    CUSTOMER

    PLANT LOCATION

     ABU DHABI GAS PROJECT

    INDUSTRIES LTD.

    (GASCO)

    PROJECT No. 5248 Doc. No. 5248-00-PA-1237 Rev 2

    RUWAIS

    GASCO

    ELECTRICAL LOAD LIST

    NMCR

     Agreement No. 13524801RUWAIS 4th NGL TRAIN

  • 8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr

    2/13

    Sheet Description and Board Location

    TOTAL LOADS AFTER ADDITION OF PROJECT NO: 5248 CONSUMERS

    2 Front Index and Summary Sheet

    3 415V SWITCHBOARD/MCC SBNMCRL3 BUS A / NMCR

    4 LV AUX. POWER DIST. BOARD NMCRPB1 / NMCR 1. 415V MCC Bus A&B&C (SBNMCRL3)

    5 POWER DIST. BOARD NMCRPB2 / NMCR Normal running load6 415V SWITCHBOARD/MCC SBNMCRL1 BUS B / NMCR Peak load

    7 415V SWITCHBOARD/MCC SBNMCRL1 Bus C / NMCR (EMERGENCY) +25% Future Expansion

    8 HVAC MCC SBNMCRL1 Bus A / NMCR

    9 HVAC MCC SBNMCRL1 Bus B / NMCR

    10 HVAC MCC SBNMCRL2 Bus A / NMCR 2. 415V MCC Bus A&B&C (SBNMCRL1)

    11 HVAC MCC SBNMCRL2 BUS B / NMCR Normal running load

    12 EMERGENCY POWER DIST. BOARD NMCRPB3 / NMCR Peak load

    +25% Future Expansion

    2. 415V MCC Bus A&B&C (SBNMCRL2)

    Normal running load

    Peak load

    +25% Future Expansion

    TOTAL PREDICTED LOAD ON SUBSTATION 3C

    Normal running load

    Peak load+25% Future Expansion

     

    Notes :

    1. THIS LOAD LIST WILL BE DEVELOPED FURTHER BASED ON VENDOR DATA DURING PROCUREMENT STAGE

    Sheet N o. : 2 REV.

      Cont'd on sheet : 3

    724 305 786

    856

    928 731 1181

    742 585

    665 538

    782 333 850

    977 1062416

    203208 91 227181 91

    283259 114

    kW

    945

    SUMMARYINDEX

    NMCR

    676

    kVAr kVA

    5248-00-PA-1237

    Document No.:

    629

    1187 845 1457

    846 1054

    950

    2

    ELECTRICAL LOAD LIST

    1166

  • 8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr

    3/13

  • 8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr

    4/13

    EQUIPMENT MOTOR LOAD EFFIC POWER

     ABSORBED RATING FACTOR -IENCY FACTOR

    Equipment Description LOAD = A/B at load at load REMARKS

    No. f ac to r C f ac to r C

     A B C D

    kW kW in decimal % cos ϕ kW kVAr kW kVAr kW kVAr  

    SBNMCRL3C 415 V EMERGENCY SW ITCHBOARD/MCC

    NMCRPB1 AUX. POWR DB- - SANITARY FEED PUMP    . . . . . .

    - -  ACTIVATED SLUDGE PUMP    . . . .

    - - POLYMER DOSING PUMP    . . . . .- - FILTER FEED PUMP    . . . .

    - - BACKWASH PUMP    . . . . .

    - - EFFLUENT PUMP    . . . .

    - -  AIR BLOWER    . . . . .

    - - FILTER PRESS   . . . .

      . . . . .

      . . . . .

       V   i   t  a   l

       E  s  s  e  n   t   i  a   l

       N  o  n  -   E  s  s  e  n   t   i  a   l

       R  e  s   t  a  r   t   i  n  g

       R   E   V

       L  o  a   d   i  n   d  e  x

    KW = A/D CONSUMED LOAD kVAr = Kw.tgϕ

    Continuous Stand-byIntermittentC F G

    kW kVAr kVA

    Normal running load x = 100 10 7 12 TOTAL 0 0 33 23 0 0(Est. x % C + y % F) = 30  

    Peak load x = 100 kW kVAr kVA

    (Est. x % C + y % F + z % G) y = 30 10 7 12 kVA = (√kW2+kVAr 2 )z = 10

    Coincidence factors x,y and z are applied to the different loads to establish the normal running load and peak load.

    a) Restart/Load Classification : b) Absorbed load : c) Consumed Load index:

    Restart : A start after a power failure, in a predetermined - for pumps, shaft load on duty point; C- Continuous : Consumers that are powered during normal 1. Continuous

    sequence, of all electric consumers that were in operation - f or instrumentation, computers, communication, plant operation, includeing electric tracing and lighting. 2. Intermitten

    before power failure occured. air conditioning, the required load during full F - Intermittent : Dosing pumps, sample pumps, MOV's etc. 3. Stand-by

    Essential : A service which if fails will affect continuity, the quality operation of plant; G - stand - by : Spare consumers for continous running 4. Spare

    and the quantity of the product. - for lighting during dark hours; consumers, wso's etc.

