Sr. No. Name & Address Capital Investment Applied For Section Page No. 1 M/s. Umicore Autocat india Pvt Ltd, S No. 1295,1296,1122,1140 & 1129, Vil Mouje Shirwal, Tal Khandala, Dist Satara 90.26 Crs. Establish AST 2 M/s. Western Coal Fields Ltd., Penganga OCM, Po- Sakhara (Kol), Tal- Wani, Dist - Yavatmal 339.77 Crs Establish JD(APC) 3 M/s. Manikgarh Cement, Po- Gadchandur, Tal- Korpana Dist - Chandrapur 409.36 Crs Establish JD(APC) 4 M/s.Hoganas India Pvt. Ltd., D-96 & 97, MIDC Ahmednagar, Ahmednagar 79.09 Crs Establish JD(APC) 5 M/s. Reliance Industries Ltd., (Nagothane Manufacturing Div.), Nagothane, Dist-Raigad. 1629.89 Crs Establish (expansion) AST Section No. of Cases JD(APC) 3 JD(WPC) 0 AST 2 RO(HQ) 0 Total 5 List of Cases to be submitted before 6th Consent Appraisal Committee Meeting of 2013 scheduled on 05.07.2013 at 11.00 am (Establish Cases)
63

6th CAC05.7.2013 - Maharashtra Pollution Control Board

Jan 16, 2023

Download

Documents

Khang Minh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

Sr. No. Name & Address Capital

Investment Applied For Section Page No.

1 M/s. Umicore Autocat india Pvt Ltd, S No. 1295,1296,1122,1140 & 1129, Vil Mouje Shirwal, Tal Khandala, Dist Satara

90.26 Crs. Establish AST

2 M/s. Western Coal Fields Ltd., Penganga OCM, Po- Sakhara (Kol), Tal- Wani, Dist - Yavatmal

339.77 Crs Establish JD(APC)

3 M/s. Manikgarh Cement, Po- Gadchandur, Tal- Korpana Dist - Chandrapur

409.36 Crs Establish JD(APC)

4 M/s.Hoganas India Pvt. Ltd., D-96 & 97, MIDC Ahmednagar, Ahmednagar

79.09 Crs Establish JD(APC)

5 M/s. Reliance Industries Ltd., (Nagothane Manufacturing Div.), Nagothane, Dist-Raigad.

1629.89 Crs Establish (expansion)

AST

Section No. of CasesJD(APC) 3JD(WPC) 0AST 2RO(HQ) 0Total 5

List of Cases to be submitted before 6th Consent Appraisal Committee Meeting of 2013 scheduled on 05.07.2013 at 11.00 am (Establish Cases)

Page 2: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

Sr. No. Name & Address Capital

Investment Applied For Section Page No.

1 M/s. B. S. Ispat Ltd., Vill- Salari Yensa, Tal- Warora, Dist - Chandrapur

160.72 Crs 1st operate for CPP & renewal

with amalgamation

JD(APC)

2 M/s. Balkrishna Industries Ltd., Plot B-66, MIDC Waluj, Dist-Aurangabad.

189.27 Crs. 1st operate for expansion & renewal with

amalgamation

AST

3 M/s. Unilever industries Pvt. Ltd. C-09, Part, MIDC Khamgaon, Dist Buldhana

143.27 Crs 1st Operate with expansion in

product

AST

4 M/s. ASB International Pvt. Ltd., MIDC Addl. Ambernath, Dist - Thane

240.47 Crs Operate for expansion

JD(APC)

5 M/s. Asahi India Glass Ltd., Plot No. T-16, MIDC Raloja, Dist - Raigad

94.38 Crs 1st operate for expansion

JD(APC)

6 M/s. Inox Air products Ltd., P. no. B-93, Vill-Bhagad, MIDC Area, Mahad, Dist-Raigad.

110.51 Crs 1st Operate AST

Section No. of CasesJD(APC) 3JD(WPC) 0AST 3RO(HQ) 0Total 6

List of Cases to be submitted before 6th Consent Appraisal Committee Meeting of 2013 scheduled on 05.07.2013 at 11.00 am (1st O Cases)

Page 3: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

Sr. No. Name & Address Capital

Investment Applied For Section Page No.

Resubmission1 M/s. Mandhana Weaving

House (Shirting Division), C-2 MIDC Tarapur Boisar, Thane

125.84 Crs. Renewal JD(WPC)

2 M/s. Maharashtra State Power Generation Co. Ltd., ( Unit 2 & 3), Bhusawal TPS, At- Deepnagar, Tal- Bhusawal

431.66 Crs Renewal JD(APC)

3 M/s. Shree Sidhbali Ispat Ltd., MIDC Tadali Growth Centre, Chandrapur

231.75 Crs Renewal JD(APC)

4 M/s. WCL Durgapur OCM, WCL Durgapur, Tal- Chandrapur

196.35 Crs Renewal with amalgation

JD(APC)

5 M/s. Wardha Power Co. Pvt. Ltd., B-2, MIDC Warora Growth Centre, Tal- Warora, Dist - Chandrapur

2829.16 Crs Renewal with amalgation

JD(APC)

6 M/s. R L Steel and Energy Ltd., Pangara Shivar, Chitegaon-Paithan Road, Aurangabad

144.69 Crs. Renewal JD(APC)

7M/s. Arshiya International Ltd., (Free trade Warehousing Zone), At vill-Sai, Tal-Panvel, Dist_Raigad

973.10 Crs. Renewal RO(HQ)

8 M/s. SI Group Indila Ltd, Plot No. D-2/1, TTC MIDC, Thane Belapur Road, Navi Mumbai

236.45 Crs. Amendment of Consent to

Operate

AST

1 M/s. Lloyds Metals & Energy Ltd., Plot No. 1 & 2, MIDC Area, Ghughus, Tal & Dist - Chandrapur

JD(APC)

2 M/s. Asian Hotel Ltd. (Hyatt Regency Mumbai), Andheri (E), Mumbai

364.81 Crs. Change in Name

RO(HQ)

3 M/s. Maa Umiya Audyogik Sahakari Vasahat Maryadit, Kapsi (buj), Tal- Kamptee, Dist - Nagpur

JD(APC)

List of Cases to be submitted before 6th Consent Appraisal Committee Meeting of 2013 scheduled on 05.07.2013 at 11.00 am (Renewal Cases)

Review ItemReconsideration of Refusal

Setting up of small scale unit covered under RED category .

Page 4: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

4 M/s. Lloyds Metals & Engineering, Ghugus, Chandrapur

Bank Guarantee

JD(APC)

5 M/s. Jayaswal Neco Industries Ltd., T-41/42, MIDC Hingna, Nagpur

Bank Guarantee

JD(APC)

6 M/s. JSW Steel Ltd., A-10/1, MIDC Kalmeshwar, Nagpur

Bank Guarantee

JD(APC)

7 M/s. Reliance Industries Ltd., Patalganga & Nagothane, Dist-Raigad.

AST

8 M/s. Koradi Power Station, Koradi, Nagpur

JD(APC)

9 M/s. Polygenta Technologies Ltd., Gut No. 265/2-266, Village Avankhed, Tal. Dindori, Dist. Nashik (review)

204.25 Crs. Amendment of Consent to

Operate

AST

10 M/s. Bharat Petroleum Corporation Ltd., (Mumbai Bijwasan Pipeline), Mahul, Mumbai (review)

Amendment of Consent to

Operate

RO(HQ)

installation of CAAQMS

Non compliance of consent conditions

Page 5: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

1 M/s. Mudra Lifestyle Ltd., Plot No. D-1, MIDC, Tarapur, Tal. Palghar, Dist. Thane

376.90 Crs.

Renewal JD(WPC)

2 M/s. Nath Pulp & Paper Mills Ltd., Nathnagar, Wahegaon, Tal. Paithan

154.95 Crs.

Renewal JD(WPC)

3 M/s. First Winner Industries Ltd., N-66, MIDC Tarapur, Dist. Thane

86.04 Crs.

Renewal JD(WPC)

4 M/s. Bharat Petroleum Corporation Ltd., Refinery, Mahul, Chembur, Mumbai

48.39 Crs.

Renewal AST

5 M/s. Piramal Enterprises Ltd., Near NSE Complex, Off Western Express Highway, Goregoan (E), Mumbai

171.49 Crs.

Renewal AST

6 M/s. Alok Industries Ltd. TTC, MIDC, Pawane, Navi Mumbai

84.65 Crs.

Renewal JD(WPC)

