Page 1: 9100 Compact BTS EVO Installation

Alcatel-Lucent GSM

9100 Compact BTS

Indoor/Outdoor Evolution

Installation Manual

BTS Document

Installation & Dismantling Manual

3BK 17430 3135 RJZZA Ed.03

Page 2: 9100 Compact BTS EVO Installation

Status RELEASED

Short title

All rights reserved. Passing on and copying of this document, useand communication of its contents not permitted without writtenauthorization from Alcatel-Lucent.

BLANK PAGE BREAK

2 / 84 3BK 17430 3135 RJZZA Ed.03

Page 3: 9100 Compact BTS EVO Installation

Contents

Contents

Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

1.1.1 Hardware Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81.1.2 Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.3 Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.4 Initial State . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.5 Final State . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.6 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.7 Grouped Task Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

1.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121.2.1 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121.2.2 Site-Specific Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

1.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 131.4 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

1.4.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 141.4.2 Forms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 171.4.3 Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 171.4.4 Applicable Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

2 Install 9100 Compact BTS Indoor/Outdoor Evolution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 192.1 Before Going On Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202.2 Before You Start . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

2.2.1 Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202.2.2 Required Knowledge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

2.3 Delivery and Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 212.4 Rack Transportation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

2.4.1 Crane Transportation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 232.4.2 Manual Transportation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27

2.5 Rack Positioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 282.5.1 C1: Case of Steel Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 282.5.2 C2: Case of Concrete Foundation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 312.5.3 C3: Case of Wall Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 352.5.4 C4: Case of Pole Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43

2.6 Power Supply and Earth Cables Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 502.6.1 Installation of Cables in the Site Cable Way . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 512.6.2 Protective Earth Cable Connection (GND) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 522.6.3 Power Cables Connection for AC Variant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 542.6.4 Power Cables Connection for DC Variant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 562.6.5 Fit the Mains In Cover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59

2.7 PCM Cables Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 602.7.1 Install the PCM Cables in the Cables Way . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 602.7.2 Cables Passing at Rack Side . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 612.7.3 Cables Connection at Rack Side . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 632.7.4 Other Connection Possibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67

2.8 Antenna Jumpers Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 702.8.1 Jumper Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 702.8.2 Connection to the Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 712.8.3 Connection to the Feeders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72

2.9 Options Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 742.9.1 Alarm Cables Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 742.9.2 Synchronization Cables Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78

2.10 Finish Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 812.10.1 Label the Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81

3BK 17430 3135 RJZZA Ed.03 3 / 84

Page 4: 9100 Compact BTS EVO Installation

Contents

2.10.2 Close the Cable Entry . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 812.10.3 Leave the Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82

2.11 OUTC Layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83

4 / 84 3BK 17430 3135 RJZZA Ed.03

Page 5: 9100 Compact BTS EVO Installation

Preface

Preface

Purpose This document describes how to install on site an 9100 Compact BTSIndoor/Outdoor Evolution (CBIE/CBOE) of Alcatel-Lucent BSS.

What’s New In Edition 03The following section were updated:

Site-Specific Information (Section 1.2.2)

Installation Kits (Section 1.4.1.2).

Connection of Optical Fiber PCM cable (Section 2.7.4.3) was added.

In Edition 02Update for indoor applicability.

In Edition 01First official release of the document.

Audience This document is intended for:

Installers

Site administrators

Supervisors

Project managers

Field service technicians

Occasional users.

Assumed Knowledge You must have a basic understanding of the following:

Basic knowledge of Alcatel-Lucent BSS equipment

Experience of electrical mounting and cabling.

3BK 17430 3135 RJZZA Ed.03 5 / 84

Page 6: 9100 Compact BTS EVO Installation

Preface

6 / 84 3BK 17430 3135 RJZZA Ed.03

Page 7: 9100 Compact BTS EVO Installation

1 Overview

1 Overview

This section provides general information about the principle of the operationand requirements for the procedure.

3BK 17430 3135 RJZZA Ed.03 7 / 84

Page 8: 9100 Compact BTS EVO Installation

1 Overview

1.1 Presentation

1.1.1 Hardware Description

1.1.1.1 Rack ConfigurationThe following figure shows the rack configuration for the 9100 Compact BTSIndoor/Outdoor Evolution installation with an AC variant.

AC Power Supply

FANU

SU

MA

AG

X

AG

X

TRM

TRM

System Cooling Fan

SR1 SR2 DACHEATER

+

+RECTIFIER

Cooling SystemAir Inlet

Heater

Figure 1: Example of 9100 Compact BTS Indoor/Outdoor Evolution(CBIE/CBOE) AC Variant 2 Sectors with 1 or 2 TRX

8 / 84 3BK 17430 3135 RJZZA Ed.03

Page 9: 9100 Compact BTS EVO Installation

1 Overview

The following figure shows the rack configuration for the 9100 Compact BTSIndoor/Out door Evolution installation with a DC variant.

DC DistributionUnit

SR1SR2DAC

HEATER

FANU

SU

MA

AG

X

AG

X

TRM

TRM

System Cooling Fan

Heater

Cooling SystemAir Inlet

Figure 2: Example of 9100 Compact BTS Indoor/Outdoor Evolution(CBIE/CBOE) DC Variant 2 Sectors with 1 or 2 TRX

3BK 17430 3135 RJZZA Ed.03 9 / 84

Page 10: 9100 Compact BTS EVO Installation

1 Overview

1.1.1.2 Weight and DimensionsThe following table gives the overall dimensions with roof overlapping.

Dimensions (mm) Average weight (kg)

CBIE/CBOE H= 900

W= 370

D= 500

35 empty cabinet

70 equipped cabinet

1.1.2 Cases

The following cases apply:

C1: Case of steel construction installation

C2: Case of concrete foundation hollow base

C3: Case of wall installation

C4: Case of pole installation.

1.1.3 Options

The following additional equipment can be installed:

Alarm cables

Synchronization cables.

1.1.4 Initial State

To begin installation the following materials are delivered and packed on site:

Rack

Installation Kits

Additional Equipment.

1.1.5 Final State

After installation:

Rack is fixed to the floor

Subracks are switched OFF

Equipment is ready for commissioning.

1.1.6 Restrictions

None.

10 / 84 3BK 17430 3135 RJZZA Ed.03

Page 11: 9100 Compact BTS EVO Installation

1 Overview

1.1.7 Grouped Task Sequence

Before going on site

Rack transportation

Power supply and Earth cables installation

PCM cables installation

Antenna jumpers installation

Options installation

Finish installation

Before you start

Delivery and checks

Rack positioning

3BK 17430 3135 RJZZA Ed.03 11 / 84

Page 12: 9100 Compact BTS EVO Installation

1 Overview

1.2 Preparation

1.2.1 Prerequisites

Before to begin installation check that:

The site is conform to safety rules of General Wiring Handbook

The site is ready to receive the rack, according to the SPP 67

The equipment is delivered on site with associated installation kits.

