PRODUCTIONS MANAGEMENT

BISLERI INTERNATIONAL PVT.LTD

By-

1

Page 2: 56185718 Bisleri Production

oBjectives of the project

1. The project will helped us to understand how different departments in production process works.

2. We will come to know how to do effective management of inbound logistics and outbound logistics, which in turn helps in bringing down the cost for the organization.

3. With the help of this project we would come to know different stages of production. i.e. inputs, conversion subsystem and finished goods stage.

4. To understand how and what types of machines are used while production5. To understand what are the factors which is to be considered while selecting the plant

layout.6. To do the ABC analysis of Bisleri inventory.

2

Page 3: 56185718 Bisleri Production

Table Of Content

Sr.No Particulars Page No

1. About the Industry

2. About Bisleri

3. Departments in M/s Parle Bisleri Pvt. Ltd.

4. Production System Model

5 Production Process

6 Planning for production function

7 Plant Location

8 Plant Layout

9 Principles of Plant Layout

10. ABC Analysis

12. Conclusion

3

Page 4: 56185718 Bisleri Production

About the Industry

Corporate control over water and water distribution in India is growing rapidly: the packaged

water business is worth Rs 1,000 crore, and it's growing at a huge 40-50% annually. Around

1,200 bottling plants and 100 brands of packaged water across the country are battling over the

market, overdrawing groundwater. Bottled water, one of India's fastest-growing industries, is a

business built on the foundation of bad governance, inequity and exploitation. It is Hard to

believe, but its true. Around 1.2 billion people worldwide lack access to clean drinking water.

Today, there are more people in the world's hospitals suffering from waterborne diseases than

any other ailment.. Providing safe drinking water is the responsibility of the state. That they are

failing miserably is evident from the fact that over 1,600 Indians reportedly die every day

because of waterborne diseases. Despite these astounding figures, the Indian state has literally

washed its hands of the responsibility of providing clean drinking water to its citizens.

Multinational corporations would have us believe so. And the reason is not hard to find: along

with imported water treatment technology like activated carbon and ultra violet (UV)

disinfection (Aquaguard), reverse osmosis (Reviva) and resins (Zero-B), the water treatment

market is estimated to be worth around Rs 700 crore. According to the Bureau of Indian

Standards, there are 1,200 bottled water factories all over India (of which 600 are in the state of

Tamil Nadu). Corporate control over water and water distribution in India is rapidly growing. As

globalisation opens up opportunities for private players, investing in water and/or manipulating

water scarcity makes increasingly good business sense for corporations.

4

Page 5: 56185718 Bisleri Production

About Bisleri

Mineral Water under the name 'Bisleri' was first introduced in Mumbai in glass bottles in two

varieties - bubbly & still in 1965 by Bisleri Ltd., a company of Italian origin. This company was

started by Signor Felice Bisleri who first brought the idea of selling bottled water in India.

Parle bought over Bisleri (India) Ltd. In 1969 & started bottling Mineral water in glass bottles

underthe brand name 'Bisleri'. Later Parle switched over to PVC non-returnable bottles & finally

advanced to PET containers.5

Page 6: 56185718 Bisleri Production

Presently we have 8 plants & 11 franchisees all over India. command a 60% market share of the

organized market. Overwhelming popularity of 'Bisleri' & the fact that we pioneered bottled

water in India, has made us synonymous to Mineral water & a household name. When you think

of bottled water, you think Bisleri.

Bisleri has developed 8 unique pack sizes to suit the need of every individual. They at present

have 50ml cups, 250ml bottles, 500ml, 1L, 1.5L, 2L which are the non-returnable packs & 5L,

20L which are the returnable packs.

Bisleri Water is put through multiple stages of purification, ozonised & finally packed for

consumption. Rigorous R&D & quality controls has made us a market leader in the bottled water

segment. Strict hygiene conditions are maintained in all plants.

Departments in M/s Parle Bisleri Pvt. Ltd.

“M/S Parle Bisleri Pvt. Ltd.” It is a medium scale company and it manufactures and sells

“Packaged Drinking Water” The different departments of this company are: -

1. Filler Department : -

This is the plant in which the bottles are filled and packed under strict levels of hygiene and

safety as per the EU norms.

