July 17, 2019 Federal Energy Regulatory Commission 888 First
Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D.
Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No.
CP19-28-000 Northern Delaware Basin Expansion Project Weekly
Environmental Inspector Report No. 20 Commissioners: El Paso
Natural Gas Company, L.L.C. ("EPNG") is hereby filing with the
Federal Energy Regulatory Commission ("Commission") in Docket No.
CP19-28-000, its weekly status report related to the Northern
Delaware Basin Expansion Project (“Project”). Description of
Proceeding On December 19, 2018, EPNG filed a prior notice
application pursuant to sections 157.205, 157.208(b), and 157.210
of the Commission’s regulations under the Natural Gas Act and
EPNG’s blanket certificate issued in Docket No. CP82-435-000 for
authorization to construct an approximate 14-mile twenty-four-inch
(24”) outside diameter (“O.D.”) loop line of its existing 20-inch
(20”) O.D. Line No. 3162 in Winkler County, Texas, as well as make
minor appurtenant facility modifications at existing compressor
station and other facility locations in Winkler, Crane, and Upton
Counties, Texas. Additionally, EPNG will be required to hydrotest
approximately 51 miles of its existing 24-inch (24”) O.D. Line No.
1105 that traverses Winkler, Ector, and Crane Counties, Texas. On
December 27, 2018, the Commission issued a Notice of Request Under
Blanket Authorization initiating the 60 day comment period to allow
for any person or Commission’s staff to file motions or notice to
intervene and protests. Since no protests were filed within the
comment period, the Project was deemed to be authorized on February
26, 2019. Submittal of Status Report In compliance with Section
157.208(c)(10) of the Natural Gas Act, EPNG is providing
Environmental Inspector Report No. 20 for the period of July 7,
2019 through July 13, 2019.
-
Federal Energy Regulatory Commission -2- July 17, 2019 Filing
Information EPNG is e-Filing this letter and report with the
Commission's Secretary in accordance with the Commission's Order
No. 703, Filing Via the Internet, guidelines issued on November 15,
2007 in Docket No. RM07-16-000.
Respectfully submitted,
EL PASO NATURAL GAS COMPANY, L.L.C.
By___________/s/______________ Francisco Tarin Director,
Regulatory
Enclosures
-
EPNG WeDocket NProject N
County/S
ReportinEnvironm 1. Summ
Line wereNo. 5No. 4tie‐inwell begaFinall43+0
Mainbegawas eslab Keyst
Line Nhydrosite workscope
2. Relev
Durintrainitraini
All eq All oentra
3. Envir
No en
eekly EnviroNo. CP19‐28‐Name:
State:
ng Period: mental Inspe
mary of Con
No. 31111
L completed 544+00 and 480+00 and n activities thas
road born on the boly, rough
cle0 and Statio
nline Valve an on
the pigexposed, grawas pouredtone Compre
No. 1105 Hyostatic testinwith
pipe space. EPNe revisions t
vant Environng this repoing.
A totaing on the N
quipment wa
open ditch apped. No a
ronmental Pnvironmenta
onmental Ins‐000
NorWinCouJuly
ector: Dav
nstruction Ac
Loop Line:
on the newStation No. Station No. hat were conre work.
Thore pits for teanup
activon No. 106+0
nd Pig Launcg launcher/ravel was
red. In additessor Station
ydrostatic Teng of the Linbegin
expo
NG notes thahat were req
nmental Actorting periol of
five‐hunorthern Del
as checked f
was walkednimals were
Problems/Issal problems
spector Rep
rthern Delawnkler,
Ector,unties, Texasy 7, 2019 to Jvid McCullou
ctivity for In
During this w loop
line. 574+00 and608+00. Onducted betwhe
road borthe bore unvities
began 00.
cher/Receivereceiver momoved fromtion,
work n with a hyd
esting: Prepne No. 1105osed and
toat this workquested in it
ivities: od, one‐hunndred
sevenaware Basin
for noxious w
d on a daile noted in th
sues and Coor issues we
port No. 20
ware Basin E, Crane
ands July 13, 2019ugh
nspection Pe
reporting p Lowering‐ind backfill actther activitiween Statiore
at Texas nder Texas Hduring
this
er Modificatdifications a
m the end ofon pig laun
drovac truck
paration wor5. Dirt workopsoiling
anconducted ts July 3, 201
dred sevennty‐five (575n Expansion
weeds and fo
y basis to he ditch duri
rrective Actere identifie
Expansion Prd Upton D
9
eriod:
eriod,
lowen work was tivities werees during thon No. 580+0Highway
30Highway 18/ reporting p
tions: Durinat the Line Nf
the launchncher/receivexposing lin
rk began durk continued nd
leveling at these loc19 alternativ
(107) peo5) people
hProject.
ound to be c
ensure thang this repo
ions Taken:d during this
roject Date: 7/17/2
ring‐in and conducted
e conducted his reporting00 and Statio02 was
com/Texas New period betw
g this reportNo. 1105 Mher/receiververs
was cones for the b
ring this repat the Line of
the 10‐cations wereve measures
ple receivedave receive
clean.
at no animaorting period
s reporting p
2019
backfill
actibetween Stbetween Stg period inclon No. 745+pleted
and Mexico Rai
ween Station
ting period, MLV 12 site. r,
and a cononducted atbypass.
porting perioNo. 1105 M‐acre
tempe not part os request.
d environmd environm
als had becd.
period.
vities tation tation luded 00 as work lway. n
No.
work Pipe crete t the
od for MLV 5 orary of the
mental mental
come
-
4. EnvirNo en
5. Issue
No la 6. Work
Durinthe nconti1105
ronmental Cnvironmenta
es and Concendowner iss
k Planned fong the next new
loop linnue during t.
