BEECHWORTH ROAD AVON ROAD NORTH SHORE RAILWAY RL 158.5 RL 158.2 RAMP 1:5 1:20 RAMP 1:20 15% RL 157.8 RL 136 RL 145.1 15% turning bay parking bay (hydrant booster set) fire hydrants to be located around builing 5 RAMP 1:6 RL 147.1 RL 128.8 1:15 RL 146.8 RAMP 1:10 1:15 1:15 1:15 RL 129.1 turning bay parking bay (hydrant booster set) 6m 6m 6m 6m 6m 5.5 m 6 m 1:15 RL 147.1 RL 146.8 5 m RAMP 1:6 RL 154.9 boundary boundary boundary boundary boundary boundary boundary boundary boundary boundary boundary boundary boundary basement line basement line basement line basement line basement line basement line BUILDING 1 BUILDING 4 BUILDING 3 BUILDING 5 17 m 20m 13 m 18 m 26 m 28 m 53 m 50 m 25 m 21 m 41 m 60 m 38 m 25 m 50 m 49m 48 m 30m CONCEPT PLAN SEPP65 DISTANCES BETWEEN BUILDINGS 1:400 @ A1 MP06.09 1:800 @ A3 Do not scale from drawings. All dimensions to be checked on site before commencement of work. All discrepancies to be brought to the attention of the Architect. Larger scale drawings and written dimensions take preference. This drawing is copyright and the property of the author, and must not be retained, copied or used without the express authority of MARCHESE + PARTNERS INTERNATIONAL PTY. LTD. IMPORTANT NOTES: DESCRIPTION REVISION DATE BY PROJECT CLIENT CHECKED DRAWN SCALE DATE DRAWING JOB REVISION DRAWING TITLE JW Neale Pty Ltd (Receivers and Managers Appointed) PROPOSED RESIDENTIAL DEVELOPMENT AVON ROAD, PYMBLE 12009 Marchese Partners International Pty Ltd Level 1, 53 Walker Street, North Sydney, NSW 2060 Australia P +61 2 9922 4375 F +61 2 9929 5786 E [email protected]www.marchesepartners.com.au 6\GQH\ Â %ULVEDQH Â 0HOERXUQH Â &DQEHUUD Â *XDQJ]KRX ACN 098 552 151 ABN 20 098 552 151 01.11.2012 A 30.11.12 SUBMISSION TO DOP PS B 10.12.12 GENERAL REVISION PS C 17.12.12 ADDITIONAL INFORMATION ADDED PS D 12.06.13 BUILDING ENVELOP REVISED PS E 11.12.13 REVISED CONCEPT PLAN PS E
4
Embed
52 m · 15 avon road 1 arilla road 6 beechworth road 10b beechworth road 10a beechworth road 23 m 33 m 27 m 53 m 25 m 25 m 52 m 30 m 24m a 30.11.12 submission to dop ps b 10.12.12
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
BE
EC
HW
OR
TH R
OA
D
AVON RO
ADNORTH SHORE RAILWAY
RL
158.
5
RL
158.
2
RAMP
1:5
1:20
RAMP 1:20
15%
RL
157.
8
RL 136
RL
145.
1
15% turningbay
parking bay(hydrant booster set)
fire hydrantsto be located
around builing 5
RAMP 1:6
RL
147.
1
RL 128.8
1:15
RL
146.
8
RAMP 1:10
1:15
1:15
1:15RL 129.1
turning bay
parking bay(hydrant booster set)
6m
6m
6m
6m
6m
5.5 m
6 m
1:15
RL
147.
1
RL
146.