7 M/s. Uttam Galva Steel Ltd., Vill- Donvat, Tal- Khalapur, Dist - Raigad

2184.42 Crs

Renewal JD(APC)

8 M/s. Welspun Maxsteel Ltd., Vill- Salav, Tal- Murud Janjirs, Dist - Raigad

33.80 Crs Renewal JD(APC)

9 M/s. Greta Energy Ltd., A-28, MIDC Mul, Dist - Chandrapur

77.08 Crs Renewal JD(APC)

10 M/s. The India Cements Ltd., (PGU), S. No. 78 to 83, 100 to 108 & 112, Parli (Vaijnath), Dist - Aurangabad

169.39 Crs

Renewal JD(APC)

11 M/s. Zydus Nycomed Healthcare Pvt Ltd, Plot No. C-4, TTC Indl Area, MIDC Pawane, Thane Belapur Road, Navi Mumbai

140.21 Crs.

Renewal amendment & expansion

AST

List of Cases to be submitted before 6th Consent Appraisal Committee Meeting of 2013 scheduled on 05.07.2013 at 11.00 am (Renewal Cases)

Fresh

Page 6: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

12 M/s. Balaji Amines, Plot No. E-7 & E-8, MIDC Chincholi, North Solapur

143.10 Crs.

Renewal AST

13 M/s. Indo rama synthetics(I) Ltd., power plant, A-31,A-31P, A-31P/1, A-40 to A-45, MIDC Butibori, Nagpur.

2952.62 Crs.

Renewal JD(WPC)

14 M/s. Godavari bio-refinery Ltd., Sakharwadi Tal-Kopergaon, Dist-Ahmednagar.

84.78 crs.

Renewal JD(WPC)

15 M/s. Oswal F.M. Hammerle Textiles Ltd., Plot no. T-5, T-5 P(I), Kagal-Hatkanangle Five star MIDC, Kagal, Dist-Kolhapur.

234.67 crs.

Renewal JD(WPC)

16 M/s. Ordanace Facotry, Ambajahari, Nagpur

365.54 Crs

Renewal JD(APC)

17 M/s. Ambuja Cement Ltd., Unit Maratha Cement Works, At - Uparwahi, Tal- Korpana, Dist - Chandrapur

1077.98 Crs

Renewal JD(APC)

18 M/s. Abhijeet MADC Nagpur Energy Pvt. Ltd., (Khairy Khurd), S. No. 15, 17/1 to 17/4, 18 & 19, Vill- Khairy Khurd, Tal- Hingana, Dist - Nagpur

1623.32 Crs

Renewal JD(APC)

19 M/s. Gupta Energy Pvt. Ltd., Kh. No. 89, Usgaon Shengaon, Tal- & Dist - Chandrapur

557.17 Crs

Renewal JD(APC)

20 M/s. Maharashtra State Power Generation Co. Ltd., Khaparkheda Thermal Power Station, Nagpur

3376.84 Crs

Renewal JD(APC)

21 M/s. Steel Authority of India Ltd., Chandrapur Ferro Alloy Plant, Mul Road, Chandrapur

93.35 Crs Renewal JD(APC)

22 M/s. SKF India Ltd., S. No. 159 to 162, 169, 186, Chinchwad, Tal- Haveli, Dist - Pune

365.14 Crs

Renewal JD(APC)

23 M/s. Bharat Forge Ltd., S. No. 72/76, Mundhwa, Pune

2230.75 Crs

Renewal JD(APC)

Page 7: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 5th CAC meeting of 2013‐14 dtd 07.07.2013

Establish Cases CAC Item No. 01

Name of Industry: M/s. Umicore Autocat India Pvt. Ltd S, No. 1295,1296,1122,1140 &1129, vill-Mouje Shirwal,Tal: Khandala, Dist- Satara.

1. Application received at RO Pune on 22/04/2013 and at HQ on 08/05/13.

2. Industry proposes to mfg of emission control catalysts, precious metals containing

solution and slurry/cake .

3. Industry has submitted distance certificate from Irrigation Dept. However in this

certificate the s.nos. 1122 , 1129 & 1140 is not included. Also distance issued by the

irrigation department does not give clarity about distance from HFL of river. Query sent

to industry and RO/SRO. but reply is awaited.

4. Applied CI Rs 90.76 cr

5. IE :- 16 CMD. DE: 8 CMD. ETP proposal comprising primary, secondary and tertiary

system.

6. Disposal: On land for gardening within own premises.

Since the case is for C to E & proposed location is proximity to notified river Nira in A -II class, it would be appropriate to take the decision about grant of C to E after confirmation of RRZ distance criteria.

Page 8: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 5th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 02

Name of Industry: M/s. WCL Penganga Opencast Project, Post: Sakhara (Kol), Tal: Wani, Dist: Yavatmal.

1. Applied for consent to Establish.

2. Industry has obtained Environmental Clearance from MoEF dated 31.01.2013.

3. Total Capital Investment of the industry is Rs.339.77 Crores.

4. Mine lease area is within 1.0 km from A-II Class river does not satisfy RRZ Policy.

Application for Consent to Establish. Mine lease area within 1.0 km from A-II Class river.

Unit has not yet paid mining charges of Rs.0.40 T/A.

In view of above, due to non-conforming of RRZ policy we may issue SCN for refusal of

consent.

Page 9: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 5th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 03

Name of Industry: M/s. Manikgarh Cement, P.O. Gadchandur, Tal: Korpana,

Dist: Chandrapur.

1. Applied consent to Establish for use of alternate fuel i.e. pet coke & lignite as a fuel in Kiln & CPP. .

2. Existing Unit Consent is valid up to 31.03.2014.

3. The Capital Investment of the industry is Rs.409.36 Crores

Application for permission to use/Substitute 15% of Natural Coal with Pet Coke (No

additional Investment). Existing consent is valid up to 30.03.2014. AAQM/Stack results are

exceeding.

We may put up the issue before CAC for further discussion.

Page 10: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 5th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 04

Name of Industry : M/s. Hoganas India Pvt. Ltd., Plot no. D-96, D-97, MIDC Ahmednagar, Ahmednagar

1. Industry has submitted application for grant of consent to establish to installation of ladle

refining furnace on 01.02.2013.

2. Application received at H.Q. on 18.04.2013.

3. Industry has obtained consent to operate which is valid up to 31.03.2015.

4. RO- Nashik has recommended case for grant of consent to Establish..

Recommended case for grant of consent to Establish to installation of ladle refining furnace.

Page 11: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 5th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 05 Name of Industry: M/s. Reliance Industries Limited (Nagothane Manufacturing Div.), Nagothane Manufacturing Div, Nagothane , Dist-Raigad.

1. Application for Consent to Establish (expansion) 2. Application received at SRO on 08/04/13 and at HQ on 13/06/13. 3. Adjoining river Amba not notified. 4. Proposed products attract E.C. 5. To ascertain adequacy of existing ETP needs to obtain feasibility study report carried out

if any along with designed details. 6. Details about effluent disposal into the estuary of Amba River to be called from project

proponent. 7. Also needs to obtain details about pollution sources and control measures adopted

measures by project proponent so as to ascertain the adequacy of Air Pollution Control Systems.

We may consider the case for C to E for expansion by imposing E.C condition and additional conditions if required

Page 12: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 5th CAC meeting of 2013‐14 dtd 07.07.2013

1st Operate Cases FRESH AGENDA

CAC Item No. 01

Name of the Industry: M/s. B.S. Ispat Ltd., Vill: Salari Yensa, Tal: Warora, Dist: Chandrapur.

1. Applied for renewal of consent for Sponge Iron Plant-60000 TPA and first consent to

operate for Captive Power Plant of 15 MW capacity (4 MW from WHRB and 11 MW

from AFBC Boiler)

2. Earlier Consent is valid up to 30 4.2013 for existing SIP & Consent to Establish for 25

MW CPP, SIP & Steel Plant obtained.

3. Total Capital Investment of the industry is Rs. 160.72 Crores.

The Case for renewal of Consent with 1st Consent to Operate for 15 MW Power Plant.

Existing validity is 30.04.2013. Consent to Establish is obtained for 25 MW Power Plant but now

applied for 15 MW Power Plant only. The piping work of fly ash silo is remaining. CAAQMS work

remaining. Needs to reconfirm about Consent to Establish/Renewal compliance from RO/SRO.

Being Sponge Iron the adequacy of A.P.C. may be determined only after getting sufficient No.

of JVS results.

In view of above we may keep the case in abeyance till the completion of requisite pollution

control system and obtaining results and compliance from RO/SRO.

