Top Banner
© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com 8000 Pump Maintenance Perform Forward System Purge Before Performing Pump Maintenance…Pump Must Be Removed From Enclosure To Service.
126

8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

Jul 27, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

8000 Pump Maintenance

Perform Forward System Purge Before Performing Pump Maintenance…Pump Must Be Removed From Enclosure To

Service.

Page 2: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Use Repair Kit P/N D3-

0102

Page 3: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

8000 Pump Removed

From Enclosure

Page 4: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Special Tool Required: 1” Socket

and 3/16” Long Tee Handled Ball

End Allen

Page 5: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Page 6: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Page 7: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Remove Oil Cap

Page 8: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Oil Cap Removed

Page 9: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

The Pump Should Have Oil In

It To Be Removed

Page 10: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Place Paper Towels in Your

Air Tight Waste Container

Page 11: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Pour Oil From The Pump Into

Waste Container

Page 12: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Assure ALL Oil is Out

Page 13: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Remove the Allen Head Screws

That Connect The Actuation Assy.

to The Hydraulic Assembly

Page 14: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Note/Mark The Orientation

Assemblies to Each Other

Page 15: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Separate The Two

Assemblies

Page 16: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Remove The Plunger Seal

and Support Sleeve

Page 17: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Sleeve and Seal

Removed

Page 18: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Remove The Body O-Ring

Page 19: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Drain Any Remaining Oil Into

Your Waste Container

Page 20: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Remove the Allen Screws That

Attach the Actuation Cylinder

Page 21: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

When Screws Are Removed,

The Spring Will Force The

Assy. Apart

Page 22: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Remove the Actuation

Cylinder

Page 23: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Remove the Plunger Assy.

and Spring

Page 24: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Plunger Assy. and Spring

Removed

Page 25: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Prepare to Remove The

Plunger Seal Cartridge

Page 26: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Using a 1” Socket Remove The

Plunger Seal Cartridge

Page 27: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Cartridge Removed

Page 28: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Remove The Three (3)

Bushings From The Cartridge

Page 29: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Bushings, Seal, and O-Ring

Removed From Cartridge

Page 30: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Remove The U-Cup

Actuation Seal

Page 31: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Remove the Bushing Stop

From The Actuation Housing

Page 32: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Actuation and Plunger Parts

Shown All Removed

Page 33: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Loosen The Outlet Check

Assembly With 3/8” Allen

Page 34: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Outlet Check Assembly

Removed

Page 35: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Remove The Outlet

Check Assembly

Page 36: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Remove The Inlet Check

Assy.

Page 37: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Inlet Check Assembly

Removed

Page 38: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Outlet C.V

Inlet C.V.

Page 39: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Disassemble Inlet C.V.

Page 40: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Page 41: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Page 42: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Notice Wafer Orientation

Page 43: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Page 44: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Dis-Assemble Discharge

Check

Page 45: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

After Removing the 1st Wafer,

Install the Bolt From Kit to

Remove Sleeve

Page 46: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Remove Sleeve By Pulling on The

Bolt Head While Holding The C.V,

Body

Page 47: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Remove 2nd C.V. Wafer

Page 48: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Lay Pump Body on It’s

Side

Page 49: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Loosen (4 ) Cap Screws

Page 50: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Turn Assy. Over and

Remove Cap Screws

Page 51: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Hold Odorant Block Down

While Removing Final Screw

Page 52: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Spring Will Separate

Bodies

Page 53: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Bodies Separated

Page 54: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Remove O-Ring

Page 55: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Remove Diaphragm and

O-rings

Page 56: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Page 57: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Prepare Parts Required

to Re-Assemble

Page 58: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Prepare Parts Required

to Re-Assemble

Page 59: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Assembly Lubricants

Lubriplate 105 Assembly Lube

Dow Corning Molykote 55

Page 60: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Use MolyKote to Lube and

Retain O-Ring P/N A5-1143

Page 61: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install O-Ring P/N A5-

1143 on Odorant Block

Page 62: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Lube O-Ring P/N A5-

2226

Page 63: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install O-Ring & Diaphragm in

The Hydraulic Block

Page 64: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Diaphragm Installed

Page 65: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install Diaphragm Piston

Page 66: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install Spring

Page 67: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Place Odorant Block with it’s O-Ring

Attached Over The Spring

Page 68: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Press Blocks Together

Page 69: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install Cap Screws by

Hand

Page 70: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Tighten Cap Screws Progressively

Using a Cross Tightening Pattern

Page 71: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Tighten Securely Utilizing

Cross Tightening Pattern

Page 72: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Lube and Assemble The O-Rings and

Back Up Rings on The Inlet C.V. Body

Page 73: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install Wafer…Notice Wafer

Orientation

Page 74: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install The Retainer

Page 75: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Tighten The Inlet C.V. Using

Two Allen Wrenches

Page 76: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install The Inlet C.V.

Assembly

Page 77: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Tighten Inlet C.V.

Assembly Securely

Page 78: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Re-Assemble The Outlet Check-Install 1st

Wafer (Rubber Side Facing You)

Page 79: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install Sleeve with O-

Ring

Page 80: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Press (Snap) Sleeve all the Way

Down Using the Bolt From Kit

Page 81: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install 2nd Check Wafer

(Rubber Side Facing You)

Page 82: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install Seal Nut With O-Ring

Page 83: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Tighten Using TWO Allen Wrenches

and Install O-Ring and Back Up Ring

Page 84: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install The Outlet C.V. Assembly

Page 85: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Tighten The Outlet C.V.

Assembly Securely

Page 86: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Prepare Lower Seal and

Retainer for Assembly

Page 87: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Lubricate the Seal with

Assembly Lube

Page 88: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Press Seal into the

Retainer

CAUTION Sharp EdgeCAUTION Sharp Edge

Page 89: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install Seal/Retainer Assy. in

The Hydraulic Block

Page 90: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Lubricate the Retainer

O-Ring P/N A5-2123

Page 91: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install the O-Ring

Page 92: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Prepare to Reinstall the

Actuation Housing

Page 93: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Align Housings to Original

Orientation, and Install Screws

Page 94: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Page 95: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Tighten All Screws

Page 96: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install the Stop Bushing

Page 97: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Stop Bushing Installed

Page 98: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Prepare Plunger

Guide/Seal Assembly

Page 99: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Lubricate and Install The

Seal

Page 100: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Press Seal ALL the Way

into The Housing

Page 101: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install One of The Short

Bushings

Page 102: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install The Long Bushing

Page 103: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install The Second Short

Bushing

Page 104: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Lube and Install The

P/N A5-2123 O-Ring

Page 105: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install The Plunger Guide

Assembly

Page 106: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Use 1” Socket to Tighten

Page 107: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Snug Tighten in Place…

DO NOT OVERTIGHTEN

Page 108: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install The Spring

Page 109: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Lube and Install Actuation Seal

on The Actuation Piston

Page 110: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Page 111: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Page 112: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Lubricate The Seal Fully

Page 113: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install Piston/Plunger

Assembly

Page 114: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Test Press the Piston Assembly

Completely a Couple of Cycles

Page 115: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Angle Actuation Cylinder

at 450 for Installation

Page 116: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Align for Correct

Orientation

Page 117: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Press Down

Page 118: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Install Screws

Page 119: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Tighten Screws

Page 120: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Add NJEX Oil To The 1st

Thread in The Reservoir

Page 121: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Tilt the Pump Partially in Several

Directions to Get The Trapped Air

Out of The Hydraulic Block

Page 122: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Proper Oil Level After Air has Been

Removed is Approximately Midway in

The Reservoir

Page 123: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Replace The Oil

Reservoir Cap

Page 124: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Lubricate and Replace External

Connection O-Rings

Page 125: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

External Connection O-

Rings Replaced

Page 126: 8000 Pump Maintenance - yzsystems.comRestart System •Install Pump In System •Close V-2, V-3 & V-5

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Restart System

• Install Pump In System

• Close V-2, V-3 & V-5

• Open V-4 Until Expansion Tank Pressure Reaches 25 psi.

• Open Odorant Supply Valve V15 or V17 as Equipped.

• Fill Verometer on Meter Level Window

• Prime Pump (V3)

• Open V6 & V8

• Start The System

• Call 1-800-653-9435 if you need assistance.