Page 1: 52234-001: Chennai Metro Rail Investment Project

Environmental Impact Assessment (Draft)

March 2021

India: Chennai Metro Rail Investment Project Corridor 3

Annexure 4

Prepared by the Chennai Metro Rail Limited (CMRL) for the Asian Development Bank.

Page 2: 52234-001: Chennai Metro Rail Investment Project

This environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 3: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-i Sign & Stamp of Tenderer

Table of Contents

1. Scope ................................................................................................................................ 1 1.2. Application of this document ................................................................................... 1 1.3. Purpose of this document ........................................................................................ 1 1.4. Chennai Metro Rail Limited ESHS Objectives ......................................................... 1

2. Reference publications .................................................................................................... 2 3. Terms and definitions ...................................................................................................... 2 4. ESHS management system requirements ...................................................................... 4

4.1. General requirement ................................................................................................. 4 4.2. CMRL ESHS Policy Statement of Intent ................................................................... 5 4.3. Planning ..................................................................................................................... 6 4.4. Implementation and operation ................................................................................ 10 4.5. Checking .................................................................................................................. 28 4.6. Management review ................................................................................................ 37 4.7. External ESHS Agency ............................................................................................ 37 4.8. Penalty ..................................................................................................................... 37

Page 4: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-1 Sign & Stamp of Tenderer

1. Scope

1.1. The Employer’s Requirements ESHS Volume 1 details the requirements of the Employer

for Environment, Social, Health and Safety control measures associated with the

Contractor and any other agency, to be practiced on all Chennai Metro Rail Limited

(CMRL) construction sites or associated premises.

1.2. Application of this document

1.2.1. The Employer’s Requirements ESHS Volume 1 applies to all aspects of the contractor’s

scope of work including that conducted by their appointed sub contractor’s and other

agencies on their behalf. There shall be no activity associated with the Chennai metro

Rail Project, which exempted from the purview of this document.

1.2.2. The Employer’s Requirement’s ESHS Volume 1 is supplemented with a further 3 ESHS

Volume for ease of reference. Their individual scope and applicability are as follows:

ESHS Volume 1 is the controlling document for all Contracts and is fixed throughout the

term of the project. Compliance with the Employer’s Requirements ESHS Volume 1 and

the Project Health and Safety Manual (H&S) Volume 2 is mandatory. Volume 1 remains

subject to revision by the Employer / Engineer in the event of new Legislation or

changing circumstances

1.2.3. H&S Volume 2 provides Project Health & Safety Manual is mandatory applies to all

aspects of the Contractor’s scope of work, including that conducted by their appointed

sub-Contractor’s and other agencies on their behalf. The contents of H&S manual

Volume 2 remains subject to revision by the Employer /Engineer in the event of new

Legislation or changing circumstances.

1.2.4. ESHS Volume 3 provides Environmental guidance and procedural requirements for the

project. Volume 3 remains subject to periodic revision and updating.

1.3. Purpose of this document

The purpose of this document, the Employer’s Requirements, ESHS Volume 1 is to

provide Contractors and other interested parties with the mandatory requirements

relating to Health, Safety and the Environment practices and performance expectations

on the Chennai Metro Rail Project.

This document:

a) Describes the ESHS interfaces between the Employer, Engineer and the Contractor;

b) Details the processes by which the Contractor shall manage ESHS issues while

carrying out the works under the contract and;

c) Describes by reference, the practices, procedures and requirements pertaining to the

Chennai Metro Rail Project.

1.4. Chennai Metro Rail Limited ESHS Objectives

Chennai Metro Rail Limited has identified five principle objectives for attainment during

the project. These long-term objectives shall be supported with quarterly, short and

medium term objectives to enable structured advancement in overall performance. Our

Short- and medium-term objectives also aim to facilitate effective monitoring and

measurement to identify where a directional change may be necessary. Our Long-term

objectives are:

Page 5: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-2 Sign & Stamp of Tenderer

1. To eliminate or minimize the unwanted effects of hazards and risks to personnel,

members of the public and other stakeholders who may be exposed to the undertakings

associated with the construction of the Chennai Metro Rail project

2. Establish an effective and robust ESHS management system that will enable Contractors

to achieve international recognition and registration to the ISO 45001:2018 Series.

3. Actively contribute to Contractors development through support, encouragement,

determination in control and transfer of knowledge and skills in order to make the move

from traditional compliance driven management through to risk managed processes.

4. To simplify the risk concept, to ensure a sensible approach to risk management and

simplify hazard awareness training through adoption of the ALARP (As low as reasonably

practicable) principles.

5. To practice ‘Best Practice’ within the construction industry - Establishing a work

environment that conforms to international health & safety standards and make

recommendation to improve effectiveness of regulations both nationally and locally.

2. Reference publications

ISO 9000:2005, Quality management systems — Fundamentals and vocabulary

ISO 9001:2015, Quality management systems — Requirements

ISO 14001:2015, Environmental management systems — Requirements with guidance

ISO 19011:2002, Guidelines for quality and/or environmental management systems

auditing

OHSAS 18001:2007 Health and safety management systems Requirements

OHSAS 18002, Health and safety management systems – Guidelines for the

implementation of BS OHSAS 18001

ISO 45001:2018 specifies requirements for an health and safety (H&S) management

system and gives guidance for its use, to enable organizations to provide safe and

healthy workplaces by preventing work-related injury and ill health, as well as by

proactively improving its H&S performance.

PAS 99, Specification of common management system requirements as a framework for

integration

International Labour Organization:2001, Guidelines on health and safety management

systems — ILO-OSH 2001

Health & Safety Guidance (HSG) Health and Safety Executive Publications United

Kingdom

Safety and Health Administration(OSHA) publications USA

3. Terms and definitions

3.1 Acceptable risk. Risk that has been reduced to a level that can be tolerated by the

organization having regard to its legal obligations and its own ESHS policy

3.2 Accident. Incident giving rise to injury, ill health or fatality

3.2 ALARP (As low as reasonably practicable) principles.

Page 6: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-3 Sign & Stamp of Tenderer

3.3 Audit. Systematic, independent and documented process for obtaining “audit evidence”

and evaluating it objectively to determine the extent to which “audit criteria” are fulfilled

3.4 BOCWA. Building and Other Construction Workers (Regular Employment and

Conditions of Service) Act, 1996

3.5 BOCWR. Building and Other Construction Workers (Regulation of Employment and

Conditions of Service) Central Rules, 1998

3.6 Chief Safety Expert. An officer appointed by Employer / Engineer who is the overall

responsible for monitoring all H&S functions prescribed in this document.

3.7 CMRL. Chennai Metro Rail Limited

3.8 Competent person. Person with the appropriate combination of skill, knowledge,

qualifications and experience

3.9 Continual improvement. Recurring process of enhancing the ESHS management

system in order to achieve improvements in overall ESHS performance consistent with

the organization’s ESHS policy

3.10 Corrective action. Action to eliminate the cause of a detected nonconformity or other

undesirable situation

3.11 Design Risk Assessments. Used to record the actions of designers when reducing risks in construction and for future repairs and maintenance issues.

3.12 Employer. Chennai Metro Rail Limited (CMRL).

3.13 Hazard. Source, situation, or act with a potential for harm in terms of human injury or ill

health, or a combination of these

3.14 Hazard identification. Process of recognizing that a hazard exists and defining its

characteristics

3.15 Health surveillance. Monitoring health of employees to detect signs or symptoms of

work‑ related ill health so that steps can be taken to eliminate, or reduce the probability

of, further harm

3.16 Ill health. Identifiable, adverse physical or mental condition arising from and/or made

worse by a work activity and/or work-related situation

3.17 Incident. Work-related event(s) in which an injury or ill health (regardless of severity) or

fatality occurred, or could have occurred. An accident is an incident which has given rise

to injury, ill health or fatality.

3.18 Interested party. Person or group, inside or outside the workplace, concerned with or

affected by the ESHS performance of an organization

3.19 Nonconformity. Non-fulfilment of a requirement; A nonconformity can be any deviation

from: relevant work standards, practices, procedures, legal requirements, etc. or ESHS

management system requirements.

3.20 ESHS management system. Part of an organization’s management system used to

develop and implement its ESHS policy and manage its ESHS risks. A management

system is a set of interrelated elements used to establish policy and objectives and to

achieve those objectives. A management system includes organizational structure,

planning activities (including for example, risk assessment and the setting of objectives),

responsibilities, practices, procedures, processes and resources.

Page 7: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-4 Sign & Stamp of Tenderer

3.21 ESHS objective. ESHS goal, in terms of ESHS performance that an organization sets

itself to achieve.

3.22 ESHS performance. Measurable results of an organization’s management of its ESHS

risks

3.23 ESHS policy. Overall intentions and direction of an organization related to its ESHS

performance as formally expressed by top management

3.24 Preventive action. Action to eliminate the cause of a potential nonconformity (3.19) or

other undesirable potential situation

3.25 Procedure. Specified way to carry out an activity or a process

3.26 Record. Document stating results achieved or providing evidence of activities performed

3.27 Risk. Combination of the likelihood of an occurrence of a hazardous event or exposure(s)

and the severity of injury or ill health that can be caused by the event or exposure(s)

3.28 Risk assessment. Process of evaluating the risk(s) arising from a hazard(s), taking into

account the adequacy of any existing controls, and deciding whether or not the risk(s) is

acceptable

3.29 Risk control. Selection and application of suitable measures to reduce risk

3.30 Shall. Indicates a mandatory requirement within this document

3.31 Stakeholders. Those with a vested interest in an organization’s achievements that

includes, but is not limited to, internal and “outsourced” employees, customers, suppliers,

partners, employees, distributors, investors, insurers, shareholders, owners, government

and regulators.

3.32 Status review. Formal evaluation of the ESHS management system

3.33 Top management. Person or group of people who direct and control an organization at

the highest level

3.34 Worker representative. Representative of employee health and safety

3.35 High Risk –A hazardous condition may cause frequency accidents which may result in

catastrophic equipment losses or buildings, severe injury, illness, disablement or possible

fatality.

3.36 Medium Risk-A hazardous condition resulting in injury /illness requiring absence from

work or equipment damage.

3.37 Low Risk-A hazardous condition is unlikely to cause accidents, minor injury, and even fit does, result in only negligible damage.

4. ESHS management system requirements

4.1. General requirement

4.1.1. The Contractor shall define and document the scope of its Safety Health and

Environmental (ESHS) management system to meet legal requirements and the

requirements of Chennai Metro Rail Limited as stated within this document.

4.1.2. The Contractor’s ESHS management system shall determine how the organisation shall

document, implement, maintain, and continually improve upon performance in

accordance with the requirements of the International ISO45001:2018 Standard to which

the Employer is committed.

Page 8: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-5 Sign & Stamp of Tenderer

4.2. CMRL ESHS Policy Statement of Intent

Chennai Metro Rail Limited consider that health, safety and environmental is of equal

importance in comparison to any other aspect of business management and as such is

committed to promoting high standards of health, safety ,environmental and welfare on

all of their sites and premises. To achieve this Chennai Metro Rail Limited shall:

Constantly work towards improving the safety culture at all levels.

Ensure compliance with all relevant legal duties in respect of health and safety at work

legislation.

Provide adequate resources for planning and controlling working conditions and safe

systems of work.

Work with our Contractors and suppliers to improve their safety performance, by

measuring and monitoring their performance.

Responsibilities and performance requirements for health, safety and environmental are

available on the Chennai Metro Rail Limited website. In summary: -

All Contractors, employees, sub-Contractors, consultants, suppliers and visitors have

A duty to play an active role in achieving our objectives through compliance with their

legal obligations and this ESHS Policy.

Participation and consultation are vital aspects of this Policy and to the achievement of

our objectives. Contractors and Staff are encouraged and expected to:

Discuss environmental, social, health and safety matters with their managers, and

company environmental, social, health and safety Representatives who will offer

or obtain further expert advice, where necessary.

Co-operate at all times; contribute good ideas and improvements; report defects

and short falls.

The correction of any breach of statutory provision or Chennai Metro Rail Limited

requirements on health and safety shall take priority. Should appropriate action not be

taken to meet the required standards, this will be taken seriously and may lead to

disciplinary action being taken.

This Policy Statement shall be displayed prominently on all Chennai Metro Rail Limited

sites and offices and will be kept under review to ensure its relevance.

____________________

Managing Director

Chennai Metro Rail Limited

Page 9: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-6 Sign & Stamp of Tenderer

4.3. Planning

4.3.1. Hazard identification, risk assessment and determining controls

4.3.1.1. The Contractor shall submit a procedure detailing the process in place for the

identification of Hazards and Risks and the determination of control measures including

the relevant standards as per clause 4.4.4.1 The Procedure shall incorporate the

Employer’s Requirements within this and other applicable ESHS Volumes.

4.3.1.2. Management of Change

4.3.1.2.1. All temporary and permanent changes to organisational, personnel, systems,

procedures, equipment, products, materials or substances shall be evaluated by the

Contractor and managed to ensure that health, safety and environmental risks arising

from these changes remain at an acceptable level. Changes made by the Contractor are

subject to submittal and notice of no objection by the Employer /Engineer prior to adopting

change.

4.3.1.3. Risk Register & Hazard Log

4.3.1.3.1. The Contractor’s Construction Health and safety Plan shall contain a detailed ‘Risk

Register’ and ‘Hazard Log’ specific to the project. The register and log shall be assessed

against the CMRL H&S Manual Volume 2.

4.3.1.3.2. The Hazard Log shall identify future method statement, risk assessment and operational

procedures pertaining to specific equipment and operations in relation risk and local

environmental constraints. Construction phase ESHS Plans shall not be accepted without

a fully completed Hazard Log and Risk Register.

4.3.1.4. Method Statements and Lift Plan

4.3.1.4.1. Method statements are to be submitted to the Employer /Engineer a minimum of 28 days

prior to task commencement to ensure sufficient time is available for review and notice

of no objection.

4.3.1.4.2. Method statements shall contain the information requirements as prescript within the

CMRL H&S Manual Volume 2.

4.3.1.4.3. Method statements shall incorporate the control measures within the process

methodology as identified within the risk assessment.

4.3.1.4.4. A copy of the relevant method statement for the activity being undertaken shall be

available on site for reference by all site management and supervisors.

4.3.1.4.5. Lift Plan are to be submitted to the Employer /Engineer a minimum of 28 days prior to

task commencement to ensure sufficient time is available for review and notice of no

objection.

4.3.1.4.6. Lift Plan shall contain the information requirements as prescript within the CMRL H&S

Manual Volume 2

4.3.1.5. Risk Assessment production & submittal

4.3.1.5.1. Risk assessments shall contain as a minimum, the information as specified within the

CMRL H&S Manual Volume 2. The Contractor may choose to use their own format

however the risk tolerances, probability and consequences must be included.

4.3.1.5.2. Risk assessments shall be produced and submitted to the Employer /Engineer a

minimum of 28 days prior to task commencement for notice of no objection. Risk

assessments may be submitted independently or as part of a Method Statement.

4.3.1.5.3. Generic risk assessments other than routine activities of low risk shall not be accepted

by the Employer/Engineer.

Page 10: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-7 Sign & Stamp of Tenderer

4.3.1.5.4. Risk assessments shall be regularly reviewed to ensure they remain suitable and

sufficient. Risk assessment reviews shall be undertaken where an incident has occurred

and when a change in location may introduce additional risks from construction activities.

4.3.1.5.5. Substances hazardous to health shall be subject to assessment by the Contractor. Where

Hazardous substances are identified for use within a process the assessment and

determining controls shall be included within the relative method statement.

4.3.1.5.6. Designer’s primary role includes to minimise the risk to health and safety of those who

are going to construct, maintain, clean, repair, dismantle or demolish the structures and

anyone else like adjoining road users/general public, who may be affected by the work.

4.3.1.5.7. When considering health and safety in designer’s work, they shall be expected to do what

is reasonable at the time the design is prepared. It may be possible for hazards, which

cannot be addressed at the feasibility stage to be looked at during detailed design. In

deciding what is reasonably practicable, the risk to health and safety produced by a

feature of the design has to be weighed against the cost of excluding the feature. The

overall design process does not need to be dominated by a concern to avoid all risks

during the construction phase and maintenance. However, a judgement has to be made

by weighing up one consideration against another, so the cost is counted not just in

financial terms, but also those of fitness for purpose, aesthetics, buildability or

environmental impact. By applying these principles, it may be possible to make decisions

at the design stage, which will avoid or reduce risks during construction work. In many

cases, the large number of design considerations will allow a number of equally valid

design solutions. What is important is the approach to the solutions of design problems.

This should involve a proper exercise of judgement, which takes account of health and

safety issues.

4.3.1.5.8. Designers shall need, so far as reasonably practicable, to avoid or reduce risks by

applying a series of steps known as the hierarchy of risk control or principles of prevention

and protection. The steps to be adopted shall include the following:

i.Consider if the hazard can be prevented from arising so that the risk can be avoided

(e.g. alter the design to avoid the risk);

ii. If this cannot be achieved, the risk should be combated at source (eg, ensure the

design details of items to be lifted include attachment points for lifting);

iii.Failing this, priority should be given to measures to control the risk that will collectively

protect all people;

iv.Only as a last resort should measures to control risk by means of personal protection

be assumed (E.g. use of safety harnesses).

4.3.1.5.9. In case of situations were the designers have carried out the design work and concluded

that there are risks, which were not reasonably practicable to avoid, detailed information

shall be given about the health and safety risks, which remain. This information needs to

be included within the design assessment to alert others to the risks, which they cannot

reasonably be expected to know. This is essential for the parties who have to use the

design information.

4.3.1.5.10. If the designers’ basic design assumptions affect health or safety, or health and safety

risks are not obvious from the standard design document, the designer shall provide

additional information. The information shall include a broad indication of the

assumptions about the precautions for dealing with the risks. The information will need

to be conveyed in a clear manner; it shall be included on drawings, in written

Page 11: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-8 Sign & Stamp of Tenderer

specifications or outline method statements. The level of detail to be recorded will be

determined by the nature of the hazards involved and the associated level of risk.

4.3.1.5.11. Job Specific Risk assessment shall be submitted to the Employer /Engineer a minimum

of 28 days prior to task commencement for notice of no objection. (Example-Manual

Handling, PPE and Fire)

4.3.1.6. Design Risk Assessment

4.3.1.6.1. Design Risk Assessments shall be submitted to the Employer /Engineer for granting of

no objection. Design risk assessments shall accompany all drawing submittals for

operations involving;

Temporary works,

Formwork & false-work

Heavy lifting equipment.

4.3.1.6.2. Drawings shall not be accepted by the Employers Representative without

an accompanying design risk assessment.

4.3.1.7. Employer/Engineer’s approval

4.3.1.7.1. Every structure like scaffold, falsework & Formwork, launching girder, Temporary work

(shoring system), earth retaining structures etc. shall have its design calculations

included in the method statements in addition to health and safety risks. The Employer

/Engineer designer or his approved proof check consultants as applicable as per the

contract conditions shall approve all these designs and issue a ‘No Objection for Use’.

4.3.1.7.2. Any non-standard structures like trestles made up of re-bars or structures which are very

old, corroded, repaired for many times etc. for which no design calculations can be made

accurately from any national standards, shall not be allowed to be used at sites even for

short duration.

4.3.1.7.3. If any of the above-mentioned clauses are not adhered penalty shall be imposed

depending upon the gravity of the unsafe act and or condition.

4.3.2. Legal and other requirements

4.3.2.1. Contractor shall comply with all legal obligations and the requirements of Chennai Metro

Rail Limited as contained herein.

4.3.2.2. Indian statutory requirements

The Contractor shall abide by all national, state and local bye-laws. It is the duty of the

Contractor to ensure that all sub-Contractors appointed also comply with their legal

obligations as listed below but not limited to:

i. Indian Electricity Act 2003 and Rules 1956

ii. Tamil Nadu Building and other construction Workers (regulations of Employment

and conditions of service) Rules ,2006.

iii. National Building Code, 2005

iv. Factories Act, 1948,

v. The Tamil Nadu Factories Rules, 1950

vi. Motor Vehicles Act as amended in 1994, The Central Motor Vehicles Rules, 1989.

vii. Indian Road Congress Code IRC: SP: 55-2001 ‘Guidelines on Safety In Road

Construction Zones.

viii. The Petroleum Act, 1934 and Rules 1976

Page 12: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-9 Sign & Stamp of Tenderer

ix. Gas Cylinder Rules, 2003

x. Indian Explosives Act. 1884, along with the Explosives substance Act 1908 and the

explosives Rules 1983

xi. The (Indian) Boilers Act, 1923

xii. The Public Liability Insurance Act 1991 and Rules 1991

xiii. Minimum Wages Act, 1948 and Rules 1950

xiv. Contract Labour Act, 1970 and Rules 1971

xv. Child Labour (Prohibitions & Regulations) Act, 1986 and Rules 1950

xvi. Environment Protection Act, 1986 and Rules 1986

xvii. Air (Prevention and control of Pollution) Act, 1981

xviii. Water (Prevention and Control of Pollution) Act, 1974

xix. The Noise Pollution (Regulation & Control) Rules, 2000

xx. Notification on Control of Noise from Diesel Generator (DG) sets, 2002

xxi. Recycled Plastic Usage Rules, 1998

xxii. Notification, Central Ground Water Board, Act January 1997

xxiii. Manufacture, Storage & Import of Hazardous Chemicals Rules, 1989

xxiv. The Hazardous Waste (Management & Handling) Rules, 1989

xxv. Hazardous Waste Management Rules 1989 (as amended in 1999)

xxvi. Batteries (Management and Handling) Rules

xxvii. Fly ash utilization notification, Sept 1999 as amended in August 2003

xxviii. Workman Compensation Act, 1923 along with allied Rules

xxix. The Mines Act 1952

xxx. The Indian Wildlife (protection) Act 1972 and The Wildlife (Protection) Amendment

Act 2002

xxxi. Coastal Regulation Zones (CRZ) Rules 2011 amended on dt. 8.12.2014

xxxii. Solid Waste Management Rules 2019

xxxiii. Municipal Solid Waste Rules 2000.

4.3.2.3. International Standards, Guidelines & ISO Certifications

4.3.2.3.1. If the requirements stated in this document are in conflict or inconsistent with the

requirements of applicable laws or the Employer’s Requirements for the CMRL project,

the more stringent requirements shall apply.

4.3.2.3.2. The works shall be undertaken in accordance with the applicable international guidelines,

standards and specifications on ESHS and every Contractor shall actively pursue the

achievement of:

ISO 45001:2018 health and safety (H&S) management system

ISO 14001:2015 Environmental management systems

4.3.2.3.3. The process of international certification to ISO 45001:2018 and ISO 14001:2015

standard shall commence immediately after the award of Contract through appointment

of ISO accrediting body for obtaining the certification. Should this not be undertaken by

the Contractor within 3 months of the Contract award, the Employer /Engineer shall

appoint at the Contractor’s cost.

Page 13: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-10 Sign & Stamp of Tenderer

4.3.2.3.4. Should the Contractor already possess such certification, the scope of the CMRL project

must be included on the Contractor’s certification within 1 year of Contract

commencement and proof of such attainment demonstrated to Chennai Metro Rail

Limited.

4.3.2.3.5. If any of the above-mentioned clauses are not adhered penalty shall be imposed as per

details given under penalty clause 4.8. of this document.

4.3.3. Objectives and programme(s)

4.3.3.1. The Contractor shall maintain procedures to establish detailed ESHS objectives and

performance criteria. Such objectives and performance criteria shall be developed to

incorporate the Chennai Metro Rail policy and strategic ESHS objectives. The

Contractor’s objectives shall be quantified, wherever practicable, and identified with

defined timescales. The Contractor is required to submit for notice of no objection their

procedure and objectives as per clause 4.4.4.1 of this control document.

4.4. Implementation and operation

4.4.1. Resources, roles, responsibility, accountability and authority

4.4.1.1. The Contractor shall detail within the Construction Health, Safety and Environmental Plan

the planned roles and resources allocated for the CMRL project. In addition to the staffing

arrangements the Contractor shall prescribe the responsibilities specific to role,

accountability, and the authority under which they operate.

4.4.1.2. ESHS resources shall be provided by the Contractor as per the Contract value in table 1.

Table 1 Mandatory Contractor ESHS management resource requirement

1 2 3 4 5 6 7

Awarded Contract value (in

Cr.)

Chief ESHS

Manager (Safety

Manager)

(Key Staff)

Senior ESHS

Manager

Junior ESHS

Manager

Safety Supervisor

Senior ESHS (Electrical) Manager

Junior ESHS

(Electrical) Manager

Public Liaison Officer

Upto 100 1 - 1

Refer

Note 3

- 1 1

Upto 200 1 1

Refer

Note 2

1

Refer

Note 4

1

Upto 300 1

Refer

Note 1

1 1

Upto 400 1 1 1

Upto 500 1 1 1

More than 500

1 2 2

8 09 10 11 12 13

Awarded Contract value (in

Cr.)

Health officer with

Nurse (Refer Note 9)

Environmental Manager

Senior ESHS

(Traffic) Engineer

Barricade Maintenance

squad

House Keeping

squad

Labour Welfare Officer

Upto 100 2 (PT) 1 1

Refer Note 7 Refer Note 8

1

Upto 200 2 (FT) 1 2 2

Upto 300 2 (FT) 1 with Support staff 2 2

Page 14: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-11 Sign & Stamp of Tenderer

1 2 3 4 5 6 7

Upto 400 2(FT) 1 with Support staff 2 2

Upto 500 2(FT) 1 with Support staff 2 2

More than 500

2(FT) 1 with Support staff 2 2

Note 1: Qualified Senior ESHS Manager as per table 2 ESHS Personnel Qualifications

& Experience to be deployed at each worksite at each shift.

Note 2: Qualified Junior ESHS Manager as per table 2 ESHS Personnel Qualifications

& Experience to be deployed at each worksite at each shif.

Note 3: Qualified Safety Steward as per table 2 ESHS Personnel Qualifications &

Experience to be deployed at each worksite at each shift.

Note 4: Qualified Junior ESHS (Electrical) Manager as per table 2 ESHS Personnel

Qualifications & Experience to be deployed at each worksite at each shift.

Note 5: (PT) means Part-Time and (FT) means Full-time.

Note 6: Senior ESHS (Traffic) Engineer Post and Barricade Manager Posts are

applicable to contracts where the work has to be executed either below or over

the right-of-way like Viaduct, Contracts wherein erection and maintenance of

barricades are paramount important.

Note 7: One Barricade Manager supported by required supervisors and workmen at

each worksite at each shift.

Note 8: One Housekeeping Manager supported by required supervisors and workmen

at each worksite at each shift.

Note 9: Qualified Nurse as per table 2 ESHS Personnel Qualifications & Experience to

be deployed at each worksite at each shift.

Note 10: The Chief ESHS Manager (Safety Manager)-Key Staff shall be a professional

and experienced manager with at least fifteen (15) years’ experience in the

construction of metro rail Projects with at least 10 year’s direct relevant

experience in administering of ESHS of similar scope in professional

experience in ESHS in international projects. The Chief ESHS Manager

should have minimum five years’ experience in similar position of similar works

Note 11: No contractor shall engage ESHS manpower from any outsourcing agencies

in which case the effectiveness would be lost. All ESHS manpower shall be

on the payroll of the main contractor only and not on the payroll of any

subcontractor or outsourcing manpower agencies etc. This condition does not

apply to positions like traffic marshals who are engaged almost on a daily

requirement basis.

Note 12: Environmental support staff shall be Govt. recognized PG Degree / Degree in

Page 15: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-12 Sign & Stamp of Tenderer

Environmental Engineering / Science with minimum of two years of experience

of similar scope of work.

Note 13: All the ESHS Personal Shall be in the payroll of the main contractor.

Note 14: The conduct and functioning of the contractor ESHS personnel shall be

monitored by the Employer. Any default or deficiency shall attract penalty as

per details given under penalty clause 4.8.3 of this document.

4.4.1.3. Responsibility

4.4.1.4. The Project Director or Project Manager of the Contractor is responsible and accountable

for compliance with the conditions and clauses within this document.

4.4.1.5. The Project Director or Project Manager is responsible to ensure that the necessary

resources are allocated and made available to meet the requirements as laid out within

this document and other referenced materials to include Legal Requirements (4.3.2).

4.4.1.6. For all works carried out by the Contractor and appointed sub-Contractor’s, the

responsibility for ensuring ESHS resources remains with the main Contractor. Activities

undertaken by the Contractor’s Sub-Contractors shall be monitored by the Contractor at

all times to ensure compliance with agreed safe systems of working.

4.4.1.7. All Contractor’s ESHS personnel shall report to the Chief ESHS Manager who shall report

directly to the Project Director or Project Manager or Corporate Safety manager of the

Contractor’s organisation. This shall be reflected in the Contractor’s organisation charts

within the ESHS plan and Quality Management Plan.

4.4.1.8. The Employer /Engineer shall monitor adherence to the provisions of Table 1. Where

deviation is evident this shall be recorded as a non-conformance.

4.4.1.9. The Contractor shall provide all ESHS personnel with such facilities, equipment and

information that are necessary to enable them to dispatch their duties effectively.

4.4.1.10. The Contractor’s ESHS Managers are responsible for ensuring that reports on the

performance of the ESHS management system are presented to top management for

review and used as a basis for improvement of the ESHS management system.

4.4.1.11. The Contractor’s ESHS Managers are responsible for independently monitoring the

operations of the Contractor, where deficiencies are identified they are responsible to

report their findings immediately to the Site Engineer in charge who then must take action

as directed.

4.4.1.12. Accountability

4.4.1.13. In cases where the Contractor fails to provide the minimum required manpower as

illustrated in Table 1, or fails to fill vacancies created within 30 days, the same may

be provided by the Employer /Engineer at the Contractor’s cost. Any administrative

expenses involved in providing the same for example, vacancy advertisements or

recruitment consultant charges, shall also be at the cost of Contractor.

4.4.1.14. No ESHS personnel shall be permitted to do any work which is unconnected to,

inconsistent with or detrimental to the performance of the ESHS duties.

4.4.1.15. Supervisors must ensure that the employees under their direct supervision are working

incompliance with the approved safe systems of working.

4.4.1.16. Authority

4.4.1.17. The Contractor’s Safety Managers, Senior ESHS Manager and Junior ESHS Manager

authority shall be stated within the Construction Health and Safety Plan and the authority

level must be communicated to all Contractor’s Staff including sub-Contractors.

Page 16: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-13 Sign & Stamp of Tenderer

4.4.1.18. The Contractor’s Safety Managers, Senior ESHS Manager and Junior ESHS Manager

Officers shall have the authority as assigned by the Project Director or Project Manager

to suspend works where deviation from an approved method of working occurs that

presents a risk of injury, equipment or property damage or “E&S” risks.

4.4.1.19. The Engineer shall have the right to stop the work at his/her sole discretion, if in his

opinion the work is being carried out in such a way that a risk of injury, property and or

equipment damage may exist. The Contractor shall not proceed with the work until

remedial works have been complied with under the direction and satisfaction of the

Employer. Should the Contractor continue to work without implementing the Engineers

instruction, clause 4.4.2.2 shall be applied to the individual responsible for the decision

to proceed.

4.4.1.20. The Contractor shall not be entitled to any damages or compensation for stoppage of

work, due to safety reasons. The period of such stoppages of work shall not be taken as

an extension of time for completion of the facilities and will not be the ground for waiver

of levy of liquidated damages.

4.4.1.21. The contractor shall submit Daily Dairy report (FSAF 029-Volume 2 of H&S Manual) with

the target date for the completion of the observation to the Employer /Engineer including

any subcontractor activity of both shift. This reporting shall be the primary duty of the

Chief ESHS Manager of the contractor and reporting shall be through email. The report

should be submitted at the end of the day of shift. If the information is not received or

delay in submission of report. Penalty shall be levied as per relevant clause.

4.4.2. Competence, training and awareness

4.4.2.1. The Contractor shall ensure that the recruitment, selection and placement processes

shall be in place to ensure that personnel are qualified, competent, and physically fit for

assigned tasks. The Contractor shall produce a procedure that shall be made available

to the Employer / Engineer for notice of no objection as per Clause 4.4.4.1 of this

document. The procedure shall define the processes in place to ensure competence.

4.4.2.2. Whereby any person employed thereon, who in the opinion of the Employer /Engineer ,

misconducts himself or is incompetent or negligent or fails to conform with any particular

provisions with regard to health , safety or environment which is set out in the

Contractor’s ESHS Plan or a requirement of the Contract, or persists in any conduct

which is prejudicial to health, safety , shall be removed from site immediately, and such

persons shall not be employed again upon the Works. The decision of the Employer

/Engineer in this regard shall be final.

4.4.2.3. The Contractor ESHS Personnel-Notice of No Objection from the Employer

/Engineer.

4.4.2.3.1. The name, educational qualifications and work experience for all ESHS persons intended

for a Contractor’s ESHS role shall be submitted to the to the Employer/Engineer

Employer in the format prescribed (FSAF 30-Volume 2 of H&S Manual) for notice prior to

employment. Only upon notice of no objection by the Employer /Engineer shall ESHS

personnel be authorised to work on a CMRL site.

4.4.2.3.2. The Original certificate of degree, mark sheet, course completed certificate and work

experience shall be maintained by the Contractor and be made available for inspection

and upon request shall be submitted to the Employer/Engineer prior to employment.

4.4.2.3.3. Age Limit: Contractor’s ESHS persons shall not be exceeding 55 years on the date of

submission of proposal.

Page 17: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-14 Sign & Stamp of Tenderer

4.4.2.3.4. The conduct and functioning of the contractor ESHS personnel shall be monitored by the

Employer/Engineer. Any default or deficiency shall attract penalty as per details given

under penalty clause of this document.

4.4.2.3.5. The Contractor ESHS personnel permitted to work only specific contract package as per

the Notice of No Objection issued by the Employer / Engineer.

4.4.2.3.6. Only approved by the Govt of India Degree from recognized university /Diploma in Safety

Engineering from State board of Technical Education and Equivalent International

Degree in Safety engineering shall be considered as the valid qualification.

4.4.2.3.7. The Project Director or Project Manager shall certify that the ESHS staff, original

certificate of educational qualifications and work experiences are verified by him and

found competent prior to the submittal to the Employer.

4.4.2.3.8. The minimum Employer’s requirements of such facilities / equipment’s to be provided for

OSHE personnel are given in the GSAF-52 of Volume 2 of H&S Manual

4.4.2.3.9. The Contractor shall appoint the required ESHS personnel in accordance with the

qualifications and experience as listed in Table 2.

Table 2 ESHS Personnel Qualifications & Experience

Item Designation Qualification Experience

(Years)

1 Chief ESHS Manager The Chief ESHS Manager shall be qualified in any of the following qualifications

i)M. E/ M.Tech. in Industrial Safety

ii)B.E. in Fire and Safety Engg.

iii)A recognised degree in any branch ofengineering from recognized university with aMinimum one-year Full Time PG Diploma/Diploma from Central labour institute /Regional Labour Institute Mumbai / Chennai /Kolkata /Kanpur/ Diploma in SafetyEngineering from State Board of TechnicalEducation

iv) A recognised degree in any branch ofengineering from recognized university withInternational qualifications like CSP (CertifiedSafety Professional), Diploma in NEBOSH

15

2 Senior ESHS Manager

The Senior ESHS Manager shall be qualified in any of the following qualifications

i)M. E/ M.Tech. in Industrial Safety

ii)B.E. in Fire and Safety Engg.

iii)A recognised degree in any branch ofengineering from recognized university with aMinimum one-year Full Time PG Diploma/Diploma from Central labour institute /Regional Labour Institute Mumbai / Chennai /Kolkata /Kanpur/ Diploma in Safety

12

Page 18: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-15 Sign & Stamp of Tenderer

Item Designation Qualification Experience

(Years)

Engineering from State Board of Technical Education

iv) A recognised degree in any branch ofengineering from recognized universitywith International qualifications like CSP(Certified Safety Professional), Diploma inNEBOSH

3 Junior ESHS

Manager

The Junior ESHS Manager shall be qualified in any of the following qualifications

i)M. E/ M.Tech. in Industrial Safety

ii)B.E. in Fire and Safety Engg.

iii)A recognised degree in any branch ofengineering from recognized university with aMinimum one-year Full Time PG Diploma/Diploma from Central labour institute /Regional Labour Institute Mumbai / Chennai /Kolkata /Kanpur/ Diploma in SafetyEngineering from State Board of TechnicalEducation

iv) A recognised degree in any branch of

engineering from recognized university with

International qualifications like CSP (Certified

Safety Professional), Diploma in NEBOSH

v)Any Graduate with 8 years of work

experience in full-fledged ESHS department

of any Public Sector / Leading Private Sector

/ MNC / with prior approval of Employer

/Engineer on a case to case basis

6 for

Category (i)

to (iv)

4 Safety Supervisor i)Degree in Science / Diploma in Engineering

with Govt. recognized safety diplomas from

National and State Productivity Councils,

Other State Technical Education Boards etc.

ii)Any Graduate with 5 years of work

experience in full-fledged ESHS department of

any Public Sector / Leading Private Sector /

MNC / with prior approval of Employer

/Engineer on a case to case basis

3 for

Category (i)

5 Senior ESHS

Electrical Manager

Degree in Electrical Engineering + Govt. Recognized Electrical “C” Licence holder

2

6 Junior ESHS

Electrical Manager

Degree in Electrical Engineering + Govt.

Recognized Electrical “C” Licence holder 1

Page 19: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-16 Sign & Stamp of Tenderer

Item Designation Qualification Experience

(Years)

7 Public Liaison officer Any Degree with Govt. Recognized Degree /

Diploma / P G Diploma in Labour Welfare

related fields like Law, Personnel / Industrial

Relations etc.

5

8

Health Officer

MBBS with Govt. recognized degree/diploma in

Industrial/ health 1

9 Nurse Any Degree with Govt. Recognized Degree /

Diploma / P G Diploma in in Nursing 1

10 Environmental

Manager

Govt. recognized PG Degree / Degree in

Environmental Engineering / Environmental

Science

5

11 Senior Traffic

Engineer

Govt. recognized PG Degree / Degree / Diploma

in Traffic/Transportation Engineering or

Planning

1

12 House Keeping

Manager

Any Diploma in Engineering 1

13 Barricade Manager Any Diploma in Engineering 1

14 Labour Welfare

Officer

Any Degree with Govt. Recognized Degree /

Diploma / P G Diploma in Labour Welfare

related fields like Law, Personnel / Industrial

Relations etc.

5

Note: In some extraordinary cases where the candidate had earlier worked in CMRL

Projects they can be considered for the following posts:

i) Junior ESHS Manager

ii) Safety Steward

depending upon the qualification and no. of years of experience on a case to case

basis even if they do not possess the prescribed qualification as listed above.

4.4.2.3.10. Where a p o t e n t i a l candidate has previously worked in a Metro Rail construction

environment and does not possess the qualifications and or the necessary experience

as listed in Table 2 for the particular role, the Employer/ Engineer may upon a successful

interview of the candidate grant a waiver subject to successful completion of a probation

period of 3 months..

4.4.2.3.11. In order to effectively interact on labour welfare matters with the Employer /Engineer and

the statutory authorities enforcing the labour welfare legislations every Contractor shall

employ a full time Labour Welfare Officer duly qualified and experienced as per clause

4.4.2.3.12. The Contractor shall ensure that all personnel working at the site receive an induction

ESHS training explaining the nature of the work, reporting & communication routes the

hazards that may be encountered during the site work and the particular hazards

Page 20: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-17 Sign & Stamp of Tenderer

attached to their own function within the operation. The training shall cover as a minimum

the contents as directed within H&S Manual Volume 2.

4.4.2.3.13. Records of all inductions shall be maintained by the Contractor and be made available

for inspection by the Employer /Engineer upon request.

4.4.2.3.14. The Contractor shall provide their workforce and management staff with an ESHS

induction Handbook containing the information as per the induction training.

4.4.2.3.15. A condensed induction shall be given by the Contractor to all visitors. The induction

briefing shall include the risk and hazards associated with the particular site and the

operations being conducted.

4.4.2.3.16. All personnel shall be issued a temporary ID upon the completion of the Contractor’s’

induction. The temporary ID shall be signed by the Human Resource Manager or

appointed representative and limited to a 2-week validity period at which time the

temporary ID shall be replaced with a permanent ID including photograph.

4.4.2.3.17. Individuals found on site by the Employer /Engineer without-dated temporary ID cards

shall be removed from site

4.4.2.4. ESHS Training

4.4.2.4.1. The Contractor shall assess the training requirements for all the employees, plan and

initiate a training program to fulfil the training needs assessment. The assessment of

training needs shall incorporate all levels of staff including Sub-Contractor’s against an

individual’s role, responsibility, ability, language skill and risk.

4.4.2.4.2. The Contractor shall provide comprehensive training to all staff as mentioned in ESHS

conditions of contract

4.4.2.4.3. The Training Plan shall provide a structured training programme to educate and train all

the personnel of the contractor in Safety aspects of all Construction activities. The training

plan can contain:

I. Objective, syllabus, format, class size and duration of each training course;II. Training facilities to be provided by the Contractor;

III. List of training materials and documentation to be included with the training course;and to be circulated in booklet format to each trainee

IV. Method of pre- and post- testing to be utilised;V. Qualifications and experience level necessary for the trainees;

VI. Instructor’s qualifications; and Course evaluation methods.VII. Training shall be carried out in the medium of the Hindi, English & Local language and

supplemented, if necessary, in other Language

VIII. Training shall consist of classroom (theory) training, and practical (hands on) trainingwherever necessary.

IX. To meet this need, the training agency shall supply competent trainers/instructors tocarry out training to a high degree of proficiency in areas where the trainer has thespecialised knowledge.

X. In order to ensure that satisfactory standards are met, the contractor’s relevantTraining Department will monitor all training.

4.4.2.4.4. The Contractor shall, at the conclusion of each training session, issue questionnaires to,

and/or set practical tests for all trainees directed at determining the level of satisfaction

with the course content and to assess the level of knowledge and understanding of the

course content by each trainee. Five Questions from each training module are to be

selected and assessment is to be conducted at the end of days training session.

4.4.2.4.5. The Contractor shall review the responses to questionnaires and the trainees’ test results

and forward a summary to the Employer /Engineer.

Page 21: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-18 Sign & Stamp of Tenderer

4.4.2.4.6. Trainees failing to achieve a minimum passing percentage of 40 percent will be regarded

as fail and re-training will be again given to trainee

4.4.2.4.7. If the Employer /Engineer considers that the course has not achieved the required

objectives, he will instruct the Contractor who shall then organise and implement

appropriate re-training.

4.4.2.4.8. The Contractor shall, at the completion of each training course. A consolidated training

record listing the training course title, date of training, name of all trainees, training result

and other relevant information; and Issue an appropriate certificate to each trainee who

has successfully completed the course. He should issue the sticker for each completion

of Course.

4.4.2.4.9. The Contractor shall produce a ‘Training Implementation Plan’ to incorporate the findings

of the needs assessment.

4.4.2.4.10. The training needs assessment together with Implementation Plan shall be submitted to

the Employer /Engineer for notice of no objection within 4 weeks of commencement. The

Employer /Engineer shall evaluate the assessment and plan against the base line training

matrix contained within H&S Manual Volume 2.

4.4.2.4.11. Records of all training conducted shall be maintained and made available for inspection

by the Employer /Engineer upon request.

4.4.2.4.12. Should the Contractor fail to provide the training identified within the Contractor’s

assessment, implementation plan and the Employer /Engineer Training matrix within the

agreed timescales, this shall be reflected in the potential scores awarded within the

monthly audit report.

4.4.2.4.13. Specific training with regard to the provisions of the Construction Safety Plan, and

associated operational and system procedures shall be conducted by the Contractor for

all persons with supervision responsibilities. Records of training including duration shall

be maintained.

4.4.2.4.14. All the Management training should be completed within six months from the date of the

contract awarded

4.4.2.4.15. Contractors and sub-contractors are responsible for providing ESHS training through

CMRL approved agency shall conduct training as per the training Implementation Plan to

all Staff and workers and for retention of records of such activities for inspection by the

Employer /Engineer.

4.4.2.4.16. The Profile of the External ESHS Agency (Training, Inspection and Testing) ISO

certifications, course details, the name, educational qualifications and experience for of

the trainers are to be submitted to the Employer/Engineer a minimum 28 days before

prior to appointment of the agency. Only upon notice of no objection by the Employer

/Engineer shall be authorised to deliver ESHS Services on CMRL sites.

4.4.3. Communication, participation and consultation

4.4.3.1. Communication

4.4.3.1.1. The Contractor shall produce a ‘High Quality’ quarterly newsletter on a rotational basis

with other Contractors. Rotation shall be announced within the Employer /Engineer ESHS

Committee meetings.

4.4.3.1.2. All Contractors including the Employer /Engineer shall provide input into the rotational

Contractor for the newsletter content such as details of accidents, incidents and near

misses together with any lessons learned; specific safety initiatives; internal competitions

and workforce awards etc.

Page 22: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-19 Sign & Stamp of Tenderer

4.4.3.1.3. The Employer /Engineer shall be issued the draft newsletter for review prior to the

Contractor’s publishing.

4.4.3.1.4. The ESHS Newsletters shall publicise all Contractors ESHS performances over the

previous 3 months in relation to ESHS Audits and shall form the basis for the Employer

/Engineer Awards programme. Results of audits shall be provided by the Employer

/Engineer for inclusion.

4.4.3.1.5. The quarterly newsletters shall be issued to all interested parties and be promulgated at

site level. Where language barriers exists the contents of the newsletters shall be

communicated by the Workforce Representative to ensure understanding.

4.4.3.1.6. At site level the Contractor shall erect pertinent awareness signage and posters. Posters

shall be changed on a monthly basis to maintain impact.

4.4.3.1.7. Poster campaigns shall be discussed and agreed at the Employer /Engineer Committee

Meeting to maintain a consistent improvement programme across all CMRL Sites.

4.4.3.1.8. Informational posters, banners etc shall be provided in Hindi, Tamil and English.

4.4.3.1.9. Toolbox talks and Method statement , Risk Assessment , Task briefings shall be carried

out daily by the Contractor and correspond to the works activities being undertaken or to

communicate a specific awareness initiative. Toolbox talks shall not replace professional

training.

4.4.3.1.10. Records of all toolbox talks and Method statement, Risk Assessment , Task briefings

undertaken together with the date, topic, participant’s names and signatures shall be

maintained and made available for inspection by the Employer /Engineer .

4.4.3.1.11. Method statement and risk assessment briefings shall be carried out prior to the

commencement of a new task and or when a change to the method of working arises.

Records of all such briefings shall be maintained by the Contractor.

4.4.3.1.12. Visitor information signage shall be posted at site entrances detailing where to report and

contact information. Note: visitors shall be accompanied at all times by site security where

office locations require walking through operational areas.

4.4.3.1.13. Job specific poster, ESHS policy statement, Employer’s Liability Insurance certificate,

Protective Equipment, Reversing Vehicles, Emergency procedure, Project Wages notice

board, BOCWR registration Licence, Labour licences, Insurance policies and Site rules

shall be displayed in the site entrance’s and site office’s

4.4.3.1.14. Public Liaison

4.4.3.1.15. Public informational signage and Contractor contact information shall be posted

externally to the site.

4.4.3.1.16. The Contractor shall appoint an individual as a Public liaison Officer to communicate

directly with members of the public regarding forthcoming operations, what to expect,

noise expectancy, duration of operations etc. Contractor will conduct a full detailed

analysis of noise and vibration prediction and submit to CMRL to clear. The analysis will

be reviewed by lenders before mobilization.

4.4.3.2. Participation and consultation

4.4.3.2.1. The Contractor shall ESHS Committee within 4 weeks of commencement that shall be

chaired by the Contractor’s Project Director.

4.4.3.2.2. The Contractor shall notify the Employer /Engineer of the establishment of the Committee

together with the committee members’ names and designation. The Contractor’s Chief

Safety Manager, Senior Safety Manager, Plant & procurement Manager and Human

Resources Manager shall form the minimum committee members. Site based personal

shall be represented within the Committee by the attendance of Site Manager(s) and the

Page 23: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-20 Sign & Stamp of Tenderer

Workforce ESHS Representative. Workforce ESHS Manager shall be elected by the

workers from among themselves.

4.4.3.2.3. The Employer /Engineer shall be invited to attend the Contractor’s ESHS Committee

meetings.

4.4.3.2.4. The Contractor’s ESHS Committee shall meet monthly throughout the duration of the

Contract.

4.4.3.2.5. The Terms of Reference for the Contractor’s ESHS Committee shall be as follows.

i) To establish company safety policies and practicesii) To monitor the adequacy of the contractor’s site ESHS plan and ensure its

implementation

iii) To review ESHS training plan implementationiv) To review the contractor’s monthly ESHS report.v) To identify probable causes of accident and non-compliance of ESHS practices in

building or other construction work and to suggest remedial measures.

vi) To stimulate interest of Employer/Engineer and building workers in ESHS by organizing

ESHS week, ESHS competitions, talks and film-shows on safety, preparing posters or

taking similar other measures as and when required or as necessary.

vii) To tour round the construction site with a view to check non-compliance of ESHS

practices and detect non-compliance of ESHS conditions and to recommend remedial

measures for their rectifications including first-aid medical and welfare facilities.

viii) Committee team members should perform a site inspection before every committee

meeting and to monitor ESHS inspection reports.

ix) To bring to the notice of the Employer /Engineer Employer the hazards associated with

use, handling and maintenance of the equipment used during the course of building

and other construction work.

x) To suggest measures for improving welfare amenities in the construction site and other

miscellaneous aspect of safety, health and welfare in building or other construction

work.

xi) To look into the health hazards associated with handling different types of explosives,

chemicals and other construction materials and to suggest remedial measures

including personal protective equipment.

xii) To review the last safety committee meeting minutes and to take action against

persons/sub-contractors for non-compliance if any.

xiii) Shall note the grievance of the staff and shall take necessary steps to address them.

4.4.3.2.6. The inspection shall review progress regarding the achievement of short term targets.

The Committee shall produce a report stating progress made together with any corrective

actions required and issue to the Employer /Engineer within 7 days following the

Inspection.

4.4.3.2.7. Minutes of the Committee meeting shall be issued within 2 days and promulgated to all

members including the Employer /Engineer at least one week prior to CMRL’s ESHS

weekly meeting. The minutes of meeting shall also be posted on all sites within the

workforce area. The minutes intended for site communication shall be in Hindi, Tamil and

English.

4.4.3.3. Employer /Engineer ESHS Committee

4.4.3.3.1. An Environmental, Social, Health and safety Committee shall be established by the

Employer /Engineer. The Employers ESHS committee shall be formed out from the

Page 24: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-21 Sign & Stamp of Tenderer

department of ESHS of CMRL and shall sit every month throughout the project period.

The Terms of Reference for the Employer’s ESHS Committee shall be as follows;

i. To establish Environment Social Health and Safety policies and practices

ii. To monitor the adequacy of the contractor’s site ESHS plan and ensure itsimplementation

iii. To review Contractors ESHS training plan and implementation

iv. To review the contractor’s monthly ESHS report.

v. To monitor the causes of accident and non-compliance of ESHS practices in buildingor other construction work and to suggest remedial measures.

vi. To stimulate interest of Contractor and building workers in ESHS by organizing ESHSweek, ESHS competitions, talks and film-shows on ESHS, preparing posters or takingsimilar other measures as and when required or as necessary.

vii. To check unsafe practices at site and detect unsafe conditions and to recommendremedial measures for their rectifications.

viii. To identify hazards associated with handling different types of explosives, chemicalsand other construction materials and to suggest remedial measures including personalprotective equipment.

ix. To review the last Health and Safety committee meeting minutes and to take actionagainst persons/Contractors for non-compliance if any.

Review the grievance redressal mechanism of Contractor. Contractor shall be

required to attend the monthly meetings who shall be represented by their Project

director or Project Manager , Corporate Safety Manager and Chief Safety Manager.

4.4.3.3.2. The Committee shall review previous performances project wide and set short and

medium term objectives and targets for achievement within the next reporting period.

4.4.3.3.3. The Employer /Engineer reserves the right to call an Emergency Meeting of the

Committee members in the event of a serious incident that requires immediate change

to the operational methods of working.

4.4.3.3.4. Minutes of the Employer /Engineer ESHS Committee shall be promulgated to all

Contractor’s within 3 days.

4.4.3.4. Workforce Representation

4.4.3.4.1. All workers shall have access to a Workforce ESHS Representative who is responsible

to communicate directly with the labour force with regard to health and safety . The

representative’s name and contact number shall be posted on all sites externally to the

site office.

4.4.3.4.2. The Workforce ESHS Representative shall be made a member of the ESHS Committee

(FSAF 025 of H&S Manual -Volume 2) and attend all meetings.

4.4.3.4.3. The ESHS Representative shall meet the labour force on a monthly basis to discuss

health, welfare, safety initiatives and or concerns the workforce may have. Minutes (FSAF

026 of H&S Manual -Volume 2) are to be produced by the Representative and issued

formally within 2 days after the meeting date to the Contractor’s Project Director or Project

Manager and Employer /Engineer.

4.4.3.4.4. The chairman shall inform the members of any outstanding issues in the meeting and in

case of repeated offence/ non-compliance by some members or other co/sub-contractors

and propose suitable disciplinary action including provisions of monitory penalty as per

the relevant contract clauses, the Engineer shall ensure that the same is implemented.

4.4.3.4.5. A lockable site suggestion box to which only the workforce ESHS Representative shall

have access shall be installed on all sites and within any labour accommodation camps.

Page 25: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-22 Sign & Stamp of Tenderer

The suggestion box shall be located independent from any offices, in a public area and

protected from bad weather. The ESHS Representative shall inform the workforce that

the purpose of the suggestion box is to provide a means of participation, communicating

ideas and initiatives and also for raising concerns without fear of reprisal.

4.4.3.4.6. The contents of all suggestion boxes shall be collected and collated on a weekly basis.

Where concerns or complaints regarding the standards of health, safety or welfare have

been reported these shall be immediately reported to the Chief ESHS Manager and

Project Manager who shall investigate the concern(s). Records of such investigations

and resultant outcomes shall be maintained.

4.4.3.4.7. Ideas, suggestions and concerns raised by the workforce during the ESHS

representative’s on site monthly meetings shall form an agenda item within the

Contractor’s ESHS Committee meeting.

4.4.3.4.8. Where an idea or specific suggestion is subsequently adopted for use by the Contractor’s

ESHS Committee, the individual shall receive an ESHS award as determined by the

Contractor.

4.4.3.4.9. Where Employee awards are issued this shall be notified to the Employer /Engineer to

ensure inclusion within the Quarterly Newsletter.

4.4.3.5. Contractor Awards

4.4.3.5.1. The Employer/Employer’s Representative shall recognize the effort, participation and

commitment demonstrated by the Contractor by nominating awards. The award type

shall be at the discretion of the Employer.

4.4.4. Documentation

4.4.4.1. Management System procedures

4.4.4.1.1. The Contractor is required to submit for notice of no objection, the organisation’s top tier

Management System Procedures as listed in Table 3 that shall be adopted for use on the

CMRL project.

4.4.4.1.2. System procedures shall be submitted to the Employer /Engineer within 4 weeks of

commencement.

4.4.4.1.3. Construction works shall not commence until such time as a notice of no objection has

been received; applicable to all management system procedures as listed in Table 3.

Should the Contractor commence operations on site without notice, the Employer

/Engineer shall award a ‘Zero’ audit score for every month of non-compliance with this

clause.

4.4.4.1.4. The Employer /Engineer shall evaluate the suitability of the Contractor’s system

procedures against the ISO 45001:2018 and ISO 14001:2015 standards.

4.4.4.1.5. The submitted procedures shall be individually identified with a unique reference and

detail in sequence the scope, purpose, referenced material and procedure processes.

4.4.4.1.6. Where such procedures as listed in Table 3 exist within other areas of the Contractor’s

organisational management systems such as quality management, these shall not be

subject to replication if the procedure makes specific reference to Health, Safety and

Environmental control.

4.4.4.1.7. Compliance standards against the Contractor’s management system procedures shall be

subject to audit by the Employer /Engineer.

Page 26: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-23 Sign & Stamp of Tenderer

Table 3 ESHS Management System Procedures

Hazard identification,

risk assessment and

determining controls

Communication,

participation &

consultation

Environmental

Impact Aspect

Assessment

Objectives and

programme(s)

Training, awareness

and competence

Implementation

and operation

Accident & Incident

Investigation Legal requirements

Documentation Monitoring &

Measurement

Emergency

Preparedness Change control

Procurement Record keeping Audit Management

review

4.4.5. Control of documents

4.4.5.1. All plans, procedures and method statements shall be controlled and subject to review and

formal approval by the Contractor’s Project Director prior to issue to the Employer

/Engineer

4.4.5.2. All documents subject to review by the Employer /Engineer shall be signed by the

Contractor’s Construction Manager, Safety Manager and Project Director and issued

formally.

4.4.5.3. Documents shall be issued as per the Employer /Engineer requirements regarding

Quality Management.

4.4.5.4. ESHS Documents shall be issued, maintained, traceable and available for retrieval

pursuant to the Contractor’s ISO accredited Quality Management System.

4.4.6. Operational control

4.4.6.1. Operational control shall be maintained through the implementation of the provisions

stated within the Contractor’s site specific Construction Health , Safety and

Environmental Plans, the contents of which are outlined in Health , Safety and

Environmental Volumes 2 and 3 and EMP and EMoP in PCC to which the Contractor

shall comply.

The Contractor shall submit the following plans which comprises the Contractors ESHS

Plan as per the given time lines for approval of CMRL.

S.No. Plan Description Shall be submitted within

1. Construction Safety Plan 28 days

2. Social Impact mitigation plan 28 days

3. Fire Evacuation plan 28 days

4. Construction Health plan 28 days

5. Construction contingency plan 28 days

Page 27: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-24 Sign & Stamp of Tenderer

6. Traffic Management Plan 28 days

7. Disaster Management Plan 28 days

8. Site Environmental Plan 28 days

4.4.6.2. Construction Phase Safety Plan

4.4.6.2.1. The Contractor shall produce a Contract specific Construction Safety Plan and submit to

the Employer /Engineer within 28 days of commencement.

4.4.6.2.2. The Construction Safety Plan shall contain the informational requirements as per the

CSP contents as prescript within the CMRL H&S Manual Volume 2, Safety Plan

contents.

4.4.6.2.3. The CHSP shall be assessed by the Employer /Engineer against the provisions as stated

within H&S Manual Volume 2. Where deficiencies exist to an extent where an objection

is raised, construction activities shall be suspended until such time as the deficiencies

are subject to corrective action, re-submittal and notice of no objection by the

Employer/Engineer.

4.4.6.2.4. Delays incurred as a result of the Contractor failing to achieve a ‘No objection’ status

from failing to submit within the specified timescale or non-compliance with ESHS

Volume 2 shall be entirely at the Contractor’s risk and cost.

4.4.6.2.5. The Contractor shall undertake a monthly review of the CSP. The review shall be

recorded and the Employer /Engineer notified of any updates.

4.4.6.2.6. The Contractor shall produce a Contract Specific Fire Evacuation plan and submit to the

Employer /Engineer within 28 days of commencement.

4.4.6.2.7. The Contractor shall produce a Contract Specific Construction ESHS plan and submit to

the Employer /Engineer within 28 days of commencement.

4.4.6.2.8. The Contractor shall produce a Contract Specific Construction contingency plan and

submit to the Employer /Engineer within 28 days of commencement.

4.4.6.2.9. The Contractor shall produce a Contract Specific Construction Health Plan and submit

to the Employer /Engineer within 28 days of commencement.

4.4.6.2.10. The Contractor shall produce a Contract Specific Traffic Management Plan and submit

to the Employer /Engineer within 28 days of commencement.

4.4.6.2.11. The Contractor shall produce a Contract Specific Disaster Management Plan and submit

to the Employer /Engineer within 28 days of commencement.

4.4.6.2.12. The Contractor shall, from time to time and as necessary are required by the

Employer/Engineer to produce supplements to the ESHS Plan such that it is at all times

a detailed, comprehensive and contemporaneous statement by the Contractor of his site

safety, industrial health and environment obligations, responsibilities, policies and

procedures relating to work on Site. Any and all submissions of supplements to the ESHS

Plan shall be made to the Employer /Engineer in accordance with the agreed procedures.

4.4.6.2.13. If at any time the ESHS plan is, in the Employer /Engineer opinion, insufficient or requires

revision or modification to ensure the security of the Works and the safety of all workmen

upon and visitors to the Site, the Employer/Engineer may instruct the Contractor to revise

the ESHS plan and the Contractor shall within 7 days submit the revised plan to the

Employer/Engineer for review.

4.4.6.2.14. Any omissions, inconsistencies and errors in the ESHS Plan or the Employer /Engineer

acceptance or rejection of the ESHS Plan and/or supplements thereto shall be without

Page 28: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-25 Sign & Stamp of Tenderer

prejudice to the Contractor's obligations with respect to site safety, industrial health and

environment and shall not excuse any failure by the contractor to adopt proper and

recognised safety practices throughout the execution of the Work.

4.4.6.2.15. The Contractor shall adhere to the ESHS Plan and shall ensure, as far as practically

possible, that all sub-contractors of all tiers require that contracting parties each have a

copy of the Site ESHS Plan and comply with its provisions

4.4.6.3. Construction Phase Site Environmental Plan

4.4.6.3.1. The Contractor shall produce a Contract Specific Site Environmental Plan (SEP) and

submit to the Employer /Engineer within 28 days of commencement.

4.4.6.3.2. The Site Environmental Plan (SEP) shall contain the informational requirements as per

the contents as prescript within the CMRL Environmental Management Arrangements

Volume 3, Environmental Plan contents.

4.4.6.3.3. The SEP shall be assessed by the Employer /Engineer against the provisions as stated

within the Environmental Management Arrangements Volume 3. Where deficiencies

exist to an extent where an objection is raised, construction activities shall be suspended

until such time as the deficiencies are subject to corrective action, re-submittal and notice

of no objection by the Employer /Engineer .

4.4.6.3.4. Delays incurred as a result of the Contractor failing to achieve a ‘No objection’ status

from failing to submit within the specified timescale or non-compliance with

Environmental Management Arrangements Volume 3 shall be entirely at the Contractor’s

risk and cost.

4.4.6.3.5. The Contractor shall undertake a monthly review of the SEP. The review shall be

recorded and the Employer /Engineer notified of any updates.

4.4.6.4 Operational procedures

4.4.6.4.1 The Contractor shall identify within the Hazard Log and Risk Register the operational

control procedures that shall be applicable for the CMRL project under their individual

scope of works.

4.4.6.4.2 Operational procedures shall be submitted for review to the Employer /Engineer for notice

of no objection together with the Construction Site Safety Plan within 4 weeks of

commencement.

4.4.6.4.3 The operational procedures shall be evaluated by the Employer /Engineer against the

requirements stated within H&S Manual Volume 2, Environmental Arrangements in

Volume 3, EMP and EMOP in PCC, international safety standards such as the

International Labour Organisation, European Norms and British Standards where an

equivalent Indian Standard does not exist.

4.4.6.4.4 Construction works shall not commence until such time as a notice of no objection has

been received; applicable to all operational procedures as identified within Table 4 and

the Contractor’s Hazard Log, Grievances Log & Risk Register. Should the Contractor

commence operations on site without notice, the Employer /Engineer shall award a ‘Zero’

audit score for every month of non-compliance with this clause.

4.4.6.4.5 The submitted procedures shall be individually identified with a unique reference and

detail in sequence the scope, purpose, referenced material and procedure processes.

4.4.6.4.6 In the event that the Contractor is unable to comply with the 28 day timeframe for

submittal of the minimum operational procedures as detailed within Table 4, the

Contractor shall assign an individual identification reference for the outstanding

Page 29: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-26 Sign & Stamp of Tenderer

procedure within the Construction Health, Safety & Environmental Plan together with the

statement ‘Under process’. The ‘Under Process’ procedure shall be required to be

submitted for notice of no objection a minimum of 28 days prior to commencement of any

activity that involves the application of the procedure.

Table 4 Operational Procedures

Lifting

Operations &

Lifting

Equipment

Plant &

Equipment

Health

provisions

Emergency

Medical

Facilities &

First Aid

Environmental

Pollutants

Personal

Protective

Equipment

Permit to Work

Systems

Site Electricity

& Distribution

Welding &

Cutting

operations

Air

Incident

Investigation

Traffic

Management

Working at

Height

Hazardous

Substances

Waste Water

Site Security Fire Safety Manual

Handling Site Set-up

Solid Waste

Abrasive

Wheels

Public

Interface

Noise and

Vibration

Welfare

Arrangements

Ecological Impacts Potential Habitat loss for Avifauna Habitats

and biodiversity.

Physical and Cultural

Resources

Historic and Cultural Value Loss

Community Liaison and

Consultation

Important measures to reduce community risk.

Grievance Redressal

Mechanism

For workers and project affected people

Monitoring ESHS compliance of all abovementioned

aspects

Pollutants monitoring in line with

Environmental Monitoring Plan in PCC

Page 30: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-27 Sign & Stamp of Tenderer

The Contractor shall adopt the following colour code scheme across all CMRL Sites to

ensure efficient recognition of relevant personnel

Safety Helmet Colour with

Logo Designation

White CMRL Staff and Engineer

Violet Contractor’s Engineers & Supervisors

Blue Sub-Contractor’s Engineers &

Supervisors

Red All Electricians

Green All ESHS personnel

Orange Security Guards & Traffic Marshals

Yellow General Workforce

White (With VISITOR

Sticker)

Visitors

4.4.6.4.7 The PPE and safety appliances provided by the contractor shall be of the standard as

prescribed by Bureau of Indian Standards (BIS). The contractor shall obtain prior

approval by the Employer /Engineer Employer before procurement of PPE and safety

appliances.

4.4.6.4.8 The contractor shall at all-time maintain a minimum of 10% spare PPE and safety

appliance stock. Stocks are to be recorded and made available for the Employer

/Engineer upon request. Failing to do so shall invite appropriate penalty as per the

provisions of the contract.

4.4.7 Emergency preparedness and response

4.4.7.1 Emergency Response Plan

4.4.7.1.1 The Contractor shall prepare a project specific Emergency Plan and submit to the

Employer /Engineer for notice of no objection. The Emergency Plan shall be submitted

within 4 weeks of contract Commencement.

4.4.7.1.2 The plan must identify the potential for emergencies and the provisions for responding

to such emergencies, particular to their environment and location. The Emergency

planning arrangements shall be assessed as per the provisions in H&S Manual, Volume

2 Environmental Management Arrangements of Volume 3 and EMP and EMoP in PCC

for suitability.

4.4.7.1.3 The Contractor shall ensure that all persons including sub-Contractors on site are aware

of the emergency procedure to follow in the event of an emergency. Awareness training

shall commence at induction and thereafter through refresher training such as toolbox

Page 31: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-28 Sign & Stamp of Tenderer

talks and monthly emergency drills. Records of refresher training and emergency drills

shall be maintained.

4.4.7.1.4 Site signage shall be erected and detail the emergency process to follow and include

emergency telephone numbers, fire, ambulance, police, nearest hospital etc.

4.4.7.1.5 Arrangements shall be made by the Contractor for casualty evacuation and emergency

medical treatment. The Contractor shall enter into an agreement with a hospital to

provide ambulance services. Alternatively, the Contractor shall provide a fully equipped

ambulance on-site that shall be manned by a paramedic. This provision shall be subject

to the Employer /Engineer audit.

4.5. Checking

4.5.1 Performance measurement and monitoring

4.5.1.1 The Contractor shall submit a Monthly ESHS Progress Report no later than 7th of each

month to the Employer /Engineer . The Monthly ESHS Progress Report template to be

prepared by Contractor for CMRL to clear 28 days prior to construction commencement.

The Report shall contain the minimum information specified within H&S Manual Volume

2, Environmental Management Arrangements of Volume 3 and EMP and EMoP in PCC.

The report shall contain text, tables and colour photographs.

4.5.1.2 Site Inspection

4.5.1.3 Independent of the plant and equipment inspection, testing and maintenance regimes

that shall be stated within the Contractor’s Plant and Equipment Procedures, the

Contractor shall carry out site monitoring exercises on a daily and weekly basis.

4.5.1.4 The Contractor shall ensure that all monitoring equipment is calibrated as per the

manufactures requirements. The Employer /Engineer shall be provided with test

certificates for such equipment

4.5.1.5 Site Engineers shall be required to participate in daily internal ESHS inspections to

facilitate prompt communication and rectification of minor deviations. Records of such

inspections and rectification needs shall be maintained at site level and made available

for review by the Employer /Engineer other interested parties.

4.5.1.6 No loose electrical connections or tapped joints shall be allowed anywhere in the work

site, office area, stores and other areas. Penalty as per relevant clause shall be put in

case of observation of any tapped joints.

4.5.1.7 Formal site inspection reports shall be produced on a weekly basis by the Contractor’s

ESHS personnel for each site and submitted to the Project Director or project manager

and copied to the Contractor’s corporate safety manager. The corporate Safety

Manager shall conduct site inspection on monthly basis and report shall be submitted

to the Employer /Engineer.

4.5.1.8 The Contractor may choose inspection format of his/her choice, however format shall

contain the minimum information as provided within FSAF-028 –H&S Manual Volume

2 regarding weekly inspection form by providing concise information and highlight the

key non-compliance inspection findings on the very first page.

4.5.1.9 The Contractor’s ESHS Personnel shall be accompanied during a formal site inspection

by the Site Manager responsible for the particular site. The resulting inspection report

shall be signed by both the Site Manager and the ESHS Manager.

Page 32: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-29 Sign & Stamp of Tenderer

4.5.1.10 The Engineer shall formally inspect and report the Contractor’s site conditions against

the compliance criteria set within the Contractor’s operational procedures and the

Engineer’s requirements on a weekly basis. These inspections shall include batching

plant and associated yards.

4.5.1.11 The Contractor shall undertake specific inspections at the Employer/Employer’s

Representative’s request where concerns have been raised regarding the suitability of

control measures and or plant or equipment condition as per the IS 13367-1 (1992), IS

4475-1(1997), ISO 12482-1:1995. The special assessment shall be carried out later

than the following number of years after manufacture for:

- Tower cranes, loader cranes, mobile cranes: 10 years;- All other cranes: 20 years. Such inspections shall be carried out with immediate effect.

4.5.1.12 The Profile of the External Inspection agency, ISO certifications, the name, educational

qualifications and experience in the field of testing and the certificate issued by Govt of

Tamil Nadu for testing are to be submitted to the Employer/Engineer a minimum 28

days before prior to appointment of the agency. Only upon notice of no objection by the

Employer /Engineer shall be authorised to deliver ESHS services on CMRL sites.

4.5.1.13 The First Generation Hydra crane shall not be strictly used in the CMRL projects.

4.5.1.14 The Second Generation Hydra crane shall not be used for any lifting and lowering

operation. Second Generation Hydra can be used for the material handling as per the

manufacture manual.

4.5.1.15 The Piling rig shall not be used as lifting equipment.

4.5.1.16 Water logging or bentonite spillage on roads shall not be allowed. If bentonite spillage

is observed on road endangering the safety of road users, the contractor shall be

penalised as per Table -6.

4.5.1.17 The contractor shall submit an electrical single line diagram, schematic diagram and the

details of the equipment for all temporary electrical installation. These diagrams

together with the temporary electrical equipment shall be submitted to the Employer

/Engineer for necessary approval. Failure to do so shall invite penalty as per relevant

clause

4.5.1.18 CCTV shall be installed in Administrative areas, Construction areas (general indoor,

general outdoor and general underground work areas, mucking and scaling),

Maintenance / Operating areas, Mechanical/electrical equipment rooms, Warehouses

and storage rooms/area, Casting yard, Labour Colony, Health Centres and First aid

stations and infirmaries, Parking areas, Visitor areas and Laboratories. The contractor

shall submit the CCTV installation and monitoring plan to Employer /Engineer.

4.5.1.19 Request for inspection form all High risk activity shall be verified by the Chief ESHS

Manager before submitting to the Employer.

4.5.1.20 Failure to do any of the above shall attract penalty from the Employer /Engineer as per

relevant clause.

4.5.2 Evaluation of compliance

4.5.2.1 The information submitted by the Contractor within the ESHS Monthly Progress Report

together with the Engineers Reports shall be evaluated against the Employer’s

compliance requirements and ESHS objectives.

Page 33: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-30 Sign & Stamp of Tenderer

4.5.2.2 Inspection reports shall be evaluated against the Legal Requirements (4.3.2) to which

the Contractor is bound to comply.

4.5.2.3 The Contractor’s ESHS Committee shall formally evaluate reports and results of

accidents and or injury on a monthly basis during the monthly meeting. The results of

this evaluation such as identified changes to safe systems of working’ shall be included

with the Committee minutes

4.5.2.4 The Engineer shall evaluate ‘Accident Injury Rates’ and ‘Frequency Rates’ per

individual Contractor and as a project to determine performance against the

international rates. The international rates used to benchmark performance shall be

promulgated to all Contractor’s and other interested parties.

4.5.2.5 The ESHS monthly progress report shall be a part of Project Monthly Progress Report

produced by the Engineer. Evaluation results shall be included within the relevant

sections for Health Safety & the Environment.

4.5.2.6 The Contractor’s External ESHS Audits (4.5.5) shall be evaluated by the Employer

/Engineer against the internal Standards ISO 45001:2018 and ISO 14001:2015.

4.5.3 Incident investigation, nonconformity, corrective action and preventive

action

4.5.3.1 Incident investigation

4.5.3.1.1 The Contractor shall undertake accident investigation for all fatal accidents, major

injuries and dangerous occurrences as defined within the Employer’s Project H&S

Manual VOL 2.

4.5.3.1.2 In the event of a fatality, major injury or dangerous occurrence, the Contractor shall not

disturb the accident scene or remove equipment beyond that required to make the area

safe and/or for the treatment and/or removal of casualty(s) to hospital.

4.5.3.1.3 Should the Employer /Engineer find an accident scene disturbed beyond that

reasonably expected with making an area safe, this shall be subject to thorough

investigation by the Employer /Engineer.

4.5.3.1.4 The Employer /Engineer shall be informed immediately via Short Message Service or

Email of all fatalities, major injuries or dangerous occurrences. Any delay in reporting to

the Employer /Engineer may be subject to disciplinary action as per Table 6.

4.5.3.1.5 The Contractor is responsible to report accidents, incidents and dangerous occurrences

to the relevant governing bodies as per their statutory obligations. The Contractor shall

maintain responsibility for ensuring sub-Contractor’s under their direct control also

comply with this requirement.

4.5.3.1.6 A preliminary accident notification report shall be issued to the Employer /Engineer for

all fatal and major injuries and or dangerous occurrences within 24 hours as per H&S

Manual Volume 2. This shall be followed by the detailed investigation report shall be

issued to the Employer /Engineer within 72 hours.

4.5.3.1.7 Any wilful delay in verbal or written reporting to the Employer /Engineer shall be penalised

as per relevant clause.

4.5.3.1.8 Near misses and minor accidents should also be investigated by the Contractor and

documented with time-bound corrective/preventive actions taken as soon as possible

as they are signals that there are inadequacies in the safety management system.

Page 34: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-31 Sign & Stamp of Tenderer

4.5.3.1.9 In case of fatal accidents, major injuries or dangerous occurrences the Employer

/Engineer shall conduct an independent investigation. The Contractor and his staff shall

extend the necessary co-operation.

4.5.3.1.10 All persons summoned by the Employer /Engineer in connection to witnesses and

statement recording shall obey the instructions without delay. Any wilful suppression of

information by any person shall be removed from the site immediately and / or

punishable as per relevant penalty clause

4.5.3.2 Nonconformity, corrective action and preventive action

4.5.3.2.1 The Contractor shall conform to their internal procedures regarding nonconformity,

corrective action and preventive action. The Contractor shall be audited by the

Employer /Engineer for compliance with internal procedures.

4.5.3.2.2 Major and Minor non-conformances shall be raised by the Employer /Engineer as per

the Employer’s Quality Management requirements and the ESHS Audit criteria as

defined within H&S Manual Volume 2, Volume 3 Environment management

arrangement and EMP and EMoP in PCC.

4.5.3.2.3 Open non-conformances shall be reflected in the Contractor’s Monthly Audit Report and

are subject to verification by the Employer /Engineer as detailed in ESHS Volume 2.

Failure to successfully take corrective action and close out non-conformances will

impact negatively on the Contractor’s total quarterly audit score.

4.5.3.2.4 Where non-conformances have been raised by an External Auditor against the ISO

45001:2018 or ISO 14001 Standard, the Contractor shall produce and submit for review

within 2 weeks, an action plan of how and within what timescale shall the non-

conformance(s) be closed-out.

4.5.3.2.5 Where the corrective action and preventive action identifies new or changed hazards or

the need for new or changed controls, the proposed actions shall be taken through the

risk assessment process. The associated method statement and risk assessment shall

be amended and re-submitted to the Employer /Engineer for notice of no objection.

4.5.3.2.6 A change in work methodology shall be communicated to the workforce. Evidence of

such communications shall be made available for inspection by the Employer /Engineer.

The Employer /Engineer shall also make random enquiries at site level to establish

workforce awareness.

4.5.3.2.7 The following table indicates the risk rating for the non-compliance of the

requirements (unsafe acts/unsafe conditions).

Risk Topic Deductible amount

High Hazardous waste management, Explosive

Handling and Blasting , Plant & Machinery

(Examination certificate of Gantry crane,

rope suspended powered platform, tractor

mounted drilling rig ,No legal documents,

Erection/lifting mast, wire rope/web sling/dog

clamp/chain pulley, rope pulley , air

compressor, Electrical trolley OTE duct

Any specific high risk activity

non-conformance (unsafe

act/unsafe condition) shall be

immediately complied by taking

corrective action by as low as

reasonably practicable and

specific high risk activity non-

conformance work shall be

Page 35: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-32 Sign & Stamp of Tenderer

Risk Topic Deductible amount

installation) Equipment

(Guarding arrangements ),

Excavations(Shoring, edge, material stored

on the edge of the excavation protection) ,

Work at Height (Edge protection, fall

protection measures , Ladder , life line ,

working platform, safe access/egress, double

layer net, provision of safety net, leading

edge protection ) ,

Floor Opening , Emergency preparedness

and response, emergency rescue basket

,emergency stop system in conveyors,

Locomotive movement Quality of

compressed air in working chamber,

hyperbaric, Emergency Equipment, vibration,

radiation, fire and smoke ,compressed air

works, pressure vessels,) ,

Public Interface, Traffic Management (Work

area perimeter hoardings, public protection

from site operations, Height barrier, Storage

of material in public area, Vehicular Traffic),

Lifting operations, Demolition, False

Work/Form Work, Piling, Work adjacent to

live railways, Over Head Protection, Site

Transport, HT Line, Material Falling Hazards,

Building demolition,

Diesel storage licence (statutory documents),

Tandem Lifting, High risk activity method

statement approval and implementation, lift

Plan for high risk activity, harmful

substances, Incident reporting and

investigation. work adjacent to live railways,

work adjacent to live roadways, launching

operation, barricade / cover to voids, trench,

bored holes and open edges of structure, site

security.

suspended until the corrective

actioned.

Medium Working at height (Harness, guard rails and toe board),

Welfare (Drainage arrangements, Rest Room, Toilet, washing Facilities, bathing facility,

Rs 10,000/-per specific activity NCR

Page 36: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-33 Sign & Stamp of Tenderer

Risk Topic Deductible amount

canteen. eating area, fan, and light at rest room, cooking facility, drinking water)

Medical Facilities, Site Tidiness, Fire precautions (Labour camp) PPE,

House Keeping (Poor housekeeping,

Poor storage of material,

Muck disposal, poor stacking, slush not disposed, waste debris not removed, water logging, water stagnation)

Gases, Fumes Etc.

Training /Induction , Reporting of accidents and investigation , Sleeping at workplace , Electrical (Trailing cable-Trip Hazard Poor distribution board),Slippery Floor, Denailing, reporting of accident ,corrective and preventive action, Traffic management (Pedestrian walkway, barrier lighting),Highway cleanness, provision of silence equipment’s , Power tool and condition of equipment’s ,Plant , equipment and machinery (Back hoe loader , tyre condition, driving licence, material hoist opening concrete bucket, insurance certificate , safety sensor , ASLI, anemometer , safety devices, banksman ASLI calibration, dumpers ),Access and egress, Disposal of waste, debris ,Fire( arc welding, gas cutting set ,hot work ,First aid facility, wheel washing facility, Mandatory contractor ESHS management resource, medical examination, Monthly audit report, Drilling machine, power tools , Manual Lifting and Carrying of excessive weight, Dangerous and harmful environment, Corrosive Substances, smoking , mobile phones ,radio’s and audio equipment.

Low Specific activity standard operating procedure , Working at height (Scaffolding inspection, competent person, , Notice Display, COSHH , health Risk ,ESHS Register’s , ESHS Documentation , Noise , Waste , Site ESHS Committees , Mobile phones , Radio , Audio Equipment , Dust and CCTV, Signage’s(Emergency Exit, Warning , cautionary and information),Safety induction, Specific activity safe work procedure ,risk assessment ,RASI permit ,public liaison signage, IRC Signage’s, PPE Examination certification, provision of skips and maintenance, ISO certification audit, competency training ,control of dust ,control of

Rs 5000/-per specific activity NCR

Page 37: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-34 Sign & Stamp of Tenderer

Risk Topic Deductible amount

noise, COSHH, Display of ESHS policy and poster , CEIG Approval Site illumination ,permits system, Ambulance, External ESHS Training as per the Training Implementation plan , Quarterly External ESHS audit, first aid resources, ID card and First Day at Work, H&S Training, Labour licence, BOCW registration, contract labour licence, legal register, Name board display in crane boom, ESHS Hand book ,personal protective equipment ,Vehicle operator check, Inspection of Plant , Equipment and machinery by the contractor plant manager, Eye Wash Station, visitor (ID Card ,lock attendance register, medical records), H&S Submittal to the Employer, Monthly H&S Report.

4.5.3.2.8 Non conformity compliance will be reviewed on periodical monthly basis and penalty

clause imposing in the tender for Non-compliance of NCR for a) Medium Risk and b)

Low risk as per below Table-5

Table-5

S.No Risk Days from the notice of the event within which the work should have are commenced duly mitigating the risk

Deductible amount

A Medium i)The contractor complied thespecific activity NCR (unsafeact/unsafe condition) ≤24hours.

ii) The contractor complied thespecific activity NCR (unsafeact/unsafe condition) more than24hours ≤ 7days

iii) The contractor failure tocomply the specific activityNCR (unsafe act/unsafecondition) within the stipulatedtime period of 7days

Fore item i) No deduction

ii)Closure of the specific activity NCR Rs7500/- per will be refunded and

Rs 2500/- will be a permanent deduction for each specific NCR.

iii)Rs10,000 will be a permanentdeduction for each specific NCR.

B Low i)The contractor complied thespecific activity NCR (unsafeact/unsafe condition)≤24hours.

ii) The contractor complied thespecific activity NCR (unsafeact/unsafe condition) more than24hours ≤ 7days

iii) The contractor failure tocomply the specific activityNCR (unsafe act/unsafe

Fore item i) No deduction

iii) Closure of the specific activity NCRRs 4000/- per will be refunded and

Rs 1000/- will be a permanent deduction for each specific NCR.

iii)Rs 5000 will be a permanentdeduction for each specific NCR.

Page 38: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-35 Sign & Stamp of Tenderer

S.No Risk Days from the notice of the event within which the work should have are commenced duly mitigating the risk

Deductible amount

condition) within the stipulated time period of 7days

4.5.3.2.9 The High Risk Non –compliance (Unsafe act/Unsafe condition) shall be suspended the

specific work activity immediately. The Contractor shall not proceed with the work until

remedial works have been complied with under the direction and satisfaction of the

Employer/Engineer. Request for inspection with the evidence of compliance shall be

submitted to the Employer/ Engineer for the verification

4.5.3.2.10 The Contractor shall not be entitled to any damages or compensation for stoppage of

work, due to safety reasons. The period of such stoppages of work shall not be taken

as an extension of time for completion of the facilities and will not be the ground for

waiver of levy of liquidated damages.

4.5.3.2.11 Any non-conformance of unsafe act should be treated as disciplinary action towards the

person and department in charge and as well as recommended for tacking refreshment

training on the specific task.

4.5.3.2.12 Closure of Non - conformance will be verified by the submission of photograph evidence

or physical verification on satisfaction of the Employer/Engineer.

4.5.4 Control of records

4.5.4.1 The Contractor shall maintain all ESHS records in accordance with the Contactors ISO

9001 :2015 Quality Management System.

4.5.4.2 Records shall be made available to the Employer /Engineer upon request for the

purpose of incident investigation and management review.

4.5.5 Audit

4.5.5.1 Monthly Audit Report (MAR)

4.5.5.1.1 The Contractor shall undertake an internal monthly audit using the process and audit

report form (MAR) as prescribed within “FSAF-11 Monthly Audit Score Sheet” of H&S

Manual Volume 2.

4.5.5.1.2 The Contractor shall submit the completed audit report no later than the 7th of each

month within the Contractor’s monthly ESHS Report. Failure to submit the monthly audit

report within the stipulated timescale shall result in the Employer / Engineer awarding a

‘Zero’ score for the month.

4.5.5.1.3 The audit scores awarded internally by the Contractor shall be subject to review and

verification by the Employer / Engineer. The Employer / Engineer shall substantiate the

awarded scores through making comparison with the results of a physical site

inspection against the model audit scores criteria as provided within H&S Manual

Volume 2.

4.5.5.1.4 The Employer / Engineer shall formally verify that the Contractor’s self-awarded scores

comply with the audit scoring system and scoring criteria as defined within H&S Manual

Page 39: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-36 Sign & Stamp of Tenderer

Volume 2. Where discrepancy exists the Employer / Engineer shall provide supporting

evidence (Photographic) and instruct the Contractor to amend the initial awarded score.

Following adjustment, the monthly audit report shall be re-submitted to the Employer /

Engineer within 3 days.

4.5.5.1.5 The Contractor shall be required to achieve a minimum 65% overall audit score on a

monthly basis.

4.5.5.1.6 If non-payment of the lump sum item in preliminaries occurs as a result of failing to

achieve the required 65% over a single quarterly reporting period, the

Employer/Engineer may reinstate the lump sum item at his discretion should the

contractor achieve above 65% for the following six (6) consecutive monthly ESHS audits

equating to two (2) quarterly reporting periods. This repayment shall not occur if the

quarterly aggregate of Monthly audit scores is less than 50%.

4.5.5.1.7 In the event the Contractor fails to achieve a minimum of 65% on a monthly audit, an

action plan shall be submitted together with the audit results detailing the actions that

shall be taken within timescales.

4.5.5.1.8 Monthly audits as part of the monthly ESHS monitoring shall be conducted prior to the

sitting of the Contractor’s ESHS Committee and shall form part of the agenda.

4.5.5.1.9 Contractor Recognizing

4.5.5.1.10 The Employer/Employer’s shall recognize the effort if the contractor achieves above

75% for the following three (3) consecutive monthly ESHS audits of one quarterly

reporting periods. Only for the preceding three (3) months deducted amount of ESHS

NCR will be refunded.

4.5.5.2 External ESHS Audit

4.5.5.2.1 The Profile of the External ESHS Audit agency, the name, educational qualifications,

and experience for of the auditors are to be submitted to the Employer/Engineer a

minimum 28 days before prior to appointment of the agency. Only upon notice of no

objection by the Employer /Engineer shall be authorised to conduct audit on CMRL

sites.

4.5.5.2.2 The External ESHS Audit template shall be submitted to the Employer/Engineer in the

format prescribed (FSAF 31-Volume 2 of H& S Manual) a minimum 28 days before prior

to conducting of the audit. Only upon notice of no objection by the Employer /Engineer

shall be authorised to conduct audit on CMRL sites.

4.5.5.2.3 The Contractor is required to conduct external audits by ISO accredited 3rd party agency

as per the Indian Standards, ISO 45001 :2018 & ISO 14001:2015 international

standards on a quarterly basis throughout the Contract period.

4.5.5.2.4 External audit and follow up audit reports shall be submitted to the Employer /Engineer

for review within 7 days of audit completion.

4.5.5.2.5 Should the Contractor fail to undertake external audits within the 3-month period the

Employer /Engineer shall appoint an ISO accredited 3rd party agency to conduct the

audit at the Contractor’s cost.

4.5.5.2.6 Where ‘Major’ non-conformances with international standards are identified, a follow-up

external audit shall be carried out within 28 days for closing out of the non-

conformance(s). Follow-up audits shall continue on a 28-day rotation until such time as

Page 40: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-37 Sign & Stamp of Tenderer

Major non-conformances are closed to the satisfaction of the 3rd Party ISO accredited

auditor.

4.5.5.2.7 In case of non-conformity of items identified by auditor, the Employer /Engineer shall

take necessary steps including stoppage of work and or imposing of any penalty to

ensure satisfactory execution.

4.6. Management review

4.6.1 Management Reviews shall be undertaken annually by the Employer /Engineer in

compliance with ISO 9001:2015.

4.6.2 The template for management review report shall be submitted a prior for approval of

CMRL. The Management Review Report shall make recommendations for

improvement.

4.6.3 The Contractor shall carry out a formal Management Review on an annual basis as a

minimum. The Management Review may form part of the review under the

organisations Quality Management System.

4.6.4 The Contractor shall submit Management Review Report to the Employer /Engineer

within 7 days after meeting completion together with the organisations new objectives.

4.7. External ESHS Agency

4.7.1 The Contractor’s External ESHS Agency thereon, who in the opinion of the Employer

/Engineer, incompetent or negligent or fails to conform with any particular provisions

with regard to ESHS or the requirement of the contract or legal requirement, or

persists in any conduct which is prejudicial to ESHS , shall be removed from site

immediately, and such external ESHS agency shall not be employed again upon the

Works. The decision of the Engineer in this regard shall be final.

4.8. Penalty

4.8.1 CMRL has built an image of safety conscious organisation meticulously over a period

of nine years. Any reportable accident (fatality / injury) results in loss of life and/or

property damage. These accidents not only result in loss of life but also damage the

reputation of CMRL. Most of the accidents are avoidable and caused preliminary due

to contractors’ negligence. Hence CMRL shall recover the cost of damages from the

contractors for every reportable incident (fatality / injury).

4.8.2 In addition, every CMRL work site is exposed to public scrutiny as the work is executed

just on the right-of-way. Any unsafe act / unsafe condition observed by public further

damages our reputation. Because of the non-voluntary compliance of contractors to the

Employer’s ESHS requirements or Employer’s direct instructions and project H&S

manual, CMRL has been forced to establish safety-enforcing organisation. The cost of

established such organisation is to be recovered from contractors for all observed safety

violations at sites.

4.8.3 The following table-6 indicates the Health, Safety and Environment violation (unsafe act

/ unsafe condition) and charges to be recovered from contractors.

Table-6 SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

i) ESHS policya) Non-compliance of CMRL ESHSContract requirement

For item i) and item ii) Rs.

1,000 per single violation,

Page 41: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-38 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

1 ESHS Policy &

Plan

b) Inadequate coverage, notsignedc) Not displayed it at conspicuous placesat work sites in Hindi and a local languageunderstood by the majority of constructionworkersii) ESHS plan:a) Not as per Employers’ content andcoverageb) Not submitted to the ER within 28daysof commencement of workc) Not updated as per CMRL ESHSContract requirementd) Copies not provided to all requiredsupervisors / engineerse) Not implemented to a satisfactory andnot recorded a monthly review of theconstruction ESHS planf) Non submission of Utility shifting Plan.

g) Non submission of any other workplans required in the EMP of PCC.h) Non submission of construction CampLayout plan

compounded to a maximum

of Rs. 5,000 at any single

instance.

2 ESHS

Organisation

i) Not complying to the minimummanpower requirements as per CMRLESHS Contract requirementii) Not filling up the vacancies created dueto ESHS personnel leaving the contractorwithin 30 days.iii) ESHS organisation not provided withrequired Audio-visual and otherequipment’s CMRL ESHS Contractrequirementiv) Employing through outsourcingagencies and ESHS personal are not inthe payroll of the main contractorv) Disobedience / Improper conduct of anyESHS personnel.vi) Chief ESHS Manager not reportingdirectly to PM of contractor.vii) Non-compliance of any rule ofschedule VI of BOCWR within one monthof commencement of work

For item i) and ii) Rs. 50,000

per month for first month

and Rs.1,00,000 for

subsequent months

For items iii), iv), v), vi) and

vii) Rs. 50,000 for first

violation

and Rs.1,00,000 for

subsequent violations

3 ESHS

committee

i) Failed to formulate or conduct ESHSCommittee meeting for any monthii) Contractor and Sub-contractorrepresentatives not attending ESHSCommittee meetingsiii) Failed to conduct Site inspection andsend monthly monitoring reports includingthe inspection form before conductingESHS Committee meetingiv) Failed to send ESHS CommitteeMeeting minutes or Agenda to Employer/Engineer in time

For item i) to vi) Rs. 1,000

for the first violation and Rs.

5,000 for the subsequent

violations.

Page 42: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-39 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

v) A minimum period of 21 days notmaintained between any two ESHSmonthly committee meetingsvi) Failed to formulate equal participantsof management and non-managementstaff for ESHS committee meeting as perBOCWR

4 ID card

i) ID Card not provided to all staff andworkersii) Contractor not issued a personnelESHS handbook to all staff and workers,which provides information on ESHS andemergency procedures that all personnelworking on contract are required to knowand the need to follow and ensured thatthis is distributed and its contentintroduced to all the personnel working atsites.iii) The contractor not ensure that allpersonnel working at the site receive anInduction ESHS training the nature of thework, the hazards that may beencountered during the site work and theparticular hazards attached to their ownfunction within the operationiv) All personnel no issued a photo identityof size 85mm x 55mm duly signed by theauthorized representative of thecontractor before they are engaged forany work

For item i) to iv) Rs. 1,000

for the first violation and Rs.

5,000 for the subsequent

violations.

5 ESHS Training

Not complying to the requirements as mentioned in CMRL ESHS Contract requirement and Employer OHS manual with regard to: a) Induction training not givenb) Supervisor/engineer/manager trainingnot conducted CMRL ESHS Contractrequirementc) Refresh ESHS training CMRL ESHSContract requirementd) Toolbox talk not conductede) Skill development training not conductedf) Daily Safety Oath not conductedg) Top management behaviour basedESHS training conductedh) Not reviewed by ESHS Committee.i)Not submitted a Training implementationplan to be cleared by Employerj) Not able to produce adequate recordsas per the approved Trainingimplementation plank) Not able to conduct training onconstruction safety plan, operational and

For item a) to k) Rs.5,000

for first violation on and

Rs.10,000 for subsequent

violations

Page 43: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-40 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

systems procedures with record of durations.

6 ESHS

Inspection

ESHS inspection a) Not complying to the requirements asmentioned in CMRL ESHS Contractrequirement and Employer ESHS manualb) All inspection records and reports notproperly kept and filed for audit purpose,inspection reports of Planned GeneralInspection and Routine Inspection notused for discussion during SafetyCommittee Meetings with MOM.c) Not conducted independent of the plantand equipment inspection, testing andmaintenance, that has been stated in theContractor’s Plant and EquipmentProcedures with records.d) Not calibrated any of the monitoringequipment’s as per the manufacturingrequirementse) Not conducting internal ESHSinspections.f) Site Engineers(contractors) notparticipating in internal ESHS inspections.g) Not submitting the Formal siteinspection report for each site on weeklybasis to Project directorh) Formal site inspection report not to besigned by both the Site Manager and theESHS officer

For item a) to h) Rs.5,000

for first violation on and

Rs.10,000 for subsequent

violations

7 ESHS audit

Internal Audit: MARS and Electrical Safety i) Not conducted as per ESHS Planii) Report not sent to Employeriii) Action not taken for any monthiv) Fail to conduct MARS before themonthly ESHS meeting to form a part ofagenda

External H&S Audit v) Not conducted as per ESHS planvi) Report not sent to Employervii) Action not taken for quarter monthviii) Fail to conduct external third-partyaudit as per BOCW Ruleix) Fail to conduct ISO certification auditfor the scope of the CMRL project

For item i) to viii)

Rs. 25,000 for first violation

and Rs. 50,000 for

subsequent violations.

For item ix) Rs 3,00,000 for

first violation and

Rs.6,00,000 for subsequent

violations.

8 ESHS

Communication

i) Important days to be observed for ESHSawareness as furnished by Employer /Engineer not observedii) Posters as furnished by Employer /Engineer not printed and displayediii) Contractor failed to produce a ‘HighQuality’ quarterly newsletter

For item i) to ix) Rs. 1,000

per single violation,

compounded to a maximum

of Rs. 5,000 at any single

instance.

Page 44: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-41 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

iv) Contractor failed to change signageand posters on a monthly basis to bringpertinent awarenessv) Poster campaigns not discussed at theEngineer’s Committee meeting and notrecorded with improvement programvi) Informational posters, banners are notprovided both in Tamil/Hindi and Englishvii) Records of all toolbox talks undertakentogether with the date, topic, participant’snames and signatures are not mentionedon daily basisviii) Not maintaining the records ofbriefings/communications of Methodstatement and risk assessment beforecommencement of a new task or when achange to the method of working arisesix) Public informational signage andContractor contract information notposted externally to the site including alllegal communicationx) Non-function Grievance RedressMechanism and no documentation ofGrievance log

09 ESHS

Submittals

(Hazard

identification,

risk

assessment

and

determining

controls)

The contractor failure to submit the following submittals to the ER a minimum 28days prior of task commencement A. REPORTS:i) Risk Register & Hazard Logii) Grievance Logiii) Operational Control Procedure notsubmitted

iv)ESHS Monthly Report

v)ESHS Inspection Report

vi) Electrical safety audit

vii) Daily reporting of total no of workmen

viii) ESHS Audit reports

ix) Monthly Audit Score (MARS) report

x) Air and Noise Quality monitoringreportxi) Specific Method statement

xii) Changes in organizational, personnel, systems,

procedures, equipment, products, materials, or substance not communicated by the Contractor B. PLANS:i) Specific Lift planii) ESHS Management System Procedureiii) Emergency Preparedness and Response planiv) Traffic Management Planv) Fire Planvi) Health Planvii) Onsite traffic Management plan

For item i) to xii) Rs. 1,000

per single violation,

compounded to a maximum

of Rs. 5,000 at any single

instance.