Note: The site feeders are not mandatory installed before starting of operation.

1.2.2 Site-Specific Information

These information are necessary to start installation:

Address and access to the site (key holder)

Grounding plate location

Customer power supply cabinet location

Fuse breakers location in customer power supply cabinet

Antenna feeders connection and information (if needed)

Rack precise location

Final configuration to be installed

Number of alarms to be connected (if the case)

Alarm terminal blocks location

Type of rack to be installed

Type of power supply, AC or DC

Type of rack fixation (steel construction or concrete construction)

PCM connection type (terminal blocks)

Abis transmission type (electrical or optical)

In case of electrical, PCM cable impedance (120-ohm or 75-ohm)

Synchronization configuration (if the case)

Optional equipment to be installed.

12 / 84 3BK 17430 3135 RJZZA Ed.03

Page 13: 9100 Compact BTS EVO Installation

1 Overview

1.3 Scheduling

In order to avoid safety problem on site, the equipment must be installedby a team of 2 installers minimum.

The following table gives the duration for the basic tasks.

Task Duration1st personin mn

Duration2nd personin mn

Before Going On Site 20 20

Before You Start 30 30

Delivery and Checks 20 20

Rack Transportation (1) - -

Rack Positioning (Section 2.5) 20 20

Power Supply and Earth Cables Installation 20 20

PCM Cables Installation 20 -

Antenna Jumpers Installation 20 20

Finish Installation 10 10

Total without optional tasks 160 140

(1) : Transportation time to final location depending of the site. Mandatory 2 peoplefor manual transport of disassembled equipment.

The following table gives the duration for the optional tasks and additionalequipment installation.

Optional Tasks Duration1st personin mn

Duration2nd personin mn

Alarm Cables Installation 15 -

Synchronization Cables Installation - 30

3BK 17430 3135 RJZZA Ed.03 13 / 84

Page 14: 9100 Compact BTS EVO Installation

1 Overview

1.4 Resources

1.4.1 Tools

1.4.1.1 Hardware ToolsThe following table is used to check, at base, the availability of the requiredtools.

Refer to Tools Catalogue for content checking.

Name Reference Calibration

Basic set of tools OUT 001 No

Tightening tool for antenna jumpers 3BK 25050 AA OUT 003 No

BTS Outdoor specific tools OUT 007 No

Dynamometric tools OUT 011 Yes

1.4.1.2 Installation KitsThe following table is used to check, on site, the mandatory or optional deliveryitem kits.

The used symbols are:

◊ = mandatory kit

# = technical choice kit

∇ = customer option kit.

