Top Banner
55 ALLEN PLAZA 55 Allen Plaza joined the challenge seeking opportunies to reduce energy while pursuing LEED Gold status and invesng in the community. The Atlanta BBC assessment provided huge value for the building in being able to move towards its goals and implement projects. The assessment provided a clear, concise summary of savings opportunies, each with a projected return on investment. Together, this info provided a clear path to their goal with no out of pocket costs. PROJECTED SAVINGS: * WATER ENERGY DOLLARS CARBON 5,451 GALLONS saved annually 1.34M KWH saved annually $117,000 saved annually 41,216 METRIC TONS saved annually 130 BATHTUBS** filled each year 567 HOMES powered for one year HIRING 2 NEW EMPLOYEES each year 8,587 PASSENGER CARS removed from the road for one year 20% WATER & ENERGY REDUCTION BY 2020 WE TOOK THE CHALLENGE “Lincoln Property Company has a long and producve relaonship with Central Atlanta Progress, movated by our shared interest of Downtown Atlanta. Our parcipaon in the Atlanta Beer Buildings Challenge lets us add our historically independent goals of envi- ronmental stewardship to our ongoing partnership.“ Shane Froman, VP of Management Services Lincoln Property Co. 2007 341,965 14 Steel & Glass Office 3000 96 BUILDING SPECS: Mgmt. Company: Year Built: Square Feet: Floors: Structure: Building Use: No. Of Occupants: ENERGY STAR Score: www.55allenplaza.com
2

55 ALLEN PLAZA - Atlanta BBC

May 19, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 55 ALLEN PLAZA - Atlanta BBC

55 ALLEN PLAZA

55 Allen Plaza joined the challenge seeking opportunities to reduce energy while pursuing LEED Gold status and investing in the community. The Atlanta BBC assessment provided huge value for the building in being able to move towards its goals and implement projects. The assessment provided a clear, concise summary of savings opportunities, each with a projected return on investment. Together, this info provided a clear path to their goal with no out of pocket costs.

PROJECTED SAVINGS:*

WATER

ENERGY

DOLLARS

CARBON

5,451 GALLONSsaved annually

1.34M KWHsaved annually

$117,000saved annually

41,216 METRIC TONSsaved annually

130 BATHTUBS**filled each year

567 HOMES powered for one year

HIRING 2 NEW EMPLOYEESeach year

8,587 PASSENGER CARSremoved from the road for one year

20% WATER & ENERGY REDUCTION BY 2020

WE TOOK THE CHALLENGE“Lincoln Property Company has a long and productive relationship with Central Atlanta Progress, motivated by our shared interest of Downtown Atlanta. Our participation in the Atlanta Better Buildings Challenge lets us add our historically independent goals of envi-ronmental stewardship to our ongoing partnership.“

Shane Froman,VP of Management Services

Lincoln Property Co.2007341,96514Steel & GlassOffice300096

BUILDING SPECS:Mgmt. Company:

Year Built:Square Feet:

Floors:Structure:

Building Use:No. Of Occupants:

ENERGY STAR Score:

www.55allenplaza.com

Page 2: 55 ALLEN PLAZA - Atlanta BBC

20% REDUCTION STRATEGY BY 2020

Upgrade Categories # Of Opportunities

Lighting Opps

HVAC Controls

Motion/Photocell

Variable Speed Controls

Computer & Server Efficiency

Cooling Tower Upgrades

Urinal

Low Flow Faucets

Insulation & Window

Toilet

Other - Misc.****

3

0

2

0

1

0

1

1

0

1

1

COSTS:*** DOLLARS SAVED:*** RETURN ONINVESTMENT:***$247,000 10 $117,000 Annually

2 Years

TOTAL:

GALLONS0 K

10 K

20 K

30 K

40 K

50 K

60 K

70 K

80 K

90 K

2009

27.3K 25.4

K

2012

23.2K

2020

KILOWATT HOURS

0 M

2 M

4 M

6 M

8 M

10 M

12 M

14 M

16 M

18 M

2009

6.7M

6.3M

2012

5.4M

2020

ADDITIONALBENEFITS

RESOURCES USED

PRODUCT DONATION:

REBATES USED:

CLASSES/EVENTS ATTENDED:

DOLLARS PUT INTOTHE COMMUNITY:***

$15,000

Through the challenge the building’s staff took advantage of several opportunities for collaboration with other participating building owners and managers to learn about methods and solutions for building retrofits. As a result, a friendly competition ensued between the participating buildings.

$247,000

ProjectsExamples:

Retrofit With Low Flow Toilets And Urinals

Retrofit Sinks With Diffusers

ProjectsExamples:

Reduced Wattage T8 Lighting

Parking Deck Lights

Stairwell Motion Sensors

*Projected savings were determined using www.epa.gov/cleanenergy/energy-resources/calculator.html#results **based on a 42 gallon tub ***Estimated figures based on assessments performed as part of the Atlanta Better Buildings Challenge ****Kitchen equipment, vending machine upgrades, etc

30%WATER

opportunities

70%opportunitiesENERGY

BUILDING ASSESSMENT:

provided assessmentenergy efficiency rebate value

donated lightingcost of full lobby lighting retrofitapprox amount of fixtures donated$25,000100 Lighting Fixtures

provided rebate

LOCAL BUSINESSSUPPORTED:

Henderson Electric Company

www.heco.org

Regency Lightingwww.regencylighting.com

55 Allen Plaza joined the challenge with an

ENERGY STAR score of 96, already starting

from a place of high performance. Yet, the

assessment yielded specific opportunities that

could improve their score 23% from their 2009

baseline. Some opportunities connected with

existing utility incentives, alleviating some of

the up front costs. 55 Allen Plaza has used

both internal employees & local contractors

during implementation of the first measures.