<<Date>> Blueprint Kickoff <<replace with Customer Logo>>
Feb 25, 2016
<<Date>>
Blueprint Kickoff
<<replace with Customer Logo>>
• Introductions• Customer Vision & Success Criteria• Apigee Accelerator Overview• Blueprint• Schedule• Roles & Responsibilities• Communications• Assumptions• Risks
© 2013 Apigee Confidential – All Rights Reserved
Introductions
<<Customer Name>>• <<name>>, Executive Sponsor• <<name>>, Product Owner• <<name>>, Project Manager• <<name>>, Lead Architect• <<name>>, Network Engineering• <<name>>, Test Lead
Apigee• <<name>>, Scrum Master• <<name>>, Global Architect• <<name>>, Principal Architect• <<name>>, Technology Specialist• <<name>>, Technology Specialist (Drupal)
© 2013 Apigee Confidential – All Rights Reserved
Vision & Success Criteria
<<customer Exec Sponsor presents this slide>>
Vision<<vision statement of what is expected of program>>
Success Criteria• <<list success criteria>>
© 2013 Apigee Confidential – All Rights Reserved
• App cycle time demands extreme flexibility and speed• IT infrastructure demands stability• Digital programs connect these two worlds
Services: Mobile requires a new model
5
Bus
ines
s D
eman
d
Time
App
App
App
AppApp
App
IT Infrastructure
Digital
Program
© 2013 Apigee Confidential – All Rights Reserved 6
• Demand increases over time in digital programs• Continuous optimization is required for best business results• Inefficiencies result from application of traditional methodologies
Traditional deployment models don’t work
Velo
city
Time
Required Velocity
Initial higher velocity by “jumping in”
Incomplete DeliveryInfrastructure
Inability to Adapt to changing business priorities
Actual Velocity
Insufficient User story gathering
Inefficient Sprint Management
© 2013 Apigee Confidential – All Rights Reserved 7
Accelerator Methodology
Validation
Quality Framework(Best Practice Validation & Continuous Improvement)
Delivery Framework(Consistent Practices, Resources and Tools)
Pro
vide
s R
esou
rces D
rives E
nhancements
Validation Validation
ValidationVa
lidati
on
Validation Validation
Standards, Guidelines, Template, Processes and
Tools
Standards, Guidelines, Template, Processes and
Tools
Standards, Guidelines, Template, Processes and
Tools
Production Release
Extreme Sprints
Blueprint
© 2013 Apigee Confidential – All Rights Reserved
BlueprintAccelerator Planning• Review and align on pre-blueprint deliverables• Customer & Apigee preparation to start Scoping
Scoping• Define boundaries of implementation• Define user stories for initial sprints
Architecture & Design• Define infrastructure and data flow architecture• Create API Proxy design
Operations & Support• Review system monitoring strategy• Define support structure needed for the solution
Delivery Infrastructure• Align on process and meetings for Extreme Sprints• Define key communication vehicles to keep team aligned
© 2013 Apigee Confidential – All Rights Reserved
Blueprint Activities & Quality FrameworkAccelerator Planning• Define Team Members• Setup Collaboration Tools• Conduct Blueprint Kickoff
Scoping• Provide Apigee Edge Overview• Define Scope for Initial Phases• Capture Requirements
Architecture & Design• Define Solution Architecture• Create API Platform Design• Create Specifications
Operations & Support• Define System Monitoring and Ops
Strategy• Align on Apigee Support Services
Delivery Infrastructure• Conduct Accelerator Methodology
Session• Define Test Strategy• Create Delivery Controls• Define Detailed Sprint Schedule• Define Code Controls & Deploy
Process• Conduct Blueprint Exec Review
Quality Framework• Conduct Env Readiness Review• Conduct Requirements Review• Conduct API Design & Spec
Checkpoint• Conduct Blueprint Checkpoint
© 2013 Apigee Confidential – All Rights Reserved
Blueprint DeliverablesAccelerator Planning• JIRA & Confluence Detailed Management
Plan• Team Directory• RACI Matrix• Blueprint Kickoff Presentation
Scoping• Functional & Non-functional Reqs Specs• User Story Backlog
Architecture & Design• API Specification• Solution Architecture• Developer Portal Design• On-Prem Environment Spec (for On-Prem
Customers only)
Operations & Support• Monitoring & Operations Strategy
Delivery Infrastructure• Milestone & Resource Alignment
Tracking• Detailed Sprint Schedule• API Test Strategy• Budget Tracking Log (Hours
Based)• Budget Tracking Log ($ Based)• Status Report• GitHub (Source Control) Account
Setup & Mgmt Process• Maven Deployment Automation
Setup & Mngt Process• Jenkins Continuous Integration
Setup & Mngt Process • Blueprint Executive Presentation• Extreme Sprints & Prod Release
SOW
© 2013 Apigee Confidential – All Rights Reserved
Blueprint Schedule – Week 1
Monday / Oct 7th Tuesday Wednesday Thursday Friday9:00-10:00 Blueprint Kickoff
TBD TBD TBD TBD10:00 - 12:00 TBD
12:00- 1:00 Lunch Lunch Lunch Lunch Lunch
1:00-6:00 TBD TBD TBD TBD TBD
© 2013 Apigee Confidential – All Rights Reserved
Blueprint Schedule – Week 2
Monday / Oct 14th Tuesday Wednesday Thursday Friday9:00-10:00 Blueprint Kickoff
TBD TBD TBD TBD10:00 - 12:00 TBD
12:00- 1:00 Lunch Lunch Lunch Lunch Lunch
1:00-6:00 TBD TBD TBD TBD TBD
© 2013 Apigee Confidential – All Rights Reserved
Blueprint Schedule – Week 3
Monday / Oct 21st Tuesday Wednesday Thursday Friday9:00-10:00 Blueprint Kickoff
TBD TBD TBD TBD10:00 - 12:00 TBD
12:00- 1:00 Lunch Lunch Lunch Lunch Lunch
1:00-6:00 TBD TBD TBD TBD TBD
© 2013 Apigee Confidential – All Rights Reserved
Blueprint – Apigee Roles & ResponsibilitiesScrum Master• Main contact for project coordination activities• Leads daily stand-up meetings, oversees project schedule and coordinates with
other organizations for testing and deployment activities• Accountable for reporting weekly status and budget informationGlobal Architect• Leads the creation of a infrastructure deliverable• Works closely with the Customer’s Technical Lead and/or Network Engineer to
ensure Customer ownership of these deliverables once completed.Principal Architect• Responsible for the software design deliverables• Leads customer requirements (user stories) sessions• Leads any design challenges that may ariseTechnology Specialist• Implements the designs and requirements defined• Conducts unit tests• Resolves defects found during customer testingTechnology Specialist (Developer Portal)• Gathers developer portal requirements, designs, configures, unit tests and
supports Customer-led functional testing
© 2013 Apigee Confidential – All Rights Reserved
Blueprint – Customer Roles & ResponsibilitiesExecutive Sponsor• Visible participant in the project and sets vision and guiding principles• Actively engaged in the Blueprint Executive Review session
Project Manager• Main contact for project coordination activities, working closely with the Apigee
Scrum Master.• Ensures customer resources are available when needed• Coordinates the customer-led activities• Ensures an efficient process is in place to log defects and track to closure
Product Owner• Participates in all design and requirement sessions to provide input to what is
needed to meet the business needs of the API program
Lead Architect• Participates in all design sessions and approves the solution design.• Participates in Functional and Performance Testing• Involved with the deployment of the solution to Production
© 2013 Apigee Confidential – All Rights Reserved
Blueprint – Customer Roles & ResponsibilitiesNetwork Engineer• Sets-up all hardware necessary for the Apigee solution, including opening ports,
setting up and modifying any firewall policies• Documents the Apigee installation procedures• Sets-up monitoring and ensures availability to the systems during the project
Test Lead• Defines the Testing Strategy for the program• Plans, develops and executes all necessary steps for executing Functional and
Performance Testing.• Sets up a process and tools to track defects to closure
© 2013 Apigee Confidential – All Rights Reserved
Communications
Daily Standups
JIRA & Confluence Home Page
Weekly Status Reports
Monthly Executive Updates
© 2013 Apigee Confidential – All Rights Reserved
AssumptionsEnter details.
© 2013 Apigee Confidential – All Rights Reserved
RisksEnter details.
© 2013 Apigee Confidential – All Rights Reserved
Q&A