Kits Mnemo Reference Qty

◊ Basic kit CBIE/CBOE 3BK 26431 ABAA 1

# Wall mounting kit for CBIE/CBOE 3BK 28943 AAAA 1/if neede

# Floor mounting kit for CBIE/CBOE 3BK 28944 AAAA 1/if neede

# Pole mounting kit for CBIE/CBOE 3BK 28945 AAAA 1/if neede

# Transportation bolts 1AD 09973 0001 4/installationteam

# Antenna jumper cable (1m) BLF1 3BK 05360 BAAA 2/AN

# Antenna jumper cable (2m) BLF2 3BK 05360 CAAA 2/AN

# Antenna jumper cable (3m) BLF3 3BK 05360 DAAA 2/AN

# 120-ohm PCM cable (8 pairs L907/4) CA120S8 3BK 08965 AAAA

3BK 08965 ABAA

100 m roll

250 m roll

14 / 84 3BK 17430 3135 RJZZA Ed.03

Page 15: 9100 Compact BTS EVO Installation

1 Overview

Kits Mnemo Reference Qty

# 75-ohm PCM Cable (8 coax FLEX3/8) CACOAX8 3BK 25241 AAAA

3BK 25241 ABAA

100 m roll

250 m roll

◊ GND Yellow/Green cable 1 x 16 mm2 PC25YG1D 3BK 08957 BAAA

3BK 08957 BBAA

100 m roll

250 m roll

◊ AC 230 Volts power cable 3 x 1.5 mm2 PC05B5 3BK 08938 AAAA reel

# DC -48V power cable 1x 10 mm2 blue PC16BL1D 3BK 26923 AAAA

3BK 26923 ABAA

100 m roll

250 m roll

# DC 0V power cable 1x 10 mm2 black PC16B1D 3BK 08937 BAAA

3BK 08937 BBAA

100 m roll

250 m roll

∇ Clock Synchronization cable (10 m) OCC33 3BK 08304 AA 1

∇ Clock Synchronization cable (10 m) OCC23 3BK 08303 AA 2

∇ Alarm cable 8 pairs (L907/4) CA120S8 3BK 08965 AAAA

3BK 08965 ABAA

100 m roll

250 m roll

∇ Mechanical part for 24 terminal blocks MP24 1AD 02843 0001 1

∇ Labels for 24 terminal blocks LAB 1AD 02853 0001 1

∇ CAD Terminal block JS10 1AB 06634 0011 4

∇ DDF wall fixation kit FKW 1AD 02844 0002 1

∇ DDF rack fixation kit FKR 1AD 02845 0001 1

# 120-ohm jumper for DDF (1 pair L904/1) CA120S 3BK 08941 AAAA

3BK 08941 ABAA

100 m roll

250 m roll

# 75-ohm jumper for DDF (1 coax FLEX3) CACOAX1 3BK 08939 AAAA

3BK 08939 ABAA

100 m roll

250 m roll

∇ Terminal block 75 Ohm 8 BNC connectors 1AD 03371 0009 For BNC links

∇ Terminal block 75 Ohm for 1.6-5.6 connectors 1AD 03371 0010 For 1.6-5.6 links

∇ BNCm connector for Flex 3 1AB 00642 0011 2/jumper cableFlex 3

∇ 1.6-5.6 connector for Flex 3 1AB 02546 0013 2/jumper cableFlex 3

∇ Specific heat shrinking sheat for Flex 3 ST75 1AC 00330 0002 8/CBIE/CBOE

◊ Shims for levelling (1 Set for 10 racks) 3BK 26159 AAAA 1/10CBIE/CBOE

3BK 17430 3135 RJZZA Ed.03 15 / 84

Page 16: 9100 Compact BTS EVO Installation

1 Overview

Kits Mnemo Reference Qty

∇ Cable Optical fiber LC-LC 2SM 15m 849122239

∇ Cable Optical fiber LC-LC 2SM 30m 849125380

∇ Cable Optical fiber LC-LC 2SM 50m 849122247

∇ Cable Optical fiber LC-LC 2SM 70m 849123591

∇ Cable Optical fiber LC-LC 2SM 85m 849125398

∇ Cable Optical fiber LC-LC 2SM 100m 849123609

∇ Cable Optical fiber LC-LC 2SM 150m 849125406

∇ Cable Optical fiber LC-LC 2SM 200m 849125414

∇ Cable Optical fiber LC-LC 2SM 250m 849125422

∇ Cable Optical fiber LC-LC 2SM 300m 849125430

∇ Cable Optical fiber LC-LC 2MM 5m 849125513

∇ Cable Optical fiber LC-LC 2MM 15m 849122270

∇ Cable Optical fiber LC-LC 2MM 30m 849125521

∇ Cable Optical fiber LC-LC 2MM 50m 849122288

∇ Cable Optical fiber LC-LC 2MM 70m 849123633

∇ Cable Optical fiber LC-LC 2MM 85m 849125539

∇ Cable Optical fiber LC-LC 2MM 100m 849123641

∇ Cable Optical fiber LC-LC 2MM 150m 849125547

∇ Cable Optical fiber LC-LC 2MM 200m 849125554

∇ Cable Optical fiber LC-LC 2MM 250m 849125562

∇ Cable Optical fiber LC-LC 2MM 300m 849125570

∇ SFP MOD 1000BASE-LX10 1AB 18728 0029

∇ SFP MOD S-16.1 1AB 19467 0019

∇ SFP MOD S-16.1 1AB 19467 0018

∇ SFP MOD 1000BASE-SX 1AB 18728 0063

∇ SFP MOD I-16.1 1AB 18728 0064

∇ SFP MOD S-16.1 1AB 18728 0065

∇ SFP MOD L-16.1 1AB 18728 0066

16 / 84 3BK 17430 3135 RJZZA Ed.03

Page 17: 9100 Compact BTS EVO Installation

1 Overview

1.4.2 Forms

You must have the following forms:

BSS Site Premises Inspection Form (post handover)8BL 00704 0016 DRBRA

Site Premises Inspection Form (CEL)8BL 00704 0015 DRBRA

1.4.3 Supplies

Installer or subcontractor must supply:

One set of sleeves to fit at each end of cables (PCM, Alarm, Power, ...)

One set of screws, nuts and washers to connect power cables to Site

Power Box and to Earth Plate

One set of terminal lugs for power cables.

1.4.4 Applicable Documents

You need the following GSM documents to complete this scenario:

Applicable Notification List (3DF 00462 0004 AAAGA)

Catalogue of Instruction Operation for GSM (3DF 00300 0004 UAZZA)

IO 78 - 9100 BTS Radio Configurations for Antenna Supervision (3DF00300 0078 UAZZA)

Tools Catalogue for field activity for GSM (3BK 20458 0001 RJZZA)

BSS Methods Handbook (3BK 17430 0002 RJZZA)

Installation Manual Generic Completion Check List for GSM (3BK 172000002 QZZZA)

General Wiring handbook for GSM (3BK 17160 0001 RJZZA)

Installation Method of DDF for BSS Equipment (3DF 00435 0033 RJZZA)

9100 BTS Hardware Description (3BK 21242 AAAA TQZZA)

Site Premise Inspection Form (8BL 00704 0015 DRBRA)

Site Preparation Specifications 9100 Compact BTS Outdoor Evolution

(CBOE)8BL 00704 0084 DRZZA

Site Preparation Specifications 9100 Compact BTS Indoor Evolution (CBIE)8BL 00704 0086 DRZZA

3BK 17430 3135 RJZZA Ed.03 17 / 84

Page 18: 9100 Compact BTS EVO Installation

1 Overview

18 / 84 3BK 17430 3135 RJZZA Ed.03

Page 19: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

Install 9100 Compact BTS Indoor/Outdoor Evolution section presents all thechecks needed before starting the installation, and all detailed tasks to beperformed on site.

3BK 17430 3135 RJZZA Ed.03 19 / 84

Page 20: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.1 Before Going On SiteBefore going on site, you must check that the following information and suppliesare available:

The customer has been informed of the:

Date and time

Site name and address

Purpose of the operation.

All Prerequisites (Section 1.2.1) are fulfilled

Personnel is available and ready for operation (see Scheduling (Section 1.3))

Site-Specific Information (Section 1.2.2) is available and ready for operation

All Hardware Tools (Section 1.4.1.1) and Supplies (Section 1.4.3) are

available and ready for operation

Applicable Documents (Section 1.4.4) are available.

2.2 Before You Start

2.2.1 Checks

On arrival at site, before you start, perform the following operations:

Check that all Prerequisites (Section 1.2.1) are fulfilled

Check applicable notifications and operating instructions (refer to Catalogueof Technical and Logistic Information (ITL-PRO) and Catalogue of Instruction

Operation (IO))

Check that all Hardware Tools (Section 1.4.1.1) and Supplies (Section 1.4.3)are available and ready for operation

Check that safety precautions have been taken in accordance with the

safety instructions described in the General Wiring Handbook

Check if any Cases (Section 1.1.2) and Options (Section 1.1.3) apply

Complete the header field of the CCL

Complete the Site Premises Inspection Form (CEL)

Check that the resistance of the antistatic wrist strap is greater than 1M .Connect the anti-static wrist strap to the rack earth.

20 / 84 3BK 17430 3135 RJZZA Ed.03

Page 21: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.2.2 Required Knowledge

You must be familiar with the following:

The safety rules and precautions given in the General Wiring Handbook

How to document faults and anomalies, as described in the BSS MethodsHandbook

How to complete the Site Premises Inspection Form (CEL).

2.3 Delivery and Checks

For personal and equipment safety, it is important that:

During any kind of transportation the door must be closed

At door open the door restrainer must be latched.

HL

1,20 0,601,20

P

AR

AV

430

H

Baie N°3Az 320°

G2_SBTS

_O_120 P

L

3 4

1 2

1. Unpack the equipment

2. Check the delivery and report any damage to the carrier delivery note

3BK 17430 3135 RJZZA Ed.03 21 / 84

Page 22: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

3. Report on CCL:

Factory serial number

Cabinet serial number

4. Identify the final location of the rack.

22 / 84 3BK 17430 3135 RJZZA Ed.03

Page 23: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.4 Rack Transportation

2.4.1 Crane Transportation

Do not try to lift the cabinet by the roof with crane hooks!The roof must be dismantled in order to lift the cabinet with eyebolts.

