PPC-Energy:Update on Window 1 RE-IPP Procurement Programme.
07 June 2012
11
6/8/12
Presentation Content Introduction.
RE-IPP Procurement Process Background.
Overview of Evaluation Process (bid window 1).
Sequence of event.
Evaluation Composition.
Preferred Bidder Results and MW allocation.
Financial Evaluation.
Bid Window 2 progress.
22
6/8/12
Introduction
• The procurement documents were released on the 03 of August 2011 and compulsory bidders conference for the first and second window on the 14 of September 2011.
• The document provides for procurement of 3725MW in five different rounds subject to the availability of the MW
• The Department, under bid window one:– Received 53 Bids by the 4th of November– Announced 28 preferred bidders in December 2011
• With regards to bid window two:– Received 79 bids on the 5th of March 2012– These bids amount to 3255MW whilst the cap was 1275MW
33
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
• Ninth Outline LevelClick to edit Master text styles
– Second level• Third level
– Fourth level» Fifth level
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
Ninth Outline LevelClick to edit Master text styles
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
• Ninth Outline LevelClick to edit Master text styles
– Second level• Third level
– Fourth level» Fifth level
6/8/12
• Procurement documents:
Request for Proposals
Part A: General Requirements and RulesPart B: Qualification Criteria
Power Purchase Agreement
Wind PPA Solar PPA
Implementation Agreement
Contract between the IPP and the DepartmentObligation for IPP to deliver on economic development
Part C: Economic Development
CSP PPA…….etcIn buyer default – Department to pay the IPPSmall hydro PPA
Procurement Process Background
44
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
• Ninth Outline LevelClick to edit Master text styles
– Second level• Third level
– Fourth level» Fifth level
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
Ninth Outline LevelClick to edit Master text styles
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
• Ninth Outline LevelClick to edit Master text styles
– Second level• Third level
– Fourth level» Fifth level
6/8/12
Procurement Process Background:
IPPGovernment Eskom
Government Framework Support Agreement
Impl
emen
tatio
n
Agre
emen
t
Pow
er P
urch
ase
Agre
emen
t
Contractual Arrangement
55
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
• Ninth Outline LevelClick to edit Master text styles
– Second level• Third level
– Fourth level» Fifth level
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
Ninth Outline LevelClick to edit Master text styles
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
• Ninth Outline LevelClick to edit Master text styles
– Second level• Third level
– Fourth level» Fifth level
6/8/12
Request for Proposal (RFP)
RFP Part A
Requirements Rules
RFP Part BQualification
RFP Part CComparative Evaluation
Price
Job creation LandEconomic DevelopFinanceTechnicalEnvironmentPrice Local content Preferential Procurement Enterprise Development
Socio-economic development
Capacity
Procurement Process Background
66
6/8/12
Part c evaluation
77
Price70 %
30 %Economic Dev
Job creation Socio -Economic Local content Preferential Procurement
Project costRand/MW
6/8/12
Overview of evaluation process(Bid Window 1)
88
6/8/12 99
Event Date
Ministerial determination (in consultation with National Energy Regulator of South Africa)• 3, 725 MW of new generation capacity required by 2016
Q2 of 2011
Programme launch• DoE issued a Request for Proposals
31 July 2011
Procurement uploaded on DoE website• Interested Bidders requested to register on a dedicated
programme site: www.ipp-renewables.co.za
03 August 2011
Compulsory Bidders’ Conference• Interested Bidders taken through the bidding process• Drew interest from across the globe
14 September 2011
Close of 1st Bidding Window• Evaluations ensued from 04 to 28 November 2011• Conducted by international and local financial, technical and
legal experts
04 November 2011
Announcement of Preferred Bidders• 28 preferred out of 53• Projects need to reach financial close by June 2012
07 December 2011
Sequence of Events: Bid Window 1
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
• Ninth Outline LevelClick to edit Master text styles
