Complied by Date ISSUE ECN DATE SIGN CUSTOMER: FIXING: ORDER No: DB 15/07/15 6185-MAR Funland Mardi Gras Ground 0 1729 15/07/15 DB 1 MC Minor 21/11/18
Complied by
Date
ISSUEECNDATESIGN
CUSTOMER: FIXING:ORDER No:
DB
15/07/15
6185-MAR Funland Mardi Gras Ground
0
1729
15/07/15
DB
1
MC
Minor21/11/18
Complied by
Date
ISSUEECNDATESIGN
CUSTOMER: FIXING:ORDER No:
DB
15/07/15
6185-MAR Funland Mardi Gras Ground
0
1729
15/07/15
DB
657 905
449 456
2595 905 425
104 111
345 345
449 456
425
13
5
635
13
5
986
1290
425
456
449
2164
11 1 1
11 1 1
1 1
11
2
2 2
2
34
Foundations:1 = 300mm x 300mm x 475mm Deep2 = 375mm x 375mm x 375mm Deep3 = 600mm x 375mm x 390mm Deep4 = 700mm x 375mm x 375mm Deep
1
MC
Minor21/11/18
Complied by
Date
ISSUEECNDATESIGN
CUSTOMER: FIXING:ORDER No:
DB
15/07/15
6185-MAR Funland Mardi Gras Ground
0
1729
15/07/15
DB
Wetpour48.5 sq. metres 60mm wetpour28.5 linear metres wetpour edging
1
MC
Minor21/11/18
35
00
904
6804
3213 733 504
9350
201
1
3843
404
1500
265
0120
065
0
1450 1050 1750 700 1050 270015
00
R15
00
R1400
R1400
R1500
R150
0
R1000
R10
00
R15
00
R1500
R1500
Complied by
Date
ISSUEECNDATESIGN
CUSTOMER: FIXING:ORDER No:
DB
15/07/15
6185-MAR Funland Mardi Gras Ground
3220
22
71
7500
10000
Grassmats43 Wicksteed safety grass mats (1.5m x 1.0m)
0
1729
15/07/15
DB
1
MC
Minor21/11/18
Complied by
Date
ISSUEECNDATESIGN
CUSTOMER: FIXING:ORDER No:
DB
15/07/15
6185-MAR Funland Mardi Gras Ground
0
172915/07/15
DB
1428 2655
407
3600 1285
9375
407
1285
14
50
655
17
29
891
400
6817
6558913390400
13002739
2739
2649
1428
1605
2940
Loosefill51.8 sq. metres loosefill surfacing28 linea metres edging
1
MC
Minor21/11/18
Complied by
Date
ISSUEECNDATESIGN
CUSTOMER: FIXING:ORDER No:
DB
15/07/15
6185-MAR Funland Mardi Gras Ground
0
172915/07/15
DB
Climbing Net
Climbing Wall & Barrier
Firemans Pole
Bannister Slide
Stainless Slide
Barrier
Barrier
Firemans PolePanel Barrier
Panel Barrier
Net Deck
Barrier
Barrier
Climbing Ramp
1
MC
Minor21/11/18
SPECIFICATION
INSTALLATION INSTRUCTIONS
Note
Note
PROD. CODE
SIZE
AGE RANGE
F/ FALL HEIGHT
HEAVIEST PART
TOTAL WEIGHT
Funland
Firemans Pole6185-002
8 to Adult
1500mm
30 Kg
30 Kg
6185-002Page 1 of 4
810mm L x 472mm Wx 3054mm H
Fixings are corrosion resistant and where exposed are anti-vandal.Steel components are zinc coated and polyester powder painted.
1. Read all instructions thoroughly before commencing installation.
2. Excavate foundation hole as per foundation plan.
3. Place firemans pole into foundation hole ensuring it is at the correct height & orientation.
4. Fix firemans pole to tower using the supplied fixings and check alignment.
5. Backfill foundation holes with concrete (4 parts gravel, 2 parts sand, 1 part cement).
6. Allow concrete to set for 48 hours.
Ensure all installation aids are removed before first use!
6185-002
Page 2 of 4
Foundations(Care must be taken under abnormal conditions)
(Tower part shown for clarity)375
30
037
5
400BARK
675.0
Roundoff concrete
42
9
453 453375 Square
Ground Fixed Bark Fixed
6185-002
Page 3 of 4
Firemans Pole Fixings
Green Top Cap
Dia. 6 x 40mm Torx C'sk Woodscrew
Green Top Cover
Yellow Poepplemann Cup
M10 Washer
M10 x 50mm Hex HD Coach Screw
Yellow Poepplemann Cap
Parts ListDESCRIPTIONPART NUMBERQTYITEM
M10 Nut2193-006210
M10 x 30 LG HEX HD SCREW2175-11629
Z-SHAPED BELOW GROUND FIXING5071-02828
M10 x 50 HEX HEAD COACH SCREW2114-02945
M10 Washer2215-50844
Yellow Poepplemann Cap2611-029_Cap43
Yellow Poepplemann Cup2611-029_Cup42
Firemans Pole4202-21311
FOR BARK FIX ADD:DESCRIPTIONPART NUMBERQTYITEM
M10 x 30 LG HEX HD SCREW2175-11628
M10 Nut2193-00627
Z-SHAPED BELOW GROUND FIXING5071-02826
REV
ECN
SIG.
DATE:
COMPILED
DATE:
6185-002
Page 4 of 4
DB
11/02/14
0
1691
DB
07/03/14
SPECIFICATION
INSTALLATION INSTRUCTIONS
Note
Note
PROD. CODE
SIZE
AGE RANGE
F/ FALL HEIGHT
HEAVIEST PART
TOTAL WEIGHT
Funland
Tower Guard Rail6185-004
8 to Adult
1500mm
7 Kg
7 Kg
6185-004Page 1 of 3
810mm W x 930mm H
Fixings are corrosion resistant and where exposed are anti-vandal.Steel components are zinc coated and polyester powder painted.
1. Read all instructions thoroughly before commencing installation.
2. Position tower barrier between uprights and loosely fit.
3. Ensure the correct clearance gap is achieved between the deck & base tube of barrier.
4. Tighten all fixings.
Ensure all installation aids are removed before first use!
6185-004
Page 2 of 3
Yellow Poepplemann Cap
M10 x 50mm Hex HD Coach Screw
M10 Washer
Yellow Poepplemann Cup
Guardrail Fixings
REV
ECN
SIG.
DATE:
COMPILED
DATE:
6185-004
Page 3 of 3
DB
12/02/14
M10 x 50 HEX HEAD COACH SCREW2114-02935
M10 Washer2215-50834
Yellow Poepplemann Cap2611-029_Cap33
Yellow Poepplemann Cup2611-029_Cup32
Handrail Assy4202-23111
DESCRIPTIONPART NUMBERQTYITEM
810.0
836
0
1691
DB
07/03/14
30
THE GAP BETWEEN THE TUBE ANDDECK MUST BE MORE THAN 26mm(TO AVOID FINGER TRAP) & LESSTHAN 44mm (TO AVOID NECK TRAP)
1
Minor
DB
25/11/15
SPECIFICATION
INSTALLATION INSTRUCTIONS
Note
Note
PROD. CODE
SIZE
AGE RANGE
F/ FALL HEIGHT
HEAVIEST PART
TOTAL WEIGHT
Funland
Climbing Wall6185-005
8 to Adult
1500mm
14 Kg Approx
28 Kg Approx
6185-005Page 1 of 3
Wooden posts are laminated, all timber is from European pine and is protected against rot.Fixings are corrosion resistant and where exposed are anti-vandal.Steel components are zinc coated and polyester powder painted.
Ensure all installation aids are removed before first use!
1. Read all instructions thoroughly before commencing installation.
3. Position climbing wall against tower and loosely fit.
4. Check climbing wall sits correctly on unit and tighten all fixings.
820mm L x 120mm Wx 1490mm H
6185-005
Page 2 of 3
Climbing Wall To Tower Fixings
AluminiumHandhold
M10 Safety Fastener(For Handhold)
Dia. 6 x 60mm Torx C'sk Woodscrew
Panel & Handhold Fixings
Green Poepplemann Cup
M10 x 150mm HexHD Bolt
M10 Washer
GreenPoepplemannCap
GreenPoepplemann
Cap
M10 Nut
M10 Washer
Green Poepplemann Cup
REV
ECN
SIG.
DATE:
COMPILED
DATE:
6185-005
Page 3 of 3
DB
12/02/14
M10 Nut2193-006414
M10 x 150 Hex Head Bolt2185-050413
Green Poeppelmann Cup2611-033_Cup812
Green Poepplemann Cap2611-033_Cap811
Ø6 x 60 Torx c'sunk woodscrew2111-1421110
M10 x 80 HEX HEAD COACH SCREW2114-02729
M10 Safety Fastener2177-00268
M10 Washer2215-508107
Climbing Wall Board3720-15214
Climbing Wall Support3720-15323
Climbing Wall Cross Brace3720-15412
Aluminium Handhold80144-0361
DESCRIPTIONPART NUMBERQTYITEM
820
12
40
0
1691
DB
07/03/14
SPECIFICATION
INSTALLATION INSTRUCTIONS
Note
Note
PROD. CODE
SIZE
AGE RANGE
F/ FALL HEIGHT
HEAVIEST PART
TOTAL WEIGHT
Funland
Climbing Net6185-007
8 to Adult
1500mm
8 Kg Approx
16 Kg Approx
6185-007Page 1 of 3
Steel components are zinc coated and polyester powder painted.Ropes are steel-cored nylon braded with aluminium or plastic fittings.Fixings are corrosion resistant and where exposed are anti vandal.Stainless steel parts are corrosion resistant and polished.
1. Read all instructions thoroughly before commencing installation.
2. Fix steel bar between uprights.
3. Attach rope net loosely to steel bar and tower uprights.
4. Check rope sits correctly on unit and tighten all fixings.
Ensure all installation aids are removed before first use!
2500mm L x 1820mm H
6185-007
Page 2 of 3
Yellow Poepplemann Cap
M10 Nut
M10 Washer
Yellow Poepplemann Cup
Wicksteed Washer
Yellow Poepplemann Cap
Yellow Poepplemann Cup
M10 Washer
M10 x 125mm Hex HD Bolt
Climbing Net Assy
32 NBT Saddle Washer
32 NBT Saddle Washer
M10 Safety Fastener
Top Rail Fixings
Side Fixings
M8 x 25mm Pent Button Head
M10 Spring Washer
M8 Short Safety Fastener
REV
ECN
SIG.
