OPERATORS AND PARTS MANUAL NO.03-03-GK FOR 81/9100 1 PB-8100-AS 08/2011 S:\DRAWINGS_ACAD\MEYER DRAWINGS\PARTS MANUALS\PB-8100-AS 08-2011.doc PB-8100-AS MEYER MODEL 81/9100 GRAIN KIT INSTALLATION/OPERATORS MANUAL Manufactured by Meyer Mfg Corp. County Hwy. A West 574 West Center Avenue P.O. Box 405 Dorchester, Wisconsin 54425-0405 Phone 715-654-5132 FAX 715-654-5513 1-800-325-9103 www.meyermfg.com E-mail [email protected]
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Step #1 - 8100 ONLY Rear Gate Belting Installation Loosen the far left and right vertical columns of screws on the front side of the backgate. Slide the backgate
belting between the cladtuff material and the backgate frame. Close the gate and then pull the belting out to the
sides of the implement to create a seal. Repeat on the other side. Re-fasten the cladtuff to the backgate frame to
hold the belting in place.
Step #2 - Belting Installation-Right and Left Place belting and steel strap onto the back side of the frame. Position the belting so the top side of the belting
touches the bottom side of the apron chain. Clamp or hold the strap onto the bottom side of the belting. Use a
9/32” drill bit, drill and bolt into place using 1/4x3/4” machine bolts and ¼” spin locknuts. (See Below)
NOTE: Watch for the light cord which is located behind the frame plate before drilling.
Left Side View Right Side View
Step #3 - Installing Brushes Brushes will get mounted to the underside of the poly floor ahead of the 2x2” rear cross floor support tube.
Position the brushes in front of the 2x2” tube and use lengths of brush per side (reference Hardware Package).
Drill four 9/32” holes (35-1/2” brushes) or two 9/32” holes(7-3/4, 12-3/4, or 9-3/16” brushes) in each brush and
bolt in place using 1/4x3-1/2” machine bolts with ¼” fender washers on wooden brush and 1/4” nylon insert
Step #4 - Center Main Roller Bearing Cover This cover gets mounted under the center main roller bearing capping of the support tube to prevent leakage.
Drill two ¼” holes and bolt in place with two 5/16 self tapping screws. (See below)
Step #5 - Gate Stops Unbolt the gate stop pieces from the back gate and rotate them ½ turn. Bolt back in place as shown below. The
grain kit hanger gussets that will be mounted in the following pages are designed to be left on the forage box
after the grain kit is removed. As long as the hanger gussets are left on, the stop brackets do not need to be put
back into the original position. (See Below)
Stop shown for grain kit hanger gusset Stop shown without grain kit hanger gusset
Step #6 - Mounting the hanger gussets The long bearing plates welded to the left and right frame are prepunched to position the holes that need to be
drilled into the rear upright tubes. Drill the two 17/32” holes through the square tube on both right and left
sides.
Note: Move the light cord on the front side of the rear upright tube before drilling.
Drill the pre-punched holes - 2 on each side
Step #7 - Installing the hanger gussets With the gate partially supported in the open position, install the left and right hanger gussets. Bolt the two
bottom bolts on each side using 1/2x3-1/2” machine bolts and ½” nylon locknuts. Install ½” flat washers onto
the front side of the upright tube. After the lower bolts are tightened drill the top hole on each side with a
17/32” drill and bolt tight using the same bolts and washers and nuts as on the lower holes. (See Below) Install
the ½” carriage bolt and nylon lock nut to fasten the hanger gusset to the bearing plate on each side.
Step #8 - Installing the grain hopper Using a safe lifting device, lift the hopper from the ground and position it at the rear of the forage box. Position
the hook so it lifts from the lifting loop at the center of the grain hopper. Lower the grain hopper as the top
hooks are over the shafts on the hanger gussets on the right and left sides. Let the hopper down, and verify the
hooks have properly seated over the shafts on the gusset, then remove your lifting device. Push down and
inward on the back of the hopper until it bottoms out to the rear frame plate of the forage box. (See Below)
After the grain hopper is in place tighten the turn arms under the back side of the implement to pull the hopper
tight to rear of the box. (See Below)
Tighten the turn arms (Right and Left as viewed from the back of the implement)
Step #9 – Adjusting the side and lower seal filler panels Once the grain kit is pulled up tight from the prior step loosen and adjust the side and lower filler panels up tight
to the left and right main bearing plate on the rear corners of the forage box. Tighten the bolts to hold filler
panels in place.
Step #10 - Installing the flow control Center the flow control between the 2
nd and 3
rd uprights from the rear on the left side as you are facing the box
from the rear. (8100’s Not Shown) Fit the mounting plate. Mark the two holes in the 4” formed side channel
and drill 11/32” holes and bolt the mounting plate in place using 5/16x1” bolts & locknuts, then bolt the flow
control on the mounting plate using the 1/4x3” machine bolts and ¼” center locknuts. (9100 Shown) Use the
bent mounting plate, and bolt in place as shown below using 3/8x1” machine bolts and 3/8” spin locknuts for
the bracket and use the 1/4x3” machine bolts and ¼” center locknuts to mount the flow control.
9100 SHOWN
Step #11 – Connecting your clearance lights Find the electrical cable going to your right hand stop/tail/turn lights, there will be a pigtail which you will need
to connect your grain kit plug to. Secure any excess wire or cable.