DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS Republic of the Philippines CONSTRUCTION OF TOILET FACILITIES Prepared by : Assistant Secretary for Project Management Planning Officer III ENGR. MANUEL C. DEL CARMEN Sheet Content: Sheet No.: Sheet No.: TS S - - - - P S R A F N A R T M T O T N E O O C D N A T R A N O I T P C I N U A E D S N O I T M M PROJECT NAME : Submitted by: Recommending Approval: Approved: Regional Director Atty ALIM D. PANGANDAMAN ILDEFONSO T. PATDU, JR. ATTY. EFREN C. MONCUPA Undersecretary for Project Implementation and Special Concerns LOCATION : CARAGA REGION XIII TOILET FOUNDATION PLAN F1 - C1 F1 - C1 F1 - C1 F1 - C1 F1 - C1 F1 - C1 WF WF WF WF WF WF WF WF WF LENGTH LENGTH / 4 LENGTH / 4 TYPICAL DETAIL OF BEAM 10mm stirrups spaced @ 5-.05 m 5-.10 m 5-.15 m rest @ .20 m 12 mm horizontal bars 12161 600 600 4154 5154 1000 BUILDING LINE FIREWALL 2"X3" C-PURLINS 1.2 THICK TRUSS TRUSS TRUSS TRUSS TRUSS TRUSS TRUSS FASCIA FASCIA FASCIA TOILET ROOF FRAMING PLAN 10961 800 250 800 250 4-12mmØ VERT. BARS W/ 10mmØ LATERAL TIES SPACED; 3 @ 50mm, 3@100mm, 3@ 150mm, REST @ 200mm 7-16mmØ MATTING BARS BOTHWAYS PLAN 300 800 N.G.L. SECTION 4-12mmØ VERT. BARS W/ 10mmØ LATERAL TIES SPACED; 3 @ 50mm, 3@100mm, 3@ 150mm, REST @ 200mm F1-C1 TRUSS DETAIL DIAGRAM 6" CONCRETE HOLLOW BLOCKS PRE-PAINTED RIB TYPE ROOFING 2" X 4" C-PURLINS 2" X 6" CHANNEL BAR RAFTER ORDINARY GUTTER FASCIA BOARD 250 NAT. GRD. LINE FIN. GRD. LINE FIN. FLR. LINE 600 VERIFY 200 150mm THK. CHB WITH 10mmØ HOR. AND VERTICAL BARS @ 600mm O.C. 3-10mmØ LONG BARS 450 ELEVATION SURIGAO DISTRICT OFFICE CAPITOL COMPOUND, SURIGAO CITY AS SHOWN LTO.13.CR.P3.E1.L1.1 LTO.13.CR.P3.E1.L1.0 LTO.13.CR.P3.E1.L1.2
20
Embed
6 CONCRETE HOLLOW BLOCKS...EFREN C. MONCUPA Undersecretary for Project Implementation and Special Concerns LOCATION : CARAGA REGION XIII TOILET FOUNDATION PLAN F1 - C1 F1 - C1 F1 -
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
SURIGAO DISTRICT OFFICECAPITOL COMPOUND, SURIGAO CITY
AS SHOWN
LTO.13.CR.P3.E1.L1.1LTO.13.CR.P3.E1.L1.0
LTO.13.CR.P3.E1.L1.2
DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS
Republic of the Philippines
CONSTRUCTION OF TOILETFACILITIES
Prepared by :
Assistant Secretary for ProjectManagement
Planning Officer III
ENGR. MANUEL C. DEL CARMEN
Sheet Content:
Sheet No.:Sheet No.:
TSA --
--
PS
RA
F
NART
MT
OT
N E
O
O
CD
N
ATRA
NOIT
P
CIN
U
AE D SN OI T
MM
PROJECT NAME :
Submitted by:
Recommending Approval:
Approved:
Regional DirectorAtty ALIM D. PANGANDAMAN
ILDEFONSO T. PATDU, JR.
ATTY. EFREN C. MONCUPAUndersecretary for Project
Implementation and Special Concerns
850 850 850 1700
977
952
979
PWD
765
600
1500
600
3308
RAMP-UP
TOILET FLOOR PLAN
A A
B
B
33048304
TOILET FLOOR PLAN
9379
4308
FRONT ELEVATION
10104
1850
900
2750
2000
2734
360
1428
319
SEE TRUSS-1
G.I. SHEETS
FIREWALL
#26 CORRUGATED
W.C.