Page 13: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 5th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 02

Name of Industry: M/s. Balkrishana Industrial Ltd.,

Plot B-66, MIDC Waluj Dist- Aurangabad

1. Application received at SRO Aurangabad I on 11/03/2013 and at HQ on 07/05/13.

2. Capital Investment is Existing Rs 130.40 Cr, Expansion Rs 59.27 Cr, Total Rs 189.27

Cr

3. Applied for Renewal &1st Operate with amalgamation.

4. Industry engaged in mfg of tyre and tubes.

5. Existing consent was valid up to 31.03.2012. C to E granted by Board on 06/07/2012.

6. Total sewage generation is 110 CMD and industry has provided STP of capacity 100

CMD, which seems to be inadequate.

7. Industry has installed coal-fired boiler with ESP as pollution control system.

8. RO has issued SCN on 21.3.13 for exceeding the JVS standards (air and water).

9. Old boiler is equipped with dust collector and with lime stone treatment for SO2

reduction.

10. Proponent proposes to use pet cake as fuel instead of coal.

11. RO Aurangabad has recommended that, consent may be granted by imposing BG

condition as per legal matrix towards O & M of STP.

Considering the non provision of Industrial effluent treatment facility and

exceeding the results of STP and taking effectives steps towards enhance production without obtaining C to O for expansion, it recommended for plain renewal and SCN for refusal for 1st C to O for expansion. It is proposed to impose the condition towards timely provision of primary treatment facility for Indl effluent with BG of Rs 5 lakh and impose the condition for BOD, SS and COD limits 30mg /l, 100mg/l and 250mg/l respectively with BG of Rs 5 lakhs.

Page 14: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 5th CAC meeting of 2013‐14 dtd 07.07.2013

Page 15: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 5th CAC meeting of 2013‐14 dtd 07.07.2013

CAC ITEM No. 03

Page 16: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 5th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 04

Name of Industry: M/s. ASB International Pvt. Ltd., E-9, Addl. MIDC Ambernath, Ambernath. Applied for first operate for expansion, Expansion is increase in product quantity of the product Moulds from 52 Nos/M to 250 Nos./M. Obtained consent to establish for the same. Existing consent is valid upto 30/09/2013. The CI deployed for expansion is Rs. 62 crores, against Rs.110 crores as proposed during obtaining consent to establish. The existing CI is Rs. 178.47 crores. There will be no generation of any industrial effluent from the expansion activity. The domestic effluent will be 12 CMD from expansion, existing domestic effluent is 48 CMD, industry will use the existing STP of 60 CMD capacity. The analysis reports are within limit. Have submitted bank gaurantee of Rs. 5.0 lacs & 1.0 lacs valid upto 30/9/2013 at Regional Office. Submitted Environmental Statement for the year of 2011-2012. The cess paid upto April 2012, returns filed upto Dec-2012. SRO recommended the grant of consent to first operate. We may grant amalgamated consent for period upto 30/9/2014 by taking additional fees.

We may place the case before CAC for further discussions.

Page 17: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 5th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 05 Name of the industry :- M/s. Asahi India Glass Limited, Plot T-16, MIDC Taloja,

Dist. Raigad 410 208

• Applied for 1st consent to operate for expansion

• Application received at SRO- Pune-II on dtd 11/03/2013 and at HQ on 12/06/2013.

• Existing plant consent is valid up to 30/09/2013 & obtained C to E for expansion on 09/02/2012

• Industry will generate trade effluent to the tune of 117 CMD (existing 15 CMD & proposed 102 CMD).

• Industry has provided ETP comprising primary & tertiary treatment of designed capacity 200 CMD for the treatment of trade effluent.

• Treated effluent is then discharged to CETP.

• RO Navi Mumbai recommended the case for grant of 1sr consent to operate for expansion in existing unit

• We may grant 1st consent to operate for expansion with amalgamation up to 30/09/2013 with operation BG of Rs. 5/- Lakhs

• We may place the consent application before CAC for further consideration.

Page 18: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 5th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 06

Name of Industry: M/s. Inox Air Products Limited,

P. No. B-93, Vill- Bhagad, MIDC Area, Mahad Dist-Raigad

1. Application for Consent to Ist-operate. 2. Application received at SRO on 13/05/13 and at HQ on 31/05/13. 3. Applied for Liquid Nitrogen, Gaseous Nitrogen, Liquid Oxygen and Liquid Argon

Hydrogen. 4. Needs to provide primary treatment facility for the treatment of cooling tower blow down. 5. We may consider the case for Ist-Consent to Operate by imposing B.G of 5 .0 Lakhs

towards provision of ETP within 3 Months.

based on the above submission from project prop

Page 19: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

Resubmission CAC Item No. 01 Name of Industry:- M/s. Mandhana Weaving House (Shirting Division),

C-2 MIDC, Tarapur Boisar, Thane

1. Industry has applied for renewal with amalgamation of Consent. Application received at SRO on 12.12.12& at HQ on 02.02.13

2. Earlier Consent of Dyeing was valid till 31.12.12 and CtoE was issued for expansion of weaving activity.?Textile industry involving dyeing activity.?Capital investment is 125.84 Cr ..

3. I.E generation 230 CMD Provided Primary ,Secondary and tert. treatment plant.?JVS results dtd 29.03.12,19.04.12/24.05.12,24.07.12 are within limits.

4. Treated effluent is sent to CETP for further treatment and disposal. 5. Member of CHWTSDF.. For Coal fired boiler cyclone separator with wet scrubber

provided. 6. Industry has submitted cess returns upto 31/08/2012 7. Industry has submitted Envt statement for the year 2011-12. 8. SRO , RO reported that ind has not made any Provision of recycle or reuse of

effluent.?Proposed directions were issued to industry on 12.01.12 for unscientific storage of fly ash.

9. RO reported ambient air Monitoring results dtd 18.09.12 are highly exceeding standards, Ind is consistent defaulter.

10. Application was discussed in CAC dtd 19.03.13 & decided to call recent JVS results. The results are exceeding marginally in respect of COD on dtd 12.02.13.

11. We may renew the consent.

Page 20: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 02 Name of Industry: M/s. Maharashtra State Power Generation Co. Ltd.,

Khaperkheda Thrmal Power Station Khaperkheda, Tal: Saoner, Dist: Nagpur.

1. Renewal of consent for Power plant i.e. 1 x 500 MW.

2. Earlier consent of 1 x 500 MW Power Plant is valid up to 30.06.2013.

3. The Capital Investment of the industry is Rs.3376.84 Crores

Capital Investment increased by 157.18 Crores. Work of ash Handling System/Silo is not

yet Completed. Analysis results of Air is not within the consented norms. RO/SRO has

recommended for forfeiture of Existing B.G. Additional Consent fee not yet submitted.

Cess/Env. Statement details are not yet furnished.

In view of above we may issue SCN for refusal of consent.

Page 21: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 03 Name of the Industry: M/s. Shree Sidhbali Ispat Ltd., MIDC, Tadali Growth Center, Chandrapur. 1. Applied for renewal of consent.

2. Earlier Consent validity is up to 31.12.2012. The case was discussed in CAC held on 19.03.2013 and it was decided to issue SCN.

Accordingly SCN was issued on 03.04.2013. Industry has submitted the reply to SCN. RO/SRO

yet not submitted the compliance report.

In view of above, we ,may grant the renewal up to 31.12.2013 with forfeiting of existing

Bank Guarantee of Rs.10/- Lakhs due to non-compliance and exceeding results & obtaining

double amount B.G.

Page 22: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 04 Name of Industry: M/s. WCL Durgapur Opencast Mine, WCL Durgapur Opencast Sub area, Durgapur, Tal & Dist: Chandrapur. 1. Applied for Renewal of consent with Amalgamation.

2. Earlier Consent of existing unit was valid up to 31.12.2012 for coal mining 2.3 mtpa.

3. Consent to Establish for expansion project of coal mining from 2.3 mtpa to 3.0 mtpa

obtained.

The case was discussed in CAC dated 19.03.2013 and it was decided to issue Show

Cause Notice for refusal of consent for non-compliance of consent conditions. Accordingly

show Cause Notice was issued on dated 03.04.2013. Industry submitted reply of SCN to the

Board. As per status report submitted by RO/SRO dust emissions were observed at receiving

hopper, other points. AAQM Results are exceeding the standards.

In view of above, we may grant renewal up to 31.12.2013 with forfeiting the existing Bank Guarantee and obtaining fresh Bank Guarantee of Rs.10/- Lakhs towards O & M.

