Solar radiation : 5.5 to 6.00 kWh/sq.m./day
with 330 sunny days / year
Land : 14.40 Million Acres of uniquelypositioned waste land in area of high solar
radiation
Solar EnergyAdvantage Gujarat •Gujarat
Water : Narmada water available in Northernpart of state having high solar radiation
Transmission grid : Gujarat have densesttransmission network
Infrastructure: 74,000 Km long roadnetwork
Gas grid : 2200 Kms long gas grid
8/3/2019 9. Solar Energy Conclave 2010 13
http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 3/19
GujaratThe Sun Temple, Modhera , GujaratBuilt in 1026 AD by King Bhimdev
8/3/2019 9. Solar Energy Conclave 2010 13
http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 4/19
GujaratDriving Development
by Solar Power
Gujarat has a history and legacy of excellence…
We dream……
We devise……. e e ver…
The Government of Gujarat have declared the
“Solar Power Policy – 2009” with the vision of positioning the state of Gujarat as the ‘Integrated
Solar Generation Hub’ for the nation.
8/3/2019 9. Solar Energy Conclave 2010 13
http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 5/19
Gujarat Solar Policy 2009 (Salient features)
Operative Period : up to 31-3-2014
Wheeling Charges for self use : 2 %
Power injection Voltage level : 66 kV (Transmission line of 66 kVand above by state utility )
Renewable Purchase Obligation : 10 % from all renewable sources
Tariff : SPV Projects Solar Thermal Projects
Gujarat
s. s.Projects commissioned 13.00 for first 12 years 10.00 for first 12 yearsbefore December 31, 2010 3.00 form the 13th to 25th years 3.00 form the 13th to 25th yearsProjects commissioned 12.00 for first 12 years 9.00 for first 12 yearsbefore March, 2014 3.00 form the 13th to 25th years 3.00 form the 13th to 25th years
Bank guarantee of Rs. 50 lacs / MW at PPA stage
8/3/2019 9. Solar Energy Conclave 2010 13
http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 6/19
Gujarat
Technology Parameter MoU signedduring
VGGIS – 2009
EOI afterVGGIS – 2009 Total
SolarPhotovoltaic
No. of companies 26 9 35
Capacity (MW) 1882 1320 3202
Investment (Rs. Crores) 40822 12400 53222
MoU signed and EOI received
Solar Thermal No. of companies 18 6 24
Capacity (MW) 1645 465 2110
Investment (Rs. Crores) 25429 6975 32404
Total No. of companies 44 1559
Capacity (MW) 3527 1785 5312
Investment (Rs. Crores) 66251 19375 85626
8/3/2019 9. Solar Energy Conclave 2010 13
http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 7/19
Step by Step marching towards the Goal
6 th January , 2009 : Gujarat Solar Policy announcement
15 th January, 2009 : MoU signed with 44 companies
18–19 th February, 2009 : One to One meeting and presentation by 59 Solar
Power Project developers to Project approval committee
13 th March, 2009 : Meeting of 74 developers / manufactures / investors
under Chairmanship of Chief Secretary along with PSEnergy, Finance and Revenue departments
Gujarat
1 st August , 2009 : Issued Letter of Intention to 34 companies for 716 MW after
due diligence of technical and financial capacity
7 th September, 2009 : Sign MoU with Clinton Foundation for setting up 3000 MW
Solar Power Project in Gujarat
9–10 th September,2009 : One to One discussion with 34 companies to evaluate
preparedness for setting up the power project
8/3/2019 9. Solar Energy Conclave 2010 13
http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 8/19
Allotment of Solar Power Capacitiesby Government of Gujarat under
Solar Power Policy – 2009
Sr. No. Type of project Nos. ofcompanies
Capacityallocated
Gujarat
1 Solar Photovoltaic Power 24 365 MW
2 Solar Thermal Power Project 10 351 MW
Total 34 716 MW
8/3/2019 9. Solar Energy Conclave 2010 13
http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 9/19
GujaratMaking Solar Energy Competitive…..
Government of Gujarat Clinton Foundation ,U. S. A.
Sign MoU for setting up of Solar Parks of 3000 MW capacity
Govt. of Gujarat
8/3/2019 9. Solar Energy Conclave 2010 13
http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 10/19
GujaratMaking Solar Energy Competitive…..