Compliance Ial complianc
erns Identifisues or conc
or the Followreporting pene.
Work wthe next rep
Issues/Resoce issues we
ed by Landocerns were id
wing Reportieriod, tie‐in,ill
continueporting perio
lutions: re identified
owners: dentified du
ing Period:,
road boreon pigging od in prepar
d during this
ring this rep
and clean‐ufacility modration for hy
s reporting p
porting perio
up activities difications aydrostatic te
period.
od.
will continund site woresting of Line
ue on k will e No.
-
Report NPhotos Location31111 ROStation NDirectionNorth DescriptiBackfillinditchlinedozer.
Location31111 ROStation NDirectionNorth DescriptiLoweringloop line ditch undline.
No. 20
: Line No. OW at No. 598+00 n of Photo:
ion: ng the with a
: Line No. OW at No. 591+00 n of Photo:
ion: g the new into the der a foreignn
-
Photos Location31111 ROStation NDirectionNorth Descriptithe tie‐innew loop
Location31111 ROStation NDirectionSouthweDescriptiPreparingbore at THighway
: Line No. OW at No. 591+00 n of Photo:
ion: Making n weld on thp line.
: Line No. OW at No. 552+00 n of Photo: est ion: g for the Texas 302.
e
-
Photos Location31111 ROStation NDirectionWest Descriptithe pipe pulled unHighway
Location31111 ROStation NDirectionNortheasDescriptiditch witloopline
: Line No. OW at No. 550+00 n of Photo:
ion: Coatingthat will be nder Texas 302.
: Line No. OW at No. 546+00 n of Photo: st ion: Open h new lowered in.
g
-
Photos Location31111 ROStation NDirectionSouthweDescriptiLoweringthe ditch
Location31111 ROStation NDirectionSouthweDescriptithe tie‐innew loop
: Line No. OW at No. 481+00 n of Photo: est ion: g pipe into h.
: Line No. OW at No. 481+00 n of Photo: est ion: Making n weld on thp line.
e
-
Photos Location31111 ROStation NDirectionNortheasDescriptiBackfillinpit on theside of TeHighway
Location31111 ROStation NDirectionNortheasDescriptithe pipe.
: Line No. OW at No. 400+00 n of Photo: st ion: ng the bore e coming‐in exas 874.
: Line No. OW at No. 389+00 n of Photo: st ion: Padding.
g
-
Photos Location31111 ROStation NDirectionSouth Descriptitopsoil bROW witwith a m
Location31111 ROStation NDirectionSouth Descriptitopsoil bthe ROWand track
: Line No. OW at No. 56+00 n of Photo:
ion: Pulling ack into theth a trackhoeop pipe.
: Line No. OW at No. 43+00 n of Photo:
ion: Bringingack across
W with dozerskhoes.
e
g
s
-
Photos Location31111 ROStation NDirectionWest DescriptiExcavatinpit on theof the Te18/TexasRailway b
Location31111 ROStation NDirectionWest Descriptithe kickobeing ba
: Line No. OW at No. 26+00 n of Photo:
ion: ng the bore e west side exas Highways New Mexicbore site.
: Line No. OW at No. 0+00 n of Photo:
ion: Piers at off site after ckfilled.
y co
-
Photos Location1105 MLDirectionSouth DescriptiRemovinleveling tthe tempworkspacMLV 5 sit
Location1105 MLDirectionSoutheasDescriptipipe at thin preparhydrosta
: Line No. V 5 Site n of Photo:
ion: g topsoil anthe grade in porary ce at the te.
: Line No. V 5 Site n of Photo: st ion: Exposedhe MLV 5 sitration for tic testing.
d
d te
-
Photos LocationCompresDirectionSouthweDescriptiPotholingpig launcof Line Na hydrovinside KeCompres
Location1105 MLDirectionSoutheasDescriptiRemovinthe end olauncherthe MLV
: Keystone ssor Station n of Photo: est ion: g near the cher/receiveo. 1105 withac truck eystone ssor Station.
: Line No. V 12 Site n of Photo: st ion: g gravel at of the pig r/receiver at 12 site.
r h
-
Certificate of Service I hereby certify that I have this day
caused a copy of the foregoing documents to be served upon each
person designated on the official service list compiled by the
Commission's Secretary in this proceeding in accordance with the
requirements of Section 385.2010 of the Federal Energy Regulatory
Commission's Rules of Practice and Procedure. Dated at Colorado
Springs, Colorado as of this 17th day of July 2019.
/s/ Francisco Tarin
Two North Nevada Avenue Colorado Springs, Colorado 80903 (719)
667-7517