Page 23: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 05 Name of Industry: M/s. Wardha Power Company Pvt. Ltd., Plot No.B-2, MIDC Warora, Warora Growth Center, Tal: Warora, Dist: Chandrapur. 1. Applied for Renewal of consent with Amalgamation.

2. Earlier Consent for Phase-I is valid 31.01.2013 & Phase-II is valid up to 31.05.2013.

The case was discussed in CAC held on 19.03.2013 and it was decided to issue SCN for

refusal of consent. Accordingly SCN was issued on 03.04.2013. Industry has submitted the

reply to SCN on 15.04.2013. The unit has installed the necessary pollution control system.

Results are exceeding.

In view of above we may grant renewal with amalgamation of consent with operational B.G. of

Rs.20/- Lakhs (which is available) and forfeiting of 50% of the existing B.G. as results are

exceeding.

Page 24: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 06 Name of Industry:- M/s. R. L. Steel and Energy Ltd.,

G No. 78/81, Pangra Shivar, Chitegaon, Tal- Paithan, Aurangabad.

.

1. Case was discussed in CAC dt.19/03/2013 and it was decided to issue SCN accordingly, SCN was issued on 03/04/2013, the reply dt. 23/04/2013 is received to this office and stated that industry have submitted BG of Rs.10/- lakhs provided fume extraction system followed by wet scrubber to induction furnace. Have complied with all directions except metallic roads and AOD will be removed within 15 days.

2. Now industry has submitted letter dt.l 08/05/2013 stated that they have removed AOD. 3. We may grant consent with forfeiting of BG 50% and also take additional BG as per

matrix.

Page 25: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 07 Name of Industry: Arshiya International Ltd., ( Free Trade Warehousing Zone) At Vill. Sai, Tal. Panvel, Dist- Raigad.

1. Resubmission Case was placed before 24/12/2012 wherein it was decide to issue show cause notice for refusal of consent.

2. Application for Renewal of Consent 3. Application received at SRO on 14/09/2012 and at HQ on 03/12/12 4. SCN issued vide No. BO/RO(HQ)/SCN/B-82 dated 04/01/2013; for- 5. RO has recommended that consent may be granted after receipt of fees and with

condition of no generation of effluent, and not to store Hazardous chemicals above threshold limits.

6. The firm in its reply dt. 24/04/2013 wherein it is stated that, the increase in C.I. is due to repairs and relying of roads, additions of Building management system, augmentation anf modification of Electrical and security system

7. Consent may be granted, with BG of Rs. 10 lacs for operation and maintenance of STP and MSW processing plants.

Page 26: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 08 Name of Industry: M/s. SI Group India Ltd Plot No D-2/1, TTC MIDC Thane-Belapur Road, Navi Mumbai.

• Applications recd at RO Navi Mumbai on 02/02/2012. • Application recd at HQ on 18/05/2012. • Existing unit engaged in chemicals. Existing consent Valid up to 31.12.2013. Applied for

amendment with respect to Change in product mix. Industry has proposed to delete the existing two products, phthalates & phosphate platicizer of total quantity 7250 MT/A and increasing the production quantity of existing product Isophorone 4000 MT/A to 11200 MT/A i.e. increased 7200 MT/A.

• Existing I.E. 1021 CMD. Proposed IE- 110 CMD. Existing D.E. 126 CMD. ETP provided, comprising primary, secondary & tertiary. Disposal – Into CETP.

• Industry has stated that, for the current mfg activity IE is 750 CMD generated and after change in product mix, additional 110 CMD will be generated and total effluent load on ETP is 860 CMD, which will be within consented limit. The existing ETP seems to be adequate to take additional effluent quantity from proposed product mix.

• Existing air pollution control system may not be sufficient especially at boiler where PP proposes to use HW as fuel.

• Industry has submitted “No increase in pollution load” certificate from ICT, Matunga, Mumbai.

• The information called from industry & RO /SRO NM by e-mail on dated 19/7/2012, 15/9/2012 & 08/10/2012 reg submission of CA certificate, Details of HW, Env. Statement, Cess Payments, JVS reports , and justification for increase in CI, but they are failed to submit the desired information.

• Earlier the case was discussed in CAC meeting held on 26/11/2012 & it was decided to issue SCN for refusal for non submission of additional consent fees, CA certificate, details of HW, Env.statement cess payment & justification for increase in CI .Accordingly SCN was issued. Industry has submitted reply to SCN along with self pollution load Performa.

• It is seen that after change in product mix there will be increase in HW (1500 MT/A) which will be use as a fuel in boiler .hence IE ,HW & air emissions increases .

• RO Navi Mumbai has recommended that, amendment shall be considered after receipt of additional consent fee Rs 1.00 lac and submission of CA certificate. Details of HW, Env. Statement, Cess Payments, and justification for increase in CI.

As there is increase in pollution load due to proposed product mix we may not consider the proposal about change in product mix.

Page 27: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

Review Item No. 01 Name of Industry: M/s. Lloyds Metals & Engineering, Ghugus, Chandrapur.

• Office note received from AS(T) section vide letter dated 15.11.2013 that there is a complaint of Shri Nanani Shyamkule, MLA, Chandrapur dated 16.11.2013 regarding pollution due to said industry.

• RO Chandrapur has issued SCN to the industry for discharging effluent into Wardha River.

• Industry has submitted the reply of SCN stating that there is no discharge of effluent from the plant. However, cooling water is being recycled.

• The results of stack monitoring and ambient air quality monitoring are exceeding the standards hence violated the consent conditions.

We may forfeit the Bank Guarantee of Rs.5/- Lakhs due to non-compliance and top up of the same of Rs.10/- Lakhs may be obtained.

Page 28: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

Review Item No. 02 Name of Industry: M/s. Asian Hotel Ltd. (Hyatt regency Mumbai) Andheri (E), Mumbai – 400 099

1. Application for Change in Name

2. Previous consent issued vide BO/AS(T)/EIC No. Mu-4453-12/R/CAC – 1311 dated

13/02/2013; valid up to 31.10.2016 in the name M/s. Asian Hotel Ltd., (Hyatt regency

Mumbai), Sahar Airport Road, Andheri (East), Mumbai - 400 099

3. Now applied for change in name as M/s. Asian Hotels (West) Limited, (Hyatt

regency Mumbai), Sahar Airport Road, Andheri (East), Mumbai - 400 099.

4. The firm has submitted Amalgamation/transfer deed with M/s. Chillwinds Hotels Ltd.

5. The firm has submitted copy of Registrar of companies of change in name from M/s.

Chindwill Hotels to M/s Asian Hotels (west) Limited.

6. We may consider the change in Name.

Page 29: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

Review Item No. 03 Name of Industry: M/s. Maa Umiya Audyogic Sahakari Vasahat Maryadit, Kapsi (buj), Tal: Kamptee, Dist: Nagpur.

1. Board had granted locational clearance to M/s. Maa Umiya Audyogik Sahakari Vasahat

Maryadit, Kapsi (buj), Tal: Kamptee,Dist: Nagpur vide Board’s Letter No. NO/RONR/

Nagpur-22/Wain/CC-109 dated 24.02.1999. To set up industrial area for only those

industries come under Orange & Green Category.

2. The cooperative industrial Estate has not yet obtained environmental clearance from

competent authority and not provided common STP.

3. The issue of allowing RED category Industry was raised by representative of VIA during

a meeting of Guardian Minister held on 29.09.2012 at Ravi Bhavan, Nagpur. Hon’ble

Guardian Minister had directed MPCB, Nagpur to send the proposal of VIA to MPCB,

H.Q. for examination.

4. As per Nagpur Regional Development Plan the NOC for notified Industries areas not

required from NIT, in Metro Region.

5. Regional Officer, Nagpur has submitted herewith the proposal of VIA for considering

permission by MPCB for small scale RED category industries in said industrial area.

Page 30: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

Review Item No. 04 Name of the Industry: M/s. Lloyds Metals & Engineering, Ghugus, Chandrapur.

• Office note received from AS(T) section vide letter dated 15.11.2013 that there is a complaint of Shri Nanani Shyamkule, MLA, Chandrapur dated 16.11.2013 regarding pollution due to said industry.

• RO Chandrapur has issued SCN to the industry for discharging effluent into Wardha River.

• Industry has submitted the reply of SCN stating that there is no discharge of effluent from the plant. However, cooling water is being recycled.

• The results of stack monitoring and ambient air quality monitoring are exceeding the standards hence violated the consent conditions.

We may forfeit the Bank Guarantee of Rs.5/- Lakhs due to non-compliance and top up of the same of Rs.10/- Lakhs may be obtained.