Page 45: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-42 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

10 Injury and

Incidence

Reporting

Injury and Incidence reporting i)Fatal accidents or major injuries anddangerous occurrences not reportedimmediately to Employerii)Injury accidentiii)Abnormal delay in reporting accidentsor wilful suppression of information aboutany accidents / dangerous occurrenceiv)Delay in informing about any accidents/ dangerous incidents.v)Not submitted a preliminary accidentnotification within 24 hoursvi)Not submitted accident investigatedreport within 72 hoursvii) Employers’ independent incidentinvestigationa) Contractor and his staff not extendnecessary co-operation and do not testifyabout the accident.b) The contractor not take effort topreserve the scene of accident till theEmployer / Engineer complete theinvestigation.c) All persons summoned by the Employer/ Engineer in connection to witnessrecording not obey the instructions

For item i) Rs. 1,00,00,000/-

(One Crore) for each fatality

For item ii) Rs 20,00,000/

(Twenty lakhs) for each

injury accident/ (Grievous

Injury as defined by

Workmen Compensation

Act)

For item iii) iv) and v) Rs

5,00,000/- (Five Lakhs) for

each violation.

For items vi) and vii)

Rs.50,000/- for first

violation and Rs.1,00,000/-

for subsequent violations

11 Emergency

preparedness

Plan

Emergency plan not cleared by Employer within 28 days of construction commencement

i) The contractor not prepared anEmergency Response Plan for all thework sites as a part of the contractorESHS Planii) The contractor not ensured that anEmergency Response Plan is prepared todeal with emergencies arising out ofa) Fire and explosionb) Collapse of lifting applications andtransport equipmentc) Collapse of buildings, or structures etcd) Gas leakages or spillage of dangerousgoods or chemicalse) Bomb threatening, Criminal or Terroristattackf) Drowning of workersg) Landslides getting workers buriedfloods, Earthquake, storms and othernatural calamitiesiii) Arrangements not made for emergencymedical treatment and evacuation of thevictim in the event of an accident ordangerous incident occurring, the chain ofcommand and the responsible persons ofthe contractor with their telephone

For item i) to xiii) Rs.5,000

for first violation on and

Rs.10,000 for subsequent

violations

Page 46: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-43 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

numbers and addresses for quick communication not adequately publicized and conspicuously displayed in the workplace iv) Contractor not tied-up with thehospitals and fire stations located in theneighbourhood for attending thecasualties promptly and emergencyvehicle kept on standby duty during theworking hours for the purposev) contractor not conducted onsiteemergency mock drill once in every monthfor all his workers and his subcontractor’sworkersvi) Contractor not keep the Local Law &Order Authorities informed along withcommunication to ER, CMRL to mitigatethe consequences of an emergencyvii) Not submitting the project specificEmergency Plan within 4 weeks ofCommencement of contractviii) Not provide training with records foremergency preparedness and responseprocedures on monthly basis with recordsix) Not conducted the mock drilledEmergency preparedness and responseprocedures on monthly basis with recordsx) Not erected hording for EmergencyProcess flow charts on conspicuousplacesxi) Not erected hording for emergencytelephone numbers like fire, ambulance,police, nearest hospital and any otherlegal relevantxii) The contractor not provided a fullyequipped ambulance on-site as per legalrequirementxiii) The ambulance van not maned byadequate number of paramedics

i) Housekeeping maintenance register notproperly maintained up to dateii) Surrounding areas of drinking watertanks/taps not hygienicallycleaned/maintainediii) Office, stores, toilet / urinals notproperly cleaned and maintained.iv) Required dustbins at appropriateplaces not provided / not cleaned.v) Stairways, gangways, passagewaysblocked.vi)Lumber with protruding nails left assuchvii)Openings unprotectedviii)Excavated earth not removed within areasonable time.ix)Truck carrying excavated earth not

For item i) to xx)

Rs. 10,000 per single

violation Compounded to a

maximum of Rs. 20,000 at

any single instance for non-

compliance of any of the

clauses

Page 47: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-44 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

12 Housekeeping

covered / tyres not cleaned. x)Vehicles / equipment’s parked / placedon roads obstructing free flow of trafficxi) Unused surplus cables / steel scrapslying scatteredxii)Wooden scraps, empty wooden cabledrums lying scatteredxiii)Water stagnation leading to mosquitobreedingxiv)Water stagnation leading to mosquitobreedingxv)Full height fence, barriers etc notinstalled at the site to preserve thesurrounding area from excavated soil andrubbishxvi)Not maintained Drip pans for oilleakages and splits of suitable size whileservicing of plants/equipment/machineryand disposed off generated waste inapproved manner.xvii) Proper Housekeeping not carried outat work sites, labour camps, stores andoffices with Housekeeping maintenanceregisterxviii)Supervisors and Engineers workingat the site not educated and trained on thenecessity of good Housekeepingxix)Not treating still water once everyweek with oil in order to prevent mosquitobreedingxx)Posters in both language and Englishnot displayed prominently to drawattention for the dangers of permittingmosquito breeding

1)Work at Height/Ladders and Scaffolds i)Not using or anchoring Safety Beltii)Not using Safety Netiii)Absence of life line or anchorage pointto anchor safety beltiv)Using Bamboo laddersv)Painting of laddersvi)Improper usage (less than 1mextension above landing point, notmaintaining 1:4 ratio)vii)Aluminium ladders without base rubberbushviii)Usage of broken / week laddersx)Usage of re-bar welded laddersxi)Improper guardrail, toe board, barriersand other means of collective protectionxii)Improper working platformxiii)Working at unprotected fragile surfacexiv)Working at unprotected edgesxv)Worker not passed Vertigo testxvi Non-skilled worker working at

For item 1) to 7)

Rs.10,000 per single

violation Compounded to a

maximum of Rs.1,00,000 at

any single instance for non-

compliance of any of the

clauses

Page 48: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-45 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

13 Working at

Height /

Ladders and

Scaffolds

height.

2)Contractor not carried out riskassessments for all the work whereworkers or materials can fall from morethan two meters3)Not provided Edge protection to workabove two meters as specified belowa) A main Guard rail at least 1 meterabove the edgeb) A Toe board at least 200 mm highc)An intermediate guard rail or otherbarrier so that there is no gap more than470 mm4)All Scaffolds not inspected by acompetent person at least in every threedays after erection and not recorded5)Tags not fitted to all scaffoldings toshow they are safe for use or not and allsafe for use tags not signed by senior siteengineer6)All scaffolds not constructed of soundmaterials and not free from patent defect7)The measures not taken by contractori)The scaffold not constructed for thecorrect use (Light or Heavy Duty)ii)Security not fixed to existing structuresor adequately buttressediii)The use of barrels, boxes, loose tiles orother unsuitable material used assupports for working platformsiv)All working platforms not fully boardedand not covered with net to prevent HeightPhobiav)All working platforms not provided guardrails at one metre height and not providedan intermediate rail at half heightvi)All working platforms not provided withToe boardsvii)All working platforms not kept free ofunnecessary obstruction or rubbishviii)Secure ladder access shall beprovidedix)Metal ladders used near or adjacent tooverhead live power linesx)Non-usage of full body harness at safeworking platform with secure anchoragepoints

i) Non-availability of fitness certificateii) Documents not displayed on themachine or not available with the operatoriii) Maximum Safe Working Load notwritten on the machineiv) Automatic safe load indicator notprovided or not in working conditionv) Age of the operator less than 21 yearsor without any licencevi) Failure to submit Lift Plan

For item i) to xxviii)

Rs.10,000 per single

violation Compounded to a

maximum of Rs.1,00,000 at

any single instance

Page 49: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-46 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

14 Lifting

appliances and

gear

vii) Person riding on crane.viii) Creating more noise and smokeix) Absence of portable fireextinguisher in driver cabinx) No fencing of hoist rope movementareaxi) Hoist platform not in the horizontalpositionxiv) Fail to guard hoist platformxv) No fencing of hoist rope movementareaxvi) Hoist platform not in the horizontalpositionxvii) All lifting appliances, includingsynchronized mobile jacks, pit jacks,mobile cranes, lower cranes, gantrycranes, launching beams and lorrymounted cranes not inspected and notcertified by competent personxviii) Competent person not approved byER/CMRLxix)Lifting capacity of more than one tonnot fitted with Automatic Safe LoadIndicators, Anemometer and Audiblewarning devices with no proper records ofinspectionxx)Lifting appliances not maintained inaccordance with manufacturer’sinstructions and irregular preventativemaintenance program with availableschedulexxi)All lifting appliances not inspectedevery six months by a third-partycompetent person with recordsxxii)The operators of lifting appliances notconducted daily record of inspections oftheir respective lifting appliancesxxiii)Load slewed over public areaswithout stopping pedestrians and vehiclesxxiv)Working closer to any live overheadpower lines without the operation of astrict Permit to Work system being inplacexxv)All lifting gear not properly stored andleft lying on the groundxxvi)Untrained and unexperiencedslingers and riggers deployed to givedirections to crane operatorsxxvii)Untrained and unexperiencedperson deployed as Crane driverxxviii)While working near isolated overhead power lines, the lifting appliances not grounded to earth as a secondary precaution against accidental energization

Page 50: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-47 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

15 Launching

operation

Non-adherence of any of the provisions mentioned in Employer’s H&S manual Volume 2, (ii) Volume 3 Env mgmt. arrangement and (iii) EMP and EMoP in PCC

Rs. 50,000 for first violation

and Rs.1,00,000 for

subsequent violations

16 Site Electrical

safety

Site Electrical Safety

i)The contractor not deploy qualified andcompetent C Licence electrical personnelas per lawii)The main contractor not takeconsideration, the requirements of thesub/petty contractor’s electrical powersupply and arrive at the capacity of powersupply from diesel supply from dieselgenerators, small capacity dieselgenerators allowed for whatever type ofjob to be executed under this contractiii)Unsafe noise making small capacitydiesel generators are found used bysub/petty contractorsiv)The contractor not submitted electricalsingle line diagram, schematic diagramand the details of the equipment for all thetemporary electrical installation and thosediagrams together with the temporaryelectrical equipment not submitted to theEmployer’s for necessary approvalv)Cables not selected after fullconsideration of the condition to whichexposed and the duties for which they arerequired. Supply cable up to 3.3 KV not inaccordancevi)Damage to1.Civil utilities such as water pipe line,sewer pipeline, storm water pipe line,drainage pipe line and structures etc2.Electrical and telecom utilities such asall types of cable and installation, streetlights, poles, and panels, Bus Q shelters,Joints, feeder pillars, cable ducts, junctionboxes, transformers, ring main andstructures provided for both telecom aswell as telecom etc3.Traffic signal cables, CCTV cables andCCTV cameras and poles, LPG/LNG Gaspipelines, petroleum tanks/pipeline,dispensers etcvii)Inserting of wires directly into thesocketsviii)Improper grounding for the electricalappliancesix) Electrical cables running on the groundx)The contractor not appointed anElectrical engineer with certificate tocomply IE act

For item i) to xxix)

Rs.10,000 per single

violation Compounded to a

maximum of Rs.1,00,000 at

any single instance

Page 51: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-48 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

xi)The name and contact telephonenumber of the electrical engineer notdisplayed at the main distribution boardfor all temporary electrical installations, forapprovalxii) All electrical work not supervised orexecuted by qualified and suitablycategorized electricians as per the lawxiii)All cabling exposes a hazard orobstruction to people and equipmentxiv)The installation on site not allowconvenient access to authorized andcompetent operatives to work on theapparatus contained withinxv)Voltages not adhered to for typicalapplications throughout the distributionsystems likea) Fixed plant – 415V 3 Phaseb) Movable plant fed by trailing cable –415Vc)Installations in Site buildings – 240V 1Phased)Fixed flood lightning – 240V 1 Phasee) Portable and hand-held tools – 110V 1Phasef) Site lightning (other than flood lightning)– 110V 1 Phase; andg) Portable hand lamps (general use) –110V 1 Phasexvi)Protection not provided for all mainand sub-circuits against excess current,residual current, earth faults an shortcircuits by protective devicesxvii)Earthing and bonding not provided forall electrical installations and equipment’sto prevent the possibility of dangerousvoltage rises cleared by installed circuitprotectionxviii)Maintenance of control apparatusand wiring distribution systems not carriedout by an approved electrician on weeklybasis with recordsxix)All portable electrical appliances notnumbered with records of date of issue,date of last inspection carried outxx)Inserting of bare wires into the socketxxi)Improper grounding for the electricalappliances and metallic barricadesxxii)Electrical live cables running on theground as per the IE actxxiii)Not provided ELCB DPxxiv)Not providing adequate earthing asper IE actxxv)Electrical live cable immersed inwaterxxvi)Not maintain safe distance from HVon LV lines while working as per the law

Page 52: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-49 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

xxvii) Non-usage of rubber mat near HV orLV distribution panels and switches forDG sets and power utilityxviii)Use of inadequate capacity fusewire/HRC (High ruptured capacity fuse) asper the IE actxxix) Utility shifting plan not prepared andcomplied with.

17 Hand tools and

Power tools

The contractor not ensure that i)Electric tools are properly grounded or /and double insulatedii)GFCI’s/RRCB’s shall be used with allportable electric too operated especiallyoutdoors or in wet conditioniii)Before making any adjustments orchanging attachments, his workers shalldisconnect the tool from the power sourceiv)When operating in confined space or forprolonged period, hearing protection shallbe required. The same shall also supply toworking with equipment’s which gives outmore noisev)Tools is held firmly and the material isproperly secured before turning on thetoolvi)All drills shall have suitable attachmentsrespective of the operation and powerfulfor ease of operationvii)When any work/operation need to berepeatedly or continuously, toolsspecifically designed for that work shall beused. The same is applicable todetachable tool bit alsoviii)Size of the drill shall be determined bythe maximum opening of the chuck n caseof drill bitix)Attachments such as speed reducingscrewdrivers and buffers shall be providedto prevent fatigue and undue musclestrain to his workersx)Stock should be clamped or otherwisesecured firmly to prevent it from movingxi)Workers shall never stand on top of theladder to drill holes in walls/ceilings,instead standing on fourth or fifth rungshall be recommendedxii)Electric plane shall be not be operatedwith loose clothing or long scarf or openjacketxiii)Safety guards used on right anglehead or vertical portable grinders mustcover a minimum of 1800 of the wholewheel and the spindle/wheelspecifications shall be checkedxiv)All power tools/hand tools shall haveguards at their nip points

From item i) to xxii)

Rs.1,000 per single

violation Compounded to a

maximum of Rs.5,000 at

any single instance

Page 53: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-50 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

xv)Low profile safety chain shall be usedin case of wood working machines and thesaw shall run at high RPM when cuttingand also correct chain tension shall beensured to avoid “kickback”xvi) Leather aprons and gloves shall beused as an additional personal protectionxvii)Push sticks shall be provided andproperly used to hold the job down on thetable while the heels move the stockforward and thus preventing kickbacksxviii)Air pressure is set at a suitable levelfor air actuated tool or equipment beingused, before changing or adjustingpneumatic tools, air pressure shall beturned offxix)Only trained employees shall useexplosive actuated tools and the tool shallalso be unloaded when not in usexx)Usage of such explosive actuated toolsshall be avoided in case of places whereexplosive/flammable vapours or gasesmaybe presentxxi)Explosive actuated tools and theirexplosives shall be stored separately andbe taken out and loaded only before thetime of immediate usexxii)Misfired cartridges of explosiveactuated tools must be placed in acontainer of water and be removed safelyfrom the project

Gas cutting and welding i) Wrong colour coding of cylinder.ii) Cylinders not stored in upright position.iii) Flash back arrester, non-return valveand regulator not present or not in workingcondition.iv) Fail to put cylinders in a cylinder trolley.v)Damaged hose.vi)Using domestic LPG cylindersvii) Fail to store cylinder 6.6m awayfrom fire prone materialsviii) Fail to use hose clampsix)Fire extinguisher not placed in thevicinity during operationx) Contractor not issued work permit forwelding over areas where others areworking and areas with increased firerisks or hazardous environments.xi)All gas and welding equipment notinspected by a competent person withrecords on weekly basisxii)Welders not wear the correct PPE likeface and eye protection with correct gradeof shield, Gauntlet gloves Safety footwear

From item i) to xxxvii)

Rs.1,000 per single

violation Compounded to a

maximum of Rs.5,000 at

any single instance

Page 54: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-51 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

18 Gas Cutting

and Welding

xiii)Efficient ventilation and fumeextraction system not provided inenclosed areas and pitsxiv)Naked flames or high temperaturesurfaces allowed in the vicinity (within 6meter) of volatile solventsxv)Cylinders kept in enclosed areas(unventilated) with unsecure uprightpositionxvi)Flash back arrestors not fitted to boththe fuel gas and oxygen cylindersxvii)Non-return valves not fitted to thetorch or cutting torchxviii)Screwed fittings and hoses are notscrewed properly and sealed to free fromcontaminantsxix)Daily checks for gas leaks not carriedout by using soapy waterxx)Not removed all torches from enclosedareas when not in usexxi)Firewatchers not present if there is apossibility of ignition unobserved by theoperatorxxii)The equipment earthing and workpiece earthing is samexxiii)Duckboards or rubber protection isnot used to avoid being in contact withwater or wet floors when weldingxxiv)Screens not provided to limitexposure of others to glare from areaxxv)The correct codified eye and faceprotection with the correct filter glass isnot issuesxxvi)Voltmeter and Ammeter not workingxxvii)Improper grounding and return path.xxviii)Damaged welding cable

xxix)Bare openings in the cable.xxx)Non-availability of separate switch inthe transformerxxxi)Non-availability of main switchcontrol to switch off power to the weldingunit.xxxii)Usage of reinforcement rod as returnconductorxxxiii)Damaged holderxxxiv)Fire extinguisher not placed in thevicinity during operation.xxxv)Site should be inspected for workersnot wearing PPEsxxxvi)Workers of proper shift not in place.xxxvii) Audit findings not implemented

i)Smoking and open flames in fire proneareaii)Using more than 24V portable electricalappliances in the fire prone area

From item i) to xxiii)

Rs.1,000 per single

violation Compounded to a

Page 55: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-52 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

20 Fire precaution

iii)Not proper ventilation in cylinderstorage area.iv)Absence of fire extinguisherv) Fire extinguisher not refilled once in ayear.vi) Fire extinguisher placed in a not easilyaccessible locationvii) The contractor not deployed speciallytrained personnel to deal with fires due toelectrical causes, gas explosions etc asper the specified law or manualviii)Combustible scrap and otherconstruction debris not disposed off fromsite on a regular basis with recordsix)Signage not erected at prominentpositions showing the correct use ofportable first aid fire extinguishersx)Emergency plans and Fire Evacuationplans not preparedxi)Mock drills not conducted once in onemonths to ensure the effectiveness of thearrangementsxii)Site clearly visible fire points notestablished for use in an emergencyeither with Dry powder type or water typeextinguishersxiii)Recharging of fire extinguishers andtheir proper maintenance not done as perIndian National Standardsxiv)Water not supplied for fire-fightingpurposes in the form of static water tankof adequate capacity or a hydrant line withadequate water pressure at outlet pointsas per Indian National Standardsxv)Sufficient number of fire hoses withbranch pipes, emergency lights notprovided at site as per Indian NationalStandardsxvi)The Telephone Number of the site firebrigade not prominently displayed neareach telephone on sitexvii)Supervisors and workmen at the sitenot trained in the use of Firefightingequipment provided at the site as perIndian National Standardsxviii)All flammable liquids without anyleaks and proper stopper without marked“FLAMMABLE LIQUID”xix)Rags soaked in paints, kerosene andother flammable liquids not disposed ofdaily under supervisionxx)All Diesel fuel storage tanks notbunded around in order to control anyspillage or leakagexxi)”NO SMOKING” signs not prominentlydisplayed at all areas of potential locationof fire

maximum of Rs.5,000 at

any single instance.

Page 56: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-53 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

xxii)Lack of site inspectionxxiii)Correction from Audit not implemented

21 Excavation Excavation

i) The contractor not ensuresa) Whether any construction buildingworker engaged in excavation is exposedto hazard of falling or sliding material orarticle from any bank or side of suchexcavation which is more than 1.5mabove his footing, such worker isprotected by adequate piling and bracingagainst such bank or sideb) Where banks of an excavation areundercut, adequate shoring is provided tosupport the material or article overhangingsuch bankc) Excavated material is not stored at least0.65m from the edge of an openexcavation or trench and banks of suchexcavation or trench are stripped of looserocks and other materials which mayslide, roll or fall upon a constructionbuilding worker working below such bankd) Metal ladders and staircases or rampsare provided, as the case maybe, for safeaccess to and egress from excavationwhere, the depth of such excavationexceeds 1.5m and such ladders,staircases or ramps comply with therelevant National Standardse) Trench and excavation are protectedagainst falling of a person by suitablemeasures if the depth of such trench orexcavation exceeds 1.5m and suchprotection is an improved protection inaccordance with the design and drawingof a professional engineer, where suchdepth exceeds 4mii) The contractor not ensure thata) Suitable warning signs or notices,required for the safety of building workerscarrying out the work of an excavation,displayed or erected at conspicuousplaces in Hindi and in a languageunderstood by majority of such buildingworkers at such building excavation workiii) The integrity of the excavation and thesupport system not inspected prior to thecommencement of any works on a dailybasis with records of checklistiv) Emergency pumping sumps andladders not placed for use in the event ofan emergency evacuationv) The contractor not plan in excavationagainst the following:

For item ( i) to (vii)

Rs. 10,000 per single

violation Compounded to a

maximum of Rs. 1,00,000

at any single instance.

Page 57: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-54 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

a) Collapse of the sidesb) Materials falling onto people working inthe excavationc) People and vehicles falling into theexcavationd) People being struck by plante) Undermining nearby structuresf) Contact with underground servicesg) Fumes andh) Make sure the necessary equipmentneeded such as trench propsvii) The contractor not taken followingprecautionsa) The sides battering them to a safeangle or supporting them with timber,proprietary support systemsb) Unsupported excavationsc) In shallow trenches contractor need toprovide support if the work involvesbending or kneeling in the trenchd) Prevention of materials falling in to theexcavatione) Make sure the edges of the excavationare protected against falling materialsf) Wear a hard hat when working inexcavationsg) Provide substantial barriers, e.g. guardrails and toe boardsh) Keep vehicles away from excavationsuse brightly painted baulks or barriersi) Where vehicles have to tip materials intoexcavations, use stop blocks to preventthem from over-running.

j) Supervising excavation work of contractor does not have service plans

Work permit system 1) A permit system is not taken forconstruction worka) Entry into confined spacesb) Wok in close proximity to overheadpower lines and telecommunicationcablesc) Hot workd) To dig where under-ground servicesmaybe locatede) Work with heavy moving machineryf) Working on electrical equipmentg) Work with radio-active isotopesh) Heavy lifting operation and liftingoperations closure to live power line2) Woking to any live overhead power lineis permitted without the operation of astrict permit to work3) The contractor not develop a permit -To-work system

For item 1 to 10

Rs.1,000 per first violation

and Rs.5,000 for

subsequent violations

Page 58: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-55 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

22 Work permit

system

4) The permit to work not issue foractivities as per CMRL ESHS contractrequirement5) To permit-to-work system not covereda) How the system worksb) The jobs it is to be used forc)The responsibilities and training of thoseinvolvedd) How to check its operations6) The permit-to-work not forms thecommunication between everyoneinvolved of respective site conditions andrequirements7) The permit to work form does notcontain as per the ESHS contractrequirements.a) Authorised person for jobs (and anylimits to their authority)b) Responsibilities for precautions (e.g.isolation, emergency arrangement, etc)c) Associated hazardsd) Plant and diagram its location andlimitationse) Precautionary measuresf) Procedure to control or abandon in thecase of an emergencyg) Time limitationsh) Job specific toolbox talk conducted bythe supervisor8)A permit-to-work authorised more thana period of twenty-four hours9)A copy of each permit to work notdisplayed during its validity in aconspicuous location in close proximity tothe actual works location to which itapplies10)A pre-permit activation job specifictoolbox-talk not conducted by thesupervisor with following detailsa) All identified hazards are explainedb) Risk mitigation process clarifiedc)Method of work explained stressingpoints (a &b above)d)Emergency response procedure isclarified and the person assigned tasks inthe event of emergencyf) Personnel Protective Equipment (PPE)requirements including PPE serviceabilitychecks and training.

Traffic Management i. The Contractor shall develop detailed

and robust traffic management plansconsistent with the Indian Guidelineson Traffic Management in work zones(IRC:SP:55-2014), prior tomobilization for respective sectionswith site- or station-specific plans and

From item i) to xxxi)

Rs. 10,000 per first violation

and Rs.1,00,000 for

subsequent violations

Page 59: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-56 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

23 Traffic

Management

measures to minimize the overall impact on traffic throughout the construction and operation periods.

ii. At congested sections, the temporarytraffic coordinators will be engaged byContractor to facilitate the trafficmanagement.

iii. At the minimum, the trafficmanagement plans will have thefollowing components: constructiontraffic, ensuring access to properties,accommodating pedestrians, parking,access by construction vehicles,faulty traffic lights and probleminterchanges, use of public roads,parking provision during construction,use of residential streets and trafficdiversion due to temporary roadclosures, and construction and use oftemporary access roads.

iv. Strengthening impact and risk prevention measures, such as establishing construction site works to minimize the entrance and exit of vehicles at stations during peak traffic.

v. The logistics should be considered tomanage transport materials fromstorage areas outside of the denseurban core to worksites and to returnexcavated soil and other materials todisposal locations. If needed,construction traffic may be confined tocertain routes (based oninfrastructure capacity) or restricted tocertain off -peak hours (that is, toreduce noise pollution at night or toavoid commuting and school hoursduring the day).

vi. Any diversions of traffic will causeconsiderable confusion forpedestrians and drivers as theyrearrange their itineraries, hence, tominimize the effects of the diversionor reorganization, it is necessary toconduct communication campaignsand disseminate appropriateinformation to urban residents andtaxi and bus drivers in advance ofdisruptions. Efforts will be given todivert traffic to roads wide enough toaccommodate extra traffic.Compliance with scheduled deadlinesfor the detour is essential. Ifnecessary, bus service and otherpublic and private transport services

Page 60: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-57 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

in the area should be improved to meet residents’ transportation needs

vii. CMRL and local authorities continueto play an oversight role in approvingthese plans during construction,evaluating their cumulative impactwith other infrastructure projects inthe region, and ensuring theirdissemination to all relevantstakeholders.

viii. In all cases, the contractor not employproper precautions. Whereveroperation undertaken are likely tointerfere with public traffic, specifictraffic management plans not drawnup and implemented by the contractorin consultation with the approval oflocal police authorities and / or theconcerned metropolitan/civilauthorities /competent authorities

ix. A warning not installed at allsecondary road which merges withthe primary road where theconstruction work is in progress atsufficient distance before it mergeswith the primary road regarding the‘Chennai Metro Work in Progress’

x. Traffic cones of 500mm, 750mm, and1000mm high and 300mm to 500mmin diameter are in square shape atbase and are often made of plastic orrubber and normally have retro-reflectorizes red and white band notused whenever required

xi. Drums about 800mm to 1000mm highand 300mm in diameter not usedeither as channelizing or warningdevices

xii. The contractor not makearrangements keeping low awayvan/manpower to low away any breakdown vehicle in the traffic flow

xiii. The contractor not ensure thecleanliness of road and footpaths bydeploying proper manpower for thesame.

xiv. The contractor not ensure propergrooming, cleaning washing of roadsand footpaths on all the time

xv. All barricade not conspicuously seenin the dark/night-time by the roadusers.

xvi. Conspicuously not ensured byaffixing retro reflective stripes ofrequired size and shape atappropriate angle at the bottom andmiddle portion of the barricade at a

Page 61: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-58 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

minimum gap of 1000mm. In addition, minimum one red light or red-light blinker not placed at the top of each barricade. i) Barricade and pedestrian walkwaya) Not Cleanedb) Not in alignmentc) Not numberedd) Not paintede) Red lights / reflectors not workingf) Damages not repairedg) Not secured properlyh) Barricade inspector not employedi) Protruding parts / portions repairedj) Barricades maintaining register notproperly maintained up to dateii) Contractor Vehiclesa) Over loading of vehiclesb) Unfit drivers or operatorsc) Unlicensed vehiclesd) Absence of traffic marshalse) Absence of reversing alarmf) Absence of fog light (at winter)g) Power / hand brakes not in workingcondition.

xvii. Splashing of Bentonite on roads /non-cleaning of tyres of dumpers andtransit mixers

xviii. Mishandling of bentonite like splashing of bentonite outside specified width of barricading

xix. Non-cleaning of tyres of dumpers andtransit mixers before leaving the siteand thereby creating a traffic safetyhazard to road users.

xx. Adequate and clear warning signs notdisplayed at appropriate distancebefore the commencement of the siteworking

xxi. Prior warning not given concerningthe location of approaching site entryand exit points

xxii. All traffic signs, barriers, cones, andlighting not kept maintained andcleaned

xxiii. Regular inspection of the trafficmanagement schemes not conductedby the contractors in both the daytimeand night-time hours with records

xxiv. The removal of excavated soil fromthe sites not done by licensed vehicle

xxv. Unchecked medical examination ofthe drivers allowed for removal ofexcavated soil

xxvi. Overloaded vehicle allowed formovement excavated soil

Page 62: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-59 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

xxvii. Any vehicle leaving the sites carryingload produce air borne contaminantsduring transportation of the publichighway

xxviii. Any vehicle revised without thecontrol of trained banksman.

xxix. Vehicles prior to leaving the site shalldid not wheels.

xxx. Any soil removed from the work sitesdisposed of at unauthorised dumpingsites.

xxxi. Not maintained and painted all thetraffic barriers on yearly basis

24 Batching

plant/Casting

yard

i) Batching plant/Casting yard

ii) The batching plant/casting yard noteffectively planned for smooth flow ofunloading and stacking the aggregatesreinforcement and cement, batchingplant, transport of concrete, casting thesegment, stacking the segment, andloading the segment to the trucks

iii) The batching plant/casting yardnot barricaded and not made ascompulsory PPE zone

iv) Electrical system not suitably notplanned for diesel-generator

v) Drainage not effectively provided andwaste water not disposed after propertreatment as per the law

vi) Time office, canteen, drinkingwater, toilet and rest place not suitablylocated for the easy access to theworkers

vii) Manual handling of cement notavoided to a larger extent

viii) The PPE’s provided to thecement handling workmen not conformto international standard

ix) Access roads and internalcirculation roads not well laid andmaintained properly at all time

x) Material stacking is not provided

xi) Not provide 50 Lux of illumination or as per law

xii) Batching plant/Casting yard

xiii) The contractor release dust dueto their activities beyond thepermissible limit as per the relevant law

xiv) The waste treatment plant notprovided and the ER/CMRL norms notfollowed

From item i) to xxiii)

Rs. 1,000 for single

violation compounded to a

maximum of Rs.5,000 at

any single instant.

Page 63: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-60 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

xv) High GI sheet screens andwater sprinkling will be employed.

xvi) The use and storage ofhazardous materials at the casting yardand batching plant should adhere toSPCB requirements.

xvii) The transport, handling andstorage of hazardous waste will bedone in accordance with the provisionsof Hazardous Chemicals (Management& Handling) Rules. Hazardous wastesfrom construction activity andequipment are labeled, recorded,stored in impermeable containmentand for periods not exceedingmandated periods and in a mannersuitable for handling storage andtransport.

xviii) The contractor shall maintain arecord of sale, transfer, storage ofhazardous waste and make theserecords available for inspection.

xix) The contractor shall getAuthorized Recyclers to transport anddispose Hazardous Waste.

xx) Proper collection and storagefacilities will be provided especially forhazardous waste.

xxi) If power from the grid is used,permission from power supplycompany must be obtained by theContractor.

xxii) DG sets, if used, should: (a)conform to height of stack norms as perCPCB rules; (b) conform to emissionnorms as per E (P) Act, 1986; (c) noiselevel at 1 m distance from enclosureshould not be >75 dB(A).

xxiii)Diesel storage if done beyondthreshold limit (1000 L) permission shouldbe obtained. Diesel should be stored onpukka platforms and spillages should beavoided.

PPE (Personnel Protective Equipment) i)Not havingii)Not wearing (or) using and kept itelsewhereiii)Using damaged oneiv)Using wrong typev)Using wrong colour helmet or helmetwithout logovi)Using for other operation (e.g. Usingsafety helmet for storing materials orcarrying water from one place to other)

From item i) to vi).

Rs.200 per single violation

For item vii) to xi)

Rs. 1,000 for first violation

and Rs. 5,000 for

subsequent violations for

item

Page 64: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-61 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

25 PPE

vii)Not conforming to BIS standardviii)The contractor not pay cash amount inlieu of PPE to the workers/Subcontractorsand expect them to buy and use duringworkix)The contractor not at all time maintain aminimum of 10% spare PPE’s and safetyappliances and properly record and notshowed to the Employer / Engineer duringthe inspectionsx)Adequate quantity of PPE’s not keptalways as the security postxi)The contractor not all times keep andmaintain an adequate supply of suitablePPE for use at all timesa) Safety helmetsb) Hearing protectionc) Respiratory protectiond) Eye protectione) Protective glovesf) Safety footwearg) High visibility clothingxii) In all construction sites personidentified other without HARD HAT orSAFETY BOOTS or both

26

Health and

Safety

Industrial Health, Safety and Welfare i)Fail to conduct Medical examination toworkersii)Absence of ambulance van &roomiii)Workers not having ID cardiv)Inadequate number of toiletsv)Toilets not cleaned properlyvi)Absence of water facilities fortoilets and washing placesvii)Toilet placed more than 500mfrom the work siteviii)Absence of drinking waterix)Absence of first-aid person in work site.x)Absence or inadequacy of first-aid box.xi)Misuse of first-aid box.xii)First-aid box not satisfy the minimumIndian standard.xiii)Smoking inside the construction sitexiv)Drink and drive or workxv)Excessive noise and vibrationxvi)Creche not providedxvii)Accommodation not provided as perBOCWAxviii)Fumigation / insecticides not sprayedto prevent Mosquito breedingxix)Contractor not maintain material safedata sheet (MSDS) for all substances atthe point of inventoryxx)Contractor not conducted anassessment of the hazardous substances

From item i) to xxvii)

Rs.1,000 per single

violation Compounded to a

maximum of Rs.5,000 at

any single instance

Page 65: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-62 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

would be used in confined space with assessment record xxi)For continuous exposure of noise, i.e.for eight hours in any one-day, the soundlevel exceeds 85DBxxii)Contractor not introduced a noisecontrol programme. If noise levels exceedabove 90DN. The use of hearingprotection should be enforced activelywhen the equivalent sound level over 8hours reaches 85 dB(A), the peak soundlevels reach 140 dB(C), or the averagemaximum sound level reaches 110dB(A).Hearing protective devices providedshould be capable of reducing soundlevels at the ear to at least 85 dB(A)xxiii) Contractor not introduced a noisecontrol programme. If noise levels exceedabove 90DNxxiv) The ventilation system not adequateto maintain circulation of following anyone:a) Less than 19.5% oxygen by volumeb) More than 0.05% carbon dioxide byvolumec) More than 0.01% carbon monoxide byvolume by volumed) More than 0.001% hydrogen sulphideby volumee) More than 0.005 oxides of nitrogenf) More than 0.0002% of aldehydeg) Any other poisonous gas in harmfulamounts.xxv)The contractor not provided at least6m3 of fresh air per minute per employeexxvii)Regular checking of gas at the facesnot done before each shift by using a multigas detectorxxvi) Motive power other than electric orpetrol usedxxvii)Diesel engines used undergroundwithout filters to remove all carbonmonoxide and oxides of nitrogen

Labour welfare measures i) Compliance with GoI labor legislation,ratified International Labour Organizationconventions including providing groupaccidental insurance for the workers.ii)Prohibition of child labour, includingprohibition of person under 18 years oldfrom working.iii)Non-adherence of Labour welfareprovisions of BOCWA.iv)Fail to register establishment anddisplay the registration certificate atworkplace.

From item i) to xvii)

Rs.1,000 per single

violation Compounded to a

maximum of Rs.5,000 at

any single instance

Page 66: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-63 Sign & Stamp of Tenderer

SI No TOPIC UNSAFE ACT/UNSAFE CONDITION DEDUCTIBLE AMOUNT *

27 Labour Welfare

measures

v)Grievance Redress Mechanism forworkers should be establish as early aspossible to function no later thanconstruction commencement.vi)Absence of workers register andrecords.vii)Absence of muster roll and wagesregister.viii)Fail to display an abstract ofBOCWA and BOCWR.ix) Inadequate number of toiletsx)Toilets not cleaned properlyxi)Absence of water facilities for toiletsand washing placesxii)Toilets placed more than 500m fromthe work sitexiii) accommodation not provided as perBOCWAxiv)Absence of drinking waterxv)Excessive noise and vibrationxvi)Canteen not providedxvii)Food stuff not served on no loss noprofit basis

28 Floor Openings i)No Provision of Protection,ii)No Relevant Signageiii)work Permit Procedure not followed

From item i) to iii)

Rs.10,000 per single

violation Compounded to a

maximum of Rs.1,00,000 at

any single instance

29

Environmental

Management

i)Tyre wash facility not providedii)Spillage from vehicles not arrestiii)Air monitoring not practicediv)Noise and vibration monitoring notpracticed

v)Surface and ground water monitoring

not practiced.

vi)The values of air monitoring and noisemonitoring not within acceptable limitsvii)Dust control measures at sites notpracticedviii)Improper disposal of debris /residues

ix)Detailed Analysis of vibration, such as

visual inspections of buildings and

baseline monitoring not conducted by

contractor prior to construction.

x)Non-compliance in legal provisions forwater treatment and disposal andenvironmental loss.

xi)Site-specific EMP and Environment

monitoring plan not cleared by Employer.

xii) Waste not treated.

From item i) to xi) Rs. 1,000

per single violation

Compounded to a

maximum of Rs. 5,000 at

any single instance

Page 67: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII Sub-section F ESHS-Volume 1 Control

1-64 Sign & Stamp of Tenderer

Without limiting to the unsafe acts and or conditions mentioned above in the clause 4.8 the Employer /Engineer shall have the right to deduct charges for any other unsafe act and or condition depending upon the gravity of the situation on a case-to-case basis. The charges shall be in comparison with that of the similar offence indicated in the above table-6.

* Maximum cumulative amount deductible for items at S.No. 1 to S. No. 29 during the entirecontract duration shall not exceed 1% of contract value.

Page 68: 52234-001: Chennai Metro Rail Investment Project
Page 69: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-ii Sign & Stamp of Tenderer

Table of Contents

Contents

1. STATEMENT OF INTENT ...................................................................................................... 1

2. REFERENCES, LEGAL REQUIREMENT’S AND DISTRIBUTION OF THIS MANUAL ......... 2

3. DEFINITION OF TERMS ........................................................................................................ 3

5. GENERAL DUTIES OF CONTRACTORS AND OTHERS ...................................................... 6

6. HEALTH AND SAFETY TRAINING AND H&S PROMOTION ................................................ 8

7. HEALTH AND SAFETY AUDIT AND FOLLOW UP ACTION ............................................. 11

8. CONTACTOR’S SITE ESHS COMMITTEES ........................................................................ 14

9. REPORTING OF ACCIDENTS AND DANGEROUS OCCURRENCES ................................ 16

10. ACCIDENT INVESTIGATION ............................................................................................... 18

11. ACCIDENT STATISTICS ...................................................................................................... 19

12. HAZARD IDENTIFICATION AND RISK ASSESSMENT ...................................................... 19

13. EMERGENCY PREPAREDNESS PLAN .............................................................................. 22

14. HEALTH AND SAFETY SIGNAGE ...................................................................................... 23

15. INDUSTRIAL HEALTH AND WELFARE .............................................................................. 24

16. WORKING AT HEIGHT ........................................................................................................ 31

17. EXCAVATIONS .................................................................................................................... 33

18. LIFTING OPERATIONS ....................................................................................................... 36

19. WORK IN CONFINED SPACES ........................................................................................... 42

20. SITE ELECTRICITY ............................................................................................................. 44

21. WELDING AND CUTTING .................................................................................................... 48

22. COMPRESSED GASES ....................................................................................................... 49

23. MACHINERY ........................................................................................................................ 51

24. PLANT AND EQUIPMENT OPERATIONS ........................................................................... 52

25. TUNNELLING OPERATIONS - NOT USED ......................................................................... 53

26. BLASTING OPERATIONS ................................................................................................... 53

27. DEMOLITION ....................................................................................................................... 54

28. FALSE WORK / FORMWORK ............................................................................................. 54

29. PILING AND DIAPHRAGM WALLS ..................................................................................... 55

30. WORK ADJACENT TO LIVE RAILWAYS............................................................................ 55

31. WORK ADJACENT TO LIVE ROADWAYS ......................................................................... 56

32. PERSONAL PROTECTIVE EQUIPMENT (PPE) .................................................................. 56

33. MEDICAL FACILITIES ......................................................................................................... 57

34. FIRE PRECAUTIONS ........................................................................................................... 59

Page 70: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-iii Sign & Stamp of Tenderer

35. CONSTRUCTION MACHINERY ........................................................................................... 62

36. TRAFFIC MANAGEMENT .................................................................................................... 63

37. HOUSEKEEPING ................................................................................................................. 67

38. OVERHEAD PROTECTION ................................................................................................. 68

39. SLIPPING, TRIPPING, CUTTING, DROWNING AND FALLING HAZARDS ........................ 69

40. LAUNCHING OPERATION .................................................................................................. 69

41. MACHINE AND GENERAL AREA GUARDING ................................................................... 70

42. MANUAL LIFTING AND CARRYING OF EXCESSIVE WEIGHT ......................................... 70

43. HAND TOOLS AND POWER TOOLS .................................................................................. 71

44. DANGEROUS AND HARMFUL ENVIRONMENT ................................................................ 72

45. CORROSIVE SUBSTANCES ............................................................................................... 72

46. BATCHING PLANT / CASTING YARD ................................................................................ 72

47. RADIATION .......................................................................................................................... 73

48. SMOKING............................................................................................................................. 73

49. MOBILE PHONES, RADIOS AND AUDIO EQUIPMENT ..................................................... 74

50. DUST, GASES, FUMES ETC. .............................................................................................. 74

51. VEHICULAR TRAFFIC ......................................................................................................... 74

52. HANDLING OF EXPLOSIVES .............................................................................................. 74

53. FLOOR OPENINGS ............................................................................................................. 75

54. EVALUATION, SELECTION AND CONTROL OF SUB-CONTRACTORS .......................... 75

55. H&S SHARING & SITE VISITS ............................................................................................ 75

56. CCTV .................................................................................................................................... 76

57. BARRICADE / COVER TO VOIDS, TRENCH, BORED HOLES AND OPEN EDGES OFSTRUCTURE ........................................................................................................................ 76

58. GENERAL SAFETY ............................................................................................................. 76

59. SAFETY (ANTI-FALL) NET .................................................................................................. 78

60. SITE TRANSPORT ............................................................................................................... 78

61. SITE SECURITY ................................................................................................................... 80

62. FLOODING ........................................................................................................................... 85

63. H&S SUBMITTALS TO THE EMPLOYER/ENGINEER ........................................................ 86

64. MONTHLY H&S REPORT .................................................................................................... 87

65. VISITORS TO SITE .............................................................................................................. 87

Appendix: Section 1 –Standard Forms

Section 2 –Guidance Documents

Page 71: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-1 Sign & Stamp of Tenderer

1. STATEMENT OF INTENT

It is the intention of the Chennai Metro Rail Limited to build the second phase of the

Metro system for Chennai in a way that will further raise the standards of Health and

Safety on construction sites to a level that will be recognized as the best in India and

comparable to the highest standards achieved worldwide.

This can only be achieved if there is a commitment from all parties involved in the

construction and management of the Project, from the most senior level of managers

within the CMRL and the Contractors, to the workers on the sites.

This document shall have the full support of all of the CMRL Project Team and any officer

failing to give support to it shall be subject to internal discipline.

The Chennai Metro Rail Limited shall actively support the efforts and initiatives that are

instigated by the Contractors and sub-contractors in their efforts for achieving high

standards of Health and Safety on the Project.

The ingredients that are needed to make and achieve a high standard of Health and

Safety, are well known to most of us, it is however the level of commitment that is

demonstrated that shall determine whether or not we succeed.

This manual represents the minimum standards that the Chennai Metro Rail Limited will

accept on matters of Health and Safety. The Chennai Metro Rail Limited will use its best

endeavors to ensure that all of the Contractors employed on the Project achieve these

Standards

Managing Director

Chennai Metro Rail Limited

Page 72: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-2 Sign & Stamp of Tenderer

2. REFERENCES, LEGAL REQUIREMENT’S AND DISTRIBUTION OF THIS MANUAL

2.1 References

2.1.1 The procedures in this manual should be read in conjunction with;

a) BOCWA means Building and Other Construction Workers (Regulation of

Employment and Conditions of Service) Act, 1996

b) BOCWR means Building and Other Construction Workers (Regulation of

Employment and Conditions of Service) Central Rules, 1998

c) Tamil Nadu building and other construction workers (regulation of employment and

conditions of service) rules, 2006.

d) The Factories Act, 1948 and Tamil Nadu Factories Rules 1950

e) Other Laws of India, Regulations, Rules and Codes of Practice on Health and

Safety that may be applicable.

f) The important Indian Standards and British Standards as applicable to the work of

this contract;

2.2 Legal Requirement’s

2.2.1 The Contractor shall comply with all applicable legislative H&S requirements of India

including any new acts and regulations which may be gazetted during the Contract

period including any amendments or re-enactments thereto.

2.2.2. The Contractor shall comply with all the H&S requirements contained in this specification

and supporting documentation, even where these impose a higher standard than that

required by current India legislation.

2.3 BOCWR Registration, Register of persons employed as building workers and Muster roll

2.3.1 Upon award of the Contract, the Contractor shall register their works as a construction

Industry. A copy of the license shall be submitted to the Employer/Engineer.

2.3.2 The Contractor shall maintain in respect of each registered establishments where he

employs building workers, a register in Form -XV under Schedule-XIII of TBOCWR 2006.

2.3.3 In respect of establishment to which the Payment of Wages Act, 1936 (Central Act of

1936) or Minimum Wages Act, 1948 (Central Act 11 of 1948) or the Contract Labour

(Regulation and Abolition) Act. 1970 (Central Act 37 of 1970) applies, the following

registers and records required to be maintained by a contractor under any of such Acts

or TBOCWR 2006, shall be deemed to be the registers and records maintained by the

contractor under the TBOCWR 2006, namely: -

(a) muster roll;

(b) register of wages;

(c) register of deductions:

(d) register of overtime;

(e) register of fines: and

(f) register of advances.

2.4 Distribution of this Manual

2.4.1 Copies of this Employer Health and Safety Manual are distributed to all Tenderers for

Contracts where this has been shown as a part of a Contract document. It will also be

issued to all appropriate staff of CMRL and all other persons who have need of it.

Page 73: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-3 Sign & Stamp of Tenderer

3. DEFINITION OF TERMS

3.1 Introduction

3.1.1 The following terms used in this manual are defined as follows and shall be construed

accordingly in this document

(a) ‘H&S’ means Health and Safety

(b) Employer means Chennai Metro Rail Limited (CMRL).

(c) BOCWA means Building and Other Construction Workers (Regulation of

Employment and Conditions of Service) Act, 1996

(d) BOCWR means Building and Other Construction Workers (Regulation of

Employment and Conditions of Service) Central Rules, 1998.

(e) TBOCWR means Tamil Nadu Building and Other Construction Workers

(Regulation of Employment and Conditions of Service) Rules, 2006

(f) DG means Director General of Ministry of Labour, Govt. of India

(g) Health and Safety means the freedom from unacceptable risks of personal

harm, i.e. the avoidance of accidents and incidents.

(h) Health means the physical wellbeing of a person and the freedom from any

illness caused working conditions.

(i) Hazard means a situation with the potential to cause harm including human

injury, damage to property, plant or equipment, damage to the environment, or

economic loss.

(j) Risk means the chance of something adverse happening and its severity. It is

a combination of the probability, or frequency, of the occurrence of a defined

hazard and the magnitude of the consequences of the occurrence.

(k) Shall. Indicates a mandatory requirement within this document

(l) Foreseeable means that which is likely or possible.

(m) Chief Health and Safety Expert means an officer nominated by Employer

/Engineer who is the overall responsible for monitoring all H&S functions

prescribed in this document

(n) Site Health and Safety Plan means the contract specific Health and Safety

plan that the Contractor has produced from his Outline H&S Plan.

(o) Accident means an unplanned event that results in personal injury or property

damage.

(p) Incident means an unplanned, undesired event that hinders completion of a

task and may cause injury, illness, or property damage or some combination of

all three in varying degrees from minor to catastrophic.

(q) Near miss means an incident in which no property was damaged and no

personal injury was sustained, but where, given a slight shift in time or position,

damage or injury easily could have occurred.

(r) Dangerous occurrence is defined as:

1) Collapse or failure of lifting appliances or hoist or conveyors or other similar;

2) Collapse or failure of a crane, derrick, winch, hoist or other appliance used

in raising or lowering persons or goods or any part thereof (except the

breakage of chain or rope slings), or the overturning of a crane;

3) Explosion or fire causing damage to the structure of any room or place in

Page 74: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-4 Sign & Stamp of Tenderer

which persons are employed, or to any machine or plant, resulting in the

complete suspension of ordinary work.

4) Electrical short circuit or failure of electrical machinery, plant or apparatus,

attended by explosion or fire, causing structural damage involving its

stoppage or disuse;

5) Explosion of a receiver or container used for the storage at a pressure greater

than atmospheric pressure of any gas or gases (including air) or any liquid

or solid resulting from the compression of gas;

6) Collapse in whole or part from any cause whatsoever of any roof, wall, floor,

structure or foundation forming part of the construction site in which persons

are employed;

7) Total or partial collapse of any overburden, face, tip or embankment on the

construction site;

8) The overturning of, or collision with any object by any bulldozer, dumper,

excavator, grader, lorry or shovel loader, or any mobile machine used for the

handling of any substance on the construction site.

(s) Recordable injury or illness means one that requires medical treatment

beyond first aid, as well as one that causes death, days away from work,

restricted work or transfer to another job, or loss of consciousness

(t) First aid means any one-time treatment, and any follow-up visit for. the

purpose of observation of minor scratches, cuts, burns, splinters, or other minor

industrial injuries, which do not ordinarily require medical care.

(u) Reportable Accident / Incident means an Accident or Incident that is reportable

to the Employer/Engineer. It shall include all fatalities, major injury accidents,

Near Misses / dangerous occurrences and all accidents, which result in

incapacity for more than Twenty -Four hours or more immediately following the

accident.

(v) Major Injury Accident is defined as:

1) Any fracture, other than to the fingers or toes;

2) Any loss of a limb or part of a limb;

3) Dislocation of the shoulder, hip, knee or spine;

4) Loss of sight (whether temporary or permanent);

5) Penetrating injury to the eye; or

6) Any other injury that:

Leads to unconsciousness

Requires resuscitation;

Requires admittance to hospital for more than 24 hours;

or which causes more than 10 days absence from work

4. GENERAL

4.1 Introduction

4.1.1 It is the objective of the CMRL to ensure that the Contract is completed on time, within

budget, and to conforming standards of Health and Safety.

4.1.2 This manual has system wide application, and therefore not all of the sections will apply

to all Contractors. Each Contractor shall develop his\her own contract specific Site

Page 75: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-5 Sign & Stamp of Tenderer

Health and Safety Plan, which will represent his\her approach to the management of

Health and Safety on his\her work, sites under the Contract with CMRL.

4.1.3 It is the intention of CMRL to levy Penalties against contractors who do not comply with

the requirements of this Manual.

4.2 Purpose of the Manual

4.2.1 This manual has been produced in order to outline the minimum Health and Safety,

standards that shall be required by CMRL during construction of the Chennai metro rail

project. Furthermore, the manual has been developed to give guidance and assistance

to the respective Contractors in the development and production of their Site Health and

Safety Plans, to satisfy the required H&S standards established by the Contract

Conditions and the Employer’s Requirements. This manual represents the minimum

standards required and each Contractor is encouraged to expand and improve upon it.

4.2.2 This manual is not intended to replace existing standards that are currently in force in

India. However, it is intended to support the standards and to highlight to Contractors

the areas of concern that shall be addressed in their respective Site Health and Safety

Plans in order to establish good H&S practices.

4.2.3 This document is intended to supplement the Section on Health and Safety Measures

as is contained in the Employer’s Requirements.

4.2.4 The obligations and requirements for Health and Safety set out within this document

are entirely without prejudice and do not derogate from the Contractor’s obligations with

respect to the Contract and his statutory obligations with respect to Health and Safety.

4.3 Scope of the Manual

4.3.1 The Contractor is fully responsible for the Health and Safety of the Works, his personnel,

subcontractors’ personnel, the public and all persons directly or indirectly associated

with the Works or on or in the vicinity of the Site.

4.3.2 This manual provides relevant information and procedures to assist the Contractor to

ensure that his\her employees and sub-contractors work within Health and Safety.

Compliance with the procedures set out in this manual shall not relieve the Contractor

of any of his\her Statutory Duties or his\her responsibilities under the Contract.

4.4 Policy Objectives

4.4.1 Every Contract should aim at zero fatal accidents.

4.4.2 Every Contract should aim at zero dangerous occurrences

4.4.3 Every Contract should aim at an Accident Frequency Rate (AFR) of less than 0.5 per

100,000 hours worked on the Contract.

4.5 Implementation of Policy Objectives

4.5.1 The following general approach has been adopted by CMRL with a view to achieving

the policy objectives set out above

(a) Secure a commitment to H&S working practices by all parties involved in the

construction process, including consultants, Contractors, sub-contractors,

workers' unions, and utility providers.

(b) Develop contract provisions that require Contractors to prepare, implement and

monitor Health and Safety plans, and ensure that sub-contractors are also

obliged to comply with the same.

(c) Arrange accident prevention, Health and Safety management training for all site

staff supervising Contracts.

Page 76: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-6 Sign & Stamp of Tenderer

(d) Establish Site Health and Safety Management Committees to monitor the

implementation of Health and Safety plans and keep a record of the Meetings of

the Committees.

(e) Oversee the Health and Safety performance of the Contractors and sub-

contractors to ensure that their duties and responsibilities on Health and Safety

under the Contract, this Manual, and other relevant Employer and Government

requirements are fully discharged.

(f) To publish and issue any further instruction / appendices needed for any specific

requirement of the Contract

4.6 Responsibility for the Manual

4.6.1 The Directors /Any Other nominated officials of CMRL are responsible for ensuring that

the contents of this Manual continue to meet the requirements of the CMRL and that

they are implemented rigorously.

5. GENERAL DUTIES OF CONTRACTORS AND OTHERS

5.1 Introduction

5.1.1 The Contractor shall be responsible for the H&S of all operations in connection with

the Contract and shall take all necessary actions to ensure the safety of all persons

and property who may be on or adjacent to the Site.

5.1.2 The Contractor shall be responsible for ensuring that his\her sub-contractors;

Interfacing Contractors; and all persons entitled to be on the Site comply with all

relevant legal and contractual requirements including the Contractor’s site Health and

Safety Plan and shall enforce its compliance.

5.1.3 Securing safe, healthy places of work requires the full co-operation of Contractors and

sub- contractors and the persons employed by them. It is imperative that there is no

ambiguity with regard to the responsibilities of any individuals in connection with duties

relating to Health and Safety.

5.1.4 The responsibilities shall be clearly detailed in the Site Health and Safety Plan from

the level of the most Senior Manager downwards, these duties shall be explained to

the individuals concerned in order to ensure that they clearly and concisely understand

them.

5.1.5 Responsibilities for H&S shall be allocated amongst others to the following personnel

of the contractors and sub-contractors:

(a) CEO / Managing Director:

(b) Project Director /Project Manager:

(c) Site Manager:

(d) Engineers:

(e) Chief ESHS Manager:

(f) Supervisors:

(g) General Workers

5.2 General Duties of Persons Employed

5.2.1 Every person employed by Contractors and sub-contractors on construction sites are

obliged to comply with the general duties imposed on them under the Contract. Every

person employed should, not only avoid careless or reckless behaviour, but should

also take positive steps to understand workplace hazards. They must follow all

necessary H&S rules and procedures, and ensure that their acts or omissions at work

do not put the Health and Safety of self or others at risk.

Page 77: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-7 Sign & Stamp of Tenderer

5.3 Contractors and Sub-contractors: Responsibilities

5.3.1 Contractors and sub-contractors are responsible for complying with all statutory and

contractual requirements on H&S including the general duties imposed on them under

the Laws and Regulations of the Government of India, Government of the Tamil Nadu

and other relevant authorities.

5.3.2 The Employer /Engineer shall only deal with Health and Safety matters through the

Contractor and shall hold the Contractor responsible for all his\her and his\her Sub-

contractors, actions. All Sub-contractors shall be responsible to the Contractor.

5.3.3 All Contractors and Sub-contractors shall ensure that an adequate level of competent

supervision is maintained at the workplace at all times with all supervisory staff

having the relevant knowledge, training, and job specific experience to enable them to

supervise the work in a proper manner.

5.3.4 Contractors shall ensure that all sub-contractors are able to demonstrate a successful

track record with regard to the management of Health and Safety. The type of

information that shall be requested from the sub-contractors during the tendering

process in order to determine their suitability shall include amongst other things the

following information relating to their activities over the last five years

(a) Fatal accidents

(b) Major lost time accidents

(c) Accidents involving members of the public

(d) Dangerous Occurrences

5.3.5 Contractors and sub-contractors are responsible for submitting written statements on

their policies relating to construction Health and Safety within 28 days of a requirement

to do so by Employer/Engineer.

5.3.6 Contractors and sub-contractors are responsible for providing comprehensive Health

and Safety plans for the review by Employer/Engineer, and for subsequent

implementation of the measures detailed in the Health and Safety plans.

5.3.7 Contractors and sub-contractors are responsible for the provision of suitably trained

and qualified Health and Safety staff to carry out regular H&S inspections, H&S

promotion, and H&S audits and for retention of records of all such activities for

inspection by Employer/Engineer.

5.3.8 Contractors and sub-contractors are responsible for providing H&S third party

approved training agency shall conduct training to all workers and supervisors on site,

and for retention of records of such activities for inspection by the Employer/Engineer.

5.3.9 Contractors and sub-contractors are responsible for organising site Health and Safety

committees which shall meet at least monthly.

5.3.10 Contractors and sub-contractors are responsible for reporting Near Miss, dangerous

occurrences, First Aid Injury, Minor Injury, Major Injury, Incidents and accidents to the

Employer/ Employers Representative by the quickest practicable means.

5.3.11 The Contractor shall establish a set of in-house H&S rules and regulations based on

industry standards and legislation for the Employer /Engineer’s acceptance. The

Contractor shall display sufficient copies of these rules and regulations on Site,

translated into languages understood by the workers.

5.4 Discipline

5.4.1 Any major breaches of the Site H&S Plan, relevant Statutory Provisions and Health

Page 78: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-8 Sign & Stamp of Tenderer

and Safety Codes, or any other blatant disregard for the Health and Safety by any

person directly or indirectly associated with the works may result in the CMRL

exercising their authority in requiring the removal from the Site of the Contractor’s Site

Manager and/or other personnel.

5.4.2 The Contractors shall develop a system of disciplinary measures and procedures,

which shall be implemented immediately that the site activities commence. These

measures and procedures should include amongst other things:

(a) The issue of Warning Notices.

(b) The removal from site of personnel who disregard Health and Safety

instructions.

5.5 Any person who is removed from the site for breach of Health and Safety measures

shall not be allowed to be re-employed on any other CMRL worksite.

5.6 Health & Safety (H&S) Personnel.

5.6.1 The Employer /Engineer shall require the replacement of the appointed H&S personnel

if the performance of the H&S personnel is not up to the Employer /Engineer

expectation.

6. HEALTH AND SAFETY TRAINING AND H&S PROMOTION

6.1 Health and Safety Training

6.1.1 Health and Safety Training is an important factor in managing H&S on construction

sites. All contractors shall provide as a minimum training as per the H&S contract

requirement’s:

6.1.2 Induction Training shall be given to all persons prior to permitting them to go to the

worksite. The worker’s ID Card should not be issued until this training has been given.

Incorporate virtual reality (VR) technology for workers training. This training should

include at least the following:

(a) General Health and Safety awareness

(b) First aid

(c) Emergency procedures

(d) Use of personal protective equipment

(e) Specific site hazards

6.1.3 Refresher Training shall be conducted at least every six months by the third-party

agency approved by the Employer/Engineer to ensure that all workers on site are kept

up to date with Health and Safety requirements on site.

6.1.4 Specific Training shall be conducted at least every six months by the third party

agency approved by the Employer/Engineer for Crane Operators, EOT Operators,

Gantry Operator’s, Fork Lift Operators, Piling Rig Operator’s, Grab Operator’s, Lifting

Supervisor, Banksmen, Slingers, Loco Operations and Plant Operators etc. Provide

personnel competency stickers to identify competent users.

6.1.5 Toolbox Talks shall be conducted so that every worker on site. These talks should be

designed to highlight relevant Health and Safety issues to the workforce on a regular

basis in order to raise their level of awareness. These should be prepared so that they

can be presented by the Site Supervisors.

6.1.6 Toolbox Meetings shall be conducted daily specific to the work performed for the day

before work commences. Workers shall be briefed on the day’s activities, the H&S

precautions to be observed, the safe work practices to be followed, and each

Page 79: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-9 Sign & Stamp of Tenderer

individual’s PPE will be checked as to its suitability, and its correct use explained where

necessary.

6.1.7 The Contractor shall setup a safety training centre to train workers on workplace on

H&S capable of providing training to at least 20 workers at a time. The training room

shall be provided with all the necessary audio and visual training facilities.

6.1.8 The Contractor shall ensure that no personnel including Interfacing Contractors work

on site prior to the completion of the Contractor’s in-house Health and Safety induction

training and obtaining a security pass. The Contractor shall ensure that training

information is given in languages understood by the trainees.

6.1.9 The Contractor shall develop and implement a comprehensive assessment system to

assure the competency of his\her supervisory staff, lifting crew and machine operators

prior to their deployment for works. The assessment system shall include face-to-face

interviews and written tests that adequately evaluate appreciation of Health and Safety

hazards associated with respective works, Safe Work Practices etc.

6.1.10 The Contractor shall implement an identification system on site to clearly identify all

the qualified personnel and operators.

6.1.11 The Contractor shall ensure that all personnel and in particular new personnel, or

personnel transferred to new assignments are given proper Health and Safety training

relevant to their duties.

6.1.12 All training that is carried out shall be formally recorded on dated and signed

attendance records, with copies of the records being kept on the sites for inspection

by the Employer/ Engineer. Details of the respective training course programmes shall

be produced, on demand or as per intervals prescribed, which include the following

information:

(a) Course Title.

(b) Course Duration.

(c) Course Content.

(d) Target Audience.

6.1.13 Actual Audience with record of attendance.

6.1.14 The Contractor shall keep detailed records of all training undertaken and shall keep

such records available for inspection by the Employer/ Engineer.

6.1.15 The minimum Employer’s requirement of training needs for various categories of

employees are given in general instruction GSAF 004.

6.1.16 The Profile of the training Agency, ISO certifications, course details, the name,

educational qualifications, and experience for of the trainers are to be submitted to the

Employer/Engineer a minimum 28 days before prior to appointment of the agency.

Only upon notice of no objection by the Employer /Engineer shall be authorised to

deliver training on CMRL sites.

6.1.17 In case of failure on the part of the contractor for various categories of employees are

given in general instruction GSAF 004 training programs to all employees in time, the

same shall be provided by the Employer /Engineer through accredited agencies if

required by formulating a common scheme to all contractors. It is mandatory for the

contractors to participate in the common scheme. Any administrative expenses and

training fee towards the same shall be at the cost of the contractor.

6.1.18 The Contractors may utilise the services of H&S agencies empanelled under Rule 250

Page 80: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-10 Sign & Stamp of Tenderer

of TBOCWR 2006 and Rule 297 of TBOCWR 2006 for the purpose of training, internal

audit, and any other H&S services with prior approval of the Employer /Engineer.

6.2 Health and Safety Promotion

6.2.1 The Contractor shall develop an annual H&S promotional programme to demonstrate

his\her commitment to advancing the H&S culture at the Site and reinforcing the

concept that H&S and construction are inseparable. The programme shall enhance

personal H&S awareness and influence all attitudes and behaviour of all personnel on

H&S matters. The programme shall consist of general promotional activities which are

carried out as part of a day-to-day activity and high impact promotion activities which

are carried out as a campaign to reinforce a particular H&S point at the Site. The H&S

promotional programme shall be revised and updated at least once a three months.

6.2.2 The Contractor shall organise a minimum of twelve campaigns covering H&S related

topics for each calendar year.

6.2.3 In addition to clause 6.2.2, the Contractor shall conduct regular ‘Safety Time-out’

sessions. This is to allow Contractor to take stock and refocus on safety, review current

work activities and its associated hazards, as well as to identify additional safety

measures required to maintain high standards on the worksites. The Contractor may

conduct the ‘Safety Time-out’ sessions on a site-wide basis or to focus on specific work

activities or subcontractors at different stages of their works. The Contractor shall

submit a schedule and programme for the ‘Safety Time-out’ to the Employer /Engineer

for approval.

6.2.4 The Contractor shall divide the worksites into designated work areas, each lead by

his\her engineers or competent supervisors (including charge-hand/ foreman/team-

leader) who will be responsible for the area’s H&S performance. The H&S performance

for each work area shall be assessed monthly and corrective actions shall be taken to

raise safety performance. The monthly H&S assessment shall include, but not limited

to accident statistics and substandard practices and conditions recorded at various

H&S inspections for the particular work area. The teams that meet H&S targets shall

be duly recognised and rewarded. The recognitions shall include both monetary and

non-monetary rewards and be given out at a suitable event attended by the workforce

or as directed by the Employer /Engineer.

6.2.5 The Contractor shall produce at least twelve H&S digital one hour each videos to raise

the H&S awareness and standards of its workforce. The topics and contents for the

H&S videos shall be decided by the Employer /Engineer. The videos shall be

professionally produced, be of High Definition (HD) quality and translated into the

respective native languages of the workforce. The Employer /Engineer shall have the

rights to the H&S videos produced.

6.2.6 Suggestions for such promotions may include such items as the issue of the following

as rewards to individuals for good Health and Safety performance:

(a) Key Rings.

(b) T-Shirts

(c) Holdall Bags

6.2.7 Other H&S award and Safety incentive schemes should be considered.

6.2.8 Regular H&S Poster Campaigns / Billboards / Banners / Glow signs should be devised,

with posters displaying H&S related issues being displayed around the worksites as

part of the effort to raise H&S Awareness amongst the workforce. Posters should be

Page 81: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-11 Sign & Stamp of Tenderer

in Hindi, Tamil and English and other suitable language deemed appropriate. Posters

/ Billboards / Banners / Glow signs should be changed at least once a month to

maintain their impact.

6.2.9 The contractor shall also observe important days as listed in General Instruction GSAF

017 and printing and displaying Health and Safety signage and posters as listed in

General Instruction GSAF 017.

6.2.10 The list indicated are the minimum requirements of the Employer and the contractor is

encouraged to further the H&S communication activities by formulating suitable reward

schemes for safety performers and any other activities, which deem fit for the purpose.

7. HEALTH AND SAFETY AUDIT AND FOLLOW UP ACTION

7.1 Audit by Contractor’s Health and Safety Supervisory Staff

7.1.1 The Contractor shall carry out internal H&S audits continuously. In addition, informal

spot checks should be carried out more frequently on critical site activities.

7.1.2 A written record shall be kept of the daily findings and the results of inspections should

be brought to the line manager having responsibility in the area concerned, together

with the necessary remedial action and due date for completion. Any corrective action

shall be immediately implemented by the line manager and followed up by the ESHS

personnel. The Contractor shall submit records of inspection report to the Employer

/Engineer.

7.1.3 Inspection of shoring of formwork, side supports of excavations and trenches, cranes

and scaffolds should be carried out after any episode of inclement weather which may

affect their stability / integrity.

7.1.4 The Contractor’s senior site management shall participate in the Employer /Engineer

weekly safety inspection and to clearly records all the observations /findings of sub-

standard safety practices and to submit their compliance action against each along

evidence photographs and to communicate it officially to the Employer /Engineer

before next weekly safety inspection for due verification .Failing above ,the Employer

may suspend all such works to the extent where in the contractor failed to address

compliance action.

7.1.5 In addition to above, the contractor’s senior site management to also participate in the

Employer / Engineer monthly, quarterly, and annual ad- hoc safety inspections and

meetings as and when required. The Contractor shall close out the inspection findings

to the full satisfaction of the Employer /Engineer.

7.1.6 The Employer /Engineer shall require the Contractor to suspend a part of the works or

the whole of the works if it is deemed to be unsafe. The Contractor shall be required

to rectify the substandard condition or practice till the satisfaction of the Employer

/Engineer. In such events, the Contractor shall not be entitled to any claim for

compensation or Extension of Time for Completion.

7.1.7 For each Contract the Contractor shall prepare a comprehensive occupational Health

and Safety inspection check list, as a requirement of the OH&S Plan. This checklist

can then be used for:

a) inspections by the Contractor's OH&S Managers.

b) monitoring of the Contractors' OH&S inspections by the Site OH&S

Management Committee.

7.1.8 In relation to Works Contracts, the insurers providing insurance cover for Contractor's

Page 82: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-12 Sign & Stamp of Tenderer

All Risks and Third Party liability may visit the sites with a view to checking whether

the Contractors have taken adequate occupational Health and Safety precautions

against damage to the works.

7.1.9 The Contractor’s senior management shall give a presentation on their safety

commitments to the Employer /Engineer on a monthly basis or when deemed

necessary by the Employer /Engineer.

7.1.10 The agenda for the presentation shall be as follows:

a) The proposed OH&S targets, goals and strategies in achieving them.b) A brief review on the past safety performance, including accident statistics,incident/accident/near misses reported with actions taken to address the shortcomings;c) An overview of the safety challenges over the next six (6) months including plans andstrategies devised to mitigate these risks.d) The OH&S hazards arising from these work activities; ande) Any other critical OH&S related issues

7.2 Follow up actions

7.2.1 Remedial action to rectify any deficiency identified or unsafe practices discovered

during the H&S inspections should be implemented immediately. Until the remedial

action is taken the task may be discontinued.

7.2.2 In cases where the Employer's /Engineer believe that the Contractor's or sub-

contractors' workmen are using unsafe working methods, the Contractor's

Representative should be informed by them as soon as possible. If the unsafe activity

continues, it shall be reported to the Employer's /Engineer.

7.2.3 If the Contractor's working method is deemed so unsafe as to represent a risk to life,

the Employer's /Engineer may require specific actions by the Contractor, such as

proposals on preventive/remedial measures, or suspension of relevant portions of the

works, and introduction of measures deemed necessary. All such instructions shall be

confirmed in writing and shall include a provision that the issue of the instruction shall

not relieve the Contractor of his\her responsibilities under the Contract or Statutory

obligations. The Employer/Engineer may also invoke a penalty on the Contractor in

accordance with H&S contract Requirements

7.3 External H&S Audit

7.3.1 General

7.3.2 External H&S audits shall be conducted by external H&S agency approved by the

Employer/Engineer that is competent with ISO 45001:2018 / ISO Lead Auditor

/DGFASLI qualified auditors.

7.3.3 The audit company engaged by the Contractor shall be accepted by the Employer

/Engineer. The audit company shall present and submit their audit methodology

including detailed resumes of their audit team and audit checklist for the

Employer/Engineer acceptance before commencement of any audits. The audit

company is required to give a presentation of the audit findings to the Employer

/Engineer.

7.3.4 The audit report and its corrective actions shall be brought to the attention of all sub-

contractors and copied to the Employer /Engineer.

7.3.5 Periodicity

7.3.6 External H&S report.

7.3.7 For all audits done on a routine basis and audits undertaken due to the deterioration

Page 83: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-13 Sign & Stamp of Tenderer

or occurrence of a major incident, the cost shall be borne by the Contractor

7.4 Areas of competence of Audit team

7.4.1 Practical understanding of BOCW Act and Rules, statutory requirements on

health/medical and welfare of workmen, construction hazards and its prevention and

control, traffic management, electrical safety, rigging, safety of construction equipment

and environment management.

7.4.2 Audit shall be conducted as per the guidelines of ISO, ILO, national & international

standards. Audit report shall also be presented as per the referenced formats.

7.4.3 Targets of H&S Audit:

7.4.4 The contents and coverage of the external audit shall include the following items;

7.4.5 H&S management:

i) Organization

ii) Communication and Motivation

iii) Time office

iv) Inspection

v) Emergency preparedness

vi) Budget allocation

vii) Education and Training

viii) Work permit system.

7.4.6 Technical:

i) Building and Structure

ii) Construction operational Health and Safety

iii) Design Safety

iv) Material safety

v) Hand tools and Power tools

vi) Electrical system

vii) Safety Appliances

viii) Fire prevention and control

ix) Housekeeping

x) Plant & Machinery safety

xi) First-aid and Medical Facilities

xii) Welfare measures

xiii) Environmental Management

7.4.7 Internal and External Audit Documents:

7.4.7.1 Contractor shall make the below listed documents available for the review by the Audit team.

i) H&S policy

ii) Construction Phase H&S Plan

iii) H&S Rules and regulation

iv) H&S organization chart

v) Annual H&S objectives / programs

Page 84: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-14 Sign & Stamp of Tenderer

vi) Accident / near miss statistics and analysis

vii) H&S Training program / records for all personnel

viii) Operating manuals and maintenance manual of all plant and equipment

ix) Safe worthiness certificates of all lifting appliances and gears

x) Medical fitness record for all personnel

xi) Risk identification, assessment and control details

xii) Environmental management reports

xiii) Emergency management records including mock drills

7.4.8 Audit Preparation:

i) Audit team members are required to gather information by observations

through interviews and by checks of hardware and documentation.

ii) Audit team shall prepare a checklist to cover all parts based on the H&S

legislations rules and regulations and CMRL requirements.

iii) Audit team members shall verify the facts and findings leading to the identified

gaps and weakness.

iv) Audit leader has overall responsibility for reaching a conclusion.

7.4.9 Reporting:

7.4.9.1 Audit report shall be prepared and directly sent to the Employer/Engineer within 7

days of conducting the audit with a copy to the contractor.

7.4.10 Report contents:

i) Executive summary - based on the finalized checklists as written the findings to

the Employer/Engineer by the audit team members, the audit leader will compile

a concise and accurate summary of observations and findings.

ii) Introduction - this will contain basic information regarding the facilities or

organization audited, the specific audit dates (inclusion of those for preparation

and post-audit activities).

iii) Principal positive findings - This will contain the summary of positive aspects as

observed by the auditors. It will also contain highlights of those issue, which may

warrant dissemination as best practice regarding methodology used or

achievement.

7.4.11 Conformity Report & Action by Employer/Engineer

7.4.11.1 In case of non-conformity of items identified by auditor, the Employer/Engineer shall

take necessary steps including stoppage of work and or imposing of any penalty to

ensure satisfactory execution.

7.4.11.2 Failure of contractor to conduct External H&S Audit

7.4.11.3 If the contractor fails to conduct the external H&S audit in time, the Employer/Engineer

at the cost of contractor shall implement through the appointment of an external H&S

agency.

8. CONTACTOR’S SITE ESHS COMMITTEES

8.1 General

8.1.1 All employees should be able to participate in the making and monitoring of

Page 85: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-15 Sign & Stamp of Tenderer

arrangements for Health and Safety at their place of work. The establishment of site

H&S committees in which employees and Contractor and sub-contractor management

are represented can increase the involvement and commitment of employees. The

Contractor shall set up such site H &S committees to promote and monitor H&S on

their worksites. A copy of the agenda shall be forwarded to the Employer/Engineer

seven days prior to the meeting date, in order that they can decide if it is necessary for

them to attend.

8.2 Composition and Functions of Contractor’s ESHS Committees

8.2.1 The Contractor should form a Health and Safety committee for each contract, however,

should the situation require more than one committee, or the Employer/Engineer so

requires, additional committees shall be created.

8.2.2 The Contractor shall adopt the following format for his\her H&S Committee Meeting.

i) To monitor the adequacy of the Contractor's Site H&S Plan and ensure its

implementation

ii) Chairman’s review of H&S performance/ condition.

iii) Report from the Secretary.

iv) Report from H&S Representatives.

v) To monitor H&S Inspection Report.

vi) To study of accidents & Incidents report.

vii) To study accident statistics and trends so as to identify unsafe practices and

conditions.

viii) To review the emergency and rescue procedures

ix) To review site safety training

x) To promote H&S on site

xi) Reports on status of authorities visits and discuss follow up actions.

xii) To discuss the Contractor's monthly Health and Safety report

xiii) H&S Talk by Committee Members.

xiv) Report from the Employer /Engineer; and

xv) To take follow up actions on minutes of meeting /Any Other Business.

8.2.3 The Membership of the committee should be as follows:

Chairman: The Contractor’s Project Manager for the Contract.

Secretary: The Contractor’s Chief ESHS Manager

Members: Contractor's and Sub-contractor’s management

representatives and Health and Safety staff. In attendance

as and when they wish, Representatives of the Employer

and the Engineer

8.2.4 Meetings should be held at least once every month

8.2.5 The Committee shall inspect the Site at least one week before each month’s meeting.

8.2.6 Minutes of the Site Health and Safety Committee shall be sent to all members within

two working days of the meeting. Copies of the minutes should be displayed on notice

boards so that employees are kept informed of the Site H&S Committee's activities

and decisions.

Page 86: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-16 Sign & Stamp of Tenderer

8.3 ESHS Coordination Meeting

8.3.1 The Contractor shall conduct weekly ESHS co-ordination meetings with his\her sub-

contractors and Interfacing Contractors to ensure that works are carried out on Site

with minimum risk to workers and to the public. The meeting shall plan and co-ordinate

all works on site including the movement of plant, equipment & hazardous materials

and also review safe work practices, permit to work procedures, training, PPE and

incidents. The meeting shall also inform personnel of potentially dangerous works

operation at the Site.

8.3.2 During co-ordination meetings on combined services drawings (CSD), Structural,

Electrical and Mechanical (SEM) & Co-ordinated installation programme (CIP), the

following items shall be included in the meeting agenda

i) Planning and sequencing of work activities and identify incompatible works

between contractors working in the same area;

ii) Identification of risks and hazards of the interfacing works, including the

conduct of site walk to verify these hazards;

iii) Highlighting potential high risk zones during handing over; and

iv) Developing a site map to show delivery routes and designated storage

area for the Contractor and Interfacing Contractors

8.4 Employer /Engineer Project ESHS Committee

8.4.1 The Employer /Engineer may require the Contractor’s Project Director /Project Manager

and ESHS personnel to attend the Employer /Engineer Project Health and Safety

Committee meeting for reviewing their ESHS provisions on site.

9. REPORTING OF ACCIDENTS AND DANGEROUS OCCURRENCES

9.1 Contractors Responsibility

9.1.1 All accidents and dangerous occurrences including Near Misses shall be recorded,

regardless of whether or not personnel injury occurs.

9.1.2 The Employer and the Engineer shall be notified by the quickest possible means, for

example by SMS, telephone of the following classifications of accidents and incidents

and by subsequent written (Preliminary notification report) within 24 hours on the

Contractors Accident and Incident Reporting Form

a) Fatal Accident

b) Major Injury Accident

c) Near Miss / Dangerous Occurrence

d) Any Incident Involving a member of the Public

9.1.3 The Chief ESHS Manager shall conduct in depth investigations into all fatal accidents,

major injury accidents, incidents involving a member of the public, dangerous

occurrences and Near Misses. Copies of these investigations shall be forwarded to the

Engineer within 72 hours of the incident.

9.1.4 The Contractor shall report immediately by telephone, SMS (Contract No, Company

Name, Location in charge, Date and time of the incident, Location, Witness,

description, Action taken, sent by) communication and in writing, all fatal accidents,

and other occurrences requiring reporting, to the police, at the police station

in whose jurisdiction the accident occurred.

Page 87: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-17 Sign & Stamp of Tenderer

9.2 Reportable Accidents

9.2.1 An accident shall also become reportable to the Employer /Engineer if it causes incapacity for more than 24 hours excluding the day of the accident. The Contractor must submit an investigation report to the Employer /Engineer within 72 hours of the incident.

9.2.2 The following information is required in reporting an accident to the Employer /Engineer.

a) Particulars of the Contractor or Sub-contractor employing the injured person.

b) Particulars of the deceased or injured person: name, address, occupation, sex, andage.

c) The date, cause, or circumstances of the accident; and

d) The nature of the injury, stating whether death or incapacity was caused by the injury.

9.3 Dangerous Occurrences

9..3.1 The Employer /Engineer requires that all dangerous occurrences on site must be

reported in writing (Preliminary accident notification report) to him within 24 hours,

irrespective of whether there are casualties or not. The following information has to be

provided:

a) The time of the occurrence.

b) Damage to any building, machinery, or plant; and

c) The circumstances in which the accident occurred.

9.4 Reporting of Fires by Contractor

9.4.1 The Contractor shall report to the Employer /Engineer all fires which occur on site

including any fires that have been extinguished by the Contractor himself, and the

Employer /Engineer may send staff to investigate such fires. The following information

should be provided:

a) Time of fire.

b) Location of fire.

c) Means of extinguishing the fire.

d) Injury to any person/damage to any property; and

e) The probable cause of fire.

f) This action is in addition to reporting the incident to the Chief Fire Officer

and Police in accordance with local regulations.

9.5 Reporting to the Employer /Engineer

9.5.1 The Contractor shall duly complete standard forms on dangerous occurrences, Near

Miss, Major Injury, Minor Injury, First Aid Cases, Non Reportable Cases, Fatal and

accidents as required by the Employer /Engineer to enable the Employer /Engineer to

prepare a database on accident statistics. The Contractor shall deliver to the Employer

/Engineer a copy of any statutory reports he submits to the Relevant Authorities.

9.5.2 The following in reporting Accidents shall attract Penalties

• Fatal accidents or major injuries and dangerous occurrences not reported

immediately to Employer

• Abnormal delay in reporting accidents or wilful suppression of information about

any accidents / dangerous occurrence

• Delay in informing about any accidents / dangerous incidents

Page 88: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-18 Sign & Stamp of Tenderer

• Not submitted a preliminary accident notification within 24 hours

• Not submitted accident investigated report within 72 hours

• Employers’ independent incident investigation

• Contractor and his\her staff not extend necessary co-operation and do not

testify about the accident.

• The contractor not take effort to preserve the scene of accident till the Employer

/ Engineer complete the investigation.

• All persons summoned by the Employer / Engineer in connection to witness

recording not obey the instructions

9.5.3 The Contractor shall send a monthly report to the Employer /Engineer of all accidents

and dangerous occurrences, Near Miss, Major Injury, Minor Injury, First Aid Cases,

Non-Reportable Cases, Fatal whether they are of a serious nature or not.

10. ACCIDENT INVESTIGATION

10.1 General

10.1.1 Investigations should be conducted in an open and positive atmosphere that

encourages the witnesses to talk freely. The primary objective is to ascertain the facts

with a view to prevent future and possibly more serious occurrences. Accidents are

rarely just the fault of the worker. If the worker has not been trained, instructed or

properly supervised then the fault may well lie with management.

10.1.2 Accidents and Dangerous Occurrences which result in death, serious injury or serious

damage must be investigated by the Contractor immediately to find out the cause of

the accident/occurrence so that measures can be formulated to prevent any

recurrence. (Refer to the advice contained in 10.2.1 below.)

10.1.3 Near misses and minor accidents should also be recorded and investigated by the

Contractor as soon as possible as they are signals that there are inadequacies in the

Health and Safety management system.

10.2 Recommended actions in incident investigation

10.2.1 It is important after any Accident or Dangerous Occurrence that information relating to

the incident is gathered in an organised way. The following steps are recommended.

a) Take photographs and make sketches

b) Examine involved equipment, work piece or material and the environmental conditions

c) Interview the injured, eyewitnesses and other involved parties

d) Consult expert opinion where necessary

e) Identify the specific Contractor or Sub-contractor involved.

10.2.2 Having gathered information, it is then necessary to make an Analysis of Incident

(a) Establish the chain of events leading to the accident or incident

(b) Find out at what stage the accident took place

(c) Consider all possible causes and the interaction of different factors that led up to

the accident, and identify the most probable cause

Note: The cause of an accident should never be classified as carelessness. The

specific act or omission that caused the accident must be identified.

Page 89: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-19 Sign & Stamp of Tenderer

10.2.3 The next stage is to proceed with the Follow-up Action

(a) Report on the findings and conclusions

(b) Formulate preventive measures to avoid recurrence

(c) Publicise the findings and the remedial actions taken

11. ACCIDENT STATISTICS

11.1 Introduction

11.1.1 Accident data, if properly collected and analysed, indicates trends, and can show

where and how problems arise. Comprehensive accident information enables accident

prevention efforts to be targeted at problem areas.

11.2 Collection of Accident Statistics

11.2.1 The procedures that apply for the reporting and collation of data in respect of accident

statistics are set out below.

11.2.2 The Contractors’ ESHS Manager are required to send duly completed Report Forms

to the Employer / Engineer. The Construction Accident Statistics Monthly Report Form

must be submitted even if there are no injuries or dangerous occurrences within the

current month.

11.2.3 Man-hours' is defined as the man-hours worked by all persons employed on site.

(including site supervisory staff, management staff and clerical staff).

11.2.4 'Man-days' is defined as the man-days worked by all persons employed on site.

(including site supervisory staff, management staff and clerical staff).

11.3 Calculation of man-days lost - Construction Accident Statistics

11.3.1 When calculating the man-days lost for the Construction Accident Statistics Summary

Sheet, the following applies:

The number of man-days lost refers to the total number of man-days lost during the

reported month due to:

(a) Non-fatal reportable accidents which happened within the reported month

(b) Non-fatal reportable accidents which occurred in previous months.

The day on which the reportable accident occurred should be excluded in calculating

man- days lost but public holidays within the injured period should be counted.

11.4 Calculation of Accident Frequency Rate (AFR)

The Accident Frequency Rate (AFR) per 100,0000 man-hours worked shall be

calculated using the following formula

x 100, 0000

12. HAZARD IDENTIFICATION AND RISK ASSESSMENT

12.1 General

12.1.1 The purpose of Hazard Identification and Risk Assessment is to identify all the

significant hazards, which may occur during the construction phase, and to rank them

according to their severity. Having ranked the risks by severity the Contractor shall

then introduce measures to mitigate the effects of that risk.

No. of reportable accidents

Man-hours worked

Page 90: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-20 Sign & Stamp of Tenderer

12.1.2 Prior to the commencement of any potential High-Risk operations the Contractor shall

conduct a detailed hazard analysis and risk assessment of the task and shall record

his\her findings on appropriate worksheets.

12.1.3 The worksheets should then show what measures the Contractor is going to take to

reduce the level of risk to acceptable levels.

12.2 Method Statements and Lift Plan

12.2.1 As a result of the Hazard Identification and Risk Assessment detailed method

statements shall need to be produced for medium and high-risk activities including

amongst others the following:

(a) Craneage of items in excess of 1 tonne lift plan shall be submitted to theEmployer/Engineer

(b) Erection of steel structures.

(c) Excavations deeper than 2m.

(d) Erection and loading of formwork

(e) Demolition.

(f) Inflammable materials – the use and storage

(g) Use and storage of explosives

12.2.2 Method Statements will usually be attached to Design Submissions but should be

cross- referenced to the Contractor’s Site Health and Safety Plan.

12.2.3 A method statement should contain sufficient information to enable the task to be

undertaken safely and should contain as a minimum the following information

(a) Introduction – A brief outline of the Task

(b) Details of the Risks involved and mitigation thereof.

(c) A step by step description of how the task is to be undertaken detailing

What needs to be done;

The order in which the task will be carried out;

What plant or equipment is required;

Who the task will be done by;

Who will supervise the task;

Where will the task take place;

When will the task take place;

The precautions which must be taken before the task is undertaken.

What to do if things go wrong;

12.2.4 The Contractor shall identify all safety critical activities and ensure that a method

statement is prepared for each activity and accepted by the Employer /Engineer

before commencement of such activities.

12.2.5 The Contractor shall address all comments on the method statement arising from

12.2.6 the Employer /Engineer review. The Contractor shall fully comply with the method

statement approved by the Employer /Engineer. If there is any intention to change

the method of work, the Contractor shall seek approval from the Employer /Engineer.

12.3 Permits to Work

12.3.1 The Contractor shall develop a permit-to-work system, which is a formal written system

used to control certain types of work that are potentially hazardous. A permit-to-work

Page 91: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-21 Sign & Stamp of Tenderer

is a document, which specifies the work to be done, and the precautions to be taken.

Permits-to- work form an essential part of safe systems of work for many construction

activities. They allow work to start only after safe procedures have been defined and

they provide a clear record that all foreseeable hazards have been considered. Permits

to Work are usually required in high-risk areas as identified by the Risk Assessments.

12.3.2 A permit is needed when construction work can only be carried out if normal

safeguards are dropped or when new hazards are introduced by the work. Examples

of high-risk activities include but are not limited to:

(a) Work close to 25kV overhead Catenary/contact system

(b) Entry into Confined Spaces.

(c) Work in Close Proximity to Overhead Power lines and Telecommunication Cables.

(d) Hot Work permit.

(e) To Dig—where underground services may be located.

(f) Work with moving construction locomotives.

(g) Working on Electrical Apparatus.

(h) Work with Radioactive isotopes.

(i) Lifting permit for critical activity

(j) Permit to dig

12.3.3 The permit-to-work system should be fully documented, laying down:

(a) How the system works;

(b) The jobs it is to be used for;

(c) The responsibilities and training of those involved; and

(d) How to check its operation;

12.3.4 The permit-to-work form must help communication between everyone involved. It

should be designed by the Contractor issuing the permit, taking into account individual

site conditions and requirements. Separate permit forms may be required for different

tasks, such as hot work and entry into confined spaces, so that sufficient emphasis can

be given to the particular hazards present and precautions required.

12.3.5 The permit to work form should contain:

(a) Clear identification of who may authorise particular jobs (and any limits to their

authority);

(b) Clear identification of who is responsible for specifying the necessary

precautions (e.g. isolation, emergency arrangements, etc);

(c) A detailed description of the task clearly identifying the work to be done and the

associated hazards;

(d) Plans and diagrams be used if appropriate to assist in the description of the

work to be done, its location and limitations;

(e) Identity of the hazards and the precautions to be taken;

(f) Clear rules about how the job should be controlled or abandoned in the case of

an emergency;

(g) The time limitations should be stated;

(h) Job specific toolbox talk conducted by the supervisor

12.3.6 A Permit to Work authorisation form shall be completed with the maximum duration

Page 92: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-22 Sign & Stamp of Tenderer

period not exceeding twelve hours.

12.3.7 A copy of each Permit to Work shall be displayed, during its validity, in a conspicuous

location in close proximity to the actual works location to which it applies.

12.3.8 A pre-permit activation job specific toolbox talk shall be conducted by the supervisor

including amongst others the following.

(a) All identified hazards are explained;

(b) Risk mitigation process clarified;

(c) Method of work explained stressing points (a) and (b) above;

(d) Emergency response procedure is clarified and persons assigned tasks in the

event of an emergency;

(e) Personal protective Equipment (PPE) requirements including PPE

serviceability checks and training if required;

All workers and supervision shall attend the toolbox talk and sign the toolbox

attendance register. Any person/s coming late to the work site shall be given the

toolbox talk and sign the attendance register

A copy of the toolbox talk and attendance register shall be displayed as per section

12.3.7 of this manual.

13. EMERGENCY PREPAREDNESS PLAN

13.1 Emergency Situations

13.1.1 Every Contractor shall formulate an Emergency Preparedness Plan for each of his\her

sites. These plans will address foreseeable emergencies that may arise during the

construction activities. Examples of activities for which plans should be prepared

include amongst other things:

(a) An Accident Which Results in Death or Major Injury.

(b) A Serious Fire That Threatens Life.

(c) A Flood That Threatens Life.

(d) Leakage of Any Dangerous Materials or Chemicals.

(e) Leakage / Short Circuit of any Electrical supply.

(f) Major Engineering Failures such as:

Collapse of tunnels or structures

Major utility collapse

Unintended explosions

Subsidence causing damage to structures or services

13.1.2 An Emergency Preparedness plan should include details of the following;

(a) The name, location and phone number of the Emergency Co-Ordinator.

(b) Designated Personnel with locations and phone numbers;

(c) Details of the Emergency Response Team with locations and phone numbers;

(d) Functions of the Emergency Response Team;

(e) The means of Escape;

(f) Communication with the Emergency Services;

Police

Fire Services

Page 93: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-23 Sign & Stamp of Tenderer

Ambulance and Hospital Services

(g) First-Aid Facilities;

(h) Site plans;

(i) Suppliers of emergency equipment such as sump pumps, lighting, craneage, etc.

13.1.3 Copies of the emergency procedures and the Contractor's rescue organisation

(reviewed without objection by the Employer /Engineer) should be displayed at each

place of work and notice boards. This information should be reviewed and updated as

often as is required, but at least once annually. Drills should be arranged to test the

efficiency in mobilising the necessary personnel and equipment. These Drills should

be carried out at least every month.

13.1.4 Regular joint exercises between the Contractor's rescue teams and the Tamil Nadu

Fire and Emergency Services should also be carried out for the major contracts.

13.1.5 Every Contractor shall formulate a Monsoon Preparedness Plan for each of his\her

sites. A Monsoon Preparedness Plan should include details of the following

a) Hazard During Monsoon Season in site premises

b) General Precaution

c) Role, responsibility, accountability, and authority of responsible

d) Communication System

e) Pest Control

f) Emergency Flow Chart

g) Emergency Equipment’s and Safety Materials

h) Dewatering Pump Details

i) Emergency Contact Numbers

14. HEALTH AND SAFETY SIGNAGE

14.1 Health and Safety Signs

14.1.1 All Health and Safety signage that is displayed in and around the sites shall be in Tamil,

Hindi and English, examples of signs that shall be required shall include amongst

others the following:

(a) Wear Safety Helmets.

(b) Permit to Work areas

(c) Wear Safety Footwear.

(d) Wear Hearing Protection.

(e) Wear Eye Protection.

(f) Danger Electricity.

(g) Danger Crane Overhead.

(h) Stop Look and Listen

(i) No Smoking.

(j) First Aid.

(k) No Entry signs

(l) Fire precautions.

(m) Emergency Exit from underground works

14.1.2 All Health and Safety signs shall comply with the Internationally recognised Health

and Safety Colours as indicated below:

Blue : Mandatory.

Page 94: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-24 Sign & Stamp of Tenderer

Yellow : Danger.

Red : Prohibition.

Green : Safe Condition.

15. INDUSTRIAL HEALTH AND WELFARE

15.1 Introduction

15.1.1 Hazards to Health on a construction site can arise from the use of a number of

materials, substances, and processes if they are not properly controlled. Some of the

more serious risks are caused by the inhalation of dusts, fibres, toxic fumes, by the

misuse of chemicals, lasers, and radioactive isotopes. Excessive vibration and

excessive noise can also cause ill health. Many man-days are lost as a result of

dermatitis, tenosynovitis, bronchitis, and rheumatism.

15.1.2 The Contractor shall be responsible for maintaining healthy working conditions for all

his\her, and his\her sub-contractors, workers. In particular he shall pay attention to the

effects of noise, dust, air pollution and the use of chemicals. If it is not possible to

remove the cause of harm, then suitable and sufficient Personal Protective Equipment

(PPE) should be provided to those workers who could be affected.

15.1.3 If the use of PPE is the only means of providing protection the Contractor shall ensure

that all the workers affected are properly trained in the use of the PPE and that

adequate supervision is provided to ensure its proper use.

15.2 Hazardous Substances

15.2.1 The Contractor shall obtain Material Safety Data Sheets (MSDS) for all substances

that are deemed to be hazardous to be used on site. An inventory shall be kept of all

such materials with the relevant MSDS and shall be available for inspection by the

Employer / Engineer who may require further MSDS’s to be obtained.

15.2.2 The Contractor shall conduct an assessment of the substance in relation to its intended

usage on site. Particular attention must be given to the actual location of usage as a

substance, which is safe for use in the open air, may be extremely hazardous in a

confined space. The results of all assessments shall be recorded, and method

statements produced.

15.2.3 The objective of the assessment is to establish what precautions and control measures

shall be implemented in order that a safe system of work can be established for the

use of the substance on site.

15.2.4 The Employer /Engineer may require the removal of any hazardous substance or

chemical if there are safer alternatives. In such events, the Contractor shall not be

entitled to any claim for compensation or Extension of Time for Completion.

15.2.5 The Contractor shall ensure that all hazardous substance and chemical containers are

labelled, its movement is recorded and returned to the designated storage areas when

not in use.

15.3 Noise

15.3.1 Industrial deafness is caused by over exposure to high levels of noise from plant,

machinery, or construction processes. Once a part of a person’s hearing has been lost

it can never be recovered. Deafness can also lead to further accidents on site with

workers being unable to hear warnings and other instructions.

