Top Banner
5

7th FPSO VESSEL CONFERENCE 4th November · hallenges and Solutions for Turret Mooring in Deepwater & Harsh Weather Environments est Practice Safe FPSO Operations Increasing Integrity

Jul 09, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 7th FPSO VESSEL CONFERENCE 4th November · hallenges and Solutions for Turret Mooring in Deepwater & Harsh Weather Environments est Practice Safe FPSO Operations Increasing Integrity
Page 2: 7th FPSO VESSEL CONFERENCE 4th November · hallenges and Solutions for Turret Mooring in Deepwater & Harsh Weather Environments est Practice Safe FPSO Operations Increasing Integrity

7th FPSO VESSEL CONFERENCE

HOUSTON, TEXAS. USA.

4th-5th

November

2015

Registration is simple:

If you would like to register for this event or wish to find out

more information, you can contact Antonio Russo using any

of the following methods:

+44(0)20 3141 0630

[email protected]

http://www.acius.net

ACI Europe, 5/13 Great Suffolk Street, London,

KEY TOPICS FOR DISCUSSION :

Critical Developments in the Gulf of Mexico & Brazil FPSO Mar-ket with Current Oil Price Fluctuation

FPSO Projects in Emerging Markets and E&P Hotspots - Where can new projects start with good economic prospects?

FPSO OWNER/OPERATOR, SYSTEMS & OIL MAJOR PANEL: Reac-tion to oil prices and are FPSOs becoming the only economically feasible choice?

Latest FPSO Design Specifications and Technology

Risks in Financing FPSO Projects

Deepwater Gulf of Mexico: Regulatory Requirements. Pre start up and operational regulatory requirements

FPSO Contract Dispute Mitigation Strategies

Challenges and Solutions for Turret Mooring in Deepwater & Harsh Weather Environments

Best Practice Safe FPSO Operations

Increasing Integrity of Standard FPSO Operations

Case studies of major contractors and operators – Understand-ing the implications of particular projects

WHO WILL ATTEND?

All ACI’s events attract a targeted group of senior level executives and

decision-makers from the Oil & Gas majors and FPSO industry. Our

meetings are strictly end-user focussed. Only a select group of compa-

nies are invited to sponsor the event – to ensure the emphasis is on the

industry participants, and making sure our delegates have a valuable

and positive experience.

Delegates will be drawn from FPSO Owners, Operators, E&P Oil Compa-

nies, EPCs…..

Operations/Fleet Directors

Risk Managers and HSEQ Managers

Technical Directors/Managers

Project Managers

Engineers

President/Vice Presidents

Managing Directors / General Managers

Business Development/Commercial Managers

As Well As:

Maritime Lawyers and Brokers

Chartering and E&P Departments of Oil Companies

Shipyards

Banks/Financiers

With the recent fluctuation in price of oil, there are a lot of questions to be answered in the FPSO market. ACI’s 7th FPSO

VESSEL CONFERENCE will examine how FPSO owners/operators and oil companies can remain profitable in a tight indus-

try. With the latest market analysis and project feedback directly from the FPSO owners and Oil & Gas majors, now is the

most beneficial time to attend and hear best practice operational efficiencies and technical guidance on keeping an FPSO

project profitable, and points to consider with proposals for future FPSO projects on both a commercial and technical level.

Commercial Opportunities :

Jean Jacques Hermans

+44 203 141 0608

[email protected]

Speaking Opportunities :

Joe Smith

+44 203 141 0612

[email protected]

LEADERS IN CONFERENCE

PLANNING & PRODUCTION

www.wplgroup.com/aci

CONFIRMED 2015 SPEAKERS INCLUDE :

Curtis Lohr, Shell Stones Project Manager, Shell

Ken Larson, FPSO Project Manager, HESS Corporation

Paulo Biasotto, Marine Systems Engineer, Petrobras

Thomas Kolanski, VP Business Development, BW Offshore

Boyd Howell, Director of Sales, Modec

John Awater, Department Head Marine & Subsea Support, Bluewater Energy

Lars Odeskaug, COO, Sevan Marine

Carlos Mastrangelo, SVP Projects and Technology Development, SBM Offshore

Sherry Xiang, Principal Lead Engineer Mooring & Risers, SBM Offshore

Peter Lovie, Senior Advisor, Floating Systems, Peter M Lovie PE, LLC

Mike Haney, Director (Houston), Douglas Westwood

John Mauger, Commanding Officer, Marine Safety Center, USCG

Barbara Gronquist, Senior VP & Head of Offshore Americas, DNB Bank ASA

And Many More...

