John C. Frain Director Regulatory Strategy & Revenue Policy P.O. Box 1475 Baltimore, Maryland 21203-1475 Telephone 410.470.1169 Fax 410.470.8022 www.bge.com [email protected]June 27, 2019 Via Electronic Filing Terry J. Romine, Executive Secretary Public Service Commission of Maryland William Donald Schaefer Tower 6 Saint Paul Street, 16 th Floor Baltimore, Maryland 21202-6806 Re: Case Nos. 9056/9064 - Revisions to P.S.C. Md. E-6 – Residential, Type I and Type II Standard Offer Generation Market-Priced Service, Transmission and Administrative Charges under Rider 1 Dear Ms. Romine: Baltimore Gas and Electric Company (BGE or the Company) files herewith Supplement 631 to P.S.C. Md. E-6, BGE’s Retail Electric Service Tariff, to include the updated retail transmission rates based on the FERC-jurisdictional wholesale transmission rates filed with FERC and effective June 1, 2019, following recent discussions with Commission Staff regarding the PJM Transmission Rate Design settlement approved by FERC on May 31, 2018 in Docket No. EL05- 121-009 (the “FERC settlement”). The Company is requesting Supplement 631 to be effective August 1, 2019. Specifically, as indicated in a May 23, 2019 letter, the Company is submitting this supplement herein to reflect updated transmission rates, effective August 1, 2019. 1 The proposed rates reflect recent discussions with Commission Staff regarding the treatment of costs associated with the FERC settlement, and also align with the Commission’s recent decisions on similar filings made by Potomac Electric Power Company and Delmarva Power & Light Company. 2 This filing revises Rider 1, to include the updated retail transmission rates and associated impacts on the CWC Revenue Requirement component of the Administrative Charges for Residential, Type I, Type II and Hourly Service customers, included as Attachment 1 in both red- lined and clean versions. Schedule PAL tariff revisions are also included in Attachment 1. The CWC Revenue Requirement component is impacted as it is based in part upon PJM costs, including transmission costs and costs associated with the FERC settlement, proposed to be included in Rider 1. Lastly, the calculations of the proposed Administrative Charges, reflecting 1 See Company filing to withdraw Amended Supplement No. 628 issued May 23, 2019. 2 See Commission Letter Orders on Mail Log #223367 and #223368 issued May 15, 2019.
14
Embed
631 to P.S.C. Md. E-6, BGE’s Retail Electric Service Tariff (the … · 2019. 6. 27. · Light-Emitting Diode* 39 LED 70 Pendant - 39 $9.32 51 LED 100 Pendant - 51 $8.03 72 LED
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
John C. Frain Director Regulatory Strategy & Revenue Policy P.O. Box 1475 Baltimore, Maryland 21203-1475
Re: Case Nos. 9056/9064 - Revisions to P.S.C. Md. E-6 – Residential, Type I and Type II
Standard Offer Generation Market-Priced Service, Transmission and
Administrative Charges under Rider 1
Dear Ms. Romine:
Baltimore Gas and Electric Company (BGE or the Company) files herewith Supplement
631 to P.S.C. Md. E-6, BGE’s Retail Electric Service Tariff, to include the updated retail
transmission rates based on the FERC-jurisdictional wholesale transmission rates filed with FERC
and effective June 1, 2019, following recent discussions with Commission Staff regarding the PJM
Transmission Rate Design settlement approved by FERC on May 31, 2018 in Docket No. EL05-
121-009 (the “FERC settlement”). The Company is requesting Supplement 631 to be effective
August 1, 2019.
Specifically, as indicated in a May 23, 2019 letter, the Company is submitting this
supplement herein to reflect updated transmission rates, effective August 1, 2019. 1 The proposed
rates reflect recent discussions with Commission Staff regarding the treatment of costs associated
with the FERC settlement, and also align with the Commission’s recent decisions on similar filings
made by Potomac Electric Power Company and Delmarva Power & Light Company.2
This filing revises Rider 1, to include the updated retail transmission rates and associated
impacts on the CWC Revenue Requirement component of the Administrative Charges for
Residential, Type I, Type II and Hourly Service customers, included as Attachment 1 in both red-
lined and clean versions. Schedule PAL tariff revisions are also included in Attachment 1. The
CWC Revenue Requirement component is impacted as it is based in part upon PJM costs,
including transmission costs and costs associated with the FERC settlement, proposed to be
included in Rider 1. Lastly, the calculations of the proposed Administrative Charges, reflecting
1 See Company filing to withdraw Amended Supplement No. 628 issued May 23, 2019. 2 See Commission Letter Orders on Mail Log #223367 and #223368 issued May 15, 2019.
Attachment 1 – Rider 1 – Standard Offer Service and Schedule PAL (Private Area
Lighting) Rates
Redline and Clean Tariff Pages
Baltimore Gas and Electric Company – Electric -- Retail 57
AVAILABILITY: For unmetered outdoor area lighting of private property.
MONTHLY RATES:
1.