15.3.2 The Use of hearing protection should be enforced when the equivalent sound level

over 8Hrs reaches 85 dB(A), the peak sound levels reach 140dB(C) or the average

Page 95: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-25 Sign & Stamp of Tenderer

Maximum sound level reaches 110dB(A) hearing protective device provided should be

capable of reducing sound levels at the ear to at least 85dB(A)

15.3.3 Consideration should always be given first to reducing the noise level at source.

Examples of noise reduction methods include.

(a) More efficient silencers on compressors and maintenance of exhaust systems.

(b) Fitting acoustic lining to machinery panels.

(c) Use of Acoustic screens and sheds to protect other workers.

(d) Using noise reduced tools.

(e) Sighting of noisy plant away from the workplace

15.3.4 Where it is not possible to reduce the noise level to which the worker is exposed the

Contractor shall provide the workers with suitable and sufficient hearing protection to

protect them. The Contractor shall ensure that all the workers affected are properly

trained in the use of the Hearing Protection and that adequate supervision is provided

to ensure its proper use.

15.3.5 Noise

i) Protection against the effects of noise exposure should be provided when the

sound levels exceeds the threshold values as provided in H&S Manual.

ii) Personal protective equipment shall be provided and used to reduce sound

levels within the levels of the table.

iii) When the daily noise exposure is composed of two or more periods of noise

exposure of different levels, their combined effect should be considered, rather

than the individual effect of each.

iv) Noise impacts should not exceed the CPCB standards described for 4 land types,

or result in a maximum increase in background levels of 3 dB at the nearest

receptor location off-site.

15.3.6 The contractor shall ensure at a construction site of a building or other construction

work that adequate measures are taken to protect building workers against the harmful

effects of excessive noise, vibration etc. at such construction site and the noise level

in no case exceeds the limits laid down in Schedule-VI of TBOCWR 2006

15.3.7 Manual handling

15.3.9.1Risks involved in manual handling should be reduced where reasonably practicable

by the mechanization of the excavation and lining erection processes, the breaking

down of loads into smaller components, the provision of lifting points, and job rotation.

15.3.8 Work-related upper limb disorders

15.3.10.1Mechanization and job rotation to reduce the risk of work-related upper limb disorders.

15.3.9 Hand–arm vibration syndrome

15.3.11.1Mechanization and job rotation can reduce the risk of hand–arm vibration syndrome

(HAVS). In addition, there should be a programme of clinical examinations by an health

specialist under the supervision of a medical practitioner experienced in HAVS.

15.3.10Heat stress and exhaustion

15.3.12.1Mechanization, ventilation and job rotation to reduce the risk of heat stress and exhaustion.

Adequate supplies of cold potable water should be made available.

Page 96: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-26 Sign & Stamp of Tenderer

15.3.11Dermatitis etc.

15.3.13.1The Contractor must take steps to reduce the occurrence of ‘Skin problems’ such as

the use of remotely operated equipment, and the use of personal protective equipment

(PPE) such as gloves and overalls. When contact has occurred, contaminated skin

should be washed immediately with hot water and cuts covered with waterproof

dressings. Barrier creams should be used before work, and moisturizer creams to

replenish skin oils. Contaminated PPE should be disposed of or, if appropriate, cleaned

before reuse.

15.4 Ventilation in Shafts and Tunnels- NOT USED

15.5 Welfare measures for workers

15.5.1 General

(a) A high standard of personal hygiene shall be practiced and enforced by

contractor management team at all times.

(b) The consumption of food and drinks shall be confined to the canteen /Workers

Rest Room area. No smoking is allowed on site.

(c) The washing and changing facilities shall include storage for contaminated

clothing, footwear etc. and arrangements shall be made for the washing and

drying of these.

(d) Appropriate Personal Protective Equipment (PPE), which may include but not

limited to waterproof safety boots and gloves when handling wet material, shall

be provided for all personnel working on site.

(e) A boot wash shall be situated immediately outside the entrance to the washing

and changing facilities, and this\her shall include running water and either fixed

or hand brushes to remove contaminated soils.

(f) Install double storey worker’s rest room.

(g) Group insurance, annual medical checkup, and grievance redress mechanism

for workers

15.5.2 Latrine and Urinal Accommodation

(a) The contractor shall provide one latrine seat for every 20 workers up to 100

workers and thereafter one for every additional 50 workers. In addition, one

urinal accommodation shall be provided for every 100 workers.

(b) Latrine and urinals shall be provided as per Section 33 of BOCWA and

maintained as per Rule 243 of TBOCWR 2006 and shall also comply with the

requirements of public health authorities.

15.5.3 Moving sites

(a) In case of works like track laying, the zone of work is constantly moving at

elevated level or at underground level. In such cases mobile toilets with proper

facility to drain the sullage shall be provided at reasonably accessible distance.

(b) In case if the contractor fail to provide required number of urinals and latrines

or fail to maintain it as per the requirements of Public Health laws, the Employer

/Engineer shall have the right to provide/maintain through renowned external

agencies like “Sulabh” at the cost of the contractor.

15.5.4 Canteen:

(a) In every workplace wherein not less than 250 workers are ordinarily employed

Page 97: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-27 Sign & Stamp of Tenderer

the contractor shall provide an adequate canteen conforming to Section 37 of

BOCWA, Rule 244 of BOCWR and as stipulated in Rule 247 of BOCWR the

charges for food stuffs shall be based on ‘no profit no loss’ basis. The price list

of all items shall be conspicuously displayed in such canteen.

15.5.5 Serving of tea and snacks at the workplace:

(a) As per Rule 246 of TBOCWR 2006, at a building or other construction work

where a workplace is situated at a distance of more than 200 m from the

canteen provided under Rule 244(1) of TBOCWR 2006, the contractor

employing building works shall make suitable arrangement for serving tea and

light refreshment to such building works at such place.

15.5.6 Drinking water

(a) As per Section 32 of BOCWA the contractor shall make in every worksite,

effective arrangements to provide sufficient supply of wholesome drinking water

with minimum quantity of 5 liters per workman per day. Quality of the drinking

water shall conform to the requirements of national standards on Public Health.

(b) While locating these drinking water facilities due care shall be taken so that

these are easily accessible within a distance of 200m from the place of work for

all workers at all location of work sites.

(c) All such points shall be legible marked “Drinking Water” in a language

understood by a majority of the workmen employed in such place and such

point shall be situated within six meters of any washing places, urinals or

latrines.

15.5.7 Labour Accommodation

(a) The Contractor shall provide free of charges as near as possible, temporary

living accommodation for all workers. All provided accommodation shall

conform to the provisions made under Section 34 of BOCWA. These

accommodations shall have cooking place, bathing, washing and lavatory

facilities. Welfare facilities must be established and in working order before any

works on site commence. All toilet, washing, changing, personal storage and

rest areas must be easily accessible and have adequate heating, lighting, and

ventilation. Facilities may need to be provided at more than one location on a

large site to ensure workers have easy access.

(b) Contractor shall submit the labour accommodation site layout and design to the

Employer/Engineer for Notice of no objection

(c) The following measures shall be taken

i. Bathroom, laundry and cooking/ kitchen/ dining/ refrigerated food storage

facilities and adequate medical facilities should be provided

ii. Sites should be adequately drained, plumbed and graded to prevent flooding and

pooling of water.

iii. Buildings should be certified by a qualified engineer particularly in areas subject

to extreme weather this is to ensure compliance to local codes, statutes and by

laws for structural adequacy, fire precaution, firefighting, electrical grounding,

lightning protection and other regulations as required.

Page 98: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-28 Sign & Stamp of Tenderer

15.5.8 Living Space

(a) No cooking should be allowed in rooms.

(b) Room doors should be fitted with one way locks to prevent workers being

trapped inside rooms in the event of an emergency.

(c) Accommodation should have adequate ventilation with fly screens fitted where

practicable.

(d) Where not, other forms of insect protection may be employed such as mobile

mosquito nets.

(e) Different cultures should be catered for e.g prayer space.

(f) Adequate security should be in place to protect workers and their belongings

e.g perimeter fencing and patrols when unoccupied.

(g) Space should be provided to secure personal belongings (this can be either

lockable cabinets or ensuring that the room is lockable).

(h) Provision of recreation/ living areas is to be encouraged e.g TV’s and sporting

equipment.

Facilities should be heated/ cooled/ ventilated naturally or mechanically to a

reasonable level of comfort (air conditioning is preferred).

(i) Spare space should be provided to prevent overcrowding in accordance with

local laws with 6 people per room as a maximum. The number of people per

SQM should also be reviewed in compliance with local regulations.

(j) Bedding that is provided should be clean and appropriate to weather conditions.

Where beds are provided, they should be spaced apart, raised off the floor and

safe access provided. Other forms of bedding, such as roll out mattress, are

acceptable.

(k) Triple deck bunks should not be utilized due to risk of falls.

(l) There should be at least 1 refuse bin per 20 workers staying at the quarters to

dispose their litter.

(m) All key contacts including nearby hospital should be posted in a prominent

place and in all languages present e.g. at camp gate and throughout the camp

(where appropriate, these contact details should include a camp supervisor and

site manager)

(n) Age of the security person shall not be more than 55 years old at time of

appointment at site.

15.5.9 Toilet / Washing Facilities:

(a) Sufficient toilet facilities should be provided, in easy access of accommodation,

and plumbed into the mains.

(b) All toilets should be cleaned and serviced regularly with provision of adequate

toilet paper, soaps etc.

(c) Washing facilities with hot and cold water should be provided and be adequate

for the numbers of workers (as a guide 1 WC and basin for every 10 persons;

1 shower for every 10 persons; laundry tray / tub for every 10 persons).

(d) These areas should be made of impervious materials, water resistant, non-skid

Page 99: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-29 Sign & Stamp of Tenderer

/ slip and easily washable.

(e) Privacy should be provided for changing and toilet facilities.

(f) Toilets should be separated from sleeping and food preparation areas

15.5.10Food Preparation/ Cooking Areas:

(a) Clean, potable water should to be provided

(b) These areas should be made of impervious materials, water resistant, non-skid/

slip and easily washable

(c) If food is provided, it should cater for different cultural needs e.g.halal,

vegetarian etc. and provide a good balanced diet

(d) High standards of hygiene should be adopted

(e) Persons / companies preparing food should be trained in proper food handling

and preparation techniques and hold appropriate qualification where required

(f) These areas should have adequate cupboards or similar for storage of wet and

dry goods, they should have adequate refrigeration and tubs / sink for cleaning

and washing

15.5.11Lighting and Ventilation

(a) Areas should be well ventilated and kept free of damp and mould

(b) Areas should be well lit and able to be switched on or off at all hours

15.5.12Evacuation:

(a) All buildings should have lit, clear and signed means of escape in case of

emergency and workers should be made aware of evacuation

15.5.13Evacuation Procedure:

(a) Evacuation exits should be kept unlocked and clear of obstructions

(b) Evacuation drills should be implemented on a monthly basis

(c) There should be nominated and trained personnel to handle fire and

emergency evacuations

15.5.14First Aid / Emergency

(a) First aid facilities should be provided and accessible at all time

(b) Ramps for medical equipment should also be provided e.g. stretchers

(c) Contact details of the nearest emergency services should be clearly publicized

(d) The names and phone numbers of qualified nurses in the camp should also be

publicized

(e) Access should be provided to enable entry by emergency services eg

ambulance or fire brigade

(f) Evacuation drills should be conducted regularly

(g) Evacuation plans should be posted throughout the camp and visible

(h) Potential health outbreaks should be monitored and measures taken to prevent

spread

(i) Camp operators should be encouraged to vaccinate the workforce from

communicable diseases prevalent in the region e.g malaria, cholera etc.

Page 100: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-30 Sign & Stamp of Tenderer

15.5.15Hazardous Areas

(a) Generators should be on stable ground, with required clearances, ventilation

etc.

(b) Fuel stores should comply with local dangerous goods laws and all combustible

materials are to be kept clear of buildings Industrial LPG stores should be

external to occupied structures

(c) Hazardous materials e.g diesel should be stored in a bunded area and spill

kits provided Clear and multilingual signage should be provided around

hazardous storage areas

15.5.16Fire Safety and Fire Fighting

(a) Open fires/burning should be strictly prohibited

(b) Fire prevention and firefighting /control facilities should be provided, particularly

in food preparation areas

(c) Fire fighting hoses should be engineered to provide full coverage of camp

perimeter and be capable of delivering the appropriate water pressure to fight

fire

(d) All structures should be constructed with fire resistant material (metal or fire

retardant treated wood form)

(e) Fire and smoke alarms should be installed in all accommodation areas

(f) Where possible, buildings should be separated from each other by providing

space or fire resistant material

15.5.17Mechanical and Electrical Safety

(a) Electrical equipment and cords should be maintained and physically protected

to prevent the risk of electrocution or shock

(b) Mechanical equipment should be operated by trained personnel only

(c) Electrical circuit breakers should be fitted to all distribution boards

(d) Electrical register of equipment should be maintained and testing to be

undertaken and recorded by qualified Electrical Engineer

15.5.18Housekeeping

(a) Waste should be centrally located in a segregated, easily cleaned area, kept in

rodent and fly tight containers, collected regularly and grounds are to be kept

free from rubbish, debris and other refuse

(b) Effective housekeeping measures should be taken to ensure pests are not

attracted to the site eg removal of all food sources and breeding areas.

(c) No pets, birds or livestock should be kept.

(d) Areas should be kept free of hazards e.g slips, trip or fall hazards

15.5.19Transportation

(a) The transport facilities are to be provided to site, these should be safe, with

trained drivers and in accordance with local laws

15.5.20Pest Control

(a) In mosquito prone areas, checks for mosquito breeding, including the presence

Page 101: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-31 Sign & Stamp of Tenderer

of larvae in all stagnant water within the worker's quarter’s premises should be

carried out at least once a week. Thermal fogging of worker’s quarters premises

should be carried out at least once each fortnight.

(b) Adequate controls should also be in place to prevent pest infestations e.g

inspections and preventative measures such as baits and other controls

15.5.21Camp / Accommodation Supervisor

(a) A camp supervisor should be appointed to coordinate all activities,

communication, and inspections etc of the camp. This supervisor should speak

at least two of the languages spoken by the workforce.

(b) A team comprising of contractor’s Labour Welfare Officer and Chief ESHS

Manager shall conduct a monthly labour colony Safety Audit and the report

shall be submitted no later than the 7th of each month within the Contractor’s

monthly H&S Report.

16. WORKING AT HEIGHT

16.1 General

16.1.1 Working at height is the largest single cause of serious accidents in the construction

industry and therefore the Contractor shall carry out risk assessments for all work

where workers or materials can fall more than two metres. The contractors will ensure

that no height work will be undertaken unless a Permit to Work, has been prepared

and issued.

16.1.2 Where work is being carried out above areas where there is public access such as

roads footpaths etc. particular care must be taken to ensure that no materials can fall

from the working area.

16.1.3 Edge protection shall be provided at all leading edges or openings where workers or

materials can fall more than two metres. Edge protection shall meet the minimum

standard of;

a) A main guardrail at least 1 metre above the edge

b) A toe board at least 200 mm high; and

c) An intermediate guard rail or other barrier so that there is no gap more than 470 mm.

d) Rebar shall not be used as edge protection only standard pipes should be used.

e) The pipes shall be painted in reflective paints.

16.2 Use of Scaffolds

16.2.1 All scaffolds should be erected and dismantled by workmen and Inspected by the

scaffold supervisor who are thoroughly trained by third Party agency and the training

requirements should meet the construction industry training board(CITB) UK,

Construction Industry scaffolders records scheme (CISRS) UK or Scaffolding Training

Institute, USA. The Profile of the training Agency, ISO certifications, the name,

educational qualifications and experience for of the trainers are to be submitted to the

Employer/Engineer a minimum 28 days before prior to appointment of the agency. Only

upon notice of no objection by the Employer/Engineer shall be authorised to work on

CMRL site.

16.2.2 All scaffolds should be inspected by a competent person at least every day after

erection and the results of inspections recorded and the records shall be kept available

for checking by the Engineer.

Page 102: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-32 Sign & Stamp of Tenderer

16.2.3 The Contractor shall develop a scaffold tagging system acceptable to the Employer

/Engineer to indicate:

a) Scaffolds under construction or demolition;

b) Scaffolds that are complete but have hazards associated with them; and

c) Scaffolds erected and safe for use.

16.2.4 Tags shall be fitted to all scaffolds to show whether they are safe for use or not. All

Safe for Use tags shall be signed by a third party trained scaffold inspector from the

contractor.

16.2.5 The Contractor shall envelope all scaffolds with screen nets to prevent debris from

falling outside the scaffold.

16.2.6 Contractor shall use only proprietary access ladders and working platforms for system

formworks. No mix and match using conventional catwalks and monkey ladders is

allowed.

16.2.7 All scaffolds shall be constructed of sound materials free from patent defect.

16.2.8 The following measures shall be taken;

(a) the scaffold shall be constructed for the correct use (Light or Heavy Duty)

(b) securely fixed to existing structures or adequately buttressed;

(c) the use of barrels, boxes, loose tiles or other unsuitable material shall not be

used as supports for working platforms;

(d) all working platforms shall be fully boarded;

(e) all working platforms shall have guard rails at one metre height and shall also

have an intermediate rail at half height;

(f) all working platforms shall be provided with toe boards;

(g) all working platforms shall be kept free of unnecessary obstruction or rubbish

(h) secure ladder access shall be provided;

(i) Wooden Scaffold not allowed

(j) Worker shall not be allowed to work from scaffolds during storms or high winds.

After heavy rains or storm, the scaffolds should be inspected by the site-in-

charge. Scaffolds should also be inspected every fortnight, during use, by him

and again before starting use. Where the joints or members are found defective,

the joint should be set right and member replaced.

(k) In case both light and heavy duty scaffolds are used in close vicinity,

conspicuously placed notice boards shall indicate the light duty scaffolds and

the limits on their usages.

(l) Safety codes should be strictly followed. Standard safety requirements are just

as important for temporary structures as they are for permanent structures

16.2.9 A team comprising of contractor’s construction Manager and Safety Manager shall

conduct a monthly working at height Safety Audit and the report shall be submitted no

later than the 7th of each month within the Contractor’s monthly H&S Report.

16.3 Use of Ladders

16.3.1 All ladders shall be of sound construction and shall be free from patent defect. Ladder

should meet the IS standard requirements

16.3.2 The Contractor shall implement a step platform/ladder inspection procedure requiring

Page 103: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-33 Sign & Stamp of Tenderer

an identification method displaying company name, unique number, inspection

frequency and inspection status.

16.3.3 Ladders should be checked daily and defective ladders shall be promptly and properly

replaced.

16.3.4 Ladders shall not be used as working platforms.

16.3.5 Ladders shall;

(a) be secured at the top or footed at the bottom to prevent slippage;

(b) not be used if any rung is missing;

(c) not be used for any other purpose than to provide access;

(d) be set at an angle of seventy five degrees unless designed for vertical access;

(e) all vertical ladders shall be fitted with hoops to prevent falls;

(f) Wooden Ladder not allowed

16.4 Safety Harnesses / Fall Arresters

16.4.1. Where it is not possible to provide a safe working platform then the use of full body

safety harness with double lanyard with fall arrester may be considered. If safety

harness are used they should be of the full body type and secure anchorage points

shall be provided and used. Workers must be instructed in the proper use of harness.

17. EXCAVATIONS

17.1 General

17.1.1 The Contractor shall appoint sufficient number of banksman to coordinate excavation

activities at the pit and the haulage activities from the pit to the bank. The banksman

shall be appointed in writing and should have attended Signalman training course

approved by Employer/ Engineer. The banksman shall be properly identified on site,

stationed at-grade and have overall control of the excavation works.

17.1.2 For excavations exceeding 4 metres in depth, the Contractor shall appoint one

banksman. If deemed necessary by the Employer/Engineer, the Contractor shall

appoint additional banksman. For excavations exceeding 10 metres in depth, the

Contractor shall appoint one banksman for every long-arm or telescopic excavator at

the bank.

17.1.3 Proper means of communication in the form of walkie-talkie sets should be established

between the banksman and the excavator operators. No one shall be within any

excavator's swing radius. In addition, all excavators shall be installed with rear view

camera that enables the operator to have a clear view of the back of the machine

17.1.4 Long arm excavators shall be provided with an extended reflective mirror in front of the

operator's cabin to enhance operator's visibility and shall not operate without the

presence of the banksman.

17.1.5 Excavators within the excavation pit shall have suitably reinforced cabin roofs capable

of withstanding impact from falling objects from the top of the excavation and its

movement coordinated by one of its operator, who shall be appointed as a leader by

the Contractor.

17.1.6 The designated locations at walers and struts used by the instrumentation contractor

for instrumentation reading and monitoring shall be provided with 2 rows of horizontal

rigid guardrails to prevent persons falling from height. Openings within struts are to be

covered. The vertical distance between the 2 rows of horizontal guardrail shall be not

Page 104: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-34 Sign & Stamp of Tenderer

more than 600mm. Toe boards are to be provided accordingly. Rebar shall not

be used as edge protection only standard pipes should be used. The guard rail pipes

shall be painted in reflective paints.

17.1.7 An alternative source of power and emergency lighting system shall be provided to

allow emergency securing operations and evacuation safely in the event of a primary

power failure. An adequate number of lamps shall be located at key points

underground

17.1.8 Excavation is one of the important phases of any construction activity. Due to

insufficient attention to the safety aspects it frequently becomes the cause of many

accidents. Contractors are therefore required to plan and execute all excavations in a

safe manner.

17.1.9 The contractor shall ensure that all excavations are supervised by workers with

thorough knowledge and experience of excavation work.

17.1.10 The integrity of the excavation and the support system shall be inspected prior to the

commencement of any works on a daily basis with the results of the inspections being

formally recorded. All such records shall be kept available for inspection by the

Employer/ Engineer.

17.1.11 Where there is the possibility of any ingress of water then pumping sumps shall be

established with pumps being readily available for use and additional ladders placed

for use in the event of an emergency evacuation.

17.1.12 The contractor should not store, or move, materials and equipment near the edge of

an excavation. Spoil and waste heaps should similarly be kept well one meter away

from the edges of excavations.

17.1.13 Adequate and well-anchored stop blocks should be provided on the surface to prevent

vehicles being driven into the excavation while tipping. The blocks should be placed at

a sufficient distance away from the edge of the excavation to avoid the danger of it

breaking away under the weight of the vehicles.

17.1.14 Make sure that there are safe means of access and egress, such as a properly secured

ladder, if you are working in an excavation. This is of particular importance when there

is a risk of flooding and rapid escape is essential.

17.1.15 There should be adequate lighting around the area of an excavation, particularly at

access points and openings in barriers.

17.1.16 Shoring should be erected, altered or dismantled only by a competent worker operating

under supervision. Wherever practicable, it should be installed before excavating to

the final depth of the trench – it is necessary to begin when the trench is less than 1.2

m deep. The excavation and installation of shoring should then proceed by stages until

the full depth is reached. You should be fully aware of the procedures to follow to

rescue a fellow worker trapped by a fall of earth.

17.1.17 A team comprising of contractor’s Construction manager and Safety Manager shall

conduct a monthly Excavation Audit and the report shall be submitted no later than the

7th of each month within the Contractor’s monthly H&S Report.

17.2 Planning

17.2.1 The correct planning of excavations is essential for Health and Safety and before

digging any excavations Contractors should plan against the following;

(a) Collapse of the sides;

Page 105: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-35 Sign & Stamp of Tenderer

(b) Materials falling onto people working in the excavation;

(c) People and vehicles falling into the excavation;

(d) People being struck by plant;

(e) Undermining nearby structures;

(f) Contact with underground services.

(g) Fumes; and

(h) Make sure the necessary equipment needed such as trench sheets, props, etc.,

are available on site before work starts.

17.3 General Precautions

17.3.1 The following precautions should be observed;

(a) Prevent the sides and the ends from collapsing by battering them to a safe angle

or supporting them with timber, sheeting or proprietary support systems.

(b) Do not go into unsupported excavations.

(c) Never work ahead of the support.

(d) Remember that even work in shallow trenches can be dangerous. You may need

to provide support if the work involves bending or kneeling in the trench.

(e) Prevention of materials falling into excavations

(f) Do not store spoil or other materials within one metre of the sides of excavations.

The spoil may fall into the excavation and the extra loading will make the sides

more prone to collapse.

(g) Make sure the edges of the excavation are protected against falling materials.

Provide toe boards where necessary.

(h) Wear a hard hat when working in excavations.

(i) Take steps to prevent people falling into excavations. If the excavation is 2 m or

more deep, provide substantial barriers, e.g. guard rails and toe boards.

(j) Keep vehicles away from excavations wherever possible. Use brightly painted

baulks or barriers where necessary.

(k) Where vehicles have to tip materials into excavations, use stop blocks to prevent

them from over-running. Remember that the sides of the excavation may need

extra support.

17.4 Undermining nearby structures

17.4.1 The following precautions should be taken to prevent the undermining of nearby structures;

(a) Make sure excavations do not affect the footings of scaffolds or the foundations

of nearby structures. Walls may have very shallow foundations, which can be

undermined by even small trenches.

(b) Decide if the structure needs temporary support before digging starts. Surveys

of the foundations and the advice of a structural engineer may be needed.

17.5 Avoiding underground services

17.5.1 The following precautions should be taken to avoid underground services;

(a) Look around for obvious signs of underground services, e.g. valve covers or

patching of the road surface.

(b) Use locators to trace any services by utility detector kit. Mark the ground accordingly.

(c) Make sure that the person supervising excavation work has service plans and

Page 106: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-36 Sign & Stamp of Tenderer

knows how to use them. Everyone carrying out the work should know about safe

digging practices and emergency procedures.

(d) Operate a “Permit to Dig” system.

(e) Safety practices in sewage and septage management issued by the Chennai

metropolitan water supply and sewerage board guidelines shall be followed.

18. LIFTING OPERATIONS

18.1 Lifting Appliances:

18.1.1 The Contractor shall ensure that all lifting appliances, including synchronised mobile

jacks, pit jacks, mobile cranes, tower cranes, gantry cranes, launching beams and lorry

mounted cranes, prior to being allowed to work on site shall have available for

inspection by the Employer / Engineer a current Certificate of Inspection issued by a

Competent Person approved by CMRL. The Profile of the Inspection Agency, ISO

certifications, inspection procedure, the name, educational qualifications and the

competent person certificate issued by the Govt of Tamil Nadu are to be submitted to

the Employer/Engineer a minimum 28 days before prior to appointment of the agency.

Only upon notice of no objection by the Employer/Engineer shall be authorised to work

on CMRL site. The approved competent person is authorised to conduct inspection

and issue certificate for lifting machines, lifting appliances and lifting gears for two

CMRL contract packages only.

18.1.2 Effective control must be exercised at all stages of a lifting operation through the

deployment of a competent lifting supervisor, a qualified signalman, a registered crane

operator and sufficient trained rigger.

18.1.3 The contractor shall ensure at a construction site of a building or other construction

work that a competent person issues a certificate for the purpose of test and periodical

examination of lifting appliances, loading of lifting appliances and lifting gears, ropes

and heat treatment of lifting gears only after actual testing. All lifting machines, lifting

appliances and lifting gears used on site must be suitable for the task, used within their

rated safe load capacity and must be in good repair.

18.1.4 The Contractor is to submit a weekly list to the Employer /Engineer of all cranes

permanently deployed on site detailing their ownership, make, identification number,

maximum safe working load and the corresponding radius, lifting Machine (LM)

certificate number and date of expiry.

18.1.5 All lorry loaders with articulating arm entering into the Site shall have an interlocking

system installed to prevent a lorry loader with articulating arm from moving off before

its articulated boom is fully retracted back to its “stored” position.

18.1.6 The boom of any lorry loader with articulating arm shall not be used for holding down

materials or equipment and it shall be retracted to its “stored” position before it moves

off.

18.1.7 Loading/ Unloading operations involving lorry loader with articulating arm shall take

place over the side of the main body and not in an arc over either the front or rear of

the chassis, in accordance with safe working practices.

18.1.8 No excavator shall be used as a lifting equipment and No Sheet piling activity by the

excavator.

18.1.9 The Contractor shall ensure that a Permit to Lift system is operated to evaluate all

routine planned lifting operations generically and all heavy or one-off lifting operations

individually. This latter category of lifting operations includes the raising / lowering of

Page 107: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-37 Sign & Stamp of Tenderer

items of plant in excavations. Lifting plans shall be submitted to the Employer /Engineer

for acceptance in advance of any heavy or one-off lifting operations.

18.1.10 All lifting appliances with a lifting capacity of more than one tonne shall, where

practicable, be fitted with Automatic Safe Load Indicators, Anemometer and Audible

Warning Devices which shall be kept in an operable condition at all times the lifting

appliance is in use. Checks should be made to ensure that the Automatic Safe Load

Indicator and Anemometer is properly calibrated and is functioning properly. The

Profile of the calibration Agency to be submitted to the Employer/Engineer a minimum

28 days before prior to appointment of the agency. Only upon notice of no objection by

the Employer /Engineer shall be authorised to work on CMRL site.

18.1.11 The crane operator is to ensure that the outriggers are fully extended, and any

adjustments made to the jacks to level the crane before the lifting operation

commences. All lifting machine with outriggers, including lorry loader with articulating

arm, shall have steel plates of minimum dimension 1m by 1m by 25mm placed under

all the outriggers deployed for a lifting operation unless that crane is entirely sited on

hard standing such as a reinforced concrete surface, with no void underneath. Pieces

of timber are not to be used.

18.1.12 The Contractor shall ensure that no lifting operation shall be carried out on site using

the auxiliary hook of a mobile crane unless the SWL of this is shown on the Lifting

Machinery Certificate in addition to that of the main hook block, and is not exceeded.

18.1.13 The Contractor shall ensure that both the Lifting Supervisor and the crane operator are

able to understand the working load chart.

18.1.14 Cranes fitted with a Automatic safe load indicator (ASLI) shall sound an audible alarm

in the crane cab if its safe working load is exceeded on either the main or the auxiliary

hook. A second alarm connected to the ASLI, shall be fitted external to the cab and

shall emit a signal of a sufficient volume to make it audible above the ambient site

noise levels during working hours. Visual warning shall also be provided externally to

indicate safe working range and overload conditions. ASLI shall be connected directly

to the start button and the ASLI should be enclosed with Plastic box or steel box.

18.1.15 load radius indicator shall be fitted with a limiting device, which disables the crane from

continuing with any lifting operation under overload conditions. Once disabled, the

device should only permit the crane to return to the safe working range. The device

shall be tamper proof, with no over-ride to disable it, and shall be maintained in good

working order. In case of provision of bypass switch for load radius indicator, it shall

be secured by a lock and kept with the lifting supervisor.

18.1.16 The Contractor shall ensure that a sufficient number of qualified lifting supervisor are

employed on site, whether by himself or by his Subcontractors, to give adequate cover

for all lifting operations carried out both by day and by night including

loading/unloading. There must be one lifting supervisor present for one crane including

all minor and major operations. In addition the contractor shall also station at least one

additional worker to assist signalman for lifting operations carried out near public areas.

18.1.17 The contractor shall install warning devices/ flags at least 2 metres above top of

hoarding that are alongside roads, footpaths and adjacent structure.

18.1.18 lifting supervisor shall supervise and co-ordinate all lifting operations under his/her

charge. lifting supervisor shall familiarise himself with the safe working load chart of

each crane for which he is responsible and has identified himself to the operator of

Page 108: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-38 Sign & Stamp of Tenderer

each such crane as being the only individual whose instructions concerning any lifting

operation are to be followed. This includes the positioning of the crane prior to the lift

as well as the slinging of the load.

18.1.19 Before any lifting operation involving a mobile or crawler mounted crane is carried out

the lifting supervisor must satisfy himself that the crane is positioned suitably close to

the load and its destination to ensure that the operation can be carried out at the safest

appropriate radius.

18.1.20 The lifting supervisor shall ensure that the load is safely rigged, and a tag line is

attached if appropriate, before signalling to the crane operator to start the lift. The lifting

supervisor is responsible for the load until it is safely resting at the intended destination

either by taking control of the operation himself for non-routine lifts or, for routine lifting

operations, by thoroughly briefing the crane operator, riggers and signalman on the

safe procedure to be followed.

18.1.21 The Contractor shall put measures in place to discipline any person other than the

dedicated lifting supervisor, or one acting under his close supervision, who attempts to

take control of any lifting operation other than those of a routine nature where a safe

lifting procedure has already been established.

18.1.22 The Contractor shall engage only qualified crane operators with at least 5 years of

experience in operating similar types of cranes with no record of crane toppling / failure

or barred from any site previously for a crane related incident.

18.1.23 The crane operator shall enter the date, types of maintenance carried out and any

malfunction of the crane in a checklist or logbook. He shall not operate the crane until

any such defect is rectified, and the crane’s use is authorised by his\her lifting

supervisor.

18.1.24 All cranes shall be checked by its operator at the start of any day / shift using a checklist

written in English and in a language comprehensible to the operator. Copies of the

checklist together with LM certificate, operator certificate, permits should be retained

in the crane cabin for verification.

18.1.25 Automatic safe load indicator (ASLI) shall be calibrated six-monthly by an approved

agency and verified by the competent person during his\her six-monthly inspections.

Records of load radius indicator calibration shall be submitted to the Employer

/Engineer. If there is any doubt as to the accuracy of the load radius indicator the

machine shall be taken out of use until the calibration is carried out to the satisfaction

of the Employer /Engineer.

18.1.26 If the crane is down rated by the competent person during his\her six monthly

inspections then the load radius indicator shall also be calibrated and a new capacity

chart should be drawn up and posted in the crane cab. The competent person shall

highlight the above details on the Lifting Machinery certificate.

18.1.27 Lifting machine shall not be used for any unsafe operation that may affect its overall

integrity or stability.

18.1.28 The Contractor shall ensure that every lifting machine capable of travelling / tracking,

including a gantry crane, or a slewing motion, such as a mobile crane, shall be

operated in such a manner that there is always an unobstructed passageway in excess

of 600mm between it and any fixture or other machinery.

18.1.29 All Lifting machines that operate on CMRL sites shall be installed with a rear view

camera that enables the operator to have a clear view of the back of the machine.

Page 109: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-39 Sign & Stamp of Tenderer

18.1.30 The use of fly jib of any Lifting machines shall be subjected to the approval of the Employer/Engineer.

18.1.31 The concurrent use of the crane’s main and auxiliary hooks during lifting shall be prohibited.

18.1.32 Before any crane is accepted onto site for use it must undergo a thorough mechanical

check by the plant Manager, and the findings verified by the Contractor’s Safety

manager.

18.1.33 Lifting of machineries and/or equipment’s shall be done as per manufacturer's

recommendations and shall be subject to a regular preventative maintenance

programme.

18.1.34 All lifting appliances shall be thoroughly tested and examined by a competent person

approved by CMRL once at least in every six months or after it has undergone any

alterations or repairs liable to affect its strength or stability. Within the validity, if the

lifting appliances are shifted to a new site, re-examination by the same competent

person for ensuring its safety shall also be done. Certificates of Inspection shall be

available with the lifting appliance and a copy shall also be sent to the Employer/

Engineer.

18.1.35 The operators of lifting appliances shall conduct daily inspections of their respective

lifting appliances with the results of the inspections being recorded in the register and

kept available for inspection by the Employer/ Engineer.

18.1.36 The Contractor shall ensure that only thoroughly third party agency trained and

experienced persons aged twenty-one years and over are allowed to operate lifting

appliances. The refresher training for Operator’s shall be conducted every six months.

The Profile of the training Agency, ISO certifications, course details, the name,

educational qualifications and experience are to be submitted to the

Employer/Engineer a minimum 28 days before prior to appointment of the agency.

Only upon notice of no objection by the Employer /Engineer shall be authorised to work

on CMRL site.

18.1.37 First generation hydra banned and shall not be strictly permitted to use in CMRL project sites.

18.1.38 All lifting machines, lifting appliances and lifting gears shall meet the requirements of Indian standards(IS).

18.1.39 The following Crane safety Equipment shall be install in the equipment

a. As stipulated in Rule 57 of TBOCW Rules 2006, every lifting appliances and

gears like cranes, hydras etc, if so constructed that the safe working load may

be varied by raising or lowering of the jib or otherwise shall be attached with an

automatic indicator of safe working loads approved by Bureau of Indian

standards/ International certifying bodies which gives a warning to the operator

and arrests further movements of the lifting parts.

b. ASLI Interlocked with the equipment key and Bye pass button shall be replaced

with Key and the key shall be available with plant department. Log register should

maintain for the purpose of the key is used.

c. ASLI shall be covered with plastic or steel cover.

d. Motion limit Devices

e. Overload cut out devices

f. Level indicator

g. Anemometer

Page 110: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-40 Sign & Stamp of Tenderer

h. Machinery guarding

i. Proximity sensor

j. Visual Warning and alarm

k. Sensing devices

l. Boom angle indicator

18.1.40 The special assessment as per IS 14475-1(1997) and ISO 12482-1:1995 shall be

carried out later than the following number of years after manufacture for:

-Tower cranes, loader cranes, mobile cranes: 10 years;

-All other cranes: 20 years.

18.1.41 Lifts involving two or more cranes are complex operations requiring considerable skill

and planning. As a result, multiple crane lifts (or tandem lifts) must be planned and

carried out under the supervision of a competent person.

18.1.42 The exact weight each crane will carry must be determined in advance since all

cranes must operate in unison. Operator headset communications systems should be

implemented. For these more complicated lifts, no more than 75 percent of the net

capacity of any crane should be used. Because the load weight shifts from one crane

to the other during movement of the booms, these changes need to be considered

during the planning process. Pre-planned load considerations can also be disrupted if

one crane lifts its end of the load before the other crane lifts, causing the first crane to

be overloaded. A practice run without the load is recommended to help coordinate the

process.

18.1.43 Compliance with the crane manufacturer's recommended wind-velocity shutdown

limit is required for safe operations, though many operators halt work if the wind speed

reaches a generic 30 mph.

18.1.44 All lifting appliances including all parts and gears thereof whether fixed or movable, are

tested and examined by a competent person before being taken into use for the first

time or after it has undergone any alterations or repairs liable to affect its strength or

stability or after erection on a construction site and also once at least in every five

years, in the manner specified in Schedule-I of TBOCWR 2006.

18.1.45 Certificate in respect of the following is obtained from competent person in the forms

as per the TBOCWR 2006 under schedule XIII mentioned below, namely: -

Winches, derricks and their accessory gears in Form V.

Cranes or hoists and their accessory gears in Form VI.

ln case of test. examination and re-examination of loose gears Form VII.

In case of test and examination of wire ropes Form VIII.

In case of heat treatment and examination of loose gears Form IX.

18.1.46 All alarms and signals like automatic safe load indicators (ASLI), boom angle

indicators, boom extension indicators, over lift boom alarm, swing alarm, hydraulic

safety valves, mechanical radius indicators, load moment indicators etc. shall be

examined daily basis by the operator. All devices shall be maintained in good working

condition.

18.2 Lifting Gear:

18.2.1 Lifting Gear includes chain slings, rope slings, or similar gear and a ring, link, hook,

plate clamp, shackle, swivel or eye bolt.

Page 111: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-41 Sign & Stamp of Tenderer

18.2.2 The Contractor shall ensure that all lifting gear shall be in good condition and shall be

tested and certified every six months, with the Safe Working Load being stamped or

clearly displayed upon it. Records of test shall be kept available for inspection by the

Employer/ Engineer.

18.2.3 The Contractor shall ensure that Lifting Gear is not loaded beyond its SWL and this

includes multi leg chain slings being used at variable angles.

18.2.4 The Contractor shall ensure that Lifting Gear is not used for any purpose other than

the raising or lowering of a load. If an excluded activity takes place, such as the use of

a lifting chain for towing an item of plant / machinery, then the Contractor shall ensure

that this item of Lifting Gear is no longer used for any further lifting operations.

18.2.5 The Contractor shall implement an inspection programme to thoroughly check all

Lifting Gear by a lifting supervisor prior to its first use on site and thereafter on a

monthly basis. A monthly colour coding system shall be adopted. Defective Lifting Gear

shall be discarded.

18.2.6 All lifting gear shall be visually inspected before any use and if any defects are found

then it shall be removed from site or dismantled / disabled in order to ensure that it is

not used in a defective state.

18.2.7 All lifting gear shall be properly stored and not left lying on the ground where it could

be damaged or used in an unsafe manner.

18.2.8 A lifting gear is initially tested for the manufacturer by a competent person, in a manner

specified in Schedule-1 of TBOCWR 2006 before taking into use or after undergoing

any substantive alterations which renders its any part liable to affect its safety and such

gear altered shall subsequently be re-tested for the use of its owner at least once in

every live years. Certificates of initial and periodical tests and examination of loose

gears under TBOCWR 2006 are obtained in Form VII under Schedule – XIII of

TBOCWR 2006.

18.3 Lifting Operations:

18.3.1 The Contractor shall ensure that during the course of any lifting operations the following

minimum requirements shall be followed:

(a) All lifting operations shall be under the control of a competent “Lifting Supervisor”

appointed by the contractor.

(b) Only thoroughly third party agency trained and experienced crane drivers shall be

allowed to operate cranes. The refresher training for operator’s, lifting supervisor,

banks Man and rigger etc. shall be conducted every six months.

(c) Only thoroughly third party agency trained and experienced slingers and riggers

shall be allowed to sling loads and give directions to crane operators.

(d) A standard code of hand signals shall be adopted for controlling the movements

of the crane and both the driver and the signaller shall be thoroughly familiar with

the signals.

(e) The driver of the crane shall respond to signals from only the appointed signaller

but shall obey the stop signal at any time no matter who gives it.

(f) Before commencing any lifting operations, the ground conditions on which the

crane is to stand shall be investigated in order to ensure that the load bearing

capabilities are adequate.

(g) The weight of the load must be known to the crane driver and the slinger/rigger

Page 112: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-42 Sign & Stamp of Tenderer

before lifting commences.

(h) No loads are to be slewed over public areas without stopping pedestrians and

vehicles first.

(i) No unauthorised persons are allowed into the lifting zone.

(j) No person is allowed to ride the hook of the crane or the loads being lifted.

(k) Any areas where a minimum clearance of six hundred millimetres from the rear of

the slewing kentledge of the crane cannot be achieved and where persons could

be trapped against obstacles then a fence shall be erected to prevent access.

(l) All crane hooks shall be fitted with an operable Safety Latch.

(m) Wherever practicable all loads shall have tag-lines attached in order to ensure

that the load can be controlled at all times.

(n) Provision shall be made to ensure that the lifting slings or chains can be safely

removed from the loads once they have been landed.

(o) All lifted loads and stacked materials shall be left in a secure and stable condition

at all times.

(p) Whenever working close to isolated overhead power-lines the lifting appliances

shall be grounded to earth as a secondary precaution against accidental

energisation.

(q) No close working to any live overhead power-lines is permitted without the

operation of a strict Permit to Work system being in place.

(r) Install wireless anti-collision sensory protection device and alarm system before

tandem lifting operation commences.

(s) Operators, lifting supervisor and Riggers is medically examined periodically as

specified in Schedule-VII of TBOCWR 2006.

19. WORK IN CONFINED SPACES

19.1 General

19,1.1 The term 'confined space' has three defining features as , any space:

(a) in which a person can bodily enter;

(b) which has limited entry / egress; and

(c) which is not meant for occupancy.

Generally it is place which is substantially (though not always entirely) enclosed with a

reasonably foreseeable risk of serious injury from hazardous substances or conditions

within the space or nearby.

19.1.2 Some confined spaces are fairly easy to identify, for example, closed tanks and sewers.

Others are less obvious but may be equally dangerous, for example closed and

unventilated or inadequately ventilated rooms and silos, ducts, culverts, boreholes,

bored piles, manholes, shafts, excavations, sumps, inspection pits, cofferdams ,and

building voids.

19.2 The hazards

19.2.1 The most likely hazards are as follows:

(a) Flammable Substances and Oxygen Enrichment;

(b) Toxic Gas, Fume or Vapour;

(c) Oxygen deficiency;

Page 113: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-43 Sign & Stamp of Tenderer

(d) The Ingress or Presence of Liquids;

(e) Presence of Excessive Heat,

(f) Excessive Humidity.

19.3 Entry Procedures

19.3.1 Contractors will ensure that no work will be undertaken in Confined Spaces unless a

Permit to Work, has been prepared and issued.

19.3.2 Only persons who have been thoroughly third party trained, experienced and are

physically fit shall be allowed to work in Confined Spaces. The refresher training shall

be conducted every six months. The Profile of the training Agency, ISO certifications,

course details, the name, educational qualifications and training experience for of the

trainers are to be submitted to the Employer/Engineer a minimum 28 days before prior

to appointment of the agency. Only upon notice of no objection by the Employer

/Engineer shall be authorised to deliver training on CMRL sites.

19.3.3 Persons with any of the following medical conditions shall not be allowed to work in

confined spaces:

(a) A history of fits, blackouts or fainting attacks,

(b) A history of heart disease or disorder,

(c) High blood pressure,

(d) Asthma bronchitis, or shortness of breath on exertion,

(e) Deafness

(f) Meniers disease or disease involving giddiness or loss of balance,

(g) Claustrophobia or nervous or mental disorder,

(h) Back pain or joint trouble that would limit mobility in confined spaces,

(i) Deformity or disease of the lower limbs limiting movement.

(j) Chronic skin disease,

(k) Serious defects in eye sight or lack of sense of smell

19.3.4 Before any confined space work commences the following equipment shall be

available for use and the sample of the personal protective equipment to be submitted

to the Employer’s/Engineer for notice for no objection. Only upon the notice of no

objection by the Employer /Engineer shall be authorised to use on CMRL site.

(a) Multi Gas Monitor; or other suitable gas monitoring equipment.

(b) Minimum 35 numbers of 60 minutes Self Contained Breathing Apparatus

(Approved by DGMS) at each Tunnel entrance shall available and Minimum 6

numbers four hours closed circuit breaker breathing apparatus (CCBA

Approved by DGMS) shall available for each tunnel to enable rescue to be

carried out;

(c) Full Body Type Harness for each worker;

(d) Tripod and Lifeline Hoist Rope; for work in situations were a vertical exit from

the confined space is required.

(e) Flame-proof lighting. (Hand lamps not more than 24 volts.);

(f) Resuscitation Equipment and details of Emergency control centre and

operating Procedure to be submitted to the Employer’s /Engineer for notice for

no objection

(g) Ventilation Equipment.

Page 114: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-44 Sign & Stamp of Tenderer

The persons involved in the confined space working operations shall need to be

thoroughly trained and certified as being competent in the use of the above detailed

item of equipment.

19.3.5 The Contractor shall have controlled access/egress points to confined spaces to

prevent unauthorised access. The Contractor shall ensure that there are at least two

readily accessible escape routes from each confined space.

19.3.6 The Contractor shall operate a tag system for entry so that all personnel entering the

confined space can be accounted for.

19.3.7 The Contractor shall ensure that there is an certified man-riding cage capable of taking

a stretcher and two persons, together with an identified crane equipped with rescue

equipment, on standby at all times whilst work is carried out in the confined space.

19.3.8 Gas monitoring shall be conducted by a competent confined space assessor to certify

that the confined space is safe for workers to enter and thereafter at every four (4)

hours intervals.

19.3.9 In addition, the Contractor shall ensure that suitable atmospheric monitoring devices

such as anemometer and wet/dry bulb thermometer are made available for the

competent confined space assessor to determine the air flow, ambient temperature

and humidity level within the confined space.

19.3.10 Provide noise enclosure for the ventilation fan and install silencer at the end of the

ventilation fan.

20. SITE ELECTRICITY

20.1 General

20.1.1 The Contractor shall nominate a representative whose name and qualifications shall

be submitted in writing to the Employer/ Engineer for review not later than 4 weeks

before the appointment and who shall be solely responsible for ensuring the Safety of

all temporary electrical equipment on Site. The Contractor shall not install or operate

any temporary Site electrical systems until this representative is appointed and has

commenced duties. The project specific CEIG shall be obtained by the contractor as

per Central Electrical Authority (Safety Requirements for construction, operation and

maintenance of Electrical plants and electric lines) Regulations, 2011.

20.1.2 The name and contact telephone number of the electrical C license holder shall be

displayed at the main distribution board for the temporary electrical supply so that he

can be contacted in case of an emergency.

20.1.3 The Contractor shall submit schematic diagrams and the details of the equipment for

all temporary electrical installations, and these diagrams together with the temporary

electrical equipment shall be submitted to the Employer/ Engineer for review.

20.1.4 All electrical installation work on Site shall be carried out in accordance with the

requirements laid down in the Specification. All work shall be supervised or executed

by an Govt recognized Electrical ‘’C’’ licence holder.

20.1.5 All temporary electrical installations, equipment and tools shall be checked and

certified safe for use prior to usage on site by a full-time an Govt recognized Electrical

‘’C’’ licence holder and thereafter monthly and after any repairs. The Electrical ‘’C’’

licence holder shall provide a sticker on the equipment and tools indicating the date of

inspection and is safe for use.

20.1.6 A current photograph of the Electrical ‘’C’’ licence holder’s and the contact number(s)

Page 115: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-45 Sign & Stamp of Tenderer

shall be displayed on the outside of all boxes containing electrical DBs for ease of

reference. These boxes must be secured with locks to prevent tampering and the keys

kept with the Electrical ‘’C’’ licence holder /Contractor’s Safety Dept.

20.1.7 The Contractor shall ensure that all portable electrical appliances used above and

below ground level, that are handheld tools and inspection lamps, are rated at 110

volts AC via a step down transformer centre tapped to earth (CTE).

20.1.8 The Contractor shall ensure that all generators and welding sets in use on Site are

adequately and effectively earthed at all times during operation.

20.1.9 All Temporary Electrical Site installations and distribution systems shall as a minimum meet IP44/IP 65 standards and be in accordance with:

(a) Indian Electrical Regulations;

(b) The Power Companies’ Supply Rules;

(c) BS 7671 Requirements for electrical installation, the IEE Wiring Regulations

(16th Edition);

(d) BS 7375 Distribution of Electricity on Construction and Building Sites;

(e) BS 4363 Distribution Assemblies for Electricity Supplies for Construction and

Building Sites; and

20.2 Design Considerations

20.2.1 Distribution equipment utilised within the temporary electrical distribution system shall

incorporate the following features:-

(a) Flexibility in application for repeated use;

(b) Suitability for transport and storage;

(c) Robust construction to resist moisture and damage; and

(d) Safety in use.

20.2.2 All cabling shall be run at high level whenever possible and firmly secured to ensure it

does not present a hazard or obstruction to people and equipment.

20.2.3 The installation on Site shall allow convenient access to authorised and competent

operatives to work on the apparatus contained within.

20.3 Distribution of supply

20.3.1 The Site mains voltage shall be as the Electricity Utility supplies, 415V 3-phase 4-wire

system.

(a) Single-phase voltage shall be as the Electricity Utility supplies, 240V supply.

(b) Reduced voltages shall conform to BS 7375.

20.3.2 The following voltages shall be adhered to for typical applications throughout the

distribution systems:

(a) Fixed plant - 415V 3 phase;

(b) Movable plant fed by trailing cable - 415V 3 phase;

(c) Installations in Site buildings - 240V 1 phase;

(d) Fixed flood lighting - 240V 1 phase;

(e) Portable and hand held tools - 110V 1 phase;

(f) Site lighting (other than flood lighting) - 110V 1 phase; and

(g) Portable hand-lamps (general use) - 110V 1 phase.

Page 116: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-46 Sign & Stamp of Tenderer

20.3.3 Protection shall be provided for all main and sub-circuits against excess current,

residual current and earth faults. The protective devices shall be capable of interrupting

(without damage to any equipment or the mains or sub-circuits) any short circuit current

that may occur.

20.3.4 Earthing and bonding shall be provided for all electrical installations and equipment to

prevent the possibility of dangerous voltage rises and to ensure that faults are rapidly

cleared by installed circuit protection.

20.3.5 Only plugs and fittings of the weatherproof type shall be used and they should be colour

coded in accordance with the Internationally recognised standards for example as

detailed as follows:

(a) 110 volts: Yellow.

(b) 240 volts: Blue.

(c) 415 volts: Red.

20.4 Cables

20.4.1 Cables shall be selected after full consideration of the conditions to which they will be

exposed and the duties for which they are required. For supply cables up to 3.3kV the

cable armouring shall be used as the earth return in conditions where the cable is

continuously extended and not subject to continuous movement after installation. If

cable laid in the above ground or underground should be laid as per the norms of Indian

electricity rules 1956.

20.4.2 For supplies to mobile or transportable equipment where operation of the equipment

subjects the cable to flexing, the cable shall conform to one of the following

specifications appropriate to the duties imposed on it:

(a) BS 6708 flexible cables for use at mines and quarries;

(b) BS 6007 rubber insulated cables for electric power and lighting; and

(c) BS 6500 insulated flexible cords and cables.

20.5 Maintenance

20.5.1 Strict maintenance and daily checks of control apparatus and wiring distribution

systems shall be carried out by an Govt recognized Electrical ‘’C’’ licence holder (duly

qualified to carry out the said checks) to ensure safe and efficient operation of the

systems. A team comprising of contractor’s senior Electrical Manager and Safety

Manager shall conduct a monthly Electrical Safety Audit and the report shall be

submitted no later than the 7th of each month within the Contractor’s monthly H&S

Report.

20.5.2 All portable electrical appliances shall be permanently numbered (inspection tag labels

or similar) and a record kept of the date of issue, date of the last inspection carried out

and the recommended inspection period.

20.5.3 The Work area light mounting height was 25 ft (7.6 m) and the distance between two

work area light should be within 30 meters. The Lighting pole shall not be tied on the

barricading board.

20.6 Lighting:

20.6.1 The contractor shall provide sufficient site lighting, of the right type and at the right

place for it to be properly effective. Lighting ought not to introduce the risk of electric

shock. Therefore, 230V supplies should be used for those fittings, which are robustly

installed, and well out of reach e.g. flood lighting or high-pressure discharge lamps.

Page 117: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-47 Sign & Stamp of Tenderer

20.7 Illumination

20.7.1 The contractor shall conduct a monthly illumination monitoring by lux meter for all the

locations and the report shall be sent to the Employer/ Engineer within 7th of the next

month and the same shall be reviewed during the monthly OSH&E committee meeting.

20.7.2 The contractor shall take every effort to illuminate the work site is listed in the below table

Minimum Lighting Requirements

S.N. Facility or Function

Luminance – Ix

(lm/ft2)

1. Administrative areas (offices, drafting and meeting rooms, etc.)

540 (50)

2. Construction areas

- general indoor

- general outdoor

55 (5)

33 (3)

3. Access ways

- exit ways, walkways, ladders, stairs110 (10)

4. Maintenance / Operating areas / shops

- vehicle maintenance shop

- carpentry shop

- outdoors field maintenance area

- refuelling area, outdoors

- shops, fine details work

- shops, medium detail work

325 (30)

110 (10)

55 (5)

55 (5)

540 (50)

325 (30)

5. Mechanical/electrical equipment rooms 110 (10)

6. Hoists, Elevators, freight and passenger 215 (20)

7. Warehouses and storage rooms/area

- indoor stockroom, active/bulk storage

- indoor rack storage

- outdoor storage

110 (10)

270 (25)

33 (3)

8. Health Centres and First aid stations and infirmaries 325 (30)

9. Toilets, wash and dressing rooms 110 (10)

10. Work areas – general (not listed above) 325 (30)

11. Parking areas 33 (3)

12. Visitor areas 215 (20)

13. Laboratories 540 (50)

20.8 Monthly Electrical Safety Audit

20.8.1 A team comprising of contractor’s Senior ESHS (Electrical) manager and the Employer/

Engineer shall conduct a monthly electrical safety audit covering the following and

submit the report to the Employer/ Engineer.

Page 118: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-48 Sign & Stamp of Tenderer

i) Electrical accidents investigation findings and remedy

ii) Adequacy of power generation and power requirements

iii) Power distribution and transmission system in place

iv) Updated electrical single line diagram showing the current condition of power

source and distribution including the IP44, IP65 DBs arrangement.

iv) Electrical protection devices – selection, installation and maintenance.

v) Earth or ground connection and earth pit maintenance details

vi) Education and training of electrical personnel undertaken

vii) Routine electrical inspection details

ix) Electrical maintenance system and register.

x) Name plate details of major electrical equipment

xi) CEIG Approval

xi) Classified zones in the site, if any.

21. WELDING AND CUTTING

21.1 General

21.1.1 Contractors shall ensure that all welding, cutting and gouging is carried out so that the

risks are kept at a minimum. There will be some circumstances when Permits to Work

will need to be issued, such as

(a) Welding over areas where others are working;

(b) Working in areas with increased fire risks or hazardous environments;

21.1.2 All equipment must be in good condition, properly installed and routinely inspected by

a competent person, and records must be kept available for inspection by the

Employer/ Engineer.

21.1.3 Flexible hoses, cables and connections must be free from damage or risk of damage

in service. Cables and hoses shall have adequate carrying capacity.

21.1.4 Welders shall wear the correct personal protective equipment which includes the following;

(a) Face and eye protection with correct grade of shield;

(b) Gauntlet gloves;

(c) Safety footwear

(d) Welders apron or fire retardant overalls;

(e) The atmosphere in the vicinity of work must be known to be safe to breathe and

free from flammable gases.

21.1.5 Adequate ventilation and fume extraction must be provided and used as required by

the risk assessment and especially in enclosed areas and pits.

21.1.6 Surfaces to be heated by the process must be cleaned of contaminants that may be

degraded by heat or give off noxious fumes (e.g. paints, plastics, zinc coating).

21.1.7 Naked flames or high temperature surfaces must not be allowed in the vicinity of

volatile solvents.

21.1.8 All moveable flammable materials must be removed from the vicinity of work and

fireproof covers placed over all flammable materials that cannot be removed.

21.1.9 During all welding the work piece and any access equipment must be safely secured.

21.2 Oxy-fuel Gas Processes

Page 119: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-49 Sign & Stamp of Tenderer

21.2.1 Handle cylinders carefully, keep outside enclosed areas and secure in an upright

position on a custom-built stand or trolley fitted. The metal cap shall be kept in place

to protect the valve when the cylinder is not connected for use.

21.2.2 Flash back arresters shall be fitted to both the fuel gas and oxygen cylinders;

21.2.3 Non return valves shall be fitted to the torch or cutting torch;

21.2.4 Hose clamp or clip shall be used to connect hoses firmly in both sides of cylinders and

torches.

21.2.5 Close cylinder valves when flame is extinguished.

21.2.6 Ensure any vessel, drum or tank that has contained flammable or toxic substances has

been properly cleaned and inspected before subjecting it to hot work.

21.2.7 Checks for gas leaks should carried out using soapy water.

21.2.8 Remove all torches from enclosed areas when not in use.

21.2.9 6kg fire extinguisher to be available at all places where hot work is being carried out.

21.2.10 Use firewatchers if there is a possibility of ignition unobserved by the operator (e.g. on

the other side of bulkheads).

21.3 Arc Cutting, Gouging and Welding Processes

21.3.1 Connect the welding current return cable to the work piece close to the arc point or to

a well electrically conductive support structure in good contact with the work piece.

Also, connect the work piece or the support structure to a separate earth terminal.

21.3.2 Take precautions against the risk of increased fume hazards when welding with

chrome containing fluxed consumables or high current metal inert gas (MIG) or

tungsten inert gas (TIG) processes e.g. local exhaust ventilation.

21.3.3 Avoid being in contact with water or wet floors when welding. Use duckboards or rubber

protection.

21.3.4 Provide screens to limit exposure of others to glare from arcs.

21.3.5 Use the correct eye and face protection with the correct filter glass.

21.3.6 Use a low voltage open circuit relay device if welding with alternating current in

constricted or damp places.

21.3.7 All electrical installations shall meet the IS: 5571: 1997 and NFPA 70 for gas cylinder

storage area and other hazardous areas.

21.3.8 Transformer used for electrical arc welding shall be fixed with Ammeter and Voltmeter

and also fixed with separate main power switch.

21.3.9 Welding grounds and returns should be securely attached to the work by cable lugs,

by clamps in the case of stranded conductors, or by bolts for strip conductors. The

ground cable will not be attached to equipment or existing installations or apparatus.

21.3.10 The current for Electric arc welding shall not exceed 300 A on a hand welding operation.

21.3.11 Use a low voltage open circuit relay device if welding with alternating current in

constricted or damp places.

22. COMPRESSED GASES

22.1 Storage

22.1.1 The Contractor shall ensure that all compressed gases, such as oxygen and fuel

gases, are stored in a safe manner in keeping with the following requirements.

22.1.2 When not in use compressed gas cylinders should preferably be stored in the open air

Page 120: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-50 Sign & Stamp of Tenderer

in a well ventilated area at ground level on a firm level surface at least 3m away from

any cellars, drains, excavations or other hollows where vapour may collect. There

should be good access to the area, which should be kept clean and clear of

combustible material, including wood, packing materials and vegetation. If any

protection is provided to prevent cylinders being exposed to the weather, it should be

of non-combustible material and should not inhibit ventilation. The area should not be

close to any source of heat.

22.1.3 Oxygen cylinders and flammable gas cylinders shall be stored separately, at least 6.6

meters (20 feet) apart or separated by a fire proof, 1.6 meters (5 feet) high partition.

Flammable substances shall not be stored within 50 feet of cylinder storage areas.

22.1.4 It is important that the valves of so-called `empty' cylinders are kept closed as well as

those of full cylinders and that plugs, shrouds and caps are kept in place on all

cylinders. This is necessary not only to prevent the escape of any residual compressed

gas into the atmosphere but also to ensure that air is not sucked into the cylinder to

form an explosive mixture inside it. All cylinders should be stored with their valves

uppermost.

22.1.5 The storage area should be enclosed by a fence approximately 2 metres in height. The

fence should be made of non-combustible material and should not inhibit natural

ventilation, particularly at low level - a wire mesh fence is particularly suitable for this

purpose. The fence should have at least two means of exit, which should not be

adjacent to each other. The gates should open outwards and not be self-locking. Both

exits should be unlocked when persons are within the storage compound. At all times

when the site is unattended the storage area should be secured.

22.1.6 On sites where only small quantities of compressed gas are stored (i.e. less than 300

kg). Only one exit will be necessary providing there is no risk of a person being trapped

in the enclosure. The cage should be clearly marked "Highly Flammable and notices

prohibiting smoking and naked lights should be displayed.

22.1.7 portable first aid and 6kg fire extinguishers shall be positioned in close proximity to the

storage area for use in an emergency. Fire Extinguisher should confirm to IS 2190:

1992.

22.1.8 Industrial Liquefied Petroleum Gas or Domestic Liquefied Petroleum Gas cylinders

shall not permit to use in CMRL project sites.

22.2 Handling Compressed Gas cylinders

22.2.1 Cylinders should be handled with care and wherever practicable moved on specially

designed trolleys. The valve on a cylinder should not be used for lifting or to lever the

cylinder into position. Damage to the valve can result in highly dangerous situations

following the escape of gas. For the same reason throwing or dropping cylinders should

be prohibited as in such circumstances damage to the valve is even more likely.

22.2.2 Before connecting any cylinder or container of compressed gas to equipment it is

essential that all fires, flames or other sources of ignition in the vicinity, including

cigarettes and pilot lights, are extinguished. Where practicable cylinders should be

changed in the open air. The cylinder should be examined and any damaged or faulty

cylinder should NOT be used. No attempt should be made to rectify any fault or

damage. The cylinder should be put in a safe place away from other cylinders or

combustible materials until returned to the supplier.

22.2.3 If a cylinder is found to be leaking and the leak cannot be stopped, the cylinder should

Page 121: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-51 Sign & Stamp of Tenderer

be carefully removed to a well-ventilated open space free from sources of ignition. It

should be left with the leak, usually at the valve, uppermost, marked faulty and notices

displayed prohibiting smoking or other naked lights. General access should be

prevented by barriers or otherwise. The supplier of the cylinder should be informed

immediately. Under no circumstances should users attempt to dismantle or repair

defective cylinders.

22.3 Regulators

22.3.1 Regulators should be suitable for the gas and pressure in use. Checks for leaks at the

regulator nuts should be made only by using soapy water. In the event of a defect or

of any damage to a regulator, no attempt should be made to repair it. Such repairs

should only be carried out by specialists.

22.4 Hoses

22.4.1 Flexible tubing should only be used for final connections to appliances. Flexible hoses

should comply with BS 3212, BS 5120 or other nationally recognised standard. They

should be additionally protected or of steel braid reinforced construction wherever they

might be subject to damage by abrasion and so sited that they are not exposed to

excessive heat. The length of hoses should be kept as short as practicable

22.5 Training and Instruction

22.5.1 Many accidents involving compressed gas are due to ignorance of simple basic

precautions. It is essential that all persons using compressed gas are suitably

instructed about the hazards and the precautions to be taken in its use.

23. MACHINERY

23.1 Machinery Fencing

23.1.1 The Contractor shall ensure that all gears, revolving shafts, flywheels, couplings and

other dangerous parts of machinery shall be effectively guarded unless they are so

constructed, installed or placed as to be safe as if they were guarded.

23.1.2 Fencing of dangerous parts of machinery shall not be removed while the machinery is

in use or in motion. If the fencing is required to be removed for maintenance purposes

it shall be replaced before the machine is taken into use.

23.2 Maintenance

23.2.1 The Contractor shall ensure that all machinery used on site is in safe condition and is

properly maintained and repaired by duly authorised, thoroughly trained and

experienced persons.

23.2.2 No repair to machinery shall be carried out whilst it is in motion unless it is unavoidable.

23.2.3 Maintenance records shall be kept available for inspection by the Engineer.

23.3 Air Receivers

23.3.1 All Air receivers shall be fitted with a pressure relief valve and shall have the safe

working pressure clearly marked upon them.

23.3.2 Every air receiver shall be subject to an annual test, which shall be carried out by a

duly authorised person. The results of all tests shall be recorded and the records shall

be kept available for inspection by the Employer/ Engineer.

23.3.3 The connection couplers on compressed airlines shall be securely fixed together and

Page 122: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-52 Sign & Stamp of Tenderer

have Safety chains or be wired at the joints in order to ensure that the joints do not

come apart when charged with compressed air.

23.4 Woodworking Machines

23.4.1 All woodworking machines shall be fitted with the following guards and devices;

(a) Top Guard;

(b) Riving Knife;

(c) Guards to protect all drive belts etc.;

(d) An emergency stop switch easily accessible by the operator;

(e) A push stick;

23.4.2 Woodworking machines shall be operated only by thoroughly trained and experienced

operators.

23.5 Abrasive Wheels

23.5.1 All Abrasive wheel machines shall be fitted with appropriate guards which shall be kept

in place at all times the machine is in use.

23.5.2 All abrasive wheel machines shall have the spindle speed clearly marked upon them

in revolutions per minute.

23.5.3 Only thoroughly trained and experienced persons are allowed to change the wheels

on the machines. Wheels must inspected and ring tested before mounting to ensure

that wheels are free from cracks or defects.

23.5.4 Safety Goggles or Face shields must be worn when grinding or cutting with abrasive wheels.

24. PLANT AND EQUIPMENT OPERATIONS

24.1 General

24.1.1 The contractor shall ensure that only safe and well-maintained plant and equipment

shall be allowed to operate on any of the sites.

24.1.2 All operators of heavy plant such as, earth movers, piling rigs, etc. shall be medical

Examination and Vision Test over twenty years of age and be thoroughly trained and

experienced to operate the equipment. Vision test shall be carried out by the

ophthalmologist doctor.

24.1.3 No unauthorised person shall be permitted to ride on plant.

24.1.4 The operators shall conduct daily inspections of their respective items of plant with the

results of these inspections being recorded and the records kept available for

inspection by the Engineer.

24.1.5 All mobile heavy plant shall be equipped with at least one 6 kg Dry Powder Fire

Extinguisher, carried at a suitable position so as to ensure its easy availability.

24.1.6 Whenever heavy plant is operating in congested areas, thoroughly trained and

experienced banksmen shall be deployed to control the plant and personnel movement

and interface.

24.1.7 Any waste engine oil and filters following any on site servicing and maintenance shall

be removed from the sites and disposed of in an environmentally conscious manner at

authorised disposal locations.

24.1.8 All drums of fuel oil shall be stored on drip trays or the fuel shall be kept in bunded bulk

Page 123: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-53 Sign & Stamp of Tenderer

storage fuel tanks, with quantities stored being kept to a minimum.

24.1.9 The storage areas shall have dry powder fire extinguishers positioned in close

proximity to their location for use in an emergency.

24.1.10 The Contractor shall assess the OSH&E risks especially in terms of age, noise,

emissions, condition, etc. associated with the plant, equipment or tool and only those

assessed with minimal OSH&E risks shall be brought to the Site.

24.1.11 The Employer /Engineer shall stop the plant, equipment or tool from operation or

require its removal if he finds the OSH&E associated risks to be high. The Contractor

shall not be entitled to any claim for compensation or Extension of Time for Completion.

24.1.12 The Contractor shall implement a preventive maintenance programme to ensure that

all plant, equipment and tools are maintained in a safe and working order.

24.1.13 The Contractor shall implement a monthly inspection program to inspect all plant,

equipment and tools. All plants, equipment and tools that have undergone repair or

maintenance shall be inspected and checked before being returned to service. Stickers

or tags shall be displayed to indicate its approval for usage or “Not for Use”.

24.1.14 The Contractor shall implement a lockout and tag-out system, Energy Lockout and

Tagout Procedure.

24.1.15 Job-made or modified tools of any kind shall not be used on site.

24.1.16 All new heavy equipment to be used in CMRL Worksites shall be subjected to approval

of the Employer /Engineer.

24.1.17 On-site speed limits shall be applied as a mandatory standard and due diligence shall

be given to any operations which are likely to create a dust nuisance.

24.1.18 All machinery/plant/vehicle used on site shall have enclosed air-conditioned cabs.

24.1.19 The windows shall be provided with toughened safety glass and wipers.

24.1.20 Seat belt for the driver shall be provided.

24.1.21 All site plant and machinery shall be thoroughly washed down before leaving the site.

24.1.22 A team comprising of contractor’s senior plant Manager and Safety Manager shall

conduct a monthly plant and machinery Audit and the report shall be submitted no later

than the 7th of each month within the Contractor’s monthly H&S Report.

25. TUNNELLING OPERATIONS - NOT USED

26. BLASTING OPERATIONS

26.1 Authorisation for Blasting

26.1.1 The Contractor shall ensure that all blasting operations will only be permitted following

consultations with the relevant authorities and subsequent issuing of the permission to

blast permits. The Employer / Engineer must also give his\her consent in writing before

any blasting operations take place.

26.1.2 All blasting shall be conducted under the direct supervision of a Licensed Shot firer.

26.2 Risk Assessment and Method Statements

26.2.1 The Contractor shall produce a detailed hazard and risk assessment and an in depth

method statement for amongst others the following elements:

(a) Type of explosives to be used.

(b) Anticipated effects of vibration on nearby structures.

(c) Blasting patterns.

Page 124: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-54 Sign & Stamp of Tenderer

(d) Delivery of the explosives.

(e) Transportation and storage of explosives on site.

(f) Drilling and charging of holes.

(g) Warning sirens.

(h) Measurement of Vibration

(i) Provision of sentries.

(j) Use of blast screens.

(k) ALL CLEAR.

(l) Ventilation following blasting.

(m) Atmosphere monitoring.

(n) Procedure for miss-fires.

27. DEMOLITION

27.1 General

27.1.1 The Contractor shall ensure that all demolition works shall be carried out in a controlled

manner under the management of experienced and competent supervision.

27.1.2 Prior to any demolition commencing, a survey shall be conducted to identify if there

are any hazardous materials present, for example the presence of materials such as

asbestos and lead.

27.1.3 If any hazardous materials are found, then consideration shall be given as to whether

they shall need to be removed by a Specialist Agency or Sub-contractor prior to the

main demolition works commencing.

27.1.4 Before the demolition commences all relevant notifications will need to be given to the

local authorities and media.

27.1.5 Measures for protection to the public shall be required to be put into place in order to

give protection from any possible falling debris and dust generation.

27.1.6 All power supplies and services shall be disconnected before any demolition work

commences.

28. FALSE WORK / FORMWORK

28.1 General

28.1.1 The contractor shall ensure that all false work / formwork has been properly designed

and is suitable for the purpose.

28.1.2 All designed false work / formwork shall be erected in strict accordance to the design.

28.1.3 Prior to the loading and subsequent striking of false work / formwork, permission shall

be obtained from the Contractor’s Designer and Engineer who shall both inspect and

sign off on the structure in person.

28.1.4 Adequate provision shall be made on the working platforms for the concrete placement

operations, these shall include locations for vibrators and the unobstructed movement

of personnel controlling the rubber hose during the concrete pumping operations or

the concrete skip during any skipping operations.

28.1.5 The Contractor should use the following checklist to check that false work / formwork

is being used safely;

(a) Have the design and the supports for shuttering and false work / formwork been

checked?

(b) Is it being erected safely from steps or proper platforms?

Page 125: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-55 Sign & Stamp of Tenderer

(c) Are the props plumb and properly set out?

(d) Are the bases and ground conditions adequate for the loads?

(e) Are the correct pins used in the props?

(f) Are the timbers in good condition?

(g) Is it inspected by a competent person against the agreed design before

permission is given to pour concrete?

29. PILING AND DIAPHRAGM WALLS

29.1 General

29.1.1 The contractor shall prepare safe systems of work and method statements for all work

concerned with piling and diaphragm walls. He shall take the following points into

consideration.

29.1.2 Piling Rig is not a lifting equipment shall not be used for any lifting operation.

29.1.3 Any excavated piles or panels shall not be left unattended, unless they are adequately

fenced around to prevent accidental entry into the immediate vicinity of the pile or

panel.

29.1.4 Because of the use of heavy plant and equipment in generally congested work areas

then trained banksmen shall be deployed to control the movement of the plant and

personnel interface.

29.1.5 All lifting operations shall be conducted in accordance with the requirements as

detailed in Section 18 Lifting Operations.

29.1.6 Calcium Oxide shall not be used for stabilising the excavated spoil as it is an acute

irritant, unless an agreed method statement has been produced.

29.1.7 A method statement shall be produced by the Contractor, which details the process for

grab retrieval in the event of a grab becoming detached during the course of a pile or

panel excavation.

29.1.8 A method statement shall be produced by the Contractor, which details the process for

stop end recovery.

29.1.9 Wheel washing facilities shall be available on the sites for washing down the spoil

removal trucks and the concrete delivery vehicles.

29.1.10 Bentonite and polymer storage tanks shall be bunded around to retain any

unintentional and uncontrolled spillage.

29.1.11 The contractor shall submit to the Employer / Engineer, for approval, proposals for the

treatment of Bentonite slurry and its subsequent disposal.

29.1.12 No Bentonite spillage shall be allowed on any roads.

29.1.13 Regular site cleaning shall be carried out at all work-sites.

29.1.14 The Contractor as part of his\her Emergency Plans shall develop procedures for the

collapse of piles and diaphragm walls.

29.1.15 Install automatic water sprinkler system to wet vehicular access.

30. WORK ADJACENT TO LIVE RAILWAYS

30.1 General

30.1.1 Whenever work is to be conducted in close proximity to the live railways then the

following measures shall need to be addressed:

(a) The laws of India, State rules shall be followed.

Page 126: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-56 Sign & Stamp of Tenderer

(b) No persons are allowed to encroach onto the railway unless specific authority has

been given by the owner.

(c) Adequate protection shall be followed. (Provision of Block Inspectors, Flagmen

and Lookouts.)

(d) All persons shall wear high visibility clothing at all times.

(e) Any induction training requirements of the railway owner shall be strictly observed

31. WORK ADJACENT TO LIVE ROADWAYS

31.1 General

31.1.1 Whenever working adjacent to any live roadways then the following aspects shall be

considered.

(a) Close liaison with the Police and Municipal Authorities.

(b) Production of an agreed traffic management scheme in accordance with the local

traffic laws. (Barriers, signs, lights and road markings.) this\her shall include

adequate provision for pedestrians.

(c) Provide traffic marshal /Traffic Controller high reflective safety vest fitted with led

lights by all personnel engaged in the activities.

(d) Traffic Marshals shall be appointed and deployed to ensure that all road

movement is carried out safely.

(e) Ensures that traffic Marshal/Traffic Controller is available at all times of the day

/Night to alert motorists of the temporary civil works ahead.

(f) Age of the traffic Marshal/Traffic Controller shall not be more than 55 years old at

time of appointment at site.

32. PERSONAL PROTECTIVE EQUIPMENT (PPE)

32.1 General

32.1.1 The contractor shall at all-time maintain a minimum of 10% spare PPE and safety

appliance stock. Stocks are to be recorded and made available for the Employer

/Engineer upon request. Failing to do so shall invite appropriate penalty as per the

provisions of the contract, and would include amongst others the following items:

(a) Safety Helmets.

(b) Hearing Protection.

(c) Respiratory Protection.

(d) Eye Protection.

(e) Protective Gloves.

(f) Safety Footwear.

(g) High Visibility Clothing to BS EN 471 Class 3 standard

32.1.2 PPE’s shall be kept available for use by all staff, workers and authorised visitors to the sites.

32.1.3 The Contractor shall remove from the site any worker who consistently refuses to wear

the appropriate personal protective equipment.

32.1.4 The Contractor shall implement a hand protection programme subject to the

acceptance of the Employer /Engineer. The programme will:

a) Identify activities on site that can cause hand injuries;

b) Propose safety interventions such as engineering or administrative measures to

reduce the hazard;

Page 127: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-57 Sign & Stamp of Tenderer

c) Select, provide and maintain suitable hand protection devices and supervise their use;

d) Review and monitor the programme to test its effectiveness.

32.1.5 where hand gloves are used as added protection against hand injury, Contractor shall

assess the work hazards and ensure suitable hand gloves are provided and used.

Latex coated gloves shall be used for general works only.

32.1.6 The Contractor shall provide, maintain and enforce the usage of PPE for all the

personnel on site at all times. The following PPE shall be compulsory on site:

a) Safety helmets with chin strap conforming to BS EN or IS standards.

b) Safety footwear with steel toe cap conforming to BS EN or IS standards

c) High-visibility vest/clothing conforming to BS EN or IS standards.

d) Safety belts shall be provided for restraining falls or safety harness for fall protection.

Safety belts and harness conforming to BS EN or IS standards

e) Respirators / dust masks of the appropriate standard shall be provided for activities

generating dust or fume.

32.1.7 The Contractor shall maintain and update all PPE issuance records.

33. MEDICAL FACILITIES

33.1 Physical fitness of workmen

33.1.1 The contractor shall ensure that his\her employees/workmen subject themselves to

such medical examination as required under the law or under the contract provision

and the record of the medical examination of every building worker employed by the

contractor shall maintained in a register in Form XII under Schedule-XIII of TBOCWR

2006 and such register shall be made available to the Employer/Engineer, on demand

33.1.2 The contractor shall not permit any employee/workmen to enter the work area under

the influence of alcohol or any drugs.

33.2 Medical Examination

33.2.1 The contractor shall arrange a medical examination of all his\her employees including

his\her sub- contractor employees employed as drivers, operators of lifting appliances

and transport equipment before employing, after illness or injury, if it appears that the

illness or injury might have affected his\her fitness and, thereafter, once in every two

years up to the age of 40 and once in a year, thereafter.

i) The Contractor shall maintain the confidential records of medical examination or

the physician authorised by the Employer/Engineer.

ii) No building worker is charged for the medical examination referred rule No 81

and rule No 223 of TBOCWR 2006 and the cost of such examination is borne by

the contractor, employing such building worker;

iii) The medical examination shall include Full medical and history.

Certificate of medical examination shall be maintained by the contractor as per

Form-XI under Schedule-XIII of TBOCWR 2006.

a) Clinical examination with particular reference to

i) General Physique;

ii) Vision: - Total visual performance using standard orthorator like Titmus

Vision Tester should be estimated and suitability for placement ascertained

in accordance with the prescribed job standards.

Page 128: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-58 Sign & Stamp of Tenderer

iii) Hearing: - Persons with normal must be able to hear a forced whisper at

twenty- four feet. Persons using hearing aids must be able to hear a warning

shout under noisy working conditions.

iv) Breathing: - Peak flow rate using standard peak flow meter and the average

peak flow rate determined out of these readings of the test performed. The

results recorded at pre- placement medical examination could be used as a

standard for the same individual at the same altitude for reference during

subsequent examination.

v) Upper Limbs: - Adequate arm function and grip

vi) Spine: - Adequately flexible for the job concerned.

vii) Lower Limbs: - Adequate leg and foot flexibility.

viii) General: - Mental alertness and stability with good eye, hand and foot coordination.

ix) Any other tests which the examining doctor considers necessary.

33.2.2 If the contractor fails to initiate and continue medical examinations as stated

previously, the Employer / Engineer has the right to appoint a medical examiner

through an agency and deduct the cost and overhead charges against the contractor.

33.3 Health Centre

33.3.1 The contractor shall ensure the provision of a site health centre. This may be mobile

or static however, both must be maintained in good order and complete with facilities

as per the Schedule IX, Schedule-X of TBOCWR 2006.

33.4 First Aid Bases

33.4.1 The Contractor shall establish a First Aid Base, in accordance with the Employer

Requirements, at each of his\her principal work areas. If during the life of the contract

the Contractor’s principal work area moves from one location to another, the Contractor

shall be required to move his\her First Aid Base.

33.4.2 If the Contractor operates more than one principal work area, he will be required to

have a First Aid Base at each of his\her principal work areas.

33.4.3 The First Aid Base shall consist of as a minimum;

(a) A treatment room fitted with two treatment couches,

(b) A hand wash basin with running water;

(c) Lockable cupboards to contain sufficient medical supplies;

(d) Bed.

(e) Six Chairs with footrests

(f) Desk and chair.

(g) Six Stretchers (Which can be lifted and lowered by a crane.)

(h) Pillows and blankets.

(i) Refuse containers.

(j) Medical dressings. (Bandages, plasters, antiseptic wipes.)

(k) Eye irrigation sterile solution.

(l) Paper towels.

(m) Disposable gloves.

Page 129: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-59 Sign & Stamp of Tenderer

33.4.4 The first-aid unit shall be provided with air conditioning and shall be kept in a clean and

tidy state at all times.

33.5 Medical Staff

33.5.1 A qualified Doctor, Nurse and assistant Nurse shall be in attendance at the first aid

base during all times when work is being undertaken on the site.

33.6 Ambulance

33.6.1 A fully equipped ambulance and driver shall be provided at the first aid base during all

working hours. The ambulance shall be equipped with the articles specified in

Schedule-IV of TBOCWR 2006.

33.7 First Aid Boxes

33.7.1 Portable first aid boxes will be maintained and is equipped with the articles specified

in Schedule-III of TBOCWR 2006 at each local site offices and work locations where

20 or more persons work at a time. Every first-aid box or cupboard is distinctly marked

'FIRST AID’.

33.7.2 In each site office and location one employee, suitably trained in first aid, should be

available at all working hours for the purpose of attending to emergencies.

33.8 HIV/ AIDS prevention and control

33.8.1 The contractor shall also extend necessary organizational support to the appointed

agency for the effective implementation HIV/AIDS programme for workmen of the

Contractors.

33.9 Prevention of mosquito breeding

33.9.1 Measures shall be taken to prevent breeding at site. The measures to be taken shall include:

i) Empty cans, oil drums, packing and other receptacles, which may retain water shall

be deposited at a central collection point and shall be removed from the site regularly.

ii) Still waters shall be treated at least once every week in order to prevent mosquito breeding.

iii) Contractor’s equipment and other items on the site, which may retain water, shall be

stored, covered or treated in such a manner that water could not be retained.

iv) Water storage tanks shall be provided.

33.9.2 Posters in Hindi, Tamil and English, which draw attention to the dangers of permitting

mosquito breeding, shall be displayed prominently on the site.

33.9.3 The contractor at periodic intervals shall arrange to prevent mosquito breeding by

fumigation / spraying of insecticides. Most effective insecticides shall include SOLFAC

WP 10 or Baytex, The Ideal Larvicide etc.

33.10 Alcohol and drugs

33.10.1 The contractor shall ensure at all times that no employee is working under the

influence of alcohol / drugs which are punishable under Govt. regulations.

33.10.2 Smoking at public worksites by any employee is also prohibited unless suitable

amenities are provided in accordance with Govt. regulations.

33.10.3 Alcohol testing shall be carried out for all workers and the report should be submitted

on monthly to the Employer / Engineer.

34. FIRE PRECAUTIONS

34.1 General

34.1.1 The Contractor shall be responsible for supplying and maintaining adequate fire

Page 130: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-60 Sign & Stamp of Tenderer

precaution facilities on all his\her sites. The following minimum standards should be

adhered to.

34.1.2 The Contractor shall ensure that specially trained personnel are available to deal with

fires due to electrical causes, gas explosions etc.

34.1.3 A good standard of housekeeping shall be maintained at all times on the sites.

34.1.4 No accumulations of rubbish shall be allowed to gather.

34.1.5 Combustible scrap and other construction debris should be disposed off site on a

regular basis. If scrap is to be burnt on site, the burning site should be specified and

located at a distance no less than 12 metres from any construction work or any other

combustible material.

34.1.6 Signage shall be erected at prominent positions showing the correct use of portable

first aid fire extinguishers.

34.1.7 Emergency Plan and Fire plan shall be prepared and issued. Mock drills should be

held on a regular basis to ensure the effectiveness of the arrangements.

34.1.8 The Contractor shall ensure that all procedures, precautionary measures and safety

standards stipulated in the Fire Plan are implemented, communicated and complied

with by all workers including sub-contractors and Interfacing Contractors.

34.1.9 The Contractor shall review and ensure the adequacy of the Fire Plan as the Works progress.

34.1.10 The Contractor shall carry out monthly checks of fire fighting equipment and test all

alarms and detection devices installed on site. Tags/stickers shall be provided to

indicate the monthly checks.

34.1.11 The Contractor shall conduct weekly inspections of escape routes, fire brigade access,

fire fighting facilities and work areas to ensure that the requirements stipulated in the

Fire Plan are complied with.

34.2 Fire Fighting Equipment

34.2.1 At various locations around the site clearly visible fire points shall be established for

use in an emergency and each fire point should have available as a minimum the

following type of equipment:

(a) Dry Powder Extinguisher.

(b) Water Type Extinguisher.

(c) Bucket of Sand.

34.2.2 Recharging of fire extinguishers and their proper maintenance should be ensured and

as a minimum should meet Indian National Standards

34.2.3 Water supply for firefighting purposes should be provided at the construction site. This

may be in the form of static water tank of adequate capacity or a hydrant line with

adequate water pressure at outlet points.

34.2.4 Sufficient number of fire hoses with branch pipes should be provided at site so that the

fire can be controlled until the arrival the arrival of the Fire Brigade.

34.2.5 The Telephone Number of the local fire brigade should be prominently displayed near

each telephone on site.

34.2.6 Supervisors and workmen at the site should be trained in the use of firefighting

equipment provided at the site.

34.3 Storage of Flammable Liquids

34.3.1 All flammable liquids shall be kept in a secure fire resistant store protected from

Page 131: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-61 Sign & Stamp of Tenderer

electrical sparks welding sparks open flames and smoking.

34.3.2 Only such amounts of flammable liquids should be issued as are required for

immediate use. Cans for carrying flammable liquids should be leakproof and properly

stoppered and clearly marked “FLAMMABLE LIQUID”.

34.3.3 Rags soaked in paints, kerosene and other flammable liquids should be disposed of

daily under supervision. Large quantities of such rags should not be allowed to

accumulate.

34.3.4 All Diesel fuel storage tanks shall be bunded around in order to control any spillage or

leakage that may occur.

34.3.5 All drivers of vehicles, foreman, supervisors and managers shall be trained on

operating the fire extinguishers and firefighting equipment

34.3.6 All lifting appliances’ driver cabin should be provided with a suitable 6kg portable fire

extinguisher.

34.3.7 If the Contractor intends to store petroleum more than the legal requirements and

flammable materials on site, he shall obtain a storage licence from the state

government and a copy of the licence shall be submitted to the Employer /Engineer.

34.3.8 The Contractor shall not store petrol on site. If they want to store they should obtain

licence from the govt of Tamil Nadu

34.3.9 All diesel stored on site shall be kept in drums or in bulk tanks which in either case

shall be located at a designated place away from any sources of ignition or open drain

which does not lead to an interceptor, and shall be properly labelled. A “No Smoking”

sign shall be displayed at the storage location and a charged fire extinguisher of correct

type kept on standby.

34.3.10 All bulk diesel tanks shall be properly supported in an elevated position to facilitate

gravity discharge. They shall stand within a bund constructed to contain a volume of

110% of the volume of the tank. There shall be no breaches in the bund wall, no

material shall be stored within the bund and rain water collecting in the bund shall be

regularly removed to prevent build-up. The inner face of the bund wall shall be coated

with a chemical resistant material. A chemical resistant valve, which shall be closed at

all times, except for releasing rainwater into a stormwater drain via an oil intercepting

system, shall be installed at the outlet situated outside the bund, in accordance with

the legal requirements.

34.3.11 All drums of diesel on Site shall be in good condition and shall be kept closed with a

lid/cap when not being used. They shall be stored on end with the lid/cap uppermost

and kept within a tray of sufficient volume to contain the contents of the largest drum

in the case of accidental rupture, taking into account the presence of other drums within

the tray.

34.3.12 Drums of diesel shall not be rolled along the ground. They shall be transported

vertically chained on a trolley; or by a forklift fitted with a drum handling device and not

standing unsupported on the forks or on a pallet; or by crane using a safe slinging

technique.

34.3.13 Diesel shall be transferred from the storage drum to another container, or to the tank

of plant/machinery using a hand pump wherever practicable and at all times a drip pan

must be provided. Where the diesel container is light enough to be lifted by one person

it can be poured out by hand, using a funnel to guide the liquid.

34.3.14 Any spillages of diesel shall straight away be absorbed using sand or other absorbent

Page 132: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-62 Sign & Stamp of Tenderer

materials, which shall be disposed of as contaminated waste. On no occasion should

diesel be allowed to enter the Site drainage system unless this is connected to an

interceptor prior to the Site waste being discharged into the public sewer system.

35. CONSTRUCTION MACHINERY

35.1 Construction machineries may include dumpers and dump trucks, lift trucks and

telescopic handlers piling rigs, vibro hammers, rail welding equipments, mobile

elevating work platforms, cranes, tipper lorries, lorry loaders, skip wagons, 360°

excavators, 180° backhoe loaders, crawler tractors, scrapers, graders, loading

shovels, trenchers, side booms, pavers, planers, chippers, road rollers, locomotives,

tankers and bowsers, trailers, hydraulic and mechanical breakers etc.

35.2 Safe worthiness certificate

35.2.1 All construction equipment shall be in sound mechanical working condition, tested and

certified every six months by either competent person under Factories Act or

manufacturers’ warranty in case of brand new equipment or authorized persons/

Charted Engineer (Mechanical) / firms approved by the Employer / Engineer before

induction to any site.

35.2.2 Every such certificate shall have the date of purchase, main overhauling undertaken

in the past, any accident to the equipment, visual examination details, critical

components safety check, list of safety devises and its working condition,

manufacturer’s maintenance checklist, past projects wherein the equipment’s were

used etc. as its minimum content.

35.3 Reverse Horns

35.3.1 All Vehicles shall be fitted with audible reverse alarms/camera and maintained in good

working condition. Reversing shall be done only when there is adequate rear view

visibility or under the directions of a banksman.

35.4 General operating procedures

i) Drivers entering site shall be instructed to follow the safe system of work

adopted on site. These shall be verbal instructions or, preferably, written

instructions showing the relevant site rules, the site layout, delivery areas,

speed limits, etc.

ii) No passengers shall be carried, unless specific seating has been provided in

accordance with the manufacturer’s recommendations.

iii) Working on gradients beyond the equipments capability shall not be permitted.

iv) Prevention of dumper and dump truck accidents should be managed by

providing wheel stops at a sufficient distance from the edges of excavations,

spoil heaps, pits, etc.

v) The manufacturer’s recommended bucket size must not be exceeded in excavators.

vi) If excavators operating on a gradient which cannot be avoided, it must be

ensured that the working cycle is slowed down, that the bucket is not extended

too far in the downhill direction, and that travel is undertaken with extreme

caution. A large excavator must never be permitted to travel in a confined area,

or around people without a banksman to guide the driver, who should have the

excavator attachment close in to the machine, with the bucket just clear of the

Page 133: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-63 Sign & Stamp of Tenderer

ground. On wheeled excavators, it is essential that the tyres are in good

condition and correctly inflated. If stabilizing devices are fitted, they should be

employed when the machine is excavating.

vii) When the front shovel of the 1800 backhoe loaders is being employed, the

backhoe attachment shall be in its “travel” position, with the safety locking

device in place.

viii) When operating the backhoe in poor ground conditions, the stabilisers tend to

sink into the surface of the ground, reducing stability. Therefore frequent

checks shall be made for the stability of the machine. The loading shovel

should always be lowered to the ground to stabilise the machine when the

backhoe is employed.

ix) The netting operation of the skip wagons should be carried out prior to lifting

the skip to reduce the risks of working on the rear platform.

x) If a tractor dozer is employed on clearing scrub or felling trees, it shall be

provided with adequate driver protection from rollover and falling objects.

xi) When two or more scrapers are working on the same job, a minimum

distance of at least 25m shall be kept between them.

35.5 All wood working machines shall be fitted with suitable guards and devices such as

top guard, riving knife, push-stick, guards for drive belts and chains, and emergency

stop switch easily accessible by the operator.

35.6 Penalty

35.6.1 If any of the above clauses are not adhered, penalty shall be imposed as per relevant

clause depending upon the gravity of the unsafe act and or condition.

35.6.2 If any of the employees detects the occurrence of minor risk and reports to the

Contractor/Employer and helps in avoiding the mishaps, shall be suitably rewarded.

36. TRAFFIC MANAGEMENT

36.1 General

36.1.1 The Contractor shall provide, install and maintain all necessary traffic and directional

signs, barriers, blinkers, rotating beacons, cones, lane markings etc. in accordance

with the legal requirements. The Contractor must observe the minimum clearance

required between the working area and the trafficked carriageway and ensure that all

plants and materials do not intrude into any area reserved for pedestrians, cyclists or

other traffic.

36.1.2 The Contractor shall regularly maintain the site road surfaces to keep them free of

potholes, unevenness, etc. Mill and patch method shall be required to repair any

uneven surface defects.

36.1.3 The basic objective of the following guidelines is to lay down procedures to be adopted

by contractor to ensure the safe and efficient movement of traffic and also to ensure

the safety of workmen at construction sites.

36.1.4 All construction workers must be provided with high visibility jackets with reflective

tapes as most of viaduct and station works are either located above or under right-of-

way. The conspicuity of workmen at all times shall be increased so as to protect from

speeding vehicular traffic.

Page 134: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-64 Sign & Stamp of Tenderer

36.1.5 At each entrance to the site the Contractor shall erect a large billboard warning all

persons who enter the site that they are required to wear the appropriate Personal

Protective Clothing and that no unauthorised access is allowed.

36.1.6 Wherever the fence runs adjacent to the highway with no buffer-zones then the fence

shall have traffic warning lights duly affixed to it.

36.1.7 Pedestrian route must be provided and separated to avoid mishap involving workers

crossing the roads from different directions ,wherever the fence borders on pedestrian

footpaths lighting shall be provided to illuminate the pedestrian routes. Additional

precautions must be taken and flash lights / flag man required to be placed during foggy

/ adverse weather. The positioning of the fence-line shall not reduce the width of the

pedestrian footpath to less than 900 mm in order to be able to accommodate disabled

persons in wheelchairs.

36.1.8 Barricade Boards shall be washed at least once a week and repainted at least annually.

All barricading boards shall be properly pegged (12 pegs for each board) & all inter

connection between the adjacent boards (3 no’s) shall be tied.

36.1.9 The site fencing shall need to be inspected on a regular basis in order to ensure that

the integrity of the fencing is maintained at all times as far as is practicable.

36.1.10 The guiding principles to be adopted for safety in construction zone are to;

i. Warn the road user clearly and sufficiently in advance.

ii. Provide safe and clearly marked lanes for guiding road users.

iii. Provide safe and clearly marked buffer and work zones

iv. Provide adequate measures that control driver behaviour

through construction zones.

v. Materials and equipment such as pile cages shall not be transported via

Hydra on a public highway unless all access is closed to members of the

public.

vi. Impact protection vehicle(IPV) should be placed in advance while working on

live road.

vii. Vinyl(2x2.5meter) public /Traffic safety information poster shall be pasted on

the each barricaded board.

viii. Light mast should be placed at the start point of the barricaded board while

working on live road.

ix. Rope light shall be installed on all barricade board.

x. Traffic digital sign boards shall be installed at the entry, exit, diversion, Warning,

Road Crossing, Left/Right Carry Way Closed, Electric Cable, Speed Bump,

Men at work, Pedestrian Crossing etc.

xi. Pedestrian route shall be provided with top rail , midrail and the pipes shall be

painted in reflective paints.

36.2 Legal permission

36.2.1 In all cases, the contractor shall employ planned precautions specific to the location of

the site works. Wherever operations undertaken are likely to interfere with public traffic,

specific traffic management plans shall be drawn up and implemented by the contractor

in consultation with the approval of local police authorities and/or the concerned

metropolitan/civil authorities as the case may be.

Page 135: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-65 Sign & Stamp of Tenderer

36.2.2 Such traffic management plans shall include provision for traffic diversion and selection

of alternative routes for transport of equipment. If necessary, the contractor shall carry

out road widening before commencement of works to accommodate the extra load.

36.2.3 The primary traffic control devices used in work zones shall include signs, delineators,

barricades, cones, pylons, pavement markings and barrier lighting.

36.2.4 The road construction and maintenance signs which fall into the same three major

categories as do other traffic signs, that are Regulatory Signs, Warning Signs and

Direction (or guidelines) Reflective Signs shall only be used. The IRC: 67 (Code of

Practice for Road Signs) provide a list of traffic signs. The size, colours and placement

of sign shall confirm to IRC: 67. The contractor shall submit Traffic Sign design to the

Employer / Engineer for Notice of No objection.