    Non-essential : Loads that are neither Vital nor Essential. - f or workshops, the average total load in normal E- Emergency - duty : Consumers that are only in operation

    Vital : A service, which if fails, can cause an unsafe condition full operation. during emergency conditions(e.g. electric drives for  

    of the process and/or electrical installation, jeopardize life or cause turbines, fire water pumps, emergency oil pumps etc.)

    major damage to the installation.

    415 V AC x 50 Hz 60 Hz

    Sheet No.: 4 REV.

      Cont'd on sheet : 5

    ELECTRICAL LOAD LIST

    NMCR

    40

    Document No.:

    5248-00-PA-1237

    SBNMCRL3B

    2

    415 V AC

    Continuous Stand-byIntermittentC F G

  • 8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr

    5/13

  • 8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr

    6/13

  • 8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr

    7/13

  • 8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr

    8/13

  • 8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr

    9/13

  • 8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr

    10/13

  • 8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr

    11/13

  • 8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr

    12/13

  • 8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr

    13/13

    EQUIPMENT MOTOR LOAD EFFIC POWER

     ABSORBED RATING FACTOR -IENCY FACTOR

    Equipment Description LOAD = A/B at load at load REMARKS

    No. f ac to r C f ac to r C

     A B C D

    kW kW in decimal % cos ϕ kW kVAr kW kVAr kW kVAr  

    NMCREB1 INTERNAL EMERGENCY LIGHTING DB (NMCR) 1   20 90 0.90 22.22 10.76  

    NMCREB2 INTERNAL EMERGENCY LIGHTING DB (NMCR) 1   20 90 0.90 22.22 10.76  

    NMCREB3 INTERNAL EMERGENCY LIGHTING DB (NMCR) 1 20 90 0.90 22.22 10.76  

    NMCREB4 INTERNAL EMERGENCY LIGHTING DB (NMCR) 1 20 90 0.90 22.22 10.76  

    NMCREB5 INTERNAL EMERGENCY LIGHTING DB (NMCR) 1 25 90 0.90 27.78 13.45  NMCREB6 INTERNAL EMERGENCY LIGHTING DB (NMCR) 1 15 90 0.90 16.67 8.07  

       R   E   V

       L  o  a   d   i  n   d  e  x

    KW = A/D CONSUMED LOAD kVAr = Kw.tgϕ

       V   i   t  a   l

       E  s  s  e  n   t   i  a   l

       N  o  n  -   E  s  s  e  n   t   i  a   l

       R  e  s   t  a  r   t   i  n  g Continuous Stand-byIntermittent

    C F G

    Normal running load x = 100 133 65 148 TOTAL 133 65 0 0 0 0s . x + y =  

    Peak load x = 100 kW kVAr kVA

    (Est. x % C + y % F + z % G) y = 30 133 65 148 kVA = ( kW2+kVAr 

    2 )

    z = 10

    Coincidence factors x,y and z are applied to the different loads to establish the normal running load and peak load.

    a) Restart/Load Classification : b) Absorbed load : c) Consumed Load index:

    Restart : A start after a power failure, in a predetermined - for pumps, shaft load on duty point; C- Continuous : Consumers that are powered during normal 1. Continuous

    sequence, of all electric consumers that were in operation - f or instrumentation, computers, communication, plant operation, includeing electric tracing and lighting. 2. Intermitten

    before power failure occured. air conditioning, the required load during full F - Intermittent : Dosing pumps, sample pumps, MOV's etc. 3. Stand-by

    Essential : A service which if fails will affect continuity, the quality operation of plant; G - stand - by : Spare consumers for continous running 4. Spare

    and the quantity of the product. - for lighting during dark hours; consumers, wso's etc.

    Non-essential : Loads that are neither Vital nor Essential. - f or workshops, the average total load in normal E- Emergency - duty : Consumers that are only in operation

    Vital : A service, which if fails, can cause an unsafe condition full operation. during emergency conditions(e.g. electric drives for  

    of the process and/or electrical installation, jeopardize life or cause turbines, fire water pumps, emergency oil pumps etc.)

    major damage to the installation.415 V AC x 50 Hz 60 Hz

    Sheet No.: 13 REV.

      Cont'd on sheet : 14

    Document No.:

    5248-00-PA-1237

    415 V AC

    NMCRPB3 (EMERGENCY)

    2

    ELECTRICAL LOAD LIST

    NMCR

    148

    Continuous Stand-byIntermittentC F G