GUTTER
FASCIA
TOILET ELEVATION/SECTION "B-B"
TOILET SECTION "A-A"
1850
651
900
1850
900
2750
8891700
W.C.LAV.
1729
260317293166
LEFT ELEVATION RIGHT ELEVATION
5007
5007
3308 3308
900
6411157
600
600
2100
SCHEDULE OF DOORS AND WINDOWS ( CLASS-A)
LOCATION :
CARAGA REGION XIII PATIN-AY DISTRICT OFFICE
PROSPERIDAD, AGUSAN DEL SUR
AS SHOWN
LTO.13.CR.P2.S1.L1.1LTO.13.CR.P2.S1.L1.0
LTO.13.CR.P2.S1.L1.2
LTO.13.CR.P2.S1.L1.1
LTO.13.CR.P2.S1.L1.0LTO.13.CR.P2.S1.L1.2
DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS
Republic of the Philippines
CONSTRUCTION OF TOILETFACILITIES
Prepared by :
Assistant Secretary for ProjectManagement
Planning Officer III
ENGR. MANUEL C. DEL CARMEN
Sheet Content:
Sheet No.:Sheet No.:
TSP --
--
PS
RA
F
NART
MT
OT
N E
O
O
CD
N
ATRA
NOIT
P
CIN
U
AE D SN OI T
MM
PROJECT NAME :
Submitted by:
Recommending Approval:
Approved:
Regional DirectorAtty ALIM D. PANGANDAMAN
ILDEFONSO T. PATDU, JR.
ATTY. EFREN C. MONCUPAUndersecretary for Project
Implementation and Special Concerns
TO SEPTIC TANK
F.D.
F.D.
C.O.
F.D.
TOILET SANITARY LAYOUT
10mmØ VERTICAL BARS SPACED@ 400mm ON CENTERS
10mmØ HORIZONTAL BARSPLACED EVERY 2 LAYERS OF CHB
11-10mmØ MATTING BARSSPACED EQUALLY AS SHOWN
1536
200
1536 307
DIGESTIVECHAMBER
LEACHINGCHAMBER
300
38
WATER LEVELWATER LEVEL
AIR SPACE AIR SPACE
500 500
926" THICK CHB
12mmØ MATTINGBARS SPACED @400mm ONCENTERS
3-10mm.Ø HORIZONTALTEMPERATURE BARS
MANHOLE MANHOLE
4" Ø PVC OUTLET
1500
500
MANHOLE MANHOLE
P1 40020001:20
DETAILED PLAN OF SEPTIC TANK5
P1 40020001:20
DETAILED SECTION OF SEPTIC TANK4
307
192
LEACHINGCHAMBER
38
WATER LEVEL
AIR SPACE300
10mmØ MATTINGBARS SPACED @400mm ONCENTERS
3-10mm.Ø HORIZONTALTEMPERATURE BARS
MANHOLE
4" Ø PVC OUTLET
MANHOLE
500
500
4000
2000 1000 1000
VENT STACK THRU ROOF
PLUMBING LEGEND:
VENT STACKVSVSTR
WM
GV
HB
FWATER METERHOSE BIBB
FAUCET
GATE VALVE
WC
CO
URFD
CLEAN-OUT
WATER CLOSET
FLOOR DRAINURINAL
LAV LAVATORY
CV CHECK VALVE
FCO FLOOR CLEAN-OUT
RD ROOF DRAINCB CATCH BASINDS DOWNSPOUTG.I.P. GALVANIZED IRON PIPE
SPECIFICATION :
LICENSED MASTER PLUMBER.8. ALL WORKS HEREIN SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY
DOUBLE CHECKED TO ENSURE WATER TIGHT PLUMBING SYSTEM.7. ALL WORKS HEREIN SHALL BE DONE OF CLASS A WORKMANSHIP, PIPING SYSTEM MUST BE
OF A TYPICAL APPROVED TANK.6. SEPTIC VAULT SHALL BE WATER TIGHT. COMPLETE WITH THE NECESSARY REQUIREMENTS
1/2" diameter PVC PIPES.5. MAIN WATER SUPPLY PIPES MUST BE 1" diameter AND BRANCH SUPPLY PIPES MUST BE4. ALL CLEAR WATER SUPPLY SYSTEM SHALL BE OF PVC PIPES, SCHEDULE 40, MOLDEX BLUE.3. USE SANIMOLD BY MOLDEX PRODUCTS FOR SANITARY WASTE SYSTEM.