36.3 Regulatory signs

36.3.1 Regulatory signs impose legal restriction on all traffic. It is essential, therefore, that

they are used only after consulting the local police and traffic authorities.

36.4 Warning signs

36.4.1 Warning signs in the traffic control zone shall be utilised to warn the drivers of specific

hazards that may be encountered.

36.4.2 The contractor shall place detour signage at strategic locations and install appropriate

warning signs. In order to minimize disruption of access to residences and business,

the contractor shall maintain at least one entrance to a property where multiple

entrances exist.

36.4.3 A warning sign shall be installed an at all secondary road which merges with the

primary road where the construction work is in progress at a sufficient distance before

it merges with the primary road so as to alert the road users regarding the ‘Metro Work

in Progress’.

36.5 Delineators

36.5.1 The delineators are the elements of a total system of traffic control and have two

distinct purposes:

i. To delineate and guide the driver to and along a safe path

ii. As a taper to move traffic from one lane to another.

36.5.2 These channelling devices such as cones, traffic cylinders, tapes and drums shall be

placed in or adjacent to the roadway to control the flow of traffic. These should normally

be retro- reflectors complying with IRC: 79 - Recommended Practice for Road

Delineators.

36.6 Traffic cones and cylinders

36.6.1 Traffic cones of 500mm, 750mm and 1000mm high and 300mm to 500mm in diameter

or in square shape at base and are often made of plastic or rubber and normally have

retro- reflectorised red and white band shall be used wherever required.

36.7 Drums

36.7.2 Drums about 800mm to 1000mm high and 300mm in diameter can be used either as

channelising or warning devices. These are highly visible, give the appearance of being

formidable objects and therefore command the respect of drivers. Drum delineators

must be sufficiently illuminated.

36.8 Barricades

Page 136: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-66 Sign & Stamp of Tenderer

36.8.1 Full height fence, barriers, barricades etc. shall be erected around the site in order to

prevent the working area from the risk of accidents due to public vehicular movements.

The barriers are also designed to protect road users from the dangers associated with

general construction operation material handling and temporary structures.

36.8.2 The structure dimension of the barricade, material and composition, its colour scheme,

CMRL logo and other details shall be in accordance with specifications laid down in

tender document.

36.8.3 All barricades shall be erected as per the design requirements of the

Employer/Engineer , numbered, painted and maintained in good condition and also

Barricade in- charge maintains a barricade register in site. All barricades shall be

washed at least once a week and repainted at least annually. The contractor shall

submit barricade design to the Employer / Engineer for Notice of No objection.

36.8.4 All barricades shall be conspicuously seen in the dark/night time by the road users so

that no vehicle hits the barricade. Conspicuity shall be ensured by affixing retro

reflective stripes of required size and shape at appropriate angle at the bottom and

middle portion of the barricade at a minimum gap of 1000mm. Red light blinker and

Reflective sticker plate should be placed at the top of each barricade.

36.8.5 The contractor shall ensure that all his\her construction vehicles plying on public roads

(like dump trucks, trailers, etc.) have appropriate licenses to ply on public roads from

the Govt. All drivers shall be medically fit and in possession of a valid and current

driving licence as per the requirements of motor vehicles act as amended in 1994, the

central motor vehicles rules, 1989 shall drive these vehicles on the public highway.

36.8.6 The contractor shall not undertake loading and unloading at carriageways obstructing

the free flow of vehicular traffic and encroachment of existing roads by the contractor

applying the excuse of work execution unless traffic management alternatives have

been installed e.g. diversion.

36.8.7 The Contractor shall undertake Barricade Board maintenance work and painting etc.

at the Engineer’s request where concerns have been raised regarding the suitability of

barricading board. Such Barricade Board maintenance shall be carried out with

immediate effect.

36.9. Tow away vehicle

36.9.1 The contractor shall make arrangements keeping tow away van / manpower to tow away

any breakdown vehicle in the traffic flow without losing any time at his\her cost.

36.10 Cleaning of roads

36.10.1 The contractor shall ensure the cleanliness of roads and footpaths by deploying

appropriate manpower to ensure efficiency in the cleaning task. Vehicle Control

36.10.2 Traffic Controllers shall be available for directing vehicles that are exiting the sites

directly onto the live carriageways. Any vehicles entering the sites that are required to

execute reversing manoeuvres shall do so under the strict control of a trained and

designated banksman.

36.11 Spoil Removal

36.11.1 Any vehicles leaving the sites carrying loads which are liable to produce airborne

contaminants shall prior to leaving the site securely sheet the load over in order to

effectively contain any dispersement during transportation on the public highway.

36.11.2 Vehicles exiting the site directly onto the live carriageway shall do so under the control

Page 137: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-67 Sign & Stamp of Tenderer

of the clearly identified Traffic Controller.

36.11.3 Any vehicles that are required to reverse whilst on the site shall do so under the control

of a trained banksman.

36.11.4 Any vehicles prior to leaving the site shall have their wheels washed and any loose

material removed.

36.11.5 Any spoil that is removed from the work-sites shall be disposed of only at authorised

dumping sites.

36.11.6 A team comprising of contractor’s construction Manager and Traffic Engineer shall

conduct a monthly Traffic Safety Audit and the report shall be submitted no later than

the 7th of each month within the Contractor’s monthly H&S Report.

37. HOUSEKEEPING

37.1 Housekeeping is the act of keeping the working environment cleared of all

unnecessary waste, thereby providing a first-line of defence against accidents and

injuries.

37.2 Contractor shall understand and accept that improper housekeeping is a primary

hazard in any construction site and ensure that a high degree of house keeping is

always maintained.

37.3 Housekeeping is the responsibility of all site personnel, and line management

commitment shall be demonstrated by the continued efforts of supervising staff

towards this activity.

37.4 General House keeping shall be carried out by the contractor and ensured at all times

at the Work Site, Construction Depot, Batching Plant, Labour Camp, Stores, Offices

and toilets/urinals. Towards this the Contractor shall constitute a special group of

house keeping personnel. This group shall ensure daily cleaning at work sites and

surrounding areas and maintain a register for inspection at the Employer /Engineer

request.

37.5 Adequate time shall be assigned to ensure that good housekeeping is maintained.

This shall be carried out by the housekeeping team.

37.6 The contractor shall be responsible to provide segregated containers for disposal of

debris at required places and regular cleaning of the same.

37.7 Full height fence, barriers, barricades etc. shall be erected around the site in order to

prevent the surrounding area from excavated soil, rubbish etc, which may cause

inconvenience to and endanger the public. The barricade especially those exposed

to public shall be aesthetically maintained by regular cleaning and painting as directed

by the Employer / Engineer. These shall be maintained in one line and level.

37.8 All stairways, passageways and gangways shall be maintained without any blockages

or obstructions. All emergency exits passageways, exits fire doors, break-glass alarm

points, fire fighting equipment, first aid stations, and other emergency stations shall be

kept clean, unobstructed and in good working order.

Page 138: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-68 Sign & Stamp of Tenderer

37.9 Lumber with protruding nails shall be either bent or removed and properly stacked.

Un- packed wooden strips shall be safely stored and disposed.

37.10 All surplus earth and debris are removed/disposed off from the working areas to

officially designated dumpsites. Trucks carrying sand, earth and any pulverized

materials etc. in order to avoid dust or odour impact shall be covered while moving.

The tyres of the trucks leaving the site shall be cleaned with water, wherever the

possibility of spillage on carriageways meant for regular road traffic exists.

37.11 No parking of trucks/trolleys, cranes and trailers etc. shall be allowed on roads, which

may obstruct the traffic movement.

37.12 Roads shall be kept clear and materials like: pipes, steel, sand boulders, concrete,

chips and brick etc.

37.13 Water logging or bentonite spillage on roads shall not be allowed. If bentonite spillage

is observed on road endangering the safety of road users, the contractor shall be

penalised as per Table -6 of Employer’s Requirements ESHS Volume 1.

37.14 Proper and safe stacking of material are of paramount importance at yards, stores and

such locations where material would be unloaded for future use. The storage area

shall be well laid out with easy access and material stored / stacked in an orderly and

safe manner.

37.15 Flammable chemicals / compressed gas cylinders shall be safely stored.

37.16 Unused/surplus cables, steel items and steel scrap lying scattered at different places

within the working areas shall be removed to predetermined locations(s).

37.17 All wooden scrap, empty wooden cable drums and other combustible packing

materials, shall be removed from work place to identified location(s).

37.18 Empty cement bags and other packaging material shall be properly stacked and removed.

37.19 The Contractor shall ensure that all his\her sub-contractors maintain the site

reasonably clean through provisions related to house keeping

37.20 The Contractor shall implement a 5S housekeeping method approved by the Employer

/Engineer. The method shall be based on a Japanese quality management concept

based on cyclical methodology. The 5S shall consist of Seiri (Sort/Organise), Seiton

(Straighten/Orderliness), Seiso (Sweep/Cleanliness), Seiketsu (Standardise) and

Shitsuke (Sustain/Discipline).

37.21 The Contractor shall transport waste material directly from the excavation to the

approved dumping ground and shall discharge the waste directly into position. No

stockpiles of waste are allowed on site.

38. OVERHEAD PROTECTION

38.1 All contractors shall provide overhead protections as per TBOCWR 2006

i) Overhead protection (Fan) should be erected along the periphery of every building

which is under construction and the building height shall be 15m or above after

construction.

ii) Overhead protection shall be minimum 2m wide and the outer edge shall be 150mm

Page 139: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-69 Sign & Stamp of Tenderer

higher than the inner edge and an angle not more than 20degree to its horizontal

sloping into the building.

iii) Overhead protection shall not be erected more than a height of 5m from the base

of the building.

iv) Areas of inadvertent hazard of falling of material shall be guarded or barricaded to

prevent access and appropriately signed.

39. SLIPPING, TRIPPING, CUTTING, DROWNING AND FALLING HAZARDS

i) All places should be free from dust, debris or similar materials.

ii) sharp projections or any protruding nails or similar objects shall be suitably

guarded or shall even be avoided to make the place safe to work.

iii) Contractor shall not allow workmen to work or use platforms,

scaffolds/passageways or any walkways, which has water, or oil or similar

substances spilt and has a slipping hazard, unless it is cleaned off or covered or

sanded or saw dusted or make it safe with any suitable material.

iv) When workers are exposed to areas where fall into water is possible, the

contractor shall provide suitable and adequate equipment for saving the workers

from drowning and rescuing from such hazard. If the Employer / Engineer

considers, the contractor shall provide well-equipped boat or launch, manned with

trained personnel at the work place.

v) Open side or opening where worker, equipment, vehicle or lifting appliance may

fall at a building or outside shall be guarded suitably except in places of free access

by reasons of nature of work.

vi) Suitable safety net shall be provided at places of material / man falling is possible in

vii) accordance with national standards

40. LAUNCHING OPERATION

40.1 The contractor shall take utmost precaution at all stages of a launching operation to

include but not limited to; planning, establishing casing yard, casting segments &

girders, transportation and load restrictions applicable, bridge and road conditions,

fabrication and erection of launching girders if any, launching of segments / lifting of

segments, pre-stressing, auto launching of girders and dismantling of launching

girders.

40.2 The contractor shall prepare a comprehensive Method Statement for the launching

operation, Particular reference shall be made to the provisions on working at height &

heavy lift planning. As the process of launching/lifting may be required utilising the

public right-of- way, the safety of workers and the equipment serviceability is of

paramount importance. The following general guidelines shall be adhered throughout

the launching operation.

i) Necessary ‘working platforms’ and fall protection anchorage arrangement shall be

provided in the launching girder itself.

ii) Provisions for mounting light fittings shall also be made available in the launching girder.

iii) The workmen engaged in fabrication of reinforcement, concreting the segment

shall be provided with necessary PPEs including compulsory hand protection

gloves.

iv) Casting and curing of segment / girder shall be undertaken under the direct

supervision of the responsible engineer of the contractor.

v) Trucks with valid registration, licence, safe worthiness certificate, Employer’s

Page 140: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-70 Sign & Stamp of Tenderer

approval certificate, and pollution under check certificate shall only be used for

transport of segments

vi) Drivers engaged for driving these trucks, shall receive refresher.

vii) Drivers shall also have undergone proper medical examination as per relevant

clause mentioned under ‘Medical Facilities’.

viii) The segments / girders shall rigidly secured to the truck with necessary wooden

wedges and necessary red indicators/safety tapes provided so that the vehicle is

clearly seen by other road users both in day / night time.

ix) Every launching girder shall have a responsible engineer on duty all the time.

x) All the time from erection to dismantling the area between the two piers wherein

launching is in progress shall always be barricaded.

xi) Unloading of segments / girders from trucks, lifting of loads, shifting of segments

/ girders, gluing shall be done under the direct supervision of the approved

engineer of the contractor.

xii) Auto launching shall be done only after approval from the Employer / Engineer.

After every auto launching the stability of launching girder shall be ensured.

xiii) The vertical deflection of launching girder shall be monitored at all critical stages

like with/without loads and after every auto launching.

xiv) A register containing all important operational details from erection to dismantling

of launching girders shall be maintained and made available to the Employer /

Engineer whenever called for.

xv) Test certificate for all lifting gears including Macalloy bars shall be maintained at

a location closer to the launching girder itself so that it can be referred during all

inspections.

xvi) Adequate lighting at all time shall be ensured in the entire area of operation.

xvii) Access to drinking water & toilet shall be ensured to all workmen engaged for

launching process.

xviii) Proper access stairways shall be maintained for safe ascending and descending

of workmen / engineers.

40.3 Non-adherence to any of the clauses mentioned above shall be viewed seriously by

the Employer and penalty levied as per relevant clause.

41. MACHINE AND GENERAL AREA GUARDING

41.1 The contractor shall ensure at the construction site all motors, cogwheels, chains and

friction gearing, flywheels, shafting, dangerous and moving parts of machinery are

securely fenced or legged. The fencing of dangerous part of machinery must not be

removed while such machinery is in motion or in use.

42. MANUAL LIFTING AND CARRYING OF EXCESSIVE WEIGHT

42.1 The contractor shall ensure that no worker lifts by hand or carries overhead or over

his\her back or shoulders any material, article, tool or appliances of such a weight that

may cause injury from either a single lift or repetitive lifting. A Risk Assessment

regarding suitable loads to preventing injury must be carried out by the contractor.

Person Maximum weight in kg.

Adult man 55

Page 141: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-71 Sign & Stamp of Tenderer

Adult woman 30

42.2 No building worker aided by other building worker shall lift or carry weight higher than

or exceeding the sum of total of maximum limits set out for each building worker

separately as mentioned in the table above.

43. HAND TOOLS AND POWER TOOLS

43.1 General

43.1.1 The contractor is wholly responsible for the safe condition of tools and equipment used

by his\her employees and that of his\her sub-contractors.

43.1.2 Use of damaged hand tools shall be avoided and the contractor shall ensure all his\her

hand tools used at his\her worksite are safe to work with or stored and shall also train

his\her employees (including his\her sub-contractors) in their correct use.

43.1.3 All hand tools and power tools shall be duly inspected before use for signs of damage.

43.1.4 All hand tools and power tools shall have sufficient grip and the design specification

on par with national/international standards on anthropometrics.

43.2 Hand tools

43.2.1 Hand tools shall include saws, chisels, axes and hatches, hammers, hand planes,

screw drivers, crow bars, nail pullers, scaffolders podge etc.

43.2.2 The contractor shall ensure that,

i) For crosscutting of hardwood, saws with larger teeth points (no. of points per inch)

shall be preferred to avoid the saw jumping out of the work piece.

ii) Mushroom headed chisels shall not be used in the worksite where the fragments of

the head may cause injury.

iii) Unless hatchet has a striking face, it shall not be used as a hammer.

iv) Only knives of retractable blades shall be used in the worksite.

v) No screwdrivers shall be used for scraping, chiselling or punching holes.

vi) A pilot hole shall always be driven before driving a screw.

vii) Appropriate PPE shall be issued to the workforce as dictated by the equipment and

manufacturers recommendations.

43.3 Power tools

43.3.1 Power tools include drills, planes, routers, saws, jackhammers, grinders, sprayers,

chipping hammers, air nozzles and drills.

43.3.2 The contractor shall ensure that

i. Electric tools are properly grounded or / and double insulated.

ii. GFCIs/ RCCBs shall be used with all portable electric tool operated especially

outdoors or in wet condition.

iii. Before making any adjustments or changing attachments, the tool shall be

disconnected from the power source.

iv. All drills shall have suitable attachments respective of the operations and

powerful for ease of operation.

v. Tools shall be specifically designed for that work that shall be

undertaken.

vi. Workers shall not stand on the top of the ladder to drill holes in walls /

Page 142: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-72 Sign & Stamp of Tenderer

ceilings.

vii. Electric plane shall not be operated with loose clothing.

viii. Safety guards used on right angle head or vertical portable grinders must

cover as per the wheel specifications shall be checked.

ix. All power tools / hand tools shall have guards at their nip points.

x. Leather aprons and gloves shall be used as an additional personal protection

auxiliary to withstand kickback.

xi. Push sticks shall be provided and properly used.

xii. Air pressures are to be set at a suitable level for air actuated tool or equipment

being used.

xiii. Before changing or adjusting pneumatic tools, air pressure shall be turned off.

xiv. Only trained employees shall use explosive actuated tools and the tool must

also be unloaded when not in use.

xv. Usage of such explosive actuated tools shall be avoided in case of

places where explosive/flammable vapours or gases may be present.

xvi. Explosive actuated tools and their explosives shall be stored separately and

be taken out and loaded only before the time of immediate use.

xvii. Misfired cartridges of explosive actuated tools must be placed in a container

of water and be removed safely from the project.

xviii. No worker shall point any power operated / hand tool to any other person

especially during loading / unloading.

44. DANGEROUS AND HARMFUL ENVIRONMENT

44.1 When internal combustion engines are to be used into a confined space e.g.

excavation or any other workplace where neither natural or artificial ventilation system

is inadequate to keep carbon monoxide below 50ppm, exposure of building workers

shall be avoided unless suitable measures are taken and provided by the contractor.

44.2 No worker shall be allowed into any confined space, tank, trench or excavation wherein

there are dusts, fumes / vapours or other impurities which is likely to be injurious or

offensive, explosive, poisonous, noxious, gaseous or other harmful substance unless

steps are carried out by the contractor and certified by the responsible person to be

safe

45. CORROSIVE SUBSTANCES

45.1 Corrosive substances including alkalis and acids shall be stored and only used by

persons who have received adequate training in dealing with such substances.

Suitable PPE shall be provided by the contractor to the worker during such handling

and work. In case of spillage of such substances on building worker, the contractor

shall take immediate remedial measures.

46. BATCHING PLANT / CASTING YARD

46.1 Contractor shall submit the Batching plant /Casting Yard site layout and design to the Employer

/ Engineer for Notice of no objection

46.2 The contractor shall ensure that

i. The batching plant / casting yard shall be effectively planned and designed for

Page 143: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-73 Sign & Stamp of Tenderer

efficiency in: unloading and stacking of aggregates, steel, cement, batching plant,

transport of concrete, casting the segment / girder, stacking of segments / girders,

loading of segments / girders on the transporter.

ii. The batching plant / casting yard shall be barricaded and made as a compulsory

PPE zone with restricted access provisions.

iii. Electrical system shall also be suitably planned so that location of diesel generator,

if any, location of DBs, routing of cables and positioning of area lighting poles/masts

does not infringe on any other utilities.

iv. Drainage shall be provided and waste water shall be disposed after treatment

v. Time office, canteen, drinking water, toilet and rest place shall be suitably located

for the easy access to workers. All the facilities shall be properly cleaned and

maintained during the entire period of operation.

vi. Manual handling of cement shall be avoided to a larger extent. Whenever it is absolutelynecessary the workmen shall be given full body, hand and respiratory protection.

vii. The PPE provided for cement handling shall conform to international standards.

viii. Access roads and internal circulation roads shall be well laid and maintained

at all times.

ix. The minimum height of stack to be provided with each generator set can be

worked out using the following. formula: H = h+0.2x ÖKVA.

H = Total height of stack in metre.

H = Height of the building in metres where the generator set is installed.

x. DG shall be silent type with acoustic enclosure.xi. Non-adherence to any of the above provision shall be penalised as per relevant

penalty clause.

47. RADIATION

47.1 The use of radioactive substances and radiating apparatus shall comply with

the Govt. regulatory requirements .

47.2 Operations involving ionising radiation shall only be carried out after having been

reviewed without objection by the Employer / Engineer and shall be carried out in

accordance with a method statement.

47.3 Each area containing irradiated apparatus shall have warning notices and

barriers, as required by the Regulations, conspicuously posted at or near the

area.

47.4 Radioactive substances will be stored, used or disposed shall be strictly in

accordance with the Indian legal requirements.

47.5 The contractor shall ensure that all site personnel and members of the public are not

exposed to radiation.

48. SMOKING

48.1 Smoking within the working areas is prohibited with the exception of designated smoking

areas near the site office. The Contractor shall provide suitably signed designated

smoking areas within the near the site office close to welfare facilities but away from

the work locations, site access routes and sensitive neighbouring properties. The

Page 144: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-74 Sign & Stamp of Tenderer

Contactor shall take all reasonable measures to prevent personnel under his\her

control from smoking on the streets adjacent to worksites.

49. MOBILE PHONES, RADIOS AND AUDIO EQUIPMENT

49.1 All workers / operators are ban from using handphone/ MP3 devices at CMRL

worksites. The handphones are to be surrender to respective supervisors and stored

away at rest areas with lockers. Workers/ Operators are only allowed to use their

handphones/ MP3 during rest times and breaks.

49.2 The Contractor shall provide suitably signed designated areas which shall include

offices and welfare/rest facilities. The Contractor shall ensure that the use of mobile

phones do not create risks to the user or others.

49.3 Use of personal radios and portable audio equipment is prohibited within the Working

Areas with the exception of welfare/rest facilities.

50. DUST, GASES, FUMES ETC.

50.1 The Contractor shall prevent concentration of dust, gases or fumes by providing

suitable means to control their concentration within the permissible limit so that they

may not cause injury or pose health hazard to a building worker at a building or other

construction work.

50.2 The contractor Shall look into the health hazards associated with handling different

types of explosives, chemicals and other construction materials and to suggest

remedial measures including use of proper personal protective equipment

50.3 Provide a vacuum machine with water sprayer to wet vehicular access.

51. VEHICULAR TRAFFIC

51.1 Whenever any building or other construction work is being carried on, or is located in

close proximity to a road or any other place where any vehicular traffic may cause

danger to building workers,

(1) The Contractor shall ensure that such building or other construction work is

barricaded and suitable warning signs and lights displayed or erected to prevent

such danger.

(2) The Contractor shall ensure that all vehicles used at construction site of a building

or other construction work comply with the requirements of the Motor Vehicles Act,

1988 (Central Act 59 of 1988).

(3) The Contractor shall ensure that a driver of a vehicle of any class or description

operating at a construction site of a building or other construction work holds a

valid driving licence under the Motor Vehicles Act, 1988 (Central Act 59 of 1988).

52. HANDLING OF EXPLOSIVES

52.1 The contractor shall ensure at a construction site of a building or other construction work that,

(a) all explosives are handled, used or stored in accordance with the instructions

and the material data sheet supplied by the manufacturer of such explosives.

(b) the use of explosives is carried out in safe manner to avoid injury to any

person and under the direct supervision of a responsible person; and

(c) before using any explosive, necessary warning and danger signals are created,

at conspicuous places of such use to warn the building workers and the general

public of the danger involved in such use.

Page 145: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-75 Sign & Stamp of Tenderer

52.2 Precautions:

52.2.1 The Contractor shall ensure at a construction site of a building or other construction

work that. (a)The following precautions are observed at the places of transporting,

handling, storage

and use of such explosives, namely: -

(i) prohibition of smoking, naked lights and other sources of ignition in the vicinity

where explosives are handled, stored and used;

(ii) to keep safe distance and to use non-sparking tools while opening

packages containing explosives; and

(iii) to stop the use of explosives and handling thereof while the weather

conditions are not suitable for such use or handling;

All measures and precautions required to be observed for use, handling,

storing or transportation of explosives under the rules framed under the

Explosives Act. 1884 (Central Act 4 of 1884) are observed.

53. FLOOR OPENINGS

53.1 Unprotected holes in the floor, deck, or roof have been responsible for a number of

very serious injuries. Yet, through planning and personal attention, falls through

openings under foot are very easy to prevent.

i) If you make a hole, guard it. Before cutting the hole, barricade the work area

to keep people out.

ii) If the hole must be open, install permanent barricades around the perimeter. Like

railings around the edge of a building or stairwell, these should be a minimum of forty-

two inches high, have a mid-rail and be capable of withstanding a 200-pound load.

Toe boards are recommended at all times and are required if anyone is going to work

under the hole.

iii) If the hole is not guarded, it must be covered. The cover must be capable of

supporting at least a 200-pound load, be larger than the opening, secured

against displacement, and

iv) labelled "Floor Opening, Do Not Remove”. I you have a choice, make a round opening

and cover.

v) Never cover a hole with any type of non-substantial material such as paper,

cardboard or plastic.

54. EVALUATION, SELECTION AND CONTROL OF SUB-CONTRACTORS

54.1 The Contractor shall include legislative and site specific ESHS requirements in tender

packages for their sub-contractor selection and conduct pre-job meetings to address

job H&S expectation before awarding them.

54.2 The Employer /Engineer may participate in pre-tender meetings, selection process,

pre-job meeting reviewing the H&S performances, etc.

55. H&S SHARING & SITE VISITS

55.1 The Contractor shall facilitate and host visits by other Contractors to his\her worksites

and to share his\her H&S management experiences with them.

55.2 The Contractor’s management team shall attend visits to other CMRL worksites

with good H&S management initiates and skills when directed by the Employer

/Employer’s Representative and to learn and implement the good initiatives at

his\her site.

Page 146: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-76 Sign & Stamp of Tenderer

56. CCTV

56.1 The Contractor shall implement a surveillance CCTV system in Administrative areas,

Construction areas (general indoor, general outdoor and Maintenance / Operating

areas, Mechanical/electrical equipment rooms, Warehouses and storage rooms/area,

Casting yard, Labour Colony, Health Centres and First aid stations and infirmaries,

Parking areas, Visitor areas and Laboratories , with cameras strategically positioned

at high-risk areas for purpose of monitoring site conditions and deterring unsafe work

practices. The number and location of cameras installation shall be subjected to the

acceptance of the Employer /Engineer. The contractor shall submit the CCTV

installation and monitoring plan to Employer /Engineer.

56.2 The CCTV shall facilitate viewing of live and recorded images. Access to viewing

and controlling of all cameras shall be via a standard web browser and/or wireless

Local Area Network (LAN) by the authorized users. All cameras shall be

weatherproof and come with pan/tilt functions, zoom lens and the ability to operate

under low light conditions.

56.3 All camera recordings shall have camera id and location/area of recording as well as

date/time stamp which cannot be altered, ensuring the audit trail is intact for evidential

purposes. Sufficient storage (hard disk space) shall be provided for all the camera

recordings for a period of 30 days or more @ 30 frames per second (FPS), at 4 common

intermediate format (CIF) or better quality using the necessary compression techniques

for all cameras. A backup system shall be maintained to protect against server or

storage failure.

56.4 The storage system should allow retrieval of data instantaneously or any date/time

interval chosen through search functionality of the application software. The system

shall have the facility to export the desired portion of clipping (from a desired

date/time to another desired date/time) onto a CD, DVD or any other device in a

format which can be replayed through standard PC based software.

57. BARRICADE / COVER TO VOIDS, TRENCH, BORED HOLES AND OPEN EDGES

OF STRUCTURE

57.1 The Contractor shall barricade all excavation, bored holes, voids and open edges of

structure under construction where a workman is liable to fall with secured and

effective guardrails / barricades / floor coverings.

57.2 The Contractor shall provide “Danger” warning signs for barriers and barricades

erected. All floor opening covers shall be stencilled or painted with “Danger, Do Not

Remove”.

57.3 Where traffic flow is to be maintained over temporary road opening or crossing, the

Contractor shall provide suitably designed chequered steel cover / decking over it. The

Contractor’s professional Engineer shall design and submit the cover / decking

proposal to the Employer/Engineer for acceptance prior to commencement of the

excavation.

58. GENERAL SAFETY

Page 147: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-77 Sign & Stamp of Tenderer

58.1 The Contractor shall provide, erect, maintain and finally remove, when instructed,

Danger, Warning, Caution or Information signs, located appropriate to the site layout.

The signs shall be no less than 1.5m x 1.0m in size written boldly in the three official

languages. These shall be erected on existing footpaths and at points of access likely

to be used by the public to warn or inform them of the existence of the Works. These

notices shall be in addition to any notices required to be put up to meet statutory

requirements.

58.2 The Contractor shall ensure that all roads, pavements and public footpaths are kept

clear of dust, silt and debris.

58.3 Unless otherwise agreed, the Contractor shall be responsible for the proper fencing,

hoarding, lighting, guarding and watching of the Works. The Contractor shall also

provide proper temporary roadways, footways, guards, fencing and hoardings so far

as the same may be necessary for the accommodation and protection of the owners

and occupiers of the adjacent property, the public and others for a like period.

58.4 All platforms, covers, ladders, stairways, staging, scaffolding and other provisions for

access erected by the Contractor shall be installed in compliance with current legal

requirements and made available for use as early as possible during the construction

period. In cases where this is impracticable the Contractor shall provide all necessary

temporary access facilities which shall be constructed, installed and maintained in a

safe and secure manner.

58.5 Designated walkways along walers and struts shall be levelled, flushed without

tripping hazards and with rigid guardrails and toe boards securely provided.

58.6 Fall Arrest System, including but not limited to life lines and anchors, shall comply with

the BS EN /IS requirements.

58.7 The Contractor shall provide capping on all protruding starter reinforcement

bars with individual plastic/ rubber caps or with hose /tube.

58.8 The Contractor shall ensure bar chairs supporting steel reinforcement bars shall be

designed by a Professional Engineer. In his\her design, the bar chair should only be

welded to temporary bars incorporated to support the bar chairs. Welding onto

permanent bars will not be permitted.

58.9 The Contractor shall ensure that horseplay, practical jokes, scuffling, wrestling or

fighting are strictly prohibited at the Site.

58.10 The Contractor shall ensure that the sale, keeping or consumption of liquor and

prohibited substances on site is prohibited.

58.11 The contractor shall organize community interaction programme with the general

public for the awareness of the projects.

58.12 Provide proper and durable wire mesh overlay across rebar surface.

58.13 Provide light–Emitting diode (LED) lights to highlight safe access and egress in the work area

Page 148: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-78 Sign & Stamp of Tenderer

58.14 Provide portable lighting detector for workers 58.15 All contractors shall provide overhead protections as per Rule 41 of TBOCWR 2006

i. Overhead protection (Fan) should be erected along the periphery of every building

which is under construction and the building height shall be 15m or above after

construction.

ii. Overhead protection shall be minimum 2m wide and the outer edge shall be

150mm higher than the inner edge and an angle not more than 200 to its

horizontal sloping into the building.

iii. Overhead protection shall not be erected more than a height of 5m from the base

of the building.

iv. Areas of inadvertent hazard of falling of material shall be guarded or barricaded to preventaccess and appropriately sign

59. SAFETY (ANTI-FALL) NET

59.1 The Contractor shall provide and maintain safety net system in compliance to BS EN /

IS Standards to catch persons falling whilst working in any location from where he

would liable to fall. The net shall be of sufficient size and strength to catch any person

for whose protection it is to be used and the net shall be so located to cover the area

of the possible fall/Material.

59.2 The Contractor shall conduct a sample test on the safety net system, comprising the

net and its supporting structures, before it is installed.

60. SITE TRANSPORT

60.1 General

60.1.1 All vehicles driven on site shall be maintained in roadworthy condition and be registered

with the appropriate authority in accordance with the Motor Vehicles Act. Each driver

of these vehicles shall hold a valid driving licence authorising him to drive that class of

vehicle. Such vehicles include, but are not limited to Cement lorries; Pick-up and flat

bed trucks; Lorry loader with articulating arms; and Rough terrain forklifts.

60.1.2 Transportation of personnel on flat bed trucks, cranes, forklifts, dumpers and similar

vehicles not designed to carry passengers is prohibited.

60.1.3 Free-standing chairs shall not be used as seating. All passengers must be seated at

all times that the vehicle is in motion and shall not have any part of their body outside

the vehicle. No more persons shall be carried in the cab of any vehicle than the number

for which it is licensed.

60.1.4 An appropriate speed limit shall be set and enforced on site.

60.1.5 The Contractor shall appoint banksman to control reversing vehicles and congested

machinery movement. The banksman shall wear a high visibility vest clearly marked

“Traffic Controller” or similar and trained in the standard hand signals and always

standing to the side of the driver’s cab, not to the rear of the vehicle.

60.1.6 Any routes on the Site where headroom is restricted shall have appropriate warning

signs posted at the approach to such restriction.

Page 149: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-79 Sign & Stamp of Tenderer

60.1.7 The Contractor shall ensure that the drivers of all delivery vehicles to Site and those

removing materials from Site, wear appropriate PPE including, but not limited to, safety

footwear and safety helmets at all times that they are outside the cabs of their vehicles.

60.1.8 The Contractor shall ensure that there is daily co-ordination of the movement of mobile

plant and vehicles on Site to minimize the potential for an incident.

60.1.9 All Site access roads used by mobile plant / vehicles shall be constructed of hard

standing and suitable for its intended purpose.

60.1.10 No unauthorised parking shall be permitted on the site anywhere other than at the

designated parking area. Only cars bearing the contractor’s permit shall be allowed to

park there, and those of authorised visitors.

60.1.11 Site plant / vehicles shall be parked at designated locations only so that they do not

cause obstructions to Site traffic.

60.1.12 Consideration shall be given at all times to the safety of the road users and gates

should be positioned so that they minimise the additional risk to traffic at such locations

as road junctions, bends, and etc.

60.1.13 A clear line of sight shall be maintained for all drivers of vehicles using the road, taking

into consideration the speed limit of that road and the position of existing street furniture

and trees / vegetation, to maximise the warning distance of approach.

60.1.14 If deemed necessary by the Employer /Engineer suitable mirrors shall be positioned

at these points to enhance vision of traffic movement both on the roadway and on

entering / leaving the Site.

60.1.15 Where the Site gates lead directly off a public street an effective method of controlling

vehicles entering / leaving the Site shall be employed. This shall be manned by workers

who have been trained in road safety and who are wearing high visibility vests bearing

the wording “Traffic Controller”. They should use recognisable hand signals and advice

should be sought from the Traffic Police if necessary.

60.1.16 If deemed necessary by the Employer /Engineer a traffic lane may be coned off to

allow for safe deceleration.

60.1.17 During the hours of darkness floodlighting of these Site entrances shall be provided

to enhance visibility of such traffic controllers, but care must be taken that these lights

do not dazzle any on-coming traffic or pedestrians or cause a nuisance to neighbouring

residents. The traffic controllers should utilise hand held batons or gloves incorporating

reflective material.

60.1.18 Warning signs in compliance with the IRC standards shall be conspicuously

displayed at appropriate distances before such gates into the Site as to give all drivers

a clear understanding of the traffic hazard ahead

60.1.19 If vehicles entering / leaving the site have to cross a public footpath or pavement

then a worker must be deployed to control pedestrians as well as road traffic. Suitable

Page 150: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-80 Sign & Stamp of Tenderer

warning signs should be deployed to alert pedestrians to possible traffic movement

across the footpath.

60.2 Spillages On Roads

60.2.1 A paved truck wash bay for washing vehicles leaving the worksite onto a roadway shall

be provided and maintained at each vehicular egress point before commencement of

works on Site. Each truck wash bay design must be approved by the Employer

/Engineer Engineer before it can be constructed on site.

60.2.2 Washwater from the wash bays shall be directed into a water treatment plant for treatment.

60.2.3 Preventative measures shall be taken to limit the incidence of earth droppings from

earth moving vehicles. In the event that any earth dropping occurs onto a public

road/drain, such earth shall be removed and the roads / drains washed by the

contractor at his\her own expense to the satisfaction of the Employer /Engineer.

60.2.4 Contractor shall assign personnel and establish a system of checks to ensure that all

vehicles and trucks leaving the worksite do not have the potential to litter the roads due

to its wheels or transportation materials.

60.2.5 Where it is foreseeable that water may drain out from a load of soft marine clay or

similar transported wet materials that will contaminate the road surface, the Contractor

shall ensure that specially designed and constructed watertight trucks are used to

transport these materials.

60.2.6 All cement mixer trucks servicing CMRL sites must have a containment system or a

flap installed to prevent spillage of cement.

60.2.7 Every vehicle or earth moving equipment shall have the following fully functional:

Silencers, Taillights , power and hand brakes , reversing alarm and search light forward

and backward.

60.2.8 In case of non-conformity of items identified by the Employer/Engineer shall take

necessary steps including stoppage of work and or imposing of any penalty to ensure

satisfactory execution.

61. SITE SECURITY

61.1 General

61.1.1 The Contractor is responsible for the security of the sites, works areas, material storage

areas, site offices, facilities and the Works.

61.1.2 Security for the site and the works shall be maintained throughout the duration of the

contract or the extended period as provided in the particular specification.

61.1.3 The Contractor is to provide a detailed security plan which includes security proposals

for the various phases of the construction of the works.

61.1.4 The security for the various phases of the works shall include the set up phase,

temporary works phase, structural works phase, E&M works and architectural works

phase as well as the completion phase.

61.1.5 For each phase, the contractor shall detail the security measures, facilities, guards and

patrols to be implemented.

61.1.6 Within 28 days the contractor shall submit a fully detailed security Plan detailing the

contractor’s propose security measures and facilities he intends to implement

throughout the contract duration. The security plan shall include but not limited to the

Page 151: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-81 Sign & Stamp of Tenderer

followings:

(a) Method of securing all site and works areas; offices and facilities, etc.;

(b) The security facilities to be set up and its locations;

(c) Lightings, alarms, communication equipment’s, cameras, surveillance equipment’s, etc.;

(d) Layout and site plans;

(e) Personnel, manpower and the organisation chart;

(f) Guards and patrols, numbers, locations and frequency;

(g) Security for various phases or stages of the Works;

(h) Controls to be implemented for access by authorised personnel/ contractors/

Construction Equipment/ Plant/ vehicles/ materials;

(i) Control of access points for visitors and their vehicles entering the Site, issue of

entry permits and maintaining records for every visitor and vehicle into the Site,

including their stated purpose;

(j) Monthly review and reports;

(k) Incident report and review;

(l) Audits; and

(m) Others.

61.1.7 The plan shall include a central security post/ office manned at all times by a competent

uniformed supervising security guard and an assistant from a licensed Security Agency

at an agreed location. It shall be possible to communicate between each of the security

posts/office and the central security post/office.

61.1.8 The Contractor shall update the Security Plan regularly and when the Works enters a

new phase to ensure that the Site, facilities, and Works are adequately and sufficiently

protected against theft, wilful damages, misdemeanours, and other illegal or

undesirable activities. Sufficient deterrence shall be implemented to be in tandem with

the progress of the Works.

61.1.9 The Contractor shall be aware that there may be other contractors employed or engage

by the Authority to carry out works within the Site. Security measures shall cover these

works carried out by other contractors, their site storage and facilities.

61.1.10 Security audit shall be carried at 3 monthly intervals to detect lapses and other

inadequacies of the Security Plan. Audit reports and propose corrective actions shall

be submitted to the Employer /Engineer.

61.1.11 The Contractor shall improve his\her site security and or implement other measures

required by the Employer /Engineer when he is of the opinion that the security measure

is insufficient or where there are lapses in the security system.

61.2 Hoardings

61.2.1 The safety of vehicular movement onto and off site shall be planned before the site

hoardings are erected to allow for features to be incorporated maximising public safety

in connection with site activities.

61.2.2 The hoarding shall be well designed and secured in place to prevent it being blown

over by gusts of wind and shall be sufficiently robust to deter anyone from removing or

displacing any panels. Regular maintenance shall be carried out.

61.2.3 At all works areas; suitable and effective gates shall be provided and shall be locked

during non-working hours/days. Guard posts shall be constructed and guards shall be

stationed at these posts. It shall be illuminated to enable the guards to carry out

Page 152: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-82 Sign & Stamp of Tenderer

checking at night. The guard shall check persons, vehicles, materials and other

equipment entering and leaving site.Intercom or other communications shall be

provided and maintained between the guard post and the security guard office.

61.2.4 At strategic locations along hoardings, entrances, guard posts and other facilities, spot

lights shall be installed.

61.2.5 There shall be no unauthorised openings in the perimeter hoarding. All access and

egress shall be via gates which are manned by 24-hour security guards.

61.2.6 If for any reason the contractor authorises any panels to be moved to create a

temporary opening then a guard must be posted to restrict access to authorised

personnel/ construction equipment/ plant/ vehicles only. It shall permanently close

immediately after works is completed.

61.2.7 Should there be any risk of materials, tools, waste material or similar escaping from

any part of the site either as projectiles or falling objects etc., then an effective

extension for the Site hoarding shall be designed and erected to prevent this. Where a

public footpath or pavement runs alongside the hoarding then overhead protection

must be provided where site activities pose a foreseeable risk of such occurrences.

61.3 Personnel Access

61.3.1 The contractor shall be responsible for controlling worksite security to prevent

unauthorised access, maintain public safety and other offences.

61.3.2 The contractor shall ensure that no illegal workers or unauthorised persons are allowed

on Site. The contractor shall conduct both internal and external raids to weed out any

illegal workers or unauthorised persons.

61.3.3 Security of the site shall also be maintained to ensure that only those persons who

have the skills and training to work safely on site and who are wearing the appropriate

personal protective equipment (PPE) may be admitted.

61.3.4 At the main Site office, the contractor shall set up a fully equipped security guard office

at the entrance to the offices. The security guard office shall be at least 6m x 3m with

direct view overlooking the entrance. A visitor book shall be maintained to record

visitors entering/leaving the site or offices. Workers’ security passes shall also be

issued to all workers entering the Site. Visitor shall be issued with temporary passes.

Ingress and egress of vehicles shall be logged.

61.3.5 A similar security pass system shall also be operated at the main entrance to all the

sites. This shall preferably incorporate a turnstile / swipe card reader but any other

equally effective means may be utilised with the prior acceptance of the Employer

/Engineer.

61.3.6 Guard posts erected at the main entrances where access is to be so controlled are to

be staffed by trained employees of the Contractor or employees of a subcontract

licence security agency. Sufficient guards shall be on duty at any one time to give

effective 24-hour cover. These trained guards shall wear uniform to enable easy

identifications.

61.3.7 All guard posts shall be equipped with a telephone / radio communication system, a

panic button and an audible alarm.

61.3.8 Two-way communication equipment shall be provided to the guards to maintain

Page 153: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-83 Sign & Stamp of Tenderer

communication between guards at other security posts or on patrol and the security

guard office. A general alarm system shall be installed for use in emergency. The

Employer /Engineer site offices shall be installed with intruder alarms, and protection

systems. The site offices surrounding shall be well lit.

61.3.9 The access control system shall cover all staff, direct employees of the contractor,

Interfacing contractors and service providers such as canteen workers, cleaning

workers and similar as well as all subcontract staff / workers and those of sub-

subcontractors etc. including operators of rental construction equipment / plant.

61.3.10 Each security pass shall bear the photograph of the holder and his\her registration

number as appropriate. It shall be issued after completion of site safety induction

training via a central registry controlled by the contractor. Temporary visitor passes

may be issued for those personnel on authorised business, in which case their names

must be recorded together with times of arrival and departure plus signature.

61.3.11 The contractor shall issue first time security passes to the Interfacing contractors.

The cost of subsequent replacement of security passes will be borne by the Interfacing

contractors.

61.3.12 Persons not wearing the correct PPE shall not be allowed onto site, unless they

identify themselves as visiting the site office only and the Contractor has provided a

designated safe access route to and from the site access control point for this purpose.

61.3.13 An accurate headcount shall be kept of all persons entering the worksite so that they

can all be accounted for in case of an emergency.

61.4 Vehicular Access

61.4.1 Effective control shall be exercised over materials entering and leaving the site, to

check on the suitability / safety of construction equipment, plant and materials delivered

to site and to prevent theft. For all materials including waste and salvaged materials,

construction equipment and plants leaving the site a proper record of authorisations

given by the respective contractors issuing such removal chits shall be maintained.

61.4.2 Wherever practicable separate access and egress gates shall be provided. The control

point for access should be located a short distance inside the main gate to permit a

vehicle to pull off the road before halting to be checked.

61.4.3 A security post shall be provided at each vehicular access point, sited so that the

checker has a clear view of incoming vehicle registration plates and any passengers

in the cabin.

61.4.4 The Contractor shall provide the following at all designated site entrances and exits for

vehicular access: -

i) Illumination of at least 100lux;

ii) Convex mirror (32 inch/ 24 inch) shall be provided at entrances/exit point

adjoining roads; and

iii) Revolving light (complying to BS3143 Part 4 or an approved equivalent).

iv) Vehicle lay-by at all site entrances/ exits point where possible.

61.4.5 Railings or similar should be erected inside the site to prevent workers and others on

site from walking into the path of vehicles entering / leaving the Site.

Page 154: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-84 Sign & Stamp of Tenderer

61.4.6 To prevent all lifting machines and vehicles from infringing the height limit of 4.5m in

public roads. The contractor shall install an effective and robust steel height barrier at

ALL vehicular access. The steel height barrier shall be constructed with a height

infringement gauge that limits the height of lifting machines and vehicles to less than

4.5m

61.4.7 Security drop-bars shall be maintained in the closed position at all vehicular entry and

exit points to the Site and every vehicle shall be stopped outside the barrier. The barrier

should only be raised after authority has been given to the driver of the vehicle to

proceed. Hump shall also be constructed at exit.

61.4.8 The registration numbers of all vehicles entering and leaving the site shall be recorded.

61.4.9 No goods shall be off-loaded at the site entrance in a manner that creates a hazard to

other vehicles entering / leaving the site.

61.4.10 Vehicles waiting to get onto the site should be directed to a designated holding area

which minimises obstruction to other road users, and called forward by a flagman.

61.4.11 The main gates shall be closed and locked after construction work has ended for the day.

61.4.12 The main gates and control points are to be well lit during the hours of darkness.

61.5 Site Patrols

61.5.1 Security guards shall patrol the site regularly during the night, non working days and

public holidays covering all locations within the site perimeter to deter, detect and follow

up any undesirable event such as theft, robbery, violence, damage to any property,

trespass, etc. The areas to be covered shall include, but not be limited to Site offices,

labour colony, canteen area, materials stockyards and perimeter hoarding.

61.5.2 Clocking points shall be installed to record their presence. Guard patrols shall visit

designated clocking points within the station and the perimeter of the station site at

least 4 times during the night and extra 5 times during the day on non working day. A

register is to be kept to record the guards visits.

61.5.3 In addition to the above when the works are near completion, guards shall patrol inside

the station and clock at pre-determined clocking points at fixed intervals. Only 1 or 2

access points into the station shall be used and manned. All persons entering or

leaving the station shall sign in or out and record their works or purpose. All materials

and equipment (including those belonging to the Interfacing Contractors) brought into

or out of the station shall be recorded. No materials or equipment shall be taken out of

the station without authorisation.

61.5.4 All incidents shall be recorded and reported to the Employer /Engineer. In cases of

emergency, the correct persons or appropriate emergency services shall be notified.

61.6 Security Guards

61.6.1 Guards shall wear uniform so that they can be readily identified. They shall be able

bodied, adequately trained, approved by relevant authorities and shall have no criminal

Page 155: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-85 Sign & Stamp of Tenderer

records. Guards on patrol shall work in pairs.

61.6.2 Personal Protection Equipment (PPE) shall be provided to the guards by the Contractor

and they shall wear them when patrolling or visiting the sites areas. They shall also

attend the safety induction course.

61.6.3 Guards shall be fully trained to handle various situations such as unauthorized site

entry, theft, fire, accident, etc.

61.3.4 A full-time guard supervisor/superintendent shall be assigned to supervise and check

on the guards. He shall be trained and well versed in security procedures, measures

and system, including preparing monthly reports, incident reports, reviews and audits.

He shall conduct security briefing, site security campaign, provide information to

workers on security and other preventive measure or deterrents.

62. FLOODING62.1 General

62.1.1 The Contractor shall consider the risks of flooding due to nature or arising from the

construction activities.

62.1.2 The Contractor shall submit, within two (2) months of the award of the Contract a

comprehensive flood protection plan for the whole of his\her Works. In preparing

this\her plan, he shall carefully examine the surrounding topography to determine the

probable nature and extent of any flooding. Where relevant the Contractor shall also

consider in his\her plan the possible adverse effects of wind and tides and the risk from

adjacent tunnel contracts.

62.1.3 The plan shall identify the areas that are at risk from flooding. The plan shall examine

the potential consequences of any flooding and shall make proposals to prevent

flooding.

62.1.4 The flood protection measures provided shall comply with the requirements of National

and State legal requirements.

62.1.5 When pumping is proposed, the Contractor shall address the following:

operating procedures

provision of a secure power supply and back-up automation and/or reaction

time required to

start the pumps

method and arrangement of discharge 1.6 Shafts shall be surrounded by

topography sloping away from shaft to direct rainwater to a drainage channel.

Shafts shall be equipped with a minimum of 2 dewatering lines per shaft to

ensure effective drainage in case of blockage.

62.2 Flooding Evacuation and Rescue Procedure

62.2.1 The Contractor must make adequate safety provisions in the event of flooding

whether it is due to inclement weather or the river bank bursting in order to minimise

the loss of life and property damage, where practicable.

62.2.2 The safety provisions to be put in place shall not be limited to providing of an

emergency evacuation and rescue plan, trained rescue teams and water rescue aid

Page 156: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-86 Sign & Stamp of Tenderer

or equipment. The trained rescue team and emergency procedure shall be in place

before the start of any work. The number of trained rescue teams and water rescue

aid or equipment shall be increase when deem necessary by the Employer /Engineer.

The water rescue aids or equipment shall be properly maintained throughout the

lifetime of the project.

62.2.3 Emergency drills shall be conducted every month with the involvement of State Govt

rescue team where necessary.

62.2.4 The following are the minimum requirement of Emergency Equipment shall be available at site.

S.No Equipment & Minimum qty

1. Motor Trolleys – 2 No.

2. Dip Lorry – 1 No.

3. Re-railing vehicle and Re-railing Equipment – 1 Set

4. Gas cutting equipment – 1 No.

5. Search Lights – 2 No.

6. Track continuity Jumpers – 2 No.

7. Fire Extinguishers – 3 No.

8. Hand Signals / Flags – 1 No.

9. Crank handle key, Clamps and Pad locks – 1 No.

10. First Aid Kits – 1 No. per station

11. Stretchers – 1 No. per station

12. Wheel Chair – 2 No. per station

13. Pick Axe - 2 No,

14. Self Contained Breathing Equipment – 2 No.

15. Inflatable tents – 1 No.

16. Collapsible lighting tower – 1 No.

17. Inflatable Air Bags – 2 No.

18. Automatic Spring loader – 1 No.

19. Track measuring gauges – 1 No.

20. Augmented First Aid Boxes – 2 No.

21. Wrist bands – As required

22. High visibility vests – As required

23. High Power torches – 2 No.

24. Nylon slings of 40 T capacity – 1 Set

25. Video Cameras – 1 No.

26. Tetra Sets, as required

27 Pumps 25HP - 03Nos

10HP -05 Nos

05 HP -05 Nos

03HP -05 Nos

63. H&S SUBMITTALS TO THE EMPLOYER/ENGINEER

63.1 The contractor’s H&S management shall send the following reports to the Employer /

Engineer:

i) Daily Reporting of total no of workmen and Daily Dairy of CSM

ii) Monthly H&S Report

iii) H&S Committee Meeting Minutes

iv) H&S Inspection Reports

v) Monthly Audit Rating Score (MARS) report

Page 157: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-87 Sign & Stamp of Tenderer

vi) External H&S Audit

vii) Electrical Safety Audit

viii) Working at height safety Audit

ix) Plant and Equipment Safety Audit

x) Labour colony safety audit

xi) Air and Noise Quality monitoring report

63.2 Daily Reporting of total no of workmen

63.2.1 The contractor shall report to the Employer the total no of workmen engaged including

any subcontractor within 2 hours of starting of any shift in any day. This reporting shall

be the primary duty of the Chief ESHS Manager of the contractor and reporting shall

be through tele-fax / email. If the information is not received or received more than 2

hrs after starting of the shift, penalty shall be levied as per relevant clause.

63.3 The Chief ESHS Manager shall prepare and submit the daily dairy (FSAF 29) to the

Employer/Engineer on the end of each shift.

64. MONTHLY H&S REPORT

64.1 The contractor shall prepare a monthly H&S report are given in general instruction

GSAF 14 and submit by the 7th of every month to the Employer/Engineer.

65. VISITORS TO SITE

65.1 General

65.1.1 All visitors to site shall report to the Contractors site offices where they shall be issued

with appropriate Personal Protective Equipment if they are to go out onto the site work

areas. Any visitors going out to the site work areas shall be accompanied at all times

by a member of the site personnel.

APPENDIX

The Contractor shall also comply with the following Section 1 & 2 to this appendix.

Section 1 –Standard Forms

Section 2 –Guidance Documents

SECTION 1 : STANDARD FORMS

INDEX REFERENCE REVISION DATE

Pre-Task Check Form FSAF 01

General Permit FSAF 02

Hazard Log & Risk Register FSAF 03 Scaffold inspection register FSAF 04

scaffolding Handover certificate FSAF 05

Crane Operator Weekly Inspection Check

list

FSAF 06

Excavation Permit FSAF 07

Hot Work Permit FSAF 08

Near miss report FSAF 09

Confined Space FSAF 10

MARS Score Sheet FSAF 11 First aid slip FSAF 12

Page 158: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-88 Sign & Stamp of Tenderer

INDEX REFERENCE REVISION DATE

CMRL Template Site Inspection Form FSAF 13

Record of Induction Training FSAF 14 Induction Checklist FSAF 15

Operations Induction FSAF 16

Visitors Induction FSAF 17

MEWP Checklist FSAF 18

Permit to work on electrical FSAF 19 Permit to excavate FSAF 20

Excavator Checklist FSAF 21

Oil Storage Requirements FSAF 22 Harness Checklist FSAF 23

Monthly contractor’s Accident Statistic

Report

FSAF 24

Formation of Site ESHS Committee FSAF 25 Minutes of ESHS Committee Meeting FSAF 26

Electrical Safety Audit Inspection Checklist

FSAF 27

Contractor Monthly Inspection Checklist FSAF 28

Chief ESHS Manager Daily Dairy FSAF 29

CV Template FSAF 30

External Quarterly Audit Template FSAF 31

Page 159: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section VII F –ESHS Volume 2 Health & Safety Manual

2-89 Sign & Stamp of Tenderer CMRL/REV.A3

FSAF 01

PRE-TASK CHECK

Item Control Measures

1 Is all equipment and correct tools available to undertake the task and in correct working order? E.g. crane, Rig, Hydra, JCB certification, launch equipment scaffold etc.

2 Are men trained and competent to undertake the task including tools and equipment? E.g. crane / Rig operators, welders and certification available

3 Is all safety equipment available to do the task e.g. head, hand, eye, hearing protection, harness, concrete

burn protection? Are men trained how to use it? E.g., harness fitting and use.

4 Have all men been briefed and instructed on the specific task to be undertaken by the task supervisor prior to commencing operations?

5 Are all safety precautions in place as identified in the risk assessment & method statement e.g. edge protection, access platforms, cordon & barriers

etc?

6 Have all men been briefed on the safety precautions, procedures and controls that must be followed as per the method and risk assessment?

7 Is competent supervision in place? E.g. suitable knowledge, training & experience in specific task to be supervised

Signature: Supervisor Name (PRINT):

TASK & LOCATION:

Date: Site:

IF THE ANSWER IS ‘NO’ WORK CANNOT START!!!!!!!

Page 160: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section VII F –ESHS Volume 2 Health & Safety Manual

2-90 Sign & Stamp of Tenderer CMRL/REV.A3

FSAF 02

GENERAL PERMIT

Number………

General Permit can be used where control of an operation is required to ensure

safety to public and or operatives. The type of operation that this permit could be

used for includes:

Any high risk areas identified in the risk assessments

e.g. Work in or near public spaces, demolition

PART A – ISSUE PART D - COMPLETION OF WORK

Permit is issued to: ............................................................…. The work has been completed and the work area

and adjacent areas have been

thoroughly checked of: ……………………………………………. to ensure

no hazards remain

All equipment and

materials removed for (specific work to be done) ............................................…...

Safety equipment

returned ............................................................................................... Area restored

Other

………………………………………………………

at (exact location of work) .....................................................

……………………………………………………………………..

……………………………………………………………..

……………………………………………………………..

……………………………………………………….........

Valid from: ……....... am/pm The work has been

completed, and I have undertaken

to: .......... am/pm Date: …....................20....

the checks and safety measures I

have ticked in Part D of this permit

above.

I issue this permit subject to the minimum precautions

I have listed in Part B below. Time ........................ am/pm

Signed: ................................................................…… Date: ……………………….….20…………

(Issuer)

Page 161: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section VII F –ESHS Volume 2 Health & Safety Manual

2-91 Sign & Stamp of Tenderer CMRL/REV.A3

PART B - PRECAUTIONS

Signed: …………………………………….

(subcontractor once completed work)

Liaise with occupiers PART E - CANCELLATION OF PERMIT

Post warning notices

Provide suitable barriers This permit to work is cancelled and the relevant

Adequate competent supervision staff have been notified. No

more work under this Other permits e.g. Confined Space permit.

Provide suitable traffic

control Location protected

and sign marked Other ……………………………………………. Time ............................... am/pm

……………………………………………………

…………………….……………………………... Date: ..............................20....…..............

……………………………………………………

Signed: ....................................................

PART C - ACCEPTANCE (Issuer)

I accept this permit and will ensure

the precautions ticked above in part

B have been undertaken before

starting work. I also understand the

checks and safety measures I am

required to undertake after

completion of work.

Signed ........................................ (Subcontractor undertaking work)

Page 162: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section VII F –ESHS Volume 2 Health & Safety Manual

2-92 Sign & Stamp of Tenderer CMRL/REV.A3

Hazard Identification and Risk register FSAF 03

Identified Hazard Applicable

Risk Rating

Location

(List Where Necessary)

Method Statements

Risk

Assessment

Required

Minimum Mitigation

(Details to be Completed if

Box ticked) (E.G.

Procedures to be followed)

Procedure

Reference

Number H M L

Site (External)

Access and Egress

Existing roads

Contaminated ground

Unstable ground

Ground

water/condit

ions

Underground services

Overhead services

Existing traffic

Traffic restrictions

Page 163: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section VII F –ESHS Volume 2 Health & Safety Manual

2-93 Sign & Stamp of Tenderer CMRL/REV.A3

Identified Hazard Applicable

Risk Rating

Location

(List Where Necessary)

Method Statements

Risk

Assessment

Required

Minimum Mitigation

(Details to be Completed if

Box ticked) (E.G.

Procedures to be followed)

Procedure

Reference

Number H M L

Existing plant

or works

Residential buildings

Hotels

Industrial buildings

Schools/hospital

Existing noise

Existing dust

Existing fumes

OTHER LIST

Page 164: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section VII F –ESHS Volume 2 Health & Safety Manual

2-94 Sign & Stamp of Tenderer CMRL/REV.A3

Construction Operations:

Identified Hazard Applicable H M L Location (List) MS/RA Minimum Mitigation

Procedure

Reference

Number

Scaffolding

Working at height

Steel erection

Confined spaces

Temporary works

Site clearance

Bulk muck shift

Piling

Girder Launch

Concrete operations

Piers / columns

Excavations

Page 165: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section VII F –ESHS Volume 2 Health & Safety Manual

2-95 Sign & Stamp of Tenderer CMRL/REV.A3

Station Roofing Activities

Brickwork/Block work

Cladding, glazing

Aluminium installation

M & E

Electrical works

Electrical works to site

distribution

Plumbing inc, drainage,

pipework installation

Fan coil installation

Air handling units

Site Hoarding

Elevator installation

Escalator installation

Page 166: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section VII F –ESHS Volume 2 Health & Safety Manual

2-96 Sign & Stamp of Tenderer CMRL/REV.A3

Surfacing

Safety impact barrier erection

Kerb Laying

Plant and equipment

Lifting Operations

Lifting Appliances and

equipment

Demolition

Plant movement

Vehicle movements

Piling

Explosives

Waste Disposal

Housekeeping

Welding

Page 167: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section VII F –ESHS Volume 2 Health & Safety Manual

2-97 Sign & Stamp of Tenderer CMRL/REV.A3

Cutting/burning

Cartridge Tools

Trial Holes

Others List: -

Page 168: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section VII F –ESHS Volume 2 Health & Safety Manual

2-98 Sign & Stamp of Tenderer CMRL/REV.A3

Risks to public

Identified Hazard

Applicable H M L Location (List) MS/RA Minimum Mitigation

Procedure

Reference

Number

Access to site

Movements of plant

Live traffic

Noise/dust

Parking

Fire

Storage of materials

Falling materials

OTHERS List:-

Page 169: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section VII F –ESHS Volume 2 Health & Safety Manual

2-99 Sign & Stamp of Tenderer CMRL/REV.A3

Health Risks

Identified Hazard Applicable H M L Location (List) MS/RA Minimum Mitigation

Procedure

Reference Number

Weil's disease

Gas oil

Dusts

Vapours

Cement

Bitumen

Epoxy

Night Working

Chlorine Storage

OTHERS List:-

Page 170: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section VII F –ESHS Volume 2 Health & Safety Manual

2-100 Sign & Stamp of Tenderer CMRL/REV.A3

TEMPORARY ACCOMMODATION

Identified Hazard Applicable H M L Location (List) MS/RA Minimum Mitigation

Procedure

Reference Number

Office installation

Electrical

installation

Drainage

Other services

Fire

Signing

Cleaning

Fencing

Security

Material storage

Sleeping

accommodation

and labour

camps

OTHERS List:-

Page 171: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section VII F –ESHS Volume 2 Health & Safety Manual

2-101 Sign & Stamp of Tenderer CMRL/REV.A3

Site Specific Risks (including Designer’s Risks)

Identified

Hazard Applicable H M L Location (List) MS/RA Minimum Mitigation

Procedure

Reference

Number

Risk Rating

Tolerance

HIGH High severity and High probability of major injury, disablement or possible fatality. Work must cease immediately, and

additional control measures implemented prior to work commencement.

MEDIUM Probability that an incident will occur over time (Over 3 day injury) but not as serious as a major injury or fatality.

Additional control measures to be implemented within 24 Hrs.

LOW Negligible risk of injury, but task requires additional control measures to reduce likelihood of injury (Minor Injury not

above 3 days off from employed role) Additional control measures to be specified and implemented within 48 Hrs

Severity

Likelihood

Minor

Injury

First Aid

Case

Over 3

day

injury

Critical

Fatality or Major Injury

Probable High High High

Page 172: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section VII F –ESHS Volume 2 Health & Safety Manual

2-102 Sign & Stamp of Tenderer CMRL/REV.A3

Possible in time Medium Medium High

Negligible

Unlikely to occur

Low Medium Medium

Page 173: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section VII F –ESHS Volume 2 Health & Safety Manual

2-103 Sign & Stamp of Tenderer CMRL/REV.A3

FSAF 04

SCAFFOLD INSPECTION REGISTER

NOTES

General

1. The inspection report should be completed before the end of the relevant working period (every 7 Days)

2. The person who prepares the report should, within 24 hours, provide either the report or a copy to the person on whose behalf the

inspection was carried out. Eg Safety Manager, Engineer etc

3. The report should be kept on site until work is complete.

Working Platforms Only

1. Any employer or any other person who controls the activities of persons using a scaffold shall ensure that it is stable and of sound

construction and that the relevant safeguards are in place before his\her employees or persons under his\her control first use the

scaffold.

2. No report is required following the inspection of any mobile tower scaffold which remains in the same place for less than 7 days.

3. Where an inspection of a working platform or part thereof or any personal suspension equipment is carried out:

i. before it is taken into use for the first time; or

ii. after any substantial addition, dismantling or other alteration;

Page 174: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section VII F –ESHS Volume 2 Health & Safety Manual

2-104 Sign & Stamp of Tenderer CMRL/REV.A3

Checklist of typical scaffolding faults:

Footings Standards Ledgers Bracing Putlogs & transoms Couplings Bridles Ties Boarding

Guard-rails & toe- boards

Ladders

Soft and uneven Not plumb Not level Some

missing

Wrongly spaced Wrong fitting Wrong

spacing Some

missing Bad boards Wrong height Damaged

No base plates

Jointed at same height

Joints in same bay

Loose Loose Loose Wrong

couplings Loose Trap boards Loose Insufficient

length

No sole plates Wrong spacing

Loose Wrong fittings

Wrongly supported Damaged

No check couplers Not

enough Incomplete Some missing Not tied

Undermined Damaged Damaged - - No check couplers

- - Insufficient supports Brick guards No Ladder

Page 175: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section- F – ESHS- Volume 2 Health & Safety Manual

2-105 Sign & Stamp of Tenderer CMRL/REV.A3

FSAF 05

HANDING-OVER CERTIFICATE – SCAFOLDING

Date: Site:

Time:

Description & location of section handed over:

Drawing No: (Where applicable)

Scaffolding as described above has now been completed and complies with Construction

Codes of Practice. It is structurally sound and should be used and loaded in accordance with

the stated specifications within this certificate.

(a) Use only for (General, Light, Heavy, Access etc)

(b) Working lifts, with distributed Load of: (kn/m2) per lift.

The detailed requirements of the Codes of Practice with regard to handrails – working platform –

toe board – bracing – and ties have been complied with. This scaffold must be inspected once a

week (or following exposure to wither conditions likely to have affected its strength or stability) by

the user and the inspection recorded in a scaffold register. This inspection is undertaken to ensure

that the scaffold continues to comply with the Codes of Practice.

N.B.Tarpauline sheets (or other wind sails) must not be fixed to a scaffold unless has been specifically designed to take them.

Scaffold Foreman: Signature:

(date:

DO NOT REMOVE TIES

Page 176: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section- F – ESHS- Volume 2 Health & Safety Manual

2-106 Sign & Stamp of Tenderer CMRL/REV.A3

FSAF-06

CRANE OPERATOR WEEKLY INSPECTION CHECKLIST

Crane name/number Crane type: Crane capacity Date of inspection:

Location: Hour Meter:

Start:

Stop:

Total hours operated:

Operator’s name: Oiler’s name:

INSTRUCTIONS: Check all items indicated. Inspect and indicate as satisfactory = S, Unsatisfactory = U, or not applicable

= N/A

Walk around inspection

U S N/A Operator Cab Inspection

U S N/A

Safety guards and plates

Gauges

Carrier frame, rotate base

Warning & indicator lights

General hardware Control/brakes

Wire rope Visibility

Reeving Load rating charts

Block Safety devices

Hook Emergency stops

Sheeves List/trim indicators

Boom/Jib Boom Angle/Radius

Indicator Gantry, pendants, boom

stops

Machinery House Inspection

U S N/A

Walks, ladders, handrails

Housekeeping

Wind locks, chocks, stops

Engine/Compressor

Tires, wheels, tracks Leaks -Fuel, lube, Oil, Water

Leaks-Fuel, oil, lube, water

Lubrication

Radius indicator Battery

Outrigger/locking device

Lights

Operation Inspection U S N/A Glass

Area safety Clutch/Brake linings

Page 177: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section- F – ESHS- Volume 2 Health & Safety Manual

2-107 Sign & Stamp of Tenderer CMRL/REV.A3

Unusual noises Electric motors

Control Action Warning tags

Brakes/boom/load/ rotate

Fire extinguisher

Crane stability Comments: No load test

Fleeting sheeve

Limit switches

Operator’s signature: Supervisor’s signature:

Page 178: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section- F – ESHS- Volume 2 Health & Safety Manual

2-108 Sign & Stamp of Tenderer CMRL/REV.A3

FSAF 07

EXCAVATION PERMIT

Number………

Excavation permits can be used where there are likely to be underground services or where

the type / depth of the excavation will involve high risks that need to be controlled.

The type of operation for which this Permit could be

used includes: Excavation Work around live services Deep excavations where men have to work

Contaminated ground

Excavation in made up ground or in poor soil

PART A – ISSUE PART D - COMPLETION OF WORK

Permit is issued to: ...................................................... The work has been completed and:

the work and adjacent areas have

been of:……………………………………… thoroughly inspected to

ensure no hazards remain

for (specific work to be done)....................................... Services re-instated

Route of excavation recorded ..................................................................................... Records of disposal of contaminated material

handed over at (exact location of work) ........................................... All equipment and material removed

Area restored

……………………………………………………………. Other …………………………………………..

………………………………………………….

Valid from:…… ....... am/pm …………………………………………………

to:......… am/pm Date:…..................20….. The work has been completed, and I have

undertaken the checks and safety

measures I issue this permit subject to the minimum precautions I have ticked in

Part D of this permit above. I have listed in Part B below.

Signed: ............................................................. Time .......................... am/pm

(Issuer) Date……………20 ……………

Page 179: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section- F – ESHS- Volume 2 Health & Safety Manual

2-109 Sign & Stamp of Tenderer CMRL/REV.A3

PART B - PRECAUTIONS Signed: ................................

Existing services identified (subcontractor once

completed work) Electrical supply isolated Temporary trench supports available

Inspection regime in place PART E - CANCELLATION OF PERMIT

Traffic control in place

Protective clothing provided This permit to work is cancelled

and the relevant staff have been

Suitable safe access provided notified. No more work under this

Location protected and sign marked permit.

Other

PART C – ACCEPTANCE

I accept this permit and will ensure the

precautions ticked above in part B have

been undertaken before

Time am/pm

Date: ..............................20...................

Page 180: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section- F – ESHS- Volume 2 Health & Safety Manual

2-110 Sign & Stamp of Tenderer CMRL/REV.A3

FSAF 08

HOT WORK PERMIT Number………

Hot work permits are to be used where a significant risk of fire or erroneous triggering of a

fire detection system has been identified. The type of heat, flame or spark producing

operation for which this Permit may be used includes:

Welding – Cutting - Grinding - Soldering – Use of Bitumen boilers - Work using LPG – Burning off paint

PART A – ISSUE PART D - COMPLETION OF WORK

Permit is issued to: ........................................ The work has been completed and the

work area and adjacent areas to which

sparks and heat might have spread

such as opposite sides of floors and

walls) have been thoroughly inspected

and found fire for (specific work to be done)..........................

immediately following completion

........................................................................ 30 minutes later

1 hour after completion

Electrical equipment/supply switched back on

at (exact location of work) .............................. Smoke detector/s have been re-activated

All equipment and material has been removed

……………………………………………………. Area

restored

Other

Valid from ..... am/pm

to:...... am/pm Date: ….......20..….. The work has been completed, and I have

I issue this permit subject to the minimum precautions undertaken the checks and safety measures

I have listed in Part B below. I have ticked in Part D of this permit above.

Signed: ..........................................................

(Issuer) Time ......................... am/pm

Date: ..........................20....................

PART B - PRECAUTIONS

Before starting: Signed: ..................................……….

Combustible materials: removed (Subcontractor

once completed work) protected

Electrical equipment/supply isolated

Smoke detector/s: isolated PART E - CANCELLATION OF PERMIT

Extinguisher/s: readily available

Personnel: instructed in fire precautions This permit to work is cancelled and the relevant

Page 181: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section- F – ESHS- Volume 2 Health & Safety Manual

2-111 Sign & Stamp of Tenderer CMRL/REV.A3

know nearest fire alarm staff have been notified. No more work under this

Location: protected and sign marked permit.

Work area screened to contain sparks

Time .......................... am/pm

Other Date: ..........................................20.......

Signed: .................................................

Following completion: (Issuer)

Work and adjacent areas to be

checked immediately 30 minutes

later

1 hour after completion

Smoke detector/s to be re-activated

Other

PART C - ACCEPTANCE

I accept this permit and will ensure

the precautions ticked above in

part B have been undertaken

before starting work. I also

understand the checks and safety

measures I am required to

undertake after Completion of

work.

Signed ......................... (Subcontractor undertaking work)

Page 182: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section- F – ESHS- Volume 2 Health & Safety Manual

2-112 Sign & Stamp of Tenderer CMRL/REV.A3

FSAF 09

NEAR MISS REPORT

Near miss incidents should be regarded with the same seriousness as personal accidents

as they are basically the same. The information recorded below is not to proportion blame

(unless a clear disregard of safe working caused the incident) but to enable the company

to learn and prevent similar occurrences.

Site/Location: Contract No.

Near Miss – Please describe what happened:

Was there an obvious cause of the incident:

Contributing Factors:

Time: Date:

Weather Conditions:

Company Involved:

Personnel Involved:

Plant Equipment Involved:

What has been done to prevent a re-occurrence:

Name of Person Making Report………………………………………………

Job Title………………………………………………………………………….

Signature:……………………………………………Date……………………………….

Distribution: Area Director, Company Safety Advisor, Sub-Contractor’s

Office, Notice Boards Attached:

Photos Y / N / NA

Sketches Y / N / NA

Risk Assessments Y / N / NA

Statements Y / N / NA

Page 183: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section- F – ESHS- Volume 2 Health & Safety Manual

2-113 Sign & Stamp of Tenderer CMRL/REV.A3

CONFINED SPACE PERMIT FSAF 10

Number………

Confined space permits are to be used where entry is required into an enclosed or partly

enclosed space where because of its nature there is foreseeable risk including dangerous levels

of fumes, gases and/or oxygen deficiency.

The type of operation for which this permit may be used includes work in:

Deep Manholes – Tanks – Wells – Live Sewers – Basements – Roof Spaces -Trenches – Pits – Other Similar Spaces

ALWAYS: ASK – IS THERE A NEED TO ENTER?

IF ATMOSPHERE IS POTENTIALLY UNSAFE - TEST ATMOSHPERE PRIOR TO ENTRY

PART A – ISSUE PART D - COMPLETION OF WORK

Permit is issued to: ............................................................….

The work has been completed and

the works area of:………………………………………………. and adjacent areas

have been thoroughly checked

to ensure no

hazards remain for (specific work to be done)............................................…..

Personnel

accounted for All equipment and materials removed

............................................................................................... Safety equipment returned

Area restored

at (exact location of work) ..................................................... Other

…………………………………………………………………….. The work has been completed, and I have

undertaken the checks and

safety measures I have ticked

in Part D of this permit above.

Valid from ....... am/pm

to:......…….. am/pm Date: …....................20..….. Time am/pm

I issue this permit subject to the minimum precautions Date:…………….20………

I have listed in Part B below.

Signed: ................................................................……

Signed…………………………………………………………

(Issuer) (Subcontractor once completed work)

Page 184: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section- F – ESHS- Volume 2 Health & Safety Manual

2-114 Sign & Stamp of Tenderer CMRL/REV.A3

PART B – PRECAUTIONS

Risk assessment undertaken and explained.

PART E – CANCELLATION OF PERMIT

Test atmosphere prior to entry This permit to work is cancelled and the

relevant staff

Test atmosphere during works - gas detector have been notified. No more work under

this permit.

Tripod, winch and harness Topman/watcher posted Time ............. am/pm

Supervision

Emergency procedures Date:…………….20………

Communications

Competence and

training Medical condition of operatives Signed…………………………………

Isolation (Issuer)

Forced

Ventilation

Pre-cleaning

Size of access (entry

and escape) Breathing

apparatus Protective clothing

Intrinsically safe tools and

equipment Suitable access

and light

Location protected and

sign marked Other

PART C - ACCEPTANCE

I accept this permit and will ensure the

precautions ticked above in part B have

been undertaken before starting work. I

also understand the checks and safety

measures I am required to undertake after

completion of work.

Signed ............................................. (Subcontractor undertaking work)

Page 185: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section- F – ESHS- Volume 2 Health & Safety Manual

2-115 Sign & Stamp of Tenderer CMRL/REV.A3

FSAF 011

MARS AUDIT SCORE SHEET FOR THE MONTH OF ..... 2020

Date of Audit: Contrator: Project Name:

Project Manager: Chief Safety Manager :

Site Conditions:

Points will be objectively awarded by the Group 6 personnel based upon site safety and environment

conditions. Scoring will be as follows: Excellent (E) = 10, Good (G) = 8, Average (A) = 6, Fail (F) = 0,

Non-Conformance (NC) = -10 with the exception of those sections marked with an asterisk which will

have a factor of 2 thus doubling the score for that section.

All non-compliance within the heavy bordered areas will receive an Action Notice at the required level.

All Suspended Operations Notices will be referred to the Project Manager, who will visit site within 24

hours to carry out further safety inspections.

Any non applicable topic and the corresponding “possible score” will not be marked, and the score will

be calculated by recognising the relevant possible score as being 100% and the actual score as a

percentage of this.

NOTICES DISPLAYED E G A F NC Actions

Health and Safety

Information Health and Safety Policy

Statements Employer’s Liability Insurance Certificate Protective Equipment Sign

Reversing Vehicles Sign

Emergency Procedure

First Aider(s), Male Nurse ,Doctor

Project Notice Boards

Site rules

TBOCWR registration Labour Licence

Restricted Usage of Hand Phone Sign

Page 186: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section- F – ESHS- Volume 2 Health & Safety Manual

2-116 Sign & Stamp of Tenderer CMRL/REV.A3

SUB

TOTAL POSSIBLE

PLANNING E G A F NC Actions Construction Phase Health and Safety

Plan

Risk Register & Hazard Log

Risk Assessment & Method

Statements Completed Risk Assessment & Method Statement

Briefings

Risk Assessments & Method Statement

Implementation Health and Safety

Organisation Chart

Manual Handling Assessment

Manual Handling Training

Safe Operational Control Procedure

H&S Management System Procedure Emergency Preparedness and Response

plan

International Certifications

Training Implementation Plan

Fire Evacuation Plan

Fire Risk Assessment

PPE Risk Assessment

Lift Plan and Risk Assessment

Transportation Plan and Risk Assessment

Safety inspection Reports

Designer's Role in Safety

ID card and First Day at Work

CCTV

Mock drills Evaluation ,Selection and Control of Sub

contractor

SUB TOTAL POSSIBLE

EXPLOSIVE HANDLING AND BLASTING

E G A F NC Actions

Transport and handling

Page 187: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section- F – ESHS- Volume 2 Health & Safety Manual

2-117 Sign & Stamp of Tenderer CMRL/REV.A3

Magazine SUB

TOTAL POSSIBLE

WELFARE E G A F NC Actions

Canteen

Toilets /Urnials

Drinking Water

Designated site eating areas

Labour Accommodation

SUB

TOTAL POSSIBLE

HOUSEKEEPING E G A F NC Actions

5S Housekeeping

Housekeeping squad

De-nailing

Storage SUB

TOTAL POSSIBLE

FIRE PRECAUTIONS E G A F NC Actions

Site Offices Work Place – Extinguishers

Hot Works Permits

Conditions on Site Storage of Flammables

Requirements

Fire fighting personnel

Diesel / Petrol Storage

Relevant statutory signs SUB

TOTAL POSSIBLE

PPE E G A F NC Actions Helmets

Footwear Hi Viz

Eye protection

Hearing Protection Respiratory Protection

Protective Gloves

Fall Protection

PPE for visitors

Safety Belt

Page 188: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section- F – ESHS- Volume 2 Health & Safety Manual

2-118 Sign & Stamp of Tenderer CMRL/REV.A3

SUB

TOTAL POSSIBLE

COSHH E G A F NC Actions

File maintenance Assessment Briefings

SUB

TOTAL POSSIBLE

PLANT ,EQUIPMENTS AND TOOLS

(*X 2) E G A F NC

Actions

Planning Lifting Appliances and Lifting Gear

Register

Plant and machinery inspection

Vehicle Control

Piling and Grab operations

Competent Personnel

On Site Traffic Management

Guarding Arrangements

Vehicle Checks

Lifting Operation(LA and LE)

Safe Use

Lifting Gear

Suitability and Specific PPE

Permits

Batching Plant and Casting Yard

Safety Devices

Welding Machine

Monthly Plant and Equipment Safety Audit

SUB

TOTAL POSSIBLE

EXCAVATIONS (*X 2) E G A F NC Actions Planning

Excavations Register

Provision of Service Locators

Underground Service identification

Edge Protection

Shoring

Competent Workface

Page 189: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section- F – ESHS- Volume 2 Health & Safety Manual

2-119 Sign & Stamp of Tenderer CMRL/REV.A3

Temporary Work Assessment

Safe Working Procedure

Excavation Work Permit

Monthly Excavation Safety Audit SUB

TOTAL POSSIBLE

ELECTRICS (*X 2) E G A F NC Actions Power Assessment

Condition of Site Distribution panel Overhead Lines Identified

Storage and Use of Power Tools

Plugs, Sockets and outlets

Competent Persons

Work Permit

illumination

Cables

Work On site

Earth Pit

Monthly Electrical safety audit report

Electrical Register

Lock out /Tag out SUB

TOTAL POSSIBLE

WORK AT HEIGHT (*X 2) E G A F NC Actions Planning

Scaffolding Register

Ladder Access

Scaffolding General

Scaffold access Towers and Platforms

Edge Protection and Toe-boards

Competent Persons Other

Precautions,Ladders,Stepladders,MEWPs

Temporary work Assessment

Recorded Inspections

Work Permit

Safety Net Monthly Safety Audit for the Working at

Height SUB

TOTAL POSSIBLE

Page 190: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section- F – ESHS- Volume 2 Health & Safety Manual

2-120 Sign & Stamp of Tenderer CMRL/REV.A3

FLOOR OPENINGS E G A F NC Actions Planning

Provision of Protection

Relevant Signage Work Permit Procedure

SUB

TOTAL POSSIBLE

SITE MANAGEMENT AND

SUPERVISION E G A F NC Actions

Resources

Monitoring

H&S submittals to Employer

H&S Committee

External H&S Audit Quarterly

Management Review

Incident Reporting

Safety Promotion

Fire and Smoke

Employer /Engineer Non-conformance

Report SUB

TOTAL POSSIBLE

TRAFFIC MANAGEMENT (*X 2) E G A F NC Actions

Safety of Traffic

Public Information

Safety of Public

Traffic Management Highway Cleanliness

Visitor Safety

Work Permit

Relevant Site Signage

Barricade Monthly Traffic Safety Audit

SUB

TOTAL POSSIBLE

NOISE E G A F NC Actions

Identification of Sources

Provision of Silenced Equipment

Monitoring

Page 191: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section- F – ESHS- Volume 2 Health & Safety Manual

2-121 Sign & Stamp of Tenderer CMRL/REV.A3

SUB

TOTAL POSSIBLE

HEALTH E G A F NC Actions

HAV’s Register

Malaria, Dengue, Silicosis, Skin

Cancer , HIV AIDS , Leptospirosis ,

Tetanus, Covid 19 and Hepatitis

Information

Medical examination Health Centre

First-aid

Ambulance van and room Alcohol and drugs

Radiation

Mosquito breeding

Vibration

SUB

TOTAL POSSIBLE

TRAINING/INDUCTION E G A F NC Actions

Management Competency

Supervisor Training

Driver/Plant Operator Training Training Programme

Specific Training Competency Certificate

Toolbox Talks

Follow up training

Important days observed

H&S Induction Training SUB

TOTAL POSSIBLE

POINTS AWARDED

Comments:

Chief Safety Manager: Signed

Project Manager: Signed

Page 192: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section- F – ESHS- Volume 2 Health & Safety Manual

2-122 Sign & Stamp of Tenderer CMRL/REV.A3

FIRST – AID TREATMENT SLIP FSAF 12

LOGO NAME OF THE SITE

SLIP NO

FIRST-AID TREATMENT

SLIP NAME:

LOCATION:

DATE:

STAFF/CONTRACTOR

(TICK)

IF SUB CONTRACTOR, NAME OF THE SUB CONTRACTOR :

MENTION BREIF CAUSE OF ACCIDENT:

TIME : am/pm NAME & SIGNATURE

OF SITE ENGINEER/SUPERVISOR

(TO BE FILLED BY ATTENDING

DOCTOR/FIRST AIDER) LOCATION OF BODY PART :

NATURE OF INJURY :

FIT UNFIT HOSPITALISED :

YES/N0 ROOM NO : BED NO

SIGNATURE OF ATTENDING DOCTOR :

NAME &REGISTRATION NO. NAME & SIGNATURE OF FIRST-AIDER

SLIP RECIVED BY SAFETY

MANAGER/SAFETY ENGINEER DATE :

TIME : am/ pm SIGNATURE BY DUTY

SAFETY ENGINEER

Page 193: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section- F – ESHS- Volume 2 Health & Safety Manual

2-123 Sign & Stamp of Tenderer CMRL/REV.A3

FSAF 13

CHENNAI METRO RAIL LIMITED

Safety Inspection Report

(SITE)

CHENNAI METRO RAIL PROJECT

CMRL Issuing entity Discipline Area Document No. Revision

Index

0

Page 194: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section- F – ESHS- Volume 2 Health & Safety Manual

2-124 Sign & Stamp of Tenderer CMRL/REV.A3

DOCUMENT / DRAWING TECHNICAL

VERIFICATION AND REVISION RECORD

PROJECT NAME Chennai Metro Rail Limited

*DOC/ NO. DATE OF ISSUE

*DOC/ TITLE Safety Inspection Report

REV No.

DATE

OF

ISSUE/R

EV.

DESCRIPTION PREPAR

ED/

DESIGN

ED

CHECKED APPROVED

1 Safety Inspection Report (SITE)

Page 195: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Sub-Section VII F -ESHS

Volume 2 Health & Safety Manual

2-125 Sign & Stamp of Tenderer

Safety Inspection Report

Site: Completed by (PRINT NAME):

Date: Title: Safety

Summary

No Category Comments & Action

Risk Rating

Behavi

our

S/U

Action

√ / X

H M L

1

Leading Edge Protection

(Double Rails &

Toeboards) N.A H M L S U

2

Void Protection

(Guard rails or securely covered)

N.A H M L S U

3

Scaffolding

(Designed, Inspected &Tagged)

N.A H M L S U

4

Temporary Works

(Compliant with design/drawing)

N.A H M L S U

5

Ladder Use

(Short duration work only) (stable

and footed)

H M L S U

6

Mobile Towers

Guardrails, Toeboards

Correctly braced N.A H M L S U

7

Electricity

(Condition, Protected) (Life risk/Fire Risk)BOCWR – R 47 Clause 26 SHE Conditions of Contract

H M L S U

8

Traffic Management

(People & Plant separated) (demarked)

BOCWR – R 48 H M L S U

Page 196: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Sub-Section VII F -ESHS

Volume 2 Health & Safety Manual

2-126 Sign & Stamp of Tenderer

9

Plant & Equipment

(In good working order)

(Operated correctly)

BOCWR – R 130

H M L S U

10

Excavations

(Inspected / shoring in place)

(Gas Levels)

11

Permit systems

(Permit in Place and being followed)

H M L S U

12

Fire Safety (Fire

points,with

extinguishers & alarm

available) BOCWR – R

35

H M L S U

13

Safe Access/Egress

(Safe pedestrian route to all areas)

H M L S U

14

Housekeeping

(No waste build up)

(slip trip hazards) H M L S U

15 Pile Rig

(Lifting Equipment)

BOCWR – R 214,216 -221

H M L S U

16 Confined spaces H M L S U

17 Storage of materials H M L S U

18

Signage

(Erected and

Appropriate) BOCWA

S - 44 BOCWR R – 5

H M L S U

19

Personal protective Equipment

(Correct for task & in

use by staff)

BOCWA and BOCWR

R – 45, R – 46; R – 54, C – XI; R– 96 to 107

H M L S U

20 Harmful Substances

(Stored, Used correctly) H M L S U

21 Dust Debris Suppression

(Vehicles covered,

H M L S U

Page 197: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Sub-Section VII F -ESHS

Volume 2 Health & Safety Manual

2-127 Sign & Stamp of Tenderer

Damp down)

22 Noise Suppression

(Enclosures Barriers in place above 90 db)

H M L S U

23 Employee Trained and aware of tasks briefed on task & safety etc

H M L S U

24 Welfare facilities

(Clean, Tidy & Hygienic)

H M L S U

25 Public Protection from site operations

26 Site Security H M L S U

Risk Rating

Tolerance

HIGH

High severity and High probability of major injury, disablement or possible fatality.

Work must cease immediately and additional control measures implemented prior

to work commencement.

MEDIUM

Probability that an incident will occur over time (Over 3 day injury) but not as

serious as a major injury or fatality. Additional control measures to be

implemented within 24 Hrs.

LOW

Negligible risk of injury, but task requires additional control measures to reduce

likelihood of injury (Minor Injury not above 3 days off from employed role)

Additional control measures to be specified and implemented within 48 Hrs

Severity Likelihood

Minor

Injury

First Aid

Case

Over 3

day

injury

Critical

Fatality or Major

Injury

Probable High High High

Possible in time

Medium

Medium High

Negligible

Unlikely to

occur

Low Medium Medium

Distribution: Site Engineer /Contractor /CMRL

Page 198: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Sub-Section VII F -ESHS

Volume 2 Health & Safety Manual

2-128 Sign & Stamp of Tenderer

RECORD OF INDUCTION TRAINING

FSAF 14

Site Safety Management Matters - Identify points covered by induction by in box

1.SUPERVISION site managementstructure.

11. CLIENTS RULES

detail any client specific rules

2. EMERGENCY alarmprocedure/muster point.

12. ACCIDENT and INCIDENT reportingprocedures Including near missincidents

3.SMOKING identify any smokingrestrictions.

13. DISCIPLINARY ACTION for safetyrelated failings

4. FIRST AID arrangements on site.

14. PPE requirements for boots, eye &hearing protection, respirators &overalls etc.

5.ENTRY ROUTES TO SITE give detailsfor both Pedestrian & Vehicle routes

15. SAFETY HELMET as directed bysite management in accordance withsite rules

6. ACCESS RESTRICTIONS detailany areas which are out of bounds

16. NOISE nuisance noise & restrictionson working hours (Section 60notices) & noise assessmentprocedure

7.ALCOHOL consumption of alcohol,taking of non prescribed drugs is notpermitted. Note section 37

17. NO RADIOS operating from leads. NOWALKMANS or other in ear audio device

8.HAZARD REPORTING detailprocedures.

18. SECURITY arrangements & right ofsearch etc.

9.WELFARE no eating on site. Sitecanteen/toilet

Arrangements. Identify smoking restrictions Arrangements

19. STATUTORY CERTIFICATESrequired for , lifting appliances, electricalpower tools etc.

10. SITE RULES give details

WORKING ARRANGEMENTS - Identify points covered by induction by in box

20. SAFE WORKING risk assessments& method statement explained

28. COSHH before using chemicals,cutting, grinding, or mixingmaterials obtain assessment. If indoubt ASK!

21. SITE VEHICLES, PLANT &MACHINES only to be operated byauthorised person, with proof oftraining & competence certificate(CITB etc

29. SCAFFOLD not to be erected,dismantled or altered except byauthorised persons. Proof oftraining & competency is required.(Includes towers.)

22. TRAFFIC MANANGEMENTVehicle/pedestrian routes. Speedlimits

30. MATERIAL STORAGE & WASTEDISPOSAL

arrangements & procedures

Page 199: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Sub-Section VII F -ESHS

Volume 2 Health & Safety Manual

2-129 Sign & Stamp of Tenderer

23. FIRE PREVENTION location andtype of fire fighting equipment.

31. MANUAL HANDLING maximumweights & assessments.

24. PERMIT TO WORK describeprocedure.

32. MATERIAL HANDLING to belowered not thrown

25. TOOLS. Personal hand toolsshould be inspected regularly andany defects corrected.

33. SAFETY MONITORINGARRANGEMENTS

safety inspections & site instructions etc.

26. ENVIRONMENT conditions andspecial arrangements relating to thissite.

34. CONSULTATIONARRANGEMENTS. You areencouraged to discuss anyconstructive aspectsof safety.

To be completed by the person receiving induction training

Appropriate box YES No

35. Has your employer explained the safe system of work containedwithin your method statement and risk assessment?

STOP

36. Do you understand the Risk Assessment and Method Statement &agree to comply with its content?

STOP

37. Do you suffer from epilepsy, asthma, hearing or visual disability,(colour blindness etc.)?

Do you have any disability or condition, which requires special medical attention or treatment?

Are you taking any medication? (Give details overleaf in order to assist any first aid treatment) 38. Have you read and understood the site rules? and agree to complywith them?

STOP

39. I am 18 years of age or older STOP

No means STOP - do not commence work. - see Rok site management before working

40. Which training certificate* doyou Hold?

None

*Certificates will be required for examination & photocopying

Operatives Name: Signature: Date: Trade:

Instructor’s Name Signature Contact No:

Page 200: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Sub-Section VII F -ESHS

Volume 2 Health & Safety Manual

2-130 Sign & Stamp of Tenderer

FSAF 15

INDUCTION CHECKLIST

Explain to all in conjunction with the Company Standard Operatives Induction.

1. Site Management Team and responsibilities

2. The scope of the project and site details

3. Site layout, boundaries, security, any notice boards

4. Welfare facilities

5. Transport plan

6. Fire plan and actions in event of an emergency

7. Name and details of first aider and first aid facilities

8. Actions in the event of an accident/near miss and reporting procedure

9. Specific site wide hazards

eg. live building services

HV cables…overheads…..underground

contaminated land

confined spaces

working adjacent to public

10. Site Procedures

eg. reporting of unsafe acts, near misses and safety issues that require attention

permits required

restricted areas

PPE zoning

signing in and out as per site rules

11. Safe use of scaffolding

12. Housekeeping arrangements and material storage

13. Methods of consultation on H&S matters

14. Personal responsibilities, conduct and disciplinary measures

15. Questions and open discussion

In addition check operatives have had their risk assessments and any associated method

statement and COSHH assessments explained to them by their company, and that they

understand what they have to do. Also check they understand who is responsible for their

immediate supervision.

All attendees should sign Operatives Safety Induction Form. Some sites may also use the

Operatives General Induction Register.

Page 201: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Sub-Section VII F -ESHS

Volume 2 Health & Safety Manual

2-131 Sign & Stamp of Tenderer

Operations induction

FSAF 16

1. Personal Protective equipment

a) Safety helmets, safety boots & hi-viz will be worn in accordancewith site rules.

b) Other items established by risk assessment must be worn.

c) Your immediate supervisor must tell you what is required foryour work.

Starting On Site

Protective Equipment

Has your manger supplied you with what you need?

i.e. helmet, hi-viz, safety footwear, RPE, gloves, goggles earprotection etc.

Y N

2. Mobile Plant

a) Only authorised &/or certificate holding operatives may driveplant.

b) Use any designated vehicle routes and be aware of anypedestrian routes etc.

c) All reversing & manoeuvring near excavations must beoverseen by a banksman.

Site Hazards

Has your manager/ site manager explained to you

where the hazardous areas are on site?

Emergency Procedures

Do you know who the first aid person is? Do you know

where the fire exit routes are located and where the

assembly point is?

Risk Assessment

A risk assessment is needed for every job on site.

Do you know what Precautions and protective

equipment apply?

Your Work

Has your work been properly explained to you? If

working to a method statement do you understand

it?

Y

Y

Y

Y

Y

Y

N

N

N

N

N

N

3. Excavations

a) All excavations & manholes must be guarded or covered.

b) When working below ground level ensure adequate steps

have been taken to prevent collapse.c) Ensure location of any underground services are known.

4. Access / Scaffolds / Ladders

a) Use & keep to proper pedestrian access routes when enteringand moving around site.

b) Use only completed platforms – guard rails / toe boards

c) Do not interfere/alter or move any scaffold/ladders/accessequipment.

d) All ladders must be tied or footed regardless of the duration ofthe work.

e) Only recognised scaffolder may erect or alter scaffolds.

Page 202: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Sub-Section VII F -ESHS

Volume 2 Health & Safety Manual

2-132 CMRL/REV.A3

06.06.2020

5. Lifting Operations / Manual Handling

a) Lifting equipment/accessories must have current certificates ofthorough examination.

b) Lifting operations must be planned and supervised.

c) Only authorised operators/banks men to be engaged in a lift.

d) Avoid manual handling heavy materials/plant if possible

e) Use proper manual handling techniques at all times.

Accidents

Do you agree to report all accidents and near

misses to your manager and site management

immediately?

Site Rules

Are you aware of and do you agree to abide with the site rules?

Medical conditions

Do you suffer from any medical condition that may affect your safety on site? If so, please provide details. Y N

6. Generally

a) Make sure you are aware of the risks relating to your work.

b) Find out the position and status of any building services andprecautions required.

c) Be aware of how to deal with any hazardous

materials/substances connected to your work (COSHH and

flammable/volatile substance issues.

d) Think seriously about progressive injury. Noise above 85dB,

dusty areas, using tools with high vibration levels.e) Work in a tidy manner, clear waste regularly.

f) We actively promote consultation on Health & Safety matters.

g) IF YOU SEE SOMETHING THAT IS A HAZARD – REPORT IT

Declaration

I have read (or have had read to me) these instructions & understand my

responsibilities for working safely. I am over 18 years of age. * (delete if not applicable)

Name ……………………………………..(print)Date:……………………….

Company/S-C:………………………………….Signed:……………………………….

Failing to follow these simple rules will result in your removal from site! Remember – Your actions could affect our future use of your company!

Page 203: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-133 Sign & Stamp of Tenderer CMRL/REV.A3

FSAF 17

VISITORS INDUCTION

The Health & Safety Policy requires you to act in a safe way and not put others at risk. A

copy of the policy is displayed on site for you to inspect. The requirements listed below will

help us to work together towards eliminating accidents and ill health on site.

AUTHORISATION

Please sign in and out of the visitor’s book.