2. Plastics Department : -

• Caps Section

• Preforms Section

This is the Department where pet material is processed to make preforms using 6 Ekou

injection moulding machine of 180 and 330 tonnes as per the requirements of the preform.

Preforms are available in various sizes according to the size of bottle.6

Page 7: 56185718 Bisleri Production

Bottle Sizes Preform Sizes1 ltr 21gms

500 ml 17gms250 ml 15gms1.5 ltr 32 gms2 ltr 34 gms5 ltr 75 gms20 ltr 710 gms

Caps are made from a mixture of HDPE and LLDPE using 4 Cincinnati Milacron and 2 Windsor

injection-moulding machines.

3. Water Treatment Plant : -

Over here the Raw water from the bore wells is treated in several stages before it is filled thus

making it very pure for human use.

4. Blowing Department : -

7

Page 8: 56185718 Bisleri Production

Over here the preforms are blown into bottles. This department has various manual and fully

automatic stretch blow moulding machines.

5. Water Testing Laboratory : -

The water-testing lab ensures that the water safety standards are maintained as per the BIS and

EU norms.

6. HORAI Department (Grinding Department): -

All rejected bottles, caps, jars and lumps of plastic material are sent over here for grinding in

order to re-use it. Before it can be grinded it is very carefully segregated in different groups.

They also buy plastic bottles from outside and grind them for resale. It is a fully automatic plant

7. Stores Department : -

All the stock of finished, semi-finished goods are stored over here and are dispatched as per the

orders. Up to 50 tonnes of stock are dispatched in a day.

8

Page 9: 56185718 Bisleri Production

9

INPUTSCONVERSION SUBSYSTEM

OUTPUT

Environment

Legal FDA, BIS, BMCTechnological

automatic inj. Mldg. m/c, auto blow mldg. m/c.

Market

Competition with Aquafina, Kinley etc.Customer Desire50 m.l., 100 m.l., 25 litres and low price

Primary Resources

Material: -

Water from bore wells HDPE, LLDPE, PET.

Personnel: -

Plastics Engineering, Production Managers.

Capital Assets: -

Auto Filling Machine, Blow moulding machine, recycling machine

Physical

Manufacturing

Locational Services

Transportation

Exchange

ServicesWholesalerRefill

Other Private Services

Utility

Bisleri Bottles

Control Subsystem

Sealed bottle, FDA, Quality Control

Page 10: 56185718 Bisleri Production

Production System Model

Inputs

Environment

1) Legal : -

Parle Bisleri being a company involved in selling water which is fit for consumption it

comes under the FDA, it also follows the standards of BIS. Therefore ensuring its quality

and the public perceive the right image of being 100% safe.

2) Technological: -

Parle Bisleri believes in keeping up with times and they are trying constantly to increase their

share market. This is the reason Bisleri has automatic Injection Moulding Machine in order

to increase their production capacity 3 folds. Bisleri already has 2 automatic Blow Moulding

Machines.

Market

1) Competition : -

Parle Bisleri Pvt. Ltd. 1992 at that time Bisleri enjoyed almost a complete monopoly.

Recently however, companies like Pepsi and Coco cola have entered the market to give

tough competition to Bisleri by introducing brands like kinley and Aquafina.

2) Customer desire :-

Bisleri has become a household name to the extent that people instead of calling it packaged

water are calling it Bisleri.

-

Primary resources: -

10

Page 11: 56185718 Bisleri Production

1) Material : -

The raw water is obtained from bore wells. The bottles are made from polymers such as

HDPE, LLDPE and PET.

2) Personnel : -

Bisleri requires mostly skilled and semi skilled labourers. The skilled labourers include

production and plastic engineers.

3) Capital assets : -

Bisleri has got 14 injection moulding machines, 2 automatic blow moulding machines and 4

semi automatic blow moulding machines. It has also got 2 plants located side by side for

production purposes.

Conversion Subsystem

1) Physical : -

Parle Bisleri Pvt. Ltd is considered to be a manufacturing unit as it manufactures the semi

finished product i.e. bottles and caps and also produces the finished products.

2) Exchange services : -

The distribution network of Bisleri is maintained by its distributors and wholesalers. To

supply to big corporates they have their own distribution network.

3) Outputs : -

The final output of whole manufacturing process is we get clean pure drinking water in

bottles of different sizes according to the needs of the consumers.

Quality control subsystem

11

Page 12: 56185718 Bisleri Production

The motto of Bisleri is “play safe” and Bisleri has implemented every measure to produce the

safest product possible. It has employed measures such as:-

1) The quality of every single raw material that goes into the products are minutely

inspected in order to ensure optimum quality standards.

2) The caps of all the bottles are tamper proof so when the consumer buys a Bisleri product

he ensures that the product is untampered.

3) The production process of Bisleri is such that a human hand never touches a Bisleri

product.

4) There is 24 hours quality checking so that no defective product reaches the consumer.

12

Page 13: 56185718 Bisleri Production

Production Process

1) The raw material (HDPE, LLDPE, PET) that is stored in the warehouses is transported to the

processing plant near by.

2) In the cap department where caps are produced. HDPE and LLDPE which are in the form of

granules are emptied into the hopper of the injection moulding machine with a colorant and

the caps are produced of the characteristics green colour of Bisleri. The caps that are

produced are automatically packed into cartons. This semi finished product is transported,

after quality testing has been done, to what is called the filling department. In the caps

department there are 7 injection moulding machines

3) In the preforms department which is located in next to the cap department it is located in the

same plant. In the preforms department PET material is used to manufacture preforms which

are semi finished bottles. They are produced by using injection moulding machine. After the

preforms are tested by the quality assurance department, they are packed in cartons and

transported to the filling department. In the preforms department there are 7 injection

moulding machines

13

Page 14: 56185718 Bisleri Production

4) In the blowing department the preforms which are obtained from the preforms department

are blown to form bottles. There are a total of 2 fully automatic blowing machines which are

directly connected from to the filler. There are about 5 more semi automatic and automatic

blowing machines which are producing bottles everyday.

5) The filling department is situated in a closed and a controlled environment to maintain the

hygiene. The bottles are transported from one operation to another on conveyor belt. The

bottles are directly loaded onto the conveyor belt, first bottles passed through UV light to

kill the bacteria, then the bottles are cleaned by pure water, then the bottles are filled to the

desired quantity and then they are automatically capped, then the sticker is put on the bottles

and the price, manufacturing date, batch number are printed by spraying machine on the

bottle itself, then the bottles pass through a screen of white light where workers manually

check all the bottles for any defects, lastly they are packed in cartons and stored in the

warehouse ready for transportation to its destination.

14

Page 15: 56185718 Bisleri Production

6) All the waste bottles are separated and they collected and send to the recycling department

for recycling where they are cleaned, grinded to a coarse powder which is again used in the

manufacturing process thus reducing wastages and being environmentally friendly. This

plant is also used for recycling of outside PET bottles and thus earning extra revenue.

7) In the water treatment plant the water form the 8 bore wells are stored in the Chlorinated

Raw Water Tank (CRWT), the chlorine in this tank is used to kill the germs, after that the

water goes through the sand filter where the solid wastes are removed, after this the water

passes through the carbon filter to remove the foul odour, then the water passes through the

Ultra Violet Light Chamber where the Water passes through it to cure the bacteria and

viruses, then the water passes through a reverse osmosis process to remove the dead

membranes of bacteria and viruses, then the water is passes through the silverisation

chamber to give the sparkle to the water, then the water passes through the ozonisation

process to remove the chlorine and to remove the and its stale odour.

15

Page 16: 56185718 Bisleri Production

Water Purification Process of Parle Bisleri Pvt. Ltd.

Planning for production function

1) Material

Without materials there can be no output. Material input may account for as much as 80%

of the value of the output. This fact indicates the importance to be attached to material

purchasing.

The materials required for the production process of packaged drinking water are: -

A) Raw water

B) HDPE

C) LLDPE

16

Raw Water

Sand Filter

Chlorinated Raw Water Tank

Carbon Filter

U.V. Filter Reverse Osmosis

Silverisation Ozonisation

Page 17: 56185718 Bisleri Production

D) PET

E) Recycled PET granules

F) Cartons

G) Stickers

2) Methods

This function analyses possible methods of manufacture and tries to define the best method

compatible with a given set of circumstances and facilities.

The method for producing packaged drinking water starts with the production of bottles

and caps. After that the semi finished products are transported from the cap and performs

division to the filling division where the caps are added to the filling machines and the

performs to the corresponding size of the bottle, these bottles are then added to the

conveyor belt to complete the process of filling the bottle automatically. After the bottle is

filled to the desired level the bottle is automatically capped and then sticker is put on the

bottle the price is printed through a spray gun. Then it is visually inspected and after that

put into cartons readily for delivery.

3) Machines and Equipment

Industrial production is closely related to available production facilities coupled with

appropriate machine and equipments. Considerations:

1) Equipments can be purchased fresh or second hand

2) Equipment can be lease or rented

3) Equipment can be fabricated within the plant

Machines used in Bisleri are injection moulding machines for the production of preforms

and caps. For making bottles blow moulding machines are used to blow the bottles to the

required size and shape of the bottles by the use of moulds. Automatic fillers are employed

17

Page 18: 56185718 Bisleri Production

for the purpose for clean and efficient filling of the bottles with the least amount of

rejection.

4) Routing

The determination of where each operation on a component part, subassembly or assembly

is to be performed results in a route for the movement of a manufacturing lot through the

factory.

The route of the production process is designed in such a way that in process transportation

is at a minimum. The plant layout is in such a way that it is easy to transport the semi-

finished product. First comes the semi finished product then it is blown filled and sealed,

now ready for delivery.

5) Estimating

. Estimating is a special type of forecasting.

Bisleri being an old company has being estimate the demand for its production due to its

past experience it is able to estimate the demand. As a general rule the demand for Bisleri

is very less but the production of Bisleri continues as the demand in summer is so high that

the production cannot keep pace with the production requirement. They also take help of

market surveys and past trends to determine the production requirements.

6) Loading and Scheduling: -

Both scheduling and loading help in production planning. Scheduling refers to the

preparation of a time table for various operations covering the beginning and finishing

times of various operations. Loading refers to the time gap for various work loads booked

18

Page 19: 56185718 Bisleri Production

in advance for different products. Thus scheduling guarantees the observation of delivery

times and loading guarantees the maximum utilisation of the available facilities.

According to the schedule of the delivery and amount to be delivered and where they are to

be delivered the trucks are loaded to be sent to wholesalers and retailers

7) Dispatching: -

Dispatching refers to the actual issuing of orders for performing operations in different

sections or units. It involves the following steps:

1) To make raw materials, equipments, tools and machines available to the worker

2) To issue orders and instructions in writing about the method of work and time for

completion

3) To note start and finish time of each process

4) To evaluate the performance and progress of production schedule

5) To introduce suitable changes in schedules

Distribution of the bottles is done using trucks of different sizes if the deliver has to be

done in the city the smaller trucks are used which are of Eicher. If the delivery has to be

made outstation then the larger Tata Trucks are used. The normal distribution to the

distributors within the city the delivery takes place 7:00 a.m. every morning except Sunday.

8) Follow Up: -

The effectiveness of any production control system is dependent upon timely and adequate

information regarding actual performance. This information usually originates with the

dispatcher..

19

Page 20: 56185718 Bisleri Production

After the delivery has been made the marketing people visit the retailer, wholesalers,

distributors for their complaints if any written and left for the consideration of their

superiors.

9) Inspection: -

Inspection is an integral aspect of quality control programme. It helps in maintaining and

raising the quality of products. Inspection judges production against established standards.

There is a very efficient quality control process followed by Parle Bisleri Pvt. Ltd. it

inspects everything from the water to the bottles very regularly, in fact it is one the main

issues in quality control of the company. The first thing the quality control head does is to

check the previous days rejection and to finds its individual reasons of rejection and steps if

required.

10) Evaluating: -

Evaluating is the important link between control and future planning. Evaluating function

provides a feedback mechanism on a longer term basis so that past experience can be

evaluated with a view to improve use of methods and facilities.

Operations of Parle Bisleri are inspected by FDA (food and drug associations) Bisleri also

follows BIS (Board of Indian Standards).

Plant Location

An ideal plant location may not be enough by itself to ensure the success of the enterprise but it

surely ensures the smooth running of a factory The need for selection of the location may arise

when a business is started or for the purpose of expansion or for opening branches etc.

Analysis of Bisleri on the location of its Factory

20

Page 21: 56185718 Bisleri Production

Analysis of a factory is carried on the basis of following steps

A) Deciding on domestic or international location

Parle Bisleri Pvt, Ltd is a national company therefore the plant will be located within the country.

B) Selection of Region

1) Availability of Raw Material : -

a) The main raw material for any bottling plant is water the location that the has

been selected has 4 bore wells on site enough to supply water for whole year

round such that the company does not have rely on BMC for its water.

b) The other raw material it requires is HDPE, LLDPE for the production of caps.

PET for the production of bottles, the granules of these are easily available

because all the polymer manufacturing companies i.e. RELIANCE and IPCL have

distributors in MUMBAI.

2) Nearness to the market : -

Mumbai is one of the biggest city in India and the market in Mumbai is very large due

to the fact the people here are more hygiene conscious. The factory is located right next

to the western express highway therefore making it easier for it to transport the finished

goods to the different parts of the city as well out station as well as out state.

3) Availability of power : -

21

Page 22: 56185718 Bisleri Production

Parle Bisleri is located in a industrial area therefore there is abundant power available

Parle Bisleri gets it power from TATA Power they have provided a substation to meet

the needs of the factory.

4) Transport facility : -

Bisleri has a fleet of trucks to meet the deliver needs of the company they Eicher trucks

and they also transport the finished goods and semi – finished goods out of the state as

well as within the city. The fleet is of about 10 trucks.

5) S -

-

C) Selection Of community

1) Availability of labour : -

Parle Bisleri Pvt. Ltd. is located in the city of Mumbai which is a metropolitan city it

has abundant skilled, semi-skilled and manual or unskilled labour.

2) Civic Amenities for workers : -

Parle Bisleri is located in the heart of Mumbai city and it is located very next to western

express highway which is connected to every part of the city and Mumbai has excellent

public transport it also has excellent canteen facilities for workers which give food to

the workers at a subsidized rate.

Plant layout

22

Page 23: 56185718 Bisleri Production

The subject plant layout refers to the arrangement of machinery, equipment and other industrial

facilities for the purpose of achieving the quickest and smoothest production at the least cost.

Bisleri plant at Andheri (E) has two different plants where the complete production takes place.

In the one plant the cap and the bottle preforms are manufactured and the other plant has the

place for preforms to be blown into bottles and the filling of the bottles is done. This building

also has the purification process of the water which has to be filled.

Plant outlet of andheri (E) unit

23

I

N

V

E

N

T

O

R

Y

P

R

O

C

E

S

S

I

N

G

U

N

I

T

G

A

R

D

E

N

Page 24: 56185718 Bisleri Production

Analysis of Bisleri on the layout of its Factory

B) Type of Industry: -

24

TRANSPORTATION

ADMINISTRATOR DEPARTMENT

SECURITY CABIN

W

A

S

T

E

W A S T E -D E P T

ENTERANCE

Page 25: 56185718 Bisleri Production

1) The type of industry and the method of the manufacturing process exercise a

significant influence on plant layout.

Bisleri falls under the category of conditioning industry. A conditioning industry is

industry which is involved in the change of form or the physical properties of a substance

in this case water. Also:

Bisleri falls under the category of a continuous industry. A continuous industry is an

industry that manufactures a product uninterrupted of standard size.

C) Nature of plant location: -

the location of the plant determines the mode of transportation, depending upon the

distances from the source of raw materials and market to the plant.

Parle Bisleri Pvt, Ltd. is located in Andheri (East) in Mumbai. The plant is located on a

large plot near the western express highway. The terrain of the place where it is located is

that it is in step form i.e. the full plot is not at the same level, this helps in the

transportation of semi-finished product to be transported to the filler.

D) Machinery: -

The type of product, the volume of its production, the type of process and management

policy determines the size and type of the machinery to be installed which, in turn,

influences the plant layout. Also the fixed and stationary parts of the machines should

also be taken into considerations while designing the plant layout.

In Parle Bisleri Pvt. Ltd. the machines are laid with many considerations such as: -

1) There is enough space for the repair and maintenance of the machinery can be done

easily.

25

Page 26: 56185718 Bisleri Production

2) The machines are placed in such a way that there is enough place for moving and

relocation of the machines

3) There is enough space for workers to move about the machines and work

comfortably.

E) workers:

The layout designer should also consider the type, position and requirements of

employees. If women workers are employed, the layout must be planned after keeping in

mind their particular requirements. The position of employees, that is whether they

remain stationary or moving, also influences the layout.

Parle Bisleri Pvt. Ltd. has provided its workers with many facilities such as: -

1) Canteen conveniently located and providing hygienic food at concessional rates.

2) Toilets for men and women conveniently located and of sufficient number maintained

in hygienic conditions.

3) Due to the location of the plant it is very convenient for all the workers to reach work.

ABC Analysis

One of the widely used techniques for control of inventory is the ABC (always better Control)

analysis. The objective of ABC control is to vary the expenses associated with maintaining

appropriate control according to the potential saving associated with a proper level of such

26

Page 27: 56185718 Bisleri Production

control. The ABC approach is a means of categorising inventory items into three classes ‘A’,

“B” and “C” according to the potential amount to be controlled.

Once the inventory is classified, we have a form base for deciding where we will put our effort.

Logically we expect to maintain strong controls over the “A”, items taking whatever special

actions needed to maintain availability of these items and hold stocks at the lowest possible

levels consistent with meeting demands. At the other end of the scale, we cannot afford the

expenses of rigid controls, frequent ordering and expediting, because of the low amounts in this

area. Thus with the “C” group, we may maintain somewhat higher safety stocks, order more

months of supply, expect lower levels of customer services or all the three.

The steps to be followed for developing ABC analysis: -

1) List each item carried in inventory by number or some other designation.

2) Determine the annual volume of usage and Rupee value of each item.

3) Multiply each items annual volume usage by its rupee value.

4) Compute each items percentage of the total inventory in terms of annual usage in Rupees.

5) Select the top 10% of all items which have the highest rupee % and classify them as “A”

items.

6) Select the next 20% of all items next highest Rupee percentages and designate them “B”

items.

7) The next 70% of all items with the lowest rupee percentage are “C” items.

ABC analysis of Bisleri’s Inventory

S.R.

NO.

ITEMS COST % OF

THE

TOTAL

GRADE

27

Page 28: 56185718 Bisleri Production

COST

1 Nuts 500 0.25 C

2 Bolts 500 0.25 C

3 Screws 500 0.25 C

4 O-Rings 500 0.25 C

5 Washers 600 0.3 C

6 Blades 100 0.05 C

7 Switches 1300 0.65 C

8 Nozzle Filters 50000 25 A

9 Ceramic Heaters 15000 7.5 B

10 Clamps 6000 3 B

11 P.l.C. 90000 45 A

12 Baffles 1000 0.5 C

13 Teflon Electrical Wires 2000 1 C

14 Sensors 6000 3 C

15 Sprockets 9000 4.5 B

16 Teflon Gears 4000 2 C

17 Stretch Rods 3000 1.5 C

18 Pressure Gauges 10000 5 B

TOTAL ITEMS = 18 COST = 2,00,000

28

ITEMS A ITEMS B ITEMS C

Items 8 and 11

10% of 18 items

70% of Rs. 2,00,000

Items 9, 10, 15, 18

20% of 18 items

20% of Rs. 2,00,000

All the remaining 12

items

70% of 18 items

10% of Rs. 2,00,000

Page 29: 56185718 Bisleri Production

conclusion

In conclusion it can be inferred that production management is very important in today’s

competitive world where cost cutting is a norm rather than exception. Production management

provides a science for effective profit maximization and optimum resources utilization.

Bisleri who ahs been in the past been facing tough competition from the other brands has

adopted production management in a big way in order to maintain its lead in the packaged

drinking water market.

By this project we have tried to highlight some of the measure taken by Bisleri in order to

improve its production processes and to show the significance and the benefits of production

management in today’s globalised market