2.4.1.1 Dismantle the RoofTo prepare the rack:

1. Remove the screws fixing the roof

2. Push the roof to the back

3. Lift the roof and remove it.

3BK 17430 3135 RJZZA Ed.03 23 / 84

Page 24: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.4.1.2 Crane Transportation

Nr Materials Reference Kit

1 Crane transportation bolts 1AD 09973 0001 -

Crane transportation:

1. At the top of the BTS remove the screws (1) (See Figure 3 )

Do not remove the rail (2), it is used during crane transportation.

1

2

Figure 3: Eyebolt Screwing Position

2. Attach the four eyebolts ( inner diameter: 26 mm, thickness :16 mm) tothe rack.

Figure 4: Eyebolts

24 / 84 3BK 17430 3135 RJZZA Ed.03

Page 25: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

12345678901234567890

Figure 5: Crane Transportation

For craning the rack:

3. Check that direction of pull [alpha] = minimum 60�. The choice of straps(slings), hooks and crane are under responsibility of subcontractor (SeeFigure 5 ).

4. After reaching the final position disconnect the straps and replace theeyebolts with the screws (1). Do not remove the rail (2) (See Figure 3 ).

2.4.1.3 Close the RoofTo close the roof:

1. Put the roof on the top of the BTS.

3BK 17430 3135 RJZZA Ed.03 25 / 84

Page 26: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2. Make sure the guiding pins are in the foreseen holes.

3. Pull the roof to the front.

4. Fix the roof with the screws

H 13

26 / 84 3BK 17430 3135 RJZZA Ed.03

Page 27: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.4.2 Manual Transportation

Cabinet can be lifted and carried manually at top hood along its reinforcedside edges.

Cabinet must not be lifted at top hood front and back edge!

Figure 6: Manual Transportation With Straps

Figure 7: Manual Transportation Using the Handles

Figure 8: With Pallet Handling

3BK 17430 3135 RJZZA Ed.03 27 / 84

Page 28: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.5 Rack Positioning

2.5.1 C1: Case of Steel Construction

Nr Materials Reference Kit

1 Screw HM10 x 30 1AD 00050 0048

2 Spring washer M10 1AD 00507 0014

3 Plain washer M10 1AD 0087 0120

4 Nut HM10 1AD 0019 70046

Floor mounting kit

3BK 28944 AAAA

5 Shims for leveling 1-2 mm thick 3BK 26159 AAAA SHIMS

To fix the rack on steel construction:

1. Drill the steel construction. Holes must be positioned as described inthe following figure.

481

mm

260 mm

337 mm

Front

Back

Figure 9: Drilling Scheme

28 / 84 3BK 17430 3135 RJZZA Ed.03

Page 29: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2. Position the rack on the steel construction.

3BK 17430 3135 RJZZA Ed.03 29 / 84

Page 30: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

3. Fix the rack to the steel construction (1, 2, 3, 4 of Figure 10 ). Do nottighten the screws.

123123

1

2

3

4

Figure 10: Fix the Rack

In case of uneven steel construction, check and correct if necessary theantiparallelism between front and back of BTS. It is important that there is nodifference in the slope angles that can twist the rack.

4. If necessary insert shims under the CBIE/CBOE support the rack weight.

5. Tighten the screws to fix the rack.

30 / 84 3BK 17430 3135 RJZZA Ed.03

Page 31: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.5.2 C2: Case of Concrete Foundation

Nr Materials Reference Kit

1 Screw HM10 x 30 1AD 00050 0048

2 Nut HM10 1AD 00197 0046

3 Plain washer M10 1AD 00087 0120

4 Spring washer M10 1AD 00507 0014

5 Screw HM10 x 70 1AD 00050 0050

6 CBIE/CBOE profile steel -

Floor mounting kit

3BK 28944 AAAA

7 Shims for leveling 1-2 mm thick 3BK 26159 AAAA SHIMS

To fix the rack on concrete floor:

1. Mark on the floor the position of the fixing points as shown in the followingfigure.

3BK 17430 3135 RJZZA Ed.03 31 / 84

Page 32: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2. Drill the fixing holes (4 holes) (See Figure 11 )

75 mm

13 mm

Figure 11: Holes Specifications

3. Place the profile steel on the concrete floor.

4. Using the M10 screws fix the steel profile to the ground.

32 / 84 3BK 17430 3135 RJZZA Ed.03

Page 33: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

5. Place the rack on the steel profiles and align the fixing holes.

6. Fix the rack to the steel profiles. Do not tighten the screws.

123123

1

2

3

4

Figure 12: Fix the Rack

In case of uneven steel construction, check and correct if necessary theantiparallelism between front and back of BTS. It is important that there is nodifference in the slope angles that can twist the cabinet.

7. If necessary insert shims under the CBIE/CBOE to support the rack weight.

3BK 17430 3135 RJZZA Ed.03 33 / 84

Page 34: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

8. Tighten the fixing screws.

34 / 84 3BK 17430 3135 RJZZA Ed.03

Page 35: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.5.3 C3: Case of Wall Installation

Nr Materials Reference Kit

1 Screw HM10 x 70 1AD 00050 0050

Expansion plug M10 x 60 1AD 02655 0001

2 Screw HM8 x 20 1AD 00050 0044

3 Plain washer M8 1AD 00087 0126

4 Spring washer M8 1AD 00507 0025

5 Screw M10 x 30 1AD 00050 0048

6 Spring washer M10 1AD 00507 0014

7 Plain washer M10 1AD 00087 0120

8 Nut HM10 1AD 00197 0046

9 90 � support 2

10 Straight support 2

11 Wall support 1

12 Cabinet support 1

13 CBIE/CBOE wall drilling template 1

Wall mounting kit

3BK 28943 AAAA

To keep mounting reliability of the rack, the wall to be fixed must be concretewall.

3BK 17430 3135 RJZZA Ed.03 35 / 84

Page 36: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

1. Use the following drawing to mark the position of the fixation holes onthe wall.

36 / 84 3BK 17430 3135 RJZZA Ed.03

Page 37: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2. Check that the holes are distributed as described in the following figure.