Page 31: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

Review Item No. 05 Name of the Industry: M/s. Jayaswal Neco Industries Ltd., T-41/42, MIDC Hingna, Nagpur. As per decision taken in CC meeting held on 15.02.2013, R.O. Nagpur has been

directed to forfeit the B.G. of the industry vide e-mail dated 5.3.2013 and issued consent to

establish for expansion vide letter No. CC-1864 dated 01.03.2013.

Industry vide letter dated 15.03.2013 received on 16.03.2013 has submitted the appeal

against the order for deduction of 50% of existing BG.

The matter is placed for decision before CAC.

Page 32: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

Review Item No. 06 Name of the Industry: M/s. JSW Steel Ltd.,

A-10/1, MIDC Kalmeshwar, Nagpur.

The Board has granted consent to M/s. JSW Steel Ltd., A-10/1, MIDC Kalmeshwar,

Nagpur which is valid up to 31.7.2013. The industry has submitted the bank Guarantee of Rs.5/-

Lakhs towards compliance of directions and operation and maintenance of pollution control

system so as to achieve consented standards.

Regional Officer, Nagpur vide consent processing report of consent to operate has

submitted the analysis results of stack and ambient air quality monitoring of existing unit which

are exceeding the standards.

In CAC meeting held on 31.01.2013 it was decided that HOD shall put up separate note

towards initiation of action against existing unit for not complying with the standards. Hence, it

is recommended to forfeit the bank Guarantee of Rs.5/- Lakhs of existing unit for not achieving

the consented standards.

Submitted for decision in CAC.

Page 33: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

Review Item No. 07 Name of Industry: Reliance Industries Limited (Nagothane Manufacturing Div.) , Nagothane Manufacturing Div, Nagothane , Dist-Raigad.

1. Application for Consent to Establish (expansion) 2. Application received at SRO on 08/04/13 and at HQ on 13/06/13. 3. Adjoining river Amba not notified. 4. Proposed products attract E.C. 5. To ascertain adequacy of existing ETP needs to obtain feasibility study report carried out

if any along with designed details. 6. Details about effluent disposal into the estuary of Amba River to be called from project

proponent. 7. Also needs to obtain details about pollution sources and control measures adopted

measures by project proponent so as to ascertain the adequacy of Air Pollution Control Systems.

8. We may consider the case for C to E for expansion by imposing E.C condition and additional conditions if required based on the above submission from project proponent.

Page 34: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

Review Item No. 08 Name of the Industry: M/s. MAHAGENCO,

Koradi Thermal Power Station, Nagpur

1. R.O. Nagpur Recommended for forfeiture of Bank Guarantee of Rs.5/- Lakhs due to non-

compliance of consent conditions issued by the Board vide letter dated 23.12.2011

2. Effluent is discharging into nallah / river.

3. Analysis results of stack monitoring and AAQM are exceeding the standards.

In view of above, we may forfeit the Bank Guarantee of the unit and also directed to

deposit Rs.10/- Lakhs to seek the compliance.

Page 35: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

Review Item No. 09

1. Name of Industry : M/s. Polygenta Technologies Ltd.,

Gut No. 265/2-266, Village Avankhed, Tal. Dindori, Dist. Nashik

1. As per CAC decision in 8th meeting dtd. 24/12/12, renewal of Consent to Operate was

granted upto 30/11/2013 subject to condition forfeiture of B.G. of Rs. 1.0 Lakh out of Rs. 5.0 Lakh of B.G.

submitted. 2. Firm has requested vide letter dtd. 24/01/13 recd. at HQ on 30/04/13 informing that previously limit of BOD upto 100 mg/l was stipulated in the Consent granted on 17/10/2008. Thereafter, BOD standard was mentioned as 30 mg/l which could be due to oversight or typing error and the same was carried forward. 3. The industry has requested to reconsider the decision of forfeiture of B.G. of Rs. 1.0 Lakh and grant amendment of Consent to Operate for revision of BOD standard from 30 mg/l to 100 mg/l. 4. The CAC on 24/12/12 has taken a decision about forfeiture of B.G. of Rs. 1.0 Lakh out of Rs. 5.0 Lakh due to non-confirming JVS results. Also, the decision about stipulating stringent BOD standards of 30 mg/l has also taken by the Competent authority after due deliberation.

In view of above, we may not consider the request about waiving of decision about forfeiture of B.G. of Rs. 1.0 Lakh and relaxation of BOD standards to 100 mg/l 5. We may issue letter to the industry to comply with decision of CAC about forfeiture of B.G. of Rs. 1.0 Lakh. Submitted for taking suitable decision in CAC please.

Page 36: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

Review Item No. 10

Name of Industry: M/s. Bharat Petroleum Corp. Ltd. (Mumbai Bijwasan Pipi Line), Mahul, Mumbai

1. Letter of M/s. BPCL for amendment in consent to operate.

2. Consent issued vide No. CAC-320 date 23/02/2012; valid upto 30/06/2013 for:

Transport of petroleum products from Manmad Terminal to the Boundary

of Maharashtra before entering into Madhya Pradesh for 170 Kms.

3. Amendment desired for:

Transport of petroleum products from Mumbai dispatch Terminal

including IPS Washala, IPS Manmad, IPS Jawkheda and SV station (SV-

01A to SV 21) to the Boundary of Maharashtra before entering into

Madhya Pradesh for 422 Kms.

4. SRO has reported that during renewal of consent unit has applied for total

pipeline project as per amendment is desired; however consent was granted

from Manmad Terminal to the Boundary of Maharashtra before entering into

Madhya Pradesh for 170 Kms and has recommended the case for amendment in

consent.

5. We may consider the amendment as desired by the firm by obtaining BG of Rs. 5

lacs for compliances of consent conditions.

Page 37: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

(Renewal Cases) Fresh Agenda

CAC Item No. 01 Name of Industry :- M/s. Mudra Lifestyle Ltd., Plot No. D-1, MIDC, Tarapur, Tal. Palghar, Dist. Thane 1.Applied for renewal of Consent.Application receivbed at SRO on 19.12.12 & at HQ on 3.01.13. 2.Textile industry 3.Two treatment Plants are provided. Secondary treatment with capacity 3MLD & Primary & Tert .treatment of Capacity 115 CMD. 4.Second ETP is provided after restart directions issued by Board on 26.04.2010. 5.As per report of SRO both ETPs are in operation. 6.Provided 10Kl/hr caustic recovery plant. 7.For coal fired boiler and thermopack provided mechanical type of dust collector followed by bag filter and syack of 37 mtrs. 8. Proposed directions were issued on 10/01/2012 for not providing secondary treatment facility, not providing scrubber to coal fire boiler, not maintaining record pertaining to generation and disposal of hazardous wastes and discharging sub-standard effluent to TEPS-CETP. 9. Voluntary closure directions were issued on 29/5/2012 for consuming excess water and thereby generating excess effluent than the consented quantity, not disposing hazardous wastes to CHWTSDF and not submitting B.G. in accordance with Interim directions issued on 24/01/2012. 10. Once again proposed directions were issued on 01/11/2012 for excess water consumption in the month of Sept. 2012 and not filing cess returns. This also amounts to violation of one of the conditions of restart orders issued on 28/6/2012 against voluntary closure directions . 11. Now, once again the industry is found to be grossly violating consent conditions by discharging untreated effluent in local nalla and also causing sever air pollution as observed from S.R.O. Tarapur-I’s report dated 29/01/2013. Complaint was received by S.R.O. Tarapur-I in this matter.

12. RO recommended for refusal of consent. RO reported that Office note for approval for issuing closure directions to the industry is submitted on 29/12/2012 for the reason of excess water consumption in the month of Aug. 2012 and Nov. 2012 along with other industries. 13. It is recommended to issue SCN for refusal of consent & also to concern HOD to Consider Closure proposal on priority.

Page 38: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 02 Name of Industry:- M/s. Nath Pulp & Paper Mills Ltd.,

Nathnagar, Wahegaon, Tal. Paithan, Dist. Aurangabad •Applied for Renewal of Consent. Total Capital investment of unit is 154.95 Cr. Application received at SROon 01.02.13 & at HQ on 25.02.13 •Manufacturing Kraft Paper & Electricity (Co-generation) – 3.5 Million KWH/Month. •Industrial effluent 312 CMD. •Provided Primary treatment for Effluent generated. JVS results dtd 06.10.12 , 07.11.12 are exceeding the consented standards. •As per previous consent condition industry has not provided Zero Discharge. •Bank Guarantee of Rs 5.0 lakhs was obtained from industry for providing Zero discharge & ind has submitted the same with validity 31.12.2013. •Treated effluent is stored in Kaccha Pit & sent on land for irrigation. •RO recommended for renewal of Consent with for fieture of B.G of Rs 5.0 lakhs and obtaining bank guarantee of Rs 10 Lakhs. •Industry has provided Dust collect , ESP/ wet scrubber to boilers . •Water Cess return submitted upto Oct2012 & Paid upto Oct 2012. •Envt statement is submitted for the year 2011-12. • Recommended for forfeiture of B.G of Rs 5.0 lakhs & issue SCN for refusal of consent .