8
5 m
RAMP 1:6
RL 154.9
boundary
boun
dary
boundary
boundary
boundary
boundary
boundary
boun
dary
boundary
boundary
boundary
boundary
boundary
basement line
basement line
basement line
basement line
basement line
base
men
t lin
e
BUILDING 1
BUILDING 4
BUILDING 3
BUILDING 5
17 m
20m
13 m
18 m
26 m28 m
53 m
50 m
25 m
21 m41 m
60 m
38 m
25 m
50 m
49m
48 m
30m
CONCEPT PLANSEPP65 DISTANCES BETWEEN BUILDINGS
1:400 @ A1
MP06.09
1:800 @ A3
Do not scale from drawings. All dimensions to be checked on sitebefore commencement of work. All discrepancies to be brought to theattention of the Architect. Larger scale drawings and writtendimensions take preference. This drawing is copyright and theproperty of the author, and must not be retained, copied or usedwithout the express authority of MARCHESE + PARTNERSINTERNATIONAL PTY. LTD.
IMPORTANT NOTES: DESCRIPTIONREVISION DATE BY
PROJECT
CLIENT
CHECKEDDRAWNSCALE DATE
DRAWINGJOB REVISION
DRAWING TITLE
JW Neale Pty Ltd(Receivers and Managers Appointed)
Marchese Partners International Pty LtdLevel 1, 53 Walker Street, North Sydney, NSW 2060 AustraliaP +61 2 9922 4375 F +61 2 9929 5786 E [email protected] · Brisbane · Melbourne · Canberra · GuangzhouACN 098 552 151 ABN 20 098 552 151
01.11.2012
A 30.11.12 SUBMISSION TO DOP PS B 10.12.12 GENERAL REVISION PS C 17.12.12 ADDITIONAL INFORMATION ADDED PS D 12.06.13 BUILDING ENVELOP REVISED PS E 11.12.13 REVISED CONCEPT PLAN PS
E
BE
EC
HW
OR
TH R
OA
D
AVON RO
ADNORTH SHORE RAILWAY
Do not scale from drawings. All dimensions to be checked on sitebefore commencement of work. All discrepancies to be brought to theattention of the Architect. Larger scale drawings and writtendimensions take preference. This drawing is copyright and theproperty of the author, and must not be retained, copied or usedwithout the express authority of MARCHESE + PARTNERSINTERNATIONAL PTY. LTD.
IMPORTANT NOTES: DESCRIPTIONREVISION DATE BY
PROJECT
CLIENT
CHECKEDDRAWNSCALE DATE
DRAWINGJOB REVISION
DRAWING TITLE
JW Neale Pty Ltd(Receivers and Managers Appointed)
Marchese Partners International Pty LtdLevel 1, 53 Walker Street, North Sydney, NSW 2060 AustraliaP +61 2 9922 4375 F +61 2 9929 5786 E [email protected] · Brisbane · Melbourne · Canberra · GuangzhouACN 098 552 151 ABN 20 098 552 151
01.11.2012
BUILDING SEPARATION PLANCONCEPT DESIGN
1:400 @ A1
MP 10.00
1:800 @ A3
BUILDING 3
BUILDING 1
BUILDING 4BUILDING 5
3 AVON ROAD
7 AVON ROAD
11 AVON ROAD
15 AVON ROAD
1 ARILLA ROAD
6 BEECHWORTH ROAD
10B BEECHWORTH ROAD
10A BEECHWORTH ROAD
23 m
33 m
27 m
53 m
25 m
25 m
52 m
30 m
24m
A 30.11.12 SUBMISSION TO DOP PS B 10.12.12 GENERAL REVISION PS C 17.12.12 ADDITIONAL INFORMATION ADDED PS D 12.06.13 BUILDING ENVELOP REVISED PS E 11.12.13 REVISED CONCEPT PLAN PS
E
BUILDING 1
3 AVON ROAD
LIVING
LIVING
LIVING
RL 144
LIVING
LIVING
CARPARK
23 m
BO
UN
DA
RY
12 mSETBACK
PREVIOUS BUILDING 1
140.00
136.00
137.00
138.00
139.00
141.00
Do not scale from drawings. All dimensions to be checked on sitebefore commencement of work. All discrepancies to be brought to theattention of the Architect. Larger scale drawings and writtendimensions take preference. This drawing is copyright and theproperty of the author, and must not be retained, copied or usedwithout the express authority of MARCHESE + PARTNERSINTERNATIONAL PTY. LTD.
IMPORTANT NOTES: DESCRIPTIONREVISION DATE BY
PROJECT
CLIENT
CHECKEDDRAWNSCALE DATE
DRAWINGJOB REVISION
DRAWING TITLE
JW Neale Pty Ltd(Receivers and Managers Appointed)
Marchese Partners International Pty LtdLevel 1, 53 Walker Street, North Sydney, NSW 2060 AustraliaP +61 2 9922 4375 F +61 2 9929 5786 E [email protected] · Brisbane · Melbourne · Canberra · GuangzhouACN 098 552 151 ABN 20 098 552 151
01.11.2012
BUILDING SEPARATION SECTION3 AVON ROAD - BUILDING 1
1:100 @ A1BO PS
MP 10.01
1:200 @ A3
BUILDING 3
BUILDING 1
BUILDING 4BUILDING 5
AVON RO
AD
BE
EC
HW
OR
TH R
OA
D
RAILWAY
PRIVATE OUTDOOR SPACE
LIVING INDOOR SPACE
23 m
NOT TO SCALE
NOT TO SCALE
1 : 200 @ A3
FIXED OPAQUE LOUVERSTO AVOID OVERLOOKING
view view
view
view
3AVON ROAD
BUILDING 1
A 30.11.12 SUBMISSION TO DOP PS B 10.12.12 GENERAL REVISION PS C 17.12.12 ADDITIONAL INFORMATION ADDED PS D 12.06.13 BUILDING ENVELOP REVISED PS E 11.12.13 REVISED CONCEPT PLAN PS
E
3 AVON ROAD
BUILDING 4
DINING
LIVING
LIVING
33 m
CAR PARK
CAR PARK
CAR PARK
POOL
BO
UN
DA
RY
18mSETBACK
LIVING
PREVIOUS BUILDING 4
147.00
Do not scale from drawings. All dimensions to be checked on sitebefore commencement of work. All discrepancies to be brought to theattention of the Architect. Larger scale drawings and writtendimensions take preference. This drawing is copyright and theproperty of the author, and must not be retained, copied or usedwithout the express authority of MARCHESE + PARTNERSINTERNATIONAL PTY. LTD.
IMPORTANT NOTES: DESCRIPTIONREVISION DATE BY
PROJECT
CLIENT
CHECKEDDRAWNSCALE DATE
DRAWINGJOB REVISION
DRAWING TITLE
JW Neale Pty Ltd(Receivers and Managers Appointed)
Marchese Partners International Pty LtdLevel 1, 53 Walker Street, North Sydney, NSW 2060 AustraliaP +61 2 9922 4375 F +61 2 9929 5786 E [email protected] · Brisbane · Melbourne · Canberra · GuangzhouACN 098 552 151 ABN 20 098 552 151
01.11.2012
BUILDING SEPARATION SECTION3 AVON ROAD BUILDING 4
1:100 @ A1BO PS
MP 10.02
1:200 @ A3
BUILDING 3
BUILDING 1
BUILDING 4BUILDING 5
AVON RO
AD
BE
EC
HW
OR
TH R
OA
D
RAILWAY
PRIVATE OUTDOOR SPACE
LIVING INDOOR SPACE
33 m
NOT TO SCALE
NOT TO SCALE
1 : 200 @ A3
view
3AVON ROAD
BUILDING 4
FIXED OPAQUE LOUVERSTO AVOID OVERLOOKING
view
view
A 30.11.12 SUBMISSION TO DOP PS B 10.12.12 GENERAL REVISION PS C 17.12.12 ADDITIONAL INFORMATION ADDED PS D 12.06.13 BUILDING ENVELOP REVISED PS E 11.12.13 REVISED CONCEPT PLAN PS