3. Drill the holes.

3BK 17430 3135 RJZZA Ed.03 37 / 84

Page 38: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

4. Identify the component parts of the support. Two pieces of each part areneeded to build the support.

5. Build up the support by connecting the parts using the screws, nuts andwashers.

38 / 84 3BK 17430 3135 RJZZA Ed.03

Page 39: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

6. Install the bracket on the rack left side wall, upper part.

7. Install the other bracket on the wall and fix it using three upper holes.

3BK 17430 3135 RJZZA Ed.03 39 / 84

Page 40: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

8. Install the support components on the wall and fix it with the provided screws.

9. Lift the rack and place it on the supports.

10. Remove the roof.

40 / 84 3BK 17430 3135 RJZZA Ed.03

Page 41: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

11. Fix the rack to the support, upper part.

12. Fix the rack to the support, lower part.

3BK 17430 3135 RJZZA Ed.03 41 / 84

Page 42: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

13. Install the roof.

42 / 84 3BK 17430 3135 RJZZA Ed.03

Page 43: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.5.4 C4: Case of Pole Installation

Nr Materials Reference Kit

1 Screw HM10 x 280 1AD 11792 0001

2 Screw HM8 x 20 1AD 00050 0044

3 Plain washer M8 1AD 00087 0126

4 Spring washer M8 1AD 00507 0025

5 Screw M10 x 30 1AD 00050 0048

6 Spring washer M10 1AD 00507 0014

7 Plain washer M10 1AD 00087 0120

8 Nut HM10 1AD 00197 0046

9 90 � support -

10 Straight support -

11 Pole support -

12 Cabinet support -

13 Fixation bracket -

Pole mounting kit

3BK 28945 AAAA

3BK 17430 3135 RJZZA Ed.03 43 / 84

Page 44: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

To install the CBIE/CBOE rack on a pole:

1. Identify the items used for pole fixation. Six brackets are delivered.

Figure 13: Pole Fixation Bracket

2. Attach the upper mounting plate to one bracket.

3. On the pole mark the position for the fixation brackets.

4. Install the upper mounting plate on the pole.

Use a torque of 47 Nm when tightening the support to the pole.

44 / 84 3BK 17430 3135 RJZZA Ed.03

Page 45: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

5. Identify the component parts of the support. Two 90� supports and fourstraight supports are needed to build the support.

6. Build up the support by connecting the parts using the screws, nuts andwashers.

Help: Use items 5, 6, 7 and 8 from materials table to connect the supportcomponents.

3BK 17430 3135 RJZZA Ed.03 45 / 84

Page 46: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

7. Attach two brackets on the support.

46 / 84 3BK 17430 3135 RJZZA Ed.03

Page 47: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

8. Install the lower support on the pole.

Use a torque of 47 Nm when tightening the support to the pole.

3BK 17430 3135 RJZZA Ed.03 47 / 84

Page 48: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

9. Install the bracket on the rack left side wall, upper part.

Help: Use items 2, 3 and 4 from materials table to fix the bracket.

48 / 84 3BK 17430 3135 RJZZA Ed.03

Page 49: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

10. Lift the rack on the lower support and attach it to the support with theprovided screws, nuts and washers.

11. Fix the rack to the upper mounting plate using the provided screws, nutsand washers.

3BK 17430 3135 RJZZA Ed.03 49 / 84

Page 50: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.6 Power Supply and Earth Cables InstallationThis section describes the procedure to :

Install cables in the cable tray

Connect protective Earth cable

Connect 230 volts mains power supply cables for AC variant

Connect 48 volts mains power supply cables for DC variant

Test the power supply installation.

Before making any electrical connections to the rack, ensure that thesafety instructions are applied:

The electrical power supply is disconnected. Ensure all switches or fuses

devoted to the new RACK into the site connection box are powered OFF.

Due to high leakage current, the protective EARTH must be connected tothe equipment before AC power cable connection.

The terminals of the wires, for all the conductive cables (AC, DC andground) are well tightened, this is very important to avoid damageof the equipment.

50 / 84 3BK 17430 3135 RJZZA Ed.03

Page 51: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.6.1 Installation of Cables in the Site Cable Way

Nr Material Reference Kit

1 Tie wraps 1AD 00414 0006 Basic kit

2 GND cable Y/G in 100m roll

GND cable Y/G in 250m roll

3BK 08957 BAAA

3BK 08957 BBAA

-

3 AC 230V power cable 3BK 08938 AAAA -

1 2

1m

34

5 6

To install the cables in the cable way:

1. Install Yellow / green cable in power compartment of cable tray (lug atBTS side)

2. Install power cables in power compartment of cable tray

3. Attach cables with plastic tie wraps

4. Cut the cables at good length

5. Fit a lug on earth cable at site side

6. Connect the earth cable at the site earth plate.

3BK 17430 3135 RJZZA Ed.03 51 / 84

Page 52: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.6.2 Protective Earth Cable Connection (GND)

Nr Material Reference Kit

1 Lug ring crimp 1AB 03205 0060 Basic kit

2 Tie wraps 1AD 00414 0006 Basic kit

To install the protective earth cable:

1. Crimp a [empty ] 8 terminal lug at RACK side and crimp an adapted lug atsite extremity of GND cable

2. Make a label and connect the GND cable to the site earth plate (ExampleBTS 3 of site)

BTS 3

52 / 84 3BK 17430 3135 RJZZA Ed.03

Page 53: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

3. Remove the screws fixing the cable entry cover plate (A) then removethe cover plate.

Cover Plate for Cable Entry

4. Connect earth cable to the grounding stud (8mm).

3BK 17430 3135 RJZZA Ed.03 53 / 84

Page 54: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.6.3 Power Cables Connection for AC Variant

2.6.3.1 AC 230V Mains Power Supply Connection

Nr Material Reference Kit

1 Wire terminal 1AB 05067 0005

2 Tie wraps 1AD 00414 0006

Basic kit

To connect the wires:

1. Cut the cable at the good length.

2. Put a shrink sleeve at each end of cable.

3. Fit a wire terminal on each wire of the cable.

Figure 14: Fit the Wire Terminals

4. Pass the cable through the grommet in the AC Mains In protection cover.

5. Connect the wires to the connectors on the LPFC ( begin with thegreen/yellow wire).

Do not fit back yet the cover, because you have to check the voltage first !

Figure 15: Connect the AC Cable to the Equipment

6. Connect the AC mains cable to the site power supply box.

54 / 84 3BK 17430 3135 RJZZA Ed.03

Page 55: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.6.3.2 AC Power Supply Testing

N P

AC230V

N P

N P

V

N P

V

7

65

43

21

To test the power supply:

1. At site power cabinet: check if 230 V fuse breakers are switched OFF.

2. At rack side: using an ohmmeter, check that there is no short circuit betweenphase and neutral.

3. At rack side: do the same test between protective earth (green / yellowwire) and each 230 V wire.

4. At site power cabinet: switch ON the 230 V fuse breakers.

5. At rack side: check that the 230 V voltage between phase and neutral ispresent.

6. At rack side: using phase tester, check that the phase wire is connectedat good connection point.

7. At site power cabinet: switch OFF the fuse breakers.

3BK 17430 3135 RJZZA Ed.03 55 / 84

Page 56: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.6.4 Power Cables Connection for DC Variant

2.6.4.1 DC Power Supply Connection

Nr Material Reference Kit

1 Lug, hole 6 mm for 10 mm2 GND cable 1AB 032050022 Basic kit

To connect the DC power supply:

1. Prepare the head of the DC cable.

16mm

2. Put a shrink sleeve at the end of each cable.

3. Fit wire terminal at the end of each wire.

6

4. Run the -48 V DC power cable through the hole in the rubber protective cap,connect it to the DC In filter and attach it to the rack using cable ties.

