck space

    Topsides weight ~ 8,500 tons

    Espirito Santo - Topsides Details

    Unique challenges: Heavy oil processing 16 API), services for subsea

    artificial lift systems i.e.15 MW available AL power, VFDs, Hot oil

    circulation with gas spike capability)

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    5/26

    Vessel As Arrived in Singapore (06)

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    6/26

    Lazy Wave Steel Risers & Umbilicals Vertical load 2,200 tonnes

    Multiple Heavy lifts for integration into vessel

    Large swivel stack 12 units ~ 150 tonnes

    High Voltage

    Centralized riser/umbilical pull-in winch

    Separate riser & umbilical decks

    Riser spool piece connection inside lower turret

    Espirito Santo - Turret Challenges

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    7/26

    Turret Cross Section

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    8/26

    Umbilical deckCollar deck

    SLWR

    Typical flexible riser

    Max SLMax SL

    Lower Turret Layout Difference

    Riser deck

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    9/26

    Construction Challenges

    Built by decks and stacked

    Inclined I-tubes, complex alignment and fit up

    Umbilical I-tubes required a reverse bend to mitigate clashing

    Complex lay-out of I-tubes, generates more engineering studies

    Dimensional control

    Site integration testing

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    10/26

    Integration Photos - Turret

    Gantry Manifold

    Bogie Support Structure

    Lower TurretCollar Structure

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    11/26

    LOWER MOONPOOL INSTALLATION

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    12/26

    Upper

    Moonpool Integration

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    13/26

    Upper

    Moonpool Integrationafter 2nd DD

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    14/26

    BC-10 FPSO TURRET(LOWER TURRET)

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    15/26

    Lower Turret ntegration

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    16/26

    BC-10 FPSO TURRET(Bogie Support Structure)

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    17/26

    BC-10 FPSO TURRET(UPPER TURRET)

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    18/26

    BC-10 FPSO TURRET(TURRET MANIFOLD)

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    19/26

    Riser / Umbilical Interface

    Risers clamp castings (12)

    Umbilical bellmouths (3)

    Umbilical Future (6)

    Mooring Connectors (9)

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    20/26

    154 tonnes 24 m Height

    Unit 12 Electro Optical

    Unit 11 Hot Oiling Service Swivel

    Unit 10 Utility LP & HP

    Unit 9 Gas Export / Injection

    Units 7 & 8 HV Electrical

    Unit 6

    Water Injection Unit 5 Gas Production

    Unit 4 Firewater

    Units 1,2,&3 Oil Production

    Swivel Stack

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    21/26

    Pull-in Winch

    New concept

    Design developed in house by SBM Winch platform provides 3 Motions

    2 axis of rotations

    1 sliding

    BC 10 FPSO P ll i Wi h

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    22/26

    BC-10 FPSO Pull-in Winch

    RiserWire

    ChainWire

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    23/26

    SLWR & Umbilical Pull-in

    Installation team

    ready for another

    pull-in within 6 to 8

    hours

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    24/26

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    25/26

    Conclusions

    Steel Risers are feasible from a turret moored FPSO

    Interface between the turret & steel risers proved feasible

    Winch platform design provided full satisfaction

    Comprehensive dimensional control management is a necessity

    Site integration testing is extremely important

    Installation time comparable to flexible riser

  • 8/11/2019 9f2b157c1b63452586ca8d2287ed5149 (1)

    26/26

    QUESTIONS ?