CONFIRMED 2015 SPEAKERS INCLUDE :

Curtis Lohr, Shell Stones Project Manager, Shell

Ken Larson, FPSO Project Manager, HESS Corporation

Paulo Biasotto, Marine Systems Engineer, Petrobras

Joe Lovett, Senior Advisor & Consultant, BW Offshore

Boyd Howell, Director of Sales, Modec

John Awater, Department Head Marine & Subsea Support, Bluewater Energy

Lars Odeskaug, COO, Sevan Marine

Carlos Mastrangelo, SVP Projects and Technology Development, SBM Offshore

Jim Wodehouse, VP Technology, SBM Offshore

Peter Lovie, Senior Advisor, Floating Systems, Peter M Lovie PE, LLC

Mike Haney, Director (Houston), Douglas Westwood

John Mauger, Commanding Officer, Marine Safety Center, USCG

Barbara Gronquist, Senior VP & Head of Offshore Americas, DNB Bank ASA

Senior Representative, Lloyd’s Register Energy

And Many More...

Page 3: 7th FPSO VESSEL CONFERENCE 4th November · hallenges and Solutions for Turret Mooring in Deepwater & Harsh Weather Environments est Practice Safe FPSO Operations Increasing Integrity

7th FPSO VESSEL CONFERENCE

HOUSTON, TEXAS. USA.

Vess

essels Summit

Rio de Janeiro, Brazil in

association with ((

iassociation with

jhjhjhjh

#

LEADERS IN CONFERENCE PLANNING & PRODUCTION

www.wplgroup.com/aci

4th-5th

November

2015

DAY 1Wednesday, 4th November 2015

08:00 REGISTRATION & COFFEE

08:45 CHAIRMAN'S OPENING ADDRESS

SESSION ONE: FPSO MARKET - THE FUTURE OF THE FPSO & OIL

INDUSTRY. BRAZIL AND USA EXPLORATION & PRODUCTION

TRENDS FOR 2015 AND BEYOND

09:00 Critical Developments in the Gulf of Mexico & Brazil FPSO Market

with Current Oil Price Fluctuation

> FPSO Project outlook

> Considering Delivery Issues: EPCs, Project Delays, Supply Chain

Issues

> FPSO Future Orderbook

> How long will this price last?

> Challenges faced by companies dealing with FPSO Developments

in Brazil

> FPSO Upcoming Projects and Supply Trends

> Managing the Risks in New Growth Markets

09:30 FPSOs-Past and Future

> Overview of the past history of FPSOs

> Comments and data on the expected future of the FPSO Market

> Areas needing specific focus in the future

10:00 PANEL DISCUSSION

Emerging FPSO markets: Current state and future project

decisions

> Given all the current constraints in the market (low oil price,

cost pressures, delayed project sanction, etc) are there any near

term opportunities for FPSOs?

> What changes are expected in the specifications and contracting

strategies for FPSOs? Will there be more conversions or

newbuildings? Increased numbers of leased or owned units?

> What are the main challenges to the viability of FPSO projects?

Why are the final investment decisions (FID) of so many FPSO

projects being delayed?

10:45 MORNING REFRESHMENTS

11:15 SESSION TWO: TECHNICAL FOCUS ON NEXT GENERATION FPSOs

Challenges and Solutions for Turret Mooring in Deepwater &

Harsh Weather Environments

> Advanced mooring systems and FPSO moored in Ultra deep

water. 