56 / 84 3BK 17430 3135 RJZZA Ed.03

Page 57: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

5. Connect the 0V DC cable to the M6 grounding bolt and attach it to therack using cable ties.

6. Connect and label the DC mains cable to the primary DC power supply.

BTS

(x)

3BK 17430 3135 RJZZA Ed.03 57 / 84

Page 58: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.6.4.2 DC Power Supply Testing

DC− 48V

0V − 48V

0V − 48V

V

1 2

3 4

5 6

To test the DC power supply:

1. At side power cabinet, check if fuse breakers are switched OFF.

2. At rack side, using a multimeter, check if there is no short-circuit between-48V filter and 0V stud.

3. At side power cabinet, switch ON the fuse breakers.

4. At rack side, verify if the voltage between -48V filter and 0V stud is about -48Volts DC nominal. Check carefully the polarity.

5. At site power cabinet, switch OFF the fuse breakers.

6. At rack side, using a multimeter, verify if the -48V is switched OFF. Fit therubber cap to the -48V terminal.

58 / 84 3BK 17430 3135 RJZZA Ed.03

Page 59: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.6.5 Fit the Mains In Cover

To fit the cover:

1. Place the cover at the good position.

2. Fix the cover with the screws (See Figure 16 ).

3. Attach the cables to the cable way using cable ties and allow sufficient lengthof wires to avoid traction at terminals.

Figure 16: Fit the Mains In Cover

3BK 17430 3135 RJZZA Ed.03 59 / 84

Page 60: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.7 PCM Cables InstallationThis chapter describes the procedure to:

Install PCM cables in site cable tray

Connect PCM cables to the rack.

2.7.1 Install the PCM Cables in the Cables Way

Nr Material Reference Kit

1 Label 3BK 08062 ADAA

2 Tie wraps 1AD 00414 0006

Basic kit

3 PCM cable L907/4 (120 ohm) 100 m roll

PCM cable L907/4 (120 ohm) 250 m roll or

FLEX 3/8 (75 ohm) 100 m roll

FLEX 3/8 (75 ohm) 250 m roll

3BK 08965 AAAA

3BK 08965 ABAA

3BK 25241 AAAA

3BK 25241 ABAA

Installation kit

1m

Abis 1

Abis 2

1 2

3 4

5

To install the cables in the cable way:

1. Install cables in PCM compartment of cable tray.

2. Attach cables with plastic tie wraps.

3. Mark cables with a marker.

4. Cut cables at good length.

5. Label cable with supplied labels.

60 / 84 3BK 17430 3135 RJZZA Ed.03

Page 61: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.7.2 Cables Passing at Rack Side

To pass the cables at rack side:

1. Strip the cable at cable gland level.

2. Pass the cables through the cable gland and attach them to the rack.

3. Tighten the gland on the cable.

15 mm

15 mm

1 2

3BK 17430 3135 RJZZA Ed.03 61 / 84

Page 62: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

4. Identify the Abis connectors on OUTC board.

Abis KRONE(inserting)

Abis (screwing)

4

5

5. Pass the cables toward the OUTC board.

62 / 84 3BK 17430 3135 RJZZA Ed.03

Page 63: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.7.3 Cables Connection at Rack Side

During installation it is mandatory to use the right tool for each terminal block.

The references for the insertion tools are:

1AD 03221 0001 for Krone

1AD 01604 0001 for Nexans.

2.7.3.1 Case of L907/ 4 - 120 Ohm CableThe following figure shows the L907/4 cable structure.

Quad 1grey/white purple/blue

Quad 4 Quad 2

Quad 3grey/blackpurple/red

grey/green

purple/white grey/yellow

purple/brown

Figure 17: L907/4 Cable

The following table gives the wires color, connecting position and signal.

Color KRONE connector Signal

white

grey

8

8

Abis1/TX

Abis1/TX

Quad 1

(output high level signal goingtoward BSC)

blue

violet

6

6

Abis2/TX

Abis2/TX

3BK 17430 3135 RJZZA Ed.03 63 / 84

Page 64: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

Color KRONE connector Signal

yellow

grey

7

7

Abis1/RX

Abis1/RX

Quad 2

(input low level signal comingfrom BSC)

brown

violet

5

5

Abis2/RX

Abis2/RX

Quad 3 & 4 not used

Table 1: Wires Color, Position and Signals

150 mm

Sleeve

1 2

3 4

5 6

87

65

4

RX

TX

RX

TX 8

1

32

18

RX

TX

RX

TX 8

1

1

OUTC

To connect the L907/4 cable:

1. Remove the PCM lightening protection from KRONE connector of OUTCboard

2. Prepare head of L907/4 cable

3. Fit a sleeve to end of cable

4. Insert the L 907/4 wires using mandatory KRONE original tool

5. Fit the lightening protection to the KRONE connector

6. Squeeze the cable braid in the metallic clamp.

64 / 84 3BK 17430 3135 RJZZA Ed.03

Page 65: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.7.3.2 Case of FLEX3/8 - 75 Ohm Coaxial CableThe following table gives the wires connecting position and signal.

Coaxial KRONE connector

1 Abis 1 (TX) 8 -braid

8 -inner conductor

2 Abis 1 (RX) 7 - braid

7 - inner conductor

3 Abis 2 (TX) 6 - braid

6 - inner conductor

4 Abis 2 (RX) 5 - braid

5 - inner conductor

50 mm

1234

1

1

10 mm

AB

IS3

AB

IS4

11

TX

R

XT

X

RX

88

1 2

3 4

5 6

1. Remove the PCM lightening protection from KRONE connector of OUTCboard

3BK 17430 3135 RJZZA Ed.03 65 / 84

Page 66: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2. Using Hot Air Blower, fit the Heat Shrink Sleeve 1AC 00330 0002 on eachcoaxial. Fit a rubber sleeve on head of cable

3. Insert the 75-ohm coaxial using original KRONE tool

4. Connect wire bridge for used ports on OUTC ABIS green connectors asfollows:

Wire bridge from pin 1 to pin 2

Wire bridge from pin 4 to pin 5

Wire bridge from pin 6 to pin 7

Ports assignment is 1 and 2 for GSM (3 and 4 are not used).