ENTERING SITE

Please use and keep to proper access when entering and moving around site. Ask the Site

Manager to advise you of pedestrian routes/pedestrian free zones. Helmets and footwear

must be worn on site. Additional PPE may be required at certain times and/or in particular

areas of the site. The Site manager will advise you of any such requirement.

SITE HAZARDS

Ask the Site Manager to advise you of type and location of site hazards. EMERGENCY

PROCEDURES

Find out who is the First Aid Person, the location of alarms, exit routes and assembly points.

An emergency procedure sign is displayed – READ IT.

ACCIDENTS AND UNSAFE CONDITIONS

All accidents and near misses must be reported to the Site Manager, you have a duty to

advise the site staff of any potentially dangerous situation or unsafe condition you may

observe.

Page 204: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-134 Sign & Stamp of Tenderer CMRL/REV.A3

Mobile Elevating Work Platforms (MEWPS) FSAF 18

Site Contract No.

Machine/Equipment

Type (Scissor lift, Telescopic, Articulated Telescopic, Vehicle Mounted

Make: Model:

Plant/Serial No. Supplier:

Documentation Date of Examination/Inspection Comments

6 monthly thorough

examination

Weekly inspection register

Log of daily checks

Operator Training

All operators of MEWPS must have received training from appropriate training

organisations and be issued with a certificate indicating competence such as the CITB

CTA card (not familiarisation training). Enter details below

Certificate of competence Yes No Certificate issued by

Certificate registration No. Certificate

expiry date

Is the operator familiar with the equipment

to be used?

Yes No Comment if necessary

General Checks (Tick boxes as appropriate) Yes No

Is SWL or Max No. of persons clearly marked on the lifting platform?

Are all dangerous parts adequately guarded?

Is the machine suitable for the ground conditions to be worked on? Is the machine to be driven on a public highway?

If yes to above question; Does driver have a suitable licence?

Is machine taxed for use on public highway?

Are safety harnesses with restraint lanyards available for use during

work operations?

Form completed by: Date:

Page 205: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-135 Sign & Stamp of Tenderer CMRL/REV.A3

PERMIT TO WORK FSAF 19

ON OR NEAR ELECTRICAL EQUIPMENT

It is intended that this form is for use by electrically competent persons only

Contract Title: Contract No:

Location of

Works:

Date of

Work:

Risk Assessment: Yes Method

Statement:

Yes No

STOP

Person in Charge: Name of

Contractor:

Part 1 Description of Work (Describe the work to be carried out)

Description of

equipment: Location of equipment: Describe the work to be carried out:

Part 2 Precautions to be Taken Before Work (Provide further details to these questions in part 3)

“CAUTION “ notice to be

displayed

Yes No “DANGER” notice to be displayed

Yes No

Equipment isolated Electrical circuits isolated

Any other precautions required

Part 3 Precautions During Work

Measures required for “Live” working

The equipment will be deemed safe and can return to normal use when work is complete and all persons, tools &

equipment are removed Permit valid from: Time of Expiry:

Part 4 Authorisations:

All Signatories to this Permit confirm that they understand the precautions to be taken prior to and during the work. The Recipient of this Permit is responsible for the safety of all persons and equipment involved. Only the Authorised Person can cancel this Permit.

Name Signature Time Date

Permit issued by (Authorised Person):

Page 206: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-136 Sign & Stamp of Tenderer CMRL/REV.A3

Recipient of Permit:

Surrendered by:

Cancelled by (Authorised Person):

Page 207: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-137 Sign & Stamp of Tenderer CMRL/REV.A3

PERMIT TO EXCAVATE FSAF 20

Contract Title: Contract

No:

Location of

Works:

Date of

Work:

Risk

Assessment:

Yes Method

Statement:

Yes

Person in

Charge:

Name of

Contractor:

Part 1 Description of Work (Include if appropriate Safe Method of digging when within 0.5 metres of services)

Anticipated period that excavation will be open:

Hours Days

Type of ground to be excavated- (Tick

box)

Rock Clay Sand Gravel Mixture

Other

Describe the work to be carried out:

Part 2 Precautions to be Taken Before Work (Provide further details to these questions in part 3)

Yes No Yes No

Service Utility records checked Stop Is there a danger of collapse

or undermining adjacent

structure/road etc.?

Stop

Site Maintenance Plans checked Will excavation support be required?

Electro-location (CAT scan) survey

carried out by trained competent person.

Stop Is ground support available on site?

Stop

Will underground services be marked on

site?

Stop Will anyone enter the excavation?

Services marked on site drawings Could water enter the excavation?

Stop

Supervision informed of location of

services

Stop Could gas enter the excavation? Stop

Trial holes dug if service identified Stop Will Confined Space Permit be

required?

Are there any overhead cables or other

restrictions on the use of excavators/plant

Other

Page 208: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-138 Sign & Stamp of Tenderer CMRL/REV.A3

What services have been

identified? (tick box & identify

size, type and how many)

Gas Electricity Water Telecom

Other (state)

Any other precautions required:

Part 3 Precautions During Work (Tick boxes as appropriate)

Type of Excavation support

Drag

box

Driven

sheets

Piling

sheets

Fully

timbered

Hit/Miss

sheeting

Jacking

system

Battered

sides

Other

Type of Edge Protection Type of gas

monitoring Adequate Access/Egress

Yes No Are existing services marked out on site

Yes No

Are other restrictions

identified in Part 2 controlled

Stop Are existing services adequately

supported

Yes No

Note size and type of service

Any other precautions to be taken:

Permit Valid

From:

Time of

Expiry:

Part 4 Authorisations

ONLY PERSONS AUTHORISED IN WRITING BY THE SENIOR RESIDENT MANAGER

MAY COMPLETE AND ISSUE THIS PERMIT.

The permit is not complete unless copies of the relevant service drawings are

attached.

All Signatories to this Permit confirm that they understand the precautions to be

taken prior to and during the work. The Recipient of this Permit is responsible for

the safety of all persons and equipment involved. Only the Authorised Person can cancel this Permit.

Name Signature Time Date

Permit issued by (Authorised Person): Recipient of Permit:

Surrendered by:

Cancelled by (Authorised Person):

Page 209: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-139 Sign & Stamp of Tenderer CMRL/REV.A3

FSAF 21

Site Excavator Checklist

Site Contract No.

Machine/equipment Supplier

Make Model

Capacity (lifting only) Plant/Serial No.

Condition - list obvious

defects

Tyres- any obvious

cuts/worn tread

Documentation Date of

Examination/Inspection

Date checked

6 month thorough

examination

Lifting equipment test

certificates

(Before first use)

6 month thorough

examination of lifting

equipment

Weekly inspection register

General information

SWL marked on boom or clearly displayed in cab

Are check valves fitted?

Is there a suitable lifting eye/point?

Operator Training

Name of operator (print name)

Card number Expiry date

Type of certificate issued

Categories of plant applicable 1 4

2 5

3 6

Checked by:

Print Name and Company:

Signature: Date:

Note: Excavators fitted with a rated capacity indicator should be treated as a crane

and a Crane Checklist used

Page 210: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-140 Sign & Stamp of Tenderer CMRL/REV.A3

OIL STORAGE REQUIREMENTS FSAF 22

Above Ground Storage Tanks for Offices

MUST have - GO RA MUST NOT have - GO RA

Good integrity and condition. Walls not penetrated by

valves or pipes.

110% bund, with rainwater

sump in base.

Inadequate bund.

Minimum clearance between

bund and tank not less than 750mm.

Any valve, sight gauge, pipe

work outside of the bund.

Suitable location to minimise

damage by impact.

Be within 10m of any

watercourse/drains.

Base and walls impermeable to

water and oil.

Be within 50m of a water

abstraction point.

Angle fillet at junction of base

and wall to deflect ice.

Sight gauge supported.

Sight gauge fitted with a valve

that automatically closes when not in

use.

Vent pipe located within the

bund, discharging vertically

downwards.

Storage Tanks for Fueling Mobile Plant (+ all the above list)

Flexible draw off pipe has

automatic closure valve.

Pipes must not hang out of

bund.

Delivery pipe must be locked

within the bund when not in use.

Mobile Bowser

Must have a hand pump or an

automatic cut-off nozzle.

Pump/valve must be locked shut

when not in use.

Pump/valve fitted with a lockable tap

where it leaves the tank. Kept locked

when not in

use.

Page 211: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-141 Sign & Stamp of Tenderer CMRL/REV.A3

Sight gauge must have a lockable

valve where it leaves the tank, and

kept locked when

not in use.

GO = Good order RA = Requires Attention

Page 212: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-142 Sign & Stamp of Tenderer CMRL/REV.A3

HARNESS CHECKLIST FSAF 23

Contract......................................................................

Make/Supplier/

Identification

No.

Date Webbing Stitching Buckles Karabiners

& Snap

hooks

Checked

By

Signature

Here are the Do’s and Don’ts

DO

Carry out a full visual inspection of your “Fall Arrest” system every time before use.

Make sure that every part of your “Fall Arrest” system is fully compatible.

Use anchorage that is located directly above the working position.

Use approved permanent anchorage points that have been built or installed byprofessionals.

Always ensure that the closing bar on the karabiner hook is locked shut. Kwiklok

types do this automatically but should be checked. Screwgate types must be

screwed home manually and checked by applying pressure against the closing

bar.

Make sure that the space you would travel through in the event of a fall is free fromprotrusions and hazards.

Ensure that your harness is fitted as close to your body as is comfortable to

prevent it’s upward movement in the event of a fall.

Only use compatible ancillary equipment.

DO NOT

Anchor to a structure that itself can fall, ie. a free standing ladder or other loose structures.

Use an anchorage point that will not take a shock load of 1000kg.

Use an anchorage point that is located below the point of attachment to your

harness. (Special conditions apply to Scaffolders)

Use waist connection points on a harness for “Fall Arrest”. Waist connection

Page 213: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-143 Sign & Stamp of Tenderer CMRL/REV.A3

points are for work positioning or restraint only.

Loop lanyards around structures with sharp edges. Do not use if less than 5mm or 7/32”radius edge.

Use any “Fall Arrest” equipment without reading both the user manual

and individual product fitting instructions.

Use any “Fall Arrest” equipment without familiarization training and if possible practicaltraining.

Mix different manufactured products into your “Fall Arrest” system without

checking and confirming their compatibility.

Use any “Fall Arrest” products that are showing signs of wear and tear. Return for formalinspection.

Extend the length of your lanyard beyond 2M. For greater working distances use a FallArrester Block.

If you have any doubts on any equipment DO NOT use it.

Page 214: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-144 Sign & Stamp of Tenderer CMRL/REV.A3

CHENNAI METRO RAIL PROJECT LIMITED

SAMPLE SAFETY

FORM REFERENCE:

FSAF- 24

CONTRACTORS MONTHLY ACCIDENT STATISTICS REPORT

NAME OF CONTRACTOR CONTRACT NO

REPORT FOR MONTH ENDING:

COMMENCEMENT DATE: SCHEDULED COMPLETION DATE:

ACCIDENT STATISTICS SUMMARY FOR MONTH CUMULATIVE

1. Number of Man-hours Worked

2. Number of Man days Worked

3. Number of Reportable Fatal Accidents

4. Number of Reportable Non-Fatal

Accidents

5. Number of Dangerous Occurrences

6. Number of Man-hours Lost

7. Number of Man days Lost

8. Number of Reportable Accidents per

100,000 Man-hours Worked

= [(3) + (4)] x 1000,000 =

Accident Frequency Rate

(1)

9. Average Number of Worker Daily

REMARKS:

Signed:

Signed:

Chief Safety Manager:

Project Manager:

Date:

Date:

/ /

/ /

NOTE: This form must be completed and returned to the Engineer within 5 days after the

end of each month.

Page 215: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-145 Sign & Stamp of Tenderer CMRL/REV.A3

FSAF 25

FORMATION OF SITE ESHS COMMITTEE

Contract No

Contractor Name

Contract Title

CIRCULAR

Committee

The following ESHS Committee is constituted with immediate

effect: Chairman:

Members:

1)

2)

3)

4)

5)

Secretary:

Periodicity

The committee will meet at least once in a month on the day (specify date)

Agenda

Secretary will circulate agenda of the meeting at least two days in advance of the

schedule date of the meeting.

Circulation

the meeting will be minuted in the standard format and circulated to the following

under the signature of the secretary

1. Chairman 3. CMRL Representatives

2. Members

5. Others concerned

Date: Signed By: ---------------------------

CHAIRMAN

Page 216: 52234-001: Chennai Metro Rail Investment Project

R Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-146 Sign & Stamp of Tenderer CMRL/REV.A3

FSAF 26

MINUTES OF ESHS COMMITTEE MEETING

Contract No.

Contractor Name

Contract Title

Meeting No. Date of Meeting

Location of Meeting

MEMBERS PRESENT INVITEES MEMBERS ABSENT

REPORT SENT TO

No. of

Copie

s

Name / Dept. No. of

Copies

Name / Dept. No. of

Copies

Name / Dept.

Prepared by: Location: Date:

Page 217: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-147 Sign & Stamp of Tenderer CMRL/REV.A3

MINUTES OF H&S MEETING

Item

No. Description of Discussion Action By Target Remarks

1 Complaints received from Clients

and corrective and preventive

action

2 Review of MOM of previous meeting

3 NCR's / Observation from third party

4 First - Aid cases / Reportable

accident cases

5 Future jobs and specific requirement

6 Status of implementation of

Safety plan

7 Sub-contractor performance

8 Analysis of first-aid cases

9 Need for any specific system / training

/ PPE's / resources

10 Observation of ESHS

committee during last walk

down

Next, ESHS Meeting is scheduled on:

Page 218: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-148 Sign & Stamp of Tenderer CMRL/REV.A3

CHENNAI METRO RAIL LTD. FSAF:27

ELECTRICAL SAFETY AUDIT INSPECTION CHECKLIST

Contractor No Contract Title

Contractor Name

Name of Site

Job No.

Inspected by

Date

Sl. No.

Points Observation Recommendations

A. WHETHER METHOD STATEMENT IS AVAILABLE FOR THE FOLLOWING

1 Electrical Safety Education & Training Procedures

2 Electrical Safety Motivation and Promotion programs

3 New Electrical Equipments laying of

specifications, procurement, review / inspection

system

4 Electrical Safety Regulatory Compliance check list

5 Electrical Accident & dangerous occurrences

reporting, analysis, investigation, and rating

6 List of Electrical duty Personal Protective

Equipments (PPEs), inspection

7 Electrical equipment Safe Operating Procedures

(SOPs) and Safe Maintenance Procedures

(SMPs), Safe start-up and shut-down and

emergency shut- down procedures

8 Safety Work Permit system and Electrical

Isolation system

9 Electrical single line diagram, schematic

diagram and the details of the equipment for all

temporary electrical installation

Page 219: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-149 Sign & Stamp of Tenderer CMRL/REV.A3

Sl. No.

Points Observation Recommendations

B. ELECTRICAL SAFETY AUDITS, CHECKS, INSPECTIONS, STUDIES & TESTS

1 Is there an internal Electrical safety audit system? If so

i) Is there a formal procedure for it?

ii) Who does it?

iii) What is the periodicity?

iv) Produce a copy of the last

internal Electrical Safety audit report.

2 Is there a system of internal electrical safety

checks and inspections? If so:

i) What types of Electrical Safety

Inspections are carried out and what is

their frequency?

ii) Who does the inspections?

iii) Is there a structured system of

Electrical safety checks and inspections?

If so:

iv) Provide samples of such safety

inspection formats (safety area wise e.g.

House keeping, fire protection, trips and

lock-outs etc.)

v) To whom are the Electrical

safety checks and inspections

reported?

vi) How action on the

recommendations of electrical safety

inspections carried out?

C. ELECTRICAL INSTALLATIONS

1 Do all electrical installations

conform to relevant

standards and codes of

practice?

2 What are the observations made by

you on electrical installations

and fire safety of the same?

3 Are there any Fire-Resistant

cables installed? If so

give details

Page 220: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-150 Sign & Stamp of Tenderer CMRL/REV.A3

Sl. No.

Points Observation Recommendations

4 Have you any Oil cooled Transformers having oil

quantity exceeding 2300 litres If so:

i) Have you segregated these

transformers from adjoining cubicles by

means of baffle walls/wired-glass

windows in steel frame?

ii) Have you provided appropriate

soak pits for soaking up of leakages of

oil?

5 Have your motors over current protection systems?

6 Have battery-charging room? If so:

Is the battery charging room well ventilated to

prevent accumulation of hydrogen evolved?

7 Do you use High Rupture Capacity (HRC) Fuses?

8 Dou you use Auto Circuit breakers for circuit

breakers carrying current above 30 amps. and

not depend on fuses only ?

9 Have you automatic circuit breaker trips? If so:

i) Do you set the circuit breaker trips

below the HRC-Fuse current level?

10 Are Electrical earthing conductors so designed

as to enable sufficient current to flow up to the

HRC-Fuse blow off current?

11 Do you ensure periodical testing of “Earth-fault

loop resistance” of all earthing connections? If

so:

i) What is the periodicity of such

tests and show register of such tests

D. CONTROL ROOM

1 Location of the Control rooms

i) Away from hazard zone?

ii) Upwind sources of ignition/

fire/ flammable storages/toxic

releases?

iii) Blast proof design?

iv) Whether under positive pressure?

Forced draft blower in safe location?

Page 221: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-151 Sign & Stamp of Tenderer CMRL/REV.A3

Sl. No.

Points Observation Recommendations

v) Cable system fire resistant? And

smoke detection and alarm systems in

cable trenches entering control room?

vi) Fire protection and control

system? Smoke detectors?

vii) Safety glass panels?

E. CABLES

1 Whether the condition of Cable is checked?

2 Are Cables received form other site / previous

site checked for Insulation Resistance before

putting them into use?

3 Are all main Cables, taken either

underground / Overhead?

4 Are welding Cables routed properly

above the Ground?

5 Are welding & Electrical Cables overlapping?

6 Is any improper joining of Cables wires prevailing

at Site?

7 Whether all Flexible cords with a conductor cross

sectional area greater than 1.5 mm2?

8 Whether all OH cables are elevated 6 m

above ground or structure or object?

9 Whether plugs, socket-outlets, and couplers are

splash proof type or IP 44 type (Ingress

Protection for solids of more than 1 mm and

splashing of liquid)

10 Mention the mechanical damage

protection for Armoured cables

F. DBs / SDBs

1 Is earth conductor continued up to DB / SDB?

2 Whether DBs & extension boards are protected

from rain / water?

3 Is there any overloading of DBs / SDBs?

4 Are correct / proper fuses & CB’s (Circuit

Breakers) provided at main boards & sub-

boards?

5 Is energised wiring in junction boxes, CB panels

& similar places covered all times?

Page 222: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-152 Sign & Stamp of Tenderer CMRL/REV.A3

Sl. No.

Points Observation Recommendations

G. ELCB / GFCI

1 Whether the connections are routed through

ELCB / GFCI?

2 Is ELCB sensitivity maintained at 30 mA?

3 Are the ELCB / GFCI numbered & tested

periodically & test results recorded in a logbook

countersigned by competent person?

H. EARTHING

1 Is neutral earthing ensured at the source of

power (Main DB at Gen. or Transformer)?

2 Whether the continuity & tightness of earth

conductor are checked?

3 Mention the gauge of earth conductor used at site.

4 Whether Electrical equipments earthed through

insulated cables?

I. ELECTRICALLY OPERATED MACHINES

1 Are all metal parts of electrical equipment’s &

light fittings / accessories grounded?

2 Is there any shed / cover for welding machines?

3 Are Halogen lamps fixed at proper places?

4 Are Portable power tools maintained as per norms?

5 Are Portable power tools provided separate

major switch / cut off switch?

6 Are portable Power-tools made double insulated

and marking towards that is visibly exist at all

tools?

7 Are portable power tools connected with

ELCB / GFCI?

J. ELECTRICAL INSTRUMENTS

1 i) All controls fail-safe.

ii) Dual indications, alarm systems and

auto correct/shutoff for critical controls and

levels and process variables.

iii) All instruments properly calibrated

and labelled. (Check calibration schedule

and records.)

Page 223: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-153 Sign & Stamp of Tenderer CMRL/REV.A3

Sl. No.

Points Observation Recommendations

iv) Tubing runs protected.

v) Response lag in instruments and

alarm systems affecting safety standards.

2 i) Safeguards provided when

instruments have to be taken out for

maintenance.

ii) Any parameters controlled

without instruments in place.

iii) Equipment designed to permit

lockout protection.

iv) Emergency shutdown procedure is

well laid down and known to all concerned.

v) Electrical/cooling water/process

water failures cause hazards or safe shut

down possible or auto shut down of plant.

3 i) Circuit breakers adequate for

circuit protection.

ii) All equipments earthed and motor

double earthed.

iii) Special interlocks needed for

safe operation.

iv) Emergency standby power on

critical equipments provided.

v) Emergency lighting provided

wherever required (emergency

operations/exit).

vi) Emergency disconnects

switches properly marked.

K. HOUSE KEEPING

1 Are all Electrical area floors and stairways in

good condition (no damages, clean and non

slippery)

2 Do you have proper system to deal with spillages

of hazardous chemicals (Diesel, Petrol, oil and

etc.) giving details of covering to

neutralize/absorb/contain hazards of spills,

collecting and disposal of the

neutralized/absorbed spillage etc.? (Give a copy)

Page 224: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-154 Sign & Stamp of Tenderer CMRL/REV.A3

Sl. No.

Points Observation Recommendations

3 Are there sufficient waste disposal bins duly

marked for collecting wastes in a segregated

manner, emptied regularly and disposed of in a

safe and approved manner.

4 Are working areas always kept clean and after

maintenance area cleaned well by the

maintenance workmen themselves.

5 Is there adequate washing and toilet facility and

kept in clean and hygienic condition.

6 Are there adequate ventilation arrangements to

ensure comfort of the work environment in

respect of composition of air, humidity and

temperature..

7 Are all Sub-stations, MCC, Transformer rooms

free of fumes and dusts?

8 Are there any working conditions making floor /

work area slippery? If so arrangements made to

prevent the same?

L. ELECTRICAL PERSONAL PROTECTIVE EQUIPMENTS (PPEs)

1 Is there a laid down system of availability, use

and maintenance of Electrical personal

protective equipments (PPEs).

2 Are there adequate Electrical PPEs made

available and workmen do use them, wherever

required?

3 Are Electrical PPEs selected in consultation with

workmen using the same and the Safety

department?

4 Are there sufficient electrical insulation mats

of ISI- marking for specified Voltage

conditions wherever required?

5 Are all Electricians provided with appropriate

work uniform and Electrical safety shoes and

their wearing made mandatory?

i) What is the percentage of

violation of this?

ii) What is the type of uniform provided?

6 Are all workmen aware of the danger of loose

clothing?

Page 225: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-155 Sign & Stamp of Tenderer CMRL/REV.A3

Sl. No.

Points Observation Recommendations

7 Is there availability of Resuscitator for Electrical

Shock treatment and Cardio Pulmonary

Resuscitation (CPR) training provided to

Electricians? If so:

i) Course details

ii) Name of the trainer

iii) Course contents

iv) Course duration

M. ELECTRICAL MAINTENANCE

1 Is the preventive Maintenance procedure

available for Electrical equipments?

2 What are the areas of Electrical Preventive

Maintenance system (PMS)?

3 Is there any system of monitoring and predicting

equipment condition and undertake Electrical

Predictive Maintenance? (Give details).

5 Is there a system of Scheduled Electrical

Maintenance and Overhauling? (Give details).

6 i) Do you have a codified system

of recording Electrical maintenance

activities?

ii) Do you carry out computer

aided Electrical maintenance analysis

and use it for Electrical maintenance

planning?

N. WORK PERMIT SYSTEM

1 What necessary Work Permit Systems

exist in your Unit? (Give details and

one form of each).

2 Is there a comprehensive Electrical

Isolation procedure in your Unit for all

process vessels and all equipments?

(Please show the procedure)

3 Do you permit Hot Work in flameproof

areas of the plant?

4 What are the hazardous chemicals

handled?

5 What is the system of electrical lockout for

maintenance?

Page 226: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-156 Sign & Stamp of Tenderer CMRL/REV.A3

Sl. No.

Points Observation Recommendations

6 Are the keys kept for individual locks,

which are used for electrical lockouts

with the supervisor concerned?

O. INSPECTION AND TESTING FREQUENCY

MONTHLY HALF YEARLY ANNUAL

1 Electrical grounding & static device check

2 Transformer checking

3 Cable checking

4 Sub-Station checking

5 Electrical Instrument checking

Page 227: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-157 Sign & Stamp of Tenderer CMRL/REV.A3

Contractor Monthly Inspection Checklist FSAF-28

Contract No.: Contractor’s Name:

1.0 OSH& E Administration

1.1 ESHS Organisation Yes No 1.1a ESHS Organisation Yes No

Adequacy of ESHS personnel ESHS manpower from outsourcing

agency

Is ESHS personal professionally

qualified ESHS personals reports to SHE manager

Employer’s approval for each ESHS

personal

ESHS manager reports to Project

Manager

Intimation of ESHS personals vacancy

to Employer

Facilities and equipment gave to the

ESHS personnel

ESHS personal lies with the main

contractor ESHS personnel can stop any unsafe act

1.2 ESHS Committee 1.3 Construction H&S Committee

Is site and construction H&S

Committee formed

Does construction OS&S committee meet

at least weekly

Does PM Chairman of H&S Committee

Do all sub contractors attend

Committee members under gone monthly

inspection

Is agenda cover all the points

Does site H&S committee meet at least

monthly with 21 days time gap

Minutes of the meeting send to all committee

members

Are Incident Reports discussed Minutes displayed in the notice board

1.4 ID card and first day at work 1.5 Designer’s role

Is ID card issued to all persons Whether designers were informed about

Conditions of Contract on H&S

Is ID card as per standard Whether designers provide H&S risk at

the drawing itself.

Authority signed all ID cards Whether hierarchy of risk control is

indicated by the designer

All worker undergone orientation training

Participation of designer in monthly SCM

OSH&E hand book issued to all personnel

Detailed supplementary information about

H&S risk of the design given by designer.

1.6 H&S submittals to Employer 1.6a H&S submittals to Employer

Daily reporting of workmen External H&S audit report

Page 228: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-158 Sign & Stamp of Tenderer CMRL/REV.A3

Monthly H&S report Electrical safety audit report

H&S committee meeting minutes Air monitoring report

H&S inspection report Noise monitoring report

Monthly internal H&S audit score report

Accident, Incident and dangerous

occurrence reporting

Sub total

1.7 Visitors to site

Visitor got the permission from Employer

Contractor have visitor PPEs

Responsible accompanied with visitor

Does visitor entering hazardous area

Visitor register maintain at site office

Contractor’s Observations:

Page 229: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-159 Sign & Stamp of Tenderer CMRL/REV.A3

Contract No.: Contractor’s Name:

2.0 H&S Training and H&S Communication

2.1 Training Policy Yes No 2.2 Induction Training Yes No

Is training policy in H&S Plan Does training take place in first week

Is policy implemented Induction Handout

Does it includes sub contractors Project related syllabus

Is training policy published Management participation

Does PM understand training policy

Attendance records kept

2.3 Toolbox Talks 2.4 Supervisor Training Are they held at least weekly Is there a recognized programme

Presented by supervision/safety Manager

Project related

System monitored by management

Senior management participation

Employee involvement Achievement test

Attendance records kept Attendance records kept

2.5 Follow up training 2.6 Driver/Plant Operator Training

Is follow up training organized Does Driver/PO training take place

Does it take place after six months Are all drivers undergone for defensive

training .

Is syllabus project related Are all Drivers and Operators certificated

Attendance records kept Are records kept

Workers participation towards training

Are all Drivers Operators retained

2.7 Promotional activities 2.8 H&S posters

Is there a safety promotional programme

Are posters adequate no’s

Are any incentive schemes used Are posters separately numbered

Are subcontractors included in promotion

Are posters cover all topics

Had any worker rewarded so far. Are safety posters visible on site

Management’s participation towards this

Are posters maintaining regularly

Sub total

2.9 H&S Signage 2.10 Important days to be observed

Is signage in correct colours

Page 230: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-160 Sign & Stamp of Tenderer CMRL/REV.A3

Adequate number of signs

Suitable positioning of signs

Signs in Hindi and English and Local

Language

Are signage maintaining regularly

Contractor’s Observations:

Page 231: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-161 Sign & Stamp of Tenderer CMRL/REV.A3

Contract No.: Contractor’s Name:

3.0 H&S Inspection and Audit

3.1 Planned General Inspection Yes No 3.2 Routine Inspection Yes No

Monthly contractor and subcontractors

site H&S committee Inspection

Operator Daily Inspection of plant and

equipment

Weekly H&S inspection by supervisors

Monthly Inspection of electrical hand tools

Daily H&S inspection by site ESHS

team

Quarterly Inspection of temporary electrical

systems

Employer’s and contractor’s

representative involved in this

H&S E inspection

Weekly Inspection of

scaffold by scaffolding

supervisor

Records maintenance Half-yearly inspection of lifting appliances

and gears by competent person

3.3 Specific Inspection 3.4 H&S Inspection

Before a heavy lifting operation Is Contractor prepare checklist for all activity

Before & after entry into confined space

Checklist mentioned in contractor H&S

plan

Before & after a welding & gas cutting

All inspection reports registered

Before concreting formwork Inspection reports sent to Employer

All high-risk processes inspected by

competent supervisor

Planned and Routine Inspection used for

discussion in H&S Committee Meeting

3.5 MARS 3.6 Electrical safety audit

Performed once in a month Covered all areas

Project Manager accompanied this audit

Performed once in a month

Conducted at least 7 days prior to

Monthly H&S Committee meeting

Team comprising of senior ESHS(Elect)

engineer

Audit Report will be sent to Employer

Audit Report will be sent to Employer

Corrective actions taken Corrective actions taken

3.7 External Audit (General) 3.8 External Audit

Conducted by external agencies Contents and coverage

Auditors ISO qualified and competent

Available documents

Approval of the Employer Qualification of audit team members

Page 232: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII

Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-162 Sign & Stamp of Tenderer CMRL/REV.A3

Audit report as per ISO/ILO standard

/CMRL Contract requirements

Had checklist prepared

Conducted on a quarterly basis Status of NCR of external audit

Sub total

3.9 Audit Report Audit report as per ISO/ILO standard

/CMRL Contract requirements

Audit conformity / non-conformity report

to the Employer

Report contents and coverage

Corrective action by contractors

Initial audit for checking the adequacy of

implementation

Contractor’s Observations:

Page 233: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-163 Sign & Stamp of Tenderer CMRL/REV.A3

Contract No.: Contractor’s Name:

4.0 Hazard Identification, Risk Assessment and Emergency Preparedness

4.1 Policy for Identifying Hazards Yes No 4.2 Risk Assessment Yes No

Procedure for identifying hazards Are risk assessment carried out

Is there a list of significant hazards Is there a formal process

Procedure for Risk Assessment Are worksheets used

Whether any schedule or hierarchy made

Are records kept in site office

Ranking of hazards Whether control measures are planned

4.3 Method Statements 4.4 Permit to work in use

Are Method Statements produced Is there a procedure for Permits to work

Dot hey contain clear instruction Issued by Authorized person

Are they given to work supervisors Issued for defined period

Is correct information given to workers

Workers instructed

Step by step description of task Are records kept of Permits issue

4.5 Emergency Preparedness Plan 4.6 Emergency control centre

Is there description within Safety Plan

Available of first-aid box

Is it up to date Public addressing system

Is it well published Emergency phone numbers

Does Project Manager have copy Emergency alarm

Exercise within past three months Employees name list

4.7 Communication system 4.8 Plan Details

Public addressing system Details of emergency co-ordinator

Emergency power supply Designated personnel with Tel. Nos.

Mobile phone in Emergency care centre

Are telephone numbers up to date

Warning boards Emergency response team identified

Records maintained for usage and

maintenance of communication systems

Functions of Team identified

4.9 Requirements 4.10 First Aid

Link to Police Is First Aid included in Safety Plan

Link to Fire Services Are adequate no. of First aiders

appointed

Link to Ambulance and Hospital Record keep of qualification

Page 234: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-164 Sign & Stamp of Tenderer CMRL/REV.A3

Communication to employees First aid boxes supplied

Displayed on Notice Boards First aid boxes properly equipped

Contractor’s Observations:

Page 235: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-165 Sign & Stamp of Tenderer CMRL/REV.A3

Contract No.: Contractor’s Name:

5.0 Reporting of Accidents and Dangerous Occurrences and Accident Investigations

5.1 Reporting to Employer Yes No 5.2 Reporting to Govt. organisation Yes No

Verbal information Reporting to Regional Labour Commissioner

Written information within 24 hrs Reporting to welfare board

Delay in reporting Reporting to director general

Are all accidents identified and recorded

Reporting to police station

Are AFR rates calculated Reporting to District Magistrate

5.3 Incident Reporting 5.4 Follow up Action

Is there a proper reporting procedure

Does Senior Manger review all reports

Is the procedure communicated to all

Is result of investigation published

Are reports available for inspection Are workers advised of remedial action

Do reports accurately describe incident

Are failure in Management recognized

Is standardised form used Whether statistics report prepared

5.5 Procedure for investigation 5.6 Incident Investigation

Made Photographs and sketches Are witness statement taken

Examine involved equipment Is the chain of events identified

Interviewed the eye-witnesses Is specific sub contractor identified

Consulted expert opinion Investigation kit available

Environmental conditions Investigation report made available to

Employer

Contractor’s Observations:

Page 236: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-166 Sign & Stamp of Tenderer CMRL/REV.A3

Contract No.: Contractor’s Name:

6.0 Housekeeping

6.1 Procedure Yes No 6.2 Organisation Yes No

Is it mentioned in H&S plan Adequacy of housekeeping personnel

Responsibility classified Is housekeeping personnel trained

Housekeeping round the clock Employer’s approval for housekeeping personnel

Reporting of housekeeping personals to ESHS Manager

Intimation of vacancy to Employer

Housekeeping persons provided no. /badge

Persons provided with suitable logistics /aid

6.3 Housekeeping squad 6.4 Barricades

Housekeeping plan Dimension of the board

Member list CMRL logo

Job allocation and time allocation Sequential Numbering

Periodicity of housekeeping Availability of protruding parts

Documentation of housekeeping Regular cleaning and painting

6.5 Access / Egress way 6.6 Dustbins

Free from debris Lumbar with protruding nails

Unprotected opening Unprotected projection

Free from obstructions Scattered unused materials

Slippery condition Spill of bentonite

Spillage of water or oil Fencing and guarding of equipments

6.7 Housekeeping at worksites 6.8 Housekeeping at roads

Lumbar with protruding nails Tyre cleaning of vehicles

Unprotected projection Parking of construction vehicles at road

Scattered unused materials Water logging or bentonite spill on road

Fencing and guarding of equipment’s

Roads kept clean

Stacking and storing of materials Position of barricades lying at roads

6.9 Storage of cylinders

Full / empty separated

Gases separated

Protected from weather

Contents labelled

MSDS available for each gas

Contractor’s Observations:

Page 237: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-167 Sign & Stamp of Tenderer CMRL/REV.A3

Contract No.: Contractor’s Name:

7.0 Working at Height

7.1 Organisation and planning Yes No 7.2 Fragile surface Yes No

Adequate number of trained personnel

Suitable working platform

Supervision Guard rails

Planning emergency and rescue Crawling boards

Work permit system Warning notice

Refresher training Work permit system to work

7.3a Scaffolding 7.3b Scaffolding

Is scaffolding included in H&S Plan

Scaffolds constructed for correct use

Are scaffolding erected and dismantled

by competent workmen

Are scaffolds constructed of sound material

without patent defect

Are records kept of inspections No unsuitable material

Security fixed or buttressed Working platforms fully boarded

Working platforms free from rubbish

Guardrails and mid rails fitted

7.3c Scaffolding 7.4a Ladders

Secure ladder access provided Are ladders specified in Safety Plan

Toe board provided Is there a system for checking ladders

‘Safe for Use’ board erected Are records kept of weekly checks

Availability of base plate Using of Bamboo ladders

Free from rust / corrosion / debris Painting of ladders

7.4b Ladders 7.5 Guardrails

Safety procedure followed Present at all working platforms

Rubber bush in aluminium ladder Securely attached

Landing properly Sound material

Climbing procedure Designed as per standard

Rungs at proper intervals Maintained properly

7.6 Harnesses 7.7 Safety net Is use of harnesses specified in H&S

Plan

Approved type

Are harnesses of full body type Good construction

Are secure anchorage points used Adequate number to issue

Has instruction on correct use been given

Testing

Maintenance and inspection Maintenance

Contractor’s Observations:

Page 238: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-168 Sign & Stamp of Tenderer CMRL/REV.A3

Contract No.: Contractor’s Name:

8.0 Lifting Operations and Gears

8.1 Certification Yes No 8.2 ASLI / Other Indicators Yes No

Procedure is available in H&S Plan

Free from damage

Fitness / Test Certificates available

In operable conditions

Daily inspection records maintained

Overload device tested

Load chart for lifting appliances Overload device operable

Employer’s approval for lifting appliances

Bypass key made available to Plant

Manager

8.3 Wire Ropes 8.4 Safety Hooks

Free from damage Free from damage

Lubricated Safety latch fitted

Correctly anchored Safety latch in operable condition

Splicing method Other form of hook closure

Inspection & Testing Test certificates

8.5 Slings, Chains & Shackles 8.6 Outriggers (Mobile Cranes)

Properly stored when not in use Outriggers locked in position

In good condition without defects Jacks in good condition

Market with safe working load Jacks firmly supported

Bulldog clips correct fit/number Wheels clear/not supporting load

Correctly used Chassis level

8.7 Operator and Operator cabin 8.8 Rigging requirement

Licence for HMV Rigger qualification & experience

Competent & skilled Load assessment

Medical fitness certificate Type of slings to be used

Portable fire extinguisher Hocks & lifting assessment

Defensive driving Overhead power line

8.9 Alarms & signals 8.10 Accessories & controls

Overload alarm Side & rear view mirror

Over hoist alarm Clutch & brake

Reverse horn Swing & Extension control

Pressure indicators Illumination

Outrigger extension alarm Maintenance

Contractor’s Observations:

Page 239: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-169 Sign & Stamp of Tenderer CMRL/REV.A3

Contract No.: Contractor’s Name:

9.0 Construction Machinery / Hand tools and power tools

9.1 Machinery Fencing Yes No 9.2 Maintenance Yes No

All moving parts effectively guarded All maintenance properly maintained

Fencing not removed No maintenance whilst M/c in motion

Is procedure in H&S Plan Records of maintenance kept

Warning board Work Permit System

Emergency stop switch Use of ‘Lock Out and Tag Out’ (LOTO)

9.3 Air Receivers 9.4 Wood working machines

Fitted with pressure relief valve Top guard fitted

Annual test carried out Working space

All couplers with safety chains/wired Guards to protect all drive belts

Condition of hoses Emergency stop switch

Noise level under permissible limit Push stick used

9.5 Grinding machine 9.6 General

Appropriate guards fitted Is procedure in H&S plan

Correct size wheel/disc fitted All operator medically fir and above 21

yrs

Spindle speed marked on M/s Unauthorized riding on plant

Name plate for equipment specification

Inspection and maintenance record

Test and maintenance Portable fire extinguisher

9.7 Safe Operating Procedure 9.8 Requirements

Available for all machines Manufacturer specification

Available in the working area Control switch

Operator trained GFCI / RCCB and other safety devices

Operator know the same IP 44 plugs, sockets & connectors

Updated regularly Guarding

9.9 Maintenance and Inspection 9.10 PPE

Daily inspection Ear protection

Lubrication Hand Protection

Pneumatic and hydraulic pressure Eye protection

Record maintenance Apron

Label displayed in the equipment itself.

Nose / face mask

Contractor’s Observations:

Page 240: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-170 Sign & Stamp of Tenderer CMRL/REV.A3

Contract No.: Contractor’s Name:

10.0 Site Electricity

10.1 Power assessment Yes No 10.2 Distribution Panels Yes No

Load calculation for power requirement

Panel secure box to IP 44/IP65

Employer’s approval for execution of the job

All cables enter box through glands

Is small capacity diesel generator present

ELCB or RCCB/ GFCI fitted

Noise from diesel generator Proper earth connection and earth pit

Sub-contractor’s power requirement by main contractor

Warning signs in appropriate position

10.3 Cables 10.4 Work on site

All cables free from damage Site electricity covered in the H&S Plan

Cables lying on the ground / water Name posted on Main Distribution Board

Cable joints made by IP 44/IP 65

connectors

Single line & Schematic diagram

submitted

Correct storage when not in use Employer’s Approval for execution

Colour coding GFCI provided

10.5 Electrical professional 10.6 Earth Pit

Sufficient numbers As per standard

Professionally qualified Wet condition

Roles and responsibilities defined Pouring 5 litre water per days

Valid license to electrical persons Earth pipe free from corrosion

Training Earth resistance

10.7 Plugs, Sockets and outlets 10.8 Voltage / Current

Are all plugs, sockets and outlets IP 44/IP 65 type Check voltage / current limit

Colour coding of plugs and sockets

Rating clearly marked on all equipments

All cables fitted with IP 44 /IP65Plugs

Monitored continuously

All equipments connected with plugs

Mismatch of cable and equipments ratings

All equipments free from defects Properly earthed

10.9 Maintenance 10.10 Correct Disc. / Revolutions

Regular inspections carried out Information plate on tool

Records kept Information on Disc/Cutter

Suitable guards/security fenced Compatibility between Tool and Disc

Faults actioned Operator trained/competent to fit Disc

Page 241: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-171 Sign & Stamp of Tenderer CMRL/REV.A3

Record maintaining Safety check on condition

Contractor’s Observations:

Page 242: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-172 Sign & Stamp of Tenderer CMRL/REV.A3

Contract No.: Contractor’s Name:

11.0 Fire prevention

11.1 Fire fighting personnel Yes No 11.2 Requirements Yes No

Adequacy of Fire fighting personnel Emergency plan

Professionally qualified Fire excavation plan

Employer’s approval Mock drill

Intimation of vacancy to Employer Nearest fire brigade phone numbers

Adequate no of trained persons Reporting of fire accident to Employer

11.3 Combustible material 11.4 Fire Extinguisher

Used in site Adequate numbers

Handling of combustible material Appropriate type

Stored in separate place Easily accessible

Spillage of materials Frequency of recharge

Location of burning site Maintenance and inspection

11.5 Firefighting equipments

Sufficient quantity of water supply

Fire hose and nozzle

Fire alarm

Condition of fire hydrants

Sufficient no. available

Contractor’s Observations:

Page 243: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-173 Sign & Stamp of Tenderer CMRL/REV.A3

Contract No.: Contractor’s Name:

12.0 Welding & Cutting

12.1 Gas Welding / Cutting Yes No 12.2 storage of cylinders Yes No

Is procedure in Safety Plan Is procedure in Safety Plan

Are cylinders in cylinder-trolley Storage in upright position

Are pressure gauges fitted and operable

Full/empty segregated

Are flashback arresters fitted Different gases separated

Are non return valves fitted Contents labelled

12.3 Condition of cylinders 12.4 Hose

No damage by misuse Colour coding

No rust/corrosion Hose clip and clamp

Protected from weather Is it free from leak and damage

Colour coding proper Hose lying on the ground

MSDS available Joints if any

12.5 Electric Arc Welding 12.6 Transformer

Are welding machines in good order Presence of voltmeter and ammeter

Welding leads free form defect Separate main power switch

Welding return free from defect Ground connection

Electrode holder properly insulated Specification plate or board

Dipping electrode in water when it is hot

Protected from weather

12.7 Electrical Cable 12.8 Work Area

Cable lying on ground / water Area clear of flammable substances

IP 44 /IP 65 cable connectors instead of

insulation tape

Smoking inside the work area

Damaged and exposed wires Fire extinguisher fitted

Separate earthing connection from work

piece to transformer

Welding screens available

Electrical protection devices ELCB,

RCCB,etc. Ventilation and fume extraction

12.9 PPE for welder, cutter and helper

Face and eye protection

Gauntlet gloves

Safety footwear

Nose mask

Ear muff / plug

Contractor’s Observations:

Page 244: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-174 Sign & Stamp of Tenderer CMRL/REV.A3

Contract No.: Contractor’s Name:

13.0 Excavations and Trenching

13.1 Planning Yes No 13.2 Access/Egress Yes No

Are excavations covered in H&S Plan

Suitable ladders provided

Examined by competent person Ladders properly secured

Records of inspection maintained Alternative ladders available

Underground cable and pipelines Staircase for excavation more 1.5 m depth

Backfilling and removal of trench Guardrail for staircase.

13.3 Shoring 13.4 Barriers and Warnings

Shoring as soon as earth is removed

Rigid barrier around excavation

Suitable support Suitable warning notices

Regular monitoring Regularly checked by supervisor

Proper repair under taken Warning light & signs

Material stacked properly on removal

Emergency exit board

13.5 Soil 13.6 Underground Services

Not closer than 1 metre Checks made with Utility providers

Properly stacked Safe digging procedures in use

Excavator clear of personnel Supervision has service plans

Storage of Excavated materials Dewatering procedures

Logistics for excavated soil Line of dewatering

13.7 Undermining Nearby Structures 13.8 Portable Electrical Equipment

Survey carried out Are as per standard

Temporary support provided if required

Proper repair and condition

Vibration measured Rating voltage more than 24 V

Regular monitoring Double insulation

Sufficient clearance provided Open bare wires

13.9 Ventilation and Illumination 13.10 Signals & Communication

Are as per standard Audio, Video signals

Exhaust fan arrangement Walkie-talkie / radio /mobile phones

Temperature management Head protection

Gas monitoring systems Arm protection

Lighting arrangement Leg protection

Contractor’s Observations:

Page 245: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-175 Sign & Stamp of Tenderer CMRL/REV.A3

Contract No.: Contractor’s Name:

14.0 Tunnelling and Confined Space operations- NOT USED

Page 246: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-176 Sign & Stamp of Tenderer CMRL/REV.A3

Contract No.: Contractor’s Name:

15.0 Traffic management

15.1 Traffic marshals Yes No 15.2 Vehicle operators Yes No

Sufficient numbers Driving licence

Professionally qualified or trained Medically fitness

Medically fit Defensive driving training

Driving licence Refresher training

Familiar with traffic signs Fire fighting training

15.3 Traffic control devices 15.4 Barricades

Cons Erected around the construction site

Drums Free from defects and protruding parts

Delineators Numbered

Traffic cylinders Painted and maintained in good condition

Traffic signs and barricades Barricade register

Rope Light and Reflective plate

15.5 Barricades 15.6 Regulatory Signs

Barricade inspector & supervisor appointed

Approval from police and traffic authorities

Retro reflective strips shape and size

Digital Warning signs

Reflective strips placed at a angle at

bottom

Red light / flag indicator

Minimum gap between retro reflective strips 1000mm

Design as per employer’s approval

One red light / blinker per barricade Material made of reflective type.

Back ground of IRC Signs made of

reflective plate of 900mm x 900 mm size

15.7a Vehicle 15.7b Vehicle

Vehicle number and company name Brakes in good working order

Inspection stickers & license plate Are wiper blades in good condition

Seat belts Rear view mirrors

Two reflective triangles on rear side Speedometer

Fog lights (front & rear) Vehicle’s horn and reverse alarm

15.8 Heavy motor vehicles 15.9 Operator cabin Automatic safe load indicator and

Calibration Made of fire resistance material

Load chart of the vehicle Protection from vibration

Fitness certificate Weather protection

Manufacturer details Adequate ventilation

Marking of safe working load Suitable fire extinguisher

Contractor’s Observations:

Page 247: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-177 Sign & Stamp of Tenderer CMRL/REV.A3

Contract No.: Contractor’s Name:

16.0 Personal Protective Equipment

16.1 Head Protection Yes No 16.2 Foot Protection Yes No

Use enforced Use enforced

As per standard Suitable type

In good condition Toecaps effective

Colour and company logo Fair condition

Available for issue Available for issue

16.3 Eye protection 16.4 Hearing Protection

Use enforced Use enforced

As per standard As per standard

Suitable type Suitable type

Good condition Available for issue

Available for issue Noise levels monitored

16.5 Respiratory Protection 16.6 Protective Gloves

Use enforced Use enforced

As per standard As per standard

Suitable type Correct type for operation

Good condition Good condition

Available for issue Available for issue

16.7 High-Visible Waist 16.8 Fall Protection

Use enforced Use enforced

As per standard As per standard

In good condition In good condition

Warning signs displayed Warning signs displayed

Available for issue Available for issue

16.9 PPE for visitors

Use enforced

10% PPEs for visitors in site office

In good condition

Colour and company logo

Available for issue

Contractor’s Observations:

Page 248: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-178 Sign & Stamp of Tenderer CMRL/REV.A3

Contract No.: Contractor’s Name:

17.0 Industrial Health & Hygiene and Lighting & Ventilation

17.1 Medical examination Yes No 17.2 Health Centre Yes No

All worker under gone Construction medical officer & qualification

Covered all testes as per standard Availability nurse & sweeper

Conducted by qualified person Floor area minimum 15 m2 with tworooms

Confidential report for all workers Adequate equipment

Frequency of medical test maintained

Medical emergency equipments

17.3 First-aid 17.4 Ambulance van and room

Equipped with all items as per standard

Equipped with all items as per standard

Sufficient numbers Availability and numbers

First-aid room facility Maintained in good repair

First-aider & his qualification Equipped with standard facilities

Register for first-aid Record of all cases of accident & sickness

17.5 Mosquito breeding 17.6 Alcohol and drugs & HIV / AIDS

prevention

Water retain on the site Employee working under the influence of

alcohol / drugs

Periodic interval Smoking at public worksites

Still waters Smoking at public worksites

Posters HIV / AIDS awareness training provided

Usage of insecticides Workers participation / co-operation

17.7 Noises 17.8 Vibration Are procedures for noise evaluation in the Safety Plan Monitoring method

Are noise assessments carried out Frequency of monitoring

Are noise zones identified Vibration limits

Is correct PPE provided Report maintenance

Usage of PPE Control plan

17.9 Radiation

Method statement

Approval from Employer

Use and storage of radioactive substance

Disposal of radioactive substance

Appropriate PPE

Contractor’s Observations:

Page 249: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-179 Sign & Stamp of Tenderer CMRL/REV.A3

Contract No.: Contractor’s Name:

18.0 Welfare amenities

18.1 Toilets / Urinals Yes No 18.1a Toilets / Urinals Yes No

Enough no available Is it properly illuminated

Separate for men and women Is it having separate and ample water

facility

Access within 500m from worksite Is it having proper drainage system

Is it properly cleaned Water leaking or spillage

Is it washed regularly Records kept and available

18.2 Drinking water 18.3 Canteen

Quantity is sufficient Is canteen available

Quality is good Is it neat and clean

Laboratory test done Is the flooring dust free

Access within 200m from worksite Is the cost ‘no loss and no gain’ basis

Is it 6m away from toilets and urinals

Lighting, ventilation and water facility

18.4 Labour Accommodation 18.5 Creaches Cooking, bathing, washing and lavatory

facilities

Is it free from mosquito and other

biological agent

Is it free from mosquito and biological

agent

In-charge to keep the children.

Is it properly illuminated and ventilated

Is it properly illuminated and ventilated

Is it adequate for all Is it adequate for all

Is it neat, clean and hygiene Is it neat, clean and hygiene

18.6 Shelter 18.7 Illumination

Adequate to all workers Minimum illumination requirement

Is it properly illuminated and ventilated

Minimum 325(30) lux at work place

Is it neat, clean and hygiene Minimum 55(5) lux on General

Construction Indoor

Is it free from mosquito and biological

agent

Minimum 110 (10)lux Access Ways

Drinking water and Toilet facilities Adequate Emergency lighting provided

Page 250: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-180 Sign & Stamp of Tenderer CMRL/REV.A3

18.8 Ventilation

Oxygen level less than 19.5

Air circulation of 6m3/min

for each building worker employed underground

Free air flow movement in work place

Ventilation system in operation

Maintenance records kept and available

Contractor’s Observations:

Page 251: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-181 Sign & Stamp of Tenderer CMRL/REV.A3

Contract No.: Contractor’s Name:

19.0 Environmental management

19.1 Air quality Yes No 19.2 Water quality Yes No

Monitoring by competent person Monitoring by competent person

Monitoring equipment as per standard

Monitoring equipment as per standard

Monitoring method Monitoring method

Report to Employer Report to Employer

Control plan Control plan

19.3 Noise monitoring 19.4 Illumination monitoring

Monitoring by competent person Monitoring by competent person

Monitoring equipment as per standard

Monitoring equipment as per standard

Monitoring method Monitoring method

Report to Employer Report to Employer

Control plan Control plan

19.5 Temperature monitoring 19.6 Dust control

Monitoring by competent person Water sprinkler arrangement

Monitoring equipment as per standard

Frequency water sprinkler inside the site

Monitoring method Dust screens

Report to Employer Dust level under permissible limit

Control plan Environmental monitoring

19.7 Waste Management 19.8 Felling of Trees

Dustbin in construction site Approval from forest department

Temporary dumping area Trees used for anchorage.

Separate dumping pit for disposable and

non-disposable wastes

Trees exposed or injured by construction

equipment

Frequency of removal of waste Protective barriers around tree

Burning of waste

19.10 Energy Management

Uniform illumination

Size and length of cable and wires

Efficient luminaries

Efficient motors and pumps

Efficient air-conditions

Contractor’s Observations:

Page 252: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-182 Sign & Stamp of Tenderer CMRL/REV.A3

Contract No.: Contractor’s Name:

20.0 Batching Plant and Casting Yard

20.1 General Yes No 20.2 Layout Yes No

Is procedure in Safety Plan Plan of layout

All operators medically fit/over 18 Drainage system

No unauthorized riding on plant Welfare amenities

Daily inspections / recorded Plan for vehicle moving area

Equipped with all Barrication

20.3 Material Handling & dust

protection 20.4 PPE

Handling of cement bag Hand protection

Loading and unloading cement Respiratory protection

Handling of launching segments Head protection

Is dust level under permissible limit

Foot protection

Environmental monitoring Ear protection

20.5 Traffic management 20.6 Welfare facilities

Barricades Toilet

Warning boards Drinking water

Traffic marshals Canteen

Delineators Shelter

Lane warning Labour accommodation

20.7 Fitness certificate

Crane

Hydra and all equipment

Ropes and chains

Hooks and shackles

Rigger & Operator

Contractor’s Observations:

Page 253: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-183 Sign & Stamp of Tenderer CMRL/REV.A3

FSAF-29

Chief ESHS Manager

Daily Dairy

Contract No:

Name of the Contractor:

Date:

Report By:

Report No :

Weather

Temperature Conditions A.M P.M

High Temperature Partly Cloudly

Partly Cloudly

Cloudy Cloudy Windy Windy Rainy Rainy

Low Temperature Clear Clear Other Other

Contractor Labour Details

Contractor Plant /Equipment /Break Down/Third Party Inspection Details

Visitors to site

Page 254: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-184 Sign & Stamp of Tenderer CMRL/REV.A3

High Risk Activity RFI details

Public Complaints /Unusual Events

Incidents /Near Miss/Dangerous Occurrence / First Aid Injury /Major injury /Minor Injury

/Road Accidents /Lost Time Injury

High Risk Safety Observation and the status of compliance

Internal Safety High /Medium/Low NCR issued the contractor and the status

Site Safety Meeting Held

Page 255: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-185 Sign & Stamp of Tenderer CMRL/REV.A3

FSAF-30

CV Template

Position Title

Name

Date of Birth

Years with the firm

Country Of citizenship /Residence

Education

S.No Degree(s)/Diploma(s) College /University Year of passing

Employment Record:

Period Employing organization

and your title

/Position

Contact Info for reference

with Email

Tile of position Held Location of

Assignment

Employing organization:

Title Held:

Employer Reference

Name: Email:

Contact:

Page 256: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-186 Sign & Stamp of Tenderer CMRL/REV.A3

Experience:

Memberships:

Language Skills

Languages Read Write Speak

Certification:

I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes

myself, my qualifications, and my experience.

I understand that any misstatement described herein may lead to my disqualification and immediate

dismissal. Name Signature Date:

Name of the Authorized Signature

Date: Representative of the company

Year:

Location:

Client:

Main Project Features:

Position Held as per the client:

Activity performed:

Name of the Assignment:

Page 257: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-187 Sign & Stamp of Tenderer CMRL/REV.A3

FSAF-31

External Quarterly Audit Template

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Construction

Risk

Assessment &

Method

Statements

Completed

(W1)Why?

(W2)What?

(W3)Who?

(W4)When?

(H) How?

Risk

Assessments &

Method

Statement

Implementation

Transport and

handling

Magazine

General

Work Areas

De-nailing

Conditions on

Site

Means of

Escape

On Site Traffic

Management

Suitability and

Specific PPE

Permits

Planning

Page 258: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-188 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Excavations

Register

Provision of

Service

Locators

Underground

Service

identification

Edge Protection

Shoring

Competent

Workface

Temporary

Work

Assessment

Safe Working

Procedure

Excavation

Work Permit

Planning

Scaffolding

Register

Ladder Access

Scaffolding

General

Scaffold access

Towers and

Platforms

Edge Protection

and Toe-boards

Page 259: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-189 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Competent

Persons

Other

Precautions,Lad

ders,Stepladder

s,MEWPs

Temporary work

Assessment

Recorded

Inspections

Work Permit

Planning

Provision of

Protection

Work Permit

Procedure

Planning

Work Permit

Quality of Air

Quality of

illumination and

Emergency

Lighting

Communication

Systems

Fire

Extinguishers

,Fire Mains &

Hose

Connections

Walkway

Page 260: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-190 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Man lock and

Medical Lock

Resources

Monitoring

Action on Safety

Advisers

Reports

Management

Review

Employer's

/Employer's

Respresentative

Non-

conformance

Report

Safety of Traffic

Safety of Public

Traffic

Management

Highway

Cleanliness

Work Permit

Relevant Site

Signage

Barricade

Identification of

Sources

Safety

Health and

Safety

Information

Page 261: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-191 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Health and

Safety Policy

Statements

Protective

Equipment Sign

Emergency

Procedure

Site rules

Construction

Phase Health

and Safety Plan

Risk Register &

Hazard Log

Risk

Assessment &

Method

Statement

Briefings

Manual

Handling

Assessment

Manual

Handling

Training

Safe

Operational

Control

Procedure

ESHS

Management

System

Procedure

Page 262: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-192 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Emergency

Preparedness

and Response

plan

International

Certifications

Training

Implementation

Plan

Fire Evacuation

Plan

Fire Risk

Assessment

PPE As per Risk

Assessment

Transportation

Plan and Risk

Assessment

Safety

inspection

Reports

Work Place –

Extinguishers

Hot Works

Permits

Relevant

statutory signs

Helmets

Footwear

Hi Viz

Safety Belt

Page 263: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-193 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

File

maintenance

Assessment

Briefings

Relevant

Signage

Warning Signs ,

Notice board

and Tally Board

Gas detection

Equipment

Self Rescue

Equipment

Training

Emergency

Under Ground

Drills

H&S

Committee

External

ESHS Audit

Quarterly

Incident

Reporting

Visitor Safety

Monitoring

HAV’s Register

Information -

Malaria ,

Dengue ,

Silicosis, Skin

Cancer ,

Page 264: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-194 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

HIV AIDS ,

Leptospirosis ,

Tetanus and

Hepatitis

Management

Competency

Staff

Training

Programme

Toolbox Talks

H&S Induction

Training

Plant

Reversing

Vehicles Sign

Have reversing

Vehicles posters

avialble in all the

location where

vehicle

reversing

carried out?

Do trained

Banksmen/

helper present

in each

equipment and

where heavy

traffic present

on site and off

site?

Page 265: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-195 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Do trained

Banksmen/

helper present

wear named

reflective jacket

on site and off

site?

Lift Plan and

Risk

Assessment

Approved Lift

Plan and Risk

Assessment

available for all

lift more than 1

ton

Briefing conducted for

Approved Lift

Plan and Risk

Assessment

Approved Lift

Plan and Risk

Assessment

available for all

lift more than 1

ton reviewed ,

monthly or

weekly or prior

to phase

change.

Planning

Page 266: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-196 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Approved

Operational

procedure

covering all

plant and

equipment used

at site with Risk

Assesment.

Availability of

Masterlist of

Standard

Documents for

each plant and

equipments with

validity ?

A. Equipment

Documents

(Third

Party;Insurance;

RC/Tax;PUC;

Fit ness.

B. Operator

Documents(

(Lic ense LMV <

7.5 T

Trans(HMV;HTV

;HGV;CRANE;

CONST. Equip

etc);

Competency

Certificate by

Plant

DepartmentJob

Specific

Training;Eye

Test 1 year > 40

years age;Eye

test 2 year < 40

years of Age;

Medical Fitness.

Page 267: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-197 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Availability of

Competent

Lifting

Supervisor/

Rigger.

Maintenance

schedule.

Daily Checklist

signed by

competent

person

Lifting

Appliances and

Lifting Gear

Register

Approved

Operational

procedure

covering all

lifting tools and

tackles used at

site with Risk

Assesment.

Availability of

Master list of

Standard

Documents for

each lifting gear

with validity ?

Availability of

Competent

Lifting

Supervisor/

Rigger and daily

checklist signed

by them?

Page 268: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-198 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Approved

competent

person

availability?

Plant and

Machinery inspection

Pre- inspection

checklist for

plant and

equipment

before allowing

to work the first

time?

Daily Checklist

signed by

competent

person for all

plant and

equipment

including Sub-

contractor?

Plant and

equipment

register showing

violation and

compliance?

Violation

identified shall

be reflected in

plant and

equipment risk

assessment?

Vehicle Control

Master list of

trained

banksmen

availability,

licensed

Page 269: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-199 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

operator as per

legal

requirement and

all inducted

having age

more than 21

years?

Wheel wash

provided and

maintained in

each location

where there has

chance to get

the existing road

dirty?

Vehicle leaving

site have

reverse horn

and is covered

by tarpoline to

avoid spillage of

muck on

existing road?

Piling

Availability of

Approved Piling

Method

statement and

risk assesment

by Employer's

/Employer's

Representative

?

Page 270: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-200 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Method

statement

include

emergency

procedure for

pile collapse,

disposal l of

muck, lifting

plan, legal

documents

checklist and

availability of

documents, third

party certificate,

if vertical lifting

by secondary

rope

arrangement of

calibrated ASLI

and third party

certificate,

banksmen?

Availability of

Daily Checklist ,

Maintenance

schedule and

maintenance

history?

Competent

Personnel

Third party

agency

approved by

Employer's

/Employer's

Representative

?

Page 271: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-201 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Availability of

Masterlist of

Standard

Documents for

each plant and

equipments with

issue date and

validity date?

A. Equipment

Documents(Thir

d

Party;Insurance;

RC/Tax;PUC;Fit

ness.

B. Operator of

age 21 having

Documents(

(License LMV <

7.5 T

Trans(HMV;HTV

;HGV;CRANE;

CONST. Equip

etc);

Competency

Certificate by

Plant

Department,Job

Specific Training

to driver/opeator

by competent

and approved

agency by

engineer;Eye

Test 1 year > 40

years age;Eye

test 2 year < 40

years of Age;

Medical Fitness.

Page 272: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-202 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Availability of

Trained

Competent

Lifting

Supervisor/

Rigger/slinger.

Guarding

Arrangements

Availability of

operational

procedure of

Machine

Guarding and

risk

assessment?

Guarding

Arrangements

training

documents

available and

awareness of

Guarding is

present on site

and daily

checklist covers

guarding

requirement?

Plant and

equipment

register

guarding

violation is

recorded and

compliance

evident?

Guarding

arrangement

implementation

noted on site?

Page 273: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-203 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Vehicle Checks

Masterlist of

vehicle register

with equipment ,

driver details

with legal

documents and

all inducted

having age

more than 21

years?

Defensive

driving training

conducted to all

drivers?

Daily checklist

of all vehicle

maintained?

Lifting Operation

Page 274: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-204 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Availability of

third party

certificate with

three month

validity? Use of

crane more than

the age without

assessment as

per IS guideline

(Assessment

test ,

Caliberated

ASLI,Load

radius

indicator,Motion

Limit Devices,

Over Load Cut-

off device,

Anneno meter,

Machine

Guarding, SWL

Load Charts ?

Issues recorded

in Plant register

not complied?

Daily checklist

maintained and

leveled for

dumpers,

MEWP, cranes,

etc.

Safe Use

Page 275: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-205 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Plant and

equipment

operational

procedure

available

covering entry

and exit

rule,Importance

of car safety

belt, importance

of stop block

near excavation,

failure of

equipment while

working near

excavator or

during digging,

Importance of

banksmen and

communication

for carrying

different activity

in safe place by

heavy

machinery?

Briefing

conducted for

Approved plant

and equipment

operational

procedure by

plant and

equipment head

to concern

operator and

banksmen?

Lifting Gear

Page 276: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-206 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Approved

Operational

procedure

covering all

lifting tools and

tackles used at

site with Risk

Assessment.

Availability of

Masterlist of

Standard

Documents for

each lifting gear

with validity ?

Availability of

Competent

Lifting

Supervisor/

Rigger and daily

checklist signed

by them?

Welding

Machine

Page 277: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-207 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Availability of

welding

operational

procedure

covering

importance of

double earthing

to welding

machine,

importance of

hot work permit

by fire watcher

,maintenance

,insulation of

electrode

holder,

importance of

Ammeter and

voltmeter ,

Protection from

Monsoon and

risk

assessment?

Availability of

hot work permit

and fire watcher

? Maintain daily

checklist for

welding

machine?

Welding

operator have

standard PPE

specific to

welding?

Track and

Locomotives

Page 278: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-208 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Availability of

Masterlist of

Standard

Documents for

locomotives with

issue date and

validity date?

A. Equipment

Documents

(Third

Party;Insurance;

RC/Tax;PUC;

Fitness.

B. Operator of

age 21 having

Documents(

(License LMV <

7.5 T

Trans(HMV;HTV

;HGV;CRANE;

CONST. Equip

etc);

Competency

Certificate by

Plant

Department,Job

Specific Training

to driver/opeator

by competent

and approved

agency by

engineer;Eye

Test 1 year > 40

years age;Eye

test 2 year < 40

years of Age;

Medical Fitness.

Page 279: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-209 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Operational

procedure for

Track and

locomotive with

adequate refuge

space, a

nominated

lookout, and

flashing warning

lights being

placed at either

end of the

section of track

available with

risk assessment

Daily checklist

maintained

Rolling Stock

Availability of

Man rider for

transporting

personnel ,

muck car for

transporting

muck and

segment car for

transporting

segment?

Availability of

track work

permit and

maintenance

schedule?

Page 280: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-210 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Daily checklist

maintained for

man rider ,

segment

car,muck car

and track?

Electrical

Qualified/Comp

etent Electrical

Engineer

Name & Contact

number of

Electrical

representative

shall be

displayed main

distribution

board for

the temporary

electrical supply

so that he can

be contacted in

case of an

emergency.

Maintenance

schedule

available and

followed to

monitor

condition of

electrical

distribution on

site.

Site Electrical

single line layout

drawing

available

Page 281: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-211 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

All faults

detected &

actions taken,

Maintenance

schedule to

monitor defects

in control

measures

Overhead lines

identified

however poor

maintenance of

goalposts,

barriers

RA/MS

completed

agreed by local

electricity

authority.

Signs and

barriers in

prominent

position.

Briefings to

plant operators

Page 282: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-212 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

All Temporary

Electrical Site

installations and

distribution

systems shall as

a minimum

meet IP44

standards and

be in

accordance

with:-

(a) Indian

Electrical

Regulations;

(b) The Power

Companies’

Supply Rules;

(c) BS 7671

Requirements

for electrical

installation, the

IEE Wiring

Regulations

(16th Edition);

(d) BS 7375

Distribution of

Electricity on

Construction

and Building

Sites;

(e) BS 4363

Distribution

Assemblies for

Electricity

Supplies for

Construction

and

Building Sites;

Monitor

compliance daily

Page 283: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-213 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

All portable

electrical

appliance

permanently

numbers

including sub-

contractor

Register of tools

on site. Secure

storage.

Inspection of

competent

person &

Authorised issue

and return

Rechargeable

tools used

preferentially.

Task

assessment

sheets confirms

condition check

before use.

Authorised

users identified

for electrical

tools

Manufacturer

data used to

assist in training

Page 284: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-214 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Equipment in

good condition.

Evidence of

equipment being

in good order,

clearly

identifiable and

being used

correctly by

trained,

authorised

person

Good clear use

of registers.

Schedule of

inspection

periods

displayed

Maintenance

schedule/hire

status record

available to

monitor

condition of

electrical

equipment on

site and

completed.

Subcontractors

provide records

of inspection

and procedure

to remove faulty

equipment

found on site.

Page 285: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-215 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Competent

person C

license

appointed for

inspections and

tests etc.

Including Sub

contractor

activity

Competent

person identified

on site notice

board.

Training records

on site of

competent

persons.

Permits

contents

communicated

to operative,

sign off

procedure in

place.

Records

maintained,

regular

monitoring and

recorded

inspection of

permits

Page 286: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-216 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Periodical

cleaning and

replacement of

light fittings

/lamps Pole

height

maintained as

per legal

requirements

Light fittings

installed & lay

out plan ,pole

number

displayed and

sufficient

illumination

maintained at

site

Register

available for

illumination and

regular update

Distribution &

Electrics up to

date and good

records of

corrective

actions and

changes

recorded

Records of

weekly

inspections and

monthly audit.

Page 287: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-217 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

All work shall be

supervised or

executed

by qualified and

suitably

categorised

electricians.

All cabling shall

be run at high

level whenever

possible and

firmly secured to

ensure it

does not

present a

hazard or

obstruction to

people and

equipment.

The installation

on Site shall

allow convenient

access to

authorised and

competent

operatives to

work on the

apparatus

contained

within.

Page 288: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-218 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

The following

voltages shall

be adhered to

for typical

applications

throughout the

distribution

systems:

(a) fixed plant -

415V 3 phase;

(b) movable

plant fed by

trailing cable -

415V 3 phase;

(c) installations

in Site buildings

- 240V 1 phase;

(d) fixed flood

lighting - 240V 1

phase;

(e) portable and

hand held tools -

110V 1 phase;

(f) Site lighting

(other than flood

lighting) - 110V

1 phase; and

(g) portable

hand-lamps

(general use) -

110V 1 phase.

Page 289: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-219 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Earthing and

bonding shall be

provided for all

electrical

installations and

equipment to

prevent the

possibility of

dangerous

voltage rises

and to ensure

that faults are

rapidly

cleared by

installed circuit

protection.

Only plugs and

fittings of the

weatherproof

type shall be

used and they

should be

colour coded in

accordance with

the

Internationally

recognised

standards for

example

as detailed as

follows:

(a) 110 volts :

Yellow

(b) 240 volts :

Blue

(c) 415 volts :

Red

Page 290: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-220 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

All lighting shall

be kept

maintained and

clean at all

times on the

traffic diversion.

Use a low

voltage open

circuit relay

device if welding

with alternating

current in

constricted or

damp places.

WORK IN

CONFINED

SPACES -

Flame-proof

lighting. (Hand

lamps not more

than 24 volts.);

Procedure of

LOTO

Procedure of

each type of

equipment

Standard

maintenance

procedure

The Site mains

voltage shall be

as the Electricity

Utility supplies,

415V 3-phase 4-

wire

Page 291: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-221 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

system.

(a) Single-phase

voltage shall be

as the Electricity

Utility supplies,

240V supply.

(b) Reduced

voltages shall

conform to BS

7375.

Cables shall be

selected after

full

consideration of

the conditions to

which they will

be

exposed and the

duties for which

they are

required. For

supply cables

up to 3.3kV the

cable armouring

shall be used as

the earth return

in conditions

where the cable

is

continuously

extended and

not subject to

continuous

movement after

installation.

Page 292: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-222 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

For supplies to

mobile or

transportable

equipment

where operation

of the

equipment

subjects the

cable to flexing,

the cable shall

conform to one

of the following

specifications

appropriate to

the duties

imposed on it:

(a) BS 6708

flexible cables

for use at mines

and quarries;

(b) BS 6007

rubber insulated

cables for

electric power

and lighting; and

(c) BS 6500

insulated flexible

cords and

cables.

Provision of

Silenced

Equipment like

D.G

Specific Training

Competency

Certificate of

electrical

personals

Page 293: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-223 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Admin & Stores

As per the child

labour abolistion

act, are any

body employed

under the age of

18 years?

Company /

Organization

registration

Certificate

available at the

Admin?

Contractor

registration

certificate

available at

office ?

Employer Public

Liability

Certificate

available and

displayed

Permission/

Clearance to

operate the

Casting Yard

Labour license

available?

Whether all the

workmen

covered under

ESIC?

Whether all the

workmen

covered under

EPF Policy?

Page 294: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-224 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Whether the

workmen

covered under

group insurance

policy?

whether the

project

registered under

BOCWR

Whether the

Contractor

having the 'CAR'

policy?

Whether the

minimum wages

act implemented

and being

followed in

practice?

Pre-

employment

medical fitness

is being carried

out for all the

workmen

Workmen

screening is

being done as

per their skills

and trade

Are Women

deployed as per

the guidelines of

factories act /

BOCW rules-

2006

Page 295: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-225 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Sexual

harassment

prevention is in

place and policy

formulated/

displayed?

Women

protection act

guidelines being

implemented

Workmen

compensation

policy is

available

Emergency

Contact

Numbers

displayed at

suitable

locations.

Ambulance is

available

Qualified Doctor

is available

Sufficient

numbers of

male nurses are

available at all

locations

Health Centre is

available as per

the guidelines of

BOCW act

Page 296: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-226 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Bed and

blankets in the

Health Centre

are available

and are in

hygienic

condition

Sufficient

numbers of

toilets are

available at the

project

Sufficient

quantity of

drinking water

facility is

available

Sufficient

quantity of

Urinals are

available

Separate

washrooms with

pictorial photos

for women are

made available

Rest rooms for

women are

available

Rain protection

system is in

place

Mosquito

prevention

system during

the rainy season

is in place

Page 297: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-227 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Fire Prevention/

Protection

systems are

adequate at work

place

Labour camp

set up is as per

the legal

requirement

Separate

kitchens in a

safe distance for

the workmen at

Labour camp is

provided

Cleaning/

white washing

frequency of

Labour camps,

toilets, urinals,

wash rooms

Fire Prevention/

Protection

systems are

adequate at

labour camp

Periodic Mock

drills at

workmen camp

Hand wash

facility with soap

water solution

Drinking water

test report

Security

arrangement at

workmen camp

Page 298: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-228 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Medical care /

Doctor visit to

Workmen camp

Fumigation,

Fogging,pest

control, Anti

larva treatment

at Workmen

camp

Vaccination

Transport facility

for workmen

from workmen

camp to site.

Drinking water

tank cleaning

frequency and

other display

posters

Cloth washing

facility at

Welfare, Health

& Hygiene

posters at

workmen camp

Health and

Hygiene

awarness

programes at

workmen camp

Energy drinks,

ORS,Lemon

water, butter

milk during the

summer

Page 299: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-229 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Emergency

lighting

arrangement is

in place

Stores

License to stock

Diesel & Gas

Cylinders if

applicable as

per LR

HIRA for stores

Store Layout

Stacking

arrangements

of material

Manufacturer

Test Certificates

for lifting tools

and tackles

Calibration

certificates for

the measuring

equipment’s

Racks

arrangement

with safe

distance

Safe access /

egress in side

the store

Fire fighting

arrangement in

the store

Page 300: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-230 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Ladder provision

to pick the

material stacked

at certain height

Ventilation in

side the store

Illumination in

side the store

5 'S' system

implementation

Separate

storage of

flammable

material and

precautions

First In / First

Out system

implementation

for material

Tag system for

all material

Emergency

evacuation

posters

Emergency

contact number

display

flame proof

electrical fittings

in the store

First aid box

Page 301: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-231 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Separate safe

storage facility

for wire ropes

and web slings

with test certificate

Display of MSDS

for all COSHH

items

Emergency

lighting

arrangement

in side the

store

Drinking water

facility

Stacking

arrangement of

Hazardous

material like

bentonite etc.

LED lighting

arrangement to

reduce power

consumption

Eye wash /

Shower facility

in case contact

with hazardous

chemical

Bund wall / dyke

wall for diesel,

petrol, chemical

storage area

Mock drill for

store

Page 302: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-232 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Display of H&S

Policy in the

store

Display of

Operational

Controls in the

store

Entry restriction

posters

Informatory

posters

Dos & Don'ts

display

Smoke / Heat

detectors

Oil/Chemical

storage in metal

containers

Waste disposal

provision / plan

Trainings for

store staff

Calibration

certificate for

Weighing

machine

Loading /

Unloading

Procedures

Page 303: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-233 Sign & Stamp of Tenderer CMRL/REV.A3

CMRL Criteria

Key

Findings

/

Observ

ations

Visual

Evidence

s(Attach)

E G A F NC Location Reason

for

Failure

Person

Responsible

With Name

and

Designation

Recommen

ded Action

Plan with

Target

Date

Wedge blocks /

wheel chockers

for parked

vehicle at the

store during

loading /

Unloading

Page 304: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-234 Sign & Stamp of Tenderer CMRL/REV.A3

SECTION 2

GUIDANCE DOCUMENTS

INDEX REFERENCE REVISION DATE

Lifting Operations contents GSAF 01

Construction Method Statements contents

GSAF 02

Working At Height contents GSAF 03

ESHS Training Matrix GSAF 04

Emergency procedure Fire/ Bomb Alert GSAF 05

H&S Audit measurement Criteria GSAF 06

Emergency Response Plan contents GSAF 07

Health Plan contents GSAF 08

On Site Traffic Management Plan contents

GSAF 09

Project H&S Plan contents GSAF 10

Site Fire Plan contents GSAF 11

Traffic Management Plan contents GSAF 12

Training Implementation Plan contents GSAF 13

Monthly H&S Report Contents GSAF 14

Minimum number of H&S Posters GSAF 15

ID Card Format GSAF 16

Days to be Observed for creating

ESHS Awareness

GSAF 17

Minimum Lighting Requirements GSAF 18

Labour Camps GSAF 19

Accident Investigation & Reporting GSAF 20

First Aid Room / Facilities GSAF 21

Personal Protective Equipment GSAF 22

Page 305: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-235 Sign & Stamp of Tenderer CMRL/REV.A3

INDEX REFERENCE REVISION DATE

Storage of LPG Cylinders GSAF 23

Storage of Flammable Liquids GSAF 24

Manual Lifting GSAF 25

Permit to Work (PTW) GSAF 26

Excavation GSAF 27

Hand Tools GSAF 28

Arc Welding & Cutting GSAF 29

Gas Welding & Cutting GSAF 30

Bench Grinders GSAF 31

Circular Saw GSAF 32

Electricity at Site GSAF 33

Air Receivers GSAF 34

Confined Space Entry GSAF 35

Scaffolding GSAF 36

Mobile Scaffold GSAF 37

Working at Height GSAF 38

Mobile Cranes GSAF 39

Tower Cranes GSAF 40

Safe Use of Ladders GSAF 41

Fire Extinguishers GSAF 42

Access & Housekeeping GSAF 43

Hoists (Man & Material) GSAF 44

Material Loading Platform GSAF 45

Site Transportation GSAF 46

Page 306: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-236 Sign & Stamp of Tenderer CMRL/REV.A3

INDEX REFERENCE REVISION DATE

Contractor Surveillance Report GSAF 47

Non-Conformance Report (NCR) GSAF 48

Site Instruction GSAF 49

Emergency Action & Notification GSAF 50

Request for Inspection (RFI) GSAF 51

Minimum Requirements of ESHS

Monitoring and Audio-Visual

Equipment’s

GSAF 52

Page 307: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-237 Sign & Stamp of Tenderer CMRL/REV.A3

GSAF 01

Rev. Date Description

0 Reviewed/edited/amended in conjunction with management review

0 Issued for use

Name:

Date:

Signature:

Prepared by: Reviewed by: Approved by:

LIFTING OPERATIONS CONTENTS

Page 308: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-238 Sign & Stamp of Tenderer CMRL/REV.A3

Contents

1. Introduction

2. Scope

3. Glossary of Terms

4. Reference Documents

5. Rules for Safe Lifting Operations

6. Responsibilities, Competence and Training of Personnel Involved in Lifting

Operations

6.1 Responsibilities

6.1.1 Person Responsible for Lifting Operations

6.1.2 Competent Person

6.1.3 Crane Operator

6.2 Competence and Training

7. Planning of Crane Operations

7.1 Define the Lift

7.2 Planning

7.2.1 Lift Categorisation

7.2.2 Risk Assessment

7.2.3 Lift Plan

7.2.4 Assessment of a Lifting Operation

7.2.5 Tandem Lift Additional Factors of Safety

7.2.6 Crane Siting Considerations and Assessment

8. Crane Daily Checks and Inspections

8.1 Crane Access Ladders, Walkways and Hatches

8.2 Housekeeping

8.3 Pre-start Checks

8.4 Start-up of Prime Mover

8.5 Pre-Operations Checks and Function Tests

8.6 Safety Equipment

8.7 Checks to be carried Out During Operations of the Crane

9. Execution

9.1 Communications of Lift Plan

9.2 Communications

9.2.1 Hand Signals

9.2.2 Radio Communication

9.3 Controlling Access to the Lift Area

9.4 Conducting the Lifting Operation

9.5 Moving the Load

9.5.1 Load Handling

9.6 General Instructions for Crane Operators

9.6.1 The Crane Operator MUST NOT

9.6.2 The Crane Operator MUST

9.7 Banksman and Load Handler (Slinger) Procedures

Page 309: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-239 Sign & Stamp of Tenderer CMRL/REV.A3

9.7.1 General Instructions for Banksmen

9.8 Reacting to Changing Circumstances

10. Learn and Record

APPENDIX 1 – Example Task Based Risk Assessment APPENDIX

2 – Example Lifting Plan & Lift Method Statement APPENDIX 3 –

Wire Ropes – Care and Inspection

A3.1 Introduction

A3.2 Construction

A3.3.1 Ordinary Lay

A3.3.2 Lang’s Lay

A3.3.3 Non-Rotating

A3.4 Wire Ropes Inspection

A3.4.1 Factors Causing Rope Deterioration

A3.4.2 Wire Rope Discard Criteria APPENDIX 4

– Recommended Hand Signals APPENDIX 5 –

Lifting of Personnel

A5.1 Personnel Lifting with a Crane A5.2

Personnel Work Cages & Baskets A5.2.1

Work Baskets

APPENDIX 6 – Typical Adverse Weather Guidelines

APPENDIX 7 – Guideline on Use of Lifting Accessories

Table A7.1 Working Load Limit for Slings Using STEEL Cored Rope Table

A7.2 Working Load Limit for Slings Using FIBRE Cored Rope Table A7.3

Working Load Limit for Round-Slings

Page 310: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-240 Sign & Stamp of Tenderer CMRL/REV.A3

Construction Method Statement Contents GSAF 02

The headings and sub-headings listed below are not exhaustive Identified

Yes / No

1. Purpose

2. Scope of Work (detailed)

Detailed description of Works to be undertaken. Limits of work and site

boundaries, including time limits / Completion criteria

3. References/Consents/Supporting Information

4. Hazards & Risks Identified

List significant hazards with operation and as identified in the Project

Safety Plan.

Consider health and safety implications

Risk Assessments

Hazardous substance assessments

Page 311: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-241 Sign & Stamp of Tenderer CMRL/REV.A3

5. 3rd Party/Arrangements/Protection/Communication & Liaison

Method

Movement – storage of materials and equipment

Restricted clearances – plant & equipment

Reduced site lines for travelling public and construction plant

Occupied premises within or adjacent to operations

Over-flying work operations (cranes)

Site security

Road traffic management

Pedestrian management

Interface with public bodies and schools

Public safety

Temporary fencing and protection

Communication & Liaison

Identify specific persons who must be contacted, additional to those

specific in the Project Safety Plan e.g. other section engineers

Consider other contractors working nearby. Highway Authorities.

Occupiers of adjacent property. Client undertakings.

Sub-standard conditions reporting

Supporting Information

Drawing and layout of initial, interim and final works. Temporary Works

design, support calculations, checking and approval Quality control

arrangements

Page 312: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-242 Sign & Stamp of Tenderer CMRL/REV.A3

6. Site Spatial Management Plan

Site Layout Plan shall include the following

• Worker’s Passage Route

• Vehicle Running Route

• Construction work area

• Workshop area

• Material storage area

• Construction waste storage area

7. Environmental

Noise, dust, smoke, mud, vibration.

Disposal of waste, frequency, and method of disposal.

De-watering arrangements and disposal of water

Pollution controls

Fuels, oils etc., storage and containment

Environmental – liaison

8. Method: Briefing Arrangements, Plant, Personnel

Method

Reference to programme chart showing sequence of separate tasks

Standards and Procedures

Sketches

Page 313: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-243 Sign & Stamp of Tenderer CMRL/REV.A3

Access and egress arrangements

Delivery of materials

Details of temporary structures

Method of authorising start of work

Risk Assessments considering Health and Safety

Personnel

Number of contractors and sub-contractors

Communication methods

Supervision arrangements, including names of person in charge

Competence and training requirements. (especially in respect of

plant and equipment used)

Working hours

Shift hand-over arrangements

Welfare and first aid

Access requirements, special conditions

Briefing Arrangements

Determine level and extent of briefing arrangements including

accompanying documentation.

Detail how understanding is to be confirmed by contractors and or

individuals

Plant & Equipment

Specify plant and equipment to be used

Competence requirements to operate or erect plant and equipment

Authority to work

Operational Restrictions

Permit systems

Inspection and examinations

Record keeping

Temporary lighting

Detail of cranes, lifting machines, appliances and lifting tackle;

including details of site access,

Rigging and de-rigging

Page 314: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-244 Sign & Stamp of Tenderer CMRL/REV.A3

Infrastructure Protection

Identify hidden services

Use of approved Cable Locating Tools

Identify infrastructure susceptible to damage e.g. power and

telecommunications equipment,

pipes, air mains, fire detection equipment

Sketch showing location of services or reference where information

can be found.

Isolation and protection – safe working locations.

Permits to work

Lock out procedure and control.

Hand over and re-energising

Plant movements.

Additional fire precautions

Hot Work arrangements

Structural considerations for existing buildings & structures.

9. Quality

Quality Control arrangement

10. Safety

Control measures for specific health hazards e.g. Leptospirosis

Relevant contractor’s risk assessments, including COSHH and

manual handling

Permit to work systems

Personal protective equipment requirements

Etc

11. Hold Points

Hold Points are trigger levels if exceeded then the work ceases.

This will include safety, quality and environmental issues.

12. Inspection & Test Plans

Page 315: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-245 Sign & Stamp of Tenderer CMRL/REV.A3

GSAF 03

Rev Date Description

Reviewed/edited/amended in conjunction with management review

Issued for use

Name:

Date:

Signature:

Prepared by: Reviewed by: Approved by:

WORKING AT HEIGHT CONTENTS

Page 316: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub-Section F –ESHS Volume 2 Health & Safety Manual

2-246 Sign & Stamp of Tenderer CMRL/REV.A3

1. Scope..............................................................................................................................

2. Definitions ......................................................................................................................

3. Responsibility ................................................................................................................

4. Procedure .......................................................................................................................

5. Examples / Diagrams / Flow Charts..............................................................................

6. General Assessments....................................................................................................

7. Working at Height (General) Risk Assessment ..............................................................

Page 317: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Sub-Section VII F -ESHS

Volume 2 Health & Safety Manual

2-247 SSign & Stamp of Tenderer

GSAF 04

ESHS Training Matrix

Management Supervisor Specific

Type

s o

f tr

ain

ing

ES

HS

Orie

nta

tio

n

ES

HS

Lea

de

rsh

ip

ES

HS

Pla

n

ES

HS

Im

pro

vem

ent

Pla

n

Ma

na

ge

me

nt

of C

han

ge

ES

HS

Au

dit &

Insp

ectio

n

ES

HS

Em

erg

en

cy

Re

spo

nse

& P

repare

dn

ess

Incid

en

t/A

ccid

en

t

Investig

atio

n &

Re

port

ing

ES

HS

Co

mm

unic

ation

ES

HS

Pro

mo

tio

n &

In

cen

tives

Tra

ffic

Ma

na

ge

me

nt

Ha

zard

Id

en

tificatio

n &

Ris

k

An

aly

sis

Pe

rmit t

o w

ork

syste

m

Co

nfin

ed

sp

ace

entr

y

sca

ffo

ldin

g

Wa

ste

Ma

na

gem

ent

En

viro

nm

ent M

onito

ring

Lab

ou

r w

elfare

me

asu

res

Be

ha

vio

ura

l B

ased

Sa

fety

Ma

na

gem

ent

(BB

SM

)Jo

b/T

ask S

afe

ty A

naly

sis

(JS

A)

Sa

fety

Tra

inin

g

Ob

serv

ation

Pro

gra

mm

e(S

TO

P)

Indu

str

ial F

irst

Aid

& C

PR

Incid

en

t / A

ccid

en

t

Investig

atio

n &

Re

port

ing

Fire

fig

htin

g

Co

nfin

ed

Sp

ace

Testin

g &

Cert

ific

atio

n

Sca

ffo

ld E

rection &

Inspe

ction

Rig

gin

g

Wire

Ro

pe

In

spe

ctio

n

Cra

ne

Insp

ectio

n

Ele

ctr

ica

l/M

echan

ica

l Is

ola

tion

Pe

rmit t

o W

ork

Syste

m

Co

nfin

ed

Sp

ace

Wo

rkin

g

Exp

losiv

e H

an

dlin

g &

Co

ntr

ol

He

avy L

iftin

g O

pera

tion

Ra

dio

gra

ph

y (

X-R

ay)

HA

ZM

AT

Ha

nd

ling &

Con

tro

l

We

ldin

g,

Cu

ttin

g &

Bra

cin

g

Po

we

r A

ctu

ate

d H

and T

ool

Ele

ctr

ica

l/M

echan

ica

l Is

ola

tion

Ro

ofin

g W

ork

Ste

el e

rectio

n w

ork

Sca

ffo

ld E

rection/D

ism

an

tlin

g

Fals

e-w

ork

Ere

ction /

Dis

ma

ntlin

gP

ain

ting

in C

onfin

ed

Are

a

Project Director /Project

Manager . . . . . . . . . . . . . . . . . . . . .

Construction

Managers/Engineer . . . . . . . . . . . . . . . . . . . . . . .

Quality Manager/Engineer

. . . . . . . . . . . . . . . . . .

Planning Manager

/Engineer . . . . . . . . . . .

Public Liaison Officer

/Labour Welfare officer . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Construction Supervisors

/Foreman . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Senior/Junior Electrical

Manager / Engineer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Machinery Operators . . . . . . .

Material Handlers . . . . . . . . .

Station Building Workers . . . . . . . . . . . . . . . Steel workers . . . . . . . . . . . . . . .

Mechanical workers . . . . . . . . . . . . . .

Other Civil workers . . . . . . . . . . . . . . . .

Electrical /Plant Foreman

/workers . . . . . . . . . . . . . .

Radiographers . . . . . . . . . .

Transportation Drivers . . . . . .

Traffic Marshal /Security

Officers . . . . . . . . . . .

Traffic Engineer /Barricade Manager /Housekeeping Manager

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Medical Doctor/Male

Nurse/First Aiders . . . . . . . . .

Page 318: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Sub-Section VII F -ESHS

Volume 2 Health & Safety Manual

2-248 SSign & Stamp of Tenderer

Chief /Sr. ESHS

Managers . . . . .

Jr.ESHS

Managers/ ESHS

supervisors /Stewards

. . . . . .

. . . . . . . .

. .

. . . . .

. . . . . . . . . . . . . . . . . . . . . .

Environmental Manager /Engineer

. . . . . .

. . . . . . . .

. .

. . . . .

. . . . . . . . . . . . . . . . . . . . . .

Page 319: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-249 Sign & Stamp of Tenderer

GSAF-05

EMERGENCY PROCEDURE FIRE/BOMB ALERT

OPERATING COMPANY:

SITE / CONTRACT:

SITE ADDRESS:

SITE TELEPHONE No:

FIRE / BOMB WARDEN DETAILS

NAME

AREA COVERED CONTACT TEL

POSITION

PROCEDURE

1. A record of all personnel must be kept on site each day.( Visitors Registerand

the Operatives Daily Register).

2. All personnel must be made aware of the fire drill during the SafetyInduction.3. All personnel must familiarise themselves with the location of FireExtinguishers

Fire Alarm Call Points (temporary and permanent), Escape Routes and the

Designated Assembly Point.

4. If a fire or bomb is discovered warn others by shouting and ensure TEL 999is called.5. Send a colleague to advise the designated fire wardens /fire safety coordinator/site manager.6. If it is a fire raise the fire alarm at a Break Glass or by sounding anytemporary sirens / horns/ bells supplied for this purpose7. Try to put out the fire only if it is safe to do so, using the appropriate fire

fighting equipment8. On hearing the fire alarms evacuate the workplace leave tools,

Page 320: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-250 Sign & Stamp of Tenderer

equipment and personal belongings behind.

9. Proceed to the Assembly Point where a check will be undertaken to confirmall personnel are out.

10. Inform the fire/bomb warden or those in authority if you know someone ismissing.11. Do not return to the work place until instructed by Rok Management.

NOT PUT

In order

If you do

Page 321: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-251 Sign & Stamp of Tenderer

GSAF-06

CHENNAI METRO RAIL LIMITED PROJECT

H&S Audit Measurement Criteria

Page 322: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-252 Sign & Stamp of Tenderer

Points will be objectively awarded by Contractor based upon site safety conditions

Scoring will be as follows:

Excellent (E) = 10,

Good (G) = 8,

Average (A) = 6,

Fail (F) = 0,

Non-Conformance (NC) = -10

Non-Conformance (NC) = -10 with the exception of those sections marked with an asterisk

which will have a factor of 2 thus doubling the score for that section.

All non-conformances within the heavy bordered areas will receive an Action Notice at the

required level. All Suspended Operations Notices will be referred to the Project Manager, who

will visit site within 24 hours to carry out further safety inspections.

Any non-applicable topic and the corresponding “possible score” will not be marked and the

score will be calculated by recognising the relevant possible score as being 100% and the

actual score as a percentage of this

Chennai Metro Rail Limited

Key:

Page 323: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-253 Sign & Stamp of Tenderer

1. Notices Displayed

ACTIVITY EXCELLENT

[An

Exceptio

nal

Standard

]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line

with

OSHE Procedur

es]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMANCE

[Unsatisfactory]

-10 Points

1.1 Health and

Safety

Information

Addition

al

Posters

displaye

d

- i.e. mess

room, site

entry and

point of

work area

and

changed

on monthly

basis

Safety

promotion

al

conducted

at site &

participatio

ns of staff ,

workmen

and sub-

contractor

s

Accidents ,

incidents

and near

misses

together with

any lessons

learned

displayed on

notice board

and poster

campaigns

conducted

Safety Hand

book on

safety and

health made

available

and

provided to

employees

Safety

incentive

schemes

are in place

for

motivation

(awards and

rewards)

Displayed

on office

notice

board/all

boxes

completed.

Emergency

contact

information

detailing

where to

report

.Public

information

signage and

contractor

contact

information

posted

externally

Limited

visitor

information

signage,

H&S

Posters,

banners

etc.

provided

both in

Marathi

/Hindi and

English.

Work force

representativ

e’s name

contact

number

posted on all

sites

externally to

site office

Safety

contents

organized in

sites

Not displayed

Health and

Safety.

No safety

suggestion box at

each site and

labour colony

No smoking , No

alcohol drinking

at public site

poster not

displayed and no

awareness

training

1.2 Additional Health & Safety

Organisation Organization Policy not

Health and copies policy declared,

signed policy having a complying with

Safety Policy

displayed in, adopted & Displayed on Health and the statutory

Page 324: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-254 Sign & Stamp of Tenderer

Statements i.e. canteens Policy is made

notice board/ Safety Policy provisions and

etc know to all? policy reviewed

signed by the CMRL ESHS

and up to date.

project Requirements.

Manager in Hindi and/ or

local Language

1.3 Employer’s Additional Additional Displayed on Displayed in Not displayed or Liability copies copies office notice prominent expired. Insurance displayed in displayed in, board/ up to position Certificate other i.e. canteens date.

locations etc.

1.4 Protective Numerous Signs Good clear Few signs No signs Equipment signs on displayed at sized signage displayed, not displayed. Sign shows

inside site entrance in visible easily seen.

the work area.

and along site

positions.

hoarding/ perimeter

fence.

1.5 Reversing Banksmen Signs Signs displayed

Few or small No sings

Vehicles

Sign

wearing

colour

coded

high

visibility

vests/

helmets.

displayed

with contact

number for

named

banksmen.

at site

entrance

and around

site.

signage in

place. Signs

not easily

seen.

displayed.

1.6 Emergency

Procedure

Also

displayed

in site

areas.

Review

dates set,

drills

completed.

Reviewed

after an

alarm.

Emergenc

y mock

drill are

conducted

as per

emergency

plan

Good

content.

Displayed

at both

exits and

fire points,

all

inducted.

Emergency

control

centre

established

and

assembly

points

provided at

site

Displayed

but poor in

content.

Emergency

team

identified

and

emergency

evacuation

plan

displayed at

prominent

locations at

site

Not fully

establish

ed, some

not

inducted.

Not displayed.

No Emergency

contact numbers

of local bodies

and other

organizations are

displayed at site

No staff ,

workmen familiar

with the plan

No emergency

lighting

Page 325: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-255 Sign & Stamp of Tenderer

1.7 First

Aider(s),

Male

Nurse ,Doctor

Helmet

stickers

worn.

Additional

first aiders

on site.

First aid

points

clearly

designated.

Fully

equipped

Ambulance

with driver available at site

in all

working

hours and

emergency

life support

equipment

attached in

Ambulance

Named and

displayed,

good cover

Safety, First

aid box

available in

each work

site with

trained

personal

Not

identified.

