Phone: 0495 - 2286109, ,2286115, 286116 Da1t::: 08-06-20 1 o OTATION OTICE SEALED QUOTATIONS drawn in favour of the Director, NITC are invited for the supply of the store given in Schedule C. The tenderers are requested to send their quotations (as per the format given in schedule D) in sealed covers 'With the quotation number and last date for receipt of quotation superscribed. Wherever indicated, samples may be furnished at the tenderer's expense unless otherwise specified. The tenderers are requested to follow the instruction given in Schedule A. This Institute cannot accept terms and conditions of payment other than the alternative given in Schedule B. 1. QUOTATION 0: : NlTCjCEDjHOD/CRRjMMP 2. Last date for receipt of quotation : 26-06-2015 3. The quoted rates should be valid upto 3 Months 4. Addresses to which quotations are to be sent: Profess ;- . e.\ \S" Department of Civil Engineering, ational Institute of Technology Calicut l'i"ITCPO CAUCUT - 673 601. for Director To SCHEDULE A-I STRUCTIONS TO TENDERERS (a) Quotations should contain the complete specifications and brand names. (bl All taxes, packing and forv.... arding charges (if any) and any other charges should be clearly shown. ote:- 1. This Institute cannot furnish C or D forms, but can issue a concession certificate to avail yourself of the concession on CST for purchase of scientific goods for educational institution. 2. This Institute is not exempted from payment of entry tax. Suppliers should quote for supply at ITC CAMPUS and entry tax should be paid at Kerala sales tax check post. The entry tax amount will be re-imbursed on production of original proof of tax payment. (c) Prices quoted should be F.O.R IT CAMPU ,CALlC T. (d) Period within which the items can be supplied of finn order should be clearly mentioned. (e) Quo ations containing conditions like "subject to prior sale" may not be considered. (f) Quotations received after the due date are liable to be rejected. SCHEDULE B- CONDITIONS OF PAYMENT One of the following conditions of payment should be accepted if the quotations is to be considered. (a) 100% payment after the receipt of the items in good condition Normally, complete payment will be made within a period of three weeks from the date of receipt of the items. 1/3
3
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 747116149

Phone: 0495 - 2286109, ,2286115, 286116

Da1t::: 08-06-201~

o OTATION OTICE

SEALED QUOTATIONS drawn in favour of the Director, NITC are invited for the supply of the store given in Schedule C. The tenderers are requested to send their quotations (as per the format given in schedule D) in sealed covers 'With the quotation number and last date for receipt of quotation superscribed. Wherever indicated, samples may be furnished at the tenderer's expense unless otherwise specified. The tenderers are requested to follow the instruction given in Schedule A. This Institute cannot accept terms and conditions of payment other than the alternative given in Schedule B.

1. QUOTATION 0: : NlTCjCEDjHOD/CRRjMMP

2. Last date for receipt of quotation : 26-06-2015

3. The quoted rates should be valid upto 3 Months

4. Addresses to which quotations are to be sent: Profess :tii~f ;- .~ e.\ \S"

Department of Civil Engineering, ational Institute of Technology Calicut

l'i"ITCPO CAUCUT - 673 601.

for Director To

SCHEDULE A-I STRUCTIONS TO TENDERERS (a) Quotations should contain the complete specifications and brand names. (bl All taxes, packing and forv....arding charges (if any) and any other charges should be clearly shown.

ote:- 1. This Institute cannot furnish C or D forms, but can issue a concession certificate to avail yourself of the concession on CST for purchase of scientific goods for educational institution.

2. This Institute is not exempted from payment of entry tax. Suppliers should quote for supply at ITC CAMPUS and entry tax should be paid at Kerala sales tax check post. The entry tax amount will be re-imbursed on production of original proof of tax payment.

(c) Prices quoted should be F.O.R IT CAMPU ,CALlC T. (d) Period within which the items can be supplied of finn order should be clearly mentioned. (e) Quo ations containing conditions like "subject to prior sale" may not be considered. (f) Quotations received after the due date are liable to be rejected.

SCHEDULE B- CONDITIONS OF PAYMENT One of the following conditions of payment should be accepted if the quotations is to be considered. (a) 100% payment after the receipt of the items in good condition

Normally, complete payment will be made within a period of three weeks from the date of receipt of the items.

1/3

Page 2: 747116149

SCHEDULE C - Technical Specification and Delivery Terms (See Annexure - 1)

SCHEDULE D - Format of Quotations

(For use of the bidder. See note below)

Quotation Ref. No: Last Date:

S1. No. Description of Goods

Specification Qty. Unit Quoted Unit Rate in Rs.

Total Amount In Figures In Words

Gross Total Cost: Rs.

l.We agree to supply the above goods in accordance with the technical specification for a total contract price (including all duties, taxes, freight etc) of Rs (amount in figures) (Rupees only) (amount in words) within the period specified in the Invitation for Quotations.

2. We also confirm that commercial warrantee/guarantee of months shall apply to the offered goods from the date of installation/ commissioning.

3. We undertake that in competing for (and if the award is made to us in executing) the above contract of supply of goods. We will strictly observe the laws against fraud and corruption in force in the Republic of India as required by National Institute of Technology Calicut.

Signature of the Bidder.

Place: Date:

(Note: 1. Above tabular form is applicable while bids are being invited for more than one

item and will be evaluated for all the items together. Modify the format accordingly where evaluation would be made for each item separately.

2. Quotations should be submitted on the official stationery of the bidder

List of Enclosures: (1) Annexure 1 (2] (3) .

2/3

Page 3: 747116149

Annexure 1 SCHEDULE C' SL.No Detailed Description

Quantity Whether samples are to be

sent 1 Multimedia LCD Projector

100 - 240 AC , 50/60 Hz Power Supply DLP Technology Resolution - XGA - ]024 x 768 Lens: 1.1 x, Manual Zoom - 1.95 - 2.15 : I throw ratio Manual Focus, F 2.41 - 2.53, F = 21. 8 - 24mm Lamp Hours - 7000 Hours Brightness: 2700 Lumens Contrast ratio: 7500: I Port Details HDM x I ; RGB Ports x 1; Video TN xl; Serial TN x I Audio I TN x I; Audio 2 TN x I; RJ45 ETHERNET Port x I;Monitor Output x 1 Built - in Speaker: Output 8W Weight less than 8kg Supplied Accessories Power Cord x I, Wireless Remote Control x I, Computer Cable x 1. Specify warranty for Projector and Lamp separately

1 No

• Quoted prices should include the Supply, Installation & demonstration at Civil Engineering Department, NIT Calicut.

• Specify the Manufacturer's name, brand name and model name/number and also enclose brochures. Offers without Complete details of the items and printed brochures will be rejected.

Scope of Work: Installation, Testing, Commissioning at Civil Engineering Department, NIT Calicut for the entire set up with all accessories as per the specification.