5. Fit the lightening protection to the KRONE connector.

6. Fit two SP2M 75-ohm adapter at PCM sub-D port ABIS1 and ABIS2 onOUTC board.

The following figure shows an example of 75-ohm cabling.

12

34

56

78

8 coaxial cable

RX

RX

RX

RX

TX

TX

TX

TX

RX

TX 87

TX coax.

Core

TX

Figure 18: FLEX 3/8 Connection

66 / 84 3BK 17430 3135 RJZZA Ed.03

Page 67: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.7.4 Other Connection Possibilities

2.7.4.1 Connection of Other 120 Ohm Cables

AB

IS1

AB

IS2

11

TX

R

XT

X

RX

88

Figure 19: Example of OUTC Screwing Connectors

If cables are not supplied by Alcatel-Lucent, then the wires must have rightspecifications for inserting in the KRONE connector. If not, the wires have to beconnected to the green screwing connectors of OUTC board ( Figure 19 ).

The 3 jumpers must be removed from the connectors (they are used only for75-Ohm connection).

1 GND braid earthing clamp

2 TX

3 TX

BTS output signal going

toward BSC

4 GND drain wires

5 RX

6 RX

BTS input signal coming

from BSC

7 R200 (not used)

8 GND braid earthing clamp

3BK 17430 3135 RJZZA Ed.03 67 / 84

Page 68: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.7.4.2 Connection of Other 75 Ohm Coaxial Cables

50 mm

10 mm123123123123

12

34

56

7

123123

1234561234561234561123456112345671212345671234567812341234

12345123451234 123123 12123 112312345123451 1234512123456123456712345

123451231231234 12123 1123123

1 2

To connect the cables:

1. Prepare the head of cables

2. Connect the wires to the terminals and mount the earthing clamp.

Coaxial Connector Pin Remarks

1 Abis 1 (TX) 2 - braid

3 - inner conductor

2 Abis 1 (RX) 5 - braid

6 - inner conductor

3 Abis 2 (TX) 2 - braid

3 - inner conductor

4 Abis 2 (RX) 5 - braid

6 - inner conductor

For each connector :

- wire bridge from pin 1 to pin 2

- wire bridge from pin 4 to pin 5

- wire bridge from pin 6 to pin 7

68 / 84 3BK 17430 3135 RJZZA Ed.03

Page 69: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.7.4.3 Connection of Optical Fiber PCM cableThe section applies only for the optical transmission on Abis.

The following table lists the items required to complete the task.

Description Reference Kit

Cable Optical fiber LC-LC 2SM 15m * 849122239 -

Cable Optical fiber LC-LC 2MM 5m * 849125513 -

SFP transceiver * 1AB 18728 0029 -

* : Refer to Installation Kits (Section 1.4.1.2) for more optical fiber cables and SFP variants

To connect the PCM optical fiber cables:

1. Run the optical fiber cables through the cable gland/cable entry inside thecabinet.

2. Insert a SFP transceiver module in the OPT1 slot (on the GNC daughterboard of the SUMX) and lock it.

3. Remove the protection cover from the SFP transceiver module.

4. Remove the protection caps from the optical fiber connectors.

5. Connect the cables to the OPT1 connector on SUMX.

6. Label the optical fiber cable on the SUMX side.

7. Tighten the cable gland, if applicable.

The PCM optical fiber cables are installed.

3BK 17430 3135 RJZZA Ed.03 69 / 84

Page 70: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.8 Antenna Jumpers Installation

2.8.1 Jumper Installation

Nr Material Reference Kit

1 Labels 3BK 08062 ADAA

2 Tie wraps 1AD 00414 0006

Basic kit

3 Antenna jumper cable 3BK 05360 xAAA Installation kit

For the jumpers type 1AB 18821 0001 (3m) or 1AB 18821 0002 (4m), use thebending tool and follow the instructions from IO 95 (3DF 00300 0095 UAZZA).

Label:

Label:

Ant A

Ant AAnt B

Ant B

230

45

A B A

NORTH

ANT BAZIMUTH

125

SECT: NANT A

CBO

AB BA

A A BB

N PANB ANB

B

Figure 20: Example of Antenna Cabling and Labeling

Figure 21: Label the Antenna Jumpers (Do Not forget the Frequency Labels)

70 / 84 3BK 17430 3135 RJZZA Ed.03

Page 71: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.8.2 Connection to the Rack

The antenna connections mapping is done according to the following scheme:

Sector P Ant B

Sector P Ant A

Sector N Ant A

Sector N Ant B

Figure 22: Antenna Mapping

To connect the cables:

1. Ensure that the radius of each cable is at least 3 cm.

2. Refer to Site-Specific Information (Section 1.2.2) for cables connections

3. Connect the cables to the rack (See Figure 23 ).

4. Tighten the screw manually then shake cables a little.

5. Using the tightening tool, tighten with firmness.

6. Use tie wraps to bundle the jumpers together.

Figure 23: Antenna Jumpers Connection

3BK 17430 3135 RJZZA Ed.03 71 / 84

Page 72: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.8.3 Connection to the Feeders

Check that feeders are properly connected to site ground !If the feeders are not labeled, don’t connect the jumpers, but inform thecustomer and fulfill the CCL

Nr Material Reference Kit

1 Vinyl electrical tape 1AC 01556 0001

2 Tie wraps 1AD 00414 0006

3 Rubber splicing tape 1AC 01595 0001

Basic kit

To connect the feeders:

1. Connect the antenna jumpers to the feeders

2. Verify the connectors

3. Screw connector male with connector female

4. Tighten the screw manually then shake cables a little

Figure 24: First Tighten Manually, then Use the Specific Tightening Tool

5. Using specific tightening tool tighten with firmness (“Tools catalogue”)

6. Fit the vinyl electrical tape (1) over the connectors.

Start taping from 30 mm from the connector (jumper side) and go downstretching and overlapping (50%) 30 mm over the connector (1 layer).

You should not see any metal after taping.

7. Fit the rubber splicing tape (3) of Figure 25 over the vinyl electrical tape.

Start taping from 20 mm top of the connector (coaxial cable side) and godown stretching and overlapping (50%) 20 mm over the connector (1 layer).

72 / 84 3BK 17430 3135 RJZZA Ed.03

Page 73: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

8. Fit the vinyl electrical tape (1) over the rubber splicing tape.

Start taping from 30 mm from the connector (jumper side) and go downstretching and overlapping (50%) 30 mm over the connector (1 layer).

