Page 1: 9. Solar Energy Conclave 2010 13

8/3/2019 9. Solar Energy Conclave 2010 13

http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 1/19

Initiatives of Gujarat for 

implementation of the Solar Power Projects

Government of Gujarat

Gujarat

Page 2: 9. Solar Energy Conclave 2010 13

8/3/2019 9. Solar Energy Conclave 2010 13

http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 2/19

Solar radiation : 5.5 to 6.00 kWh/sq.m./day

with 330 sunny days / year 

Land : 14.40 Million Acres of uniquelypositioned waste land in area of high solar 

radiation

 

Solar EnergyAdvantage Gujarat •Gujarat

 

Water : Narmada water available in Northernpart of state having high solar radiation

Transmission grid : Gujarat have densesttransmission network

Infrastructure: 74,000 Km long roadnetwork

Gas grid : 2200 Kms long gas grid

Page 3: 9. Solar Energy Conclave 2010 13

8/3/2019 9. Solar Energy Conclave 2010 13

http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 3/19

GujaratThe Sun Temple, Modhera , GujaratBuilt in 1026 AD by King Bhimdev

Page 4: 9. Solar Energy Conclave 2010 13

8/3/2019 9. Solar Energy Conclave 2010 13

http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 4/19

GujaratDriving Development

by Solar Power

Gujarat has a history and legacy of excellence…

We dream……

We devise……. e e ver…

The Government of Gujarat have declared the

“Solar Power Policy – 2009” with the vision of positioning the state of Gujarat as the ‘Integrated

Solar Generation Hub’ for the nation.

Page 5: 9. Solar Energy Conclave 2010 13

8/3/2019 9. Solar Energy Conclave 2010 13

http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 5/19

Gujarat Solar Policy 2009 (Salient features)

Operative Period : up to 31-3-2014

Wheeling Charges for self use : 2 %

Power injection Voltage level : 66 kV (Transmission line of 66 kVand above by state utility )

Renewable Purchase Obligation : 10 % from all renewable sources

Tariff : SPV Projects Solar Thermal Projects 

Gujarat

 

s. s.Projects commissioned 13.00 for first 12 years 10.00 for first 12 yearsbefore December 31, 2010 3.00 form the 13th to 25th years 3.00 form the 13th to 25th yearsProjects commissioned 12.00 for first 12 years 9.00 for first 12 yearsbefore March, 2014 3.00 form the 13th to 25th years 3.00 form the 13th to 25th years

Bank guarantee of Rs. 50 lacs / MW at PPA stage

Page 6: 9. Solar Energy Conclave 2010 13

8/3/2019 9. Solar Energy Conclave 2010 13

http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 6/19

Gujarat

Technology Parameter MoU signedduring

VGGIS – 2009

EOI afterVGGIS – 2009 Total

SolarPhotovoltaic

No. of companies 26 9 35

Capacity (MW) 1882 1320 3202

Investment (Rs. Crores) 40822 12400 53222

MoU signed and EOI received

Solar Thermal No. of companies 18 6 24

Capacity (MW) 1645 465 2110

Investment (Rs. Crores) 25429 6975 32404

Total No. of companies 44 1559

Capacity (MW) 3527 1785 5312

Investment (Rs. Crores) 66251 19375 85626

Page 7: 9. Solar Energy Conclave 2010 13

8/3/2019 9. Solar Energy Conclave 2010 13

http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 7/19

Step by Step marching towards the Goal

6 th January , 2009 : Gujarat Solar Policy announcement

15 th January, 2009 : MoU signed with 44 companies

18–19 th February, 2009 : One to One meeting and presentation by 59 Solar 

Power Project developers to Project approval committee

13 th March, 2009 : Meeting of 74 developers / manufactures / investors

under Chairmanship of Chief Secretary along with PSEnergy, Finance and Revenue departments

 

Gujarat

 

1 st August , 2009 : Issued Letter of Intention to 34 companies for 716 MW after 

due diligence of technical and financial capacity

7 th September, 2009 : Sign MoU with Clinton Foundation for setting up 3000 MW

Solar Power Project in Gujarat

9–10 th September,2009 : One to One discussion with 34 companies to evaluate

preparedness for setting up the power project

Page 8: 9. Solar Energy Conclave 2010 13

8/3/2019 9. Solar Energy Conclave 2010 13

http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 8/19

Allotment of Solar Power Capacitiesby Government of Gujarat under

Solar Power Policy – 2009

Sr. No. Type of project Nos. ofcompanies

Capacityallocated

Gujarat

1 Solar Photovoltaic Power 24 365 MW

2 Solar Thermal Power Project 10 351 MW

Total 34 716 MW

Page 9: 9. Solar Energy Conclave 2010 13

8/3/2019 9. Solar Energy Conclave 2010 13

http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 9/19

GujaratMaking Solar Energy Competitive…..

Government of Gujarat Clinton Foundation ,U. S. A.

 Sign MoU for setting up of Solar Parks of 3000 MW capacity

Govt. of Gujarat

Page 10: 9. Solar Energy Conclave 2010 13

8/3/2019 9. Solar Energy Conclave 2010 13

http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 10/19

GujaratMaking Solar Energy Competitive…..