– Second level• Third level
– Fourth level» Fifth level
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
Ninth Outline LevelClick to edit Master text styles
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
• Ninth Outline LevelClick to edit Master text styles
– Second level• Third level
– Fourth level» Fifth level
6/8/12
• Evaluation team:
• International reviewers
• Legal review – Linklaters (UK)• Technical review – Blueprint
consult • Financial review – cross-
moderation between the two Financial Advisory firms
• Governance review – Ernst & Young
• Legal evaluation team
• Bowman Gilfillan• Edward Nathan Sonneberg• Ledwaba Mazwai• Webber Wentzel• BKS
• Technical evaluation team
• Mott Macdonald
• Financial evaluation team
• Ernst & Young• PWC
• Evaluation Streams:
• Legal Environment• Environmental Authorization
• Legal Land• Land right• Notarial lease registration• Proof of land use application
• Legal Commercial• Acceptance of the PPA• Project structure
• Economic Development• Contributor status level 5• Compliance with threshold
• Financial• Full and partial price
indexation• Technical
• Eligibility• Energy resource
Evaluation Composition
1010
6/8/12
Renewable Energy IPP’s: Window 1 Preferred Bidder
1111
Allocation to Preferred Bidders: Window 1
Allocation per Determination Still Available MW allocation
per Determination
MW Percentage MW PercentageSolar PV 631.53 43.6% 818.47 56.4% 1450.00Solar CSP 150.00 75.0% 50.00 25.0% 200.00Wind 633.99 34.3% 1216.01 65.7% 1850.00Biomass 0.00 0.0% 12.50 100.0% 12.50Biogas 0.00 0.0% 12.50 100.0% 12.50Landfill gas 0.00 0.0% 25.00 100.0% 25.00Small Hydro 0.00 0.0% 75.00 100.0% 75.00Total MW 1415.52 39.0% 2209.48 61.0% 3625.00 Total Capacity - Bids Received 2127.66 Percentage Preferred Bidders 66.5%
Number of Passing Bids 28
6/8/12
Contracted Number of Jobs: Window 1 & Window 2 Compared.
1212
Jobs during construction Jobs during operations
First Round 13 908 874
Second Round 22 590 1 371
6/8/12
Financial Evaluation(Bid Window 1)
1313
6/8/12
Introduction
• Majority of bids to a generally high standard;• No bidder submitted a fully compliant Part B submission;• Significant number of “failures” related to non-material
omissions and inconsistencies perhaps reflecting tight timeframe for bid preparation;
1414
6/8/12
Financial Evaluation
Key areas of shortcoming included:• Letters of support not provided by parent company &/or
funders;• Rationale and quantum of success fees not fully described;• Limited information on hedging strategies;• Incomplete financial accounts for equity participants• Calculation of partial/fully indexed tariffs not done
comprehensively.
1515
6/8/12
Financial evaluation results
Results post-clarification:
Solar PV Wind CSP Hydro Total
Pass (MW) 682 701 150 0 1533
No. Projects 21 10 2 0 33
Fail (MW) 357 233 0 4 594
No. Projects 16 3 0 1 20
1616
6/8/12
Financial Analysis – Tariffs
• Majority of bidders have priced at or just below the applicable technology price cap;
• Similarly most bidders have shown a strong preference for a fully indexed tariff;
• This may reflect bidder expectation that Round 1 would be undersubscribed.
1717
6/8/12
Bidding Price Differential: Window 1 & Window 2 Compared.
1818
Technology2nd Round
Average1st Round Average Difference Price Cap
Solar Photovoltaic R 1 993.20 R 2 662.00 -25.1% R 2 850.00
Onshore Wind R 1 005.30 R 1 134.00 -11.3% R 1 050.00
Small Hydro R 1 030.00 R 1 030.00 0.0% R 1 030.00
Concentrated Solar Power R 2 512.00 R 2 686.00 -6.5% R 2 850.00
Landfill Gas R 840.00 R 840.00
6/8/12
Overview of evaluation process(Bid window 2)
1919
6/8/12 2020
Financial Investment: Bid Window 2 Number of Projects Net Capacity
(MW) Total Project Cost
(R' 000 000) Concentrated Solar Power Northern Cape 1 50 R 4 483 Landfill Gas Gauteng 1 14 R 237KwaZulu Natal 1 3 R 52 Onshore Wind Eastern Cape 10 619 R 12 812Northern Cape 2 238 R 4 853Western Cape 10 599 R 12 202 Solar Photovoltaic Eastern Cape 6 190 R 5 382Free State 4 145 R 4 558Gauteng 3 136 R 3 139Limpopo 4 127 R 4 559Mpumalanga 1 9 R 248North West 3 67 R 2 376Northern Cape 23 799 R 22 745Western Cape 7 221 R 6 708 Small Hydro Free State 2 8 R 202Northern Cape 1 10 R 498 Grand Total 79 3 233 R 85 054
6/8/12
Preferred BiddersGeographic Distribution
2121