No full time

cover both

day and

night shift.

Fully

trained. In

each site

office and

work

location to

attending

emergencie

s

None on site.

No records of first

aid boxes

inspection

No records of first

aid training

No enough

qualified /trained

first aiders are

available at each

site each shift

No first Aid room

/Ambulance room

at site

No tie with nearest hospital

No qualified

doctor available

in each shift in

site

1.8 Project Good EHS Minimal Some Not displayed. Notice health

posters information, requirements displayed not

Boards HAV etc COSHH etc. site rules etc. all displayed in Policies in requirements prominent CHSP met.

Telephone positions. no of local

Fire , Electrical and other agency

1.9 Site rules Additional Additional Forms part of Not all site staff

Unsafe acts and

copies copies induction. inducted. conditions in displayed in displayed in, Displayed on breach of rules.

other i.e. canteens office notice

locations, i.e.

etc board.

work area.

Page 326: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-256 Sign & Stamp of Tenderer

2. Planning

1.10 BOCWR Additional Additional Displayed on Displayed in Not displayed or Registration copies copies office notice prominent expired.

displayed in displayed in, board/ up to position other i.e. canteens date.

locations etc.

1.11 Labour Additional Additional Displayed on Displayed in Not displayed or Licence copies copies office notice prominent expired.

displayed in displayed in, board/ up to position other i.e. canteens date.

locations etc.

1.12Restricted Numerous Signs Good clear Few signs No signs Usage of signs on displayed at sized signage displayed, not displayed.

Hand Phone shows inside

site entrance in visible easily seen.

Sign the work area.

and along site

positions.

hoarding/ perimeter

fence.

ACTIVITY EXCELLENT

[An

Exceptiona

l Standard]

10 Points

GOOD

[Exceed

ing the

Norm]

8 Points

AVERAGE

[In line with

OSHE Procedures]

6 Points

FAIL

[In Need of

Improvement]

0 Points

NON

CONFORMAN

CE

[Unsatisfactory]

-10 PointsAll reviews Reviewed

more Reviewed Not reviewed Construction

2.1 briefed to staff on

frequently than

monthly and regularly or Phase Health and

Construction site and recorded

procedures

up to date. All only going Safety Plan for

Phase Health (i.e. tool box dictate, i.e. prior

sections through the stations and

and Safety talk). Plan to phase reviewed. motions (i.e. no Viaduct not Plan updates changes

orEvidence of record of reviewed.

available on site

weekly. changes appropriate

made. changes)

Employer Employer /Engineer /Engineer not Notified notified

Notice of no objection not

received Hazard & Risk

2.2 Risk Log Procedure in

Company Hazard & Risk Hazard Log & Hazard Log &

Register & place for review Procedures

Log Schedule Risk Register Risk Register not

Hazard Log and change Key

referenced

of Key Tasks not available in place or

Page 327: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-257 Sign & Stamp of Tenderer

Task Schedule. within Hazard &

completed on site. tasks/hazards

Employer Risk Log. with dates Notice of no substantially /Engineer Procedur

es required, RA’s objection not missing from

Notified of available on

and MS on received hazard/risk logs.

Updates to site site.

Logs. Updates

available on site

2.3 Risk

Assessmen

t & Method

Statements

Completed

Review of

RA/MS carried

out following

near miss or

incident/accide

nt. Review

evidence

provided to ER

RA/MS

Availabl

e on

site.

Schedu

le of

operati

ve

briefing

s

identifie

d.

Completed as

per Hazard

Log & Risk

Register.

Suitable and

sufficient for

tasks. Notice

of no objection

received from ER

RA/MS on site

but not suitable

and sufficient

for task. Notice

of no objection

not obtained

from ER.

RA/MS not

completed.

No Design

Risk

Assessment

2.4 Risk

Assessmen

t & Method

Statement

Briefings

Follow up

briefings,

recorded to

show updates

and change

reviews.

Employer

/Engineer

Notified

of

change.

Record

of all

briefings

maintain

ed.

Signed

proof of

attendan

ce

maintain

ed.

Task Briefings

carried for all

Risk

Assessments

and Method

Statements.

Only the

occasional

RA/MA briefing

carried out.

Task briefing

not conducted

Notice of no

objection not received

No briefings of

RA or MS

carried out.

Task briefing

not

conducted

2.5 Risk

Assessment

s & Method

Statement

Implementat

ion

Briefing

records

signed by

operatives

and available

on site

RA/MS

availa

ble on

site.

Operati

ve

trained

and

able to

explain

Assess

Works carried

out as per the

RA/MS.

Designated

supervisor

available

Operatives not

briefed on

contents of the

RA/MS.

Change in

methodology

not notified to

Employer

/Engineer.

Notice of no

objection not received

Provision as

determined in

the RA/MS not

available on

site

No supervision

Not following

the RA/MS

safe system

of work

methodology.

Page 328: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-258 Sign & Stamp of Tenderer

2.7 Manual

Handling

Assessment

Comprehe

nsive

controls

designate

d.

Daily

monitoring

recorded.

Tool box

talks

carried out,

information

posters

displayed.

Comprehensiv

e specific risk

assessments

Briefings

recorded.

Included in task

risk

assessment.

Where possible

mechanical

aids are used

Briefings

recorded.

RA & controls

needs

enhancement.

Control

measures poor.

Reliance placed

on manual

handling rather

than mechanical

Notice of no

objection not

received from

Employer

/Engineer

No risk

assessments

ment.

2.6

Health

and Safety

Organisati

on Chart

List/ Names

and positions

of key

competent

persons

provided

displayed at

point of work

and in other

locations i.e. Rest Areas

Procedu

re

availabl

e on

authorit

y given

to

ESHS

Persona

l to

STOP

any

unsafe

act and

conditio

n.

HSE

professional

provided such

facilities,

equipment

and other

facilities. Sub-

contractor

work

monitored by

Main

contractor

both day and

night shift etc.

A qualified

Doctor and

nurse and

Assistant

Nurse

deployed at each work site

H & S personal

deployed at site

are

professional

qualified

including sub-

Contractor up

to date

All sections

completed

displayed in

prominent

position Notice

of no objection

not received

from Employer

/Engineer

Incomplete or

not up to date

(i.e. no

showing

management

changes). No

public liaison

officer .No

Labour

Welfare officer

Page 329: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-259 Sign & Stamp of Tenderer

2.8 Manual

Handling

Training

Tool box

talks.

Guidance

document

s

displayed

at

workface.

Additional

training,

records

maintained.

Guidance

documents

displayed.

Completed with

all staff as per

induction.

Training being

put into practice

Some

completed poor

in content.

None.

Records maintained.

2.9

Safe

Operational

Control

Procedure

Safe

Operational

Control

Procedure

available

for all

activity

Safe operating

procedure

displayed and

file available

and explained

in the local

language to

the workers

SOP reviewed

and updated

regularly.

Training

provided to

workmen to

identify the

unsafe act and

unsafe

condition

Some of activity

SOP completed

prepared jointly

by the site team

and safety team

and available.

Notice of no

objection not

received from

Employer

/Engineer

No safe operating

procedure as per

ER ESHS

contract

requirement of

CMRL ESHS

Requirements.

2.10 ESHS

Management

System

Procedure

H&S

Managem

ent

System

Procedur

e

available

for all

activity

are per

Table 3 of

ESHS

COC

H&S

Management

system

procedure file

available and

explained in

the staff

MSP reviewed

and updated

regularly.

Training

provided to

workmen to

identify the

unsafe act and

unsafe

condition

Some of activity

MSP completed

prepared jointly

by the site team

and safety team

and available.

Notice of no

objection not

received from

Employer

/Engineer

No H&S

Management

system

procedure.

All reviews Reviewed more Reviewed Not reviewed Emergency

2.11 briefed to staff

frequently than monthly and regularly or Preparedness

Emergency on site and procedures up to date. All only going and Response Preparedness recorded

(i.e. dictate, i.e. prior sections through the Plan for stations

and Response tool box talk).

to phase reviewed. motions (i.e. no and Viaducts not

plan Plan updates

changes or Evidence of record of reviewed.

available on site

weekly. changes appropriate

made. changes)

Page 330: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-260 Sign & Stamp of Tenderer

Employer Employer /Engineer /Engineer not Notified notified

Notice of no objection not received from

Employer

/Engineer Copy of No project International Appointed the No process of

2.12 certification specific certification accrediting certification. No International displayed in

site certification Audit body for appointment of

Certifications areas. Review

conducted obtaining the accrediting body

dates set, certification and for obtaining the completed. No audit certification

conducted.

Employer /Engineer not notified Notice of no objection not

received from

Employer

/Engineer 2.13 Additional Records of all No training Training No Training Training Training Training conducted for Implementation Implementation Implementation conducted

and conducted Sub Plan .Notice of Plan. No

Plan Recorded including for all contractor’s no objection assessment done sub contractor’s not received

and maintained from Employer

/Engineer

2.14 Fire

Evacuation

Plan

Records

of briefing

maintaine

d and or

Fire drills

carried

out.

Reviewed prior

to all phase

changes. Plan

displayed in

critical areas,

at all fire

points.

Workforce

aware and

briefed.

Plan

established and

displayed at

exit points and

at fire points.

Included within

induction.

Reviewed with

health and

Safety Plan.

Basic plan, not

displayed.

Not included in

induction.

Not established

2.15 Fire Risk Reviewed prior

Reviewed prior Risk Poor content, Not carried out

Assessment to start of all hot

to all phase assessment not

work or tasks

changes. completed communicated

Page 331: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-261 Sign & Stamp of Tenderer

using flammable materials. Records kept

Records of Briefing maintained

and available. Task risk

assessments

consider fire

risk.

Operatives briefed

to operatives.

2.16 PPE

Risk

Assessment

Specified

,

enforced,

monitore

d and

recorded

(random

daily

checks).

Operatives

briefed on

correct use

and

maintenance

requirements.

Use monitored

by supervisor.

PPE identified

in risk

assessment

including

relevant

standard.

Being used as

per RA/MS

In test.

PPE not

specified in risk

assessment.

No risk

assessment.

2.17 All reviews Reviewed more Reviewed Not reviewed

Lift Plan and briefed to staff

frequently than monthly and regularly or No lift Plan and

Risk on site and procedures up to date. All only going Risk Assessment Assessment recorded

(i.e. dictate, i.e. prior sections through the

tool box talk).

to phase reviewed. motions (i.e. no

Plan updates

changes or Evidence of record of

available on site

weekly. changes appropriate

made. changes)

Employer Employer /Engineer /Engineer not Notified notified

Notice of no objection not

received 2.18 All reviews Reviewed more Reviewed Not reviewed

Transportation briefed to staff

frequently than monthly and regularly or No

Plan and Risk on site and procedures up to date. All only going Transportation Assessment recorded

(i.e. dictate, i.e. prior sections through the Plan and Risk

tool box talk).

to phase reviewed. motions (i.e. no Assessment

Plan updates

changes or Evidence of record of

available on site

weekly. changes appropriate

made. changes)

Employer Employer /Engineer /Engineer not Notified notified

Notice of no objection not

Page 332: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-262 Sign & Stamp of Tenderer

received

2.19Safety

inspection Daily, weekly

Up to date, Up to date Record of Not up to date, or

Reports and monthly shows remedial with good contractor’s site inspections inspections action taken. clear Manager and missed. records information. supervisory maintained. Well Weekly Including documented inspection Subcontractors

and dates of including

complete remedial subcontractor’s inspection action activity carried reports. required, as/

when and

submitted to

Project

Manager

out

2.20 Designer’s

Role in safety

Detailed

suppleme

ntary

informatio

n about

SHE risk

of the

design

given by

designer

Participation

of designer in

monthly

Safety

committee

meeting

Hierarchy of

risk control is

indicated by

the designer

designers not

provided OSHE

risk at the

drawing itself.

designers were

not

communicated

about their role

as per Conditions

of Contract on

OSHE

2.21 ID card

and First Day

at work

OSHE

hand

book

issued to

all

personnel

All worker

undergone

orientation

training

Authority

signed all ID

cards

No ID card as

per standard

No ID card issued

to all persons

2.22 CCTV

A backup

system

shall be

maintained

to protect

against

server or

storage

failure.

The storage

system should

allow retrieval

of data

instantaneousl

y

All camera

recordings shall

have camera id

and

location/area

of recording

No facility

viewing of live

and recorded

images

The Contractor

not implement a

surveillance

CCTV system

Page 333: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-263 Sign & Stamp of Tenderer

Emergency Fire plan shall Drills carried No drills Copies of the

2.23 Mock drills be prepared out at least emergency drills conducted

with approved by every month procedures and

the the Engineer the Contractor's

involvement of

Re Mock drills rescue

State Govt should be organisation

rescue team held on a (Not reviewed

where regular basis by the

necessary to ensure the Engineer)

effectiveness

of the

arrangements. The Employer

The Employer The Not The Contractor

2.24 /Engineer /Engineer Employer conducted not included Evaluation,

selection and

control of

Subcontractor

participated

in pre-job

meeting

reviewing

the

participated in

selection

process

/Engineer may

participate in

pre-tender

pre-job

meetings to

address job

H&S

legislative and site

specific H&S

requirements in

H&S meetings expectation tender

performances,

before packages for

etc. awarding their sub- them. contractor

selection

3. Explosive Handling and Blasting

ACTIVITY EXCELLENT

[An

Exceptional

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE Procedures]

FAIL

[In Need

of

Improve

ment]

0 Points

NON

CONFORMAN

CE

[Unsatisfactory]

-10 Points

6 Points

Page 334: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-264 Sign & Stamp of Tenderer

3.1

Transport

and

handling

All means

of entry

guarded

against

entry

blasting

area

Follow up

briefings,

recorded to

show

updates

and

change

reviews.

Employer

/Enginee

r

Notified

of

change.

Reviewed

more

frequently

than

procedures

dictate, i.e.

prior to

phase

changes or

weekly.

Record of all

briefings

maintained.

Signed

proof of

attendance

maintained

Explosives,

blasting

agents or

detonators

transported

in securely

covered

cases or

container

that provide

safety.

Reviewed

monthly and

up to date.

All sections

reviewed.

Evidence of

changes

made.

Employer

/Engineer

Notified

Task

Briefings

carried for

all Risk

Assessmen

ts and

Method

Statements

.

There is

plan

showing

the type of

explosive

to use at

the

charging

area

Not reviewed

regularly or

only going

through the

motions (i.e.

no record of

appropriate

changes)

Employer

/Engineer

not notified

Notice of

no

objection

not

received

Only the

occasional

RA/MA

briefing

carried out.

Task

briefing not

conducted

Notice of

no

objection

not received

No audible

signal

sounded

before firing

activity

No shot

fires

certificate

recognised

by

governmen

t

department

No

blasting

Managem

ent Plan

Provision as

determined in

the RA/MS

not available

on site

No supervision

Not following

the RA/MS

safe system

of work

methodology

Separate

containers

provided

for

transportin

g

explosives

,

detonators

or

blasting , fuses

No proper

warning

signs on the

vehicle

transporting

the

explosives

No blast board

showing firing

times

displayed in a

prominent

location

Page 335: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-265 Sign & Stamp of Tenderer

3.2 Magazine Danger

explosives ,

no smoking

, no naked

flames

signs in

place

Magazine

doors

securely

locked

Earth

strips

fitted to

each

magazine

Initiators

and

explosives

stored

separately

SOP for the

disposal of

old or

damaged

explosives

No records

of explosive

in and out

available

The

magazine

compound

free from

rubbish

No fire

extinguishe

r in place

No appointed

person in

charge of the

Magazine

No competent person for handling of explosives

4. Welfare

ACTIVITY EXCELLENT

[An

Exceptio

nal

Standard

]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE Procedures]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMAN

CE

[Unsatisfactory]

-10 Points

4.1 Canteen Exceptional

standards

(i.e. using

existing

facilities)

with

additional

facilities

available

(i.e. drinks

dispensers

cooked

food etc)

Cleaned

daily or

more

frequently

as

necessary.

Clean and

tidy with

lighting,

adequate

benches/

tables,

facility for

heating

food,

supply

cups/

drinking

water.

Untidy/grub

by or

cleaned by

site

labourer

infrequentl

y.

Overfull

waste bins.

None or

dirty

inadequate

facilities.

Materials

stored in

canteen/eating

area. No

facility for

heating food.

Waste food left

lying

No clean canteen

, floor is dust

,No loss and

no gain policy

not displayed

Page 336: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-266 Sign & Stamp of Tenderer

No adequate

rest room to all

workers

No

illuminated

and

ventilated

No free

from

Mosquito

and

biological

agent

No fan and

seating

arrangemen

ts provided

for workmen

adequately

4.2 Toilets

/Urinals

Exceptional

standards

(i.e. using

existing

facilities)

with

additional

facilities

such as

showers,

where a

risk

assessment

of site

activities

warrants

their provisions.

Exception

ally clean

and towels

provided.

Soap,

barrier

cream etc

provided.

Clean and

tidy with

running

water,

soap,

flushable

toilets,

towels and

facilities for

ladies

where in

attendance.

Untidy/grubb

y. Small

wash hand

basins (not

able to fit

forearms

inside)

None or dirty,

inadequate

facilities i.e.

too many

person per

available

water closets.

No

washbasins.

No access to

toilet within

300m from

worksite

Toilet not cleaned properly and records not maintained No drainage system No enough no’s of toilets

available

Page 337: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-267 Sign & Stamp of Tenderer

4.3 Drinking Easy Six meters of Drinking Insufficient No Drinking Water accessible away from marked in

local arrangement Water

location to washing place ,

language and are made Quality of

worker .Tank urinal or latrine

water drinking is not

cleaned and calibrated and

good and not

well maintained

displayed tested as per

IS 10500 No laboratory test records Not 6m away from toilets and urinals No access within 200m from

worksite

4.4

Designated

site Eating

area

Exceptional

standards

(i.e. using

existing

facilities)

with

additional

facilities

available

(i.e. drinks

dispensers

cooked

food etc)

Cleaned

daily or

more

frequently

as

necessary.

Clean and

tidy with

lighting,

adequate

benches/

tables,

facility for

heating

food,

supply

cups/

drinking

water.

Untidy/grub

by or

cleaned by

site labourer

infrequently.

Overfull

waste bins.

None or

dirty

inadequate

facilities.

Materials

stored in eating

area. No facility

for heating

food.

Waste food left

lying

No clean, floor

is dust, No loss

and no gain

policy not

displayed

No adequate

rest room to all

workers

No

illuminated

and

ventilated

Page 338: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-268 Sign & Stamp of Tenderer

No free

from

Mosquito

and

biological

agent

No fan and

seating

arrangemen

ts provided

for workmen

adequately

Neat , clean Adequate for properly Not free from No Cooking,

and hygiene all illuminated and

mosquito and bathing, washing

4.5 ventilated biological agent

and lavatory

Labour facilities and Accommodation

Labour Colony

Layout not approved by the

ER

5. House Keeping

ACTIVITY EXCELLENT

[An

Exceptio

nal

Standard

]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line

with

OSHE Procedur

es]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMA

NCE

[Unsatisfactory]

-10 Points

5.1 5S

House

Keeping

Outside the

site

perimeter

and inside

site

standard of

housekeepi

ng

excellent.

Good

standard of

housekeepin

g is evident

on all parts

of the site

(internal and

external)

First

impression

on arrival to

site of good

housekeepin

g/ storage.

No

wrapping/ba

gs left lying.

The method

not based

on a

Japanese

quality

manageme

nt concept

based on

cyclical

methodology

The

Contractor not

implement a

5S

housekeeping

method

approved by

the Employer

/Engineer

Page 339: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-269 Sign & Stamp of Tenderer

5.2

Housekeepi

ng Squad

Records of

daily

inspection/

monitoring

from site

designated

persons

are

available

and

actioned.

No waste

materials left

in work area

at the end of

the day.

Regular

inspections.

Periodicity

of

housekeepi

ng

All waste

debris is

removed

from work

areas and

left clean and

tidy.

Job allocation and time allocation

Waste/debri

s moved to

areas/store

d in one

area for

removal,

however it

remains a

hazard. No

Member list

No attempt of

housekeeping

control. Loose

materials

causing trip

and fire

hazards in

areas.

No

Housekeeping

plan

5.3

De-nailing

Surplus

timbers

skipped or

transferred

for use

elsewhere.

De-nailed

timbers

stacked

tidily. All

nails cleared

away to

skips.

Timbers to

be nailed

segregated

.

Timber

waiting de-

nailing not

segregated.

Evidence

of poorly

maintain

ed

pallets, etc

Timbers left

with

protruding

nails in open

areas and on

access routes.

5.4

Storage Daily

monitorin

g

recorded

. Very

good

standard

of

storage

is

evident.

Regular

inspection.

Good clear

access.

Stable

accessible

lay- down

areas.

Materials

returned to

storage

areas,

dedicated

lay- down

area,

applicable

signage

displayed.

Poorly

stacked

materials

and stored

in wrong

position.

Safe

movement of

operatives

not possible.

Material

storage is

uncontrolled

& untidy,

unstable.

Material

storage

blocking site

access. Materials stored

in public area.

6. Fire Precautions

ACTIVITY EXCELLENT

[An

Exception

al

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line

with

OSHE Procedur

es]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMA

NCE

[Unsatisfactory]

-10 Points

Page 340: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-270 Sign & Stamp of Tenderer

6.1

Site Offices

Daily

checks

recorded.

Names of

Fire

Wardens

identified at

each fire

point. Fire

plan at each

fire point.

Fire plan

displayed in

site

offices/cantee

ns. Fire point

boxes in

place.

Appropriates

No’s of

extinguisher

s at marked

fire points.

Regular fire

checks

carried out.

Fire point

not clearly

identified.

Fire

extinguisher

s missing or

out of date.

Fire Warden

checks

incomplete.

No

extinguishers

in place No

Fire Warden

checks

carried out.

6.2

Work Place

Extinguish

ers

Daily

checks

recorded.

Names of

Fire

Wardens

identified at

each fire

point.

Records of fire mock drill at site

Fire Plan

displayed at

exits and at

fire points.

Fire alarms

adequate

and free

from obstruction

Minimum of

2

extinguishe

rs stored in

red box at

marked fire

points.

Regular fire

checks

carried out.

Fire points

not clearly

identified.

Fire

extinguisher

s missing or

out of date.

Fire Warden

checks

incomplete.

No

extinguishers

in place No

Fire Warden

checks

carried out.

No proper

maintenance

as per IS

standards

Records of

fires

incidents

reported

investigated

and

corrective

actions

taken

Insufficient

records of

recharge

/refill

frequency

inspection

and

maintenanc

e schedule

of fire

extinguisher

No fire points

located in all

locations of

work, fire plan

available and

displayed at

site.

No records

of

awareness

training on

fire

fighting

Page 341: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-271 Sign & Stamp of Tenderer

6.3

Hot

Work

Permits

Subcontract

ors provide

records of

monitoring

Hot Work

Permits

issued daily.

Warden

records

inspections

daily.

Records of

monitoring

Hot Work

Permits

maintained

by Site

Manager.

Permits

issued for all

activities

including

Sub-

contractors.

All Hot Work

Permits

signed off

and with end

of shift

inspections.

Fire

extinguishe

rs are in

place and

housekeepi

ng

is good.

Hot Work

Permits

issued with

incomplete

sections. No

monitoring

of

compliance

of Hot Work

Permit

carried out.

No Hot Work

Permit issued

for hot work

activities.

Housekeepi

ng poor

where hot

works are

ongoing.

6.4 Conditions on Site

Excellent

housekeepi

ng.

Records of daily

Regular

inspection

and

monitoring of site

Housekeepi

ng is good

with

effective control

Housekeepi

ng could be

improved.

Housekeepin

g is poor and

presents a fire

monitoring

available.

Proof of

monitoring is

provided by

the

subcontractor.

conditions. of

combustible

s, paint,

solvents,

etc.

hazard. Poor

compliance

from

subcontractor

s.

Page 342: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-272 Sign & Stamp of Tenderer

6.5 Storage

of

Flammable

s

Proof of

daily

monitoring,

records of

monitoring

by

subcontrac

tor

Operator

provided

with cutting

goggle ,

body apron

and other

appropriate

PPE’s

Records of

monitoring by

Fire Warden.

All material

returned to

store at the

end of the

day or after

use.

Empty and

full cylinder

stored

separately

stored in

secured

upright

position and

fastened

with chain

Gas

cylinder

stored in a

well

ventilated

location

Adequate

facility

available for

storage of

cylinder with

adequate

safety

measures

and

availability of

MSDS

Adequate

storage

facilities,

materials

controlled.

Adequate

signage.

Extinguisher

s near to

point of use.

Good

ventilation

Record of

hose lead

test

Hose clip

and clamp

provided

Calibrated

double

pressure

gauges

fitted and

operable

Flash back

arresters

fitted on

cylinder

valve

SOP is

available for

loading and

unloading of

filled and

empty

cylinder at site

Storage

facilities

uncontrolled

of left open.

Poor

signage. No

extinguisher

s near point

of use.

No ventilation.

No record

of specific

permit to

work

Availability of

Fire

extinguisher

and fire

watcher

Containers /

cylinders

and drums

(full and

empty) lying

around site.

Excessive

quantities on

site. No

suitable

storage

facilities. No

job based

training

No Non

return valves

fitted on gas

cutting torch

No records of

checking

cylinder expiry

date and

cylinders

discarded if

found not valid

No availability

of Wheel

barrow for

transportation

of cylinders

from store to

work site

Page 343: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-273 Sign & Stamp of Tenderer

6.6

Requirements

Daily

recorded

inspection.

Fire drills

carried out at

planned

intervals and

recorded.

Review of

drills

recorded. Reporting of fire accident to Employer

Regular

inspection

carried out

with

evidence of

inspection.

Nearest fire

brigade

phone

numbers

displayed

Maintained

clear and

well

signed.

Included

in

induction

.

Mock

drill

complet

ed

No Fire

excavation

plan

Major

obstructions.

No signage,

No

emergency

lighting.

No

Emergency

plan

6.7 Fire

Fightin

g

Person

al

Adequate no

of trained

persons

Intimation

of vacancy

to ER

ER

approved

the

firefighting

personal

Non

Professiona

lly qualified

No Firefighting

personnel available at site

6.8 Diesel

/Petrol Storage

All Diesel

fuel storage

tanks

bunded

Transporte

d vertically

chained on

a trolley

They

stored on

end with

the lid/cap

uppermost

Drums of

diesel

shall rolled

along the

ground.

Diesel drums

on site not in

good

condition.

Plastic

barrel used

for the

transport of

Diesel/petro

l

Stored more

than legal

requirements

6.9 Relevant Daily recorded

Regular Fully and Some None displayed.

statutory signs

inspection. inspections clearly displayed.

carried out. displayed. Reviewed with Included in

the Fire Plan. induction.

Page 344: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-274 Sign & Stamp of Tenderer

7. PPE

ACTIVITY EXCELLENT

[An

Exception

al

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE Procedure

s]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMA

NCE

[Unsatisfactory]

-10 Points

7.1

Helmets

Induction

records

confirm that

a

satisfactory

helmet or

other

headwear is

brought to

site.

Records

maintained

for site issue

Spares

available

for short

term

visitors.

Risk

assessme

nt

available

to support

other

headwear.

All persons

are wearing

safety

helmets (or

other form

of approved

headwear if

applicable)

An

occasional

operative is

not wearing

a safety

helmet.

Helmet not to

IS or BS

standard

Inadequate

supply of

safety

helmet for

use of staff ,

workers and

authorised

visitor’s to

the

site

Numerous

operatives,

subcontractor

s and

management

are not

wearing safety

helmets. No

safety Helmet

Colour with

logo as per

CMRL ESHS

Requirements.

An occasional 7.2 Induction All visitors

wear All persons are

operative Numerous

Footwear records confirm

safety footwear

wearing including operatives,

that satisfactory

unless risk satisfactory subcontractors

subcontractors &

safety footwear

assessment safety footwear.

is not wearing management are

is brought to identifies safe safety footwear.

not wearing

site. to do so. Inadequate safety footwear.

supply of safety shoe for use of

staff , workers

Page 345: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-275 Sign & Stamp of Tenderer

and

authorised

visitor’s to

the

site

7.3

Hi Viz

Induction

records

confirm that

satisfactory

Hi-viz

clothing is

brought to

site. Records

maintained

for site

visitors.

Spares

available for

short term

visitors.

Issued on

site when

not provided

or found to

be unsuitable.

All persons

are wearing

Hi-vis

clothing to

BS EN

Standard.

An

occasional

operative is

not wearing

Hi-viz

clothing.

Numerous

operatives,

subcontractor

s and

management

are not

wearing Hi-viz

clothing.

7.4

Eye Protection

Available

for issue

Good condition

Suitable type Not as

per

standar

d

Not enforced

to use

7.5 Hearing Protection

Available

for issue

Good condition

Suitable type Not as

per

standar

d

Not enforced

to use

7.6 Respiratory Protection

Available

for issue

Good condition

Suitable type Not as

per

standar

d

Not enforced

to use

7.7 Protective Gloves

Available

for issue

Good condition

Correct type

for operation

Not as

per

standar

d

Not enforced

to use

7.8

Fall protection

Available for

issue

Warning signs

displayed

Good condition

Not as per

standard

Not enforced to

use 7.9

PPE for Visitors

Available

for issue

Colour and

company

logo

In good

conditi

on

10% PPEs

for visitors

not available

in site office

Not enforced

to use

Page 346: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-276 Sign & Stamp of Tenderer

7.10

Safety Belt External

Agency

training

conducted

and records

maintained

Spares

availab

le

All persons

are wearing

Full body

safety

harness

with double

lanyard to

BS /IS/EN

Standard.

An

occasional

workers

working at

height is not

wearing Full

body safety

harness

with double

lanyard

Work at

height PPE

not inspected

or tested e.g

as per IS

standards

No fall arrest

equipment

(Safety

harness fall

arrestor

)Checked by

competent person

8. COSHH (Control of Substance Hazardous to Health)

ACTIVITY EXCELLENT

[An

Exceptional

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line

with

OSHE Procedur

es]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMA

NCE

[Unsatisfactory]

-10 Points

8.1

File

maintena

nce

Assessm

ent

Briefings

Manufacturer

s hazard data

(MSDS) from

supplier

included in

the

assessment.

Proof that

operatives

fully

understand

briefing

content (i.e.

signed

assessment

for

questionnaire)

Good clear

filing system

available &

corresponds

to Hazard &

Risk

Register.

Name of

competent

Co-ordinator

displayed or

in named in

induction.

Records

obtained from

subcontractor

of

assessment

briefings.

All

substances

identified in

the Hazard

Log & Risk

register. File

maintained

Suitable

assessment

carried out.

Competent

person

designated

as

coordinator

.

Good clear

records

available of

briefings

Poorly

maintained

file.

Incomplete

or difficult to

identify

substances,

etc.

Occasional

assessment

carried out.

Poorly kept

or

incomplete

records of

briefings,

unable to

read

names, etc.

Not included

with Hazard

Log & Risk

Register.

File has not

been

developed

adequately.

No

assessments

carried out.

No

assessment

briefings

carried out.

Page 347: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-277 Sign & Stamp of Tenderer

carried out to

operatives.

Persons briefed

identified.

9. Plant (X 2)

ACTIVITY EXCELLENT

[An

Exception

al

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line

with

OSHE Procedur

es]

6 Points

FAIL

[In Need of

Improvemen

t] 0 Points

NON

CONFORMA

NCE

[Unsatisfactory]

-10 Points

9.1

Planning Every item

of plant is

subject to

planned

maintenanc

e and

inspection.

All such test

&

inspections

are

recorded.

Plans

available for

siting of

plant

including

ground

conditions

i.e.

undergroun

d services,

etc.

Daily user

inspection

Sheet

signed by

competent person.

Suitable

equipment

for the task

as per

RA/MS.

Compet

ent

operato

r

Plant

certificate

displayed.

Weekly

Inspection

Sheet

signed by

competent person.

No records

of

equipment

issued to

operatives.

No checks

on condition

of

equipment.

No

maintenanc

e records

Poorly

maintained

equipment on

site.

Poor

condition of

equipment &

plant.

9.2 Lifting

Appliances

and Lifting

Gear

Register

Chart

showing test

expiry or

other

scheme for

displaying

status of

items.

Daily monitoring/ pre use records.

Up to date

and

schedule of

competent

authorised

users

displayed.

Up to

date. All

plant

weekly

checklists

fully

completed

within

inspection

schedule.

Incomplete

records or

some items

expired/ out

of date.

No records,

or difficult

to find

paperwork.

Page 348: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-278 Sign & Stamp of Tenderer

9.3 Plant

and

machinery

inspection

Maintenanc

e and/or

hire status

records on

site,

equipment

all risk

assessed.

Up to date,

shows

remedial

action

taken, some

equipment

specific risk

assessments.

Fully

complete

including

subcontract

or

equipment.

Use

considered

in task risk

assessments.

Not fully

complete

(i.e.

subcontract

or records

missing.

None existing,

no risk

assessments.

No pre

inspection

records of

plant and

machinery

9.4Vehic

le

Control

Vehicle

drivers

having valid

and current

licence and

all legal

documents

available at

site wheels

washed bay

in operational

and

maintained

Vehicle with

reverse horn

under

control of

banksman

Vehicles

leaving site

carrying

load

covered at

site with

securely

sheet

before

leaving the

site

All drivers over

21.

Complete

records

available

of trained

operators.

Compete

nce

checks

done

e.g. by

assessment

Few of

medical

fitness done

for operators

Vehicles are

overloaded

Insufficient

fire

extinguisher

and First aid

box

Few

construction

equipment

operations

operators

and

banksman

are trained

Vehicle

drivers not

having valid

and current

licence and

No legal

documents

No wheels

washed bay

No

construction

equipment

operations

operators

and

banksman

are trained

Page 349: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-279 Sign & Stamp of Tenderer

9.5Piling

and

Grab

operatio

ns

Every item

of plant is

subject to

planned

maintenanc

e and

inspection.

All such test

&

inspections

are

recorded.

Plans

available

for siting of

plant

including

ground

conditions

i.e.

undergroun

d services,

etc.

Daily user

inspection

Sheet

signed by

competent person

Suitable

equipment

for the task

as per

RA/MS.

Compet

ent

operato

r

Plant

certificate

displayed.

Weekly

Inspection

Sheet

signed by

competent person.

No emergency

procedure for

collapse of

piles No

Employer

/Engineer

approval for

the bentonite

slurry and its

subsequent

disposal

No banks man

Operators

using plant

without 3RD

party test and

thorough

examination

certificate or

certificate

expired.

Poorly

maintained

equipment on

site.

Excavated

piles etc left

unattended

Poor

condition of

equipment &

plant.

No records

of

equipment

issued to

operatives.

Piling rigs not

tested as per

ER CMRL

ESHS

Requirements.

No checks

on condition

of

equipment.

Piling rig used for lifting other than piling operation

No

maintenanc

e records

Specific

method

statement for

piling and No

No not

received from

Employer

/Engineer

Page 350: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-280 Sign & Stamp of Tenderer

9.6

Compete

nt

Personn

el

Records

show the

operators

certification

and date of

expiry.

Records

collated

into easy

read

sections

i.e.

dumper

operators

, MEWP

operators,

crane

operators,

etc.

All drivers over

21.

Complete

records

available

of trained

operators.

Compete

nce

checks

done

e.g. by

assessm

ent

Incompatible

cross-

referencing of

operator

certification

with on site

records.

No

records

available.

Few of lifting

operations

operators and

lifting

Supervisor ,

slinger ,

riggers

are trained

Operators

driving plant

without third

training

certificate.

Drivers not

aware of

hazards.

Associated

with

equipment.

No lifting

Supervisor ,

No slinger ,

No riggers

are trained

9.7

On Site

Traffic

Manageme

nt

Banks man

in

attendance

at all times

with

working

plant.

Banksman

controls

pedestrian

movements

Barriers

erected

Specific

access for

pedestrians

marked.

Continual

monitorin

g in

place

Working

equipment

is

segregated

with crush

zone

identified.

All

movements

under

control of

Banksman

No

segregation of

working plant

Free access

to crush zone.

Vehicles

reversing

with no

Banksman

No banks

man in

attendance

during plant

movements

or operations,

9.8

Guarding

Arrangeme

nts

Inspection

records of

each

particular

piece of

plant or

equipment

are available

in site

records.

Operatives

report faults

and

damage to

site

manageme

nt who take

action.

Written

eviden

ce

require

d

All guards

are in place

as per the

manufactur

er’s

information

i.e. no in

running

nips,

guards in

place on

bench

saws,

piling, soil

investigatio

n

Guards

loosely fitted

or makeshift

guards with

incorrect

fittings.

Working /

Risk areas

not barriered

off around

machinery.

Guards

missing from

machinery,

visible signs

of tampering

of guards,

untrained

operatives.

Plant poorly

maintained.

Page 351: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-281 Sign & Stamp of Tenderer

machinery etc.

9.9

Vehicle Management Daily pre-use Vehicle Registers not Vehicle registers

Checks monitor checks registers completed not maintained. checklists/ act completed by completed weekly (hit and

on reports. operators. weekly. miss)

9.10

Operators

using plant

without 3RD

party test and

thorough

examination

certificate or

certificate

expired.

Cranes not

tested as per

CMRL ESHS

Requirements.

Crane age

more than the

required IS

standards

and No

special

assessment

test

conducted

No ASLI,No

Load radius

indicator, No

motion limit

devices, No

over load cut-

off device ,No

level Indicator

, Cut off

device , No

anemometer ,

No machine

Lifting

Operatio

n (Lifting

Applianc

es and

Lifting

Equipme

nt)

Date of

certification

expiry

displayed on

chart within

site office.

File

available

with

sections

i.e.

dumpers,

MEWP,

cranes, etc.

All sections

of plant

checklists

completed

and faults

rectified.

Test and

thorough

examination

certificates

are

available on

site All

relevant

plant

checklists

fully

completed

3 monthly

test

certificates

not available

for cranes to

BS7121.

Only load

test

undertaken

for cranes.

No

instruction

Manual

No

calibration

certificate

for

monitoring

equipment

as per the

manufacture

Page 352: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-282 Sign & Stamp of Tenderer

No checks of

lifting

equipment on

site by Crane

Co-ordinator.

Faults

recorded but

not actioned

within a

reasonable

time

guarding

, No safe working

load charts .

9.11 Team briefings

List of Inspections No Plant operators

Safe Use carried out with

authorised show that plant

communication driving too fast.

management drivers and is being used between teams Seat belts not and operators operators

kept safely. Rules doing different used by

operator. as a proactive up to date. are being work within No stop blocks role rather than

Record of observed by same area. near excavations.

reactive. equipment operators. Reckless

Record of

briefings,

meetings,

etc.

issued to

and used

by

authorised

persons.

Daily

checks not

showing

faults.

Banksman not

present.

operation,

i.e. digging

in close

proximity to

workers.

9.12

Lifting Gear

Date of

expiry

displayed of

lifting

equipment

examination

on chart.

Records

of

inspectio

ns

available

File with

sections

related to

lifting gear.

Storage

facilities

available

for

equipme

nt

Weekly

inspectio

ns completed

All lifting

gear

thoroughly

examined

every six

months

(certificate).

All

equipment

stamped

with ID

Number and

or colour

coded

Daily user check

No checks of

lifting gear on

site by lifting

supervisor

and plant in

charge.

Faults

recorded but

not actioned

within a

reasonable

time

No lifting gear

thoroughly

examined

every six

months

(certificate).

Badly worn

slings on site.

Badly

stretched

chains on site,

etc.

Wrong lifting

gear used for

lifting.

Page 353: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-283 Sign & Stamp of Tenderer

9.13

Suitability

and

Specific

PPE

Assessed

regularly,

monitored,

topic for

tools box talks.

Suitably

document

ed,

specified

in

assessme

nt.

Specified in

risk

assessmen

t and

utilised on

site.

Some

specified,

suitability not

assessed for

environment.

None

specified

applicable

standard

missing.

Reliance on

PPE rather

than

permanent

protection e.g.

edge protection

9.14 Permits Subcontract

ors provide

records of

monitoring

Lifting

Permit

issued daily.

Lifting

supervisor,

plant

Manager

records

inspections

daily.

Records of

monitoring

Lifting

Permit

maintained

by plant

Manager.

Permits

issued for

all activities

including

Sub-

contractors.

All Lifting

Permit

Permits

signed off

and with

end of shift

inspections.

Lifting Permit

Permits

issued with

incomplete

sections. No

monitoring of

compliance of

Lifting Permit

carried out.

Lifting

Permit

issued for

all lifting

work

activities.

9.15

Batching

Plant and

Casting

Yard

Daily

inspection

s /

recorded

No

unauthoriz

ed riding

on plant

All

operators

medically

fit/over

18

No

Drainage

system

No

Welfare

amenities

No Plan of layout

No Barrication

No Plan for

vehicle

moving area

9.16

Safety Devices

maintained in

accordance

with

manufacturer

’s

instructions

Audible

warning

devices

fitted

Over load

Limit switch

installed

Fitnes

s

certific

ate

Manufact

urer

details

No Load

chart of the

vehicle

No Calibration

for ASLI and Anemometer

No

Automatic

safe load

indicator

No Anemometer

Page 354: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-284 Sign & Stamp of Tenderer

Reverse horn

Outrigger

Marking of

safe

working

load

Automatic

safe load

indicator

No Proxy

sensor for the

Gantry

extension alarm

Overload alarm

Over

hoist

alarm

provided or

not in

working

condition

No digital

load

indicator

9.17

Welding

Machine

Operator

provided

with face

shield, body

apron and

other

appropriate

PPE’’s

Separate

main power

switch ,

ground

connection

and

protection

shed for

weather

Electrode

holder

properly

insulted

and facility

provided

for storage

of welding

electrode

buds

Presence

of

voltmeter

and

ammeter

on the

machine

and

functional

No checks of

welding leads

& return cable

free from

defect

No record of

specific

permit to

work

Availability of

Fire

extinguisher

and fire

watcher

Welding

machine not in

good order No

job based

operator

training

No Double

earthing to

welding

machine

No separate

earth

connection

from work

piece to

transformer

and supply to

welding

machine

From rated

RCCB/ELCB Corrective Audit Report Conducted

at Not Plant Not Performed

9.18 Monthly actions taken will be sent to least 7 days Manager once in a month

Plant and ER prior to Monthly

accompanied

Equipment OSHE this audit Safety Audit Committee

meeting

Page 355: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-285 Sign & Stamp of Tenderer

10 Excavations (X2)

ACTIVITY EXCELLENT

[An

Exception

all

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line

with

OSHE Procedure

s]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMA

NCE

[Unsatisfactory]

-10 Points

10.1 Planning Training/briefi

ng of safe

system of

work carried

out before

works

commence.

Records

maintained

of such

briefings

Inspection

requirements

specified with

necessary

supervision

appointed to

ensure

compliance

with safe

system of

work, e.g.

inspection

required

every shift. (2

per day)

All necessary

equipment on

site before

works

commence.

RA/MS in

place &

reviewed.

Team

briefings

carried out

& recorded.

Works ready

to start and

not all

equipment is

on site/in

place.

Poor

access into

the

excavation.

Using

makeshift

ladders or

no ladder.

No permit

to dig in

place

where

new

excavatio

n planned

Works are

ready to

commence

however the

RA/MS is not

on site and

not been

reviewed by

ER.

Surveys

not

carried

out

10.2Excavation

s

Daily monitoring

Up to date and

Up to date and Up to date and

Not up to date, or

Register records

per shift.

records in

place to

demonstrate

preventative

actions.

record of

defects and

corrective

actions

maintained.

signed but

with

outstanding

actions.

shift

inspections

missed.

10.3

Provision

of Service

Locators

Information

from service

providers

available to

identify line

of

service.

Plans

developed

to ensure

comprehens

ive

coverage of

area.

Correct

cable (and

certificate)

avoidance

tool on site.

Operators

trained in its use.

Cable

avoidance

tool

available,

no

calibration

certificate

No cable

avoidance

tool on site.

Untrained

operators

using

equipment.

Page 356: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-286 Sign & Stamp of Tenderer

on file.

10.4

Undergrou

nd Service

identificati

on

Task

training

carried out

before

works

commence

(proactive)

and

recorded.

Operative

s briefed.

All

experienc

ed

operative’

s

supervisio

n.

Existing

Plans

available on

site. Permit to

work in use.

Safe system of work followed

Permit to

work not in

place.

Supervisors

/ Operatives

not

complying

with safe

system of

work MS/RA

Safe system

of work

RA/MS not

available or

not

completed.

Not

submitted to

ER for notice

of no

objection

10.5

Edge

Protecti

on

Regularly

monitored

and

recorded.

Sketch

included in

method

statement.

Physical

barrier in

place/ used

and suitable.

Inadequate

edge

protection

e.g. only

soft when

fixed is

required

No

barriers in

place.

10.6

Shoring

Regularly

monitored

and

recorded.

Maintenan

ce/

inspection

records

available.

Sketch

included in

Method

Statement.

Operatives

briefed in

safe system

of work.

In place as

per approved

Risk

Assessment

s or Method

Statements

including

good access.

Incorrect

support

equipment

on site to

carry out

the tasks or

equipment

not on site.

Works not

carried out in

accordance

with the

approved

safe system.

No safe angle of

incline sufficient to prevent collapse

10.7

Compete

nt

Workfac

e

Regularly

monitored

and

recorded.

Re- briefing

of changes.

Operatives

briefed in

system of

work.

Records of

briefing and

training

available.

Trained

operatives

Works

carried out in

accordance

with

the MS/RA

Operatives

not familiar

with the

approved

MS/RA.

Works not

carried out in

according

with the

approved safe

system.

10.8

Temporar

y Work

Assessm

ent

Safe

Working

Procedures

established

and

communicat

Temp works

coordinator

designated

Design

Assessment

in place.

RA/MS

incorporates

recommendat

Design

assessme

nt findings

not

incorporat

ed into

No

Temporary

work

procedure

No

Page 357: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-287 Sign & Stamp of Tenderer

ed to

supervising

staff.

Records

available

ion s of

design

assessment

RA/MS design

assessm

ent

10.9

Safe

Working

Procedure

Recorded

inspections

as per

schedule.

RA/MS

reviewed as

work

progresses,

records

maintained.

RA/MS in

place and

followed.

Verbal

procedur

e only.

Unsafe acts & conditions on site.

No RA/MS

10.10

Excavation Records Permits contents

Permit in place

Permit in place

None in place,

Work Permit maintained,

regular

monitoring

and

recorded

inspection

of

permits

communicat

ed to

operative,

sign off

procedure

in place.

issued for

relevant

operatives,

fully

completed.

not fully

completed

and signed

off.

No specific

permit to

work

unsafe

acts/conditi

ons.

10.11

Monthly

Excavatio

n Safety

Audit

Corrective

actions

taken

Audit Report

will be sent

to ER

Conducted

at least 7

days prior to

Monthly

OSHE

Committ

ee

meeting

Not Station

Manager

accompanie

d this audit

Not

Performed

once in a

month

Page 358: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-288 Sign & Stamp of Tenderer

11. Electrics(*x2)

ACTIVITY EXCELLENT

[An

Exceptional

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE Procedures]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMAN

CE

[Unsatisfactory]

-10 Points

11.1

Power

Assessm

ent

Site Electrical

single line

layout

drawing

available.

All faults

detected &

actions

taken

Name and

contact person

posted on

main

distribution

board

Maintenance

schedule

available and

followed to

monitor

condition of

electrical

distribution

on site.

Designed,

installed

commissioned,

tested,

maintained by

competent

person.

Poor

condition,

frayed. No

record of

inspections.

Loose

cables on

the ground.

No ER

approval for

execution of

the job

Distribution

not to

standard IP65

IEEE 17TH

Edition.

No

double

earthing

No

inspection

Tag

No earth

measureme

nt register

No Load

calculation

for power

requirement

Warning signs Proper earth ELCB or RCCB/ All cables enter

No IP 65

11.2 in appropriate connection and GFCI fitted box without Condition of position earth pit glands site distribution

panel

11.3

Overhe

ad

Lines

Identifie

d

Monitor

compliance

daily.

Maintenance schedule to monitor defects

All works

carried out

to Code of

Practice.

RA/MS

completed

agreed by local

electricity

authority.

Signs and

barriers in

Overhead

lines

identified

however

poor

maintenance

of goalposts,

barriers, etc.

Not

included

within

Hazard

Risk Logs

Not goal-

posted. No

contract made

with local

electricity

Page 359: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-289 Sign & Stamp of Tenderer

ACTIVITY EXCELLENT

[An

Exceptional

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE Procedures]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMAN

CE

[Unsatisfactory]

-10 Points

in control

measures.

Prominent

position.

Briefings to

plant operators

No briefings

to plant

operators

company.

Machines

running under

unidentified

overhead lines.

11.4

Storage

and Use of

Power

Tools

Good clear

use of

registers.

Schedule of

inspection

periods

displayed.

Evidence of

equipment

being in good

order, clearly

identifiable and

being used

correctly by

trained,

authorised

person. Task

assessment

sheets

confirms

condition

check before

use.

Rechargeabl

e tools used

preferentially.

Authorised

users

identified.

Manufacture

r data used

to assist in

training.

Equipment in

good

condition.

All portable

electrical

appliance

permanently

numbers

including sub-

contractor

Register of tools

on site. Secure

storage.

Inspection of

competent

person &

Authorised issue

and return.

Use of 110v

(preferable)

Inspection,

maintenance

and defect

withdrawal

schemes.

Trained used,

VWF, noise and PPE managed.

Incomple

te

register.

No

inspection

records of

daily, weekly

and monthly

or inspection

of power

tools carried

out by Non-

qualified

person

No records.

No

procedures in

place for issue

and

authorised

use.

Poor

inspection

reg condition

of tools.

11.5 Plugs, Sockets and Outlets

All equipment’s

free from defects

All equipment’s connected with plugs

All cables fitted

with IP 65 Plugs

Colour coding of plugs and sockets

Are all plugs, sockets and outlets IP 65 type

Page 360: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-290 Sign & Stamp of Tenderer

ACTIVITY EXCELLENT

[An

Exceptional

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE Procedures]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMAN

CE

[Unsatisfactory]

-10 Points11.6

Compete

nt

Persons

Training

records on site

of competent

persons.

Competent

person

identified

on site

notice

board.

Competent

person C license

appointed for

inspections and

tests etc.

Including Sub

contractor activity

Untrained

person

carrying out

inspections.

Untrained

persons

carrying out

electrical

tests.

11.7

Work Permit

Records

maintained,

regular

monitoring

and recorded

inspection of

permits

Permits

contents

communicate

d to

operative,

sign off

procedure in

place.

Permit in place

issued for

relevant

operatives, fully

completed.

Permit in

place not

fully

completed

and signed

off.

None in

place,

unsafe

acts/conditio

ns.

11.8

illumination Register

available for

illumination

and regular

update

Light fittings

installed &

lay out plan

,pole number

displayed

and

sufficient

illumination

maintained

at site

Periodical

cleaning and

replacement of

light fittings /lamps Pole height

maintained as

per legal requirements

Insufficie

nt

illuminati

on level

at site

Poor

illumination

level

11.9

Cables

Colour coding Correct storage

when not in use

Cable joints

made by IP 65 connectors

Cables lying

on the

ground / water

Not all cables

free from

damage

11.10

Work on site

Single line

&

Schemati

c diagram submitted

GFCI provided Employer’s

Approval for

execution

No Name

posted on

Main

Distribution Board

No Site

electricity

covered in the

OSHE Plan

11.11

Earth Pit

Earth resistance

in the limit

Earth pipe free

from corrosion

Pouring 5 litre

water per days

No Wet

condition

Not as per

Standard

Page 361: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-291 Sign & Stamp of Tenderer

ACTIVITY EXCELLENT

[An

Exceptional

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE Procedures]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMAN

CE

[Unsatisfactory]

-10 Points11.12

Monthly

Electrical

Safety

Audit

Corrective

actions

taken

Audit Report

will be sent to

ER

Conducted at

least 7 days prior

to Monthly OSHE

Committee

meeting

Not

Electrical

Manager

accompani

ed this

audit

Not

Performed

once in a

month

11.13

Electric

al

Registe

r

Daily

monitoring

records per

shift.

Up to date and

records in place

to demonstrate

preventative

actions.

Up to date and

record of defects

and corrective

actions

maintained.

Up to date

and signed

but with

outstanding

actions.

Not up to date,

or shift

inspections

missed.

11.14

LOTO Use of

‘Lock Out

and Tag Out’ (LOTO)

Work Permit

System

Records of

maintenance kept

No

maintenan

ce

Not

maintenance

properly maintained

12. Work at Height (X2)

ACTIVITY EXCELLENT

[An

Exceptiona

l Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE

Procedures]

6 Points

FAIL

[In Need of

Improvement]

0 Points

NON

CONFORMANCE

[Unsatisfactory]

-10 Points

12.1

Planning

Evidence of

preplanning

carried out

of future

high- risk

activities by

site

manageme

nt team

including

subcontract

ors before

work

commences

. Access to

ladders

Tower

scaffolds,

MEWP in use in

place of

stepladders/lad

ders and shown

on RA.

Monitoring in

place to ensure

compliance with

safe system of

work.

Risk

assessments

justify use of

Suitably

protected

working

platform

(minimum

600mm fully

boarded) has

been provided.

Scaffolders

handover

certificate on

site.

Stepladders or

ladders are in

use where

tower scaffolds

or MEWP

would be more

suitable.

No monitoring

for compliance

with safe

system of work.

No procedure

available (with

notice) No RA

showing hazards

or risk of

operatives falling.

Operatives

working without

protection in

place.

No training

records on

working at height

and use of safety

Page 362: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-292 Sign & Stamp of Tenderer

ACTIVITY EXCELLENT

[An

Exceptiona

l Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE

Procedures]

6 Points

FAIL

[In Need of

Improvement]

0 Points

NON

CONFORMANCE

[Unsatisfactory]

-10 Points

controlled

by site

manageme

nt. Policy

displayed or

included in CSHP.

stepladders

etc.

harness

12.2

Scaffolding

Daily Up to date and Up to date and Up to date and Not up to date

Register monitoring records in place to

record of defects signed but inspections

records. demonstrate and corrective with missed. preventative actions

maintained. outstanding

actions. actions 12.3

Ladde

r

Acces

s

Written

record of

inspection,

defects, etc.

produced

by

subcontract

ors before

work

commences

.

Ladders show

ID mark.

Written record

on inspection,

defects, etc.

Self-closing

safety gate

used on

access

platform.

Base is firm,

level. Clear of

excavations Set

at 1-4, Lashed

at two stiles.

Clear access

onto ladder and

minimum 1m

above platform

landing

Ladder secured

at only one

point.

Obstructions

at base,

Incorrect

ladder tie

used, Ladder

set at wrong

angle.

Ladders too

short, ladders

unsecured,

Damaged

ladders, Poor

access to ladder,

Access onto

platform is poor

No ladder register

12.4

Scaffoldi

ng

General

Well

maintain

ed

scaffold

Red Scaff-

tag in use

and

enforced

by

supervisor

s Action

taken,

monitoring.

Scaff-tag

system in place

at prominent

locations and

at all access

points to the

scaffold.

Inspections

and

handover

completed

upon

adaption.

All components

correct and in

place.

Inspections

all in date with

register

completed.

Handover

certificate

signed by

competent

person with

working load

stated.

Scaffold

inspection not

in date or not

completed

Scaffold not

protected from

vehicle strike

Supporting

concrete pump

pipe-work

without vibration

and load

assessment

undertaken.

No Handover

Certificate.

Operatives

working off

incomplete

platforms.

No competent

scaffolders.

Poor Standard of

erection; Bamboo

or wood in use,

boards and rails

missing, no

access, not

plumb, missing

Page 363: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-293 Sign & Stamp of Tenderer

ACTIVITY EXCELLENT

[An

Exceptiona

l Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE

Procedures]

6 Points

FAIL

[In Need of

Improvement]

0 Points

NON

CONFORMANCE

[Unsatisfactory]

-10 Points

No pre-load

check( where

applicable)

bracing,

damaged

equipment in use

or not to

standard.

Not erected to

design (where applicable)

12.5

Scaffold

access

Towers

and

Platforms

Pre-Use

checks

undertak

en daily

and

inspectio

n

recorded

Register

of

equipme

nt

maintain

ed.

Scaff-tag in use

Platforms

used

wherever

practicable

(in

preference

to ladders)

Erected correctly

All inspections

completed

record of

inspection,

defects, etc.

maintained.

Platforms used

but not

assembled

correctly such

as missing

bracing.

Damaged

equipment in

use

No pre use inspection.

No RA carried out

showing hazards

or risk of

operatives falling.

Erected by

unqualified

persons

Base to height

width not correct

causing instability

Operatives making

adaption when

not qualified

Operatives

working without edge protection in place.

12.6

Edge

Protecti

on and

Toe-

boards

Written

record of

inspection,

defects

produced

weekly by

subcontract

or and

before work

commence

s.

Registers

show

records of

inspections

of

components

i.e. checking

for defects.

All in place and

secure, i.e.

double guardrail

in place. A main

guard rail at

least 1 meter

above the edge

, toe board at

least 200 mm

high and

intermediate

guard rail no

Poorly recorded

register i.e. not

showing defects

or edge

protection

missing, but no

persons working

on platforms.

Areas of edge

protection

missing.

Operatives

working on

incomplete

platform. Toe-

boards missing

Page 364: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-294 Sign & Stamp of Tenderer

ACTIVITY EXCELLENT

[An

Exceptiona

l Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE

Procedures]

6 Points

FAIL

[In Need of

Improvement]

0 Points

NON

CONFORMANCE

[Unsatisfactory]

-10 Points

gap more

than 470 mm

12.7

Compete

nt

Persons

Advanced

scaffolder

is the

supervisor

on site.

Training

records held for

persons

erecting

scaffolding

under

supervision

(trainees)

Scaffolds

erected by

trained

scaffolders.

Certification of

all training

records on site

match

scaffolder on

site.

Cross

referencing of

scaffolders

names do not

match with

training records

in site records.

Untrained

scaffolders

erecting scaffold

without trained

supervisor

present. No

training records

available in site

records.

12.8

Other

Precautio

ns,

Ladders,

Stepladde

rs,

MEWPs

Induction

talks, tool

box talks

and other

briefings

with

subcontract

manageme

nt on the

safe system

of work

prior to

works

commencing.

Registers

show

records of

inspections

of

components

i.e. checking

for defects.

Operatives

complying with

the approved

Risk

Assessment/Met

hod Statement

for work at

height

Operatives

using the

equipment

incorrectly,

over reaching,

over-

stretching.

Operatives using

ladders or steps,

when the RA

states MEWPs

will be used

No competency

certificate of

MEWP & Scaffold

erection

supervisor

12.9

Temporar

y work

Assessm

ent

Daily

monitoring

recorded

tool box

talks.

Full

assessment,

controls

communicated,

inspection

records.

Assessment

completed.

Controls

reasonable.

Erected as per

design. Pre-

load check

completed

Assessment

completed not

covering all the

issues.

None completed.

No pre-load

check.

Not following

design

No ER Notice

12.10

Recorded

Fully

recorded Fully Completed as None recorded, None completed

Page 365: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-295 Sign & Stamp of Tenderer

ACTIVITY EXCELLENT

[An

Exceptiona

l Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE

Procedures]

6 Points

FAIL

[In Need of

Improvement]

0 Points

NON

CONFORMANCE

[Unsatisfactory]

-10 Points

Inspectio

ns

and

monitored

at regular

intervals,

topic for

tool box

talks.

recorded at

regular

intervals.

per legal

requirement

and OSHE

Volume 1 & 2

visual

inspection only

not comply with

volume 1

& 2.

unsafe

acts/conditions.

12.11

Work Permit

Records

maintained

, regular

monitoring

and

recorded

inspection

of

permits

Permits contents communicated to operative, sign off Procedure in place.

Permit in place issued for relevant operatives, fully completed

Permit in place not fully completed and signed off

None in place, unsafe acts/conditions.

12.12

Safety Net

Maintenance Testing Adequate number

to issue

Not Good

construction

Not approved

type

12.13

Monthly Safety Audit for working at Height

Corrective

actions

taken

Audit Report

will be sent to

ER

Conducted at

least 7 days

prior to Monthly

OSHE

Committee

meeting

Not station

Manager

accompanied

this audit

Not Performed

once in a month

Page 366: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-296 Sign & Stamp of Tenderer

13. Floor Openings

ACTIVITY EXCELLENT

[An

Exception

al

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line

with

OSHE Procedur

es]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMAN

CE

[Unsatisfactory]

-10 Points

13.1

Planning

Planned

works

include

fixing of

manufacture

rs cover in

place when

work is

completed.

Discussed in

toolbox talks

and

inductions.

Briefing with

operatives

on the safe

system of

work before

works

commence.

Records

maintain

ed

Suitable

and

sufficient

risk

assessme

nt and

method

available

with Notice

from ER.

Controls

incorporat

e design

assessm

ent

results

Inadequate

Risk

Assessment

, does not

incorporate

the controls

as specified

in the

design

assessment

Inspections

not carried

out or

recorded.

No Risk

Assessment

carried out

showing

physical

barriers or risk

of operatives

falling into

hole. Design

assessment

does not

incorporate

falls from

height

13.2

Provision of

Protection

Daily

monitoring

recorded.

Sub-

contractors

supervision

management

include

inspection in

their weekly

report.

Daily

inspections

carried out,

recorded and

action taken

immediately

where

deficiency

found.

Operatives

briefed on

early

reporting

where fault

noticed

Physical

protection

has been

provided

i.e. two

guardrails,

toe- boards,

signs fixed

hole cover

and

barriers,

covers are

load

bearing.

Guardrail in

place but

insufficient

i.e. only one

guardrail

and

toeboard in

place, poor

signage

displayed.

Rail does

not take

weight of a

fall

Pallets used

as covers, ply

sheeting used

as covers,

pieces of ply

used as

covers,

scaffold

boards

provided but

unsecured, no

supports,

openings left

open.

13.3 Safety signs Signs clearly Adequate Incomplete or

No signs in place.

Relevant monitored daily

visible and warning unclear

Signage and recorded. comprehensiv signage in signage in

Page 367: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-297 Sign & Stamp of Tenderer

ACTIVITY EXCELLENT

[An

Exception

al

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line

with

OSHE Procedur

es]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMAN

CE

[Unsatisfactory]

-10 Points

e. Changed as Regularly place before place. work monitored until works start. progresses. opening

permanently

closed.

13.4 Work Records Permits contents

Permit in place

Permit in place

None in place,

Permit maintained, communicated issued for not fully unsafe Procedure regular to operative, relevant completed

and acts/conditions.

monitoring and sign off operatives, signed off. recorded procedure in fully inspection of place. completed.

permits

Page 368: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-298 Sign & Stamp of Tenderer

14. Tunnelling operation (X2) – NOT USED

Page 369: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-299 Sign & Stamp of Tenderer

15. Site Management & Supervision

ACTIVITY EXCELLENT

[An

Exceptional

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE

Procedures]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMA

NCE

[Unsatisfactory]

-10 Points

15.1

Resources

All

management

staff are

direct

employees.

An

assessment

of the

supervisory

resources

necessary

has been

carried out

and findings implemented.

Relief

supervisory

staff

available as

required.

Duties

hours

including

travel time

(to camps)

are within

the

maximums

working

times.

Site Manager

available at

all times Duty

hours

Key duty

holders

available at

all times.

Good

shift

rotation

Sub-

contractors

supervisors

only.

Key duty

holders not

always

available.

Operatives

working

excessive

shifts (12

Hours

Maximum)

No supervision

on site

NOTE:

THIS

WILL RESULT IN AN

IMMEDIAT

E STOP

WORK

(SCORE-

20)

15.2 Regular Regular monitoring

Site inspection of

Irregular No site auditing.

Monitoring Monitoring by by Project the plant and monitoring, not

Not submitted

senior Manager. equipment following report on or before

management. Own KPI’s inspection .Plant

schedule. No 7th of eachmonth

established. and Equipment ,

procedure to Employer

Monitoring Equipment

Electrical site monitoring

mentioned in SOP for

/Engineer

calibrated as per

exercises on a inspection ,

manufactures daily and weekly

testing and

requirements and

basis maintenance

test certificate

available at site

Page 370: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-300 Sign & Stamp of Tenderer

ACTIVITY EXCELLENT

[An

Exceptional

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE

Procedures]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMA

NCE

[Unsatisfactory]

-10 Points

Monthly OSHE inspection

OSHE committee

15.3 internal OSHE report meeting minutes

Monthly OSHE

Chief Safety

H&S audit score report not Manager Daily Submittal to

report submitted before

report not

Employer 7th of Every submitted to ER Month

Safety Agenda cover

15.4 Awareness Safety budget Monthly only limited No record of H&S programme

for discussed inspection

carried points and Safety

Committee Committee workers reviewed and out by

Chairman accidents statics

Meetings or site

conducted on updated Meetings

of Safety is discussed safety meetings.

monthly. held more Committee and and Meetings Safety Committee,

Awards to frequently i.e. records of held monthly site meetings held

subcontractors

weekly. Reports inspection carried

including infrequently, no

or individuals from Safety reps,

by committee actions/timescal

action/ timescales

on safe Sub-contractors members es. Safety reps

noted on the

working safety adviser .Minutes issued identified and minutes. No practices. Near

reports available

within 2 days to understand their

subcontractor and

miss reporting

and shown action

the members. duties. .No work force

scheme. Near

taken. Some Minutes posted on

Information attended meeting

misses posters displayed.

all sites within discussed at the

recorded at the

work force area in

Meeting

Meetings and both Hindi/Marathi

distributed to

action taken. and English site operatives Health and .Lockable site and displayed

at Safety posters

suggestion box site notice

displayed on posted as per board. walls, CMRL ESHS Newsletters. Requirements. Booklets etc vided at

induction

Page 371: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-301 Sign & Stamp of Tenderer

ACTIVITY EXCELLENT

[An

Exceptional

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE

Procedures]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMA

NCE

[Unsatisfactory]

-10 Points

15.5

External

H&S Audit

Quarterly

All audit

points

complied

and briefed

to

Manageme

nt staff

Management

involved in

audit

Limited audit

observation

complied

.No

managemen

t review

report

Audit not

conducted

each

quarter.

Audit conducted

.Follow up

audit not

carried out

within 28

days

No

External

H&S Audit

Quarterly

conducted

or report

not

submitted

to

Employer

/Engineer Within

7days of audit completed

Management The Management

Report submitted

The contractor No formal

reviews Review Report to Employer not submitted Management 15.6 Management

undertaken annually

Recommendation simplemented

/Engineer Management Review Report

Review

Review to Employer /Engineer within 7 days after meeting

completed 15.7

Incident

Reporti

ng

Near

misses and

minor

accidents

also

investigated

and

communicat

ed by

Safety alert

Contractor

reports

accidents ,

incidents and

dangerous

occurrences to

governing

bodies as per

statutory

obligations

Detailed

investigation

report within

48 hours of

investigation

completed

submitted to

Engineer

Preliminary

accident

report not

submitted to

Employer

/Engineer

within 24 hours

No information to

Employer

/Engineer via

SMS for

accident , first

aid injury ,

near miss ,

dangerous occurrence

Records

available on

investigation

recommend

atio

All near

misses

incidents

and

accidents

Record

available for

accident

statistics

No System available for classification and

Page 372: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-302 Sign & Stamp of Tenderer

ACTIVITY EXCELLENT

[An

Exceptional

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE

Procedures]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMA

NCE

[Unsatisfactory]

-10 Points

n

implemente

d at site to

avoid

recurrence

of incidents

and

accidents

Availability of

RCA/CAPA

on accident

/incident

reported and

investigated

Accident

statistics

maintained

and updated

effectively

utilized to

avoid similar

incidents/

accidents

Root cause

analysis done

for all

incidents and

accidents 7

investigation

records

maintained

analysing the

near miss

incidents and

accidents

occurred at

site No

accidents and

incidents

notified to

Employer

/Engineer

15.8

Safety

Promoti

on

Manageme

nt’s

participation

towards this

worker rewarded

All the

subcontract

ors included

in

promotion

There is no

incentive

schemes

used

There No

safety

promotional

programme

15.9

Employer

/Engineer

Non-

conforma

nce

Report

All NCR

raised by the

Third party

.The

contractor

submitted

action plan

with time

scale within

two weeks

to be closed

Contractor’s

Raised

internal NCR

as per their

Quality

Management

System

Corrective

action and

preventative

identified as per

CMRL ESHS Requirements.

Few NCR

action taken

and No

evidence of

compliance

No action on

Employer

/Engineer NCR

Page 373: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-303 Sign & Stamp of Tenderer

16. Traffic Management (*x2)

ACTIVITY EXCELLENT

[An

Exception

al

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE Procedures]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMAN

CE

[Unsatisfactory]

-10 Points

16.1 Safety

of Traffic Records of

meetings

and or

information

sent to

suppliers,

etc. Plan

displayed

showing

designated

traffic routes

for delivery

vehicles /

public where

appropriate

All persons

wearing

high

visibility

clothing,

good clear

signage,

one

way/turn

circle,

Banksman

clearly

identified on

signage and

PPE.

Discussed

with police,

local

authority, etc

where

appropriate.

Traffic

managemen

t Competent

person

designated.

Clear

instructions

displayed.

PPE, signs

in place.

Arrangement

s to

eliminate

reversing.

Inadequate

traffic

management

system in

place,

instructions

not provided

to operatives

delivery

drivers

/ suppliers,

No control

over vehicles

entering site,

no segregation

of pedestrians

/ vehicles,

mud on roads.

No Traffic

Devices such

as cones

,drums ,

delineators ,

traffic

cylinders ,

traffic signs

and

barricades not

available

No records

of regular

monitoring

No retro

reflective strips

shapes and

size &

reflective strips

placed at an

angle at

bottom

Page 374: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-304 Sign & Stamp of Tenderer

ACTIVITY EXCELLENT

[An

Exception

al

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE Procedures]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMAN

CE

[Unsatisfactory]

-10 Points

16.2

Public

Informati

on

Informatio

n regularly

reviewed

as work

progresse

s. Public

liaison

officerappointed

Public

safety

notices

sited in

advance of

all critical

areas and

phase

changes.

Information

clearly

erected,

contact

information,

duration of

works etc.

Signs/notic

es poorly

located

information

minimal.

None provided,

16.3Safety

of Public

Daily

monitoring is

recorded.

Road

markings

where

appropriate.

An

appointed

team/

designated

person in

place to

monitor

public

access

daily.

Evidence

of monitoring.

Effective

segregation

of pedestrian

from

vehicles,

barriers,

work areas.

Good clear

signage.

Clean

footpaths.

Untidy

public

access,

poor

signage,

poorly

constructed

access-

ways.

Pedestrian

barriers

missing/falle

n over. Dirty

footpath and

uneven

floors.

16.4

Traffic

Managem

ent

Drawings

available on

display

around the

site and in

site offices

showing

traffic

routes and

traffic

manageme

nt scheme.

Information

issued to

suppliers

regarding

restricted

delivery

Barricade

manager

assigned.

Daily &

weekly

inspections

undertaken

with

remedial

actions

stated and

rectified.

Site

fencing

washed

and

repainted

annually

Traffic

Manageme

nt Plan in

place with

no

objection

from the

ER.

Plan

measures

implemented

on site e.g.

Road

Signage

erected,

Barriers with

full lighting.

An attempt

to segregate

other road

users or

pedestrians

has been

made but

without

adequate

planning.

Barriers not

maintained.

Entry, exit

tapers not

correctly set

or

Maintained.

Inadequate

No Traffic

Management

Plan in place,

Road user and

or pedestrians

movement is

uncontrolled.

Incorrect or

no signage

No barrier

lighting.

Openings in

barriers with

no security

No as per

agreed

Page 375: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-305 Sign & Stamp of Tenderer

ACTIVITY EXCELLENT

[An

Exception

al

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE Procedures]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMAN

CE

[Unsatisfactory]

-10 Points

times

e.g. schools

Inspection

conducted

both day

and night

shift

Rules

provided for

in the

railways

manual

followed

Banksman

in

attendance,

Entry/exit

tapers

correctly

installed.

signage

Insufficient

warning

signs

displayed at

distance

before

commencem

ent of work

Insufficient

traffic signs ,

barriers

,cones and

lighting

schemes of

local traffic

police and

Metropolitan

and other

authorities No

traffic controller No approval from

Employer

/Engineer for the

site perimeter fencing

16.5 Highway Areas Areas undergo

Roads and Reasonable but

Not carried out,

Cleanliness inspected daily,

regular pavements infrequent, no hazardous

records recorded reasonable. programme for,

conditions

maintained inspections or poor Programme established for regular cleaning.

cleaning.

16.6

Visitor

Safety

All visitors

signed off

site upon

leaving.

All visitors

accompanie

d at all times

by a member

of the site

personal

Site plan in

place,

information

displayed,

induction

attendance

recorded.

Visitor

register

well used.

All wearing PPE.

No clear

directions

displayed for

visitors Only

some

inductions

carried out.

Entry

register not

consistently

used. Not all wearing PPE.

No controls

in place,

visitors

uncontrolled.

No Visitors

approvals

from

Employer

/Engineer

Records Permits Permit in place

16.7 maintained, contents issued for Permit in place

None in place,

Work Permit regular communicated

relevant not fully unsafe

Page 376: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-306 Sign & Stamp of Tenderer

ACTIVITY EXCELLENT

[An

Exception

al

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE Procedures]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMAN

CE

[Unsatisfactory]

-10 Points

monitoring and

to operative, operatives, fully

completed and

acts/conditions.

recorded sign off completed. signed off. inspection of procedure in

permits place.

16.8 Relevant Monitored daily

Good, clear and

Good in most

Site Signage and upgraded concise in all areas, Poor display in

Not displayed at

where areas. Regular

maintained in critical areas. all.

necessary. inspections. good condition.

Evidence provided of daily review and

updates

16.9

Barricade

Board

Areas

inspected

daily, records

maintained.

Daily

monitoring of

Barrier is

documented.

Records of

reviews of

any

modificatio

ns kept.

Areas

undergo

regular

recorded

inspections

Programme

established

for regular

cleaning.

Securable

gates (if

necessary)

an access

points in

place, clear

signage,

painted, well

maintained,

inspected

regularly.

Barricade

Boards

and

painting

reasonab

le.

Barrier is in

place and is

stable. No

gaps in

hoarding.

Good clear

signage.

Temp

Works

consulted.

Reasonable

but

infrequent,

no

programme

for, or poor

cleaning.

Signs of

attempted

access.

Wrong type

barrier

used, poorly

designed.

No cleaning

of barricade

No flashers and

rope light fixed

on barricade

boards and No

inspection

No

barricade

Manager

/Supervis

or

appointed

Barriers

unstable in

places. Poorly

erected, poorly

maintained,

gaps in

hoarding. 16.10 Corrective Audit Report Conducted at Not Station Not Performed Monthly traffic

actions taken will be sent to least 7 days Manager once in a month

Safety Audit Employer prior to Monthly

accompanied

Page 377: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-307 Sign & Stamp of Tenderer

ACTIVITY EXCELLENT

[An

Exception

al

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE Procedures]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMAN

CE

[Unsatisfactory]

-10 Points

OSHE this audit Committee

meeting

17. Noise

ACTIVITY EXCELLENT

[An

Exceptional

Standard]

10 Points

GOOD

[Exceeding

the Norm]

8 Points

AVERAGE

[In line with

OSHE Procedures]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMA

NCE

[Unsatisfactory]

-10 Points

Ear muffs/plugs

17.1 Regular review

Information on

Sources not provided to

None recorded in

Identification of sensitive Limit/exposure

identified, Workmen and Hazard & Risk

of Sources receptors. levels held on assessments staff .No Log or Aspect site. completed employees Impact

training and assessment frequency of training not identified. Sources documented, assessments

not completed

17.2

Provision

of

Silenced

Equipme

nt

Maintenanc

e and test

certificates

maintained

for

machinery

DBA

frequently

checked.

Noise

monitoring

equipment

available

and

calibrated

Equipme

nt

silenced

to

accepta

ble

levels

Machine

provided

with acoustic

material and

display of

signage’s

control been

Identified in

Hazard &

risk log but

not

implemented

throughout.

Some

provided but

do not cover

all risks

Not identified

in Hazard &

Risk logs. Not

provided in

areas where

noise levels

are exceeded

and near

sensitive

receptors.

Machines

generating

excessive

noise

Page 378: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-308 Sign & Stamp of Tenderer

implemented

to reduce

noise

exposure

below the

permissible

limit

available

work site

17.3

Monitoring Noise levels Frequent Noise levels Equipment on No base line from equipment

checks, records

monitored site, Irregular monitoring

checked and maintained. calibration checks made conducted as per

recorded daily records on site.

no calibration

records

monitoring plan

None carried out

18. Health

ACTIVITY EXCELLENT

[An

Exception

al

Standard]

10 Points

GOOD

[Exceeding the Norm]

8 Points

AVERAGE

[In line with OSHE

Procedures]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON CONFORMA

NCE

[Unsatisfactory]

-10 Points

18.1 HAV’s Register

Records signed off daily, usage monitored, equipment well maintained.

List of competent operatives attached. Tool box talks completed

All equipment recorded, usage time/Trigger times recorded Operatives checked for signs and symptoms

Basic register requires updating not all equipment on register

Not maintained

Page 379: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-309 Sign & Stamp of Tenderer

ACTIVITY EXCELLENT

[An

Exception

al

Standard]

10 Points

GOOD

[Exceeding the Norm]

8 Points

AVERAGE

[In line with OSHE

Procedures]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON CONFORMA

NCE

[Unsatisfactory]

-10 Points

18.2 Malaria , Dengue , Silicosis, Skin Cancer , HIV AIDS , Leptospirosis , Tetanus and Hepatitis Information

OCC health, exposure controlled monitored and recorded Comprehensive information, contact numbers provided, controls monitored with records

Procedure established information displayed, controls implements, dust suspension in place. Tool box talks completed.

Procedures in place. information provided fully assessed

Educational programme scheduled and implemented. Liaisonpersonnominated

Minimal information, mentioned in policy

Minimum dress, part of site rules, information provided

None procedures available

No information provided in both Hindi/Marathi and English

18.3 Medical Examination

Frequency of medical test maintained

Confidential report for all workers

Conducted by qualified person

Not Covered all testes as per standard

Not All worker under gone

18.4 Health Centre

Medical emergency equipment’s

Adequate equipment

Floor area minimum 15

m2

with two rooms

Non Availability nurse

No Construction medical officer & qualification

18.5 First -Aid

Register for first-aid

First-aider & his qualification

First-aid room facility

No Sufficient numbers

Not Equipped with all items as per standard

18.6 Ambulance van and Room

Record of all cases of accident & sickness

Equipped with standard facilities

Maintained in good repair

No Availability and numbers

Non Equipped with all items as per standard

18.7 Alcohol and Drugs

Workers participation / co-operation

HIV / AIDS awareness training provided

Management participated awareness training

Smoking at public worksites Smoking at public worksites

Employee working under the influence of alcohol / drugs

18.8 Radiation

Appropriate PPE

Disposal of radioactive substance

Approved Method statement

Not Approval from Employer

No Method statement

Page 380: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-310 Sign & Stamp of Tenderer

ACTIVITY EXCELLENT

[An

Exception

al

Standard]

10 Points

GOOD

[Exceeding the Norm]

8 Points

AVERAGE

[In line with OSHE

Procedures]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON CONFORMA

NCE

[Unsatisfactory]

-10 Points

18.9 Mosquito Breeding

Regular inspection and report submission to the Employer

Posters No waters No Periodic interval

Water retain on the site

18.10 Vibration

Control plan Report maintenance

Vibration limits

Frequency of monitoring

Monitoring method

19 Training & Induction

ACTIVITY EXCELLENT

[An

Exception

al

Standard]

10 Points

GOOD

[Exceeding the Norm]

8 Points

AVERAGE

[In line with OSHE

Procedures]

6 Points

FAIL

[In Need of

Improveme

nt] 0

Points

NON

CONFORMAN

CE

[Unsatisfactory]

-10 Points

19.1 Management Competency

Audit/inspection training. Competency formally assessed

Records of retraining whenever new hazards introduced.

Knowledge of SMS training (project, site and corporate arrangements)

Involvement of senior management personnel in safety and health training and records

Enough

infrastructu

ral facilities

with Audi-

visual

support

are

available

Availability of Monthly training

No training

programme is

prepared in

consultation

with

department

heads

No formal

management /

No supervisory

training

No

induction./No

JV ID card with

authority sign

and validity

schedule and

Matrix. Records of training

submitted to

GC as per

approved

training

implementation

plan

Page 381: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-311 Sign & Stamp of Tenderer

19.2

Supervisor Training

Additional training needs identified specific to role.

Competency formally assessed

Skilled in the area supervising

Skills training completed, inductions completed, all recorded on site. cards held, Fire training , First Aiders

Only some

have

attended the

supervisors

course

None

attended

supervisors

course

No

induction./No

JV ID card

with authority sign and

validity

19.3

Driver /Plant Operator Training

Additional training needs identified specific to role.

Competency formally assessed

Fire training and first aid training completed for specific individuals

Defensive driver training all recorded on site. Operatives received formal training in role needs.

Only some have attended safety training. Persons undertaking tasks or role for which no formal

None trained

No

induction./No

JV ID card with

authority sign

and

validity

training has

been given

19.4

Training

Programme

Programme of additional training needs maintained. Implementation schedule attainment reported monthly

Document system established for safety and

Programme Regularly reviewed and updated.

Implementation standard monitored and reported on.

training presentation covers site rules , hazard communication and other special safety

Programme maintained for induction, safety skills and competency. Health HIV AIDS. Equipment training for operatives, Worker trained in Fire fighting

Involvement of senior

Only

some

Training

program

me

complete

d

No training

procedure

or

programme

No training

plan for

workmen and

staff

No monthly

training

schedule and

matrix.

No Records of

health training rules specific to the project requirements

management personnel in safety and health training

training as

per training

implementati

on plan

Page 382: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-312 Sign & Stamp of Tenderer

19.5 Specific Training Competency Certificate

All competency Records maintained on site. Records match task undertakings

Competency assessment carried out by contractor prior to working. Records of assessment maintained

Person undertaking skilled role have competency certificates and formal training e.g.welders,slingersignallersandrefreshertrainingconductedat leastevery threemonths

Formal

qualification

certificates

only held for

some skilled

applications

No formal

training

certificates held

for high risk

roles

e.g. scaffolding,

Banksman,

Lifting

Supervisor ,

slingers, plant

operator and

crane operators

19.6 Toolbox Talks

Topics pre- selected attendance sheets completed and signed off by attendees, topics debated

Regular T.B.T’s programmed proactive and records maintained

T.B.T’s held but tend to be reactive, no programme

T.B.T’s

planned but

none carried

out

No T.B.T’s

held or

planned.

19.7

Follow Up Training

Workers participation towards training

Attendance records kept

syllabus project related

Not take

place after

six months

No follow up

training

organized

19.8

Important Days observed

Topics pre- selected attendance sheets completed and signed off by attendees, topics debated

Regular Important days for creating ESHS awareness programmed proactive and records maintained

Important days for creating ESHS awareness held but tend to be reactive, no programme

Important

days for

creating

ESHS

awarenes

s planned

but none

carried

out

Important

days for

creating

ESHS

awareness

held or

planned.

Page 383: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-313 Sign & Stamp of Tenderer

19.9

H&S

Induction

Training

New Visitor

to site ,

induction,

ID card and

communicat

ed to

Employer

/Engineer

All

workforce

and

Managem

ent staff

with H&S

induction

Hank book

provided

Records of

all

inductions

maintained

Limited

induction

training

CMRL

ESHS

Requireme

nts and

limited

number of

workforce

and

manageme

nt staff with

ESHS

induction

Hank book

provided

No induction

training as

per CMRL

ESHS

Requirement

s. No

JV ID card with

authority sign

and validity

No work

men , staff

training

assessment

records

Page 384: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-314 Sign & Stamp of Tenderer

GSAF-07

CHENNAI METRO RAIL LIMITED

EMERGENCY RESPONSE PLAN CONTENTS

Contractor Name

Project Name

1 Project Highlights

i. Title of the content

ii. Contractor Number

iii. Brief scope of work

iv. Location map/ key plan

v. Period of the project

2 Reference Publications

3 Terms & Definitions

4 Design & Planning

5 Legal & Other requirements

6 Declaring of the Emergency situation

7 Roles, responsibility, accountability and authority

8 Information System to concern service & persons

9 Emergency organization during silent working hours

10 Emergency Control Room Diagram

11 Media Centre & Media Centre Diagram

12 Evacuation Map have not been included to be inserted

13 Cyclone preparedness

Page 385: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-315 Sign & Stamp of Tenderer

14 Evacuation Routes and off site assembly area Diagram

15 Conducting Hazard Analysis

16 Procedure to be followed during non-working hours

17

Emergency Evacuation Procedure

• In case of fire

• In case of collapse of building

• In case of shed or structure

• In case of Gas leakage

• In case of Liquid spill control

• In case of injury

• In case of Strom

• In case of riots or civil disturbances procedures

• In case Bomb threat

• In case of terrorist attack

• In case of land slide

• In case of floods

• In case of Earth quake and other natural calamities

18 Site Emergency Team

19 List of Trained personnel of fire fighting and other emergency

situation

20 Details of Emergency response kits at project site

21 Collapse & Settlement Emergency process

22 Inundation Procedure

23 Piling Preparedness

24

Site Emergency response layout

• Site layout indicating site address & site telephone number

• Fire point locations

• Fire muster /Meeting point

• Fire escape routes

• Location of site office & welfare

• Site showing locations of structures, roads, parking area, natural features,

onsite warning devices, firefighting or other emergency equipment, major

utility systems, and other features deemed essential for emergency

purposes.

Page 386: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-316 Sign & Stamp of Tenderer

• legend showing all symbolic and numerical representations used for

labelling features, or label features on the map

Page 387: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-317 Sign & Stamp of Tenderer

CHENNAI METRO RAIL LIMITED

HEALTH PLAN CONTENTS

Contractor Name

Project Name

1 Project Highlights

i. Title of the content

ii. Contractor Number

iii. Brief scope of work

iv. Location map/ key plan

v. Period of the project

2 Reference Publications

3 Terms & Definitions

4 Health Policy

5 Legal & Other requirements

6 Roles, responsibility, accountability and authority

7 Health Hazards in construction- Chemical, Biological & Physical

8 Conduct an Assessment

9 Method of monitoring airborne hazards

10 Site Implementation Procedure - Prevent or minimise exposure –Hand and arm vibration syndrome, silicosis, skin cancer, HIV AIDS, Leptospirosis, tetanus & Hepatitis

11 Maintenance of control measure

12 Recording and Reviewing the Assessment

13 Health Surveillance /Exposure Monitoring - Keeping records, Monitoring

14 Assessment Briefing, Information, Instruction, awareness And Training For Employees

15 First Aid/Spillage/Disposal Procedure

16 Communication

17 Non -Compliance /Corrective action & records

18 Review & Audit

GSAF-08

Page 388: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-318 Sign & Stamp of Tenderer

GSAF 09

CHENNAI METRO RAIL LIMITEDON SITE TRAFFIC MANAGEMENT PLAN CONTENTS

Contractor Name

Project Name

1 Project Highlights

i. Title of the content

ii. Contractor Number

iii. Brief scope of work

iv. Location map/ key plan

v. Period of the project

2 Reference Publications

3 Terms & Definitions

4 Design & Planning

5 Legal & Other requirements (Relevant legislation, Guidelines & standards)

6 Purpose, objective & Performance goals

7 Structure & Responsibilities (General (Site Structure reporting chart)), Role and

Responsibilities for all staff

8 Concerns of local community and stake holders, limiting traffic movements

9

Existing road infrastructure & construction interface -Road network, Access

control, site speed limit, transport of materials, plant and equipment to site

existing traffic control, road dilapidation surveys, Works boundary plan,

Assignment of construction traffic, Roads & Intersection operation &

Closures & Public areas.

10 Interface between on-site and off-site road movements

11 Interface with public

12 Traffic Controls & Mitigation measures- project site offices, project site

access points, Heavy vehicle traffic routes, site office, light vehicle &

parking.

13 Setup of traffic management controls & signage - Construction signage placement plan

14 Traffic Control plan

15 Construction deliveries /project deliveries procedures

Page 389: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-319 Sign & Stamp of Tenderer

16 Environmental Impact on the area Dust Management

17 Accident & Emergencies

18 On Site Parking

19 Community

20 Monitoring and management of the traffic management plan

21 Training awareness & competence

22 Risk Assessment

23 Review & Audit

24 Pedestrian route checklist

25 Vehicle movement checklist

Page 390: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-320 Sign & Stamp of Tenderer

GSAF 10

CHENNAI METRO RAIL LIMITED

CONSTRUCTION PHASE HEALTH & SAFETY PLAN CONTENTS

Contractor Name

Project Name

1 Application of this plan

2 Purpose of this Plan

3 Scope

4 Reference Publications

5 Terms and definitions

6 H&S Management and system requirements

7 Contractor H&S policy

8 Drugs & Alcohol Policy Statement

9

Planning and

Implementation Planning and

Implementation Interface

Management Management of

Change Procurement

Sub-contractor Selection

Construction Management Process Overview

10 H&S Objectives and programme(s)

11

Legal and other requirement

Legal and other requirement

International Standards, Guidelines & ISO Certifications

12

Implementation and operation

Contractor’s ESHS Organization

Resources, roles, responsibility, accountability and

authority Roles & Responsibilities

General duties of the contractor and others

General duties of persons employed

Contractors and sub-contractors

responsibilities Duties of the H&S Persons

Powers of H&S persons

Competence, training and

Page 391: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-321 Sign & Stamp of Tenderer

awareness

ESHS personnel NONO from the Employer/Engineer

13 Method Statement

14 Lift Plan

15 Hazard identification, risk assessment and determining

controls Hazard identification, risk assessment and

determining controls Hazard Log & Risk Register

Risk Assessment

COSHH Assessment

Design Risk

Assessment

Risk assessment production and submittal

16 Designer’s Role

17 ID card and First day at work, H&S Orientation training

18

Safety Training and Safety

Promotion health and safety

training Induction training

Refresher

Training Specific

Training Tool box

talks

Safety Promotion

19

H&S communication

Health and safety signage

Communication, Participation and

consultation Contractor’s site ESHS

committees

Sub contractor awards

Page 392: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-322 Sign & Stamp of Tenderer

20

Documentation

Management system

procedure Management

System Management System

procedures Corporate

Operating Procedures

Standard Operating

Procedures

Standard Operating Procedures Safety

Standard Operating Procedures

Environmental Standard Forms Safety

Standard Forms

Environmental Control of

documents Operational

control Operational

procedures Document

Control

Control of Records

Filing System

21

Performance measurement and

monitoring Performance measurement

and monitoring Surveillance Exercise’s

Site Safety Inspections

Plant & Equipment Inspection

Request for Inspection

Evaluation of compliance

22

Reporting of accidents and Dangerous Occurrence

Contractor

responsibility

Reportable accidents

Dangerous

occurrences

Reporting of fire by the contractor

Reporting to Employer/Engineer

23

Accident investigation

General

Recommended actions in incident investigation

Page 393: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-323 Sign & Stamp of Tenderer

24

Accident Statistics

Collection of accident statistics

Calculation of man-days lost –construction accident statistics

Calculation of accident frequency rate (AFR)

25 Nonconformity, corrective action and preventive action

Control of records

26

H&S Audit

MARS Audit

ISO Certification

Audit Engineer

Audit

External Quarterly H&S

Audit Period of Quarterly

Audit

Areas of competence of audit team

27 Management review

28

Industrial Health and

Welfare Physical Fitness of

Workforce Medical Facilities

Medical Examination

Health Centre Medical

Staff

HIV/AIDS prevention control

Prevention of Mosquito

breeding Alcohol and drugs

Noise

Ventilation

Radiation

29

Welfare measures for workers

Latrine and urinal accommodation

Moving sites

Canteen

Drinking

water

Labour

Page 394: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-324 Sign & Stamp of Tenderer

Accommodation

Living Space

Toilet/Washing

Facilities

Food Preparation/Cooking

Area Lighting and ventilation

Evacuation

procedure First

Aid/Emergency

Hazardous area

Fire safety and fire

fighting Mechanical and

electrical safety House

keeping

Transportation

Pest Control

Accommodation Supervisor

30

Working at height

General

Use of

scaffolds Use

of ladders

Safety harnesses/Fall Arresters

31

Excavations

General requirements on excavation work

Duties of engineer on excavation

Access and egress from excavation

Undermining nearby

structures Avoiding

underground services

32

Lifting Operations

Lifting appliances

Crane safety

Equipment Lifting gear

33

Working in confined space

General

The

hazards

Entry procedure

Page 395: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-325 Sign & Stamp of Tenderer

34 Site Electricity

General

Design considerations

Cables

Maintenance

Lighting

Illumination

Electrical power circuits

Installation of electric wiring and power lines

Residual current circuit breakers and overcurrent protective

devices Prohibition on use of fuse

Industrial plug and socket outlet

Distribution board and socket out

assembly

Electrical installations and equipment used underground or in confined

space. Monthly Electrical Safety Audit

35

Welding, gouging and cutting

Oxy-fuel gas processes

Arc Cutting, gouging and welding

processes Compressed gases storage

Handling of compressed gas

cylinders Regulators

Hoses

Training and instruction

36

Machinery

Machinery

Fencing

Maintenance

Air receivers

Woodworking

machines

Abrasive wheels

37 Plant and equipment operations

Page 396: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-326 Sign & Stamp of Tenderer

38

Personal Protective Equipment

Head

protection Eye

protection

Whole body

protection

Respiratory

protection High –

visibility clothing

Hearing protection

Self-Rescuers

39

First Aid provisions and procedures

First aid bases

First Aid boxes

First aid

facilities First

Aid rooms First

aid Training

Stretchers

Ambulance van

40

Blasting Operation

Authorisation for blasting

Risk assessment and method statements

41

Demolition

General duty of the contractor

Preparation of demolition

Protection of adjacent

structures Removal of load

bearing structures Demolition of

walls, partitions, etc. Access to

floor

Barricades, catch platforms and warning signs

Mechanical method of demolition

Page 397: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-327 Sign & Stamp of Tenderer

42

False work /Formwork

General duty of the

contractor General

Requirements Supports and

shores

Appointment of formwork

supervisor Duties of formwork

supervisor Concrete work

Dismantling

Steel

Reinforcement

Reshoring

43

Piling and Diaphragm

walls Stability of adjacent

structures Inspection

Pile driver not in

use Pile testing

Footing

44 Work adjacent to live Railways

45 Work adjacent to live roadways

46

Fire prevention, protection and fighting system

Fire Fighting equipment

Storage of flammable

liquids

47

Construction

Machinery Safe

worthiness certificate

Reverse Horns

General Operating

procedure Strength and

stability Capacity chart

Through examination and

inspection Handling of suspend

load Prohibition on riding in

loads

Cranes or machinery at rest

Operators of employee’s lift

Page 398: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-328 Sign & Stamp of Tenderer

48

Traffic

Management

Legal permission

Regulatory signs

Warning signs

Delineators

Traffic Cones and cylinders

Drums

Barricades

Yow away

vehicle Cleaning

of roads Spoil

Removal

49

House Keeping

Accumulation of debris

Method of removal of debris, etc.

Floor opening for removal of

debris Debris collection area

50 Over Head protection

51 Slipping, Tripping, Cutting, Drowning and Falling Hazards

52 Launching Operation

53 Manual Lifting

54 Hand Tools and Power Tools

55 Dangerous and Harmful Environment

56 Corrosive substances

57 Batching Plant and Casting Yard

58 Radiation

59 Smoking

60 Mobile Phones, Radios and Audio Equipment’s

61 Dust, Gases, fumes

62 Vehicular Traffic

Page 399: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-329 Sign & Stamp of Tenderer

63

Explosives

General duty of the

contractor Handling of

explosives Smoking, open

lights etc.