Billing Watts Description Rate
Mercury Vapor (limited to existing installations)
117 100w MV Pendant $9.01205 175w MV Pendant $10.78 $10.77454 400w MV Pend/Flood $15.97 $15.96
1,090 1000w MV Pendant $29.39 $29.38
Sodium Vapor
120 100w SV Flood (limited to existing installations) $10.55120 100w SV Pendant $9.02173 150w SV Pendant $10.49298 250w SV Pendant $17.49467 400w SV Pend/Flood $17.68 $17.67
1,130 1000w SV Pendant $46.75 $46.73
Metal Halide (limited to existing installations)
189 100w MH Pulse Teardrop $26.02 $26.01189 150w MH Pulse Pendant $17.81 $17.80205 175w MH Pendant $17.76 $17.75445 400w MH Spot or Flood $27.50445 400w MH Pendant $27.19448 400w MH Pulse Flood/Spot $27.50 $27.49448 400w MH Pulse Pendant Gray $27.19 $27.18
1,090 1000w MH Pend/Flood $44.02 $44.01
Where longer than 4-foot upsweep arms are required for such lighting supply, add $3.68For each span of overhead wires required on existing and additional poles $1.60For the installation and maintenance of overhead-supplied lamp poles–each additional standarddistribution wood pole $3.67
39 LED 70 Pendant - 39 $9.3251 LED 100 Pendant - 51 $8.0372 LED 100 Pendant - 72 $9.8670 LED 100 Post Top Acorn $25.4772 LED 100 Post Top Arlington $28.5872 LED 100 Post Top Colonial $17.3454 LED 100 Post Top Modern $16.7070 LED 100 Post Top Decorative Acorn $34.7052 LED 100 Premiere Colonial $18.3372 LED 150 Pendant - 72 $9.2588 LED 150 Pendant - 88 $10.30
104 LED 150 Post Top Arlington $29.11106 LED 150 Post Top Colonial $18.38101 LED 150 Post Top Acorn $25.96101 LED 150 Post Top Decorative Acorn $35.2086 LED 150 Tear Drop $33.3375 LED 150 Premiere Colonial $20.23
129 LED 250 Pendant - 129 $13.28145 LED 250 Pendant - 145 $13.60151 LED 250 Tear Drop $42.49157 LED 400 Pendant - 157 $16.52273 LED 400 Pendant - 273 $20.05129 LED 400 Floodlight $14.87256 LED 1000 Floodlight $28.84 $28.83
*LED naming based on HID equivalent lamp watts4. For the installation and maintenance of underground supplied lamp poles and cables
each 12-foot square wood standard embedded post-top pole $15.66 each 12 foot fiberglass pole $15.66 each 12-foot fiberglass pole with shroud $25.70 each 14 foot fiberglass pole $15.66 each 14-foot embedded fiberglass post-top pole $15.66 each 14-foot fiberglass hinged pole $21.65 each 14-foot fluted black fiberglass pole $30.85 each 19-foot underground pole $22.01 each 20-foot round embedded bronze fiberglass pole each 30-foot round bronze finished $24.90 each 23 foot fiberglass pole with shroud $32.79 each 25-foot embedded metal pole $25.99 each 30-foot embedded metal pole $22.01 each 30-foot round embedded bronze fiberglass $26.79 each 30-foot round embedded bronze-fiberglass pole (incl. 1 arm) $29.54
Scheds. GL, P & T - Type II SOS Transmission Demand Charge - - - - - 2.64 - 2.64
- - - - - 2.93 - 2.93
Note:1
The Adminstrative Charge rates typically change every February, June and October.2
Tax Rates:
Gross Receipts Tax (GRT) = 2% (Transmission only)
PSC Assessment = 0.1937% (Effective October 2018)3
Charge per lamp-watt (¢/lamp-watt) = 4.405 4.406 ¢/kWh x 0.333 = 1.467 ¢/lamp-watt; Sch. PL rate reflected in lamp fixture and renewal rates, effective August June 2019
Total SOS rates exclude Rider 8 - Energy Cost Adjustment
Hourly Administrative Charge = 0.098 0.100 ¢/kWh effective August June 2019
Baltimore Gas & Electric Company
Current Market-Priced Service Rate Components
Generation Rate Total SOS RateTransmission Rate
(Transmission Rates Effective June 1, 2018)
(Transmission Rates Effective August 1, 2019)
Baltimore Gas and Electric Company – Electric -- Retail 57
AVAILABILITY: For unmetered outdoor area lighting of private property.
MONTHLY RATES:
1.
Billing Watts Description Rate
Mercury Vapor (limited to existing installations)
117 100w MV Pendant $9.01205 175w MV Pendant $10.77454 400w MV Pend/Flood $15.96
1,090 1000w MV Pendant $29.38
Sodium Vapor
120 100w SV Flood (limited to existing installations) $10.55120 100w SV Pendant $9.02173 150w SV Pendant $10.49298 250w SV Pendant $17.49467 400w SV Pend/Flood $17.67
1,130 1000w SV Pendant $46.73
Metal Halide (limited to existing installations)
189 100w MH Pulse Teardrop $26.01189 150w MH Pulse Pendant $17.80205 175w MH Pendant $17.75445 400w MH Spot or Flood $27.50445 400w MH Pendant $27.19448 400w MH Pulse Flood/Spot $27.49448 400w MH Pulse Pendant Gray $27.18
1,090 1000w MH Pend/Flood $44.01
Where longer than 4-foot upsweep arms are required for such lighting supply, add $3.68For each span of overhead wires required on existing and additional poles $1.60For the installation and maintenance of overhead-supplied lamp poles–each additional standarddistribution wood pole $3.67
39 LED 70 Pendant - 39 $9.3251 LED 100 Pendant - 51 $8.0372 LED 100 Pendant - 72 $9.8670 LED 100 Post Top Acorn $25.4772 LED 100 Post Top Arlington $28.5872 LED 100 Post Top Colonial $17.3454 LED 100 Post Top Modern $16.7070 LED 100 Post Top Decorative Acorn $34.7052 LED 100 Premiere Colonial $18.3372 LED 150 Pendant - 72 $9.2588 LED 150 Pendant - 88 $10.30
104 LED 150 Post Top Arlington $29.11106 LED 150 Post Top Colonial $18.38101 LED 150 Post Top Acorn $25.96101 LED 150 Post Top Decorative Acorn $35.2086 LED 150 Tear Drop $33.3375 LED 150 Premiere Colonial $20.23
129 LED 250 Pendant - 129 $13.28145 LED 250 Pendant - 145 $13.60151 LED 250 Tear Drop $42.49157 LED 400 Pendant - 157 $16.52273 LED 400 Pendant - 273 $20.05129 LED 400 Floodlight $14.87256 LED 1000 Floodlight $28.83
*LED naming based on HID equivalent lamp watts4. For the installation and maintenance of underground supplied lamp poles and cables
each 12-foot square wood standard embedded post-top pole $15.66 each 12 foot fiberglass pole $15.66 each 12-foot fiberglass pole with shroud $25.70 each 14 foot fiberglass pole $15.66 each 14-foot embedded fiberglass post-top pole $15.66 each 14-foot fiberglass hinged pole $21.65 each 14-foot fluted black fiberglass pole $30.85 each 19-foot underground pole $22.01 each 20-foot round embedded bronze fiberglass pole each 30-foot round bronze finished $24.90 each 23 foot fiberglass pole with shroud $32.79 each 25-foot embedded metal pole $25.99 each 30-foot embedded metal pole $22.01 each 30-foot round embedded bronze fiberglass $26.79 each 30-foot round embedded bronze-fiberglass pole (incl. 1 arm) $29.54
Aug. 1, 2019 - May 31, 2020 4.275 0.122 0.008 4.405 - - 4.405 -
Sched. PL - Type I SOS 3
Aug. 1, 2019 - May 31, 2020 4.275 0.122 0.008 4.405 - - 4.405 -
Sched. G - Type II SOS Aug. 1, 2019 - Aug. 31, 2019 4.953 0.113 0.010 5.076 0.828 - 5.904 -
Sched. GS - Type II SOS Aug. 1, 2019 - Aug. 31, 2019 On-Peak Energy 6.418 0.113 0.012 6.543 0.804 - 7.347 -
Aug. 1, 2019 - Aug. 31, 2019 Inter-Peak Energy 4.409 0.113 0.009 4.531 0.804 - 5.335 -
Aug. 1, 2019 - Aug. 31, 2019 Off-Peak Energy 3.899 0.113 0.008 4.020 0.804 - 4.824 -
Scheds. GL, P & T - Type II SOS Aug. 1, 2019 - Aug. 31, 2019 On-Peak Energy 6.612 0.113 0.013 6.738 - - 6.738 -
Aug. 1, 2019 - Aug. 31, 2019 Inter-Peak Energy 4.487 0.113 0.009 4.609 - - 4.609 -
Aug. 1, 2019 - Aug. 31, 2019 Off-Peak Energy 3.999 0.113 0.008 4.120 - - 4.120 -
Scheds. GL, P & T - Type II SOS Transmission Demand Charge - - - - - 2.93 - 2.93
Note:1
The Adminstrative Charge rates typically change every February, June and October.2
Tax Rates:
Gross Receipts Tax (GRT) = 2% (Transmission only)
PSC Assessment = 0.1937% (Effective October 2018)3
Charge per lamp-watt (¢/lamp-watt) = 4.405 ¢/kWh x 0.333 = 1.467 ¢/lamp-watt; Sch. PL rate reflected in lamp fixture and renewal rates, effective August 2019
Total SOS rates exclude Rider 8 - Energy Cost Adjustment
Hourly Administrative Charge = 0.098 ¢/kWh effective August 2019
Baltimore Gas & Electric Company
Current Market-Priced Service Rate Components
Generation Rate Total SOS RateTransmission Rate
(Transmission Rates Effective August 1, 2019)
Attachment 2 – Development of the Retail Transmission Rates