At the end of taping do not stretch the tape in the last few turns.

9. Secure with tie wraps to avoid tape removing (2) of Figure 25 .

12121231231231231231234512345612345123121234121212 1212 1231212

12312312 1212 1231 1212 12312 12312 123412 12312 123

12 1231234 12311234 1231234 12341234 1231234 123412 12341 123123123

1231234123 121234512345

12312311234 1212345 1212 12312 12312 1212 12312

1212312312 12312 123412 12312 121212 1212312 1212312123412312345123123456712345612345

1234512312312 121

Tie wrap(2)

Rubbersplicing tape (3)

Feeder Jumper

Vinylelectrical tape (1)

Tie wrap(2)

Ground link for feeders

1212312312123456123123412123412 112312 1212 1212 12123 12312 12312 12312 1231 12312 1231234 12311234 1211234 121234 121234 123123 123123 12312

1212121231231234 12312123 121234 1212 1212 12312 123412

121234123412 1231 121 1231212123121212312312341234512345123411212

Figure 25: Water Proof the Connections

3BK 17430 3135 RJZZA Ed.03 73 / 84

Page 74: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.9 Options Installation

2.9.1 Alarm Cables Installation

2.9.1.1 Alarm Cables Passing

Nr Material Reference Kit

1 Tie wraps 1AD 00414 0006 Basic kit

2 Labels 3BK 08062 ADAA Basic kit

3 L907/4 in 100 m roll

L907/4 in 250 m roll

3BK 08965 AAAA

3BK 08965 ABAA

Installation kit

Alarm

Figure 26: Alarm Cable Passing Through the OUTC Board

74 / 84 3BK 17430 3135 RJZZA Ed.03

Page 75: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

1m

Alarm

1

15 mm

15 mm

12

3

4

56

To pass the cables:

1. Mark the cables with a marker

2. Install the cables in the special compartment of the cable tray

3. Attach the cables with plastic tie wraps

4. Label the cables with supplied labels

5. Strip the cables at cable gland level

6. Pass the cables trough the cable glands

Use adhesive tie wraps to fix the cable to the side wall.

3BK 17430 3135 RJZZA Ed.03 75 / 84

Page 76: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.9.1.2 Alarm Cables ConnectingTo install the alarm cables:

1. Prepare the end of cable (cut the no-used wires)

5 6

70 mm

2. Label the cable with supplied labels: [Alarm 1]

3. Unscrew and remove the jumpers from X900 external alarm connectoron OUTC

76 / 84 3BK 17430 3135 RJZZA Ed.03

Page 77: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

4. Connect the cable to the X900 connector

5. Fix the cable in the earthing clamp.

3BK 17430 3135 RJZZA Ed.03 77 / 84

Page 78: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.9.2 Synchronization Cables Installation

2.9.2.1 Synchronization Cables Passing

Nr Materials Reference Kit

1 Labels 3BK 08062 ADAA Basic kit

2 Tie wrap 1AD 00414 0006 Basic kit

3 Cable for clock synchronization - Installation kit

Alcatel-Lucent 9100 BTS/G2-BTS (10 m) 3BK 08303 AA

Alcatel-Lucent 9100 BTS/Alcatel-Lucent 9100 BTS (10 m) 3BK 08304 AA

XCLK

Figure 27: Synchronization Cable Passing Through the OUTC Board

78 / 84 3BK 17430 3135 RJZZA Ed.03

Page 79: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.9.2.2 Compact BTS Indoor/Outdoor Evolution / Alcatel-Lucent G2 BTS Connection

CBOE OUTCXCLC 1 out

Master Slave

CLK inSTSE viaCOB2

G2

CBOEOUTCXCLC 1 in

Master Slave

CLK out MBSR via COB2

G2

59

4

8

3

7

2

6

P1

59

4

8

3

7

2

6

P2

screen

screen

white

brown

green

yellow

grey

pink

blue

red

OUTC COB2

OCC23 3BK 08303 AA

1 2 3 4 5

6 7 8 9

10 m

P1 P2

Figure 28: Compact BTS Indoor/Outdoor / Alcatel-Lucent G2 BTS Synchronization Cable

3BK 17430 3135 RJZZA Ed.03 79 / 84

Page 80: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.9.2.3 Compact BTS Indoor/Outdoor Evolution / MBS GSM Outdoor or 9100 BTSEvolution or 9100 BTS Connection

CBOE OUTC

XCLC 1 out

Master Slave

G3/G4/MBO/CBOE

COAR/OUTC

XCLK 1 in

59

4

8

3

7

2

6

P1

59

4

8

3

7

2

6

P2

screen

screen

white

brown

green

yellow

grey

pink

blue

red

OUTC 1 COAR/OUTC 2

OCC33 3BK 08304 AA

1 2 3 4 5

6 7 8 9

10 m

P1 P2

Figure 29: Compact BTS Indoor/Outdoor Evolution/ 9100 BTS Synchronization Cable

To install the synchronization cables:

1. Choose the good configuration

2. Pass the synchronization cables in the site cable way

3. Label the cables with supplied labels

4. Dismantle SubD 9 connectors (write down the wire colors)

5. Pass the cables through the BTS bottom plate

6. Put back the SubD 9 connectors

7. Connect the cables to the corresponding sockets of connection area

8. Fasten the connectors with knurled screws.

80 / 84 3BK 17430 3135 RJZZA Ed.03

Page 81: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.10 Finish Installation

2.10.1 Label the Rack

BTS STATION 4

BTS STATION 4

Figure 30: Fit the "BTS STATION" and "N" Labels at the Top of the BTS

2.10.2 Close the Cable Entry

Cover Plate for Cable Entry

Figure 31: Close the Cable Entry

To close the cable entry:

1. Fit the cover plate

2. Fix the plate to the rack with the provided screws (A).

3BK 17430 3135 RJZZA Ed.03 81 / 84

Page 82: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

2.10.3 Leave the Site

12

1. Clean the site.

Do not put packages into the customer bin.

2. Give the key to the site responsible.

82 / 84 3BK 17430 3135 RJZZA Ed.03

Page 83: 9100 Compact BTS EVO Installation

2Install9100

Com

pactB

TS

Indoor/Outdoor

Evolution

2.11O

UT

CL

ayou

t

18

1 81 81 81 8

1 16

1 16

Figure

32:O

UT

CC

onnectors

3BK

174303135

RJZ

ZA

Ed.03

83/

84

Page 84: 9100 Compact BTS EVO Installation

2 Install 9100 Compact BTS Indoor/Outdoor Evolution

BLANK PAGE BREAK