Page 39: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 03 Name of Industry:- M/s. First Winner Industries Ltd.,

N-66, MIDC Tarapur, Dist. Thane

1. Applied for renewal of Consent with increase in C.I due to additional Weaving machines.

Application received at SRO on 28.08.12 & HQ on 30.10.12. 2. Textile Processing involving Dyeing, sizing & weaving. 3. IE Generation 283 CMD provided Secondary & tert. Treatment followed by RO system. 4. JVS results dtd 23.02.2012 are within prescribed limits. 5. Treated effluent is 100% recycled & reused. 6. ETP sludge is sent to CHWTSDF.. 7. Furnace oil fired boilers . 8. Cess returns submitted upto Aug 2012. 9. Consent fees paid upto 31.10.2015. 10. SRO Tarapur recommended for grant of Consent upto 31.10.2015. 11. Recommended for grant of renewal of consent with amalgamation of existing consent

upto 31.01.16 by calling additional fees for three months.

Page 40: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

Page 41: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

Page 42: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 04

Page 43: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 05 Name of Industry: M/s. Piramal Enterprises Ltd.,

Near NSE Complex, Off Western Express Highway, Goregoan (E) Mumbai-93

• Application received at Mumbai on 04/01/2013

• Application received at HQ on 21/02/2013.

• Industry is engaged in R & D activity holding consent valid up to 30.11.12.

• Renewal for R & D activity

• Previous consent was given in ORANGE category. As R & D activity for pharmaceutical

products comes under RED category. Hence in RED category.

• Maximum quantities and products to be processed in the R & D activity has not been mentioned

• I.E. – 71.5 CMD, D.E. – 12 CMD. ETP comprising primary, secondary & tertiary

treatment. The treated effluent is discharged in MCGM drain. Justification for the

increase in I.E from consented 60 CMD to 71.5 CMD has not been submitted by

industry.

• Natural gas is used as fuel for boiler.

• Returns regarding Hazardous waste submitted for 2011-12

• Industry has submitted the name change from M/s Piramal Healthcare Limited to M/s

Piramal Enterprises Limited.

• Following information had been called from RO/SRO: Gross Block investment of the

industry of last five years, status of ETP, comments on increase in effluent, latest JVS

reports in CAC format from the industry/RO. No information has been received till date

• RO has recommended for renewal of consent for the period up to 30.11.2014

We may consider the case by restricting the quantity of trade effluent to existing consented 60 CMD and after the receipt of additional consent fees of Rs 1,25,640.00 and imposing B.G of Rs 3 lakhs towards O & M of pollution control system and compliance of consent conditions.

Page 44: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 06 Name of Industry : M/s. Alok Industries Ltd.,

C-16/2, MIDC TTC, Pawane, Navi Mumbai

• Industry has applied C to R for Cellulose Sheeting & Cellulose knits without increase in

production and pollution load. Red/LSI • Previous consent was valid up to 31.12.2012 • CI is increased from 78.19 Cr. to 84.65 Cr. additional fees obtained. • Water intake – 1830 CMD, IE – 1305 CMD, DE – 80 CMD • ETP provided with primary, secondary system. • DE treated in septic tank followed by soak pit. • JVS results are within consented limits. • Provided 42 m stack for coal and FO fuel fired boiler. • Member of CETP & CHWTSDF • Industry paid fees of Rs. 3,75,100 + 1,500+ 23,500 = Rs. 4,00,100/- • RO recommended for renewal up to 31.12.2015 with change in CI and adding condition

of using PNG as and when made available. • We may ask industry for additional fees to grant consent up to 30.01.2015 as per

uniform validity circular. • Recommended to grant of renewal up to 31.01.2016 as per uniform validity by obtaining

consent fees for one month.

Page 45: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 07 Name of Industry : M/s. Uttam Galva Steel Ltd., Village: Donvat, Tal: Khalapur, Dist: Raigad.

1. Application for renewal of consent to operate submitted by industry on 27.02.2013.

2. Application received at H.Q. on 04.04.2013.

3. Industry has paid water cess up to 31.03.2012.

4. Industry has submitted Environment Statement for year 2011-12.

5. RO- Raigad has recommended case for renewal of consent to operate with condition

that industry shall increase the storage capacity of spent acid

- Recommended case for grant of renewal of consent to operate up to 31.03.2018, with

condition that

a. Industry shall commission ETP on or before 30.09.2013 with submission of B.G. of

Rs.5 Lakhs towards compliance of the same.

b. Industry shall submit BG of Rs.5 Lakhs towards compliance of the consent

conditions.

Page 46: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 08 Name of Industry : M/s. Welspun Maxsteel Ltd [Jetty], Vill: Salav, Tal: Murud Janjira, Dist: Raigad 1. Application for grant of renewal of consent to operate submitted by industry on 10.01.2013. 2. Application received at H.Q. on 02.04.2013. 3. Industry has submitted Environment Statement for year 2011-12. 4. RO- Raigad has recommended case for grant of renewal of consent to operate. 5. Recommended case for grant of renewal of consent to operate up to 31.03.2014. with

condition that industry shall extend the existing the BG of Rs.2 Lakhs towards compliances of consent conditions.

Page 47: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 09 Name of Industry: M/s. Greta Energy Ltd.,

A-28, MIDC Mul, Dist: Chandrapur.

1. Applied for renewal of Consent.

2. Earlier consent for 15 MW Bio-Mass based power plant was valid up to 31.03.2013.

3. Four Fields ESP & Bag Filter provided.

4. Analysis results of AAQM and stack monitoring carried out on 23.03.2013 are

exceeding.

The unit is not complying to the consent condition no.11,12 & 13. Disposal of fly ash is in

an unscientific manner.

We may issue show cause notice for refusal of consent due to above non compliance

Page 48: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 10 Name of Industry:- M/s. The India Cements Ltd. (PGU) , Survey No. 78 to 83, 100 to 108 & 112, Parli (Vaijnath), Parli. .

1. Applied for renewal of consent. 2. No change in product & its quantities. 3. CI is Rs. 169.39 crores and existing was Rs.116.40 crores, the increase is of Rs.52.99

crores. 4. It is a cement grinding unit. Indl effluent is Nil. 5. Provided Bag filter to grinding section & wagon tippler, metal cover to conveyor belt,

unloading of fly ash is carried out in closed shed. Water sprinkling provided in loading & unloading section. The JVS results of Stack air & Ambient air are exceeding the consented limits.

6. Cess paid upto March 2012. 7. RO recommended grant of consent subject to forfeiture of BG of Rs. 5.0 lacs and fresh

BG of Rs. 10.0 lacs towards O&M and provision of CAAQMS within 4 months. Submitted for further orders please.

8. We may place the case before CAC for further discussions.

Page 49: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 11 Name of the Industry: M/s Zydus Nycomed Healthcare Pvt Ltd.,

Plot No C-4, TTC indl area, MIDC, Pawane, Thane Belapur Road, Navi Mumbai

• Application recd to RO Pune 01.02.2013. • Application recd at HQ on 01.04.2013. • Industry engage in Mfg. of Basic Drugs. • Now applied for renewal of consent with increased CI from Rs 88.18 cr to 140.21 cr and

for inter change in production quantity and kept total quantity same as per existing one. • Existing I.E. – 200 CMD, proposed IE 205 CMD, Existing D.E. - 25 CMD. Proposed DE –

No change. Primary, secondary and tertiary treatment provided. • 20 CMD High TDS and High COD & BOD effluent is treated in Tripple effective

evaporator plant and weak stream i.e 25 CMD domestic effluent, 90 CMD effluent from process and 90 CMD effluent from utility is treated in ETP. 90 CMD is boiler & cooling tower blowdown.

