CUSTOMER
PLANT LOCATION
ABU DHABI GAS PROJECT
INDUSTRIES LTD.
(GASCO)
PROJECT No. 5248 Doc. No. 5248-00-PA-1237 Rev 2
RUWAIS
GASCO
ELECTRICAL LOAD LIST
NMCR
Agreement No. 13524801RUWAIS 4th NGL TRAIN
8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr
2/13
Sheet Description and Board Location
TOTAL LOADS AFTER ADDITION OF PROJECT NO: 5248 CONSUMERS
2 Front Index and Summary Sheet
3 415V SWITCHBOARD/MCC SBNMCRL3 BUS A / NMCR
4 LV AUX. POWER DIST. BOARD NMCRPB1 / NMCR 1. 415V MCC Bus A&B&C (SBNMCRL3)
5 POWER DIST. BOARD NMCRPB2 / NMCR Normal running load6 415V SWITCHBOARD/MCC SBNMCRL1 BUS B / NMCR Peak load
7 415V SWITCHBOARD/MCC SBNMCRL1 Bus C / NMCR (EMERGENCY) +25% Future Expansion
8 HVAC MCC SBNMCRL1 Bus A / NMCR
9 HVAC MCC SBNMCRL1 Bus B / NMCR
10 HVAC MCC SBNMCRL2 Bus A / NMCR 2. 415V MCC Bus A&B&C (SBNMCRL1)
11 HVAC MCC SBNMCRL2 BUS B / NMCR Normal running load
12 EMERGENCY POWER DIST. BOARD NMCRPB3 / NMCR Peak load
+25% Future Expansion
2. 415V MCC Bus A&B&C (SBNMCRL2)
Normal running load
Peak load
+25% Future Expansion
TOTAL PREDICTED LOAD ON SUBSTATION 3C
Normal running load
Peak load+25% Future Expansion
Notes :
1. THIS LOAD LIST WILL BE DEVELOPED FURTHER BASED ON VENDOR DATA DURING PROCUREMENT STAGE
Sheet N o. : 2 REV.
Cont'd on sheet : 3
724 305 786
856
928 731 1181
742 585
665 538
782 333 850
977 1062416
203208 91 227181 91
283259 114
kW
945
SUMMARYINDEX
NMCR
676
kVAr kVA
5248-00-PA-1237
Document No.:
629
1187 845 1457
846 1054
950
2
ELECTRICAL LOAD LIST
1166
8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr
3/13
8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr
4/13
EQUIPMENT MOTOR LOAD EFFIC POWER
ABSORBED RATING FACTOR -IENCY FACTOR
Equipment Description LOAD = A/B at load at load REMARKS
No. f ac to r C f ac to r C
A B C D
kW kW in decimal % cos ϕ kW kVAr kW kVAr kW kVAr
SBNMCRL3C 415 V EMERGENCY SW ITCHBOARD/MCC
NMCRPB1 AUX. POWR DB- - SANITARY FEED PUMP . . . . . .
- - ACTIVATED SLUDGE PUMP . . . .
- - POLYMER DOSING PUMP . . . . .- - FILTER FEED PUMP . . . .
- - BACKWASH PUMP . . . . .
- - EFFLUENT PUMP . . . .
- - AIR BLOWER . . . . .
- - FILTER PRESS . . . .
. . . . .
. . . . .
V i t a l
E s s e n t i a l
N o n - E s s e n t i a l
R e s t a r t i n g
R E V
L o a d i n d e x
KW = A/D CONSUMED LOAD kVAr = Kw.tgϕ
Continuous Stand-byIntermittentC F G
kW kVAr kVA
Normal running load x = 100 10 7 12 TOTAL 0 0 33 23 0 0(Est. x % C + y % F) = 30
Peak load x = 100 kW kVAr kVA
(Est. x % C + y % F + z % G) y = 30 10 7 12 kVA = (√kW2+kVAr 2 )z = 10
Coincidence factors x,y and z are applied to the different loads to establish the normal running load and peak load.
a) Restart/Load Classification : b) Absorbed load : c) Consumed Load index:
Restart : A start after a power failure, in a predetermined - for pumps, shaft load on duty point; C- Continuous : Consumers that are powered during normal 1. Continuous
sequence, of all electric consumers that were in operation - f or instrumentation, computers, communication, plant operation, includeing electric tracing and lighting. 2. Intermitten
before power failure occured. air conditioning, the required load during full F - Intermittent : Dosing pumps, sample pumps, MOV's etc. 3. Stand-by
Essential : A service which if fails will affect continuity, the quality operation of plant; G - stand - by : Spare consumers for continous running 4. Spare
and the quantity of the product. - for lighting during dark hours; consumers, wso's etc.
Non-essential : Loads that are neither Vital nor Essential. - f or workshops, the average total load in normal E- Emergency - duty : Consumers that are only in operation
Vital : A service, which if fails, can cause an unsafe condition full operation. during emergency conditions(e.g. electric drives for
of the process and/or electrical installation, jeopardize life or cause turbines, fire water pumps, emergency oil pumps etc.)
major damage to the installation.
415 V AC x 50 Hz 60 Hz
Sheet No.: 4 REV.
Cont'd on sheet : 5
ELECTRICAL LOAD LIST
NMCR
40
Document No.:
5248-00-PA-1237
SBNMCRL3B
2
415 V AC
Continuous Stand-byIntermittentC F G
8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr
5/13
8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr
6/13
8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr
7/13
8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr
8/13
8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr
9/13
8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr
10/13
8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr
11/13
8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr
12/13
8/20/2019 7t54 Cr Itc Ele 178 Earthing Layout Nmcr
13/13
EQUIPMENT MOTOR LOAD EFFIC POWER
ABSORBED RATING FACTOR -IENCY FACTOR
Equipment Description LOAD = A/B at load at load REMARKS
No. f ac to r C f ac to r C
A B C D
kW kW in decimal % cos ϕ kW kVAr kW kVAr kW kVAr
NMCREB1 INTERNAL EMERGENCY LIGHTING DB (NMCR) 1 20 90 0.90 22.22 10.76
NMCREB2 INTERNAL EMERGENCY LIGHTING DB (NMCR) 1 20 90 0.90 22.22 10.76
NMCREB3 INTERNAL EMERGENCY LIGHTING DB (NMCR) 1 20 90 0.90 22.22 10.76
NMCREB4 INTERNAL EMERGENCY LIGHTING DB (NMCR) 1 20 90 0.90 22.22 10.76
NMCREB5 INTERNAL EMERGENCY LIGHTING DB (NMCR) 1 25 90 0.90 27.78 13.45 NMCREB6 INTERNAL EMERGENCY LIGHTING DB (NMCR) 1 15 90 0.90 16.67 8.07
R E V
L o a d i n d e x
KW = A/D CONSUMED LOAD kVAr = Kw.tgϕ
V i t a l
E s s e n t i a l
N o n - E s s e n t i a l
R e s t a r t i n g Continuous Stand-byIntermittent
C F G
r
Normal running load x = 100 133 65 148 TOTAL 133 65 0 0 0 0s . x + y =
Peak load x = 100 kW kVAr kVA
(Est. x % C + y % F + z % G) y = 30 133 65 148 kVA = ( kW2+kVAr
2 )
z = 10
Coincidence factors x,y and z are applied to the different loads to establish the normal running load and peak load.
a) Restart/Load Classification : b) Absorbed load : c) Consumed Load index:
Restart : A start after a power failure, in a predetermined - for pumps, shaft load on duty point; C- Continuous : Consumers that are powered during normal 1. Continuous
sequence, of all electric consumers that were in operation - f or instrumentation, computers, communication, plant operation, includeing electric tracing and lighting. 2. Intermitten
before power failure occured. air conditioning, the required load during full F - Intermittent : Dosing pumps, sample pumps, MOV's etc. 3. Stand-by
Essential : A service which if fails will affect continuity, the quality operation of plant; G - stand - by : Spare consumers for continous running 4. Spare
and the quantity of the product. - for lighting during dark hours; consumers, wso's etc.
Non-essential : Loads that are neither Vital nor Essential. - f or workshops, the average total load in normal E- Emergency - duty : Consumers that are only in operation
Vital : A service, which if fails, can cause an unsafe condition full operation. during emergency conditions(e.g. electric drives for
of the process and/or electrical installation, jeopardize life or cause turbines, fire water pumps, emergency oil pumps etc.)
major damage to the installation.415 V AC x 50 Hz 60 Hz
Sheet No.: 13 REV.
Cont'd on sheet : 14
Document No.:
5248-00-PA-1237
415 V AC
NMCRPB3 (EMERGENCY)
2
ELECTRICAL LOAD LIST
NMCR
148
Continuous Stand-byIntermittentC F G