    Methods of Pavement Design

    Four Groups:

    1. Group A2. Group B3. Group C

    4. Group D

  • 8/17/2019 9-Road Note-31

    2/32

    Group A:

    Empirical Methods using no soilstrength tests (Basic properties of soils

    are involved)

    • U.S. Highway Engineers Group IndexMethod

    • Civil Aeronautic Administration, USAMethod

    Methods of Pavement Design

  • 8/17/2019 9-Road Note-31

    3/32

    Group B:Empirical Methods using soil strength(CBR Test is generally performed)

    • CBR Method• North Dakota Cone Method• U.S. Navy and Flexible Pavement Committee

    Method• Canadian Department of Transport Method

    • Markwick Method for Rigid Pavement• Overseas Road Note-31• AASHTO Design Guide

    Methods of Pavement Design

  • 8/17/2019 9-Road Note-31

    4/32

    Group C:Methods based partly on theory and partly onexperience(Fundamental stress strain properties of subgradesoi ls and sometimes the base material aredetermined by shear or bearing test)

    • Westergaard’s Method ( based on Plate Load Test)• Shear Strength Method• Golder’s Method• Kansas Highway Department Method• V. R. Smith Method

    Methods of Pavement Design

  • 8/17/2019 9-Road Note-31

    5/32

    Group D:Wholly Theoretical Method(These are based on mathematicalanalysis of the stresses and strains

    throughout the pavement and subgradeand the true stress straincharacteristics of the variousmaterials)

    • Burmster’s Analysis and DesignMethod

    Methods of Pavement Design

  • 8/17/2019 9-Road Note-31

    6/32

    PAVEMENT DESIGN BY

  • 8/17/2019 9-Road Note-31

    7/32

    Important Aspects:

    • CBR > 80% for Base Material• If CBR > 30% for subgrade, then Sub-base

    is not required• If subgrade has CBR < 4%, then use

    Capping Layer • There are two types of Surface Dressings

    1. Single Surface Dressing2. Double Surface Dressing

    ROAD NOTE-31

  • 8/17/2019 9-Road Note-31

    8/32

    Single &DoubleSurface

    Dressing

    ROAD NOTE-31

  • 8/17/2019 9-Road Note-31

    9/32

    ROAD NOTE-31 Important Aspects:

  • 8/17/2019 9-Road Note-31

    10/32

    • Parent fines are the fines developedduring crushing of rocks. These areusually 5 mm or less in size. These should

    be used to fill the voids of aggregates.• Macadam developed the design procedure

    for the construction of pavements.

    • Particle size is 37.5 mm or 50 mm in DryBound Macadam and Water BoundMacadam.

    Important Aspects:ROAD NOTE-31

  • 8/17/2019 9-Road Note-31

    11/32

    • In Dry Bound Macadam, vibrations areused to fill the parent fines into the voids ofgravels.

    • In Water Bound Macadam, water is usedto fill the parent fines into the voids ofgravels. This technique gives better resultsnormally to fill the voids. But if the

    subgrade is clayey then water will reduceits strength.

    Important Aspects:ROAD NOTE-31

  • 8/17/2019 9-Road Note-31

    12/32

    Pavement Components NomenclatureRoad Note-31

  • 8/17/2019 9-Road Note-31

    13/32

    ROAD NOTE-31-DESIGN STEPS

  • 8/17/2019 9-Road Note-31

    14/32

    DETAILED DESIGNFLOW CHART

    ROAD NOTE-31

  • 8/17/2019 9-Road Note-31

    15/32

    ROAD NOTE-31

  • 8/17/2019 9-Road Note-31

    16/32

    ROAD NOTE-31

  • 8/17/2019 9-Road Note-31

    17/32

    ROAD NOTE-31

  • 8/17/2019 9-Road Note-31

    18/32

    ROAD NOTE-31

  • 8/17/2019 9-Road Note-31

    19/32

    ROAD NOTE-31

  • 8/17/2019 9-Road Note-31

    20/32

    ROAD NOTE-31

  • 8/17/2019 9-Road Note-31

    21/32

    ROAD NOTE-31

  • 8/17/2019 9-Road Note-31

    22/32

    ROAD NOTE-31

  • 8/17/2019 9-Road Note-31

    23/32

    ROAD NOTE-31

  • 8/17/2019 9-Road Note-31

    24/32

    ROAD NOTE-31

  • 8/17/2019 9-Road Note-31

    25/32

    ROAD NOTE-31CHART-1

  • 8/17/2019 9-Road Note-31

    26/32

    ROAD NOTE-31CHART-2

  • 8/17/2019 9-Road Note-31

    27/32

    ROAD NOTE-31CHART-3

  • 8/17/2019 9-Road Note-31

    28/32

    ROAD NOTE-31CHART-4

  • 8/17/2019 9-Road Note-31

    29/32

    ROAD NOTE-31CHART-5

  • 8/17/2019 9-Road Note-31

    30/32

    ROAD NOTE-31CHART-6

  • 8/17/2019 9-Road Note-31

    31/32

    ROAD NOTE-31CHART-7

  • 8/17/2019 9-Road Note-31

    32/32

    ROAD NOTE-31CHART-8