MoU signing ceremony
8/3/2019 9. Solar Energy Conclave 2010 13
http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 11/19
Path paved to achieve excellence
1. Signed MoU with Clinton Climate Initiative for setting up of various sizeof large scale Solar Power Parks of total 3000 MW capacity to makeSolar power competitive with conventional fossil fuels within the nearfuture.
2. Identified large area of government waste land and assigned GPCL as a
nodal agency for land allotment.
Making Solar Energy Competitive…..Gujarat
.private companies for project land allocation
4. Developed plan to strength the transmission network and infrastructurefor power evacuation of large capacity solar power projects
5. Introduced Master Course on Solar Energy at Pandiat Dindayal
University, Gandhinagar and interaction of industries with ITI/s tointroduce new curriculum for Solar Energy
8/3/2019 9. Solar Energy Conclave 2010 13
http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 12/19
1. Dist. Banaskantha, Taluka Vav, Village Radhanesda : 1,400 ha
2. Dist. Surendranagar, Taluka Mul, Village Kuntalpur : 5,200 ha
Government wasteland identified in fourmajor potential areas
Gujarat
. st. ac c , a u a ac au, age a arva : 11, 7 a
4. Dist. Patan, Taluka Santalpur, Village Charanka : 2,500 ha
----------------------------------
Total : 20,400 ha
8/3/2019 9. Solar Energy Conclave 2010 13
http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 13/19
Govt. of Gujarat
Overall view of major Gujarat site/sand Narmada canal network
Gujarat
8/3/2019 9. Solar Energy Conclave 2010 13
http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 14/19
Features
Name of Village (s) Radhanesda,
Kundalia
Name of Taluka Vav
Name of District Banaskantha
Govt.Wasteland(As on 31/8/2009)
App.1400 Ha
1. Radhanesda Site(Dist Banaskantha) Gujarat
Nearest Road (State
Highway / National
Highway)
SH ( 8 KM)
Distance from
Nearest Existing
Main Canal or
Branch Canal of
SSNNL
Main Canal
(25KM)
Distance from 66KV
Transmission
Substation
66 KV Tadav
(18 KM)
220 KV Tharad
(35 KM)
8/3/2019 9. Solar Energy Conclave 2010 13
http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 15/19
Features
Name of Village(s) Kuntalpur, Sarla
Name of Taluka Muli
Name of District Surendra Nagar
Govt.Wasteland
(As on 31/8/2009)
Appr. 5200 Ha
2. Kuntalpur( District Surendranagar)
Gujarat
Nearest Road (State
Highway / National
Highway)
SH ( 8 KM)
Distance from Nearest
Existing Main Canal orBranch Canal of SSNNL
SBC
(25KM)
Distance from 66KV
Transmission Substation
66 K Kuntalpur
(4 KM)
220 KV Limdi
(35 KM)
8/3/2019 9. Solar Energy Conclave 2010 13
http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 16/19
Features
Name of Village(s) Kakarva, Kankoth
Name of Taluka Bhachau
Name of District Kachchh
Govt.Wasteland
(As on 31/8/2009)
Apprx. 11567 Ha
3. Kakarva(District Kachchh)
Gujarat
earest oa ( tate
Highway / National
Highway)
– ass ng
Nearby
Distance from Nearest
Existing Main Canal or
Branch Canal of SSNNL
KBC (125KM)
Distance from 66KV
Transmission Substation
66 KVChobari (5
KM)
220 KV Shivalekha
(25 KM)
8/3/2019 9. Solar Energy Conclave 2010 13
http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 17/19
Features
Name of Village(s) Charnka, Patanka,
Dhokawada
Name of Taluka Santalpur
Name of District Patan
Govt.Wasteland (Ason 31/8/2009) App.2500 Ha
4. Charnka/Patanka Site(District Patan)
Gujarat
Nearest Road (State
Highway / National
Highway)
NH14 ( 12 KM)
Distance from
Nearest Existing
Main Canal orBranch Canal of
SSNNL
KBC -12 KM ( At
4 KM under
construction)
Distance from 66KV
& 220 KV
Transmission
Substation
66 KV Santalpur
(15 KM)
220KVRadhanpur
(35 KM)
8/3/2019 9. Solar Energy Conclave 2010 13
http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 18/19
GujaratGas Grid network of Gujarat
8/3/2019 9. Solar Energy Conclave 2010 13
http://slidepdf.com/reader/full/9-solar-energy-conclave-2010-13 19/19
toWelcome
Gujarat