Opening

Packages

Deepening holes

Size of holes

Removing cartridge

wrappers Loading and

other operations Loading

and tamping

Work of firing of any

blast Warning and

retreat Return to blast

area Misfires

Operations during Thunderstorm

64 Floor Openings

65 Evaluation , selection and control of subcontractors

66 CCTV

67

Site Security

Hoardings

Personnel

access

Vehicular

access Site

patrols

Security Guards

68 Flooding

Flooding Evacuation and Rescue procedure

Page 400: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-330 Sign & Stamp of Tenderer

69

Work permit system

Implementation of permit to work

No high risk construction work without permit to

work Application for permit to work

Evaluation of permit to

work Issue of permit to

work

Posting of permit to work and supervisor’s

duty Monitoring of work

Duty to report incompatible work

Revocation of permit to work

70 Visitor’s to site

71 Grievance and Disciplinary

72 Compressed Gases

73 Heavy Plant operations

74 Site Perimeter Hoarding

75 H&S Submittals to the Employer/Engineer

76

Appendix

Emergency Preparedness Flow Chart, Emergency Evacuation Plan layout with

Emergency Contact Number

Hazard Log & Risk Register

Page 401: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-331 Sign & Stamp of Tenderer

GSAF 11

CHENNAI METRO RAIL LIMITED

SITE FIRE PLAN CONTENTS

Contractor Name

Project Name

1 Project Highlights

i. Title of the content

ii. Contractor Number

iii. Brief scope of work

iv. Location map/ key plan

v. Period of the project

2 Reference Publications

3 Terms & Definitions

4 Design & Planning

5 Legal & Other requirements

6 Roles, responsibility, accountability and authority

7

On site Implementation procedures

• Site set up

• Site induction

• Means of Escape/Re direction of means, Escape through construction site

• Inspection, test & drills

• Emergency Evacuation procedure in case of fire, Hot work

• Site Security

• Flammable liquids & LPG Electricity

• Waste Material Temporary Covering materials

• Plant, Relevant statutory Signs

Page 402: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-332 Sign & Stamp of Tenderer

10 Emergency Team to include SCBA use, Training & awareness

11

Fire-fighting and rescue

• Emergency control facilities

• Alarm procedures

• Lighting

• Smoke control

• Rescue facilities

• Self-rescuers

12 TBM Firefighting facilities

13 Fire Drills, Training & awareness

14 Communication /Relevant Statutory Signs

15 Non -Compliance /Corrective action & records

16 Fire Risk Assessment

17 Review & Audit

18

Site Fire plan Layout

• Site layout indicating site address & site telephone number

• Fire point locations

• Fire muster /Meeting point

• Fire escape routes

• Location of site office & welfare

Page 403: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-333 Sign & Stamp of Tenderer

GSAF 12

CHENNAI METRO RAIL LIMITED

Traffic Management Plan Contents

Contractor Name

Project Name

1 Project Highlights

i. Title of the content

ii. Contractor Number

iii. Brief scope of work

iv. Location map/ key plan

v. Period of the project

2 Reference Publications

3 Terms & Definitions

4 Legal & Other requirements

5 Roles, responsibility, accountability and authority

6

2. TERMINOLOGY AND CONCEPTS

2.1 FUNDAMENTAL DEFINITIONS

2.1.1 Proponent

2.1.2 Traffic Manager

2.1.3 Traffic Control Supervisor

2.1.4 Traffic Engineer

2.1.5 Traffic Management Strategy

2.1.6 Traffic Management Plan

2.1.7 Authorization

2.1.8 Approval

2.2 TRAFFIC MANAGEMENT SUB PLANS

2.2.1 Traffic Control Plan

2.2.2 Public Information Plan

2.2.3 Incident Plans

2.2.4 Implementation Plan

Page 404: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-334 Sign & Stamp of Tenderer

7

3. TRAFFIC MANAGEMENT OVERVIEW

3.1 A CLEAR CONSISTENT PROCESS

3.2 DEVELOPING A STRATEGY - A PRACTICAL APPROACH

3.2.1 Identify the Type of Traffic Control Required

3.2.2 Identify Likelihood of Traffic Delays

3.2.3 Assess Risks and Special Conditions

3.2.4 Identify the Traffic Management Strategy

8 4. RISK ASSESSMENT

4.1 RISK ASSESSMENT GUIDELINES

9

5. DEVELOPING TRAFFIC MANAGEMENT STRATEGIES

DEVELOP A TRAFFIC MANAGEMENT STRATEGY (STEP BY STEP)

5.1 CATEGORY 1 - BASIC TRAFFIC MANAGEMENT STRATEGY.

5.2 CATEGORY 2 - BASIC TRAFFIC MANAGEMENT STRATEGY.

5.3 CATEGORY 3 - BASIC TRAFFIC MANAGEMENT STRATEGY.

5.4 CATEGORY 4 - BASIC TRAFFIC MANAGEMENT STRATEGY.

5.5 CATEGORY 5 - BASIC TRAFFIC MANAGEMENT STRATEGY.

10

6. DEVELOPING TRAFFIC MANAGEMENT PLANS

6.1 CATEGORY 1 - TRAFFIC MANAGEMENT PLAN REQUIREMENTS.

6.2 CATEGORY 2 - TRAFFIC MANAGEMENT PLAN REQUIREMENTS.

6.3 CATEGORY 3 - TRAFFIC MANAGEMENT PLAN REQUIREMENTS

6.4 CATEGORY 4 - TRAFFIC MANAGEMENT PLAN REQUIREMENTS.

6.5 CATEGORY 5 - TRAFFIC MANAGEMENT PLAN REQUIREMENTS.

6.6 DEVELOP A TRAFFIC MANAGEMENT PLAN (STEP BY STEP)

11

PART 3 - IMPLEMENTING STRATEGIES AND

EVALUATING PLANS

7. POLICIES

7.1 NOTIFICATION

7.2 PLAN UPDATES AND

MODIFICATIONS 7.3PROPONENT

COMPLIANCE WITH TMP TABLE OF

CONTENTS

TRAFFIC MANAGEMENT GUIDELINES FOR WORK ON ROADWAYS

7.4 MINIMUM ACCEPTABLE PLAN DOCUMENTATION

7.4.1 Traffic Control Plan – Category 1

7.4.2 Traffic Control Plan – Category 2

7.4.3 Traffic Control Plan – Category 3

7.4.4 Traffic Control Plan – Category 4 and 5

7.8 TRAFFIC VOLUME DATA

Page 405: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-335 Sign & Stamp of Tenderer

12

8. TYPICAL SPECIAL PROVISIONS

8.1 TRAFFIC MANAGEMENT PLAN REQUIREMENTS

8.1.1 Risk Assessment

8.2 TRAFFIC MANAGEMENT PLAN REVIEW AND APPROVAL

8.3 PROPONENT'S TRAFFIC MANAGER

8.4 TRAFFIC MANAGEMENT SUB PLAN SUBMISSION

8.5 TRAFFIC CONTROL PLANS

8.5.1 Acceptance of Traffic Control Plans

8.5.2 Traffic Engineer

8.5.3 Proponent's Traffic Control Supervisor

8.5.4 Traffic Control Schedule

8.5.5 Provision of Services

8.5.6 Documentation

8.5.7 Permitted Work Days

8.5.8 Lane Closure/Reduction Windows

8.5.9 Permissible Delays

8.5.10 Obstruction of Traffic

8.5.11 Traffic Control Devices

8.5.12 Construction Detours

8.5.13 Temporary Lighting

8.5.14 Barrier Requirements

8.5.15 Drop-offs

8.5.16 Accommodation of Pedestrians and Cyclists

8.5.17 Temporary Pavement Markings

8.5.18 Use of Pilot Cars

8.5.19 Completed Sections of New Roadway

8.6 PUBLIC INFORMATION PLAN

8.7 INCIDENT MANAGEMENT PLAN

8.8 IMPLEMENTATION PLAN

8.9 SNOW AND ICE CONTROL

8.10 PROJECT INFORMATION SIGNING

8.11 LOCATION AND STORAGE OF MATERIALS AND EQUIPMENT.

8.12 STANDARD ACCOUNTABILITY MEASURES

13 TRAFFIC MANAGEMENT GUIDELINES FOR WORK ON ROADWAYS

14

9. EVALUATING A TRAFFIC MANAGEMENT PLAN

9.1 OVERVIEW

9.2 TMP EVALUATION PROCEDURE

9.2.1 Simplified TMP Evaluation Procedure (Suitable for Category 1 and 2 only)

9.2.2 Full TMP Evaluation Procedure – All Categories

15

APPENDIX A - TRAFFIC MANAGEMENT PLAN REVIEW AND

ASSESSMENT APPENDIX B - TRAFFIC CONTROL PLANNING AND

ASSESSMENT APPENDIX C - LANE CLOSURE REQUEST/PERMIT

FORM

APPENDIX D - ALTERNATE AUTHORIZATION FORMS

APPENDIX E - EXAMPLE PROJECT SPECIAL PROVISIONS

Page 406: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-336 Sign & Stamp of Tenderer

16 Non -Compliance /Corrective action & records

17 Review & Audit

Page 407: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-337 Sign & Stamp of Tenderer

GSAF 13

CHENNAI METRO RAIL LIMITED

Training Implementation Plan contents

Contractor Name

Project Name

Sl. No

01 Introduction

02 Purpose

03 Project Description

04 Scope of work

05 Management Commitment

06 General Training Prerequisites

07 Training and Accountability

08 Training Approach

8.1 Training Requirements

8.2 Roles and Responsibilities

8.3 Techniques and Tools

8.4 Training Prerequisites

8.5 Training for revised Standard Operating Procedures

8.6 Schedule

8.7 Training Periods

8.8 Training Instructors and Agencies

9.0 Types of Training

9.1 New Employee Orientation

9.2 On the Job Training

9.3 Contract Workers

9.4 Experienced Workers

9.5 All workers

9.6 Safety Induction Trainings

10 Evaluation

10.1 Metrics

10.2 Strategy

11 Incentives, Recognition and Reward

Page 408: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-338 Sign & Stamp of Tenderer

Annexure-A Training Matrix

Annexure-B Internal Training Monitoring plan (for 6 month)

Annexure-C External Training Monitoring plan (for 6 month)

Page 409: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-339 Sign & Stamp of Tenderer

MONTHLY H&S REPORT CONTENTS GSAF-14

SI.No Description

1 Executive Summary 2 Monthly man-hour details as specified in the Contract requirements

3 Reportable accidents, and First Aid Cases (Dangerous occurrences) and Lost work days

4 Accident /Incident by categories

5 Accident frequency Rate & Severity & Incidence Rate

6 Reportable accident /Incident Log

7 Incident investigation, Non-conformity, Corrective actions and preventive actions, Lessons learnt

8 Daily Tool Box tack Topic Schedule

9 Safety Theme of the Month

10 Status of implementation of CMRL policy objectives & Aims.

11 Status of compliance of TBOCWR 2006

12

Status of Compliance of GC report (Weekly inspection, NCR and CSR), Observation of CMRL staff &

Legal inspector (e.g. Labour welfare inspector, TBOCWR Inspector etc.) 13 Status of Contractor Internal NCR to Employer/ER NCR (5:1)

14 Safety promotions activities. 15 Safety inspection and follow up actions ( Inspection by contractor’s safety supervisory staff)

16 Safety walk conducted by Contractors’ Project Manager in the month

17 Contractor’s site safety committees

18 Status of NONO of Hazard identification and risk assessment

19 Status of NONO of Method statement and Lift Plan

20 Notice of no objection status of safety staff from the Employer/ER and Organization Chart Day , Night

including casting Yard . 21 Status of Permit to work issued

22 Emergency preparedness plans and team and organization chart

23 OSH Communication activities under taken in the month indicating the number of posters displayed

and balance availability in stock. 24 Industrial health and Labour Colony Inspection and follow up actions

25 Records of Gas (Carbon monoxide, Carbon dioxide, Nitrogen oxides, Methane, Hydrogen

sulfide, Sulfur dioxide, Propane Butane Acetylene, Ammonia, Volatile organic compounds,

Organic solvents, Oxygen deficiency, Oxygen enrichment, Petrol/Diesel vapour, Ozone,

Radon), Noise, Vibration, Lux

Meter, Ventilation Monitoring Details (in terms of m3/sec, m3/min)26 Records of visitor to site

27 ISO 45001 H&S management systems certifications

28 Status of Update of Management system procedures ,Operational control procedures ,Construction

phase health and safety plan, Emergency Plan , Fire plan and Health Plan 29 Monthly Training Plan (Management Staff , Specific Training and Worker)

30 Details of H&S training conducted internally and External Agency in the month

31 External Quarterly Audit training plan(Management Staff , Specific Training and Worker)

32 External Quarterly H&S Audit plan

33 Management review update

Page 410: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-340 Sign & Stamp of Tenderer

34 OSH internal audit details like MARS, Labour Colony, Traffic Management, Plant and Equipment,

Excavation, Working at Height, Electrical audit etc. 35 PPE details: Quantity purchased, issued to the workmen and stock available.

36 Details on IP 44 panel boards, lighting poles, welding and cutting equipment’s, Ladders, Hoists, tools

& tackles. 37 Housekeeping

38 Barricade maintenance details

39 No of critical excavations

40 Status of Mock Drill

41 H&S Activities Planned for next month

Page 411: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-341 Sign & Stamp of Tenderer

Minimum No. of H&S Posters GSAF-15

Sl

.

N

o

ESHS

Poster

Title

Minimum

No. of

concepts

in each

title

No. of Posters / Signage / Video

up to

100

Crore

Contract

value

Up to 200

Crore

Contract

value

up

to

300

Crore

Contract

value

up to 400

Crore

Contrac

t value

up to

500

Crore

Contract

value

More 500

Contract

value

1. Safety Culture 5 Each 10 Each 50 Each

75 Each 100 Each 125 Each 150

2. Daily Safety

Oath

1 Tamil , 1

English &1

Hindi

Each 100 Each 200 Each

500 Each 750 Each 1000 Each 1250

3. Mandatory

PPE Usage

a)

Signages to

display the

messages like

PPE ZONE,

NO PPE

ZONE, HARD

HAT AREA

etc.

2 types of

sizes made

up of

metal

sheet to be

mounted at

different

locations

Each 25 Each 50 Each 75 Each 100 Each 125 Each 200

b) Helmet 5 Each 25 Each 50 Each 75 Each 100 Each 125 Each 200

c) Shoe 5 Each 25 Each 50 Each 75 Each 100 Each 125 Each 200

d)

Goggles &

Ear

Protection

5 Each 25 Each 50 Each 75 Each 100 Each 125 Each 200

e) Full Body Harness

5 Each 25 Each 50 Each 75 Each 100 Each 125 Each 200

f) Hi-Vi Jacket 5 Each 25 Each 50 Each 75 Each 100 Each 125 Each 200

4.

Emergency

Management

Plan

5

Each 25 Each 50 Each 75 Each 100 Each 125 Each 200

5. Working at Heights

10 Each 25 Each 50 Each 75 Each 100 Each 125 Each 200

Page 412: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-342 Sign & Stamp of Tenderer

a)

Ladder,

Stairway,

Scaffold –

Signages to

display the

messages like

SAFE,

UNSAFE, FIT

FOR USE,

AVOID USE

etc.

5 types of

sizes made

up of

metal

sheet to be

mounted at

different

locations

Each 25 Each 50 Each 75 Each 100 Each 125 Each 200

6. Site Electricity 5 Each 25 Each 50 Each 75 Each 100 Each 125 Each 200

7. Crane Safety 5 Each 25 Each 50 Each 75 Each 100 Each 125 Each 200

8. Slings 5 Each 25 Each 50 Each 75 Each 100 Each 125 Each 200

9. Rigging 5 Each 25 Each 50 Each 75 Each 100 Each 125 Each 200

Procedures

10. Excavation 5 Each 25 Each 50 Each 75 Each 100 Each 125 Each 200

11. Health

(Mosquito

Control,

HIV/AIDS

awareness,

Dust Control,

Noise Control,

No

Smoking/Spittin

g, etc.)

10 Each 25 Each 50 Each 75 Each 100 Each 125 Each 200

12. First – Aid 3 Each 25 Each 50 Each 75 Each 100 Each 125 Each 200

13. Labour

Welfare

Measures

(Payment of

Minimum

Wages,

Avoidance of

Child labour,

Signing in the

Muster Roll,

In case of

accidents-

what to do?

Etc

5 Each 25 Each 50 Each 75 Each 100 Each 125 Each 200

14. Importance of

“Safety

Handbook”

1 25 50 75 100 125 200

Page 413: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-343 Sign & Stamp of Tenderer

15. Traffic Safety

(Speed limit,

safe

crossing and

working

within

barricaded

area etc.)

5 Each 25 Each 50 Each 75 Each 100

Each 125 Each 200

16. Environme

ntal

Monitoring

(Spillage of

Muck,

hazardous

material,

Improper

drainage,

water spray

for dust

containment

etc.)

5 Each 25 Each 50 Each 75 Each 100

Each 125 Each 200

17. Video in

Hindi on

PPE usage

– 15

minutes

duration

1 - - - 1 1 1

18 High Risk

Specific

activity Do’s

and Don’t

5 Each 25 Each 50 Each 75 Each 100

Each 125 Each 200

Note 1: Items mentioned under 17 is video. Items under 3 (a) and 5 (a) are metal signage boards

and all other items are posters.

Page 414: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-344 Sign & Stamp of Tenderer

Table No.: 2 – Size of Posters / Signages

Sl.No Item Size

1. Posters – Standard 1.5 meter x 1.5 Meter Vinyl 4 Colour Printing

2. Posters – Special (Wherever required) 17”x22” card laminated FA Poster

3. Posters - Mega size (Wherever required) 2 meter X 2 meter Flex FA Poster

4. First-Aid Booklet 6”x4”

5. Safety Handbook 6”x4”

6. Signages Small: 0.5 Meter x 0.5 Meter

Big : 01 Meter x 01 Meter

7. Road Traffic Sign Boards Strictly as per Indian Road Congress

(IRC) specifications

Reflective Stickers

Size :900mm x 900mm

(Diameter of Circle/Rectangular

/Triangular)

Table No.: 3 – Safety Signage Colour (as per IS 9457)

Sl.No Type of signage Colour

1 Mandatory Blue

2 Danger Yellow

3 Prohibitory Red

4 Safe conditions Green

Page 415: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-345 Sign & Stamp of Tenderer

Authorised Signatory

Photo

Name:

Designation:

Blood Group:

Name & Address of Main / Sub /

Labour contractor

Company

Logo

GSAF 16

ID Card Format

(85 mm x 55mm)

Front side of ID

CMRL Project Card:

Backside of ID Card:

Employee Address:

Main contractors’ Address

Contractor) and must be returned on demand and on transfer /

cancellation of employment.

This card is the property of “XX“ (Main / Sub / Labour

Page 416: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-346 Sign & Stamp of Tenderer

GSAF 17

CHENNAI METRO RAIL LTD.

GSAF No :

DAYS TO BE OBSERVED FOR CREATING OSH&E AWARENESS

1st Monday to

Sunday of

January

Road Safety Week (Subjected to confirmation from Ministry of

Road Transport, Govt. of India every year.)

4th February World Cancer Day

16th February Kyoto Protocol Day

March Red Cross Month

4th March National Safety Day

22nd March World Water Day

7th April World Health Day

14th April Fire Safety Day

April 18 to 22 Earth Week

20th April Noise Awareness Day

22nd April Earth Day

28th April ILO World Day for Safety and Health at Work Day

May 1 to 7 Emergency Preparedness Week

5th June World Environmental Day

12th June World Day against Child Labours

9th July Health Day

9th Sep World First Aid Day

17th October World Trauma Day

1st December World AIDS Day

Page 417: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-347 Sign & Stamp of Tenderer

MINIMUM LIGHTING REQUIREMENTS

GSAF 18

S.N. Facility or Function Luminance –

Ix (Im/ft2)

1. Administrative areas (offices, drafting and meeting rooms, etc.)

540 (50)

2.

Construction areas

- general indoor

- general outdoor

55 (5)

33 (3)

3. Access ways

- exit ways, walkways, ladders, stairs 110 (10)

4.

Maintenance / Operating areas / shops

- vehicle maintenance shop

- carpentry shop

- outdoors field maintenance area

- refueling area, outdoors

- shops, fine details work

- shops, medium detail work

- welding shop

325 (30)

110 (10)

55 (5)

55 (5)

540 (50)

325 (30)

325 (30)

5. Mechanical/electrical equipment rooms 110 (10)

6. Hoists, Elevators, freight and passenger 215 (20)

7.

Warehouses and storage rooms/area

- indoor stockroom, active/bulk storage

- indoor rack storage

- outdoor storage

110 (10)

270 (25)

33 (3)

8. Health Centers and First aid stations and infirmaries 325 (30)

9. Toilets, wash and dressing rooms 110 (10)

10. Work areas – general (not listed above) 325 (30)

11. Parking areas 33 (3)

12. Visitor areas 215 (20)

13. Laboratories 540 (50)

Page 418: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-348 Sign & Stamp of Tenderer

Labour Camps GSAF 19

PORTA CABINS EMERGENCY PREPARDNESS

AND RESPONSE PROCEDURE

BEDS, COOLING AND

LOCKER FACILITY

Ensure that the flammable

storage is kept away from the

residential zones.

Display emergency contact

numbers clearly and

prominently.

Display & communicate to

workers the MSDS and action

to be taken in case of an

emergency.

Provide appropriate security

personnel to prevent

unauthorized entry in to the camp

area.

Maintain register to keep a track

on the head count of persons

present in the camp at any given

time.

Control the traffic movement &

provide enough parking spaces

for vehicles.

Locate the DG sets away

from the flammable storage

area.

Enclosed type of DG sets will

be ideal to avoid

unnecessary noise.

Provide proper floor and

bunding if required to take

care of spillage.

GARBAGE COLLECTION &

DISPOSAL

SEPTIC TANK WASHING FACILITY

Provide appropriate bins for

collecting garbage.

Dispose off the garbage on

regular basis.

Carry out pest control in this

area.

Provision of enclosed type of

septic tank is mandatory.

Dispose off the sewage regularly.

Do not allow the septic tank to

overflow.

Keep the surrounding clean & tidy.

Provide adequate clothes

washing facilities.

Provide appropriate clothes

drying facility.

Ensure that proper drainage

system is provided &

maintained.

KITCHEN FACILITY DINNING AREA SHOPPING

Provide proper kitchen facility

for cooking food.

Take necessary Fire safety

precautions in this area.

Always maintain good

housekeeping in this area.

Provide shaded dining area with

tables & chairs for eating food.

Ensure that proper lighting and

ventilation is provided in this

area.

Provide adequate numbers of

insect killers in this area.

Always maintain good

housekeeping.

Provision of shopping facility

will be added advantage.

Household items may be

sold at this out let.

Do check for expiry dates of

food & other items being

sold.

Maintain good housekeeping

in this area.

Obtain necessary license/

permission for shops.

FIRST AID RECREATION AREA REST ROOMS

Provide First aid facility round

the clock.

Maintain stock of medicines as

per the TBOCWR 2006.

Provide full time designated first

aider or male nurse as the case

may be.

Provide recreation facilities for

the workers with TV & Audio

arrangement.

Adequate air conditioners to be

provided for better ventilation.

Maintain good housekeeping in

this area.

Provide well shaded rest

rooms.

Provide sufficient numbers of

chairs and tables for workers.

Keep the area clean.

Page 419: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-349 Sign & Stamp of Tenderer

Accident Investigation & Reporting – GSAF 20

PROCEED TO THE LOCATION

OF ACCIDENT

CALL AMBULANCE /

FIRE BRIGADE

INFORM RELEVANT

PEOPLE

Immediately proceed to the

location of an accident as soon

as you receive the information /

call.

Assess the situation.

Find out the type of emergency.

Check out if anyone is injured.

If minor injury provide first aid.

Do not panic.

Call the concerned emergency

services if accident is serious.

Police - 100

Ambulance - 108

Fire - 101

Inform relevant Project

/Construction Manager.

Inform relevant ESHS

Manager / Engineer.

Ensure that all the reportable

accidents / diseases as

described under TBOCWR

2006 are reported to

Employer /ER

CORDON OFF THE AREA COLLECT EVIDENCE &

INVESTIGATE REPORT TO EHS

Cordon off the accident area by

using PVC tape & cones.

Do not allow unauthorized

access.

Ensure that the scene of the

accident is not disturbed until

full investigation has been

completed.

Collect evidence before it is

moved or altered.

Take necessary photographs.

Speak to eyewitnesses and

collect facts.

Note down the time and other

details as necessary.

Report facts to ensure rumours &

false information are not spread.

Report the accident to

Employer/ER, as per the

Form No: 8A within 12 hours

of the accident.

Do not hide any accident or

information.

Follow the contact no and

email id of ESHS for

emergency reporting

Page 420: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-350 Sign & Stamp of Tenderer

First Aid Room / Facilities GSAF-21

APPOINT FIRST AIDER DISPLAY EMERGENCY

CONTACT NO’S

FIRST AID BOX /

CUPBOARD

Appoint one full time first aider

Appoint male nurse.

Telephone numbers of hospitals

or ambulances and police shall

be displayed at conspicuous

places.

Display name & contact no of the

first aider at the site office & other

prominent places.

Emergency contact no of ESHS

also displayed at conspicuous

places

First aid box shall be placed

in a clearly identified and

readily accessible location.

It should contain a sufficient

quantity of suitable first-aid

materials.

Ensure that the contents of

the first-aid box or cupboard

are protected from dampness

and dust.

FIRST AID ROOM ACCIDENT REGISTER FIRST AID FACILITY

Provide suitable staff &

equipped first-aid room.

Dispose off the expired

medicines in an environmentally

friendly way.

Provide and maintain Accident

Register to record all the first aid

cases.

Keep track of the number of man

days lost through work related

accidents.

Contents of the first-aid box /

cupboard shall be as per

Schedule III mentioned

TBOCWR 2006

First-aid facilities shall meet

the requirements specified in

TBOCWR2006

Page 421: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-351 Sign & Stamp of Tenderer

Personal Protective Equipment . GSAF 22

RESPONSIBILITY FOR ISSUE

OF PPE’S

PPE TO BE USED AS LAST

RESORT PPE’S SHALL CONFIRM TO

It is the responsibility of the

main contractor to provide

protective clothing including

coverall and other PPE required

for different operations.

Contractor shall bear the cost of

issuing coverall and PPE’s.

Adequate control measures shall

be taken by contractors to protect

workers against the hazards.

Contractor shall not wholly rely

on the PPE’s.

Risk Assessment undertaken to

identify type of PPE required.

PPE shall confirm to following

Head Protection

Eye & Face Protection

Hearing protection

Protective clothing

Hand protection

Foot protection

Safety belt, life line & lanyard

Respiratory protection

MAINTENANCE ALTERATION / MODIFICATION RESPONSIBILITY OF ITS

USE

It is the responsibility of workers

to maintain the PPE in good

usable condition.

However damaged PPE shall

be replaced immediately by the

contractor .

Personal protective equipment

shall not be altered or modified.

Do not use PPE that is damaged

or worn out.

It must be replaced.

It is the responsibility of line

management to implement

the effective use of PPE

issued to workers.

Workers must follow the

instruction they are given

with regard to using &

maintaining PPE.

Page 422: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-352 Sign & Stamp of Tenderer

Storage of LPG Cylinders . GSAF 23

LOCATION SHED FOR LPG CYLINDERS SECURITY

LPG cylinders shall be stored

away from combustible

materials.

Cylinders shall be stored at

ground level and be readily

accessible.

Do not store close to occupied

building.

Follow Gas Cylinder Rules for

better practice.

Store LPG cylinders in a well-

ventilated shed, made up of non-

combustible material.

It should be protected from

extreme weather / shelter

provided.

LPG cylinders shall be stored at

least 3 meters’ away from other

cylinders like oxygen, chlorine,

ammonia.

Always store or keep LPG

cylinders in vertical position.

Storage shed shall be kept

under lock and key.

Key shall be readily available

all the time.

Do not allow unauthorized

access by providing a fence

2.5 meters’ high.

Keep the cylinder valve

closed if not in use.

EMERGENCY PROCEDURES DISPLAY NOTICES MAINTENANCE

Develop a written procedure to

deal with emergencies that may

arise.

Provide appropriate fire

extinguishers as per TBOCWR

2006

Maintain all fire-fighting

equipment in good working

condition as per TBOCWR 2006

Ensure Personnel are trained to

deal with any emergency that

may arise.

Display notices such as, “LPG –

Highly Flammable”, “NO

SMOKING” or “NO NAKED

FLAME”.

Display notices in languages that

are understood by the workforce.

.

Maintain all the installations

by trained LPG fitters.

Pipe lines / hoses if any shall

be tested for safe working /

leakages.

Page 423: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-353 Sign & Stamp of Tenderer

Storage of Flammable Liquids . GSAF 24

CONTAINERS & TANK LOCATION &

STORAGE SHED

BUNDING & FLOORING

Use containers and portable

tanks made of material suitable

for storage of flammable liquids.

Always store flammable liquids

in a closed vessel.

Keep minimum 1.5 metres

space between two portable

tanks as per Petroleum Rules

Keep the area free from weeds,

debris & other combustible

materials.

Do not store flammables near

exits, stairways or in passages

used by people.

Keep the store under lock and

key.

Structure should be fire resistant.

Provide concrete floor for the

flammable storage area.

Proper bunding to be

provided to contain any

leakage.

Drums must be stored in a

bunded area too.

Capacity of the bund should

be 1.5 times the storage

capacity.

FIRE SAFETY PRECAUTIONS DISPLAY NOTICES & MSDS MAINTENANCE

Provide appropriate fire

extinguishers as prescribed as

per TBOCWR 2006

Maintain all fire-fighting

equipment in good working

condition.

Install flame proof electrical

fittings in the area.

Display notices such as,

“Flammable Liquid”, “NO

SMOKING” or “NO NAKED

FLAME”.

Communicate & Display Material

Safety Data Sheet (MSDS).

Display notices in languages that

are understood by the workforce.

Maintain all the installations

by trained & experienced

fitters.

Pipe lines / hoses if any shall

be tested for safe working /

leakage on a regular basis.

Page 424: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-354 Sign & Stamp of Tenderer

Manual Lifting . GSAF 25

ASSESS THE LOAD POSITION YOURSELF KEEP THE BACK STRAIGHT

Assess the load to be lifted.

Do not lift more than individual’s

capacity.

Avoid lifting if you are medically

unfit or sick.

Wherever possible make use of

mechanical lifting aids.

Come closer to the load to be

lifted.

Avoid over reaching or stretching.

Position your feet properly in the

direction of load to be moved.

Bend your knees.

Keep your back straight (but

not vertical).

Keep chin tucked into the

body.

CORRECT GRIP LIFTING CARRYING LOAD

Take a firm grip by using the

palms of the hands and roots of

fingers.

Take care of the sharp edges.

Use appropriate PPE such as

gloves, safety shoes etc.

If lifting from ground make

maximum use of legs.

Lift the load smoothly.

Avoid giving jerk.

Never lift the load using your

back.

Make sure you can see

where you are going.

Avoid twisting the body,

move your feet instead.

Keep control of the load.

Keep your back straight at all

times.

Take care that your fingers

are not trapped below the

load.

Check & remove tripping

hazards if any.

Ensure adequate lighting

levels are maintained.

Page 425: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-355 Sign & Stamp of Tenderer

Permit to Work (PTW) . GSAF 26

PTW REQUIREMENT &

RESPONSIBILITY OF ISSUE

VALIDITY OF

PERMIT TO WORK CANCELLATION OF PTW

PTW is required for hazardous

activities like,

Hot Works.

Confined space entry.

Cartridge operated tools

Excavation

Responsibility for ensuring a

PTW is issued lies with the

Main Contractor.

Comply with all the safety

regulations as applicable for

different type of works.

Activity for which PTW is issued

must have Risk Assessment

done.

PTW is valid only for the day on

which it is issued.

It can be renewed provided the

work is continued by same group

of workers & at the same

location.

PTW must be signed by the area

supervisor.

Explain hazards involved &

precautions to be taken to the

workers concerned.

Display PTW & safety notices in

the area where work is carried

out.

Work Permit can be

cancelled if the work is being

carried out in an unsafe

manner.

Cancelled work permit shall

not be reopened.

New PTW to be obtained to

continue the stopped work.

CLOSING OF PTW TRAINING PPE

PTW shall be closed only after

work is completed in all respect.

Proper housekeeping shall be

maintained during and after

completion of work.

Keep the record of issued PTW

for at least six months.

Ensure fire watch for at least 1

hour after completion of hot

work.

Workers associated with

hazardous works shall be trained

prior to starting the work.

Records of toolbox talk given

shall be maintained.

Everyone involved must

understand PTW requirements.

It is the responsibility of main

contractor to ensure that

appropriate PPE is issued

before starting the work.

Supervisor must ensure that

PPE is worn by the workers

at all times.

Page 426: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-356 Sign & Stamp of Tenderer

Excavation . GSAF 27

PRIOR TO EXCAVATION BARRICADE THE AREA DISPLAY NOTICES

Identify the presence of

underground installations & take

necessary safety precautions.

Obtain NOC from service

authorities

Ensure that Risk Assessment is

done for excavations &

necessary safety precautions

taken.

Employ cable avoidance tool

(CAT) prior to excavating.

Adequately barricade the area to

be excavated.

Do not stack any material near

the edge of any excavation, shaft,

pit or opening in the ground.

No load or plant or equipment

shall be placed near excavation

to prevent collapse.

Provide sufficient lighting for safe

operations.

Display adequate warning

notices in languages

understood by the workers.

Provide flashing amber lights

if excavation is left open

overnight & there is a risk of

vehicles passing by.

No unauthorized access to

be permitted.

PPE & FRESH AIR SAFE ACCESS & EGRESS SHORING & DEWATERING

Personal protective clothing &

equipment shall be provided to

the employees & be worn.

Contractor shall provide

instruments to test the

atmosphere for oxygen

deficiency in any excavation.

Provide adequate ventilation

where there is insufficient

movement of air.

Ensure that minimum of 19.5%

& maximum of 23.5% oxygen

level by volume is maintained in

the air.

Do not allow any person to

enter if the air is suspected to

be poisonous or asphyxiating.

Provide ladder or steps for safe

access & egress.

Evacuation plans & procedures

must be made known to

employees.

An emergency hoisting facility

shall be readily available at shafts

If the depth of vertical cut

exceeds 1.0m provide

shoring.

Provide shoring if there is a

possibility of fall or

dislodgement of earth, rock

or other material.

The angle of repose & design

of the supporting system

shall be based on depth of

cut, soil, loading, system of

dewatering, vibrations, traffic

etc.

Ensure that surface water

does not enter the excavated

areas & / or water shall not

be allowed to accumulate in

an excavation.

Page 427: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-357 Sign & Stamp of Tenderer

Hand Tools . GSAF 28

SELECT RIGHT TOOL

FOR THE JOB

USE THE TOOL CORRECTLY /

USE OF PPE

QUALITY OF TOOL /

UNSAFE TOOL

Always select right tool for the

job.

Supervisors have a

responsibility to ensure correct

tools are available.

Use tools for their designed

purpose only.

Do not modify tools in any way.

Always use hand tools in

accordance with the

manufacturer’s instructions.

Managers and supervisors must

provide training in the use of tools

where necessary.

Use appropriate PPE as detailed

in manufacturers’ instructions.

It is the responsibility of main

contractor to provide PPE.

Ensure that good quality

tools are selected, procured

& issued to labourers.

Unsafe hand tools should be

removed from site.

(e.g. Mushroom headed

chisel)

Broken or damaged tools

should be disposed of.

Register to be maintained for

issuance of PPE.

STORAGE OF TOOLS &

MAINTENANCE POWER OPERATED TOOLS

CARTRIDGE OPERATED

TOOLS

Provide suitable cabinet for

storage of tools & identify them.

Return all tools to their proper

store after use.

Protect the tools by keeping

them away from extreme

weather.

Maintain hand tools in good

working condition, inspect them

regularly for defects.

Select & use tools operating at

110V where possible.

Ensure that the guards are fitted

to all moving parts.

Make employees aware of the

hazards & manufacturers

operating instructions.

Do not carry tools by holding the

electric cables.

Where a specific tool is not

available at 110V then 240V must

be used only with 30mA RCD.

No person shall use cartridge

operated tools unless he has

been trained & is

experienced in the operation.

Make employees aware of

hazards & manufacturers

operating instructions.

Shall be fitted with guards if

there is potential hazard of

flying pins & splinters.

Main contractor to adopt

written procedure to control

the issue, use, storage &

maintenance of cartridge

tools.

Page 428: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-358 Sign & Stamp of Tenderer

Arc Welding & Cutting . GSAF 29

WELDING MACHINE &

CONNECTIONS HOT WORK PERMIT

WELDING ROD, HOLDER,

CABLE & EARTHING

Select the correct welding

machine depending upon the

type of metal to be welded.

Ensure that connection is done

by certified electrician.

Keep the welding machine

away from the source of heat.

Ensure that the cables are not

causing a tripping hazard.

Do not overload the welding

machine.

Switch off the power supply to

the machine when not in use.

Obtain Hot work Permit from the

area supervisor & to be closed

daily.

Cordon off the area & display

PTW where welding work is

carried out.

Welding operations shall be

shielded by non-combustible or

flameproof screens to protect

people working in the close

vicinity from ultra violet rays.

Welding or cutting work shall be

performed away from the

flammable goods storage.

Flammable containers shall be

drained, washed, dried

thoroughly & purged with inert

gas.

Do not bend the welding rod

& flux should be intact.

Ensure that the holder is

properly insulated.

Welding cable should be

completely insulated, flexible

& capable of handling the

maximum current

requirements of the work.

Pipe lines containing gases

or flammable liquids or

electrical conduits shall not

be used as a ground return.

FIRE FIGHTING EQUIPMENT

& PPE FUME EXTRACTION SYSTEM TRAINING & FIRE WATCH

Provide appropriate fire-fighting

equipment as prescribed as per

TBOCWR 2006

Workers shall be protected by

suitable eye, face, hand, body,

foot & respiratory protective

equipment.

Provide adequate mechanical

fume extraction & / or forced

ventilation whenever work is not

carried out in the open air.

Contactors shall instruct

employees in the safe means

of arc welding and cutting.

Provide fire watch for at least

an hour after completion of

welding or cutting work.

Page 429: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-359 Sign & Stamp of Tenderer

Gas Welding & Cutting . GSAF 30

LOCATION OF WORK

& TROLLEY

HOT WORK PERMIT FLASH BACK ARRESTOR,

HOSE PIPES & PRESSURE

GAUGES

Keep the flammable storage

away from the gas welding &

cutting operation.

Keep & store the gas cylinders

away from the source of heat.

Always keep the gas cylinders

vertical in a trolley & tied with

chain.

Do not lift gas trolley with crane.

Obtain Hot work Permit from the

area supervisor & to be closed

daily.

Cordon off the area & display the

permit where welding & cutting

work is carried out.

Operations shall be shielded by

non-combustible or flameproof

screens to protect people working

in the close vicinity.

Flammable containers shall be

drained, washed, dried

thoroughly & purged with inert

gas.

Ensure that Flash back

arrestors are provided on

both the cylinders.

Hose pipes must be

connected with proper

clamps.

Maintain pressure gauges in

working condition.

Torch should be kept free

from molten metal slag.

FIRE FIGHTING EQUIPMENT

& USE OF PPE STORING GAS CYLINDERS TRAINING & FIRE WATCH

Provide appropriate fire-fighting

equipment as prescribed as per

TBOCWR 2006

Workers shall be protected by

suitable eye, face, hand, body,

foot & respiratory protective

equipment.

Provide adequate mechanical

fume extraction & / or forced

ventilation whenever work is not

carried out in the open air.

Gas cylinders shall be stored in a

well-ventilated shed made up of

non-flammable material.

Keep the valve caps in place.

Contactors shall instruct

employees in the safe means

of arc welding and cutting.

Provide fire watch for at least

an hour after completion of

welding or cutting work.

Page 430: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-360 Sign & Stamp of Tenderer

Bench Grinders . GSAF 31

DETAILS OF MACHINE GURADING REST BRACKETS

RPM to be displayed on the

machine.

Emergency stop button must be

located on the machine.

Keep the area around machine

clear of all materials.

Keep the machine switched off

when not in use.

Ensure that the guard is fixed to

the machine.

Guard must be replaced after

carrying out any maintenance

work if any.

Cover the abrasive wheels after

work is completed.

Rest bracket should be

properly secured & must be

adjustable.

Keep the rest bracket in

horizontal position.

ABRASIVE WHEELS SAFETY NOTICES / PPE TRAINING & USE

Select the correct wheel for the

job to be grinded.

Ensure that the safe peripheral

speed of the wheel is not

exceeded.

Abrasive wheels shall be

mounted, balanced & dressed

by trained and experienced

person.

Ensure that wheels are

mounted using washers /

blotters.

Do not use wheels that have

been dropped or cracked. It

should give clear ringing sound.

Worn out wheels must be

replaced immediately.

Display safety notices in the

languages easily understood by

the operators.

Display names of the operators

authorized to operate the

machine.

It is the responsibility of the

contractor to provide appropriate

PPE like face shield or safety

goggles.

Area supervisors will ensure that

the operator uses the issued

PPE.

Provide appropriate training

to the workers.

Do not apply excessive

pressure on to the wheels.

Never grind on sides of the

wheel.

Do not try to stop the rotating

wheel by hand.

Any person mounting,

balancing or dressing an

abrasive wheel must be

trained & appointed in

writing.

Page 431: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-361 Sign & Stamp of Tenderer

Circular Saw . GSAF 32

DETAILS OF MACHINE GUARDING RIVING KNIFE & PUSH

STICK

Machine shall be positioned

such that there is no obstruction

to operator & others.

Always keep the machine

switched off when not in use.

Emergency stop control must

be provided on the machine &

should be easily accessible.

Keep the space around the

machine clean & free from any

obstructions.

It will be ideal if saw dust

extraction system is provided if

used inside a building.

Ensure that the crown guard is

fixed to the machine.

Guard the fly wheel & belt located

below the machine.

Guard must be of adequate

strength & of good construction.

Guard should not create any

danger to the operator while

using.

Guard must not be bypassed or

removed.

Disciplinary procedure in place to

deal with any safety violation.

Ensure that Riving knife is

fitted & is in place while

machine is being operated.

Maintain appropriate

distance between the circular

blade & riving knife as

prescribed in the

manufacturers operating

manual.

Make use of Push stick when

there is a danger of hand

coming in to contact with the

revolving blade (danger

zone).

Ensure adequate lighting

arrangements have been

made.

TRAINING & AUTHORISATION SAFETY NOTICES / PPE USE & MAINTENANCE

Display names of the operators

authorized to use the machine.

Do not try to stop the rotating

blade by hand.

Cutting work should be carried

out under the supervision of a

trained & experienced person.

All circular saw operators must

be trained & competent and

authorized to use the machine.

Display safety notices in the

language easily understood by

the operators.

It is the responsibility of the

contractor to provide appropriate

PPE like face shield, safety

goggles & respiratory protection.

Area supervisors will ensure that

the operator uses the issued

PPE.

Regular monitoring of airborne

particles must be carried out & if

hardwoods are machined a full

assessment must be undertaken.

Do not apply excessive

pressure on the blades.

Circular saws are for straight

edge cutting never try to cut

in curves.

Maintain machine in good

working condition.

No adjustments shall be

made while the machine is in

motion.

Ensure that the guard is

replaced back immediately

after the maintenance work is

completed.

Blades with broken teeth

should be replaced

immediately.

Page 432: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-362 Sign & Stamp of Tenderer

Electricity at Site . GSAF 33

DESIGN & LOCATION PROTECTION SAFETY MEASURES

Design & installation of

temporary electrical power

systems must be carried out by

a competent electrical C

licence.

Circuit breakers must be

appropriate for the circuits they

are protecting.

Cables and connections must

meet the standard requirements

& adequate steps must be

taken to prevent cable damage

in construction area.

Mechanically protected cable

such as SWA must be used

where any cables above 110V

are run across site.

Tools shall be disconnected

before any adjustments are made

or attachment changed.

All distribution boards must be

kept under lock and key.

Distribution board must be

covered to protect from weather.

Always use industrial sockets for

joining & connecting cables.

Inspect all cable regularly &

ensure any damage is repaired /

replaced by a competent

electrician.

Provide necessary

protective devices such as

Earth Leakage Circuit

Breaker (ELCB) in the circuit

to avoid risk of shock, fire or

burns.

Where cranes or excavators

etc. are in operation or

scaffolding is being erected

near overhead cables install

warning barriers to keep

persons & plant clear.

Ensure that supply cables for

fixed plants shall be routed

clear of construction work &

are protected against traffic

movement & water.

Make use of reduced voltage

of 110V where tools are

available.

Ensure that RCD with 30mA

trip fitted on all 220-240V

tools.

Never insert loose wires of a

tool cord into a socket.

AUTHORISATION /

CERTIFICATION

SAFETY NOTICES & USE OF

PPE

TRAINING / LOCK OUT &

TAG OUT

Ensure that all electrical work at

site is executed by qualified &

authorized competent person.

Contact numbers of Electrical C

licence Competent shall be

displayed prominently & all the

electrical connections shall be

checked and approved through

them.

Display sign board on work area

for safety awareness.

Display danger sign & voltage

details on all electrical panels /

distribution boards used at site.

The main contractor shall ensure

that necessary PPE is worn by

the electricians to prevent

electrical shock or burns.

All hand tools used by

electricians shall be insulated &

in good condition.

Provide necessary training to

all electricians and workers

concerned.

Conduct a tool box talk on

safe use of electricity on site

Use lockout & tag out

procedures when working on

electric circuits coupled with

permit to work systems.

Only instigator can remove

lock out or tags from electric

sources.

No live working to be carried

out.

All circuits must be isolated

before work commences.

Page 433: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

v

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-363 Sign & Stamp of Tenderer

Air Receivers . GSAF 34

POSITIONING DRAIN PIPE & VALVE PRESSURE GAUGE

& SAFETY VALVE

Air receivers shall be placed

away from the combustible

materials & sources of heat.

Air receivers must never be

buried underground or located

in an inaccessible place.

Air receivers shall be placed

with sufficient clearance to allow

a complete external inspection.

Ensure that adequate drain pipe

& valve is installed at the lowest

point of every air receiver to

remove accumulated oil and

water.

Adequate automatic traps may be

installed in addition to drain

valves.

Completely drain the air receiver

by opening drain valve at such

intervals as to prevent the

accumulation of excessive

amount of liquid.

Every air receiver shall be

equipped with a pressure

gauge & safety valve.

Ensure that the safety valve

is tested frequently in

accordance with the

manufacturer’s manual.

TESTING & CERTIFICATION GUARDING HOSE CONNECTION & USE

Every pressure vessel shall be

examined by a competent

person as per TBOCWR 2006

Testing frequency shall be once

in 6 months.

It shall be examined by visual

examination & hydrostatic or

pneumatic test.

Ensure that proper guards are

provided to all the moving parts

like fly wheel & belt.

Replace the guard immediately

after completing maintenance

work.

Undertake regular inspections to

check the guarding of the

machine.

Air lines shall be connected

using proper clamps.

Air lines should be of good

approved quality.

Never use compressed air

for cleaning of clothes or

body parts.

Whip checks must be

provided to all connections in

a compressed air line.

Page 434: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

v

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-364 Sign & Stamp of Tenderer

Confined Space Entry . GSAF 35

RISK ASSESSMENT

& ENTRY PERMIT

TESTING & MONITORING

OF ATMOSPHERE

COMMUNICATION

& USE OF PPE

Ensure that Risk Assessment

(RA) is done and precautions

are taken accordingly.

Confined space entry permit to

be obtained before entering &

carrying out work in a confined

space.

Main contractor must ensure

that the permit to work

procedures & working

procedures are regularly

checked & audited.

Confined space shall be

certified by a competent person

based on the test carried out by

himself.

Establish testing of atmosphere

prior to entry where identified in

the risk assessment.

Also carry out ongoing monitoring

of the atmosphere whilst work is

being carried out.

Isolation & lock off procedure

must be followed to prevent

gases, liquids or other free

flowing materials entering the

confined space.

Flameproof electrical equipment

shall be used in case of possible

flammable gas atmosphere.

Ensure that there is an

agreed means of

communication between

those in the confined space

& the person(s) appointed as

the look out.

Use PPE as prescribed in the

Risk Assessment.

Escape set breathing

apparatus to be provided

where there is a risk of a

hazardous atmosphere

developing.

All persons entering a

confined space must wear

safety harnesses to facilitate

rescue in an emergency

situation.

SAFE ACCESS / EGRESS & DISPLAY OF NOTICES

TRAINING, SUPERVISION & EMERGENCY PROCEDURE

VENTILATION & AIR QUALITY

Ensure that safe access &

egress are provided into and

out of the confined space.

Display appropriate warning

signs & notices in languages

that are easily understood by

the work force.

Before using open flames in a

confined space, combustible

gases or liquids must be

removed if present.

Manholes used for access

should be rectangular, oval or

circular in shape & be not less

than 450mmX407mm or

457mm diameter.

Provide adequate trained

supervision for the confined

space working.

Maintain a tally of people with

name, number & time of entry &

exit from the confined space for

any emergency purposes.

Establish & communicate an

emergency procedure to deal

with rescue or recovery of any

workers who become injured or

dehydrated.

Practice the evacuation drills on

regular basis.

Provide good ventilation in

the confined space to

prevent stale air & ensure

that the air quality remains

breathable.

Remove any residue that

may be present & may give

rise to risk to workers

working in confined spaces.

In case of an excessive

temperature reduce the time

of working shifts and give

frequent breaks.

Make arrangements to

ensure that workers do not

become dehydrated whilst

working in excessive

temperatures.

Page 435: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-365 Sign & Stamp of Tenderer

Scaffolding . GSAF 36

SELECT THE

TYPE OF SCAFFOLD

INSPECT THE MATERIAL

& GROUND CONDITIONS

TRAINING TO

SCAFFOLDERS

Check, for what purpose

scaffold is required.

Select the correct type of

scaffold for the job.

Scaffold should take the load of

man, material and equipment to

be used.

Scaffold extended over the

height of 6m must be designed

by a competent scaffold

designer.

Take into account the weather

condition too.

Scaffold material including

fixtures shall be of adequate

strength & free from any defects,

corrosion and bends.

Ground should be levelled &

compacted properly.

Do not erect scaffold on loose

soil.

Select & engage

experienced scaffolders for

the job.

They should possess a

professional training

certificate by ESHS

approved third party agency.

Work should be carried out

under the supervision of

competent person (scaffold

supervisor).

Impart tool box talk to the

labourers.

BARRICADE THE AREA &

DISPLAY NOTICES

BASE PLATES &

ALL THE FIXTURES

FULLY BOARDED

WORK PLATFORMS

Barricade the area where

scaffold has to be erected or

dismantled.

Display adequate cautionary

notices and signs.

Do not allow any unauthorized

access.

Provide base plates below all the

uprights or standards.

Ensure that all the ledgers,

transoms & cross bracings are

used and tightened / clamped

properly.

Ties to be provided in

accordance with design.

Work platform shall be fully

boarded not less than

200mm wide & 38mm thick.

Secured properly.

Width of the platform shall

not be less than 60 cm when

used for persons only & shall

be 80 cm) when used for

man and materials.

Width of gangway shall be 43

cm for passage of persons

only and 60 cm if used for

passage of material.

Page 436: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-366 Sign & Stamp of Tenderer

Mobile Scaffold . GSAF 37

SELECTION & ERRECTION WORK PLATFORM &

ACCESS / EGRESS WHEELS & OUTRIGGERS

Ensure that the mobile scaffold

is of good construction, sound

material & adequate strength.

Take into consideration the type

of work, height & weather

conditions.

Place the mobile scaffold on

level & firm ground.

Keep the scaffold loads to

minimum (including tools &

equipment).

Do not use partly erected or

dismantled scaffold.

Carry out risk assessment &

take the necessary safety

precautions.

Provide full planking.

Use internal ladder with protected

opening.

Ensure that the guardrails and

toe boards are in place on all

open sides.

Ensure that access & egress

ladder is properly secured to the

scaffold.

Do not exceed the scaffold’s

working load.

Tagging system must be strictly

followed for using mobile

scaffolds.

Provide wheels as per the

manufacturer’s instruction

manual.

Ensure that all the castors

are capable of being locked

& in good condition.

Keep all the castors locked

when work is performed from

the scaffold.

Unlock it while moving.

Provide outriggers if required

as per the manufacturer’s

instruction manual

TRAINING & PPE USE & SUPERVISION HEIGHT & WIDTH RATIO

Ensure that only authorized

people are allowed to

assemble, use and dismantle

mobile scaffolds.

Wear appropriate personal

protective equipment as

suggested by the manufacturer

or identified in the risk

assessment.

Any scaffold must be erected by

persons trained through

ESHS approved third party.

Never move the scaffold when

someone is on the scaffold.

Provide adequate supervision by

deputing an experienced person.

Never use mobile scaffold during

high winds.

Take adequate safety

precautions where overhead

electric cables are running.

Carry out weekly inspections of

the scaffold.

Ensure that the maximum

height to shortest width ratio

of the mobile scaffold does

not exceed 3.5:1 for indoor

works and 3:1 for outdoor

works.

Never climb the outside of

any mobile scaffold tower

which can overturn even a

correctly erected tower.

Page 437: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-367 Sign & Stamp of Tenderer

Working at Height . GSAF 38

RISK ASSESSMENT /

PERMIT TO WORK SAFE WORK PRACTICES TRAINING

Ensure that Risk Assessment

(RA) & Method Statement have

been completed prior to

carrying out the work at height.

Hazards involved and safety

precautions to be taken shall be

communicated to workers

involved in working at height.

In special cases ensure that

permit to work is obtained prior

to starting the work at height.

Follow hierarchy of controls for

mitigation of risk.

Ensure that proper safety

arrangements have been made

for working at height.

Ensure all the control measures

identified in the Risk Assessment

(RA) are implemented at site &

safe work practices are followed.

Provide life line where proper

platform cannot be provided.

Cordon off the area where work

at height is carried out & provide

warning signs.

Working at height shall be

carried out by experienced &

trained workers.

Record of induction training

& tool box talks shall be

maintained.

If new person is appointed,

they shall carry out work

under the supervision of an

experienced worker.

Medically unfit persons must

not be engaged to work at

height.

Training in use of safety

harness should be given to

workers.

USE PPE & DISPLAY NOTICES EMERGENCY ARRANGEMENTS USE OF EQUIPMENT &

TESTING

It is a responsibility of the main

contractor to issue required

PPE to all the workers.

If proper working platforms

cannot be provided, use full

body harness having

attachment of fall arresting

device.

Display notices in languages

easily understood by workers.

Risk Assessment must detail

emergency procedures including

rescue of any person suspended

by their safety harness within 10

minutes.

Display names & contact

numbers of the persons to be

contacted in case of an

emergency.

Equipment such as hydraulic

lifters or scissor lifts should

be utilized where there is a

space constraint.

Equipment like temporary

suspended working platform

(cradle) shall be tested

through ESHS approved

third party.

Page 438: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

v

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-368 Sign & Stamp of Tenderer

Mobile Cranes . GSAF 39

SELECTION OF CRANE TESTING & CERTIFICATION POSITIONING OF CRANE &

RIGGING

Select the right crane for the

load to be lifted.

Crane must be of good

mechanical construction of

sound material, adequate

strength & free from any defect.

Risk assessments (RA) must be

carried out for all mechanical

lifting.

Method of lifting as per the RA

must be communicated to all

those involved.

Detail of crane capacities at

various radiuses must be

displayed prominently.

Cranes over 1 ton capacity

must be fitted with SLI/ASLI.

Provide proper access & egress

to operator’s cabin.

Ensure that limit

Lifting equipment must be tested

every 6 months through ESHS

approved third party.

Lifting must be done under the

supervision of appointed person

with relevant experience.

Crane operator, signaller / rigger

must have competency certificate

issued by an ESHS approved

third party.

Carry out weekly service

inspection of crane which must

be recorded in a register.

Ensure that all operators,

signaller / rigger are medically fit

& have good eye sight.

Ground must be leveled &

compacted & shall be stable

for positioning of crane.

Ensure that the crane does

not possess any hazard to

other workers & moving

traffic.

Outriggers must be used with

pads below.

Make use of safe & tested

lifting tackle marked with

SWL on it.

Lifting tackle must not be

altered, lengthened or

repaired.

Do not position the crane

unsafely near excavated pit

or trench.

Lifting tackle must be free

from any defects.

Page 439: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-369 Sign & Stamp of Tenderer

Tower Cranes . GSAF 40

COMMUNICATION TRAINING & PPE CLIMBING FRAMES &

EMERGENCY

Provide effective means of

communication between the

crane operators & signallers,

slingers.

When there is no clear line of

sight between operators &

signallers and when tower

crane is erected the operators

cab, provide radio

communication.

Crane must be of good

mechanical construction, sound

material, and adequate strength

and free from any defect.

Risk Assessments (RA) must

be carried out for all mechanical

lifting.

Detail of crane capacities at

various radiuses must be

displayed prominently.

Cranes over 1 ton capacity

must be fitted with SLI/ASLI.

Provide proper access & egress

to operator’s cabin.

Wherever possible ensure

cranes are positioned to avoid

collision

Position the crane such that it

does not possess any hazard to

others.

Where it is possible for 2 or

more cranes can collide, anti-

collision devices must be

installed.

Ensure that the highest crane is

fitted with anemometer & kept in

good working condition.

Do not operate the crane in high

winds refer crane manual.

All operators, signallers, slingers

to be trained & certified by

ESHS approved third party.

Use PPE as identified in RA & as

recommended in the

manufacturer’s operation manual.

Lifting equipment must be tested

every 6 months & also after any

modification (i.e. jumping)

through ESHS approved third

party.

Carry out weekly service

inspection of the crane which

must be recorded in a register.

Ensure that all operators are

medically fit & have good eye

sight.

Lifting must be done under the

supervision of appointed person

with relevant experience.

Climbing frame used in the

tower crane must be tested &

certified by a competent third

party engineer.

Emergency procedure to be

in place in case of any

emergency.

Display emergency contact

numbers.

Ensure that all the limit

switches are in working

condition.

Method of lifting as per the

risk assessment must be

communicated to all those

involved.

Lifting operations must be

planned, supervised,

monitored & reviewed.

Ensure that people involved

in any lifting operation are

competent to carry out their

work safely.

Lifting accessories must be

safe & thoroughly examined

by a competent person every

6 months.

Lifting tackle must not be

altered or repaired.

Lifting tackle must be free

from any defects.

Ensure that SWL is marked

on the tested slings.

Cordon of the area & display

adequate safety notices.

Page 440: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

v

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-370 Sign & Stamp of Tenderer

Safe Use of Ladders . GSAF 41

SELECTION OF LADDER FOOTING / TRAINING USE OF LADDER

The ladder must extend at least

1metre above the landing place,

unless another suitable hand

hold is provided.

Do not use homemade ladders.

Metal ladders must have rubber

shoes fixed to its base all the

time.

Rung of the ladder must be flat.

Ensure that the ladder is of

adequate strength and sound

construction.

The ladder must be set on a firm

level footing (not bricks).

Do not over load step ladders.

Do not use any metal ladder

while carrying out electrical

works.

Long ladder shall be carried by

two persons.

Keep the front end of the portable

ladder 2 metres above the

ground level when carried by

single person.

Person involved in using portable

ladder must be given training.

Risk assessment must be

prepared before carrying out

any works from ladders or

step ladders.

Ensure that 3 point contact is

made all the time while

climbing or descending a

ladder.

Ensure that the ladder is

used by only one person at a

time

The ladder must be set at the

correct angle, approximately

750 with the horizontal.

(1H:4V)

All ladders used for access

must be securely fixed in

place.

Do not try to stretch too far

on sides whilst standing on

the ladder.

STEP & EXTENSION LADDER INSPECTION & TAGGING STACKING &

MAINTENANCE

If working from a ladder or step

ladder top 3 rungs must not be

used.

Always ensure extension

ladders and step ladders are

locked securely to prevent

collapse.

Overlapping of two extension

ladders shall be done in

accordance with the

Manufacturers Manual.

Ladder must be inspected by a

competent person at the start of

each shift.

Use an inspection tagging system

for ladders.

Defective ladders must be

removed from use.

Use PPE as per site rules or as

per risk assessment.

After completion of the works

ladders should be returned to

the store for maintenance /

thorough inspection.

Ideally ladders should be

stored off the floor to

maintain safe access.

Ladders with missing rung/s

must not be allowed to use.

Page 441: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-371 Sign & Stamp of Tenderer

Fire Extinguishers – GSAF 42

TYPES OF FIRE

EXTINGUISHER LOCATION SELECTION & USE

Compressive risk assessment

(RA) must be undertaken for

site, labour camp & office fire

risks.

Risk assessment must identify

sources of fire & detail

adequate control measures.

Key findings of the assessment

must be briefed out during the

site & office induction.

Inspection checklist should be

prepared to ensure risk

assessment requirements are

complied with

Install firefighting equipment /

extinguishers in the area where

fire hazard is present.

Maintain location plan of fire

extinguishers installed.

Access to all available fire

extinguishers shall be maintained

at all times.

Portable fire extinguishers must

be provided on each floor.

In multi-story buildings, at least

one fire extinguisher shall be

located adjacent to the staircase

on each level.

Travel distance to the nearest fire

extinguisher should be within

15m radius

Select the correct fire

extinguisher depending on

the type of fire.

Use PASS method to

extinguish small fire.

(P – Pull, A-Aim, S -

Squeeze, S- Swipe)

Do not use carbon-

tetrachloride fire

extinguishers which are

prohibited.

Only trained personnel

should be allowed to use fire

extinguisher to extinguish

fires.

Workers must be instructed

not to take risks when

tackling fire.

MAINTENANCE INSPECTION & TAGGING STACKING &

MAINTENANCE

Fire extinguisher type, capacity

& number based upon hazard

occupancy as per TBOCWR

2006

Check the pressure and

contents of your extinguisher

recommended by the

manufacturer.

Fire extinguishers must be

maintained in good usable

condition as per TBOCWR 2006

Examine fire extinguishers for

any physical damage, corrosion

or leakage, defective equipment

must be replaced immediately.

Carry out weekly inspection of

fire extinguishers and maintain

records.

Carry out annual service of fire

extinguishers & maintain records.

Ensure that the tag is present on

all the fire extinguishers with the

date of servicing done.

Do hydraulic testing of fire

extinguishers as prescribed as

per TBOCWR 2006

The main contractor shall

provide adequate firefighting

training to all employees.

Maintain a list of people

trained in firefighting.

Basic fire safety

arrangements must be

included as part of the site &

office induction.

Appoint adequate numbers

of Fire Fighters at the site.

Display names of Fire

Fighters, preferably near the

fire extinguishers.

Page 442: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-372 Sign & Stamp of Tenderer

Access & Housekeeping – GSAF 43

REQUIREMENTS &

RESPONSIBILITY

PRECAUTIONS TO BE TAKEN ACCESS REQUIREMENTS

It is the responsibility of the

main contractor to provide safe

access and maintain site

housekeeping.

As part of safe access the main

contractor must consider

lighting requirements

All access routes must be wide

enough to allow people to move

around safely.

Good housekeeping is the

regular removal of waste

material and management of

material storage areas.

Set up designated pedestrian

walkways wherever possible.

Display clear signage indicating

crossing points and directions.

Install crash decks over access

routes that provide access into a

building under construction.

Fix electrical leads up off the

ground to reduce trip hazards.

Stairs and passageways must be

kept clear of rubbish and

materials

Undertake risk assessments

for specific access needs

taking into account numbers

of workers.

The main contractor must

ensure emergency escape

can be made safely and

quickly.

Once access is provided

workers must use the

approved access route and

not take shortcuts.

INDUCTION & TOOLBOX TALK WASTE MANAGEMENT MAINTENANCE

All workers must be briefed

during the induction on the

importance of keeping the site

clean and tidy.

Regular tool box talks must be

given to workers as a reminder.

Waste must be managed.

Unmanaged site will quickly

become unproductive through

rubbish accumulation.

Supervisors must implement a

‘clean as you go’ policy.

Special arrangements must be in

place for hazardous substances.

Food waste must be collected

and disposed off separately.

Good access and

housekeeping require good

management

Regular monitoring of access

routes must be carried out.

The supervisor or manager

of each area must be made

accountable for maintaining

access and housekeeping.

Page 443: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-373 Sign & Stamp of Tenderer

Hoists (Man & Material) . GSAF 44

CONSTRUCTION /

ANCHORING WITH MAIN

STRUCTURE

TEST CERTIFICATES SAFETY NOTICES / RULES

Hoist shall be of sound

construction & adequate

strength.

Use the hoist for the purpose of

which it is designed (for man or

material).

Tie the hoist mast to the

permanent structure at locations

recommended by the

manufacturer.

Provide complete railing on the

sides of the floor when cage is

stopped on that floor.

Test the hoist shall be tested

through approved third party as

per the Tamil Nadu BOCWR

2006 at an interval of every three

months

Retest the hoist when relocated,

modified or extended up to the

higher floors.

Display SWL & maximum number

of persons allowed in the hoist

cage.

Also display the operator’s

training certificate.

Do not overload the cage (either

with persons or materials).

Display safety notices /

instructions & emergency

contact numbers in

languages easily understood

by the operators.

Follow safety instructions in

case of an emergency

Defective hoists shall not be

used and ‘DO NOT USE’

board shall be displayed until

defect is rectified.

Barricade the area around

the hoist at the ground level

to prevent unauthorized

access and crushing injuries.

EMERGENCY STOP BUTTON /

LIMIT SWITCHES TRAINING / USE OF PPES

FLOOR GATE /

MAINTENANCE

Provide & maintain upper and

lower level limit switches.

Make sure that the hoist cage

cannot be moved or operated

unless the hoist gate is closed.

Provide emergency stop button

in the hoist cage.

Provide appropriate type of fire

extinguisher in the cage.

Always employ competent &

trained operators for operating

the hoist.

Impart tool-box talk to all users of

the hoist & maintain records.

Provide & make sure that people

wear adequate personal

protective equipment at all times.

Provide gate on each landing

floor or wherever the hoist is

made to stop.

Inspect every hoist weekly &

keep records of

maintenance.

Ensure that the gap between

the floor and the hoist cage is

closed adequately.

Provide safe access – egress

to the hoist all the time.

Page 444: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-374 Sign & Stamp of Tenderer

Material Loading Platform . GSAF 45

DESIGN & CONSTRUCTION POSITIONING / LOADING TEST / CERTIFICATION

It is the responsibility of the

main contractor to provide &

maintain loading platforms.

The loading platform design

must be approved by a 3rd

party competent person

Suitable edge protection must

be provided to the edges where

persons and/or materials can

fall.

Any loading platform gates must

provide ridged edge protection.

The location of loading platforms

should be decided by the main

contractor.

Locate loading platforms so that

they do not create a snag hazard

for the site tower cranes.

Load material such that it does

not exceed the guardrail height.

Loading activity shall be

performed in the presence of

competent banks man.

Material loading platform

shall be tested through

approved third party as per

the Tamil Nadu BOCWR

2006 at an interval of every

three months.

Loading platforms must also

be tested whenever modified

or relocated.

Clearly display safe working

load at each loading

platform.

NOTICES / RULES TRAINING / INSPECTIONS RISK ASSESSMENT

The area under the loading

platform shall be barricaded

appropriately.

Display adequate warning signs

& notices for the safe use of

platforms.

All notices and warning signs

must be in a language

understood by the workforce.

All workers involved in the use

and loading of loading platforms

must be instructed on the agreed

safe system of work.

A competent person must

undertake a formal documented

inspection of every loading

platform at least weekly.

A risk assessment must be

undertaken for the design,

installation, use and removal

of loading platforms.

A method statement must be

prepared covering the

procedure for the safe use of

the loading platform.

Page 445: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-375 Sign & Stamp of Tenderer

Site Transportation . GSAF 46

IDENTIFY THE AREA WRITTEN PROCEDURE TOOLBOX TALK

Specific area for the pick-up

and drop-off point must be

identified with relative proximity

to the areas of work.

Proper barriers to hold the line

for maintaining the queue.

Area must be free from dust

and other obstacles.

A written procedure must be

established for the movement of

employees on the pick-up /

dropdown area.

This procedure must be posted in

different languages and

communicated to all staff.

Disciplinary action must be taken

against the violating drivers.

Procedure must be

communicated to all site

operatives.

Operators must be delegated

of their task and

responsibility as well as their

role in site implementation.

Bus drivers should undergo

specific training as per rules

& regulations.

PEDESTRIAN & VEHICLE

SEGREGATION SIGNAGE

MONITORING &

SUPERVISION

Pedestrian route must be

provided and separated to avoid

mishap involving workers

crossing the roads from

different directions.

Additional precautions must be

taken and flash lights / flag man

required to be placed during

foggy / adverse weather.

Display clear directional signage

leading to the identified point.

Mandatory and Informatory signs

must be displayed to enhance

awareness of the implemented

procedure.

“T” junctions and invisible areas

must have appropriate control

measures to avoid collision.

Supervision must be in place

at time of pick up & drop off.

It is the responsibility of

employer to provide safe

transportation for all

employees to and from each

work station and

accommodation.

Adequate no of buses must

be provided to meet legal

capacity requirements.

Vehicles must be maintained

in good condition.

Page 446: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-376 Sign & Stamp of Tenderer

GSAF 47

Contractor Surveillance Report

Serial: GCC/NNN/NNN/0000

Internal on Contractor:

External on Subcontractor:

Name of Originator:

Mr. XX

Contractor Name:

XX

Date Exercise Undertaken:

DD/MM/YYYY

Subcontractor Name:

XX

Location:

XX

Subject: XX

1. General

2. Purpose

a) XX

b) YY

3. Progress (if required)

a) XX

b) YY

c) ZZ

4. Surveillance Attendance

RE Team Contractor

A N Other (Designation) A. Boss (Designation - Contractor)

A Other (Designation) B. Boss (Designation - Contractor)

5. Summary of the Surveillance

a) The Surveillance was carries to verify the Contractors compliance etc

b) The following Observations were made

OBS-1: XX

Page 447: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-377 Sign & Stamp of Tenderer

OBS-2: YY

OBS-3: ZZ

Note: Observation is a statement of fact made during the Surveillance Exercise and

substantiated by objective evidence.

6. Comments & Conclusion

The Surveillance Exercise was carried out etc.

Reported by: Reviewed By:

Signature: Signature:

Date: Date:

Distribution: RE, DPD, Copy to Contractor under covering letter File No: XX.XX.XX

Page 448: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-378 Sign & Stamp of Tenderer

GSAF 48

Chennai Metro Rail Project

Non-Conformance Report (NCR)

Contractor Name: Contract No:

Package/Section: Chainage: Date: Time: NCR Serial: Subject:

Location: (a) Description of the Non-conformance

Attachments: (b) Drawing / SpecRef:Issued by Received by (for Contractor) Name: Designation: Name: Designation: Signature: Date: Signature: Date:

(c) Contractor’s Proposed Corrective Action

Statement of proposed Corrective Action, signed and dated by Contractor Project Manager / Designer:

USE AS IS - Work can proceed

REWORK -to make it conform/acceptable for use

To incorporate in as-built drawing To incorporate Designer comments.

REJECT - Scrap. Reasons noted below

Comments:

(d) Contractor’s Proposed Action to Prevent Recurrence

Attachments: Issued by (for Contractor): Received by:

Name: Designation: Name: Designation: Signature: Date: Signature: Date:

Contractor’s Proposed Corrective Action Acceptable Yes No

Comments:

(e) NCR Closed out: Yes No

Name: Designation:

Signature: Date:

Page 449: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-379 Sign & Stamp of Tenderer

Site Instruction (SI)

Project Name:

Contract No.:

Contractor: Sub-contractor:

Subject: SI No.:

Discipline: Date:

Location: Chainage:

Description:

Note – This form is to be used for instructions which have no time or cost impact. If the contractor considers that this instruction has time and cost implications he shall notify EMPLOYER in writing not later than 2 working days from the date of this site instruction or prior to commencement of work whichever is earlier.

Attachments:

References:

Drawing:

Contract Documents:

Other Correspondence:

Page 450: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-380 Sign & Stamp of Tenderer

GSAF-49

Issue to Contractor:

Contractor’s written response

required:

Yes No

Issued

by:

Name:

Designation:

Signature: Date: Time:

Received By (for

Contractor): Name: Designation:

Signature: Date: Time:

Close out by EMPLOYER:

This Site Instruction(s) has been carried out:

Yes No

Further Action / Comments:

Name: Designation:

Signature: Date:

Copied to: Employer's Representative

Document Control

Contractor Site Representative

Date: Signature: Designation: Name:

Action by Contractor:

Page 451: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-381 Sign & Stamp of Tenderer

GSAF 50

Note: When unable to contact

the RE the next progressive

level name must be contacted.

Inform Employers

Representative of Incident

Incident

Occurrence

Alarm Raised

Call Emergency

Services

Contractors Site Manager /

Engineer / Incident Controller

Take charge of situation &

confirm Alarm call to the

Emergency services

Resident Engineer

Mob:

Mob:

Mob:

Chief Safety Expert

Employers Representative

CMRL

CGM

Mob:

MD Mob:

Emergency Action & Notification

Process

Employers Representative

Contact

Page 452: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-382 Sign & Stamp of Tenderer

GSAF 51

REQUEST FOR INSPECTION (RFI)

Price Centre: Contract No: Contractor:

RFI No: Date:

Location

Price Centre –NA

Scope: -

Inspection Description:

Contractor’s Q/A or Senior Engineer Comments: Contractor Quality Manager Signature:

Date of Inspection:

Safety Precautions Taken : Yes No Contractor ESHS Manager Signature:

Contractor’s Safety /Quality checklist (Attachment Contractor’s ref No)

Objection : Notice of No Objection/with comments

(Yes/ No) Reasons:-

Contractor Engineer Signature: GC Engineer

Signature: Dated:- Dated

Comments / Recommendations of Resident Engineer after site measurement record:

RE Comments:

Site Inspector Comments:

Objection Notice of No Objection

Reason:- R E Signature

Date & Time:

Page 453: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub Section F ESHS -Volume 2 Health & Safety Manual

2-383 Sign & Stamp of Tenderer

GSAF 52

Minimum Requirements Of ESHS Monitoring and Audio-Visual Equipment’s

Sl.No OSHE monitoring and Audio-

Visual Equipment details

OSHE monitoring and Audio-

Visual equipment required for

Contract

1. Portable hand held Digital Sound

Level Meter (SLM)

5

2. Portable hand held Digital Lux Meter 5

3. Alcohol meter 3

4. Laptop Computer with standard

configuration including multi

media facilities

1

5. Colour Printer 1

6. Computer projector with screen 1

7. Overhead projector 1

8. Portable loudspeaker (for tool-box

talk and emergency purpose)

5

9. Gas Monitoring Equipment 5

10. Communication facility like

mobile phone, walky-talky etc

For all supervisors and

managers/engineers working in ESHS

11. Accident investigation Kit containing

the following:

2

a) Chalk piece for marking

b) Measuring tape for measuring

Flexible tape – 2m length

Metal Foot long scale and

Metal tape – 30m

c) Equipment tags

d) Multipurpose Flash light

e) Barrier tape of 20m length

f) Accident investigation Forms

and checklists

g) Enough Paper for witness recording

and other noting

h) Emergency Phone Numbers list

Page 454: 52234-001: Chennai Metro Rail Investment Project
Page 455: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII Sub section F ESHS Volume 3 Environmental Management Arrangement

3-i Sign & Stamp of Tenderer

STATEMENT OF INTENT

Chennai Metro Rail Limited firmly believes in a “development which meets the needs of the

present without compromising the ability of future generations to meet their own needs”. This

commitment towards sustainable development is manifested clearly in our corporate culture,

even as we continue to build a world-class metro.

CMRL intends to incorporate ISO 14001 standards in its construction. This commitment entails

aggressive employment of methods and strategies during construction that maximize energy

efficiency, use cleaner technologies, reuse and or recycle materials and similar other efforts

that help to prevent and reduce environmental degradation.

It is the intent of CMRL to demonstrate continual improvement in its Environmental

Management system during the execution of the project.

This manual represents the minimum standards that Chennai Metro Rail Limited will accept

on matters of Environment. It lays down the guidance for environmental protection measures

to be adopted as part of mitigation strategy for overcoming adverse environmental impacts

during construction. It suggests environmental friendly construction practices that the

Contractors are encouraged to adopt in order to contain various types of pollutants that may

be generated due to construction activities.

Chennai Metro Rail Limited actively supports the efforts and initiatives that are instigated by

the Contractors and sub-contractors in their efforts for achieving good standards of

Environment on the project. The Corporation will use its best endeavours to ensure that all of

the Contractors employed on the Project achieve these Standards.

Managing Director

CMRL

Page 456: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-ii Sign & Stamp of Tenderer

ENVIRONMENTAL POLICY

Chennai Metro Rail Limited is committed to promoting sustainable development in

transportation sector and continuously improving its operations and business in a responsible

way. We have created an Environmental Management Framework setting objectives and

targets, which are incorporated in an Environmental Management System (EMS) that complies

with ISO 14001:2015.

This will be achieved by:

Implementing Environmental Management Systems which identify, control and

wherever possible, minimise the negative impacts on the environment arising from our

activity or operations.

Compliance with all relevant environmental legislation, regulations, codes of practice and

other requirements in which we operate.

Minimize Waste through a commitment of Refuse, Reduce, Reuse, Recycle and Rethink

where feasible.

Commitment to the continual improvement of our EMS.

Continue efforts to reduce operational waste, conserve water and energy, maximize

recycling, adopt responsible paper management practices and increase the purchase of

sustainable products.

Raising environmental awareness to our staff and encourage their participation in

environmental action and train them where required.

Monitoring the environmental performance on an annual basis, improve where

necessary.

Implementing effective communication with contractors and stakeholders on

environmental issues.

Make this policy available to all staff, contractors, and all interested parties/stakeholders.

Date: March 2018

Place: Chennai Managing Director

Page 457: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-iii Sign & Stamp of Tenderer

Table of Contents

1. Introduction 1

2. Purpose & Scope 3

3. Objective 3

4. Definitions & Abbreviations 4

5. Legal and other requirements 6

6. Responsibilities 7

7. Site Environmental Plan 7

8. Contractor’s Method Statement 8

9. Environmental Performance Reviews 8

10. Environmental Friendly Construction Practices 9

11. Housekeeping 23

12. Landscape, Greenery and Aesthetics 25

13. Energy Management 27

14. Water Consumption: 28

15. Traffic Management 29

16. Archaeological and Historic Resources (Physical –Cultural Resources) 30

17. Environmental Monitoring - General 31

18. Air Monitoring 32

19. Noise and Vibration Monitoring 34

20. Emergency Preparedness and Response 38

21. Environmental Site Inspection 39

22. ESHS Committee Meetings 39

23. Environmental Audits 40

24. Training 41

25. Reporting System 41

26. Grievance Redress Mechanism 42

27. Completion of the EMA Programme 43

Appendix –I SITE ENVIRONMENTAL PLAN OUTLINE 44

Appendix – II Weekly Environmental Inspection Checklist 46

APPENDIX - III - DETAILS ON FLY ASH 53

APPENDIX – IV Environment Audit Measurement Criteria. 55

Page 458: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-1 Sign & Stamp of Tenderer

1. Introduction

Significant success has been made in India in developing and enforcing

environmental regulations in many areas. However, there still remain a number of

areas that have not yet seen the promulgation of Environmental Standards and

Regulations. Many of these areas have a high potential for adverse environmental

impact if allowed to go unregulated. As the CMRL undertakes to build this Metro

system it shall institute and enforce adequate environmental standards to provide

for the protection of the people and the environment.

In response, the Contractor shall comply with all applicable Indian laws and

regulations to mitigate the adverse environmental impacts from the construction

activities. Based on the Employer’s Environmental Impact Assessment (EIA) report

the Contractor shall conduct an analysis of the environmental Impacts and

implement suitable measures to mitigate the adverse impacts so as to comply with

all the Environmental Standards & Regulations. All appropriate categories/areas,

such as air quality, noise, water quality, vibration etc. are to be considered in the

environmental analysis. The Contractor will have to undertake Environmental

Monitoring and Audit during construction to measure the environmental impacts.

Should the impact measurements exceed the respective limits set forth in EIA

Report, the Contractor shall be required to review and implement effective

measures so as to ensure that the impact of the construction works will not exceed

the respective limits set forth in the EIA report.

The Contractor shall be responsible for the total compliance of the Environmental

Protection safeguards as elaborated in this Environmental Management

Arrangements.

1.1 The ‘Environmental Management Arrangements’ (EMA) document forms an

essential part of the overall Environmental Protection System employed by CMRL

for the construction of the Chennai Metro Rail Project – Phase 2.

1.2 The EMA has been prepared to facilitate construction progress while ensuring

fulfilment of environmental commitments. It provides systematic procedures for

monitoring and minimizing environmental impacts that may arise from the

construction activities.

1.3 The EMA will apply to all construction works of the Chennai Metro Rail Project

carried out by the Contractors and Sub-contractors.

1.4 The primary reason for adopting the EMA approach is to make the Contractor

aware of his environmental responsibilities and to ensure his\her commitment to

achieving the specified standards.

1.5 The CMRL EMA is meant to be a living document that will be updated as design

and construction progresses and when further environmental issues are identified.

1.6 Periodic reviews of the plan and procedures will be performed to ensure continual

improvement of the Plan’s adequacy and it will be expanded and updated during

the project duration.

1.7 Because the work potentially involves build contracts, this EMA is intended to be

flexible and tailored to match highly variable construction activities and locations

throughout the project.

Page 459: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-2 Sign & Stamp of Tenderer

1.8 The EMA is set out as follows:

Section 2 highlights the purpose and scope

Section 3 outlines the objective, which will form a basis for

Environmental Management System (EMS)

Section 4 lists the definitions and abbreviation of terms used

Section 5 lists the applicable legal and other requirements.

Section 6 sets out the responsibilities for application of the procedures

Section 7 provides guidance to the Contractor for preparation of his

contract specific Site Environmental Plan

Section 8 commits the Contractor’s Method Statement to

incorporate environmental issues during execution of works

Section 9 focuses on the Environmental Performance Review of

Contractor’s activities through Environmental Audits

Section 10 details measures to contain Air, Water, and Noise Pollution

and management of waste through Environmental Friendly Construction

Practices

Section 11 specifies good Housekeeping measures

Section 12 is on Landscape, Greenery and Aesthetics

Section 13 suggests measures to conserve energy through effective

Energy Management

Section 14 deals with Traffic Management

Section 15 focuses on requirements that the Contractor shall have to

meet in case Archaeological and Historic Resources are encountered

Section 16 on Environmental Monitoring - lists the relevant monitoring

equipment, compliance criteria and monitoring programme to be undertaken

by the Contractor during construction

Section 17 details requirements for impact monitoring for air quality including

Air Monitoring and Control Plan

Section 18 details requirements for impact monitoring for noise including

Noise Monitoring and Control Plan

Section 19 provides guidance to Spill Management Plan

Section 20 describes the Environmental Site Inspection process

to be implemented by the Contractor

Section 21 details requirements on Environmental Committee Meeting.

Section 22 details the Environmental Audits, which the Employer’s

Representative may undertake as part of environmental performance

review

Section 23 deals with Environmental Training requirements.

Section 24 details the Reporting requirements as related to

submission of Contractor’s Monthly Environmental Management

Report under this EMA

Page 460: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-3 Sign & Stamp of Tenderer

Section 25 sets out the Complaint response process and finally,

Section 26 mentions the requirements of Completion of the EMA programme

2. Purpose & Scope

2.1 The purpose of this Environmental Management Arrangements is to make the

Contractors aware of the environmental concerns of CMRL, and to establish

guidelines for the application of environmental controls during the construction of

the project.

2.2 The Environmental Management Arrangements is intended to translate into

practice, three important principles of CMRL’s mandate, which the construction

activities should not:

Inconvenience or endanger public

Create a permanent visual eyesore

Result in unmitigated ecological or environmental degradation

2.3 The EMA is intended to guide and assist the Contractors in exploring all reasonable

and feasible means for reducing construction related environmental impacts as

they prepare and produce contract-specific Aspect / Impact Assessments and Site

Environmental Plans.

2.4 The EMA stipulates environmental controls that in lieu of alternative controls

specified by the Contractor must be applied.

2.5 Environmental controls adopted by the individual contractors as an alternative to

the measures identified herein must be as protective of the environment.

2.6 The scope of the EMA is to establish procedures to:

Supervise Contractor’s compliance with defined environmental control criteria

by carrying out reviews of monitored impact data

Oversee the procedure for identification of mitigation measures, their design

and implementation

Carry out environmental monitoring emissions during construction through an

impact monitoring programme

Undertake additional ad hoc monitoring if required, to address specific instances

3. Objective

3.1 The various components included in the EMA along with the Employer’s

Representative requirements on Environment will form the basis of an

Environmental Management System to be implemented by CMRL, which will

enable it to manage the environmental challenges and resolve environmental

issues posed during construction of Chennai Metro Rail project.

3.2 The main objectives are to:

Provide database from which environmental impacts of the project can be

determined.

Provide timely indication if any environmental control measure fails to achieve

desired results.

Monitor effectiveness of environmental mitigation measures

Page 461: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-4 Sign & Stamp of Tenderer

Initiate remedial action if unacceptable impacts arise.

Determine contractor’s compliance with statutory and legal requirements.

4. Definitions & Abbreviations

4.1 Air Monitoring and Control Plan is abbreviated as AMCP.

4.2 Auditor: Person with the competence to conduct an audit.

4.3 A – Weighted Noise levels in Decibels (referenced to 20 micro-Pascal) as

measured with A - weighting network of standard sound level meter, abbreviated

dB(A).

4.4 Central Pollution Control Board is abbreviated as CPCB.

4.5 Continual improvement: Recurring process or enhancing the environmental

management system in order to achieve improvements in overall environmental

performance consistent with the organization’s environmental policy.

4.6 Corrective action: Action to eliminate the cause of a detected nonconformity.

4.7 Decibel is measure on a logarithmic scale of the magnitude of a particular quantity

(such as sound pressure, sound power) with respect to a standardized reference

quantity.

4.8 Document: Information and its supporting medium.

4.9 Energy Equivalent Level (Leq) is the level of a steady noise which has the same

energy as the fluctuating noise level integrated over the period of measurement.

Lmax is the maximum Noise Level during the period of measurement. L10 and L90

are the are the percentile exceeding levels of sound which are exceeded 10% and

90% of the time of measurement.

4.10 Environmental Pollutant means any solid, liquid or gaseous substance present

in such concentration as may be or tend to be injurious to environment.

4.11 Environmental Pollution means the presence in the environment of any

environmental pollutant.

4.12 Environment: Surroundings in which an organization operates, including air,

water, land, natural resources, flora, fauna, humans, and their interrelation.

4.13 Environmental Aspect: Element of an organization’s activities or products or

services that can interact with the environment.

4.14 Environmental Impact: Any change to the environment whether adverse or

beneficial, wholly or partially resulting from an organization’s environmental

aspects.

4.15 Environmental Management Manual is abbreviated as EMM.

4.16 Environmental Management System: Part of an organization’s management

system used to develop and implement its environmental policy and manage its

environmental aspects.

4.17 Environmental Objective: Overall environmental goal, consistent with the

environmental policy that an organization sets itself to achieve.

4.18 Environmental Performance: Measurable results of an organization’s

management of its environment aspects.

4.19 Environmental Policy: Overall intentions and direction of an organization related

Page 462: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-5 Sign & Stamp of Tenderer

to its environmental performance as formally expressed by top management, under

signature.

4.20 Environmental Target: Detailed performance requirement applicable to the

organization or parts thereof, that arises from the environmental objectives and that

needs to be set and met in order to achieve those objectives.

4.21 Interested Party: Person or group concerned with or affected by the environmental

performance of an organization.

4.22 Internal audit: Systematic, independent, and documented process for obtaining

audit evaluating it objectively to determine the extent to which the environmental

management system audit criteria set by the organization are fulfilled.

4.23 Ministry of Environment, Forest & Climate Change, Government of India is

abbreviated as MoEF & CC.

4.24 Monitoring is the use of direct or indirect reading field instrumentation to provide

information regarding the levels of pollutants released during construction.

4.25 Noise is any unwanted sound disturbance of the environment around the area of

construction operations.

4.26 Noise Monitoring and Control Plan is abbreviated as NMCP.

4.27 Nonconformity: Non-fulfilment of a requirement.

4.28 Nuisance is annoyance, which results from any construction activity that affects

the material comfort and quality of life of the inhabitants of the area surrounding

the construction site.

4.29 Organization: Company, corporation, firm, enterprise, authority or institution, or

part or combination thereof, whether incorporated or not, public or private, that has

its own functions and administration. It also includes the Contractor executing the

CMRL contract of Chennai Metro.

4.30 Preventive Action: Action to eliminate the cause of a potential nonconformity.

4.31 Prevention of pollution: Use processes, practices, techniques, materials,

products, services or energy to avoid, reduce or control the creation, emission or

discharge of any type of pollutant or waste, in order to reduce adverse

environmental impacts.

4.32 Procedure: Specified way to carry out an activity or a process.

4.33 Record: Document stating results achieved or providing evidence of activities

performed.

4.34 Respirable Particulate Matter is abbreviated as RPM and is particulate matter

with size less than 10 µm and is measured in µg/m3(microgram per cubic meter)

4.35 Suspended Particulate Matter is abbreviated as SPM and measured in

µg/m3(microgram per cubic meter)

4.36 Site Environmental Plan is abbreviated a SEP. A document prepared by the

Contractor that contains detailed procedures on implementing the Employer’s

Representative requirements on Environment.

4.37 Tamil Nadu Pollution Control Board is abbreviated as TNPCB.

4.38 Usage factor: Expressed as the percent of time that the equipment is operated at

full power while on site.

Page 463: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-6 Sign & Stamp of Tenderer

4.39 Waste is unwanted surplus substance arising from the application of all

construction operations and any substance or articles, which is required to be

disposed.

5. Legal and other requirements

5.1 Contractor shall comply with all legal obligations and the requirements of Chennai

Metro Rail Limited as contained herein.

5.2 Indian Statutory Requirements

The Contractor shall abide by all national, state and local bye-laws. It is the duty of

the Contractor to ensure that all sub-Contractors appointed also comply with their

legal obligations as listed below but not limited to:

i. The Environment Protection Act, 1986, amended 1991

ii. The Environment (Protection) Rules, 1986

iii. The Water (Prevention and Control of Pollution) Act, 1974

iv. The Water (Prevention and Control of Pollution) Cess Act, 1977 ,

v. The Air (Prevention and Control of Pollution) Act, 1981, amended 1987

vi. The Air (Prevention and Control of Pollution) Rules, 1982

vii. The Noise Pollution (Regulation and Control) Rules, 2000 as amended by

(Amendment) Rules, 2017

viii. The Hazardous and Other Wastes (Management and Trans boundary

Movement) Amendment, Rules, 2019

ix. The Municipal Solid Waste (Management & Handling) Rules, 2016

x. The Bio-medical Waste Management Rules, 2016

xi. The Plastic Waste Management (Amendment) Rules, 2018

xii. The E- Waste (Management) Amendment Rules, 2018

xiii. The Construction and Demolition (C&D) Waste Management Rules, 2016

xiv. The Batteries (Management and Handling) Rules, 2001

xv. The Manufacture, Storage and import of Hazardous Chemical Rules, 1989.

xvi. The Ozone Depleting Substances (Regulation and Control) Rules, 2000

xvii. The Ancient Monuments and Archaeological Sites and Remains

(amendment and validation) Act, 2010

xviii. The Wetlands (Conservation and Management) Rules, 2017

xix. The Wildlife (Protection) Act, 1972, amended 2002

xx. The Forest (Conservation) Act, 1980, amended 1988

xxi. The Coastal Regulation Zone Notification, 2011 and 2019

xxii. EIA Notification, 2006 and its amendments.

xxiii. The Tamil Nadu Water (Prevention and Control of Pollution) Rules, 1983

amended May 2009

xxiv. The Tamil Nadu Air (Prevention and Control of Pollution) Rules, 1983

amended May 2009

xxv. Tamil Nadu Forest Act, 1882xxvi. The Indian Wildlife (protection) Act 1972 and The Wildlife (Protection)

Amendment Act 2002xxvii. Coastal Regulation Zones (CRZ) Rules 2019.xxviii. Solid Waste Management Rules 2019xxix. Municipal Solid Waste Rules 2000.

5.2 International Standards, Framework, Guidelines & ISO Certifications

Page 464: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-7 Sign & Stamp of Tenderer

5.2.1 If the requirements stated in this document are in conflict or inconsistent

with the requirements of applicable laws, the GoI and International

standards, whichever stringent will be followed.

5.2.2 The works shall be undertaken in accordance with the applicable international guidelines, standards and specifications on Environment Management and every Contractor shall actively pursue the achievement of:

• ISO 14001-2015: Environmental Management Systems

5.2.3 The process of international certification to ISO 14001-2015 standard shall commence immediately after the award of Contract through appointment of ISO accrediting body for obtaining the certification. Should this not be undertaken by the Contractor within 3 months of the Contract award, the Employer’s Representative shall appoint at the Contractor’s cost.

5.2.4 Should the Contractor already possess such certification, the scope of the CMRL project must be included on the Contractor’s certification within 1 year of Contract commencement and proof of such attainment demonstrated to Chennai Metro Rail Limited.

5.2.5 The contractor shall comply the other legal obligations as listed below: i. Safeguard Policy Statement (SPS) June 2009 of Asian

Development Bank (ADB)ii. Environmental and Social Framework (ESF) of Asian Infrastructure

Investment Bank (AIIB) February 2019iii. New Development Bank Environment and Social Framework,

March 2016.iv. Guidelines for Environmental and Social Considerations of Japan

International Cooperation Agency (JICA), April 2010.

6. Responsibilities6.1 The Contractor shall set up an environmental team with dedicated environmental

officer, with separate ToR to execute the environmental requirements.

6.2 The duties of the Contractor’s Environmental Team will include (but not limited to):

To monitor the various environmental parameters as required by the EMA

To inspect, investigate and audit the work methodology with respect to

environmental mitigation and control

To anticipate environmental issues before they arise and plan for their mitigation

To audit and prepare audit reports, weekly/monthly reports on site

environmental conditions for submission to the Employer’s Representative.

6.3 Reporting to the Employer’s Representative, the Contractor shall

Work within the scope of contract and other tender condition.

Operate and strictly adhere to the requirements of his\her contract specific-SEP

Undertake any corrective actions as instructed by his\her Environmental Manager6.4 To lead his\her Environmental team, the Contractor shall deploy an Environment

Manager who shall be responsible for environmental control, environmental

monitoring, and record keeping and be available to the Employer’s Representative

for resolution of environmental issues.

7. Site Environmental Plan7.1 To effectively implement monitoring, mitigation and remedial requirements, an

Page 465: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-8 Sign & Stamp of Tenderer

appropriate contractual and supervisory framework needs to be established.

7.2 The basis of framework within which implementation will be managed is through

the preparation of contract-specific Site Environmental Plan by the Contractor. The

Employer’s Representative will audit this contract-specific plan and advise the

necessary remedial actions required through contractual means.

7.3 Based on the site situation, baseline and assessment, contractor will prepare the

Site Environmental Plan accordingly and cover all EMP of PCC requirements

7.4 The Site Environmental Plan shall provide details of the means by which the

Contractor (and all subcontractors working for the Contractor) will implement the

recommended mitigation measures and achieve the environmental performance

standards defined both in Indian environmental legislation and in the Employer’s

Representative’s requirements, whichever stringent will be followed.

7.5 Based on Site Environmental Plan outline given in this document, as Appendix – I,

Contractor shall prepare a Site Environmental Plan for submission as part of the

tender process.

7.6 The outline Environmental Plan shall demonstrate the determination and

commitment of Contractor’s organisation towards environment and indicate how

the environmental performance requirements laid out in the Employer’s

Representative’s requirements will be met and, where appropriate exceeded.

7.7 Within 28 days of the date of Notice to commence, the Contractor shall submit a

draft contract – specific Site Environmental Plan for notice of no objection of the

Employer’s Representative and a final version prior to the commencement of the

works.

7.8 The contract-specific Site Environmental Plan will contain description of all

procedures developed to control environmental pollution. Elements of the plan

must address the management of pollution, the monitoring programme, and the

reporting requirements.

7.9 The Site-Specific Environmental Plan shall contain an Aspect Impact register

together with outline proposals/procedure for mitigating negative impacts.

8. Contractor’s Method Statement8.1 It shall be the practice for the Contractor to prepare method Statement in

advancement of actual works, for the notice of no objection of the Employer’s

Representative.

8.2 The selection of Construction Method shall be environmentally friendly

8.3 The Contractor’s Environmental Manager will be one of the signatories to the

Method Statement, after assessing and verifying the environmental impact of the

prepared construction activity and ensuring that effective control measures will be

in place, timely.

9. Environmental Performance Reviews

9.1 Environmental Performance Reviews, through an Environmental Audit

Programme, may be carried out quarterly by the Employer’s Representative to

assess the effectiveness of the Site Environmental Plan, and that the required

mitigation measures are routinely implemented, and environmental standards are

Page 466: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-9 Sign & Stamp of Tenderer

maintained.

9.2 The preliminary objective of the audit programme will be to assess the

effectiveness of management systems established by the Contractor to implement

the environmental mitigation measures.

9.3 The reviews by Employers Representative shall focus on the effectiveness of the

implemented measures to achieve the purpose not simply the fact that a measure

has been implemented.

9.4 In such reviews, demonstrable evidence on the part of the environmental

requirements will be sought.

9.5 The Contractor shall carry out daily, environment inspection of his\her works and

submit a weekly report as per format for reporting is suggested as Appendix – II.

9.6 The Contractor shall ensure that his\her weekly/monthly environmental reports and

mandating audits are linked to respective previous submission. The Employers

Representative will ensure that this procedure is followed by the institution of a

monitoring and reporting system that provides information about the environmental

performance of the construction Contractor throughout the duration of the contract.

9.7 The Employer’s Representative will monitor Contractor’s performance of tasks

specified, and will inspect necessary records, reports and procedures as defined

in this manual.

10. Environmental Friendly Construction Practices

10.1 Containment of Air Pollution

10.1.1 During Transport of Material

(a) The Contractor shall take precautions to minimise visible particulate matter

from being deposited upon public roadways as a direct result of his\her

operations. Precautions include removal of particulate matter from equipment

before movement to paved streets or prompt removal of material from paved

streets onto which such material has been dropped.

(b) All construction equipment should be washed clean of visible dirt/mud before

exiting the construction sites. Any deposition of material on public streets by

construction equipment should be removed by manual sweeping, or by

deploying electro – mechanical devices.

(c) The Contractor shall provide a wash pit or a wheel washing and/or vehicle

cleaning facility at the exits from work sites such as construction depots and

batching plants. At such facility, high-pressure water jets will be directed at the

wheels and the body of vehicles to remove all spoil and dirt. Water shall be

pumped through an electrically operated pump set, to hydrants attached with

rubber hoses, by activation of push button located at the hydrant, allowing for

up to 10 minutes of wash time.

(d) Wheel washing facilities and/or vehicle cleaning facility will be provided with

efficient drainage, incorporating silt traps to prevent any excessive build up of

water. These facilities could include water re-circulation apparatus to minimise

water consumption. At the wheel wash facility, water, dirt, gravel etc. shall be

drained into precast trench drains with removable grated cover. This dirty water

Page 467: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-10 Sign & Stamp of Tenderer

shall flow, through a piping, into solids separator and from there to oil separator

before final discharge.

(e) Where wheel-washing facility is not possible, the Contractor shall ensure

manual cleaning of wheels by wire brushes or similar suitable means.

(f) The Contractor shall ensure that Vehicles with an open load carrying shall not

be used for moving potentially dust-producing materials. Vehicles shall have

properly fitting side and tailboards. Materials having the potential to create dust

shall not be loaded to a level higher than the side and tail boards and shall be

carried in vehicles fitted with cover lids or tarpaulin covers.

10.1.2 At Dumping Sites

(a) The Contractor shall place excavated materials in the dumping/disposal areas

designated in the drawings.

(b) The Contractor shall place material in a manner that will minimise dust

production. Material shall be stabilised each day by watering or other accepted

dust suppression techniques.

(c) The heights from which materials are dropped to 1.5 m to limit fugitive dust

generation.

(d) The Contractor shall stockpile material in the designated and approved

locations with suitable slopes. Access to the site shall be regulated for entry of

men, material and machine.

(e) During dry weather, dust control methods such as water sprinkling must be

used daily at every two hours intervals especially on windy, dry days to prevent

any dust from blowing and causing nuisance. During rains, the stockpile may

be covered with tarpaulin or similar material to prevent run off.

(f) The Contractor shall provide water sprinkling at any time that it is required for

dust control use.

(g) Sufficient equipment, water, and personnel shall be available on dumping sites

at all time to minimise dust formation and movements to prevent nuisance.

(h) Dust control activities shall continue even during work stoppages.

10.1.3 At Construction Site

(a) At each construction site, the Contractor shall provide storage facilities for dust

generating materials and shall be closed containers/bins or wind protected

shelters or mat covering or walled or any combination of the above to the

satisfaction of the Employer’s Representative. The Contractor shall spray water

at construction sites as required to suppress dust, during handling of excavation

soil or debris or during demolition.

(b) Stockpiles of sand and aggregate greater than 20m3 for use in concrete

manufacture shall be enclosed on three sides, with walls extending above the

stockpile and two (2) metres beyond the front of the stockpile.

(c) Effective water sprays shall be used during the delivery and handling of all raw

sand and aggregate and other similar materials, when dust is likely to be

created and to dampen all stored materials during dry and windy weather.

(d) Areas within the Site such as construction depots and batching plants, where

Page 468: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-11 Sign & Stamp of Tenderer

there is a regular movement of vehicles shall have an approved hard surface

that is kept clear of loose surface material.

(e) Unless the Employer’s Representative has given notice otherwise, the

Contractor shall restrict all motorised vehicles on the Site to a maximum speed

of 15 kilometres per hour and confine haulage and delivery vehicles to the

designated roadways inside the site.

(f) At the Batching plant the following additional conditions shall be complied with:

The Contractor shall undertake at all times the prevention of dust nuisance

as a result of his\her activities.

The Contractor shall frequently clean and water the concrete batching plant

and crushing plant sites and ancillary areas to minimise any dust emission.

(g) The Contractor shall erect hoardings as specified in Employer’s Representative

requirements – construction, securely around all construction work sites during

the main construction activity, to contain dust within the site area and also to

reduce air turbulence caused by passing traffic. The hoarding shall be safely

secured to the ground to prevent from toppling with minimum gap between the

base of hoarding and ground surface.

10.1.4 During Drilling and Blasting

(a) Water spray should be used to control dust during breaking of rock/concrete.

(b) During blasting operations, appropriate precautions should be taken to

minimise dust such as the use of blast nets, canvas covers and watering.

(c) Wire mesh made of heavy-duty tyres or sand bags should be used over blast

area on each shot to prevent flying rock and reduce dust.

(d) Blasting technique should be consistent not only with nature and quantity of

rock to be blasted but also the location of blasting.

(e) The Contractor shall give due preference to explosives with better

environmental characteristics.

(f) Vibration shall be monitored during blasting and values shall not exceed as

those given in this Environmental Management Manual

10.2 Containment of Water Pollution

(a) The Contractor shall comply with the Indian Government legislation and other

State regulations in existence in Chennai insofar as they relate to water

pollution control and monitoring.

(b) The Contractor shall provide adequate precautions to ensure that no spoil or

debris of any kind is pushed, washed, falls or deposited on land adjacent to the

site perimeter.

(c) In the event of any spoil or debris from construction works being deposited on

adjacent land any silt washed down to any area, then all such spoil, debris or

material and silt shall be immediately removed and the affected land and areas

restored to their natural state by the Contractor to the satisfaction of the

Employer’s Representative.

(d) At construction depots and batching plants temporary drainage works should

Page 469: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-12 Sign & Stamp of Tenderer

be maintained, removed and reinstated as necessary and all other necessary

precautions should be taken for avoidance of damage by flooding and silt.

(e) A Drainage system should be constructed during the commencement of the

works, drain off all surface water at the site into suitable drains.

(f) Sedimentation tanks or other acceptable measures, of sufficient capacity to

trap silt-laden water before discharge into the outlet drain should be provided.

The system should be flexible and be able to handle multiple inputs from a

variety of sources.

(g) Temporary open storage of excavated materials meant for backfilling on site,

should be covered with tarpaulin or similar fabric during rainy season or at any

time of the year when rainstorms are likely. Washout of construction or

excavated materials should be diverted to drainage system through appropriate

sediment traps.

(h) Any mud slurry from drilling or grouting etc. shall not be discharged into the

drainage system unless treatment is carried out that will remove silt, mud

particles, bentonite etc. The Contractor shall provide treatment facilities as

necessary to prevent the discharge of contaminated ground water.

(i) All water and waste products (surface runoff and wastewater) arising on the

site shall be collected and removed from the site via a suitable and designated

temporary drainage and disposed off at allocation and in a manner that will

leave neither pollution nor nuisance.

(j) Bentonite slurries or other grouts used in diaphragm wall construction piling

and other concrete works should be collected in a separate slurry collection

system. If reuse is not practicable then it should be disposed off at nearest

landfill site after obtaining permission from the agency owning the landfill and

under the conditions imposed by the agency concerned.

(k) The bentonite mixing, treatment and handling system shall be established by

the Contractor giving due regard to its environmental impacts. The disposal of

redundant bentonite shall be carefully considered whether in bulk or liquid form.

The disposal location will be advised and agreed with the relevant authorities.

(l) Due to lowering of potable water supplies in Chennai and subsequent

contamination of ground water, the Contractor is not allowed to discharge water

from the site without the notice of no objection of the Employer’s

Representative. The Contractor must comply with the requirements of the

Central Ground Water Board for discharge of water arising from dewatering.

Any water obtained from dewatering systems installed in the works must be

either re-used for construction purposes and this water may subsequently be

discharged to the drainage system or, if not re-used, recharged to the ground

water at suitable aquifer levels. The Contractor must submit his proposals for

notice of no objection of Employer’s Representative, on his\her proposed

locations of dewatering of excavation and collection of water for either

construction re-use or recharge directly to aquifers. The Contractor’s recharge

proposals must be sufficient for recharging of the quantity of water remaining

after deduction of water re-used for construction. The Contractor will not be

permitted to directly discharge, to the drainage system, unused ground water

Page 470: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-13 Sign & Stamp of Tenderer

obtaining from the excavation without obtaining notice of no objection from the

Agency controlling the system.

(m) The Contractor shall prevent soil particles and debris from entering the wells or

water discharge points by use of filters and sedimentation basins as required.

(n) The Contractor shall provide treatment facilities as necessary to prevent the

discharge of contaminated ground water.

(o) The Contractor shall at all times ensure that all existing stream courses and

drains within, and adjacent to the site are kept safe and free from any debris

and any excavated materials arising from the Works.

(p) The Contractor shall discharge wastewater arising from site offices, canteens

or toilet facilities constructed by him into sewers after obtaining prior notice

of no objection of agency controlling the system. A wastewater drainage

system shall be provided by the Contractor to drain wastewater into the

sewerage system.

(q) The contractor shall take measures to prevent discharge of oil in land and water

bodies. Oil separator/interceptors shall be provided at Batching Plant and

construction depot location for vehicle maintenance to prevent the release of

oils and grease into the drainage system. These shall be cleaned on a regular

basis.

(r) A Spill Prevention and Control Procedure shall be prepared to identify project

components such as storage areas, storage tanks that could allow discharge

of oil grease or hazardous materials to the drainage system or ultimately in any

water body during spillage. The volume of spill should be calculated as well as

storage volume to contain spill within the materials storage containment areas.

The procedure shall include measures to contain and mitigate transportation of

oil, grease or hazardous materials to the drainage system or any water body.

(s) The Contractor shall ensure that earth, bentonite, chemicals and concrete

agitator washings etc. are not deposited/drained in the watercourses but are

suitably treated and effluents and residue disposed off in a manner approved

by local Regulatory Authorities.

(t) Perimeter channels/drains should be constructed in advance of site formation

works and earthworks. Silt removal facilities, channels and manholes should

be maintained and the deposited silt and grit should be removed regularly, to

ensure that these facilities are functioning properly at all times.

(u) Construction works should be programmed to minimize soil excavation works

in rainy season. If excavation in soil could not be avoided in these months or at

any time of year when rains are likely, for the purpose of preventing soil erosion,

temporarily exposed slope surfaces should be covered e.g. by tarpaulin, and

temporary access roads should be protected by crushed stone or gravel, as

excavation proceeds. Arrangement should always be in place to ensure that

adequate surface protection measures can be safely carried out well before the

arrival of rains.

(v) Measures should be taken to minimize the ingress of rainwater into trenches.

If excavation of trenches in wet seasons is necessary, they should be dug and

backfilled in short sections. Rainwater pumped out from trenches or foundation

Page 471: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-14 Sign & Stamp of Tenderer

excavation should be discharged into storm drains via silt removal facilities.

(w) Open stockpiles of construction materials (e.g. aggregates, sand and fill

material) on sites should be covered with tarpaulin or similar fabric during

rainstorms. Measures should be taken to prevent the washing away of

construction materials, soil, silt or debris into any drainage system.

(x) Manholes (including newly constructed ones) should always be adequately

covered and temporarily sealed so as to prevent silt, construction materials or

debris from getting into the drainage system, and to prevent storm run-off from

getting into sewers. Discharge of surface run-off into sewers must always be

prevented in order not to unduly overload the sewerage system.

(y) Groundwater pumped out of wells, etc. for the lowering of ground water level in

basement of foundation shall be discharged into storm water drains after the

removal of silt in silt removal facilities.

(z) Wastewater from Concrete Batching & Precast Concrete Casting and that

generated from the washing down of mixer trucks and drum mixers and similar

equipment should wherever practicable be recycled. The discharge of

wastewater should be kept to a minimum.

(aa) The section of construction road between the vehicle washing bay and the

public road should be paved to reduce vehicle tracking of soil and to prevent

site run-off from entering public road drains.

(bb) Surface run-off should be segregated from the concrete batching plant and

casting yard area as much as possible and diverted to the storm water drainage

system. Surface run-off contaminated by materials in a concrete batching plant

or casting yard must be treated to, within the discharge norms before disposal

into storm water drains.

(cc) The effluent monitoring is carried out pursuant to and using an equipment that

complies with the relevant standards of the Central Pollution Control Board.

(dd) The contractor shall apply to the appropriate authority for installing bore wells

for water supply at site.

10.3 Containment of Noise and Vibration

(a) Construction of facilities and structures would require the use of equipment,

which may generate high noise levels and adversely affect noise sensitive

receivers.

(b) In assessing the impact of construction noise and hence its containment, the

nature and level of activities that generate noise, the pathway through which

noise travels, the sensitivity of the receptor, and the period of exposure should

be considered.

(c) Environmental noise is measured in decibels (dB). To better approximate the

range of sensitivity of the human ear to sounds of different frequencies, the A-

weighted decibel scale (dBA) was devised. As the human ear is less sensitive

to low frequency sounds, the A-scale de-emphasizes these frequencies by

incorporating frequency weighting of the sound signal. When the A-scale is

used, the decibel levels are represented by dBA.

(d) On this scale, the range of human hearing extends from about 3 dBA to about

Page 472: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-15 Sign & Stamp of Tenderer

140 dBA. A 10-dBA increase is judged by most people as a doubling of the

sound level.

(e) To the extent required to meet the noise limits the Contractor shall use

reasonable efforts to include noise reduction measures listed below to minimize

construction noise emission levels. Noise reduction measures – include, but

not limited to the following:

(i) Minimize the use of impact devices, such as jackhammers, and pavement

breakers. Where possible, use concrete crushers or pavement saws for

tasks such as concrete deck removal and retaining wall demolition.

(ii) Equip noise producing equipment such as jackhammers and pavement

breakers with acoustically attenuating shields or shrouds recommended by

the manufacturers thereof, to meet relevant noise limitations.

(iii) Pneumatic impact tools and equipment used at the construction site shall

have intake and exhaust mufflers recommended by the manufacturers

thereof, to meet relevant noise limitations.

(iv) Provide mufflers or shield panelling for other equipment, including internal

combustion engines, recommended by manufacturers thereof.

(v) Employ prefabricated structures instead of assembling on-site.

(vi) Use construction equipment manufactured or modified to dampen noise

and vibration emissions, such as:

Use electric instead of diesel-powered equipment.

Use hydraulic tools instead of pneumatic impact tools.

(f) Maximize physical separation, as far as practicable, between noise generators

and noise receptors. Separation includes following measures:

Provide enclosures for stationary items of equipment and barriers around

particularly noisy areas on site.

Locating stationary equipment in such a way, so as to minimize noise and

vibration impact on community.

(g) To the extent feasible, configure the construction site in a manner that keeps

noisier equipment and activities as far as possible away from noise sensitive

locations and nearby buildings. Plant and equipment known to emit noise

strongly in one direction should where possible, be oriented in a direction away

from noise sensitive receptor and reduce the number of plant and equipment

operating in critical areas close to noise sensitive receptors.

(h) Scheduling truck loading, unloading, and hauling operations in such a way so

as to minimize noise impact near noise sensitive locations and surrounding

communities.

(i) Minimize noise intrusive impacts during most noise sensitive hours by adopting

the following.

Plan noisier operations during times of highest ambient noise levels.

Keep noise levels relatively uniform; avoid excessive and impulse noises.

(j) Equipment and plant are not to be kept idling when not in use.

(k) Use only well-maintained plant/equipment at site, which should be serviced

Page 473: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-16 Sign & Stamp of Tenderer

regularly.

(l) Maintain equipment such that parts of vehicles and loads are secure against

vibrations and rattling.

(m) Grading of surfaced irregularities on construction sites to prevent the

generation of impact noise and ground vibrations by passing vehicles.

(n) Schedule work to avoid simultaneous activities that generate high noise levels.

(o) The construction of temporary noise barriers.

(p) If back-up alarms are used on construction equipment, their noise emission

level near noise sensitive receptors such as residences, schools, hospitals and

similar areas where calmness is essential, should be regulated, especially at

nighttime.

(q) Select truck routes for muck disposal so that noise from heavy-duty trucks will

have minimal impact on sensitive areas (e.g., residential) and submit to the

Employer’s Representative for notice of no objection:

Conduct truck loading, unloading and hauling operations in a manner such

that noise and vibration are kept to a minimum.

Route construction equipment and vehicles carrying soil, concrete or other

materials over streets and routes that will cause least disturbance to residents

in vicinity of work.

Avoid operating truck on streets that pass by schools during school hours.

(r) The maximum permissible sound pressure level for new generator sets (up to

1000 KVA) run on diesel, shall be 75 dB(A) at one metre from the enclosure

surface.

(s) For existing diesel generator sets, the noise from the DG set shall be controlled

by providing an acoustic enclosure or acoustic treatment of the room for DG

sets. Such acoustic enclosures/acoustically treated rooms shall be so designed

for minimum 25 dB(A) insertion loss or for meeting the ambient noise

standards, whichever is on higher side.

(t) Cast in situ piling to avoid excessive vibrations.

(u) Contractor will conduct a full detailed analysis of noise and vibration prediction

and submit to CMRL for approval. The analysis will be reviewed by lenders

before mobilization.

10.4 Containment of Waste

(a) The Contractor is required to develop, institute and maintain a Waste

Management Plan (WMP) during the construction of the project for his\her

works, which may include:

i. Identification of disposal sites

ii. Identification of quantities to be excavated and disposed off

iii. Identification of split between waste and inert material

iv. Identification of amounts intended to be stored temporarily on site

location of such storage.

v. Identification of intended transport means and route.

vi. Obtaining permission, where required, for disposal.

Page 474: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-17 Sign & Stamp of Tenderer

Such mechanism is intended to ensure that the designated area for the segregation and temporary storage of reusable and recyclable materials are incorporated in the WMP. The WMP should be prepared and submitted to Employer/Employer Representative for NONO.

(b) The Contractor shall handle waste in a manner that ensures they are held

securely without loss or leakage thus minimizing potential for pollution. The

Contractor shall maintain and clean waste storage areas regularly.

(c) Careful design, planning and good site management can minimise waste of

materials such as concrete, mortars and cement grouts. The Contractor shall

ensure regular maintenance and cleaning of the waste storage areas.

(d) Construction activities are expected to generate a variety of waste such as:

i. General refuse

ii. Construction Waste including waste from excavated material

iii. Chemical waste and

iv. Hazardous waste

v. Biomedical waste

(e) Handling and disposal of such waste may cause environmental degradation

and nuisance. To prevent it, such waste has to be handled and disposed

properly. As such, transportation and disposal of all waste shall be strictly

managed.

(f) The contractor shall make arrangements to dispose of metal scrap and other

waste to authorised vendors and make available to Employer/Employer

Representative on request and records.

(g) General Refuse

(i) Each worksite would generate general refuse including paper and food

waste. There is likely to be a concentration of such waste at batching plants

on major worksite. The storage of general refuse has the potential to give

rise to negative environmental impacts.

(ii) Burning of wastes is prohibited. The Contractor shall not burn debris or

vegetation or construction waste on the site.

(iii) Handling and disposal of general refuse should cope with the peak

construction workforce during the construction period. The refuse should

be stored and transported in accordance with good practice and disposed

at licensed landfills

(iv) General refuse should be stored in enclosed bins or units and has to be

separated from construction and chemical wastes. An authorised waste

collector should be employed by the Contractor to remove general refuse

from the site, on a daily basis to minimise odour, pest and litter impacts.

(h) Construction Waste

(i) Construction Waste would mainly arise from the project construction

activities and from the demolition of existing structures where necessitated.

It includes unwanted materials generated during construction, rejected

structures and materials, materials that have been over-ordered and

materials, which have been used and discarded such as:

Page 475: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-18 Sign & Stamp of Tenderer

Material and equipment wrapping packaging material

Unusable/surplus concrete/grouting mixes

Damaged/contaminated/surplus construction materials; and

Wood from formwork and false work.

(ii) Also, demolition of buildings and houses to accommodate station buildings

and construction depots will generate concrete rubble, plastics, metal,

glass, asphalt from surfaces, wood and refuse.

(iii) Waste from excavation would comprise soil, rubble, sand, rock, brick etc.

(iv) It is estimated that construction activities used generate 2.5mm3 of soil,

majority of which will be used for filling purpose.

(i) Chemical Waste

(i) Chemical waste is likely to be generated by construction and maintenance

activities. For those processes, which generate chemical waste, it may be

possible to find alternatives, which generate reduced quantities or even no

chemical waste, or less dangerous types of chemical waste.

(ii) The contractor should explore the possibilities given in (i) above and

produce evidence of acceptable disposal methods (e.g., waste transfer) to

the Employer’s Representative.

(iii) Containers used for the storage of chemical waste should:

Be suitable for the substances they are holding, resistant to corrosion,

maintained in good condition, and securely closed.

Be of adequate capacity and

Display a label in English and local language as to the contents, quantity

and safe method of disposal in accordance with instructions contained in

MSDS.

(iv) The storage area for chemical waste should:

Be clearly labelled and used solely for the storage of chemical waste;

Be enclosed on at least three sides;

Have an impermeable floor and bunding, of capacity to accommodate

110% of the volume of the largest container or 20% by volume of the

chemical waste stored in that area, whichever is higher

Have adequate ventilation;

Be covered to prevent rainfall entering and

Be arranged so that incompatible materials are adequately separated.

(v) Disposal of chemical waste should be through a licensed waste collector,

duly authorized by MoEF or State Pollution Control Board as the case may

be. License of the waste collector shall be shown to the Employer’s

Representative on demand.

(vi) The Contractor should maintain an inventory of chemicals, solvents and

adhesives. He should minimise disposal of excess material, reuse when

applicable and dispose of chemical waste properly. He should prepare a

plan that identifies proper ventilation, protected clothing and personal

Page 476: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-19 Sign & Stamp of Tenderer

protective equipment.

(vii) The Contractor should have a point of contact, who will maintain the above

information and also conducts periodic inspections.

(j) Hazardous Waste

(i) If encountered or generated as a result of Contractor’s activity, then waste

classified as hazardous under the “Hazardous Waste (management,

handling and trans-boundary movement) rules, 2016” shall be disposed off

in a manner in compliance with the procedure given in the rules under the

aforesaid act.

(ii) Chemicals classified as hazardous chemicals under “Manufacture, Storage

and Import of Hazardous Chemical Rules, 1989 of Environment (Protection)

Act, 1986 shall be disposed off in a manner in compliance with the

procedure given in the rules under the aforesaid act.

(iii) The Contractor shall identify all the hazardous waste generated as a result

of his\her activities. If such waste is generated then the Contractor shall

apply to State Pollution Control Board for ‘authorisation’ according to Form

1 of the Hazardous Waste (Management & Handling) Rules and dispose

the same only to currently authorised recyclers( a list of which can be

obtained from Tamil Nadu Pollution Control Board) under intimation to the

Employer’s Representative.

(iv) The Rules given in (I) above shall govern the Classification, Handling,

Storage and disposal of such Hazardous Waste.

(v) Hazardous waste would mainly arise from the maintenance of equipment.

These may include, but not be limited to, the following:

Used engine oils, hydraulic fluids and waste fuel;

Spent mineral oils/cleaning fluids from mechanical machinery;

Scrap batteries or spent acid/alkali; and

Spent solvents/solutions, some of which may be derived, from

equipment cleaning activities.

(iv) For disposal of waste requiring special attention and hazardous waste the

contractor shall enter into agreement with authorised agencies dealing with

the same.

(v) The hazardous waste shall be stored on an impermeable surface with

containment bunding to retain leaks, spills and ruptures.

(vi) Waste oil and chemical containers shall be delivered to the Contractor’s

Storage yard. The Contractor is responsible for the correct storage and

handling of waste oil/waste chemical containers for such a time until they

are transported to the chosen disposal area or waste oil containers.

(vii) All waste collection containers shall be of appropriate size with a closed lid.

Each container will be clearly labelled both with a colour code system and

labelled in local language and English. Original labels of empty containers

should be completely covered and the contents of the type of waste stored

in the used containers clearly indicated.Bio medical waste

Page 477: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-20 Sign & Stamp of Tenderer

i. The contractor shall not mix Biomedical Waste & General Waste.

Storage time of waste should be as less as possible so that waste

storage, transportation and disposal is done within 48 hours.

ii. All bags or containers containing segregated bio-medical waste shall be

labelled ( including bar code) as per Bio Medical Waste Rules before

disposal.

iii. The contactor shall ensure Adequate number of colour coded

bins/containersor bags should beavailable at the point of generation of

bio-medicalwaste

iv. The contactor shall ensure Posters/ placards for bio-medicalwaste

segregation should be installed at the point of generation.

v. General waste should not be collected at the same time or in the same

trolley in which bio-medical waste is collected.

vi. Disposal of biomedical waste should be through a licensed waste

collector, duly authorized by MoEF&CC or Tamil Nadu Pollution Control

Board as the case may be. License of the waste collector shall be

shown to the Employer’s Representative on demand.

vii. Bio-medical waste collected by the staff, should be provided with PPEs.

viii. The contractor must ensure that there is no secondary handling of the

waste

(k) Storage and Segregation of Waste

(i) Disposal and collection points should be established around all construction

work sites. The waste containers should be of at least 50L/100L

(ii) Outside the storage area, the Contractor shall place a ‘display board’, which

will display quantity and nature of hazardous waste, on date. Hazardous

Waste needs to be stored in a secure place.

(iii) It shall be the responsibility of the Contractor to ensure that hazardous

wastes are stored, based on the composition, in a manner suitable for

handling, storage and transport. The labelling and packaging is required to

be easily visible and be able to withstand physical conditions and climatic

factors.

(iv) The contractor shall enter into a contract with a licensed organisation to

collect waste from Construction depots, Labour Colony etc. and dispose it

at their landfill as per existing norms.

(iv) The Contractor is responsible for the separation of construction and

demolition material into re-usable and non-reusable materials, and transfer

of these materials to low lying areas or landfills, depending on the type of

material and the percentage of inert material.

(v) Segregation of Waste should be done on site. All construction waste

including debris should be sorted on site into inert and non-inert

components as given in Table - I. Different areas of the worksites should

be designated for such segregation and storage wherever site conditions

permit.

Page 478: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-21 Sign & Stamp of Tenderer

Table –1

Storage of Waste

Waste Container Colour Code Sign

Landfill / Biodegradable Green Waste

Recyclable Blue Paper & Plastic

Burning / Combustible Red Burning

Scrap Metal Brown Metal

(vi) On-site measures promoting proper segregation and disposal of

construction waste should be implemented e.g. provide separate

containers for inert (rubber, sand, stone etc.) and non-inert (wood, organics

etc.) wastes. The inert waste should be used on site before disposed of at

filling area and the non-inert waste should be sorted for re-use or recycling

before being transported to landfills.

(vii) Non-inert materials such as wood, glass and plastic are acceptable for

disposal to a landfill as a last resort if these can no longer be reused or

recycled.

(viii) Inert materials such as excavated materials comprising soil, rubble, sand,

rock, brick and concrete should be separated and broken down to size

suitable for subsequent filling in low lying areas, if it is determined that such

material can no longer be reused at the site itself.

(h) Reuse and Recycle

(i) If some good quality reusable topsoil is expected from site clearance works

it shall be locally stockpiled and used later in final landscaping works, thus

saving on costs for such works and transportation and environmental

impacts of disposal.

(ii) The design of framework should maximise use of wooden panels so that

high reuse levels can be achieved. Alternatives such as steel framework

should be considered to increase the potential for reuse.

(iii) The Contractor should recycle as much of the construction waste as

possible on-site.

(iv) Excavated materials are usually inert such as soil and rock, and can

normally be reused on site or in public filling areas. The excavated material

may have to be temporarily stockpiled on-site for subsequent re-use.

(v) Steel and other metals should be recovered from the construction waste

and recycled as far as practical. If possible, scrap steel mills can use steel

bars.

(k) Transportation of Waste

(i) The transportation of construction spoil shall be allowed only to officially

designated dumpsites after obtaining necessary permission from

appropriate authority.

(ii) The Contractor shall approach only Authorised Recyclers of Hazardous

Page 479: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-22 Sign & Stamp of Tenderer

Waste for disposal of Hazardous Waste, under intimation to the Employer

(iii) A procedure to facilitate tracking of loads should be developed to prevent

illegal disposal of waste. This procedure should include, inter alia, the name

of driver, vehicle registration number, type and quantity of waste, place and

time of origin, place of disposal and route of haulage.

(iv) In orders to avoid dust or odour impacts, vehicles leaving a site carrying

excavate should have their load covered. Vehicles should be routed as far

as possible to avoid sensitive receivers in the area.

(v) Contractors who produce significant quantities of scrap are obliged to enter

into agreement with authorised dealers of scrap for its disposal. Copies of

such agreements shall be shown to the Employer’s Representative on

request.

(vi) The Contractor shall submit all Environment related documents and records

pertaining to monitoring and trend analysis on key parameters as listed

below but not limited to: consumption/ efficient use of resources such as

energy, water, material such as demonstrated continual improvement in the

implementation of Environmental Management System. Failure to do so the

Employer/Employer representative shall impose appropriate penalty as per

Volume 1 of ESHS Employer Requirements.

(l) Training

(i) The Contractor’s Environmental Department is responsible for training of

workers and personnel involved in generation of waste.

(ii) The Contractor shall provide training for workers about the concepts of site

cleanliness and appropriate waste management procedure, including

waste separation, reduction, reuse and recycling. Failure to do so would

result in poorly separated waste, resulting in difficulties in treating the waste

correctly and/or a bad market for reuse /recycling.

(iii) The awareness will be created through briefings and toolbox talks. The

personnel/workers should be trained in waste classification and separation.

The training should include:

Biodegradable waste

Combustible waste

Hazardous waste

Minimisation of waste

(iv) Separation awareness training shall be given to employees responsible for

the separation of the waste and information regarding waste separation

shall be posted at appropriate locations around the site.

10.5 Ecological Impacts: Disturbance to the Avifauna Habitats and Biodiversity

Contractor shall engage an Ornithologist to conduct an Ecological Survey for the

preparation of Biodiversity Management Plan (BMP).

Page 480: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-23 Sign & Stamp of Tenderer

Consultation with CMRL/TNFD the contractor shall implement and monitor the BMP

before starting construction to ensure that there is no net loss of Avifauna Habitats and

Biodiversity.

Contractor shall ensure that no disturbance/damage is caused to the Forest land and

Marsh. For instance, the contractor shall ensure the use of noise barriers on the

elevated line and the lighting at stations on this section will be kept to the minimum and

of frequencies and brightness which do not affect bird behavior.

Contractor shall ensure the use of Turbidity curtains to minimize the release of

construction materials into the waterbodies.

GoI legislation, IFC/MDB guidelines and good international industry practices should

be integratedly followed.

10.6 Soil Contamination: i. Concrete spoils will be collected manually and will be disposed in

proposed disposal grounds.ii. Steel scrap will be collected, sorted by diameter and sold to scrap

dealers on alter date.iii. Proper care will be taken to clear spills by scraping and disposing the

products as road sub-grade material.iv. The spoils from pouring concrete will be collected and reused as sub-

grade material in road constriction.v. Municipal solid waste will be collected and taken away and disposed

by municipality

11. Housekeeping11.1 The Contractor shall constitute a special group of housekeeping personnel in

charge of each work section. Site Engineer of each section or work areas shall be

responsible for housekeeping at their respective sites.

11.2 Each section of work site shall maintain the site reasonably clean, keep free from

obstruction and properly store any construction equipment, tools, and materials.

Any wreckage, rubbish shall be temporarily stored in wreckage and rubbish bins.

These wreckage and rubbish bins shall be cleaned at frequent intervals. Special

housekeeping group will ensure daily cleaning work at the site and its surrounding

areas.

11.3 General Housekeeping shall be carried out and ensured at all times at work sites,

Labour Camps, Stores and Offices.

11.4 Full height fence, barriers etc. will be installed at the site in order to preserve the

surrounding area from excavated soil, rubbish etc which may cause inconvenience

to public.

11.5 The Contractor will ensure that all sub-contractors maintain the site reasonably

clean through the sub-contract’s provision related to housekeeping.

11.6 The Contractor’s designated department through daily pre-work meeting (tool box

talk), safety meeting etc. will impart the necessary introduction and education to

labour on housekeeping. Other staff such as supervisors and engineers working at

the site will also be educated on the necessity of good housekeeping.

Page 481: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-24 Sign & Stamp of Tenderer

11.7 Every individual would be responsible for housekeeping in his\her area i.e.

At Work Site: All workers should clean their work place after completion of their

job. Supervisor should ensure good housekeeping of their respective work area

through their workers. Section Managers shall ensure housekeeping in their area

through their supervisors. Contractor’s designate department will monitor this

activity through section manager as well as site supervisor.

At Labour Camp: All workers should be responsible to maintain good

housekeeping and hygienic condition in their respective rooms/dormitories. The

Contractor should ensure the availability of dustbins at required place and regular

cleaning of rooms, kitchens, toilet blocks and dustbins. Safe disposal of all waste

materials should also be ensured. Arrangement for regular fumigation should be

made by the contractor.

At Store: Proper access and stacking shall be ensured at the Stores. A list will

display daily stock of materials. All work material should be stored in clearly

marked containers or at designated storage area.

At Office: Everyone is responsible to maintain housekeeping of their work station.

Disposal of waste materials (i.e. stationary, cigarette butts, tea bags etc.) must

be in dustbin only.

11.8 Avoidance of Nuisance

(a) The Contractor shall take all precautions to avoid any nuisance arising from

his\her operations. This shall be accomplished, wherever possible by

suppression of nuisance at source rather than abatement of the nuisance once

generated.

(b) Following site clearing and before construction, the Contractor shall remove all

trash, debris and other weeds.

(c) The Contractor shall ensure that the work place is free of trash, garbage, debris

and weeds.

(d) The Contractor shall provide at site, metal or heavy-duty plastic ‘Refuse

Containers’ with tight fitting lids for disposal of all garbage or trash associated

with food.

(e) To keep the area free of litter and garbage, specific locations shall be

designated for consuming food and snacks to prevent random disposal of

waste. All waste shall be deposited in the refuse containers. Suitable all

weather signage shall be prominently displayed for compliance of these

requirements.

(f) The refuse containers shall be kept upright with their lids shut. These

containers shall be emptied at least once daily by the Contractor to maintain

site sanitation. There shall be different containers for bio-degradable/recyclable

and hazardous (flammable) wastes.

(g) All plants/equipment/machinery shall be well maintained by regular servicing

and kept free from oil/grease dripping. Drip pans of suitable size shall be used

to collect oil leakages and spills. The area shall be cleaned after completion of

maintenance/repair and generated waste disposed off in approved manner.

(h) The contractor shall make available Material Supply Data Sheet (MSDS) for

Page 482: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-25 Sign & Stamp of Tenderer

material/chemicals/substances used, for which these are available to the

Employer’s Representative when requested.

(i) Such material/chemicals/substances used shall be treated, handled, stored,

transported and disposed off, by the contractor, in a manner specified in the

MSDS.

11.9 Prevention of Mosquito Breeding

(a) Measures shall be taken to prevent mosquito breeding at site. The measures

to be taken shall include, but not limited to, the following:

(i) Construction run of shall not be allowed to stagnate at work sites specially

at construction depots and batching plant locations, by executing and

efficient drainage system and/ or levelling off low lying areas.

(ii) Empty cans, oil drums, packing and other receptacles which may retain

water shall be deposited at a central collection point and shall be removed

from the Site regularly.

(iii) Still waters shall be treated at least once every week with oil in order to

prevent mosquito breeding.

(iv) Contractor’s Equipment and other items on the Site, which may retain

water, shall be stored, covered, or treated in such a manner that water could

not be retained. Posters in both local language and English which draw

attention to the dangers of permitting mosquito breeding shall be displayed

prominently on the site.

12. Landscape, Greenery and Aesthetics

12.1 As far as is reasonably practicable, the Contractor shall maintain ecological

balance by preventing deforestation and defacing of natural landscape. In respect

of ecological balance, the Contractor shall observe the following instructions.

12.2 The Contractor shall, so conduct his\her construction operations, as to prevent any

avoidable destruction, scarring or defacing of natural surroundings in the vicinity of

work.

12.3 Where destruction, scarring, damage, or defacing may occur as a result of

operations relating to Permanent or Temporary works, the same shall be repaired,

replanted or otherwise corrected at Contractor’s expense. All work areas shall be

smoothened and graded in a manner to conform to natural appearance of the

landscape as directed by the Employer.

12.4 The Contractor should be able to demonstrate evidence that the landscape and

aesthetics quality during construction have been considered and appropriate

actions have seen taken to mitigate negative impacts due to construction.

12.5 The construction of metro system will have negative but temporary impacts on the

landscape and aesthetics due to loss of amenities and tress. Large-scale

construction activity will impact negatively on roadside areas and residential

communities immediately adjacent to the construction sites.

12.6 However, transplanting, replanting of trees and additional landscape treatment is

likely to result in long-term beneficial impacts. Some such species are given in

Table –2 for guidance.

Page 483: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-26 Sign & Stamp of Tenderer

Table – 2

Recommended species for Plantation and Landscaping

Sl. No. Botanical Name Common Name

A TREES

1. Azadirachta indica Neem

2. Mangifera indica Mango

3. Madhuca indica Illuppai

4. Tamarindus indica Tamarind

5. Dipterocarpus indicus Ennei

Sl. No. Botanical Name Common Name

B PALMS

1. Corypha umbraculifera Talipot

2. Borassus flabellifer Palm

3. Cycas circinalis Queen Sago

4. Phoenix sylvestris Date Palm

5. Phoenix pusilla Ceylon Date Palm

C GROUND COVER

1. Jatropha curcas Jatropha

2. Tecoma stans Tecoma

3. Murraya paniculata Murraya

4. Sphagneticola trilobata Wedelia

5. Sansevieria trifasciata Snake Plant

12.7 Light used for construction lighting can illuminate adjacent areas in undesired

ways. Such lighting and glare shall be prevented from striking adjacent areas,

where feasible, through directional shielding.

12.8 The other measures include but not limited to:

(a) Erection of decorative screen hoarding prominently displaying the logo of

Chennai Metro Rail Limited.

(b) Minimizing height of temporary buildings.

(c) Careful positioning of construction equipment.

(d) Eliminating the possibility of stockpiles of material from being visible to public.

(e) Strategically placing hi visibility site markings at construction sites indicating

facilities, offices and stores.

(f) Adequate and properly managed parking of vehicles at batching plants.

Page 484: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-27 Sign & Stamp of Tenderer

12.9 Consent for height of stacks of Diesel Engines with rating more than 250 kV shall

be obtained by the Contractor from statutory Government agency. Where the

calculated height of stack is obtrusive and does not blend with the neighbourhood,

the contractor will provide either alternative sucrose of power or provide a solution

that is acceptable to the Employer’s Representative. This may include but not

limited to providing appropriate cladding for the stack.

12.10 Tree Felling

(a) Contractor needs to conduct a final tree inventory survey (number, type, height)

with the final designs of alignment and station. Trees with conservation value

should be transplanted. Plan to avoid cutting patrimonial trees, including

adjustments in project alignment to minimize effect on such trees and inform

the Employer.

(b) Revisit the works in public parks or green spaces and potential tree removal,

especially involving patrimonial trees of special significance, so minimize the

impacts as much as possible.

(c) If unavoidable, implementation of acceptable plans for transplanting (to the extent

technically and economically viable) or replacing such trees and for their short-

term maintenance and care.

(d) Adequate coordination with applicable government regulatory authorities. As

alignment passes through built land use, green belt development along elevated

section is not feasible. Compensatory plantation of 12 saplings for every tree

felled will be done in sites to be identified.

(e) All trees and shrubs, which are not specifically required to be cleared or

removed for construction purposes, shall be preserved, and shall be protected

from any damage that may be caused by Contractor’s construction operations

and equipment. The Contractor shall not fell, remove or dispose of any tree or

forest produce in any land handed over to him for the construction of works and

facilities related to CMRL except with the previous permission obtained from

the Forest Department.

(f) The Employer shall arrange permission from the forest department for trees to

be felled or transplanted. The Employer will permit the removal of trees or

shrubs only after prior approval.

(g) Special care shall be exercised where trees or shrubs are exposed to injuries

by construction equipment, blasting, excavating, dumping, chemical damage

or other operation and the contractor shall adequately protect such trees by

used of protective barriers or other methods approved by the CMRL

Environment Specialist.

(h) Trees shall not be used for anchorage.

13. Energy Management13.1 By using energy efficiently, the same services can be delivered with less energy,

which helps protect the environment by preventing pollution.

13.2 Measures to conserve energy include but not limited to the following:

a. Use of energy efficient motors and pumps

b. Use of energy efficient lighting, which uses energy efficient luminaries

c. Adequate and uniform illumination level at construction sites suitable for the

task

Page 485: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-28 Sign & Stamp of Tenderer

d. Proper size and length of cables and wires to match the rating of equipment

e. Use of energy efficient air conditioners

13.3 The Contractor should optimize the use of tools and plants and equipment to

perform tasks with correct power. Optimizing cable sizes and joints can control

voltage drops.

13.4 The Contractor should use energy efficient pumps (at least 80% efficiency) and

motors (95% efficiency or more). The efficiency should be measured during

installation and also periodically.

13.5 If power from the grid is used, permission from power supply company must be

obtained by the Contractor.

13.6 DG sets, if used, should: (a) conform to height of stack norms as per CPCB rules;

(b) conform to emission norms as per E (P) Act, 1986; (c) noise level at 1 m

distance from enclosure should not be >75 dB(A). DG sets compliant with CPCB

norms will be used. Specification no. GSR 520(E) dt. 1-7-2003 for DG sets rating

< 800 KW, and GSR 489(E) dt. 09-07-2002 for DG sets > 800 KW under E (P)

Rules, 1986. Stack height of DG sets will be as per CPCB requirement [stack ht. =

0.2*(rating in kVA)0.5];

13.7 Diesel storage if done beyond threshold limit (1000 L) permission should be

obtained. Diesel should be stored on pukka platforms and spillages should be

avoided. Low-sulfur Diesel will be used

13.8 The Contractor should rigorously follow the maintenance regime of his\her DG sets.

13.9 The Contractor should plan in advance and select locations to receive and store

material such that these are at the least distance from place of use. Such an

approach will result in less energy being consumed since optimum energy will be

expended for transport of material.

13.10 The Contractor should plan works in a manner as to avoid reworking especially

during meeting the interface requirements of systems contractor.

13.11 The Contractor shall design site offices maximum daylight and minimum heat gain.

The rooms shall be well insulated to enhance the efficiency of air conditioners and

the use of solar films on windows may be used where feasible

13.12 The Contractor shall use and maintain equipment so as to conserve energy and

shall be able to produce demonstrable evidence of the same upon

Employer/Employer’s Representative request.

14. Water Consumption:14.1 Water requirement for Construction works and for labour camps shall be properly

estimated.

14.2 Necessary permissions form TN Metro water board shall be obtained for water

usage.

14.3 Ground water shall be judiciously used depending on the quality of water.

14.4 Usage of treated water for plantation and for subsidence of dust shall be done

which reduces the requirement of potable water.

14.5 Water conservation methods shall be followed.

Page 486: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-29 Sign & Stamp of Tenderer

15. Traffic Management15.1 Traffic Management for the project includes public roadways and sidewalks and

the maintenance of access to residence, business and public services throughout

the construction area. Traffic delays and reduction in roadways capacity are

anticipated during aspects of the construction of the metro rail.

15.2 Even though vehicular, pedestrian and surface transit traffic will be impacted at a

few locations, the contractor should minimize such impacts through the

development of Traffic Management Plans, which will be submitted in advance to

the Employer’s Representative for his\her notice of no objection. These plans will

provide specific guidance on traffic management for various portions of

construction zones and staging.

15.3 The Contractor shall develop detailed and robust traffic management plans

consistent with the Indian Guidelines on Traffic Management in work zones

(IRC:SP:55-2014), prior to mobilization for respective sections with site- or station-

specific plans and measures to minimize the overall impact on traffic throughout

the construction and operation periods;

15.4 At congested sections, the temporary traffic marshals will be engaged by CMRL to

facilitate the traffic management;

15.5 The traffic management plans will have the following components: construction

traffic, ensuring access to properties, accommodating pedestrians, parking, access

by construction vehicles, faulty traffic lights and problem interchanges, use of

public roads, parking provision during construction, use of residential streets and

traffic diversion due to temporary road closures, and construction and use of

temporary access roads;

15.6 Strengthening impact and risk prevention measures, such as establishing

construction site works to minimize the entrance and exit of vehicles at stations

during peak traffic;

15.7 The logistics should be considered to manage transport materials from storage

areas outside of the dense urban core to worksites and to return excavated soil

and other materials to disposal locations. If needed, construction traffic may be

confined to certain routes (based on infrastructure capacity) or restricted to certain

off -peak hours (that is, to reduce noise pollution at night or to avoid commuting

and school hours during the day);

15.8 Any diversions of traffic will cause considerable confusion for pedestrians and

drivers as they rearrange their itineraries, hence, to minimize the effects of the

diversion or reorganization, it is necessary to conduct communication campaigns

and disseminate appropriate information to urban residents and taxi and bus

drivers in advance of disruptions. Efforts will be given to divert traffic to roads wide

enough to accommodate extra traffic. Compliance with scheduled deadlines for the

detour is essential. If necessary, bus service and other public and private transport

services in the area should be improved to meet residents’ transportation needs.

15.9 Incorporation of community safety considerations into plan design, especially at

such locations where buildings are close to the construction site;

15.10 The types of mitigation measures to be implemented by the Contractors will be on

a site-specific basis and will include

Page 487: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-30 Sign & Stamp of Tenderer

Signage and barriers for protecting and guiding pedestrians

Detour signs placed at strategic locations

Relocation of bus stops at construction sites

Provision of sidewalks of least 2m where feasible

Physical separation between construction zone and sidewalks of concrete

barriers or wood fencing or mesh fencing

15.11 Wherever heavy equipment like cranes or dozers have to be moved on public roads

and the normal moving dimensions are infringed, these shall be moved under advice

to traffic police, and with adequate precautions and at low speed.

15.12 CMRL and local authorities continue to play an oversight role in approving these

plans during construction, evaluating their cumulative impact with other

infrastructure projects in the region, and ensuring their dissemination to all relevant

stakeholders.

16. Archaeological and Historic Resources (Physical –Cultural Resources)

16.1 During the construction period, Physical cultural resources other than

Archaeological and Historic resources may potentially be affected by direct or

indirect construction activity. If any such structures are likely to be affected, special

measures to be initiated with the notice of no objection of the Employer’s

Representative.

16.2 Contractor to conduct pre-construction structural integrity inspections if there are

known or a significant likelihood of archeological and/or culturally valuable sites or

finds in the project’s direct area of influence.

16.3 The Contractor shall consult the Archaeological Survey of India (ASI) and other

parties, on the advice of the Employer / Employer’s Representative, to identify and

assess construction effects and seeks ways to avoid, minimize or mitigate adverse

effects on such monuments. Chance finds procedure to be prepared by Contractor

16.4 Adaptive management in site-specific EMP during final design, including site

locations (stations, emergency exits, ventilation shafts, and construction staging

areas);

16.5 Prior to the initiation of construction Employer’s Representative intends to review

a resource protection plan for historic structures where it appears that they may be

affected by the project. This plan will be developed by the Contractor in compliance

with applicable legislation (permits and procedures) and good international practice

in consultation with The Archaeological Survey of India (ASI).

16.6 The plan will identify the sensitive resources as well as specify the construction

monitoring requirements. These requirements may include ground vibration

monitoring and recording any components inadvertently subjected to impact.

16.7 If the project is likely to affect a previously unidentified historic property, work in

that area shall cease until actions that will take into account the effect of the

undertaking on the property can be implemented. . The Contractor shall consult

the Employer’s Representative before proceeding further in such an event.

Page 488: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-31 Sign & Stamp of Tenderer

17. Environmental Monitoring - General17.1 Contractor shall collect a full set of ambient environmental baseline prior to

mobilization as a benchmark as per EMP and EMoP of PCC.

17.2 The Contractor’s Environmental Team shall carry out the monitoring of

environmental impacts during construction. Representative sensitive receivers in

the vicinity of the works shall be monitored for air, water (surface and ground),

noise and vibration, soil quality impacts.

17.3 Contractor will conduct a full detailed analysis of noise and vibration prediction and

submit to CMRL for no objection. The analysis will be reviewed by lenders before

mobilization.

17.4 For carrying out impact monitoring for noise and air, equipment shall be provided,

operated, and maintained by the Contractor. The equipment shall be kept in a good

state of repair in accordance with the manufacturer’s recommendations and

maintained in proper working order with sufficient spare equipment available in the

event of breakdown to maintain the planned monitoring programme.

17.5 The calibration of monitoring instruments and their respective calibrators shall be

carried out in accordance with the manufacturer’s requirement to ensure they

perform to the same level of accuracy as stated in the manufacturer’s

specifications.

17.6 PM2.5 levels shall be measured by following the standard high-volume sampling

method as set out in High Volume Method for Suspended Particulate, BIS: 5182-

1981.) PM10 shall be measured in accordance with BIS 5182 Part 23.

17.7 24-hour average PM2.5 concentration shall be measured by drawing air through a

High-Volume Sampler (HVS) fitted with pre-weighted Glass Fibre filter paper at an

average flow rate not less than 1.1 m3 per minute. Similarly, for PM10, Respirable

dust sampler, fitted with pre-weighted Glass Fibre and an average flow rate of not

less than 1.1 m3/minute shall be used. The duration of monitoring of PM10 shall be

24 hrs.

17.8 The minimum requirements to the specifications of sound level meter are given in

IS: 9779-1981.

17.9 The Contractor’s monitoring programme is summarised in Table –3 and other environmental elements monitoring should be consistent with Environmental Monitoring Plan in PCC.

Table –3

Summary of Contractor’s Environmental Monitoring Programme (Tentative)

Parameter Noise Air

Sampling Day Time (6 AM – 10PM)

Lmax, Leq, L10, L90

Night Time (10PM – 6AM)

Lmax, Leq, L10, L90

PM2.5

24 hours

PM10

24 hours

Page 489: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-32 Sign & Stamp of Tenderer

Frequency at each location

Once a week (when noise- generating activities are underway.

Two 24 samples week.

hours every

Two 24 sample week

hours every

Locations and number

To be determined, by the Contractor and approved by the Employer’s Representative based on noise sensitive receptors, but at least at all metro station sites, Batching Plant and sensitive sites such as school, hospital archaeological sites etc.

To be determined by the Contractor and approved by the ’Employer's Representative, based on air sensitive receptors, but at least all metro station sites, Batching Plant and sensitive location like school hospital archaeological site etc. are to be monitored

To be determined by the Contractor and approved by the Employer’s Representative,

based on air sensitive

receptors, but at least all metro

station sites, Batching Plant and sensitive location like school hospital

archaeological site etc. are to be

monitored

Duration Monitoring by Contractor

of

During Civil Construction During Civil Construction

If any unanticipated EHS impacts arise during construction, implementation or operation of the

Project that were not considered in the Environmental Impact Assessment / EMP, Contractor

and GC to promptly inform CMRL of the occurrence of such risks or impacts, with detailed

description of the event and proposed corrective action plan. CMRL will report to all lenders

accordingly The above indicated Contractor’s Environmental Monitoring Programme is

mandatory and any additional monitoring, with respect to additional environmental attributes

(like surface water & ground water, soil etc.), additional locations, frequency, parameters etc.,

as directed by the Employer’s representative, will have to be undertaken by the Contractor.

18. Air Monitoring18.1 Construction activities that will generate dust impacts include excavation, material

handling and stockpiling, vehicular movement, and wind erosion of unpaved work

areas.

18.2 The impact of fugitive dust on ambient air pollution depends on the quantity

generated, as well as the drift potential of the dust particles injected into the

atmosphere. Large dust particles will settle out near the source and smaller

particles are likely to undergo dispersal over greater distance from the sources and

impeded setting. PM10 and PM2.5 levels will be monitored to evaluate the dust

impact during the construction phase of the Project.

18.3 The Air Quality Monitoring and Control Plan (AMCP) in contract-specific Site

Environmental Plan prepared by the Contractor shall establish procedures to

monitor impact air quality and measures to control air pollution including dust

suppression due to construction activities at work sites. This plan shall contain

description of activities that will cause degradation in air quality, environmental

Page 490: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-33 Sign & Stamp of Tenderer

procedures to manage pollutants, monitoring programme record keeping and

reporting.

18.4 The Employer’s Representative shall monitor Contractor’s performance of tasks

specified and will inspect necessary records, reports and procedures related to the

control of air quality given in AMCP.

18.5 Information gathered during the AMCP will be catalogued and maintained by the

Contractor and shall be available for review by the Employer’s Representative.

18.6 The exact location of the air monitoring stations located near air sensitive receptors

adjoining the construction sites, such as residences, schools, and hospitals and

placement of monitoring equipment shall be agreed with the Employer’s

Representative prior to commencement of air monitoring programme.

18.7 Impact monitoring during the course of the Works shall be carried out at the

monitoring stations for two days (continuous twenty-four hours) every fifteen days

and where there is a perceived air quality problem.

18.8 The Contractor should construct suitable fence, lockable gate, 220V AC power

point and suitable access at each air monitoring station. Monitoring stations should

be free from local obstructions or sheltering.

18.9 Should impact monitoring record dust levels which are:

Indicative of a deteriorating situation such that closer monitoring is reasonably

indicated, or

When in the opinion of the Employer’s Representative additional

measurements are required in view of deteriorating air quality.

Then, the Employer’s Representative may require the Contractor to increase the

frequency of impact monitoring at any one or more of the monitoring stations until

the results indicate an improving and acceptable level of air quality.

18.10 The Contractor shall keep records of air quality monitoring (including location, date,

time). The Contractor shall submit a copy of monitoring results to the Employer’s

Representative. The results should represent a statistical evaluation of data by

calculating maximum, minimum, mean, for valuation of trends, and comparison

with emission standards.

18.11 The National Ambient Air Quality Standards given in Air (Prevention and Control of

Pollution) Act, 1981 may be referred by the Contractor for Limit Levels of PM10 and

PM2.5 in ambient air which may be followed in estimating the pollution level caused

by Contractor’s activities.

18.12 Where the Employer’s Representative determines that the recorded PM10 level is

significantly greater than the Limit levels, the Employer’s Representative may direct

the Contractor to take effective remedial measures including, but not limited to,

reviewing dust sources and modifying working procedures.

18.13 Where the recorded baseline levels exceed the ambient air quality standards, then

at such locations the limit level is the recorded base line. Contractor shall take all

effective remedial measures to contain the levels to their baseline value as a result

of his\her activities.

18.14 The Contractor should inform Employer’s Representative of all steps taken to

investigate cause of non-conformance and immediate action taken to avoid further

Page 491: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-34 Sign & Stamp of Tenderer

occurrences through written reports and proposals for action.

18.15 The Contractor shall take all necessary precautions to minimise fugitive

emissions from operations Involving excavation, grading and clearing of land and

disposal of waste. He shall not allow emissions of fugitive dust from any

transport, handling, construction or storage activity to remain visible in

atmosphere beyond the property line of emission source of any prolonged period

of time without notification to the Employer/Employer’s Representative.

19. Noise and Vibration Monitoring19.1 The activities which are expected to cause noise during the construction include

noise from construction equipment, construction activities such as portal

construction, earthwork excavation, concreting, removal of spoil, movement of

construction vehicles and delivery vehicles travelling to and from the construction

and disposal sites etc.

19.2 The level of impact of these noise sources depends upon the noise characteristics

of the equipment and activities involved the construction schedule, and the

distance from noise sensitive receptors.

19.3 The Noise Monitoring and Control Plan (NMCP) in contract specific site

Environmental Management Plan prepared by the Contractor shall establish

procedures to monitor construction noise and determine when to apply measures

to control noise pollution due to construction activities at works site.

19.4 The NMCP will provide site description, define acceptable noise monitoring

equipment, provide monitoring locations and operating procedures for noise

equipment and indicate reports and record keeping on noise monitoring data.

19.5 The NMCP will provide guidance for construction activity. It shall also address noise

performance criteria used in the selection of construction equipment. In defining

the requirements of the NMCP, available measures for noise control, such as, the

use of equipment with special exhaust silencers or enclosures, and the

construction of temporary enclosures or noise barriers around specific construction

site activity areas shall be considered.

19.6 The NMCP will be reviewed on a regular basis and updated as necessary to assure

current construction activities are addressed.

19.7 The Employer’s Representative shall monitor Contractor’s performance of tasks

specified, and will inspect necessary records, report and procedures related to the

control of noise.

19.8 Noise monitoring shall be carried out at noise sensitive receptor locations within

200 feet of the construction site once each week and after a change in construction

activity. Construction noise measurements shall coincide with daytime and night-

time periods of maximum noise generating construction activities.

19.9 The appropriate parameter for measuring construction noise impacts shall be the

equivalent A-weighted sound pressure level (Leq) measured in decibels (dB). The

two statistical sound levels L10 and L90; the level exceeded for 10 and 90 percent of

the time respectively, shall also be recorded during monitoring. The L90 may be

considered as the ambient level into which the L10 as average peak level intrudes.

The Lmax, Leq, L10 and L90 values will be reported in the noise measurement form

Page 492: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-35 Sign & Stamp of Tenderer

along with allowable noise limit. The duration of monitoring shall be on hourly basis

for 24hours.

19.10 In no case shall the Contractor expose the public to construction noise levels

exceeding 85 dBA(slow) or to impulsive noise levels with a peak sound pressure

level exceeding 140 dB as measured on an impulse sound level meter. The use of

hearing protection should be enforced actively when the equivalent sound level

over 8 hours reaches 85 dB(A), the peak sound levels reach 140 dB(C), or the

average maximum sound level reaches 110dB(A). Hearing protective devices

provided should be capable of reducing sound levels at the ear to at least 85

dB(A).”;

19.11 Limit for construction noise is based on the existing ambient noise levels in areas

adjoining the construction sites. If the measured noise levels exceed the noise

limits, the noise levels shall be reduced by appropriate abatement measures.

19.12 The noise levels emanating from any source during construction, shall not exceed

10 dB(A) or more above existing ambient pre-construction noise levels when

measured at a point outside the premises of the location of source. The same may

be varied from time to time by and at the sole discretion of the Employer’s

Representative.

19.13 The construction activities shall be limited to levels measured at a distance of 200

feet from the construction limits or at the nearest affected building, whichever is

closer, as given in Table - 4.

Table- 4

Allowable construction noise

LAND USE MAXIMUM NOISE LEVELS – Leq dB (A)

Residential Day

Time 75

Night Time

65

Commercial At all

Times 85

Industrial 90

19.14 At the surface of the construction site during night time hours, the Contractor shall

use only equipment that operating under full load meets the noise limits specified

in Table-5, if a sensitive receptor would be affected.

Table - 5

Noise emission limits for construction equipment measured at 50 feet

from construction equipment*

Equipment Category Lmax Level dB(A)

Backhoe 80

Bar Bender 75

Chain Saw 81

Compactor 80

Compressor 80

Concrete Mixer 85

Page 493: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-36 Sign & Stamp of Tenderer

Concrete Pump 82

Crane 85

Dozer 85

Front End Loader 80

Generator 82

Gradall 85

Grader 85

Paver 85

Pneumatic Tools 85

Scraper 85

Tractor 84

19.15 The adjustments for close in equipment noise measurement shall be made in

accordance with Table - 6.

Table – 6

Adjustments for close in equipment noise measurements

(Measurement Values to be subtracted from Measured Sound)

Distance (Feet) Level to Estimate Sound Level at 50 Feet

dB(A)

19-21 8

22-23 7

24-26 6

27-29 5

30-33 4

34-37 3

38-42 2

43-47 1

48-50 0

19.16 Should the impact monitoring record noise levels which are:

indicative of a deteriorating situation such that closer monitoring is reasonably

indicated, or

when in the opinion of the Employer’s Representative additional measurements

are required in view of deteriorating noise environment,

then, the Employer’s Representative may require the Contractor to increase the

frequency of impact monitoring at any one or more of the monitoring stations until

the results indicate an improving and acceptable level of noise.

19.17 The Contractor shall inform the Employer’s Representative of all steps taken to

investigate cause of non-conformance and immediate action taken to avoid further

occurrences through written reports and proposals for action.

19.18 The Contractor shall submit a copy of monitoring results. The results should

represent a statistical evaluation of data for evaluation of trends and comparison

Page 494: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-37 Sign & Stamp of Tenderer

with noise emission standards.

19.19 Noise impacts should not exceed the CPCB standards described for 4 land types,

or result in a maximum increase in background levels of 3 dB at the nearest

receptor location off-site. Where the Employer’s Representative determines that

the recorded Noise level is significantly greater than the acceptable levels, the

Employer’s Representative may direct the Contractor to take effective remedial

measures including, but not limited to, reviewing noise sources and modifying

working procedures.

19.20 Protection against the effects of noise exposure should be provided when the

sound levels exceed those shown in Table No. 6 below when measured on the A-

scale of a standard sound level meter at slow response.

19.21 When employees are subjected to sound levels exceeding those listed in the Table

No. 7 feasible administrative or engineering controls should be utilized.

19.22 If such controls fail to reduce sound levels within the levels of the table, personal

protective equipment shall be provide and used to reduce sound levels within the

levels of the table.

Table – 7

Permissible Noise Exposures

Duration per day, Hours Sound level

(slow Response)

8 90

6 92

4 95

3 97

2 100

1 ½ 102

1 105

½ 110

¼ or less 115

19.23 When the daily noise exposure is composed of two or more periods of noise

exposure of different levels, their combined effect should be considered, rather

than the individual effect of each. Exposure to different levels for various periods

of time shall be computed according to the formula as given below.

Fe = (T1/L1) +(T2/T2) +…+(Tn/Ln)

where, Fe= the equivalent nose

exposure factor.

T= the period of noise exposure at any essentially constant level.

L = the duration of the permissible noise exposure at the

constant level (from Table)

If the value of f exceeds unity (1) the exposure exceeds permissible levels.

19.24 A sample computation showing an application of the above formula is as follows.

An employee is exposed at these levels of these periods:

Page 495: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-38 Sign & Stamp of Tenderer

11 dB(A) 1/4

hour. 100 dB(A)

1/2 hour. 90

dB(A) 1/2

hours. Then,

Fe = 0.500 +0.25 +0.188

Fe = 0.938

Since the value of Fe does not exceed unity, the exposure is within permissible limits.

19.25 The vibration level limits at work sites adjacent to the alignment shall conform to

permit values of peak particle velocity as give in Table No. 8.

Table 8

Permitted Values of PPV

Sl. No. Condition of Structure Max. PPV in mm/sec

1. Most structures in “good condition” 25

2. Most structures in “fair condition” 12

3. Most structures in “poor condition” 5

4. Water supply structures 5

5. Heritage structures/bridge structures 5

19.26 When Diesel Generator (DG) Sets are used for operation of equipment and

machinery, then Ministry of Environment and Forest notification dated 12th July

2004, issued under The Environment (Protection) Second Amendment Rules,

2004, on noise limits shall apply.

20. Emergency Preparedness and Response20.1 Spill Management Plan

19.1.1 The Contractor shall prepare a project specific Spill Management Plan and

submit to the Employer’s Representative for notice of no objection. The Spill

Management Plan shall be submitted within 4 weeks of contract

Commencement.

19.1.2 The plan must include emergency response arrangements to be

implemented if a spill occurs.

20.2 The Contractor shall ensure that all persons including sub-Contractors on site are aware of the spill management plan in the event of a spillage. Awareness training shall commence at induction and thereafter through refresher training such as toolbox talks and mock drills. Records of refresher training and mock drills shall be maintained.

20.3 The Contractor shall report environmental accidents to CMRL immediately for proper

Page 496: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-39 Sign & Stamp of Tenderer

response. The local authorities should also be informed.

21. Environmental Site Inspection21.1 Site inspection shall be undertaken by the Contractor’s staff to inspect the

construction activities in order to ensure that appropriate environmental protection

and pollution control measures are properly followed and implemented. The

frequency of site inspection shall be at least once a week.

21.2 The Contractor shall prepare an ‘Environmental Inspection and Action Reporting

System’, submit to the Employer’s Representative for notice of no objection and

make amendments as suggested. It shall contain a contract specific

comprehensive Environment Inspection checklist as requirement of Site

Environmental Plan.

21.3 The area of inspection shall not be limited to environmental compliance within the

site but areas outside the site which are likely to be affected, directly or indirectly

by activities at site.

21.4 Results of inspection shall be discussed with Employer’s Representative and

his\her recommendations on better environmental protection shall be notified to the

Contractor for taking immediate action and rapid resolution of identified non-

compliance.

21.5 If significant environmental problems are identified or if there is an environmental

complaint or as a part of investigation work, then the Employer’s Representative

shall also carry out Ad hoc site inspection which shall be attended by Contractor’s

Representative.

22. ESHS Committee Meetings

22.1 The Contractor shall establish an Environment Committee within 4 weeks of

commencement that shall be chaired by the Contractor’s Project Director. ToR is

included in Volume 1 of Section VII-F.

22.2 The Contractor shall notify the Employer’s Representative of the establishment of

the Committee together with the committee members’ names and designation. The

Contractor’s Environment Manager, Safety Manager’s, Plant & procurement

Manager and Human Resources Manager shall form the minimum committee

members. Site based personal shall be represented within the Committee by the

attendance of Site Manager(s) and the Workforce ESHS Representative.

22.3 The Employer’s Representative shall be invited to attend the Contractor’s

Environment Committee meetings.

22.4 The Contractor’s ESHS Committee shall meet on a monthly basis throughout the

duration of the Contract.

22.5 The Committee shall review the previous month’s performance, to include,

inspections and audits undertaken, environmental impacts and any concerns or

complaints that have been raised. Short term objectives and targets for

improvement shall be set for completion by the next scheduled Committee meeting.

22.6 Minutes of the Committee meeting shall be issued within 2 days and promulgated

to all members including the Employer’s Representative. The minutes of meeting

Page 497: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-40 Sign & Stamp of Tenderer

shall also be posted on all sites within the workforce area. The minutes intended

for site communication shall be in both Tamil and English.

22.7 The Workforce ESHS Representative shall be made a member of the ESHS

Committee and attend all meetings.

23. Environmental Audits

23.1 As indicated earlier in this EMA, the Employer’s Representative may undertake

regular audits at monthly intervals and Auditing by approved external agencies

periodically, of the Contractor’s onsite practices and procedures as a means of

assessing the on-going performance of the Contractor.

23.2 The external auditing agency shall report to Employer/ Employers representative,

with its findings.

23.3 A checklist of environmental requirements was prepared (Refer Appendix IV) and

amended if necessary, throughout the construction phase to focus on areas of

frequent non-compliance and to reflect the potential impacts associated with

specific activities within the construction programme

23.4 The criteria against which the review will be undertaken will be derived from (but

not be limited to):

(a) The approaches, procedures and commitments given by the Contractor in the

‘Site Environmental Plan’

(b) The clauses contained within the Employer’s Representative’s Requirement on

Environment.

(c) The allocation of responsibility for fulfilling environmental requirements and the

effective lines of communication with regard to environmental issues.

(d) Compliance with procedures established to enable and effective response to

environmental incident or non-compliance.

(e) The extent and accuracy of record-keeping related to environmental

performance indicators.

(f) The effectiveness of ensuring high levels of awareness with regard to

environmental requirements; and

(g) The effectiveness of environmental management activities, including the speed

and effectiveness of responses to complaints.

23.5 The likely protocol will include (but not limited) the auditing of the following activities:

The allocation of responsibility for fulfilling environmental requirements and

effectiveness of lines of communication.

Compliance with procedures established to enable effective response

to environmental issues.

The extent and accuracy of record keeping related to environment.

The effectiveness of staff training ensuring high levels of awareness with regard

to environmental requirements.

The speed and effectiveness of responses to complaints.

23.6 The criteria against which the audits will be undertaken shall be derived from the

Page 498: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-41 Sign & Stamp of Tenderer

clauses within the Employer’s Representatives Requirements contract-specific Site

Environmental Plan and previous site inspection results.

23.7 Nonconformity, corrective action and preventive action

a) The Contractor shall conform to their internal procedures regarding

nonconformity, corrective action and preventive action. The Contractor shall be

audited by the Employer’s Representative for compliance with internal

procedures.

b) Major and Minor non-conformances shall be raised by the Employer’s

Representative as per the Employer’s Quality Management requirements and

the ESHS Audit criteria as defined within ESHS Volume 2.

c) Open non-conformances shall be reflected in the Contractor’s Monthly Audit

Report and are subject to verification by the Employer’s Representative as

detailed in ESHS Volume 2. Failure to successfully take corrective action and

close out non-conformances will impact negatively on the Contractor’s total

quarterly audit score.

d) Where non-conformances have been raised by an External Auditor against the

ISO 14001 Standard, the Contractor shall produce and submit for review within

2 weeks, an action plan of how and within what timescale shall the non-

conformance(s) be closed-out.

24. Training

24.1 The Contractor shall assess the training requirements for all the employees, plan

and initiate a training program to fulfil the training needs assessment. The

assessment of training needs shall incorporate all levels of staff including Sub-

Contractor’s against an individual’s role, responsibility, ability, language skill and

risk

24.2 The Contractor shall produce a ‘Training Implementation Plan’ to incorporate the

findings of the needs assessment.

24.3 Records of all training conducted shall be maintained and made available for

inspection by the Employer’s Representative upon request.

24.4 Should the Contractor fail to provide the training identified within the Contractor’s

assessment, implementation plan and the Employer’s Representative’s Training

matrix within the agreed timescales, this shall be reflected in the potential scores

awarded within the monthly audit report.

25. Reporting System

25.1 Reporting under the Environmental Management System will contain results of

monitoring and inspection programmes.

25.2 In Site Environmental Plan, the Contractor shall prepare and submit monthly

Environmental Management Reports and shall be agreed by CMRL in accordance

with Employer’s Representatives Requirements.

25.3 Environmental accidents shall be reported to Employer/Employers representative

in accordance with the reporting formats given in Volume 2. CMRL will inform the

lenders and supervise the corrective or remedial actions proposed by contractor.

25.4 The monthly report shall include (but not limited to) the following while following the

Page 499: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-42 Sign & Stamp of Tenderer

formats given in Volume-2.

Executive Summary

Brief mention of construction activities

Tree Felling, Transplanting and Compensatory Planation Details

Monitoring results under AMCP, and NMCP

Interpretation of monitoring results, significance and influencing factors

Graphical representation of monitored results over past four reporting periods.

Details on Fly ash consumption as given in Appendix-III.

Raw material consumption details such as electricity, diesel, water

Generation of scrap during the month and sold to authorized recyclers

Generation of other type of waste and sold to respected authorized buyers.

Measures to control spills

Action taken on recommendation under site inspection programme or specific

directions.

Training Details

Weekly Inspection Records

Summary of complaints, results of investigations and follow-up action

Environmental Initiatives

Future key issues.

26. Grievance Redress Mechanism

26.1 Enquiries, complaints, and requests for information can be expected from a wide

range of individuals and organisations both private and government. The majority

of complaints is likely to be received by CMRL, although the site offices are also

likely to be contacted.

26.2 The objective of complaint process is to ensure that public and agency complaints

are addressed and resolved consistently and expeditiously.

26.3 The Contractor’s Project Manager will be notified immediately on receipt of

complaint that may relate to environmental impacts. The Project Manager will

immediately inform the Employer’s Representative.

26.4 Field investigation should determine whether the complaint has merit, and if so,

action should be taken to address the impact.

26.5 The outcome of the investigation and the action taken shall be documented on a

complaint Performa prepared by the Contractor and submitted for notice by the

Employer’s Representative in advance of the works.

26.6 Where possible, a formal response to each complaint received shall be prepared

by the Contractor within seven days in order to notify the concerned person(s) that

action has been taken.

26.7 Grievance log should be prepared and documented in the monitoring report with

the resolution details.

26.8 Grievance Redress Mechanism for workers shall be established as early as

Page 500: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-43 Sign & Stamp of Tenderer

possible to function no later than construction commencement.

26.9 The Grievance Redress Mechanism information and focal should be disseminated

to public.

27. Completion of the EMA Programme27.1 The construction of Chennai Metro will be undertaken as a series of individual

construction contracts with necessarily different construction programme and

completion dates.

27.2 The Employer’s Representative shall maintain an overview of the ‘impact causing

potential’ of each site, monitoring parameter or contract with a view to maintaining

the most cost-effective use of the environmental resources dedicated to the Project.

27.3 For release of final bill, the contractor shall ensure

(i) Closure of all environment related non-conformance reports

(ii) Compensatory plantation reports

(iii) Submittal of all environment related documents and records pertaining tomonitoring and trend analysis on key parameters such as but not limited toconsumption/efficient use of resources such as energy, water, material such ascement, fly ash, iron and steel, recycle/reuse of waste etc. that shalldemonstrate continual improvement in the implementation of EnvironmentalManagement System.

(iv) Aesthetic value of the site will be restored after completion of the construction.

27.4 CMRL will review the completion reports of contractors to confirm the satisfactory

with lenders.

Page 501: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-44 Sign & Stamp of Tenderer

Appendix –I SITE ENVIRONMENTAL PLAN OUTLINE

Sl. NO. SITE ENVIRONMENTAL PLAN OUTLINE

Vibration, Ecological Impacts, Water (Surface and Ground) Soil Monitoring

1 GENERAL

(i) The Environmental Policy of the Contractor is clearly defined in the Site Environmental Plan, which, inter-alia, commits the Contractor to follow national and state environmental legislation and regulations.

(ii) The Contractor is committed to CMRL’s Environmental Management System and shall provide desired manpower and financial resources for its success

(iii) The person responsible for day-to-day environmental matters is identified and vested

with authority to execute the Site Environmental Plan.

(iv) Procedure is available for Contractor’s system of enforcing good environmental practices of its Sub-contractor.

(v) The Site Environmental Plan contains procedures for screening material used in the

contract, for their environmental friendliness.

2 ENVIRONMENTAL FRIENDLY CONSTRUCTION PRACTICES

(i) The Site Environmental Plan must contain specific procedures for achieving environmental performance requirements as given in the Employer’s Representative’s requirement on Environment and CMRL Environmental Management Manual, EMP in PCC.

(ii) Procedures for carrying out Aspect/Impact analysis of contractor’s proposed works and their impacts on environment.

(iii) Procedures for setting up Objectives and Targets commensurate with Employer’s Representative's requirement on Environment and CMRL Environmental Management Manual and how these shall be met.

(iv) Procedures for formulating Environmental Management Plans and Operational Control Procedures to meet contractual requirements.

(v) Procedures for offering environmental training and methods for promoting environmental awareness amongst his\her employees.

(vi) The SEP must contain details on Air, Soil, Surface water and Ground water, Ecological Monitoring and Control Plan which details Mitigation measures / Corrective Action / Preventive Action and Monitoring Schedule.

(vii) The SEP must contain details on Noise and Vibration Monitoring and Control Plan which

details Mitigation measures / Corrective Action / Preventive Action and Monitoring Schedule in consistent with Environmental Monitoring Plan of PCC.

(viii) The SEP must contain procedures on prevention and control of water pollution from sanitary surface runoff and process wastewater.

(ix) The SEP must contain details on procedures for Storage, handling and disposal of

waste including, municipal, construction, chemical and hazardous wastes.

(x) The SEP must contain procedures for reuse/recycle of waste, selling to authorized recyclers and records thereof.

Page 502: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-45 Sign & Stamp of Tenderer

(xi) The SEP must contain procedures for preservation of landscape disturbed due to

construction, housekeeping, and traffic management as required under the contract.

(xii)

The SEP must contain procedures for dealing with unforeseen environmental situations under Environmental Emergency.

Sl. No. SITE ENVIRONMENTAL PLAN OUTLINE

3 MONITORING, AUDITS AND RECORDS

(i) The Contractor keeps records of monitoring and the SEP contains provision for reporting results of environmental monitoring in a manner as specified in the contract.

(ii) The Contractor carries out weekly inspection under the ‘Environmental Inspection and Action Reporting System’ through Environmental Inspection checklist and submits to the Employer’s Representative.

(iii) The SEP contains procedures for mandatory audits by the contractor as given in the contract.

(iv) The SEP contains provisions for submitting monthly Environmental Quality Management reports.

(v) The SEP contains procedures for recording environmental complaints and response process.

Page 503: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-46 Sign & Stamp of Tenderer

Appendix – II Weekly Environmental Inspection Checklist SUMMARY SHEET

1. Major issues of non-conformity in the past week are:

Issue Reason

(i) Air (Specify)

(ii) Water (Specify)

(iii) Noise (Specify)

(iv) Vibration (Specify)

(v) Ecological Impact (Specify)

(vi) Soil (Specify)

(vii) Waste (Specify)

(viii) Storage (Specify)

(ix) Housekeeping (Specify)

(x) Roads (Specify)

2. Over the last week have been able to implement environmental managementrequirements as per contract

Yes No if not yes reasons are

I)

ii)

iii)

3. Following issues have not been resolved for more than past two weeks

(i)

(ii)

(iii)

4. Support/Clarification from Employer’s Representative required in the following:

(i)

(ii)

(iii)

5. Complaints received in the past week.

(i) From Action Taken Reasons for Delay

(ii) Public

(iii) Client

(iv) Statutory Agency

Auditor: Project Manager

Contract Number: Contractor:

Page 504: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-47 Sign & Stamp of Tenderer

Environmental Manager Project Director Document No.:

Weekly Environmental Inspection

Report No.: Inspection Date: Inspected by:

Inspection Area:

Participants:

SL.

NO. ITEM OBSERVATION REMARKS

ACTION

By Date By whom

1.0 AIR POLLUTION

1.1 Dust Site Satisfactory

Site Dusty

Sprinkling carried out as required

Excavate removal within 2 days

(approach roads, adjacent roads, working area, cement handling etc.)

1.2 Generators Satisfactory

Maintenance regimefollowed

Black smoke

Leaking oil

Drip Pans not available

1.3 Vehicles Satisfactory

PUC certificate available

Black smoke

Wheel Washed /Cleaned

Leaking oil

Side of vehicle clear of mud

Material transported in closed manner

1.4 Air Monitoring Carried out as per contract

Results reported as per contract

Remedial measures in

place where required

Page 505: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-48 Sign & Stamp of Tenderer

SL.

NO. ITEM OBSERVATION REMARKS

ACTION

By Date By whom

2.0 WATER

POLLUTION

2.1 Site Drains Drainage systemfunctional

No Contamination

Not blocked by debris/

garbage

No indications of Oil spilled in drains

Storage of chemicalwaste not nearby

storage of refuse/excavate muck not nearthe drains

2.2 Adjacent Drains

Not damaged

No signs of pouringbentonite

No signs of pouringChemicals

Signs of discharging Silt/debris

2.3 Separator Tanks

Tank not full of silt

Tank regularly emptied

3.0 NOISE

POLLUTION

3.1 Noise control measures

All powered mechanicalequipments are soundreduced

Acoustic / enclosuresconstructed in areas ofexcessive noise

Equipment located and directed away fromnoise receptors

3.2 Generators Effective

provided with acoustic enclosures

Not effective

Not provide

Page 506: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-49 Sign & Stamp of Tenderer

SL.

NO. ITEM OBSERVATION REMARKS

ACTION

By Date By whom

3.3 Noise Monitoring

Carried out as per contract

Not exceeded baselinevalues

Remedial measures in place

Results evaluatedstatistically for inclusionin Monthly report

4.0 WASTE MANAGEMENT

4.1 Waste Identified

Chemical FlammableCorrosive Constructionrelated/ oil/ Filters/Batteries

Hazardous

Other (Specify)

4.2 Storage Containers & Bins

Adequate number and properly place

Proper quality

Emptied regularly

Labelling proper

No spillage on containersurface noticed

4.2 Storage Containers & Bins

Pollutants (e.g. wastechemical), not dumpedinbins

Recyclable (e.g. metal)notdumped in garbage bins

4.3 Oil Waste Drip pans available

No oil stains on ground

Spill absorption materialavailable

Waste oil poured in todesignated waste drums

Used oil filters not dumpedin garbage bins

Page 507: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-50 Sign & Stamp of Tenderer

SL.

NO. ITEM OBSERVATION REMARKS

ACTION

By Date By whom

4.4 Excavate/Muck Storage satisfactory/

properly secured

Dumping in authorized

areas

No interference with

nearby drainage

5.0 STORAGE

5.1 Diesel Storage Extensive diesel spillage

on ground not visible

Drip pans used when

pumping diesel

Pipes / connectors/

pumps not leaking

Not located close to

storm water drains

transfer arrangement

satisfactory

6. AESTHETICS & CLEANLINESS

6.1 Housekeeping

& Hygiene

Designated storage area

for materials

Scraps/brickbats/rubbish

scattered at site

Proper space for

handling

waste

Area Clean and dry

Stagnant water treated

weekly

Proper stacking of

drums

Barricades are clean, in

line, firmly secured and

proper earthling

Water not allowed to

accumulate in work area

for any reason

Page 508: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-51 Sign & Stamp of Tenderer

7.0 ROADS

7.1 Access Roads Satisfactory

Maintenance

In urgent need of

Maintenance

7.2 Public Roads

used by

Contractor

Satisfactory

maintenance

Repair not carried out

Page 509: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-52 Sign & Stamp of Tenderer

WEEKLY ENVIRONMENTAL AUDIT

AUDIT No.: WEEK ENDING :

PROGRESS IN THE LAST WEEK:

PLANNING /GOALS FOR THE NEXT WEEK:

Environmental Manager Project Director Document No.:

Page 510: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-53 Sign & Stamp of Tenderer

APPENDIX - III - DETAILS ON FLY ASH

The Employer’s Representative shall give his\her consent to the civil Contractor for using Fly

Ash in concrete or brick works. The Contractor shall record all relevant details on the

consumption of Fly Ash from the data of initial consumption to date of final use.

The details on Fly Ash consumption shall be reported on a monthly basis in the Contractor’s

monthly Environmental Management Report required to be submitted to the Employer’s

Representative.

The details on Fly Ash shall be reported in groups and subgroups as noted below: -

F1 Data required from the Concrete Production Contractor

F1.1 Concrete Production

Daily records of concrete production

Mix Design

F1.2 Material consumption from Daily production Records:

Cement delivery records

Fly ash delivery records

F1.3 Transportation Cement

Load capacity of cement delivery vehicles (tons)

Distance of batching plants to cement plant (km)

Fuel consumption of delivery vehicles (km/l)

F1.4 Transportation (Fly Ash)

Load capacity of fly ash delivery vehicles (tons)

Distance of batching plants to fly ash source (km)

Fuel consumption of delivery vehicles (km/l)

F2 Data required from Cement Manufacturer (to be obtained by the contractor and

submitted to the Employer’s Representative, on a monthly basis)

F2.1 Process Emission from daily production records

Quantity of calcareous raw material (limestone etc.) consumed

% of CaO in raw material

% of MgO in raw material

% of CaO in clinker

% of MgO in clinker

Quantity of clinker produced

F2.2 Kiln fuel emissions from Monthly Consumption Records

Quantity of each type of fuel used in the kiln

CO2 Emission factor (tons CO2/MJ) and specific heat for each fuel type (MJ/Kg)

or % carbon and density (if liquid) for each fuel type

Page 511: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-54 Sign & Stamp of Tenderer

F2.3 Non- Kiln Fuel emission from Monthly consumption records

Quantity and specific uses for each type of non-kiln fuel used

CO2 emissions factor (tons CO2/MJ) and specific heat for each fuel (MJ/kg)

or % carbon and density (if liquid) for each fuel type

F2.4 Emission from Electricity consumption in clinker production from Monthly electricity

consumption records

Electricity consumption of equipment related to cement production (kWh)

Grid electricity supplier

Quantity of electricity drawn from grid

Quantity of electricity self-generated

Fuel consumption of generating plant

Waste heat capture from kiln

F2.5 Additives from daily production records

Quantities of all additives blended with clinker at cement plant

F2.6 Cement Delivery

Monthly records of cement delivery to batching plants

Page 512: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-55 Sign & Stamp of Tenderer

APPENDIX – IV Environment Audit Measurement Criteria.

1. WasteACTIVITY EXCELLENT

[An Exceptional

Standard]

10 Points

GOOD

[Exceeding the Norm]

8 Points

AVERAGE

[In line with Environment Procedures]

6 Points

FAIL

[In Need of

Improvement]

0 Points

IMMEDIATE ACTION

[Unsatisfactory]

-10 Points

1.1

Provision of Skips

Daily recorded inspection of area.

Well signed and regularly inspected. Area around skip tidy, maintained

Safety sited, good access, skip in good condition.

Provided but position compromised safety, lack of signs. Open topped skip.

None provided, hazardous sighting

1.2

Instructions on waste disposal

Out-sourcing of waste management

Instructions displayed on notice board. Segregation points for hazardous waste clearly signed.

Formal procedure in place, disposal instructions included.

Procedures followed

Identified in Hazard & Risk Logs, procedure not implemented with poor site control

Not identified in Hazard & Risk Logs

No procedure, hazardous waste

Waste not segregated.

1.3

Use of Reg. Waste Carrier

Carrier provides regular reports of handling/disposal performance at transfer station.

Regular collection with no excessive waste builds up on site.

Waste carrier appointed procedures in place.

Different carriers used with, no formal procedure in place.

Not formally appointed, AD- HOC system

1.4

Use of Waste Transfer Notes

Records of, quantities maintained

Transfer notes retained and filed.

Transfer notes raised, and signed off

Some completed not all retained

Nonexistent

1.5

Recycling Materials

All recycling opportunities identified and procedure in place for objective achievement.

Contractor sets recycling objectives and targets in a percentage format

Procedures established and recycling active.

Procedures and opportunities need enforcing

Recycling opportunities not identified

1.6

Waste Management Plan & Policy

All waste monitored and plan regularly reviewed. Corporate policy also displayed and implemented.

Comprehensive plan, waste streams identified, impact register in place.

Waste Plan established and implemented, waste management out-sourced, records maintained.

Plan only partly implemented, not all waste considered.

No plan or not implemented

1.7

Waste Minimization

Full procedures, staff trained records kept, waste monitored.

Staff inducted; records maintained.

Included in management policy, Procedures in place.

Partial implementation, records not completed

No arrangements in place

1.8 Identification of Special Wastes

Regular review of arrangements. Staff briefed/toolbox talk.

Procedures in place. Records maintained and transfer notes raised.

Special waste segregated and labelled for disposal by licensed carrier

Special waste identified, not properly stored prior to disposal

Not identified, no arrangements in place, not segregated.

Page 513: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-56 Sign & Stamp of Tenderer

2. NoiseACTIVITY EXCELLENT

[An Exceptional Standard]

10 Points

GOOD

[Exceeding the Norm]

8 Points

AVERAGE

[In line with OSHE

Procedures]

FAIL

[In Need of Improvement]

0 Points

IMMEDIATE ACTION

[Unsatisfactory]

-10 Points

6 Points

2.1 Regular review Information on Sources Sources None recorded Identification of of sensitive Limit/exposure identified, documented, in Hazard & Risk Sources receptors. levels held on assessments assessments not Log or Aspect

site. completed completed Impact

assessment

2.2

Provision of Silenced Equipment

Maintenance and test certificates maintained for machinery

dBA frequently checked. Noise monitoring equipment available and calibrated

Equipment silenced to acceptable levels

Identified in Hazard & risk log but not implemented throughout. Some provided but do not cover all risks

Not identified in Hazard & Risk logs. Not provided in areas where noise levels are exceeded and near sensitive receptors

2.3 Noise Noise levels Frequent Noise levels Equipment on None carried out Monitoring from equipment checks, records monitored site, Irregular

checked and maintained. calibration checks made no recorded daily records on site. calibration

records

2.4 Stack Monitoring

Frequent checks, records maintained.

Stack monitored calibrated monitoring equipment used.

Irregular checks. No standard procedure.

Damaged/non- standard equipment used.

None carried out

Page 514: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-57 Sign & Stamp of Tenderer

3. AirACTIVITY EXCELLENT

[An Exceptional Standard]

10 Points

GOOD

[Exceeding the Norm]

8 Points

AVERAGE

[In line with OSHE

Procedures]

FAIL

[In Need of Improvement]

0 Points

IMMEDIATE ACTION

[Unsatisfactory]

-10 Points

6 Points

3.1 Monitoring Frequent checks, records

Air quality monitored at

Air Quality monitored

Irregular checks. Damaged/non-

None carried out

maintained. Sensitive and calibrated standard Mitigation Residential monitoring equipment used. measures are in areas. equipment used.

place.

3.2 Mitigation Measures

Regular review of arrangements. Staff briefed/tool

APC measures implemented and monitored frequently.

APC measures implemented.

Identified, not implemented.

None recorded in Aspect Impact Register

box talk. Dust Control Plan at place

3.3 Relative Frequent Mitigation Monitored, Irregular checks. None carried out Humidity checks, records measures are in calibrated Damaged/non-

maintained. place. monitoring standard

equipment used. equipment used.

3.4 Velocity Monitoring

Frequent checks, records

Mitigation measures are in

Monitored, calibrated

Irregular checks. Damaged/non-

None carried out

maintained. place. monitoring standard

equipment used. equipment used.

3.5 Frequent Mitigation Monitored, Irregular checks. None carried out Temperature checks, records measures are in calibrated Damaged/non- Monitoring maintained. place. monitoring standard

equipment used. equipment used.

Page 515: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-58 Sign & Stamp of Tenderer

4. LandACTIVITY EXCELLENT

[An Exceptional Standard]

10 Points

GOOD

[Exceeding the Norm]

8 Points

AVERAGE

[In line with OSHE

Procedures]

FAIL

[In Need of Improvement]

0 Points

IMMEDIATE ACTION

[Unsatisfactory]

-10 Points

6 Points

4.1 Excavated Dumped in Dumped within Stored at site Irregular Soil/Muck not

Soil/Muck designated areas and

48 hours after excavation.

and secured properly.

disposal and soil/muck not

disposed.

transfer notes secured

retained. properly.

4.1 Muck Disposal – Transfer Notes

Records of, quantities maintained

Transfer notes retained and filed.

Transfer notes raised, and signed off

Some completed not all retained

Non existent

4.3 Land Regular review Spill clean-up Drip trays Spillage on Spillage on

contamination of arrangements.

equipment readily available.

available. ground. Drip trays not used.

ground. Used oil drums/ oil filters

Staff briefed/tool found scattered

box talk. at site.

4.4 Transportation of Muck

Regular review of arrangements. Staff briefed/tool box talk. Dust Control Plan at place

Side of vehicles clear from mud.

Wheel washing facilities available.

Materials transported in a closed manner.

Manual cleaning of vehicle tyres.

Non-existent of Wheel Wash Facilities

Page 516: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-59 Sign & Stamp of Tenderer

5. Tree Cutting, Tree Transplantation and CompensatoryPlantation

ACTIVITY EXCELLENT

[An Exceptional Standard]

10 Points

GOOD

[Exceeding the Norm]

8 Points

AVERAGE

[In line with OSHE

Procedures]

6 Points

FAIL

[In Need of Improvement]

0 Points

IMMEDIATE ACTION

[Unsatisfactory]

-10 Points

5.1 Method Regular review MS Available on Completed as MS on site but MS not completed. Statement for of MS. site. Schedule of per not suitable and Tree Cutting & operative Environmental sufficient for Tree briefings Impact Aspect task. Notice of Transplantation identified. Register. no objection not

Suitable and obtained from sufficient for ER. tasks. Notice of no objection received from

ER

5.2 Approvals Vegetation Weekly Approval - Tree for Tree cutting study in work inspections obtained from cutting/transplanting and area done records ES/CMRL done without

Transplantation maintained. approval.

5.3 Storage & Weekly Regular update Fire wood logs Improper Disposed without Disposal of Fire disposal of Stack wood proper stacking of fire approval from

Wood records maintained.

Register stacking done logs/wood ES/CMRL

5.4 Excess Quarterly Compensatory Compensatory Compensatory Compensatory compensatory inspection planting done planting done planting not done

Plantings plantation done.

reports on planting and

as per the requirement/

but not up to the

survival status. standard/ requirement.

norms

5.5 Landscape Works

Weekly inspections records

Regular review of implementations.

Landscape plan/ design implemented at

Work carried out without Landscaping

No landscape plan/ design

maintained.. site. plan/design

approval.

Page 517: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-60 Sign & Stamp of Tenderer

6. Environment DocumentationACTIVITY EXCELLENT

[An Exceptional Standard]

10 Points

GOOD

[Exceeding the Norm]

8 Points

AVERAGE

[In line with OSHE

Procedures]

FAIL

[In Need of Improvement]

0 Points

IMMEDIATE ACTION

[Unsatisfactory]

-10 Points

6 Points

6.1 All aspects and All impacts Environment Plan only partly No plan or not Environment impacts are identified, Management implemented, implemented

Plan monitored and plan regularly

mitigation measures

Plan established aspect impact

not all impacts considered.

reviewed. implemented. register in place. Corporate policy also displayed and

implemented.

6.2 Daily inspections Up to date, Up to date with Information Not up to date, Environment records shows mitigation good clear poorly recorded. or inspections Inspections maintained. measures/action information. Well missed.

taken. documented and dates of remedial action required, as/

when.

6.3 Display of Environmental Policy/ Awareness Posters

Posters displayed on Environmental impacts (on going work activities)

Additional Posters displayed

- i.e. mess room,site entry andpoint of work

Displayed on office notice board/all boxes completed.

Not in prominent position (hidden away)

Not displayed, or incomplete.

7. Storage of Hazardous MaterialsACTIVITY EXCELLENT

[An Exceptional Standard]

10 Points

GOOD

[Exceeding the Norm]

8 Points

AVERAGE

[In line with OSHE Procedures]

6 Points

FAIL

[In Need of Improvement]

0 Points

IMMEDIATE ACTION

[Unsatisfactory]

-10 Points

7.1 Storage Proper signage’s

and labels are

Properly stored.

Quantity and

Stored as per the

standard/regulation

Spillage on the

ground. No

Improper

storage of present on all last date of identification of Hazardous waste disposal storage Waste Materials containers. displayed at materials.

storage area.

7.2 Authorised Handler provides Regular Authorised Waste Different Hazardous

Handlers regular reports of handling/disposal

collection with no excessive

Handlers carrier appointed

handlers used with, no formal

waste disposed to unauthorised

performance. waste builds up procedures/ procedure/ handlers. on site. agreements in agreement in

place. place.

Page 518: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-61 Sign & Stamp of Tenderer

8. WaterACTIVITY EXCELLENT

[An Exceptional Standard]

10 Points

GOOD

[Exceeding the Norm]

8 Points

AVERAGE

[In line with OSHE

Procedures]

FAIL

[In Need of Improvement]

0 Points

IMMEDIATE ACTION

[Unsatisfactory]

-10 Points

6 Points

8.1 Testing Water level recorded.

Frequent checks, reports maintained.

Water Testing done and report on site.

Irregular testing None carried out

8.2 Treatment Facility

Daily inspections records

Onsite treatment facilities

Out-sourcing of wastewater

Discharge into other water bodies/sewer/storm

No treatment facilities available

maintained. available. water line without

approval

8.3 Reuse of Full procedures, Staff inducted, Included in Partial No

Water staff trained records kept,

records maintained.

management policy,

implementation, records not

arrangements in place

procedure Procedures in completed

monitored. place.

9. TrainingACTIVITY EXCELLENT

[An Exceptional Standard]

10 Points

GOOD

[Exceeding the Norm]

8 Points

AVERAGE

[In line with OSHE

Procedures]

FAIL

[In Need of Improvement]

0 Points

IMMEDIATE ACTION

[Unsatisfactory]

-10 Points

6 Points

9.1 Management Competency

Audit/inspection training. Competency formally assessed.

Knowledge of project, site and corporate arrangements.

Induction done Limited environmental/ waste management training

No formal management or supervisory training.

No induction

9.2 Training Programme

Programme of additional training needs maintained.

Implementation schedule attainment reported monthly.

Programme regularly reviewed and updated.

Implementation standard monitored and reported on.

Programme maintained for induction, waste management, environmental awareness and management.

Training programme nit up to date or not implemented.

No training procedure or programme.

Page 519: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-62 Sign & Stamp of Tenderer

Monthly Environment Audit

Date of Inspection:

ENVIRONMENT TOTAL %

Contrator: Project Name:

Project Manager: Environment Manager :

Site Conditions:

Points will be objectively awarded by Environmental Personnel based upon site Environmental conditions.

Scoring will be as follows: Excellent (E) = 10, Good (G) = 8, Average (A) = 6, Fail (F) = 0, Non-Compliance (NC) = -10.

All non-compliance within the heavy bordered areas will receive an Action Notice at the required level.

All Suspended Operations Notices will be referred to the Project Manager, who will visit site within 24 hours to carry out further environment inspections.

Any non applicable topic and the corresponding “possible score” will not be marked and the score will be calculated by recognising the relevant possible score as

being 100% and the actual score as a percentage of this.

1 Waste E G A F NC Actions

1.1 Provision of Skips

1.2 Instructions on Waste Disposal

1.3 Registered Waste Carrier

1.4 Retention of Waste Transfer Notes

1.5 Recycling Materials

1.6 Waste Management Plan & Policy

1.7 Waste Minimisation

1.8 Identification of Special Wastes

SUB TOTAL POSSIBLE 80

2 Noise E G A F NC Actions

2.1 Identification of Sources

2.2 Provision of Silenced Equipment

2.3 Noise Monitoring

2.4 Stack Monitoring

SUB TOTAL POSSIBLE 40

3 Air E G A F NC Actions

3.1 Monitoring

3.2 Mitigation Measures

3.3 Relative Humidity

3.4 Velocity Monitoring

3.5 Temperature Monitoring

SUB TOTAL POSSIBLE 50

4 Land E G A F NC Actions

4.1 Excavated Soil/Muck

4.2 Muck Disposal - Transfer Notes

4.3 Land Contamination

4.4 Transportation of Muck

SUB TOTAL POSSIBLE 40

4 Tree Cutting/Transplantation E G A F NC Actions

5.1 MS for Tree Cutting/Transplantation

5.2 Approvals for Tree Cutting

5.3 Storage & Disposal of Fire Woods

Page 520: 52234-001: Chennai Metro Rail Investment Project

Part-2 - Section VII Works Requirements

Section VII

Sub section F ESHS Volume 3 Environmental Management Arrangement

3-63 Sign & Stamp of Tenderer

5.4 Compensatory Plantings

5.5 Landscape Works

SUB TOTAL POSSIBLE 50

6 Environment Documentation E G A F NC Actions

6.1 Environment Plan

6.2 Environmental Inspections

6.3 Environmental Awareness

Contrator: Project Name:

SUB TOTAL POSSIBLE 30

7 Storage of HAZMAT E G A F NC Actions

7.1 Storage

7.2 Authorised Handlers

SUB TOTAL POSSIBLE 20

8 Water E G A F NC Actions

8.1 Testing

8.2 Treatment Facility

8.3 Reuse of Water

SUB TOTAL POSSIBLE 30

9 Training E G A F NC Actions

9.1 Management Competency

9.2 Training Programme

SUB TOTAL POSSIBLE 20

OVERALL TOTAL POSSIBLE 360

Environment Score % 0.00

Environment Manager Mr. xxxxxxxxxxxxxxxxx Signed

(Print Name) --------------------------------------------------------------------

Project Manager Mr. xxxxxxxxxxxxxxxxx Signed

(Print Name) --------------------------------------------------------------------

Comments: