“8 steps to innovation” in action Vinay Dabholkar, Ph.D. President, Catalign Innovation Consulting [email protected], 99457-57913 www.catalign.com May 08, 2013 Rishikesha T. Krishnan Professor of Strategy & Corporate Policy Indian Institute of Management, Bangalore [email protected]
Anyone interested in making his team / organization more innovative needs to find out answers to 2 questions: (1) Where do we stand? (2) What to do next? This presentation shows how "8 steps to innovation" approach can be used to do this systematically.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
“8 steps to innovation” in action Vinay Dabholkar, Ph.D.
Elephant: Will follow a changed path (process change – ATM card removal)
Build Pipeline Improve velocity Enhance batting average
Ho
w t
o s
ust
ain
th
e ch
ange
? What to improve?
Dir
ect
th
e R
ide
r M
oti
vate
th
e
Ele
ph
ant
Shap
e t
he
P
ath
Situation #1: Pipeline “uninteresting”
• Innovation program launched in Dec 2010 • Within a month 40 ideas came from 25 people • None of the ideas was “interesting enough”
Is it an Elephant problem or a Rider problem?
• A challenge book was created: 20 problems • President’s challenge was launched • 20 responses came – Many were “interesting”
It is a Rider problem: Don’t know which problem to solve
Build Pipeline Improve velocity Enhance batting average
Ho
w t
o s
ust
ain
th
e ch
ange
? What to improve?
Dir
ect
th
e R
ide
r M
oti
vate
th
e
Ele
ph
ant
Shap
e t
he
P
ath
Challenge Campaign (step-2)
Situation #2: Pipeline drying up
• Portal phobia – Not interested in one more log-in • Innovation council members felt portal is the only way
?
Is it an Elephant problem or a Rider problem?
It is an Elephant problem: resistance for one more login
An experiment: Put up a challenge next to cafeteria Wow! A number of responses in a couple of days And everybody passing by is stopping by to read!
In two months, 100+ ideas!
Generated gossip around ideas as well
Launched an “idea wall” on every floor
Build Pipeline Improve velocity Enhance batting average
Ho
w t
o s
ust
ain
th
e ch
ange
? What to improve?
Dir
ect
th
e R
ide
r M
oti
vate
th
e
Ele
ph
ant
Shap
e t
he
P
ath
Idea Wall (step-1)
Situation #3: Avg response time high
• Average response time > 4 months • Dept / Brand heads were not reviewing ideas (online)
Is it an Elephant problem or a Rider problem?
• Not sure… May be Elephant • Experiment: Took approver’s appointment • Took printouts of 10 ideas to him • In 15 minutes all reviews were done! • Looks like an Elephant problem! • Idea review not getting a priority
Shape the path: Review by walking around
3 Reviewers
50 ideas, 1 poster / idea
Prototypes if available
Idea authors in the room
Review done in less than an hour!
Some idea authors got opportunity to explain
Outcomes: Direct implementation, PoC, Parked
Build Pipeline Improve velocity Enhance batting average
Ho
w t
o s
ust
ain
th
e ch
ange
? What to improve?
Dir
ect
th
e R
ide
r M
oti
vate
th
e
Ele
ph
ant
Shap
e t
he
P
ath
Review by walking Around (step-5)
Situation #4: Lack of collaboration in group companies
• Group Chairman felt there was possible synergy • Nothing was moving
Is it an Elephant problem or a Rider problem?
100 prototypes on display in 3 months! Group Chairman visited
A mini-sandbox
Build Pipeline Improve velocity Enhance batting average
Ho
w t
o s
ust
ain
th
e ch
ange
? What to improve?
Dir
ect
th
e R
ide
r M
oti
vate
th
e
Ele
ph
ant
Shap
e t
he
P
ath
Sandbox + Chairman visit (step-7)
The book has many more options!
Build Pipeline Improve velocity Enhance batting average