DATE:
COMPILED
DATE:
6185-007
Page 3 of 3
DB
12/02/14
M8 x 25 Pent Button Head2176-152819
M10 Safety Fastener2177-002318
M8 Short Safety Fastener2177-004817
M10 x 125 Hex Head Bolt2185-051216
M12 Binx Nut2191-011815
M10 Nut2193-006214
M10 Spring Washer2212-203813
M10 Washer2215-508412
M12 Plain Washer2215-509811
Wicksteed Washer2215-519110
Yellow Poepplemann Cap2611-029_Cap89
Yellow Poepplemann Cup2611-029_Cup88
Green Poepplemann Cap2611-033_Cap47
Green Poeppelmann Cup2611-033_Cup46
CHAIN BOLT HEAD3030-27485
M12 x 110mm Stud3033-04684
32 NBT SADDLE WASHER3711-05163
Climbing Net4141-14912
Net Support Rail Assembly4202-23311
DESCRIPTIONPART NUMBERQTYITEM
2500
60
01810
0
1691
DB
07/03/14
SPECIFICATION
INSTALLATION INSTRUCTIONS
Note
Note
PROD. CODE
SIZE
AGE RANGE
F/ FALL HEIGHT
HEAVIEST PART
TOTAL WEIGHT
Funland
Bannister Slide6185-008
8 to Adult
1500mm
18 Kg Approx
18 Kg Approx
6185-008Page 1 of 4
Fixings are corrosion resistant and where exposed are anti-vandal.Steel components are zinc coated and polyester powder painted.
1. Read all instructions thoroughly before commencing installation.
2. Excavate foundation hole as per foundation plan.
3. Place bannister slide into foundation hole ensuring it is at the correct height & orientation.
4. Fix bannister slide to tower using the supplied fixings and check alignment.
5. Backfill foundation holes with concrete (4 parts gravel, 2 parts sand, 1 part cement).
6. Allow concrete to set for 48 hours.
Ensure all installation aids are removed before first use!
2203mm L x 810mm Wx 2424mm H
6185-008
Page 2 of 4
Foundations(Care must be taken under abnormal conditions)
(Tower part shown for clarity)21
60
453 453
375
Round off concrete
675
400BARK
375
300
700
375
Ground Fixed Bark Fixed
6185-008
Page 3 of 4
Fixing DetailSlide Rail To Tower
Yellow Poepplemann Cap
M10 x 50mm HexHD Coach Screw
M10 Washer
Yellow Poepplemann Cup
REV
ECN
SIG.
DATE:
COMPILED
DATE:
6185-008
Page 4 of 4
DB
11/02/14
PARTS LISTDESCRIPTIONPART NUMBERQTYITEM
M10 x 50 HEX HEAD COACH SCREW2114-02946
M10 Washer2215-50845
Yellow Poepplemann Cap2611-029_Cap44
Yellow Poepplemann Cup2611-029_Cup43
LH Bannister Assembly4202-23512
RH Bannister Assembly4202-23611
FOR BARK FIX ADD:DESCRIPTIONPART NUMBERQTYITEM
M10 Nut2193-00649
M10 x 30 LG HEX HD SCREW2175-11648
Z-SHAPED BELOW GROUND FIXING5071-02847
0
1691
DB
07/03/14
SPECIFICATION
INSTALLATION INSTRUCTIONS
Note
Note
PROD. CODE
SIZE
AGE RANGE
F/ FALL HEIGHT
HEAVIEST PART
TOTAL WEIGHT
Funland
Gala Slide6185-011
8 to Adult
1500mm
57 Kg Approx
70 Kg Approx
6185-011Page 1 of 5
Solid steel to BS 970 Part 1.Nominal bore tube (meduim) to BS 1387.Stainless steel tube to ISO 4200.Stainless steel plate to BS 1449 Part 2.Welds are from copper free wire to BS EN 440.
Low lead polyester powder paint to BS 71 part 3.Standard fixings are made to either BS 3692 orBS 4190.Non standard fixings are anti-vandal andcorrosion resistant.
1. Read instructions thoroughly before commencing installation of unit.
2. Excavate foundation holes as shown on the foundation plan.
3. Attach legs to chute and position in place.
4. Attach slide loosely to tower.
5. Check slide is at the correct height & position.
6. Tighten all fixings and concrete foundations (4 parts gravel, 2 parts sand, 1 part cement).
7. Allow concrete to set for a period of 48 hours.
8. Re-tighten all fixings.
All installation aids to be removed before first use!
2780mm L x 980mm Wx 2250mm H
In accordance with 6.1.3 EN1176-1:2008 we recommend that slides do notface south or near due south due to heat build up.
6185-011
Page 2 of 5
Foundations(Care must be taken under abnormal conditions)
983
690
375
600
375 Sq.
375 Sq.
Tower shownfor clarity
375
390
Concrete
1290
Spragging Iron
Brick
6185-011
Page 3 of 5
Slide To Tower Fixings
Poepplemann Cap
M10 x 50mm Hex HD Coach ScrewM10 Washer
Poepplemann Cup
375
400
(300)
ROUND OFFEDGES
Bark
Spragging Iron
Brick
Concrete
Foundations For Bark(Care must be taken under abnormal conditions)
6185-011
Page 4 of 5
Guardrail To Tower Fixings
Poepplemann Cap
M10 x 80 Hex HD Coach Screw
M10 Washer
Poepplemann Cup
Please Note: Guardrailshould be a minimum of600mm up to a maximumof 900mm from the towerdeck surface!
Slide Leg To Chute Fixings
M12 x 30mm Pent Button Head
M12 Spring Washer
M12 Washer
Chute Leg
REV
ECN
SIG.
DATE:
COMPILED
DATE:
6185-011
Page 5 of 5
DB
20/03/14
Parts ListDESCRIPTIONPART NUMBERQTYITEM
M10 x 80 HEX HEAD COACH SCREW2114-027414
M10 x 50 HEX HEAD COACH SCREW2114-029413
M12 x 30 Pent Button Head2176-177212
M12 Spring Washer2212-204211
M10 Washer2215-508810
M12 Plain Washer2215-50929
Yellow Poepplemann Cap2611-029_Cap48
Yellow Poepplemann Cup2611-029_Cup47
Green Poepplemann Cap2611-033_Cap46
Green Poeppelmann Cup2611-033_Cup45
SUPPORT LEG3001-43524
SPRAGGING IRON3031-01023
LOW SLIDE CHUTE4202-26312
Guard Rail Assy4202-26411
0
1691
DB
20/03/14
For Bark Fixed Units:Item 2 (Low Slide Chute) is replaced with 4202-266& Item 4 (Support Leg) is replaced with 3001-438.
1
MC
Minor
18/08/15
SPECIFICATION
INSTALLATION INSTRUCTIONS
Note
Note
PROD. CODE
SIZE
AGE RANGE
F/ FALL HEIGHT
HEAVIEST PART
TOTAL WEIGHT
Funland
6185-012
8 to Adult
1500mm
15 Kg Approx
178 Kg Approx
6185-012Page 1 of 7
Mardi Gras Step Tower
1945mm L x 1000mm Wx 2520mm H
Wooden posts are laminated, all timber is from European pine and is protected against rot.Fixings are corrosion resistant and where exposed are anti-vandal.Steel components are zinc coated and polyester powder painted.
1. Read all instructions thoroughly before commencing installation.
2. Excavate foundation holes as per foundation plan.
3. Place tower into foundation holes ensuring it is at the correct height & orientation.
4. Backfill foundation holes with concrete (4 parts gravel, 2 parts sand, 1 part cement).
5. Allow concrete to set for 48 hours.
Ensure all installation aids are removed before first use!
6185-012
Page 2 of 7
Foundations(Care must be taken under abnormal conditions)
905 905
905
1810
300 Sq.
GROUND FIXED BARK FIXED
475
Brick
BelowGroundFixing
Concrete
300
475
40
0B
ark
RoundOffConcrete
BrickZ-Shaped Bars
77
5
6185-012
Page 3 of 7
GreenPoepplemann
Cap
M10 Nut
M10 Washer
GreenPoepplemann
Cap
M10 Nut
M10 Washer
GreenPoepplemann
Cup
GreenPoepplemannCup
M10 x 155mm Hex HD Bolt
GreenPoepplemannCap
Green Poepplemann Cap
M10 x 65mm Hex HD Bolt
Green Poepplemann Cup
M10 x 65mm Hex HD Bolt
Green Poepplemann CapGreen Poepplemann Cup
M10 Washer
M10 Nut
GreenPoepplemannCup
Tower Under Deck Fixings
6185-012
Page 4 of 7
Dia. 6 x 60mmTorx C'sk Woodscrew
Green Top Cap
Green Top Cover
Dia. 6 x 40mm Torx C'sk Woodscrew
Tower Deck Fixings
Top Cap Fixings
6185-012
Page 5 of 7
Barrier Board Fixings
Green Poepplemann Cap
M10 x 80mm Hex HD Coach Screw
M10 Washer
Green Poepplemann Cup
Rope Deck Fixings To Tower Uprights
GreenPoepplemannCap
M10 x 140mm Hex Head Bolt
M10 Washer
GreenPoepplemannCup
GreenPoepplemann
Cup
M10 Nut
GreenPoepplemann
Cap
6185-012
Page 6 of 7
Rope Deck Fixing of Rope To Frame
M10 x 50mm Pent Button Head
M10 Washer
M6 x 6mm Grub Screw
Net Assembly
REV
ECN
SIG.
DATE:
COMPILED
DATE:
6185-012
Page 7 of 7
DB
27/07/15
PARTS LISTDESCRIPTIONPART NUMBERQTYITEM
Woodland BGF5124-02761
Mardi Gras Net Deck Assy4202-47313
Barrier Board3720-25114
Rope Bridge Brace3720-24315
Tower Upright 2500mm Lg3720-24016
Tower Upright 2500mm Lg3720-23917
Tower Upright 2050mm Lg3720-23818
Tower Upright 2500mm Lg3720-23719
Tower Upright 2500mm Lg3720-236210
Tower Deck Support3720-145211
Tower Support3720-144212
Tower Deck3720-143113
85 x 85mm Angle Fixing Bracket3201-136414
Plastic Top Cap2611-041 Top Cap615
Plastic Fixing Cap2611-041 Fixing Cap616
Green Poeppelmann Cup2611-033_Cup4017
Green Poepplemann Cap2611-033_Cap4018
M10 Washer2215-5082219
M10 Nut2193-0061820
M10 x 155 Hex Head Bolt2185-572621
M10x140 Hex Head Bolt2185-049422
M10 x 65 Hex Head Bolt2185-041823
M10 x 80 HEX HEAD COACH SCREW2114-027425
Ø6 x 60 Torx c'sunk woodscrew2111-1421026
Ø6 x 40 Torx c'sunk woodscrew2111-140627
M10 Nut2193-0061228
FOR BARK FIX ADD:DESCRIPTIONPART NUMBERQTYITEM
Z-SHAPED BELOW GROUND FIXING5071-028122
M10 x 30 LG HEX HD SCREW2175-1161224
M10 Nut2193-0061228
0
1729
DB
27/07/15
SPECIFICATION
INSTALLATION INSTRUCTIONS
Note
Note
PROD. CODE
SIZE
AGE RANGE
F/ FALL HEIGHT
HEAVIEST PART
TOTAL WEIGHT
Funland
Mardi Gras Tower6185-013
8 to Adult
1500mm
15 Kg Approx
113 Kg Approx
6185-013Page 1 of 5
Wooden posts are laminated, all timber is from European pine and is protected against rot.Fixings are corrosion resistant and where exposed are anti-vandal.Steel components are zinc coated and polyester powder painted.
1. Read all instructions thoroughly before commencing installation.
2. Excavate foundation holes as per foundation plan.
3. Place tower into foundation holes ensuring it is at the correct height & orientation.
4. Backfill foundation holes with concrete (4 parts gravel, 2 parts sand, 1 part cement).
5. Allow concrete to set for 48 hours.
Ensure all installation aids are removed before first use!
1000mm L x 1000mm Wx 2520mm H
6185-013
Page 2 of 5
Foundations(Care must be taken under abnormal conditions)
400 Sq.
905.0905.0
475
Brick
WoodlandBGF
Concrete
400
BA
RK
300
475
775
Round OffConcrete
Z-Shape Bars
Brick
WoodlandBGF
GROUND FIXED BARK FIXED
6185-013
Page 3 of 5
Tower Under Deck Fixings
GreenPoepplemannCup
M10 Nut
M10 Washer
Green Poepplemann CupGreen Poepplemann Cap
M10 x 65mm Hex HD Bolt
Green Poepplemann Cup
M10 x 65mm Hex HD Bolt
Green Poepplemann Cap
GreenPoepplemannCap
M10 x 155mm Hex HD Bolt
GreenPoepplemannCup
GreenPoepplemann
CupM10 Washer
M10 Nut
GreenPoepplemann
Cap
M10 Washer
M10 Nut
GreenPoepplemann
Cap
6185-013
Page 4 of 5
Tower Deck Fixings
Dia. 6 x 60mmTorx C'sk Woodscrew
Top Cap Fixings
Dia. 6 x 40mm Torx C'sk Woodscrew
Green Top Cover
Green Top Cap
REV
ECN
SIG.
DATE:
COMPILED
DATE:
6185-013
Page 5 of 5
DB
21/07/15
PARTS LISTDESCRIPTIONPART NUMBERQTYITEM
Woodland BGF5124-02741
Tower Upright 2500mm Lg3720-24012
Tower Upright 2500mm Lg3720-23633
Tower Deck Support3720-14524
Tower Support3720-14425
Tower Deck3720-14316
85 x 85mm Angle Fixing Bracket3201-13647
Plastic Top Cap2611-041 Top Cap48
Plastic Fixing Cap2611-041 Fixing Cap49
Green Poeppelmann Cup2611-033_Cup2410
Green Poepplemann Cap2611-033_Cap2411
M10 Washer2215-5081212
M10 Nut2193-0061213
M10 x 155 Hex Head Bolt2185-572414
M10 x 65 Hex Head Bolt2185-041815
Ø6 x 60 Torx c'sunk woodscrew2111-1421016
Ø6 x 40 Torx c'sunk woodscrew2111-140417
M10 Nut2193-006820
FOR BARK FIX ADD:DESCRIPTIONPART NUMBERQTYITEM
Z-SHAPED BELOW GROUND FIXING5071-028818
M10 x 30 LG HEX HD SCREW2175-116819
M10 Nut2193-006820
0
1729
DB
21/07/15
SPECIFICATION
INSTALLATION INSTRUCTIONS
Note
Note
PROD. CODE
SIZE
AGE RANGE
F/ FALL HEIGHT
HEAVIEST PART
TOTAL WEIGHT
Funland
Climbing Ramp6185-014
8 to Adult
1000mm
16 Kg Approx
50 Kg Approx
6185-014Page 1 of 6
Wooden posts are laminated, all timber is from European pine and is protected against rot.Fixings are corrosion resistant and where exposed are anti-vandal.Steel components are zinc coated and polyester powder painted.
1. Read all instructions thoroughly before commencing installation.
2. Excavate foundation holes as per foundation plan.
3. Place climbing ramp into foundation holes ensuring it is at the correct height & orientation.
4. Fix climbing ramp to tower using the supplied fixings and check alignment.
5. Backfill foundation holes with concrete (4 parts gravel, 2 parts sand, 1 part cement).
6. Allow concrete to set for 48 hours.
Ensure all installation aids are removed before first use!
810mm W x 1250mm Lx 1000mm H
6185-014
Page 2 of 6
Foundations(Care must be taken under abnormal conditions)
(Tower shown for clarity)
300 Sq.
65
7
635
Below Ground Fixing
Concrete
Brick
475
GROUND FIXED BARK FIXED
40
0B
AR
K
475 7
75
300
Round Off Corners
Z-Shaped Bars
Brick Concrete
6185-014
Page 3 of 6
Leg Fixing Detail
GreenPoepplemannCap
M10 x 130mmHex Head Bolt
M10 Washer
GreenPoepplemannCup
M10 x 155mmHex Head Bolt
YellowPoepplemannCap
Yellow Poepplemann Cup
M10 x 80mm Hex Head Coach Screw
Green Poepplemann Cap
M10 Washer
Green Poepplemann Cup
GreenPoepplemann
Cup
M10 Washer
M10 Nut
GreenPoepplemann
Cap
Yellow Poepplemann Cap
M10 Nut
M10 Washer
Yellow Poepplemann Cup
6185-014
Page 4 of 6
Upper Fixing Detail
M10 x 100mm HexHead Coach Screw
Yellow Poepplemann Cap
M10 Washer
Yellow Poepplemann Cup
Yellow Poepplemann Cup
M10 Washer
M10 x 80mm Hex HeadCoach Screw
Yellow Poepplemann Cap
Yellow Poepplemann Cup
M10 Washer
M10 x 80mm Hex Head Screw
Yellow Poepplemann Cap
6185-014
Page 5 of 6
Dia. 6 x 60mm Torx C'sk Woodscrew
AluminiumHandhold
M10 Safety Fastener(For Handhold)
Panel & Handhold Fixings
REV
ECN
SIG.
DATE:
COMPILED
DATE:
6185-014
Page 6 of 6
DB
28/07/15
PARTS LISTDESCRIPTIONPART NUMBERQTYITEM
Aluminium Handhold80144-0351
Woodland BGF W.A.4202-34823
Climbing Ramp Leg Support3720-24814
Climbing Ramp Leg Support3720-24715
Climbing Ramp3720-24616
Climbing Ramp Support3720-24517
Climbing Ramp Support Brace 13720-24418
Climbing Ramp Support3720-24119
Climbing Ramp Support Brace 23720-148110
Fixing Plate3201-231111
Green Poeppelmann Cup2611-033_Cup1212
Green Poepplemann Cap2611-033_Cap1213
Yellow Poepplemann Cup2611-029_Cup1014
Yellow Poepplemann Cap2611-029_Cap1015
M10 Washer2215-5082016
M10 Nut2193-006617
M10 x 155 Hex Head Bolt2185-572218
M10 x 130 Hex Head Bolt2185-048419
M10 Safety Fastener2177-002520
M10 x 100 HEX HEAD COACH SCREW2114-028222
M10 x 80 HEX HEAD COACH SCREW2114-027823
Ø6 x 60 Torx c'sunk woodscrew2111-1421324
M10 Nut2193-006425
FOR BARK FIX ADD:DESCRIPTIONPART NUMBERQTYITEM
M10 x 30 LG HEX HD SCREW2175-116421
Z-SHAPED BELOW GROUND FIXING5071-02842
M10 Nut2193-006425
0
1729
DB
28/07/15
SPECIFICATION
INSTALLATION INSTRUCTIONS
Note
Note
PROD. CODE
SIZE
AGE RANGE
F/ FALL HEIGHT
HEAVIEST PART
TOTAL WEIGHT
Funland
Rope Deck Barrier6185-015
8 to Adult
See Tower
N/A
14 Kg Approx
6185-015Page 1 of
Wooden posts are laminated, all timber is from European pine and is protected against rot.Fixings are corrosion resistant and where exposed are anti-vandal.Steel components are zinc coated and polyester powder painted.
1. Read all instructions thoroughly before commencing installation.
3. Position tower barrier between uprights and loosely fit.
4. Check barrier sits correctly on unit and tighten all fixings.
Ensure all installation aids are removed before first use!
850mm x 810mm
6185-015
Page 2 of
Barrier Panel To Support Rail
M10 x 75mm Hex Head Bolt
Green Poepplemann Cap
Green Poepplemann Cup
GreenPoepplemannCap
M10 Nut
M10 Washer
Support Rail To Tower
M10 x 80mm Hex Head Screw
Yellow Poepplemann Cap
M10 Washer
Yellow Poepplemann Cup
Yellow Poepplemann Cup
M10 Washer
M10 x 80mm Hex Head Screw
Yellow Poepplemann Cap
REV
ECN
SIG.
DATE:
COMPILED
DATE:
6185-015
Page 3 of 3
DB
29/07/15
PARTS LISTDESCRIPTIONPART NUMBERQTYITEM
Barrier Panel3720-25011
Rope Bridge Brace3720-24922
85 x 85mm Angle Fixing Bracket3201-13643
Green Poeppelmann Cup2611-033_Cup84
Green Poepplemann Cap2611-033_Cap85
Yellow Poepplemann Cup2611-029_Cup86
Yellow Poepplemann Cap2611-029_Cap87
M10 Washer2215-508128
M10 Nut2193-00649
M10 x 75 HEX HEAD BOLT2185-043410
M10 x 80 HEX HEAD COACH SCREW2114-027811
0
1729
DB
29/07/15
Product: Date of Issue: 29/07/15
Issue: A
Item Unit Qty Part No. Checked
1 2 3720-250
2 4 3720-249
3 5 80144-03
4 1 3720-248
5 1 3720-247
6 1 3720-246
7 1 3720-245
8 1 3720-244
9 1 3720-241
10 1 3720-148
12 1 3720-240
13 3 3720-236
14 2 3720-145
15 2 3720-144
16 1 3720-143
Picked By: Checked By:
COMPILED REV 0
BY: DB ECN No. 1729
DATE 29/07/2015
DATE: 29/07/15 SIGN DB
Order No:
Barrier Panel *
Climbing Ramp *
Rope Deck Barrier - 6185-015
Tower Upright 2500mm Lg *
Tower Deck Support *
Climbing Ramp Support *
Mardi Gras Single Tower - 6185-013
Tower Upright 2500mm Lg *
Climbing Ramp Support Brace 2 *
Climbing Ramp Support *
Sheet 1 of 4
Climbing Ramp Support Brace 1 *
Climbing Ramp Leg Support *
DESPATCH LIST
Mardi Gras Climbing Ramp - 6185-014
Aluminium Handhold *
Climbing Ramp Leg Support *
Rope Bridge Brace *
Description
6185-MAR - Funland Mardi Gras Unit
Total No. of Items
Items marked * to be fitted before despatch
Tower Support *
Tower Deck *
Product: Date of Issue: 29/07/15
Issue: A
Item Unit Qty Part No. Checked
17 1 4202-473
18 1 3720-251
19 1 3720-243
20 1 3720-240
21 1 3720-239
22 1 3720-238
23 1 3720-237
24 1 3720-236
25 1 3720-142
26 2 3720-145
27 2 3720-144
28 1 3720-143
29 1 4202-264
30 1 4202-263
31 2 3031-010
32 2 3001-435
Picked By: Checked By:
COMPILED REV 0
BY: DB ECN No. 1729
DATE 29/07/2015
DATE: 29/07/15 SIGN DB
DESPATCH LIST Sheet 2 of 4
6185-MAR - Funland Mardi Gras Unit
Order No:
Description
Mardis Gras Step Tower - 6185-012
Mardi Gras Net Deck Assy *
Barrier Board *
Rope Bridge Brace *
Tower Upright 2500mm Lg *
Tower Upright 2500mm Lg *
Tower Upright 2050mm Lg *
Tower Upright 2500mm Lg *
Tower Upright 2050mm Lg *
Tower Upright 2500mm Lg *
Tower Deck Support *
Tower Support *
Tower Deck *
Gala Slide - 6185-011
Guard Rail Assy *
Low Slide Chute (For bark fix see last page)
Spragging Iron
Items marked * to be fitted before despatch
Total No. of Items
Support Leg (For bark fix see last page)
Product: Date of Issue: 29/07/15
Issue: A
Item Unit Qty Part No. Checked
33 1 4202-236
34 1 4202-235
35 1 4202-233
36 1 4141-149
37 6 80144-03
38 1 3720-154
39 2 3720-153
40 1 3720-152
41 5 4202-231
42 2 4202-213
Picked By: Checked By:
COMPILED REV 0
BY: DB ECN No. 1729
DATE 29/07/2015
DATE: 29/07/15 SIGN DB
DESPATCH LIST Sheet 3 of 4
6185-MAR - Funland Mardi Gras Unit
Order No:
Description
Bannister Slide - 6185-008
RH Bannister Assembly
LH Bannister Assembly
Climbing Net - 6185-007
Net Support Rail Assembly
Climbing Net
Climbing Wall - 6185-005
Aluminium Handhold *
Climbing Wall Cross Brace *
Climbing Wall Support *
Climbing Wall Board *
Tower Guard Rail - 6185-004
Handrail Assy *
Firemans Pole - 6185-002
Items marked * to be fitted before despatch
Total No. of Items
Firemans Pole Assy
Product: Date of Issue: 29/07/15
Issue: A
Item Unit Qty Part No. Checked
43 10 5124-027
44 2 4202-348
45 2 3201-231
46 28 5071-028
47 1 4202-266
48 2 3001-438
Picked By: Checked By:
COMPILED REV 0
BY: DB ECN No. 1729
DATE 29/07/2015
DATE: 29/07/15 SIGN DB
DESPATCH LIST Sheet 4 of 4
6185-MAR - Funland Mardi Gras Unit
Order No:
Description
Woodland BGF
Woodland BGF W.A.
Fixing Plate
For Bark Fix Add:
Z-Shaped BGF
Low Slide Chute - Bark (Replaces 4202-263)
Support Leg - Bark (Replaces 3001-435)
Items marked * to be fitted before despatch
Total No. of Items
Product: Date of Issue: 29/07/15
Issue: A
Item Unit Qty Part No. Checked
1 8 3201-136
2 16 2611-033_Cup
3 16 2611-033_Cap
4 16 2611-029_Cup
5 16 2611-029_Cap
6 24 2215-508
7 8 2193-006
8 8 2185-043
9 16 2114-027
10 12 2611-033_Cup
11 12 2611-033_Cap
12 10 2611-029_Cup
13 10 2611-029_Cap
14 20 2215-508
15 6 2193-006
16 2 2185-572
19 4 2185-048
20 5 2177-002
22 2 M10 x 100mm Hex Head Coach Screw * 2114-028
23 8 2114-027
24 13 2111-142
Picked By: Checked By:
COMPILED REV 0
BY: DB ECN No. 1729
DATE 29/07/2015
DATE: 29/07/15 SIGN DB
Total No. of Items
M10 x 80mm Hex Head Coach Screw (4 off *)
M6 x 60mm Torx C'sunk Woodscrew *
Items marked * to be fitted before despatch
M10 Safety Fastener *
M10 x 130mm Hex Head Bolt
M10 Nut *
FIXINGS LIST
Yellow Poepplemann Cup *
M10 x 155mm Hex Head Bolt *
M10 x 80mm Hex Head Coach Screw *
Yellow Poepplemann Cap *
M10 Washer (8 off *)
M10 Nut (2 off *)
Yellow Poepplemann Cap *
M10 Washer *
Green Poepplemann Cup *
Description
85 x 85mm Angle Fixing Bracket *
Sheet 1 of 5
Order No:
6185-MAR - Funland Mardi Gras Unit
Yellow Poepplemann Cup *
Climbing Ramp (Mardi Gras) - 6185-014
Green Poepplemann Cap
Green Poepplemann Cup
Green Poepplemann Cap *
M10 x 75mm Hex Head Bolt *
Rope Deck Barrier - 6185-015
Product: Date of Issue: 29/07/15
Issue: A
Item Unit Qty Part No. Checked
Mardi Gras Single Tower - 6185-013
25 4 85 x 85mm Angle Fixing Bracket * 3201-136
26 4 Plastic Top Cap * 2611-041_Top Cap
27 4 Plastic Fixing Cap * 2611-041_Fixing Cap
28 24 Green Poepplemann Cup * 2611-033_Cup
29 24 2611-033_Cap
30 12 2215-508
31 12 2193-006
32 4 2185-572
33 8 2185-041
34 10 2111-142
35 4 2111-140
36 4 3201-136
37 6 2611-041_Top Cap
38 6 2611-041_Fixing Cap
39 40 2611-033_Cup
40 40 2611-033_Cap
42 22 2215-508
43 18 2193-006
44 6 2185-572
45 4 2185-049
46 8 2185-041
Picked By: Checked By:
COMPILED REV 0
BY: DB ECN No. 1729
DATE 29/07/2015
DATE: 29/07/15 SIGN DB
Items marked * to be fitted before despatch
Total No. of Items
Green Poepplemann Cap *
M10 Washer *
M10 Nut *
M10 x 155mm Hex Head Bolt *
M10 x 140mm Hex Head Bolt *
M10 x 65mm Hex Head Bolt *
Mardis Gras Step Tower - 6185-012
85 x 85mm Angle Fixing Bracket *
Plastic Top Cap *
Plastic Fixing Cap *
Green Poepplemann Cup *
M10 Washer *
M10 Nut *
M10 x 155mm Hex Head Bolt *
M10 x 65mm Hex Head Bolt *
M6 x 60mm Torx C'sk Woodscrew *
M6 x 40mm Torx C'sk Woodscrew *
Green Poepplemann Cap *
FIXINGS LIST Sheet 2 of 5
6185-MAR - Funland Mardi Gras Unit
Order No:
Description
Product: Date of Issue: 29/07/15
Issue: A
Item Unit Qty Part No. Checked
47 4 M10 x 80mm Hex Head Coach Screw * 2114-027
48 10 M6 x 60mm Torx C'sk Woodscrew * 2111-142
49 6 M6 x 40mm Torx C'sk Woodscrew * 2111-140
50 4 2611-033_Cup
51 4 2611-033_Cap
52 4 2611-029_Cup
53 4 2611-029_Cap
54 2 2215-509
55 8 2215-508
56 2 2212-204
57 2 2176-177
58 4 2114-029
59 4 2114-027
60 4 2611-029_Cup
61 4 2611-029_Cap
62 4 2215-508
63 4 2114-029
Picked By: Checked By:
COMPILED REV 0
BY: DB ECN No. 1729
DATE 29/07/2015
DATE: 29/07/15 SIGN DB
FIXINGS LIST Sheet 3 of 5
6185-MAR - Funland Mardi Gras Unit
Order No:
Description
Gala Slide - 6185-011
Green Poepplemann Cup
Green Poepplemann Cap
Yellow Poepplemann Cup
Yellow Poepplemann Cap
M12 Washer
M10 Washer
M12 Spring Washer
M12 x 30mm Pent Button Head
M10 x 50mm Hex Head Coach Screw
M10 x 80mm Hex Head Coach Screw
Items marked * to be fitted before despatch
Total No. of Items
Mardis Gras Step Tower - 6185-012 (Cont)
Bannister Slide - 6185-008
Yellow Poepplemann Cup
Yellow Poepplemann Cap
M10 Washer
M10 x 50mm Hex Head Coach Screw
Product: Date of Issue: 29/07/15
Issue: A
Item Unit Qty Part No. Checked
64 6 32 NBT Saddle Washer 3711-051
65 8 M12 x 110mm Stud 3033-046
66 8 Chain Bolt Head 3030-274
67 4 Green Poepplemann Cup 2611-033_Cup
68 4 2611-033_Cap
69 8 2611-029_Cup
70 8 2611-029_Cap
71 1 2215-519
72 8 2215-509
73 4 2215-508
74 8 2212-203
75 2 2193-006
76 8 2191-011
77 2 2185-051
78 8 2177-004
79 3 2177-002
80 8 2176-152
81 8 2611-033_Cup
82 8 2611-033_Cap
83 10 2215-508
84 4 2193-006
Picked By: Checked By:
COMPILED REV 0
BY: DB ECN No. 1729
DATE 29/07/2015
DATE: 29/07/15 SIGN DB
FIXINGS LIST Sheet 4 of 5
6185-MAR - Funland Mardi Gras Unit
Order No:
Description
Climbing Net - 6185-007
Green Poepplemann Cap
Yellow Poepplemann Cup
Yellow Poepplemann Cap
Wicksteed Washer
M12 Washer
M10 Washer
M10 Spring Washer
M10 Nut
M12 Binx Nut
M10 x 125mm Hex Head Bolt
M8 Short Safety Fastener
M10 Washer (2 off *)
M10 Nut
Items marked * to be fitted before despatch
Total No. of Items
M10 Safety Fastener
M8 x 25mm Pent Button Head
Climbing Wall - 6185-005
Green Poepplemann Cup
Green Poepplemann Cap
Product: Date of Issue: 29/07/15
Issue: A
Item Unit Qty Part No. Checked
85 4 M10 x 150mm Hex Head Bolt 2185-050
86 6 M10 Safety Fastener * 2177-002
87 2 M10 x 80mm Hex Head Coach Screw * 2114-027
88 11 M6 x 60mm Torx C'sk Woodscrew * 2111-142
89 15 2611-029_Cup
90 15 2611-029_Cap
91 15 2215-508
92 15 2114-029
93 8 2611-029_Cup
94 8 2611-029_Cap
95 8 2215-508
96 8 2114-029
97 28 2175-116
98 28 2193-006
Picked By: Checked By:
COMPILED REV 0
BY: DB ECN No. 1729
DATE 29/07/2015
DATE: 29/07/15 SIGN DB
FIXINGS LIST Sheet 5 of 5
6185-MAR - Funland Mardi Gras Unit
Order No:
Description
Climbing Wall - 6185-005 (Cont)
Tower Guard Rail - 6185-004
Yellow Poepplemann Cup
Yellow Poepplemann Cap
M10 Washer
M10 x 50mm Hex Head Coach Screw
Firemans Pole - 6185-002
Yellow Poepplemann Cup
Yellow Poepplemann Cap
M10 Washer
Items marked * to be fitted before despatch
Total No. of Items
M10 x 50mm Hex Head Coach Screw
For Bark Fix Add:
M10 x 30mm Hex Head Screw
M10 Nut