2. ALL MATERIALS TO BE USED SHALL BE OF BRAND NEW AND OF APPROVED TYPE FORLOCATION AND PURPOSE.
PHILIPPINE PLUMBING CODE AND WITH THE LOCAL SANITARY AGENCY.1. ALL WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH THE PROVISION OF THE
LOCATION :
CARAGA REGION XIII PATIN-AY DISTRICT OFFICE
PROSPERIDAD, AGUSAN DEL SUR
AS SHOWN
LTO.13.CR.P2.S1.L1.1LTO.13.CR.P2.S1.L1.0
LTO.13.CR.P2.S1.L1.2
DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS
Republic of the Philippines
CONSTRUCTION OF TOILETFACILITIES
Prepared by :
Assistant Secretary for ProjectManagement
Planning Officer III
ENGR. MANUEL C. DEL CARMEN
Sheet Content:
Sheet No.:Sheet No.:
TSE --
--
PS
RA
F
NART
MT
OT
N E
O
O
CD
N
ATRA
NOIT
P
CIN
U
AE D SN OI T
MM
PROJECT NAME :
Submitted by:
Recommending Approval:
Approved:
Regional DirectorAtty ALIM D. PANGANDAMAN
ILDEFONSO T. PATDU, JR.
ATTY. EFREN C. MONCUPAUndersecretary for Project
Implementation and Special Concerns
baSab
SS
S
LIGHTING LAYOUT PLAN ( CLASS-B)
POWER LAYOUT PLAN ( CLASS-B)
FROM ELECTRICALPOWER SOURCE
FROM ELECTRICALPOWER SOURCE
Legend & Symbols:
32 WATTS CIRCULAR FLUORESCENT LAMP
S SINGLE SWITCH
DUPLEX THREE PRONG-GROUNDED RECEPTACLE OUTLET
S3 TRIPLEX SWITCH
1x36 WATTS FLUORESCENT LAMP IN 0.30m. x 1.20m. FLUORESCENTFIXTURE, MIRRORIZED REFLECTOR AND LUOVER
CONDUIT RUN EMBEDDED ON WALLS & CEILING
1. All electrical works herein shall be done in accordance with the provisions of
the latest edition of the Philippine Electrical Code, existing rules and
ordinances of the Local Government, and with requirements of the Local
Power Company.
2. Type of power service shall be 230 volts, 2-wire, 60 hz., single phase, line
to ground.
3. All wirings shall be installed in standard PVC/RSC pipes inside a concrete
structure and inside ceiling spaces.
4. All materials to be used shall be brand new and of approved type.
5. Minimum size of wire and conduit to be used shall be 2.0 mm. sq. and 20
mm. dia. respectively.
6. Wherever required and necessary, pull boxes or junction boxes of proper
sizes shall be installed at convenient and inconspicuous locations, although
such boxes are not shown on the plan nor mentioned in the specifications.
7. The electrical works shall be done under the direct and immediate supervision
RD ROOF DRAINCB CATCH BASINDS DOWNSPOUTG.I.P. GALVANIZED IRON PIPE
SPECIFICATION :
LICENSED MASTER PLUMBER.8. ALL WORKS HEREIN SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY
DOUBLE CHECKED TO ENSURE WATER TIGHT PLUMBING SYSTEM.7. ALL WORKS HEREIN SHALL BE DONE OF CLASS A WORKMANSHIP, PIPING SYSTEM MUST BE
OF A TYPICAL APPROVED TANK.6. SEPTIC VAULT SHALL BE WATER TIGHT. COMPLETE WITH THE NECESSARY REQUIREMENTS
1/2" diameter PVC PIPES.5. MAIN WATER SUPPLY PIPES MUST BE 1" diameter AND BRANCH SUPPLY PIPES MUST BE4. ALL CLEAR WATER SUPPLY SYSTEM SHALL BE OF PVC PIPES, SCHEDULE 40, MOLDEX BLUE.3. USE SANIMOLD BY MOLDEX PRODUCTS FOR SANITARY WASTE SYSTEM.