• JVS results are within limits except COD parameter collected on 18.6.2012. • Clarification called from industry for increase CI. Industry stated that, due to

modernization of plant, furniture, computers and decanter machine etc. • Due to CI increased industry fall in CAC category. • CA certificate shows CI is Rs 130.65 cr. • Industry has hide their actual investment at the time of renewal or otherwise now they

had made expansion. • Industry has claimed that, there is no increase in pollution load with all respect. However

there is increase in air emission (SPM/TPM) and also there is increase in HW quantity. • Industry has submitted pollution load proforma stating no increase in production and

pollution load. However unit has not submitted the NO increase in pollution load certificate from technical institute.

• There is also violation of EC condition wrt specific & general. • RO Pune has recommended for grant of renewal of consent upto 31.03.2016 under CAC

category based on no increase in pollution load certificate from competent authorities.

As there is increase in pollution load in air and Hw, also not submitted No increase in pollution load certificate from recognized institute, we may consider only plain renewal of consent with Board Resolution and BG of Rs 2 lakh towards increase in CI and BG of Rs 5 lakhs towards not to take any effective steps towards change in product mix.

Page 50: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 12 Name of Industry: M/s. Balaji Amines,

Plot No E-7 & 8, MIDC Chincholi, Tal. North Solapur

• Application recd to RO Pune 02.05.13 • Application recd at HQ on 10.05.2013. • Industry engaged in Mfg. of Synthetic Organic Chemicals. • Now applied for renewal of consent with increase in CI from Rs 42 cr to 143.10 cr.

Industry has submitted the Justification for increased CI. • Due to increase, CI this case falls under CAC category. • Being zero discharge unit JVS was not collected. However, for confirmation at least

quarterly JVS needs to be carried out. • Industrial effluent is separated in two streams, for High COD and Low COD.

For High COD- Forced evaporation system provided. For low COD – Primary and RO system provided and achieve Zero

discharge. • RO Pune has recommended for grant of renewal of consent subject to clarification for

increase investment.

New entry to CAC. We may consider the case for renewal of consent with increase in CI by imposing following conditions:

i. Board Resolution with BG of Rs 2 lakh towards increase in CI without Board permission.

ii. Operational BG of Rs 5 lakhs.

Page 51: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 13 Name of Industry:- M/s. Indorama Synthetics(I) Ltd.,

Power plant, A-31,A-31P, A-31P/1, A-40 to A-45, MIDC Butibori, Nagpur. 1. Applied for renewal of consent (Power plant of 11MW). Application received at SRO on 06.04.13 & at HQ on 28.06.13 2. Existing Polyester, Captive Power plant & coal fired HTM heaters. 3. Consent is valid till 31.05.2104 Existing Capital investment 2928.34 Crores . 4. For this coal based power plant C.I is RS 23.63 crores. Total 2952.62 Crores. 5. 11MW coal based power plant. Obtained Environmental Clearance for power plant. 6. IE generation 156 CMD mainly due to cooling tower blow down. The effluent is treated in ETP of existing industry & treated effluent is sent to CETP Butibori for further disposal. 7. JVS results are fluctuating. Two JVS results dtd 06.03.13 & 04.04.13 are within limit however dtd 12.02.13 are exceeding in respect of BOD,COD & SS. 8. Provided ESP as an Air pollution control equipment. Stack Monitoring results are exceeding the standards. 9. Existing Ind has submitted Cess returns upto feb 2012 & paid Cess up to 31/03/2011 10. Environmental statement for year 2010-2011 is submitted. 11. As per report of SRO Nagpur-II out of 8 directions of restart orders issued on 1.02.2011, ind has complied 6 directions & for one direction ind has approached to MIDC authority for allotment of land .Ind requested for relaxation/Wavier of condition of installation of Ozonization plant instead of chlorination for cooling tower effluent. 12. Out of B.G of Rs 10.0 lakhs B.G of Rs 1.0 lakh is forfeited by Board & B.G of Rs 9.0 lakhs is valid till 16.09.2013. 13. WE may issue SCN for refusal

Page 52: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 14 Name of Industry : M/s. Godavari Bio-Refinery Ltd.,

Sakharwadi Tq. Kopergaon, Dist. Ahmednagar.

• Applied for renewal of consent with same production qty.. • C.I. of Rs. 84.78 Cr. • Category RED/LSI. • Stand alone distillery with (Molasses based). • Water consumption -1260 CMD. • Industrial Effluent. 720 CMD. • Domestic effluent 100 CMD. • SRO Reported.

a) Kattcha pit not scrapped. b) Not achieve zero discharge. c) Stack provided with mechanical dust collector. d) Processed for refusal.

• Industry reply. a) Kachha Pit scrapped. b) RO provided for treated effluent. The permeate (pure water) around 600 m3.

Which is recycled as make up water to cooling tower. Reject of 200-300 m3 is composted.

• Compost yard of 7.6 acre provided and submitted. • ESP provided to 2 nos. boilers and bag filer provided to 1 boiler. • Case was discussed in CC meeting dated 18.01.2013.

RE – SUBMITTED

1) The said case was discussed in cc meeting at that time case was under purview of CC Committee.

2) Now the said cases comes under CAC purview as capital investment of the industry is Rs. 84.78 Cr.

3) SRO Ahmednagar visited to said industry on 29.01.2013 on the basis of water pollution complaints of received from farmers wells.

a) The R.O. system was not in operation & effluent was being taken after Bio-methanization for composting.

b) The industry has provided two kachha lagoons back side of Bio-digester plant and having capacity about 5000 M3 & 50,000M3. in which untreated effluent was stored.

Page 53: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

c) Pakka lagoons having capacity 30,000 M3 , 8000M3 , 40, 000 M3 & 40,000 M3 provided for storage of effluent.

d) There are around 100 Nos. Kachha lagoons which are in dry condition but yet not scrapped.

4) SRO submitted proposal on 25.02.2013 to RO Nashik to initiate legal action against industry.

5) RO issued interim direction to industry on 21.03.2013 & forfeited the B.G.of Rs.1.0/–Lakh. As industry failed to scrap the katcha laggon.

6) RO imposed additional BG of Rs. 3.0 /- Lakh . 7) Earlier CPCB Officials visited to industry & issued stop work direction on 15.02.2011. 8) CPCB issued direction on 25.04.2011 to submit BG of Rs. 20.0 Lakh. & industry had

submitted BG to CPCB which was valid up to : 13.5.2012. 9) Industry has submitted BG of Rs. 3.0 Lakh to Regional Office Nashik against the Interim

direction issued by R.O. dated 21.03.2013. BG valid up to: 10) From the above report submitted by SRO it seems that the industry is frequently failed

to comply the CREP guide lines.

As per instruction mail was sent to RO/SRO on 08.04.2013 to submit verification report on point raised/mentioned by company in its letter dated 31.12.2012. In view of the above, RO/SRO has submitted point wise verification report by mail on 26.04.2013.

1) a) Industry has provided anaerobic digester followed by R.O. and bio-composting. b) During the visit of Board official on 16.04.2013, the R.O. plant was not in

operation. c) 30 days leak proof storage tank provided as per CREP guidelines. d) 5 days HDPL lined storage tank provided for untreated effluent. e) 7.6 acres Compost yard with HDPL lined & bricks on edge provided. 2) a) About 100 nos. Kacha Solar pits scrapped & leveled by industry. b) Provided cantor bund so as to avoid mixing of rain in river 3) a) ESP provided to two boilers & MDC for one boiler. 4) a) Being there was no distillery operation, two boilers were not in operation only one boiler having ESP found in operation. b) Not observed discharge of boiler blow down & cooling tower blow down. 5) a) Septic tank with soak pit provided for domestic effluent. 6) a) Composting found in operation, compost found bagged in 50 Kg cap HDPE bags.

Again RO submitted mail on 17.05.2013. A) Industry has provided two RO system for distillery effluent. B) 70 % recycle the effluent for cooling tower water make up. C) RO reject effluent generated 30% i.e. 126 M3.

Page 54: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

D) 7.62 acres land provided for compost. E) Personal hearing of industry has conducted on 29.04.2013 & decided RO/SRO visit the

industry carry out the monitoring of the industry & submit the compliance report of the industry.

Page 55: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 15 Name of Industry : M/s. Oswal F M Hammerle Textiles Ltd.

Plot No. T-5, T-5 Part/1, Kagal – Hatkanagale, Five Star MIDC, Kagal, Dist - Kolhapur.

• Industry has applied for Renewal of Consent with no increase in production and pollution load. It is RED/LSI unit.

• Previous C to R was valid up to 30.09.2012 • CI of industry was Rs. 228.75 Cr. now CI – Rs. 234.67 Cr.

Increased in CI by Rs. Rs. 5.92 Cr. Industry has paid additional fees of Rs. 25,000/- for the same.

• Water consumption is - 1060 CMD; IE - 950 CMD; DE - 50 CMD • Industry has provided ETP comprising Primary, Secondary and Tertiary Treatment

facility, treated effluent disposed to CETP. • Provided septic tank followed by soak pit for treatment of DE. • Industry has provided cyclomax and bag filter to boiler, Multi cyclone dust collector &

bag filter to thermopack with common stack of 45 meter height as an APC system. • Industry is member of CETP and CHWTSDF. • Industry has paid Cess up to July 2012 and submitted returned up to Dec 2012 • Industry has submitted Environmental Statement for the year 2011-2012 • JVS results dt. 17.04.2012, 31.08.2012, 30.09.2012, 17.10.2012, 29.112012,

31.12.2012, 14.01.2013 are exceeding. • Industry has submitted new BG of Rs.3 lakhs for O & M of ETP Rs. 2 lakhs for up-

gradation of ETP and Rs. 2 lakhs for as per previous consent condition. • Industry has not carried out up-gradation of ETP and Rs. 5 lakh BG was forfeited. • SRO Kolhapur asked to submit BG of Rs. 10 Lakhs • Industry has not yet submitted BG of Rs. 10 lakhs and not even submitted proposal of

up-gradation of ETP. • Industry has paid fees of Rs. 4,94,441/- for renewal of consent. • SRO Kolhapur has recommended renewal of consent to operate up to 30.09.2013 with

appropriate BG • As per sectoral approach and uniform validity, this industry falls in month of January, we

may obtain requite fees of four months from industry before granting consent of industry if approved.

• It is noted that industry has not upgraded its ETP and not meeting JVS. Hence it is recommended to forfeit existing BGs and issue SCN for refusal of consent renewal considering effluent quantity, size of industry and exceeding JVS.

Page 56: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 16 Name of the Industry: M/s. Ordanance Factory, Ambajhari, Nagpur, Dist: Nagpur.

1. Applied for Renewal of consent. 2. Earlier Consent is valid up to 31.05.2013.

3. The Capital Investment of the industry is Rs.365.54 Crores

4. Presently effluent after treatment discharge in local nalla which ultimately meets to Wena river.

5. A.P.C. is required at anodizing, Pickling, Cynide plating, chromotizing plant, forging shop.

6. As per previous consent condition unit needs to achieve zero discharge by October, 2013 and also submitted B.G. of Rs.2/- Lakhs.

7. Analysis results of stack/Ambient/JVS are not yet furnished by SRO.

In view of above, we may ask the Ordinance Factory to submit present status on 1), 2) &

3) and also ask SRO to submit present status on 1), 2) 3) & also ask SRO to submit results &

present status.

Page 57: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 17 Name of Industry: M/s. Ambuja Cement Ltd., Unit Maratha Cement Works, At: Upparwahi, Tal: Korpana, Dist:Chandrapur.

1. Applied for renewal of consent.

2. Earlier Consent is valid up to 31.5.2013.

3. Total Capital Investment of the industry is Rs.1077.98 Crores.

ETP/STP provided. ESTP/GBH provided/Dust Collector/Bag Filters Provided.

Analysis results are exceeding. Justification on increase in C.I. by Rs.155/- Crores not

submitted. Compliance of Consent to Operate is not furnished.

In view of above, we may issue SCN for refusal of consent.

Page 58: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 18 Name of Industry: M/s. Abhijeet MADC Nagpur Energy Pvt. Ltd., (Khairy Khurd), S.No.15,17/1 to 17/4 & 19, Vill: Khaire Khurd, Tal: Hingna, Dist: Nagpur.

1. Applied for renewal of consent.

2. Earlier Consent is valid up to 30.06.2013.

3. Total Capital Investment of the industry is Rs.1623.32 Crores.

C.I. Increase by Rs.241.32 Crores. Clarification regarding increase in C.I. by Rs.241.00

Crores is not yet submitted by the Unit. Analysis results of Stack and Ambient air are

exceeding. Fly ash disposal is not yet submitted by the Unit. Compliance of existing

renewal/E.C. not submitted.

In view of above, we may issue SCN for refusal of the consent as the results are

exceeding/ Fees not paid.

Page 59: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 19 Name of Industry: M/s. Gupta Energy Pvt. Ltd., Kh. No.89, Usgaon Shengaon,

Tal. & Dist: Chandrapur.

1. Applied for renewal of consent.

2. Earlier Consent is valid up to 31.03.2013.

3. Total Capital Investment of the industry is Rs. 557.17 Croes. The unit has not given specific reply for the increase in capital investment. Only the primary treatment is provided and recycled. Analysis results are exceeding. CAAQMS

not yet installed. Disposal of Fly /Bottom Ash not specified. Cess payment/Env. Statement

details not submitted. Additional Consent fee not yet submitted.

In view of above, we may issue show cause notice for refusal of consent.

Page 60: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 20 Name of Industry: M/s. Maharashtra State Power Generation Co. Ltd.,

Khaperkheda Thrmal Power Station, Khaperkheda, Tal: Saoner, Dist: Nagpur.

1. Renewal of consent for Power plant i.e. 1 x 500 MW.

2. Earlier consent of 1 x 500 MW Power Plant is valid up to 30.06.2013.

3. The Capital Investment of the industry is Rs.3376.84 Crores

Capital Investment increased by 157.18 Crores. Work of ash Handling System/Silo is not

yet Completed. Analysis results of Air is not within the consented norms. RO/SRO has

recommended for forfeiture of Existing B.G. Additional Consent fee not yet submitted.

Cess/Env. Statement details are not yet furnished.

In view of above we may issue SCN for refusal of consent.

Page 61: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 21 Name of Industry: M/s. Steel Authority of India Ltd., Chandrapur Ferro Alloy Plant,

Mul Road, Chandrapur.

• Applied for renewal of consent to Operate.

• Capital investment of the industry is Rs.93.35 Crores.

• Earlier consent was valid up to 31.12.2012.

We may grant plain renewal with operational B.G. of Rs.5/- Lakhs.

Page 62: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 22 Name of industry :- M/s. SKF India Limited,

S. No. 159 to 162,169,186, Chinchwad, Tal. Haveli, Dist. Pune 411 033

• Applied for renewal of consent

• Application received at SRO- Pune on dtd 05/02/2013 and at HQ on 25/03/2012

• Previous consent was valid up to 31/03/2013

• Industry has provided ETP comprising of primary, secondary and tertiary treatment system for treatment of trade effluent 120CMD. (earlier 704 CMD)

• Domestic waste water generated 250 CMD (earlier 288 CMD) is treated in Sewage Treatment Plant.

• As per earlier consent condition Industry has submitted Bank Guarantee of Rs. 5.0 Lakhs towards the segregation of metal bearing effluent.

• Industry has provided stacks to the all the sources of emissions. DG Sets are acoustically enclosed and with a sufficient height of stack.

• Regional officer Pune Recommended for grant of renewal of consent.

• We may GRANT CONSENT UP TO 31/03/2014 WITH EXTENSION OF BG UP TO 31/03/2014

• We may place the consent application before CAC for further consideration.

Page 63: 6th CAC05.7.2013 - Maharashtra Pollution Control Board

MAHARASHTRA POLLUTION CONTROL BOARD

Web agenda of 6th CAC meeting of 2013‐14 dtd 07.07.2013

CAC Item No. 23 Name of Industry :- M/s. Bharat Forge Ltd.

S. No. 72/76, Mundhwa, Pune 411 036

• Applied for renewal of consent

• Application received at SRO- Pune on dtd 28/03/2013 and at HQ on 01/06/2012

• Previous consent was valid up to 31/05/2013.

• Industry has generates trade effluent to the tune of 1065CMD (earlier 465 CMD) and for which they have provided effluent treatment plant of capacity 1500CMD consisting of primary, Secondary and tertiary system. The treated water is used for gardening and also recycled in process.

• Industry has generates domestic effluent to the tune of 683.9CMD (earlier 683.9 CMD ) and for which they have provided sewage treatment plant of capacity750CMD consisting of primary, Secondary and tertiary system and chlorination for disinfection.

• As per earlier consent condition Industry has installed CAAQMS and same is in operation and B.G of Rs.5Lacs towards install/operate CAAQMS submitted same is valid upto 31/5/2013.

• SRO Pune-I recommended the case for grant of renewal of consent

• RO Pune reported that the industry has not provided scrubber/fume extraction system as APC’s Bank Guarantee of Rs. 2.0 Lakhs may be forfeited

• We may call clarification from industry on various point