MoU signing ceremony

Page 11: 9. Solar Energy Conclave 2010 13

8/3/2019 9. Solar Energy Conclave 2010 13

http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 11/19

Path paved to achieve excellence

1. Signed MoU with Clinton Climate Initiative for setting up of various sizeof large scale Solar Power Parks of total 3000 MW capacity to makeSolar power competitive with conventional fossil fuels within the nearfuture.

2. Identified large area of government waste land and assigned GPCL as a

nodal agency for land allotment. 

Making Solar Energy Competitive…..Gujarat

 

.private companies for project land allocation

4. Developed plan to strength the transmission network and infrastructurefor power evacuation of large capacity solar power projects

5. Introduced Master Course on Solar Energy at Pandiat Dindayal

University, Gandhinagar and interaction of industries with ITI/s tointroduce new curriculum for Solar Energy

Page 12: 9. Solar Energy Conclave 2010 13

8/3/2019 9. Solar Energy Conclave 2010 13

http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 12/19

1. Dist. Banaskantha, Taluka Vav, Village Radhanesda : 1,400 ha

2. Dist. Surendranagar, Taluka Mul, Village Kuntalpur : 5,200 ha

 

Government wasteland identified in fourmajor potential areas

Gujarat

 

. st. ac c , a u a ac au, age a arva : 11, 7 a

4. Dist. Patan, Taluka Santalpur, Village Charanka : 2,500 ha

----------------------------------

Total : 20,400 ha

Page 13: 9. Solar Energy Conclave 2010 13

8/3/2019 9. Solar Energy Conclave 2010 13

http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 13/19

Govt. of Gujarat

Overall view of major Gujarat site/sand Narmada canal network

Gujarat

Page 14: 9. Solar Energy Conclave 2010 13

8/3/2019 9. Solar Energy Conclave 2010 13

http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 14/19

Features

Name of Village (s) Radhanesda,

Kundalia

Name of Taluka Vav

Name of District Banaskantha

Govt.Wasteland(As on 31/8/2009)

App.1400 Ha

1. Radhanesda Site(Dist Banaskantha) Gujarat

Nearest Road (State

Highway / National

Highway)

SH ( 8 KM)

Distance from

Nearest Existing

Main Canal or

Branch Canal of 

SSNNL

Main Canal

(25KM)

Distance from 66KV

Transmission

Substation

66 KV Tadav

(18 KM)

220 KV Tharad

(35 KM)

Page 15: 9. Solar Energy Conclave 2010 13

8/3/2019 9. Solar Energy Conclave 2010 13

http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 15/19

Features

Name of Village(s) Kuntalpur, Sarla

Name of Taluka Muli

Name of District Surendra Nagar

Govt.Wasteland

(As on 31/8/2009)

Appr. 5200 Ha

 

2. Kuntalpur( District Surendranagar)

Gujarat

Nearest Road (State

Highway / National

Highway)

SH ( 8 KM)

Distance from Nearest

Existing Main Canal orBranch Canal of SSNNL

SBC

(25KM)

Distance from 66KV

Transmission Substation

66 K Kuntalpur

(4 KM)

220 KV Limdi

(35 KM)

Page 16: 9. Solar Energy Conclave 2010 13

8/3/2019 9. Solar Energy Conclave 2010 13

http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 16/19

Features

Name of Village(s) Kakarva, Kankoth

Name of Taluka Bhachau

Name of District Kachchh

Govt.Wasteland

(As on 31/8/2009)

Apprx. 11567 Ha

3. Kakarva(District Kachchh)

Gujarat

earest oa ( tate

Highway / National

Highway)

– ass ng

Nearby

Distance from Nearest

Existing Main Canal or

Branch Canal of SSNNL

KBC (125KM)

Distance from 66KV

Transmission Substation

66 KVChobari (5

KM)

220 KV Shivalekha

(25 KM)

Page 17: 9. Solar Energy Conclave 2010 13

8/3/2019 9. Solar Energy Conclave 2010 13

http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 17/19

Features

Name of Village(s) Charnka, Patanka,

Dhokawada

Name of Taluka Santalpur

Name of District Patan

Govt.Wasteland (Ason 31/8/2009) App.2500 Ha

4. Charnka/Patanka Site(District Patan)

Gujarat

Nearest Road (State

Highway / National

Highway)

NH14 ( 12 KM)

Distance from

Nearest Existing

Main Canal orBranch Canal of  

SSNNL

KBC -12 KM ( At

4 KM under

construction)

Distance from 66KV

& 220 KV

Transmission

Substation

66 KV Santalpur

(15 KM)

220KVRadhanpur

(35 KM)

Page 18: 9. Solar Energy Conclave 2010 13

8/3/2019 9. Solar Energy Conclave 2010 13

http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 18/19

GujaratGas Grid network of Gujarat

Page 19: 9. Solar Energy Conclave 2010 13

8/3/2019 9. Solar Energy Conclave 2010 13

http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 19/19

toWelcome

Gujarat