2. ALL MATERIALS TO BE USED SHALL BE OF BRAND NEW AND OF APPROVED TYPE FORLOCATION AND PURPOSE.
PHILIPPINE PLUMBING CODE AND WITH THE LOCAL SANITARY AGENCY.1. ALL WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH THE PROVISION OF THE
LOCATION :
CARAGA REGION XIII BISLIG DISTRICT OFFICE
BISLIG CITY
AS SHOWN
LTO.13.CR.P5.N1.L1.1LTO.13.CR.P5.N1.L1.0
LTO.13.CR.P5.N1.L1.2
DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS
Republic of the Philippines
CONSTRUCTION OF TOILETFACILITIES
Prepared by :
Assistant Secretary for ProjectManagement
Planning Officer III
ENGR. MANUEL C. DEL CARMEN
Sheet Content:
Sheet No.:Sheet No.:
TSE --
--
PS
RA
F
NART
MT
OT
N E
O
O
CD
N
ATRA
NOIT
P
CIN
U
AE D SN OI T
MM
PROJECT NAME :
Submitted by:
Recommending Approval:
Approved:
Regional DirectorAtty ALIM D. PANGANDAMAN
ILDEFONSO T. PATDU, JR.
ATTY. EFREN C. MONCUPAUndersecretary for Project
Implementation and Special Concerns
baSab
SS
S
LIGHTING LAYOUT PLAN ( CLASS-B)
POWER LAYOUT PLAN ( CLASS-B)
FROM ELECTRICALPOWER SOURCE
FROM ELECTRICALPOWER SOURCE
Legend & Symbols:
32 WATTS CIRCULAR FLUORESCENT LAMP
S SINGLE SWITCH
DUPLEX THREE PRONG-GROUNDED RECEPTACLE OUTLET
S3 TRIPLEX SWITCH
1x36 WATTS FLUORESCENT LAMP IN 0.30m. x 1.20m. FLUORESCENTFIXTURE, MIRRORIZED REFLECTOR AND LUOVER
CONDUIT RUN EMBEDDED ON WALLS & CEILING
1. All electrical works herein shall be done in accordance with the provisions of
the latest edition of the Philippine Electrical Code, existing rules and
ordinances of the Local Government, and with requirements of the Local
Power Company.
2. Type of power service shall be 230 volts, 2-wire, 60 hz., single phase, line
to ground.
3. All wirings shall be installed in standard PVC/RSC pipes inside a concrete
structure and inside ceiling spaces.
4. All materials to be used shall be brand new and of approved type.
5. Minimum size of wire and conduit to be used shall be 2.0 mm. sq. and 20
mm. dia. respectively.
6. Wherever required and necessary, pull boxes or junction boxes of proper
sizes shall be installed at convenient and inconspicuous locations, although
such boxes are not shown on the plan nor mentioned in the specifications.
7. The electrical works shall be done under the direct and immediate supervision
RD ROOF DRAINCB CATCH BASINDS DOWNSPOUTG.I.P. GALVANIZED IRON PIPE
SPECIFICATION :
LICENSED MASTER PLUMBER.8. ALL WORKS HEREIN SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY
DOUBLE CHECKED TO ENSURE WATER TIGHT PLUMBING SYSTEM.7. ALL WORKS HEREIN SHALL BE DONE OF CLASS A WORKMANSHIP, PIPING SYSTEM MUST BE
OF A TYPICAL APPROVED TANK.6. SEPTIC VAULT SHALL BE WATER TIGHT. COMPLETE WITH THE NECESSARY REQUIREMENTS
1/2" diameter PVC PIPES.5. MAIN WATER SUPPLY PIPES MUST BE 1" diameter AND BRANCH SUPPLY PIPES MUST BE4. ALL CLEAR WATER SUPPLY SYSTEM SHALL BE OF PVC PIPES, SCHEDULE 40, MOLDEX BLUE.3. USE SANIMOLD BY MOLDEX PRODUCTS FOR SANITARY WASTE SYSTEM.
2. ALL MATERIALS TO BE USED SHALL BE OF BRAND NEW AND OF APPROVED TYPE FORLOCATION AND PURPOSE.
PHILIPPINE PLUMBING CODE AND WITH THE LOCAL SANITARY AGENCY.1. ALL WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH THE PROVISION OF THE
LOCATION :
CARAGA REGION XIII TANDAG DISTRICT OFFICE
TANDAG CITY
AS SHOWN
LTO.13.CR.P4.S1.L1.1LTO.13.CR.P4.S1.L1.0
LTO.13.CR.P4.S1.L1.2
DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS
Republic of the Philippines
CONSTRUCTION OF TOILETFACILITIES
Prepared by :
Assistant Secretary for ProjectManagement
Planning Officer III
ENGR. MANUEL C. DEL CARMEN
Sheet Content:
Sheet No.:Sheet No.:
TSA --
--
PS
RA
F
NART
MT
OT
N E
O
O
CD
N
ATRA
NOIT
P
CIN
U
AE D SN OI T
MM
PROJECT NAME :
Submitted by:
Recommending Approval:
Approved:
Regional DirectorAtty ALIM D. PANGANDAMAN
ILDEFONSO T. PATDU, JR.
ATTY. EFREN C. MONCUPAUndersecretary for Project
Implementation and Special Concerns
850 850 850 1700
977
952
979
PWD
765
600
1500
600
3308
RAMP-UP
TOILET FLOOR PLAN
A A
B
B
33048304
TOILET FLOOR PLAN
9379
4308
FRONT ELEVATION
10104
1850
900
2750
2000
2734
360
1428
319
SEE TRUSS-1
G.I. SHEETS
FIREWALL
#26 CORRUGATED
W.C.
GUTTER
FASCIA
TOILET ELEVATION/SECTION "B-B"
TOILET SECTION "A-A"
1850
651
900
1850
900
2750
8891700
W.C.LAV.
1729
260317293166
LEFT ELEVATION RIGHT ELEVATION
5007
5007
3308 3308
900
6411157
600
600
2100
SCHEDULE OF DOORS AND WINDOWS ( CLASS-A)
LOCATION : CARAGA REGION XIII
SURIGAO DISTRICT OFFICECAPITOL COMPOUND, SURIGAO CITY
AS SHOWN
LTO.13.CR.P3.E1.L1.1LTO.13.CR.P3.E1.L1.0
LTO.13.CR.P3.E1.L1.2
LTO.13.CR.P3.E1.L1.0
LTO.13.CR.P3.E1.L1.1
LTO.13.CR.P3.E1.L1.2
DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS
Republic of the Philippines
CONSTRUCTION OF TOILETFACILITIES
Prepared by :
Assistant Secretary for ProjectManagement
Planning Officer III
ENGR. MANUEL C. DEL CARMEN
Sheet Content:
Sheet No.:Sheet No.:
TSE --
--
PS
RA
F
NART
MT
OT
N E
O
O
CD
N
ATRA
NOIT
P
CIN
U
AE D SN OI T
MM
PROJECT NAME :
Submitted by:
Recommending Approval:
Approved:
Regional DirectorAtty ALIM D. PANGANDAMAN
ILDEFONSO T. PATDU, JR.
ATTY. EFREN C. MONCUPAUndersecretary for Project
Implementation and Special Concerns
baSab
SS
S
LIGHTING LAYOUT PLAN
POWER LAYOUT PLAN
FROM ELECTRICALPOWER SOURCE
FROM ELECTRICALPOWER SOURCE
Legend & Symbols:
32 WATTS CIRCULAR FLUORESCENT LAMP
S SINGLE SWITCH
DUPLEX THREE PRONG-GROUNDED RECEPTACLE OUTLET
S3 TRIPLEX SWITCH
1x36 WATTS FLUORESCENT LAMP IN 0.30m. x 1.20m. FLUORESCENTFIXTURE, MIRRORIZED REFLECTOR AND LUOVER
CONDUIT RUN EMBEDDED ON WALLS & CEILING
1. All electrical works herein shall be done in accordance with the provisions of
the latest edition of the Philippine Electrical Code, existing rules and
ordinances of the Local Government, and with requirements of the Local
Power Company.
2. Type of power service shall be 230 volts, 2-wire, 60 hz., single phase, line
to ground.
3. All wirings shall be installed in standard PVC/RSC pipes inside a concrete
structure and inside ceiling spaces.
4. All materials to be used shall be brand new and of approved type.
5. Minimum size of wire and conduit to be used shall be 2.0 mm. sq. and 20
mm. dia. respectively.
6. Wherever required and necessary, pull boxes or junction boxes of proper
sizes shall be installed at convenient and inconspicuous locations, although
such boxes are not shown on the plan nor mentioned in the specifications.
7. The electrical works shall be done under the direct and immediate supervision
of a duly licensed electrical practitioner.
General notes:
LOCATION :
CARAGA REGION XIII TANDAG DISTRICT OFFICE
TANDAG CITY
AS SHOWN
LTO.13.CR.P4.S1.L1.1LTO.13.CR.P4.S1.L1.0
LTO.13.CR.P4.S1.L1.2
DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS
Republic of the Philippines
CONSTRUCTION OF TOILETFACILITIES
Prepared by :
Assistant Secretary for ProjectManagement
Planning Officer III
ENGR. MANUEL C. DEL CARMEN
Sheet Content:
Sheet No.:Sheet No.:
TSP --
--
PS
RA
F
NART
MT
OT
NE
O
O
CD
N
ATRA
NOIT
P
CIN
U
AE D SN OI T
MM
PROJECT NAME :
Submitted by:
Recommending Approval:
Approved:
Regional DirectorAtty ALIM D. PANGANDAMAN
ILDEFONSO T. PATDU, JR.
ATTY. EFREN C. MONCUPAUndersecretary for Project
Implementation and Special Concerns
TO SEPTIC TANK
F.D.
F.D.
C.O.
F.D.
TOILET SANITARY LAYOUT
10mmØ VERTICAL BARS SPACED@ 400mm ON CENTERS
10mmØ HORIZONTAL BARSPLACED EVERY 2 LAYERS OF CHB
11-10mmØ MATTING BARSSPACED EQUALLY AS SHOWN
1024
200
1024 205
DIGESTIVECHAMBER
LEACHINGCHAMBER
300
25
WATER LEVELWATER LEVEL
AIR SPACE AIR SPACE
500 50061
6" THICK CHB
12mmØ MATTINGBARS SPACED @400mm ONCENTERS
3-10mm.Ø HORIZONTALTEMPERATURE BARS
MANHOLE MANHOLE
4" Ø PVC OUTLET
1500
500
MANHOLE MANHOLE
P1 40020001:20
DETAILED PLAN OF SEPTIC TANK5
P1 40020001:20
DETAILED SECTION OF SEPTIC TANK4
205
128
LEACHINGCHAMBER
25
WATER LEVEL
AIR SPACE
300
10mmØ MATTINGBARS SPACED @400mm ONCENTERS
3-10mm.Ø HORIZONTALTEMPERATURE BARS
MANHOLE
4" Ø PVC OUTLET
MANHOLE
500
500
40002000 1000 1000
VENT STACK THRU ROOF
PLUMBING LEGEND:
VENT STACKVSVSTR
WM
GV
HB
FWATER METERHOSE BIBB
FAUCET
GATE VALVE
WC
CO
URFD
CLEAN-OUT
WATER CLOSET
FLOOR DRAINURINAL
LAV LAVATORY
CV CHECK VALVE
FCO FLOOR CLEAN-OUT
RD ROOF DRAINCB CATCH BASINDS DOWNSPOUTG.I.P. GALVANIZED IRON PIPE
SPECIFICATION :
LICENSED MASTER PLUMBER.8. ALL WORKS HEREIN SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY
DOUBLE CHECKED TO ENSURE WATER TIGHT PLUMBING SYSTEM.7. ALL WORKS HEREIN SHALL BE DONE OF CLASS A WORKMANSHIP, PIPING SYSTEM MUST BE
OF A TYPICAL APPROVED TANK.6. SEPTIC VAULT SHALL BE WATER TIGHT. COMPLETE WITH THE NECESSARY REQUIREMENTS
1/2" diameter PVC PIPES.5. MAIN WATER SUPPLY PIPES MUST BE 1" diameter AND BRANCH SUPPLY PIPES MUST BE4. ALL CLEAR WATER SUPPLY SYSTEM SHALL BE OF PVC PIPES, SCHEDULE 40, MOLDEX BLUE.3. USE SANIMOLD BY MOLDEX PRODUCTS FOR SANITARY WASTE SYSTEM.
2. ALL MATERIALS TO BE USED SHALL BE OF BRAND NEW AND OF APPROVED TYPE FORLOCATION AND PURPOSE.
PHILIPPINE PLUMBING CODE AND WITH THE LOCAL SANITARY AGENCY.1. ALL WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH THE PROVISION OF THE
LOCATION :
CARAGA REGION XIII SURIGAO DISTRICT OFFICECAPITOL COMPOUND, SURIGAO CITY
AS SHOWN
LTO.13.CR.P3.E1.L1.1LTO.13.CR.P3.E1.L1.0
LTO.13.CR.P3.E1.L1.2
DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS
Republic of the Philippines
CONSTRUCTION OF TOILETFACILITIES
Prepared by :
Assistant Secretary for ProjectManagement
Planning Officer III
ENGR. MANUEL C. DEL CARMEN
Sheet Content:
Sheet No.:Sheet No.:
TSE --
--
PS
RA
F
NART
MT
OT
N E
O
O
CD
N
ATRA
NOIT
P
CIN
U
AE D SN OI T
MM
PROJECT NAME :
Submitted by:
Recommending Approval:
Approved:
Regional DirectorAtty ALIM D. PANGANDAMAN
ILDEFONSO T. PATDU, JR.
ATTY. EFREN C. MONCUPAUndersecretary for Project
Implementation and Special Concerns
baSab
SS
S
LIGHTING LAYOUT PLAN ( CLASS-B)
POWER LAYOUT PLAN ( CLASS-B)
FROM ELECTRICALPOWER SOURCE
FROM ELECTRICALPOWER SOURCE
Legend & Symbols:
32 WATTS CIRCULAR FLUORESCENT LAMP
S SINGLE SWITCH
DUPLEX THREE PRONG-GROUNDED RECEPTACLE OUTLET
S3 TRIPLEX SWITCH
1x36 WATTS FLUORESCENT LAMP IN 0.30m. x 1.20m. FLUORESCENTFIXTURE, MIRRORIZED REFLECTOR AND LUOVER
CONDUIT RUN EMBEDDED ON WALLS & CEILING
1. All electrical works herein shall be done in accordance with the provisions of
the latest edition of the Philippine Electrical Code, existing rules and
ordinances of the Local Government, and with requirements of the Local
Power Company.
2. Type of power service shall be 230 volts, 2-wire, 60 hz., single phase, line
to ground.
3. All wirings shall be installed in standard PVC/RSC pipes inside a concrete
structure and inside ceiling spaces.
4. All materials to be used shall be brand new and of approved type.
5. Minimum size of wire and conduit to be used shall be 2.0 mm. sq. and 20
mm. dia. respectively.
6. Wherever required and necessary, pull boxes or junction boxes of proper
sizes shall be installed at convenient and inconspicuous locations, although
such boxes are not shown on the plan nor mentioned in the specifications.
7. The electrical works shall be done under the direct and immediate supervision
of a duly licensed electrical practitioner.
General notes:
LOCATION :
CARAGA REGION XIII SURIGAO DISTRICT OFFICECAPITOL COMPOUND, SURIGAO CITY
CARAGA REGION XIII BUTUAN DISTRICT OFFICE CAPITOL AVE, BUTUAN CITY
AS SHOWN
LTO.13.CR.P1.N1.L1.1LTO.13.CR.P1.N1.L1.0
LTO.13.CR.P1.N1.L1.2
LTO.13.CR.P1.N1.L1.1
LTO.13.CR.P1.N1.L1.0LTO.13.CR.P1.N1.L1.2
DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS
Republic of the Philippines
CONSTRUCTION OF TOILETFACILITIES
Prepared by :
Assistant Secretary for ProjectManagement
Planning Officer III
ENGR. MANUEL C. DEL CARMEN
Sheet Content:
Sheet No.:Sheet No.:
TSP --
--
PS
RA
F
NART
MT
OT
N E
O
O
CD
N
ATRA
NOIT
P
CIN
U
AE D SN OI T
MM
PROJECT NAME :
Submitted by:
Recommending Approval:
Approved:
Regional DirectorAtty ALIM D. PANGANDAMAN
ILDEFONSO T. PATDU, JR.
ATTY. EFREN C. MONCUPAUndersecretary for Project
Implementation and Special Concerns
TO SEPTIC TANK
F.D.
F.D.
C.O.
F.D.
TOILET SANITARY LAYOUT
10mmØ VERTICAL BARS SPACED@ 400mm ON CENTERS
10mmØ HORIZONTAL BARSPLACED EVERY 2 LAYERS OF CHB
11-10mmØ MATTING BARSSPACED EQUALLY AS SHOWN
1536
200
1536 307
DIGESTIVECHAMBER
LEACHINGCHAMBER
300
38
WATER LEVELWATER LEVEL
AIR SPACE AIR SPACE
500 500
92
6" THICK CHB
12mmØ MATTINGBARS SPACED @400mm ONCENTERS
3-10mm.Ø HORIZONTALTEMPERATURE BARS
MANHOLE MANHOLE
4" Ø PVC OUTLET
1500
500
MANHOLE MANHOLE
P1 40020001:20
DETAILED PLAN OF SEPTIC TANK5
P1 40020001:20
DETAILED SECTION OF SEPTIC TANK4
307
192
LEACHINGCHAMBER
38
WATER LEVEL
AIR SPACE300
10mmØ MATTINGBARS SPACED @400mm ONCENTERS
3-10mm.Ø HORIZONTALTEMPERATURE BARS
MANHOLE
4" Ø PVC OUTLET
MANHOLE
500
500
4000
2000 1000 1000
VENT STACK THRU ROOF
PLUMBING LEGEND:
VENT STACKVSVSTR
WM
GV
HB
FWATER METERHOSE BIBB
FAUCET
GATE VALVE
WC
CO
URFD
CLEAN-OUT
WATER CLOSET
FLOOR DRAINURINAL
LAV LAVATORY
CV CHECK VALVE
FCO FLOOR CLEAN-OUT
RD ROOF DRAINCB CATCH BASINDS DOWNSPOUTG.I.P. GALVANIZED IRON PIPE
SPECIFICATION :
LICENSED MASTER PLUMBER.8. ALL WORKS HEREIN SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY
DOUBLE CHECKED TO ENSURE WATER TIGHT PLUMBING SYSTEM.7. ALL WORKS HEREIN SHALL BE DONE OF CLASS A WORKMANSHIP, PIPING SYSTEM MUST BE
OF A TYPICAL APPROVED TANK.6. SEPTIC VAULT SHALL BE WATER TIGHT. COMPLETE WITH THE NECESSARY REQUIREMENTS
1/2" diameter PVC PIPES.5. MAIN WATER SUPPLY PIPES MUST BE 1" diameter AND BRANCH SUPPLY PIPES MUST BE4. ALL CLEAR WATER SUPPLY SYSTEM SHALL BE OF PVC PIPES, SCHEDULE 40, MOLDEX BLUE.3. USE SANIMOLD BY MOLDEX PRODUCTS FOR SANITARY WASTE SYSTEM.
2. ALL MATERIALS TO BE USED SHALL BE OF BRAND NEW AND OF APPROVED TYPE FORLOCATION AND PURPOSE.
PHILIPPINE PLUMBING CODE AND WITH THE LOCAL SANITARY AGENCY.1. ALL WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH THE PROVISION OF THE
LOCATION :
CARAGA REGION XIII BUTUAN DISTRICT OFFICE CAPITOL AVE, BUTUAN CITY
AS SHOWN
LTO.13.CR.P1.N1.L1.1LTO.13.CR.P1.N1.L1.0
LTO.13.CR.P1.N1.L1.2
DEPARTMENT OF TRANSPORTATIONAND COMMUNICATIONS
Republic of the Philippines
CONSTRUCTION OF TOILETFACILITIES
Prepared by :
Assistant Secretary for ProjectManagement
Planning Officer III
ENGR. MANUEL C. DEL CARMEN
Sheet Content:
Sheet No.:Sheet No.:
TSE --
--
PS
RA
F
NART
MT
OT
NE
O
O
CD
N
ATRA
NOIT
P
CIN
U
AE D SN OI T
MM
PROJECT NAME :
Submitted by:
Recommending Approval:
Approved:
Regional DirectorAtty ALIM D. PANGANDAMAN
ILDEFONSO T. PATDU, JR.
ATTY. EFREN C. MONCUPAUndersecretary for Project
Implementation and Special Concerns
baSab
SS
S
LIGHTING LAYOUT PLAN ( CLASS-B)
POWER LAYOUT PLAN ( CLASS-B)
FROM ELECTRICALPOWER SOURCE
FROM ELECTRICALPOWER SOURCE
Legend & Symbols:
32 WATTS CIRCULAR FLUORESCENT LAMP
S SINGLE SWITCH
DUPLEX THREE PRONG-GROUNDED RECEPTACLE OUTLET
S3 TRIPLEX SWITCH
1x36 WATTS FLUORESCENT LAMP IN 0.30m. x 1.20m. FLUORESCENTFIXTURE, MIRRORIZED REFLECTOR AND LUOVER
CONDUIT RUN EMBEDDED ON WALLS & CEILING
1. All electrical works herein shall be done in accordance with the provisions of
the latest edition of the Philippine Electrical Code, existing rules and
ordinances of the Local Government, and with requirements of the Local
Power Company.
2. Type of power service shall be 230 volts, 2-wire, 60 hz., single phase, line
to ground.
3. All wirings shall be installed in standard PVC/RSC pipes inside a concrete
structure and inside ceiling spaces.
4. All materials to be used shall be brand new and of approved type.
5. Minimum size of wire and conduit to be used shall be 2.0 mm. sq. and 20
mm. dia. respectively.
6. Wherever required and necessary, pull boxes or junction boxes of proper
sizes shall be installed at convenient and inconspicuous locations, although
such boxes are not shown on the plan nor mentioned in the specifications.
7. The electrical works shall be done under the direct and immediate supervision
of a duly licensed electrical practitioner.
General notes: