'7 PASCHIM MEDINIPUR ZILLA PARISHAD Midnapore :: 721 101 Fax: (03222) 263597 :: Phonc.- (03222) 275071 :: cmail.- [email protected] :: wcbsitc.- www.zpmidwest.org ORDER An amount of Rs. 108.00 lakh (Rupees one crore eight lakh) only is hereby sub- allotted to the Executive Officer of Medinipur Sadar, Salboni, Garhbeta-I, Garhbeta-Ill, Keshpur, Dantan-Il, Narayangarh, Pingla, Mohanpur, Debra, Jhargram, Binpur-I, Binpur-Il, Jamboni, Gopiballavpur-Il, Nayagram, Sankrail, Chandrakona-I, Chandrakona-Il & Daspur-I Panchayat Samiti to meet up the 2 nd installment of lAY for the year 2013-14 as shown in annexure-lout of the total fund of Rs. 14233.65307 lakh (Rupees one hundred forty two crore thirty three lakh sixty five thousand three hundred seven) only received as central and state assistance of 1 st installment for the year 2014-15 for new construction under Indira Awaas Yojana. Terms & conditions:- 1. The fund will be utilized for the construction of new houses @ Rs. 75000/- to the conditions laid down in the guidelines of Indira Awaas Yojana (lAY) from time to time. No deviation from the provisions of the guidelines is permissible. 2. Regular close supervision / inspection of the construction of houses is obligatory. During each inspection photograph of the house will have to be captured and the same should be uploaded in Awaassoft. 3. Disbursement shall be made at Block level in a camp mode on prior arrangement and intimation shall be given to Zilla Parishad, SDO and operating bank branches. Application for loan as Differential Rate of Interest (DRI) shall be collected from the beneficiaries at the time of disbursement. 4. The amount so disburse amongst the eligible beneficiaries must be uploaded through Awaassoft. 5. Executive Officer of Panchayat Samiti shall abide by other terms and conditions as laid down by State Govt.lMORD in the implementation of lAY. 6. Progress Report shall be submitted by the 3 rd day of each month positively In prescribed format. 7. UC of the allotted fund must be submitted to this end. "-..... Enclo.- Annexure -I i, :1 ~Ml~ Additional District Magistrate & Additional Executive Officer Paschim Medinipur Zilla Parishad C:\Rajesh\My-Dock\RD\IAY 2014-1S\Order & sub-allotment_2013-14_2nd instt.Jll.docx Page 1of 3
5
Embed
'7 PASCHIM MEDINIPUR ZILLA PARISHAD · OFFICE OF THE PASCHIM MEDINIPORE ZILLA PARISHAD (U\~·I Memo No..'f~~ /Accts. Date: 24-12-2014 To The Sr. Branch Manager United Bank of India,
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Panchayat Samiti to meet up the 2nd installment of lAY for the year 2013-14 as shown in
annexure-lout of the total fund of Rs. 14233.65307 lakh (Rupees one hundred forty two
crore thirty three lakh sixty five thousand three hundred seven) only received as central
and state assistance of 1st installment for the year 2014-15 for new construction under Indira
Awaas Yojana.
Terms & conditions:-
1. The fund will be utilized for the construction of new houses @ Rs. 75000/- to theconditions laid down in the guidelines of Indira Awaas Yojana (lAY) from time totime. No deviation from the provisions of the guidelines is permissible.
2. Regular close supervision / inspection of the construction of houses is obligatory.During each inspection photograph of the house will have to be captured and thesame should be uploaded in Awaassoft.
3. Disbursement shall be made at Block level in a camp mode on prior arrangement andintimation shall be given to Zilla Parishad, SDO and operating bank branches.Application for loan as Differential Rate of Interest (DRI) shall be collected from thebeneficiaries at the time of disbursement.
4. The amount so disburse amongst the eligible beneficiaries must be uploaded throughAwaassoft.
5. Executive Officer of Panchayat Samiti shall abide by other terms and conditions aslaid down by State Govt.lMORD in the implementation of lAY.
6. Progress Report shall be submitted by the 3rd day of each month positively Inprescribed format.
7. UC of the allotted fund must be submitted to this end.
PASCHIM MEDINIPUR ZILLA PARISHADSub-allotment of Fund for new construction of houses under lAY 2nd Installment of - 2013-14 vide this Office memo No. 224/1(12)/RO dl22.12 2014
No. of beneficiariesTotal amount
0Fund now being Fund already released @
z Name of Block Bank Name Bank Branch Account No. IFSCCODE released released Rs.4S000/- asVi 2nd Installment (