> Mooring line integrity management

> Typical types of FPSO moorings

Mike HaneyDirector, Houston OfficeDouglas Westwood

Bruce CragerExecutive Vice President, Expert Advisory GroupEndeavor Management

Jim WodehouseVice President TechnologySBM Offshore

David Boggs,Managing DirectorEnergy Maritime Associates

Mike HaneyDirector, Houston OfficeDouglas Westwood

Bruce CragerExecutive Vice President, Expert Advisory GroupEndeavor Management

Ken LarsonFPSO Project ManagerHess Corporation

Peter LovieSenior Advisor, Floating SystemsPeter M Lovie PE, LLC

Puneet SharmaVice PresidentMODEC

11:45 Turret mooring system design in Squall prone areas

> Extreme mooring line loads in Squalls

> Dynamic effects due to anchor leg azimuth spread

> Manoeuvring models and FPSO yaw response

> Case study on what can be done with heading control

12:15 PANEL Q&A SESSION

12:30 LUNCH

SESSION THREE: FPSO Project Showcase

Hear feedback & analysis on future and current FPSO projects

13:30 Petrobras Case Study: Update on 1st FPSO in US GoM

> Field development and operations

> FPSO operational efficiency

> FPSO readiness to disconnect

> Integrity management strategies from Lessee viewpoint

14:00 Working Title: Pemex Ayatsil-Tekel FPSO Case Study

14:30 PANEL Q&A SESSION

14:45 AFTERNOON REFRESHMENTS

SESSION FOUR: FPSO DESIGN, OPERATIONAL & TECHNICAL FOCUS

15:15 Latest Developments of Cylindrical Hull Based Floating Offshore

Installations.

> Special features of the cylindrical hull

> Operational experience

> New applications

> The Cylindrical Hull for GoM

15:45 An Independent Look at the Round Hull Concept

> Discovery of the Round Hull in Antiquity> Experience with Round Hulls in Modern Times> The 2000s: Development of the Round Hull for Offshore Service

> The Texas Roundup and Shootout on three Round Hull FPSO

Designs

> One Operator’s Reaction on Relevance for US GoM and Contrast

with Ship Shape FPSOs

> Closing Thoughts

16:15 The SSP Plus Offshore Maritime Technology delivers cross-over

Solutions for Field Development

> Introduction to the SSP Technology

> The SSP FWPSO Solution

> The Value of a Single Asset

16:45 PANEL Q&A SESSION

17:00 CHAIRMAN SUMMARY

17:15 END OF DAY ONE

Lars OdeskaugCOOSevan Marine

George BakerEnergia

Paulo BiasottoMarine Systems EngineerPetrobras

Peter LovieSenior Advisor, Floating SystemsPeter M Lovie PE, LLC

Arjan VoogtsManagerMARIN USA

Nico Vandenworm, Executive Vice President Business Development & Technology,

Sembmarine SSP

Peter LovieSenior Advisor, Floating SystemsPeter M Lovie PE, LLC

Page 4: 7th FPSO VESSEL CONFERENCE 4th November · hallenges and Solutions for Turret Mooring in Deepwater & Harsh Weather Environments est Practice Safe FPSO Operations Increasing Integrity

7th FPSO VESSEL CONFERENCE

HOUSTON, TEXAS. USA.

Vess

essels Summit

Rio de Janeiro, Brazil in

association with ((

iassociation with

jhjhjhjh

#

LEADERS IN CONFERENCE PLANNING & PRODUCTION

www.wplgroup.com/aci

4th-5th

November

2015

Images above: ACI Maritime & Offshore Conference in December 2014

12:10 LUNCH

13:25 CONFERENCE PRESENTATION

FPSO operations in reality...

14:10 CONFERENCE PRESENTATION

FPSO Drytransportation and Offshore Drydocking

14:55 CONFERENCE SUMMARY - WHAT NEXT?

15:10 AFTERNOON REFRESHMENTS

15:40 END OF CONFERENCE

Hans Leerdam Sales Manager Offshore ProjectsDockwise

David Boggs,Managing DirectorEnergy Maritime Associates

John AwaterDepartment Head Marine & Subsea SupportBluewater Energy Services

DAY 2Thursday, 5th November 2015

08:30 REGISTRATION and COFFEE

09:00 CHAIRMAN'S OPENING ADDRESS

SESSION FIVE: FPSO REGULATORY LANDSCAPE

09:05 Inspection of Floating Offshore Production Units to Alternate

Design Standards

09:35 Risk Based Inspection and Maintenance of Offshore Assets

10:05 PANEL Q&A SESSION

10:20 MORNING REFRESHMENTS

FPSO OWNER/OPERATOR, SYSTEMS & OIL MAJOR PANEL:

10:50 > Reactions to oil prices - How has it really affected the FPSO

business and solutions on how FPSO sector can remain

profitable

> Oil price leading to increase take up in FPSO projects?

> Deepwater FPSO projects - operational challenges moving into

deeper water locations

> Reducing CAPEX and OPEX overruns, and minimising project

delays

> New opportunities in FPSO sector

12:00 Short address from Ampelmann

Curtis LohrStones Project ManagerShell

Puneet SharmaVice PresidentMODEC

Eric Van DijkVP Business DevelopmentSBM Offshore

Joe LovettSenior Advisor & ConsultantBW Offshore

Paulo BiasottoMarine Systems EngineerPetrobras

Capt. Josh ReynoldsUSCG

Dan Holmes,Head of Sales and Client Accounts,Lloyd's Register Energy

David Boggs,Managing DirectorEnergy Maritime Associates

Thomas MassinkBusiness Development AmericasAmpelmann

Page 5: 7th FPSO VESSEL CONFERENCE 4th November · hallenges and Solutions for Turret Mooring in Deepwater & Harsh Weather Environments est Practice Safe FPSO Operations Increasing Integrity

7th FPSO VESSEL CONFERENCE

HOUSTON, TEXAS. USA.

LEADERS IN CONFERENCE PLANNING & PRODUCTION

www.wplgroup.com/aci

£1,495

£420.00

Registration Is Simple

Documentation Packet Only

Conference (Includes Documentation Packet) 4th -5th November 20 15

Documentation Packet Available

We are selling the 2015 7th FPSO Vessel Conference papers at just £420 (incl. postage & packaging). Simply tick the box on the booking form, send it with payment and your copy will be on its way to you after the meeting. This important manual will be a source of invaluable reference for the future.

Terms & Conditions

Payment Payment must be received within five business days of returning the signed contract. After receiving payment a VAT receipt will be issued. If you do not receive a letter outlining details two weeks prior to the event, please contact the Conference Coordinator at ACI Europe Ltd.

Discounts are available for multiple/group bookings. Please call +44 (0) 203 141 0630 for more information.

Cancellations Substitutions are welcome up to 24 hours prior to the event. Cancellations must be received in writing no less than 3 weeks prior to the start of the conference; a full credit voucher towards a future ACI conference will be issued. Any cancellation received less than 3 weeks prior to the start of the event shall be deemed to be a breach of this contract by client, and accordingly, no credits will be given. Cancellations must be received in writing by mail or fax three weeks before the conference. Thereafter the full conference fee is payable. If for any reason ACI Europe Ltd decides to amend, cancel or postpone this conference, the conference fee will not be refunded. Furthermore, ACI Europe Ltd will not be responsible for covering airfare, hotel or other costs incurred by registrants. In the event that ACI Europe Ltd cancel or postpone the event, ACI Europe Ltd reserves the right to transfer this booking to another conference to be held in the following twelve months, or to provide a credit of an equivalent amount to another conference within the following twelve months. The construction, validity and performance of this agreement shall be governed in all respects by the laws of England to the exclusive jurisdiction of whose courts the Parties hereby agree to submit. Accommodation The cost of accommodation is not included in the event fee. Preferential rates will be arranged with or near the event venue, and all confirmed delegates will be given details of how to book accommodation at this rate

Registration Is Simple

If you would like to register for this event or wish to find out more information,

you can contact Antonio Russo using any of the following methods:

+44 (0) 20 3 141 0630

[email protected]

http://www.acieu.net

Postal Address: ACI Europe, 5/13 Great Suffolk Street, London, SE1

Supporting Partners

4th-5th

November

2015

Please Note. Members and customers of all supporting organisations are entitled to a discount off their conference package. For more information please call +44 (0) 203 141 0623.