PB 9 7 PG 46 SE WE R E ASE ME NT 3 0'ACCE SS & PB 97 PG 46 DB 4 38 PG 7 4 5 60'E ASE ME NT DB 5 61 PG 103 20'WATE R L I NE E ASE ME NT DB 701 PG 592 60'PRI VATE E ASE ME NT D B 38 4 P G 417 & 43 4 30 ' P O W E R L I N E E A S E M E N T DB 3 8 2 PG 4 4 5 3 0'RI GH T- OF - WAY E ASE ME NT C ON C I S L C ON C 30 " C & G 30 " C & G B S T B S T C ON C C ON C B S T B S T B S T P A R K I NG B S T P A R K I NG B S T G R C ON C C O NC B S T C ONC B S T SPRI NGDA LE DR VA R BST PA RK DR VA R BST L AUNI S ST VA R BST U S 1 5 / U S 50 1 H I L L S B O R O S T VA R B S T U S 15 / U S 501 H I LL S B O R O S T VA R B S T 30"C&G N MA SONI C ST VA R BST C ONC C I RC LE D R VA R B S T 2 4 "C&G 24 "C&G 2 4 "C&G C AN C AN C AN C AN CAN C AN B S T B S T C ON C C ON C C O N C C ON C B S T BST B S T B S T B S T 60 " C ON C 24 " C & G 2 4 " C & G 15 "RCP G R G R S O I L B S T C O N C P OND B S T C ON C G R C ON C G R 15 " RC P CONC 15 " RC P 15 " HD P E G R 1 5 " R C P 1 5 " RC P G R G R G R G R 12 " RC P G R G R G R G R G R G R G R BK G R 12 " RC P G R G R BK CONC CONC G R G R GR 15 " RC P G R G R G R CONC G R C ON C C O NC C ON C 1 5 " RC P B S T 15 " R C P R A P R I P - R A P R I P - D I B S T BST G R C O N C BK C O N C CONC R I P R A P RC P 12 " G R CURB CONC C O N C C U RB CURB CONC CURB CONC G R DK D K DK PA TTI SHA L L DR G R DA RK OAKS DR G R C AN G R 1 SF D 1 SF D C ON C C ONC G R 12 " RC P 18 " RC P 12 " RC P 12 " RC P GA R AG E 1 2 " R C P LSA F O C THI S STRUCTURE RECORDS F OUND F OR NO ASSOCI ATED 30. 00' 6 0 . 00 ' 20 . 0 0 ' 60 . 00 ' 1 5 " RC P F E S I NV = 429 . 1 8 ' 15 "CPP I N V = 4 2 8 . 62 ' I NV = 428 . 16 ' 30 " RC P I NV = 43 1 . 5 3 ' 36 " HD P E 1 8 " RC P 1 8 " RC P 1 2 "RCP 24 " RC P 15 " RC P 18 " R C P 95 " x67 "CMAP I NV = 414 . 09 ' I NV = 414 . 70 ' CB CB CB CB CB CB DI 6 ' C ON C H W DI I NA CC E SS I B LE R C P 15 " W/ F E S 18 " R C P R C P 18 " W/F ES 24 "RCP E I P EIP E I P EI P EI P EI P CURB 6"CONC EI P EI P E I P E I P E I P E I P E I P E I P E I P E I P E I P E I P E I P E I P E I P E I P E I P E I P E I P E I P E I P E I P E I P E I P E I P E I P E I P EI P EIP E I P W OOD S W OOD S W OOD S 3 5 . 0 0 ' EXI STI NG R/W EXI STI NG R/W E X I S T I NG R / W E X I S T I NG R / W 60. 00' EXI STI NG R/W EXI STI NG R/W EXI STI NG R/W EXI STI NG R/W E X I S T I N G R / W E X I S T I NG R / W 100. 00' E I P EXI STI NG R/W EXI STI NG R/W W O O D S W OOD S W O OD S E X I S T I NG R / W E X I S T I NG R / W 100. 00' EXI STI NG R/W EXI STI NG R/W 30 . 00 ' W/F ES 18 "RCP E X I S T I NG R / W E X I S T I NG R / W 100. 00' CUL4 C E 2 CUL3 C E 1 CUL1 CUL2 H W 4 . 5 ' C ON C RC P 15 " E I P E I P E I P E I P E I P E I P 30 . 0 0 ' 30. 00' EIP E I P E I P D I 1 5 " R C P I N A CC E SS I B LE W / F E S 18 " RC P 18 " RC P EI P W ETL AND S W ET L AND S U S 15 / U S 501 H I LL S B O R O S T VA R B S T TOP= 4 60. 07 ' T O P = 466 . 52 ' G R AV E LD R C ONC WA L K C ON C I S L AND C ON C W A L K C O N C W A L K S O I L& G R AV ELD R C O N C W ELL EI P EI P EI P S & G D R 15 "RCP 15 "RCP S I GN C ON C W A L K WA LL C ONC WA L K C ONC SO I L & G RAV EL TOP= 4 62 . 19 ' MI DWAY ST PAV ED RDWY U T I L I T Y W A TE R GA TE M TL CB CB 15 " RC P 15 " R C P C I RC LE D R P A V E D R D W Y 6"HDPE S & G D R S & G D R S & G D R 1 5 "RCP 15 "RCP 15 "RCP EI P EXI STI NG R/W EXI STI NG R/W 40 . 00 ' 35 . 00 ' 60 . 00 ' WOODS WOODS GRASS W OOD S G R A S S G R A S S G R A SS G R A SS G R A S S G R A SS GRASS G R A SS G R A SS G R A S S W ETL AND S W ET L AND S M A T C H L I N E S E E M A P 2 - L - S T A . 52 + 0 0 . 00 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS ERIC DOUGLAS HOBBS and EVELYN RAMSEY MELTON ANNIE M FARRAR, MARY ANNA FELICIA EVANS and MELVIN HARRIS 1 2 3 BURTON T MOORE, GEORGE SANDERS, and CATHERINE D ROGERS JEFF HALEY and wife, TANYA HALEY 4 5 GEORGE BROOKS and wife, HATTIE BROOKS 6 DENNIS BROWN 7 GEORGE DARK and ELLA DARK 8 T. ALBERT HARGROVE 9 GEORGE DARK and ELLA L DARK 10 FRANK H ALSTON and wife, MARY PATTISHALL ALSTON 11 CLYDE HADLEY and wife, MASIE GRAY HADLEY 12 ISAIAH EUGENE TAYLOR III INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS LEGEND AND GUTTER, CULVERTS, SIDEWALKS PROPOSED STRUCTURES, ISLANDS, CURB EXISTING RIGHT OF WAY BUILDINGS LAKES, RIVERS, STREAMS AND PONDS PROPOSED ROADWAY EXISTING ROADWAY TO BE RESURFACED EXISTING ROADWAY PROPOSED RIGHT OF WAY AND UTILITY) PROPOSED EASEMENTS (DRAINAGE, CONSTRUCTION, EXISTING TRAFFIC SIGNAL PROPERTY LINES WETLAND LIMITS BOUNDARY HISTORIC PROPERTY BOUNDARY HPB EXISTING UTILITY EASEMENT EXISTING STRUCTURES, ISLAND, CURB TO BE REMOVED AND GUTTER SIDEWALKS TO BE RETAINED EXISTING STRUCTURES, ISLAND, CURB AND GUTTER, EXISTING ROADWAY TO BE REMOVED 0000 0000 PRESENT ADT FUTURE ADT CITY LIMITS BOUNDARY LEGEND AND GUTTER, CULVERTS, SIDEWALKS PROPOSED STRUCTURES, ISLANDS, CURB EXISTING RIGHT OF WAY BUILDINGS LAKES, RIVERS, STREAMS AND PONDS PROPOSED ROADWAY EXISTING ROADWAY TO BE RESURFACED EXISTING ROADWAY PROPOSED RIGHT OF WAY AND UTILITY) PROPOSED EASEMENTS (DRAINAGE, CONSTRUCTION, EXISTING TRAFFIC SIGNAL PROPERTY LINES WETLAND LIMITS BOUNDARY HISTORIC PROPERTY BOUNDARY HPB EXISTING UTILITY EASEMENT EXISTING STRUCTURES, ISLAND, CURB TO BE REMOVED AND GUTTER SIDEWALKS TO BE RETAINED EXISTING STRUCTURES, ISLAND, CURB AND GUTTER, EXISTING ROADWAY TO BE REMOVED 0000 0000 PRESENT ADT FUTURE ADT CITY LIMITS BOUNDARY P R O P . 10 ' M U LT I- U S EP A T H P R O P . C ON C . S I D E W A L K P R O P . C ON C . S I D E W A L K P R O P . 10 ' M U LT I- U S EP A T H P R O P . C ON C . S I D E W A L K P R O P . 10 ' M U L T I- U S EP A T H F C C F F F F F C C C F C F F F F F F F F F F F F F C F C F C C F F C F F C C F F F F C F C F C C F F F F C F C F C F C F F F F F F F F F C F F F C F C F C C F F F F C F F F F F F F F F F F F F F F F B U S 1 SF B U S 2 S B K B U S 1 S B L K S G 1 S F D 1 S F D 1 S F D S S 1 S B L KD 1 S B L KD S HTR 1 SF D 1 SF D 1 SF D HTR 1 S B KD 1 SF D S S S 1 S F D 1 S B L KD 2 S B K F D 1 SF D S 1 S F D 1 S B L K D 1 S B L KD 1 S F D 1 S B KD 1 S B KD S S S 1 SF D DU P L E X 1 S B K 1 S F D S A B AN D B U S 1 S B K B U S 1 SF 2 SF D 1 S F D GA ZE B O S 1 SF D S A B AND B U S 1 S B L K S S B U S 1 S M TL 4 8 " B K W A LL S W A LL 48 " B L K 1 SF D 1 S F D 2 S B K D S T O N E W A LL S T E PS BR I C K CONC WALL M A S ON R Y D 1 . 5 S STEPS BK 4 3 2 1 5 6 7 8 9 10 11 12 DESIGN DATA Max. Superelev. Design Speed Functional Class. ORTHOPHOTO DATA Flight Date = 2010 Aerial Photo Source = NC OneMap = 0.04 = 40 MPH / 50 MPH = Urban Minor Arterial UTILITY INFORMATION: ARE PRELIMINARY AND ARE SUBJECT TO CHANGE. EASEMENTS. THE DESIGNS SHOWN ON THESE MAPS, INCLUDING UTILITY EASEMENTS, ON THESE MAPS IS LIMITED TO LOCATIONS OF MAJOR EXISTING AND POTENTIAL UTILITY SHOWN ON THESE MAPS OR ON OTHER DISPLAYS. THE UTILITY INFORMAITON SHOWN TO PROVIDE GREATER VISUAL CLARITY, EXISTING AND PROPOSED UTILITIES ARE NOT UTILITY INFORMATION: ARE PRELIMINARY AND ARE SUBJECT TO CHANGE. EASEMENTS. THE DESIGNS SHOWN ON THESE MAPS, INCLUDING UTILITY EASEMENTS, ON THESE MAPS IS LIMITED TO LOCATIONS OF MAJOR EXISTING AND POTENTIAL UTILITY SHOWN ON THESE MAPS OR ON OTHER DISPLAYS. THE UTILITY INFORMAITON SHOWN TO PROVIDE GREATER VISUAL CLARITY, EXISTING AND PROPOSED UTILITIES ARE NOT CHANGE BASED OFF FINAL DESIGN ARE PRELIMINARY AND SUBJECT TO DRIVEWAY LOCATION AND SIZE CHANGE BASED OFF FINAL DESIGN ARE PRELIMINARY AND SUBJECT TO DRIVEWAY LOCATION AND SIZE ORTHOPHOTO DATA Flight Date = 2010 Aerial Photo Source = NC OneMap DESIGN DATA Max. Superelev. Design Speed Functional Class. = 0.04 = 40 MPH / 50 MPH = Urban Minor Arterial L AUN I S S T C I RC LE D R N M A S ON I C S T - Y 3 - SP R I NGDA LE D R - Y 2 - P A R K D R D A R K OAK S D R - L - H I LL S B O R O S T P A TT I S HA LL D R O F R O B E R S ON CR E E K UNNA M E D T R I B U T A R Y CONFERENCE CENTER CHATHAM MILLS DISTRICT HISTORIC PITTSBORO -L- STA 13+80.00 BEGIN TIP PROJECT R-5724 -L- STA 48+00.00 BEGIN POSTED 45 MPH END POSTED 35 MPH 0' 50' 100' 25' 50' (ENGLISH) 3,400 3,200 6,600 23,800 24,000 1,530 16,890 16,390 -L- -L- -Y3- US 15-501 US 15-501 SPRINGDALE DR 2019 ADT 2040 ADT 520 1,020 25,000 24,800 16,340 2019 ADT -L- -L- -Y1- LAUNIS ST US 15-501 US 15-501 2040 ADT 100 100 220 300 320 400 16,230 4,400 3,400 7,800 24,000 25,000 16,390 16,340 -L- -L- US 15-501 US 15-501 PARK DR -Y2- 2019 ADT 2040 ADT 1,680 820 870 0' 50' 100' 25' 50' (ENGLISH) C I T Y L I M I T S P I TT S B O R O A PP R OX I M A T E -Y1- POT Sta. 10+00.00 -Y1- PT Sta. 11+13.69 -Y1- PT Sta. 12+50.80 -Y1- PC Sta. 12+04.65 -Y1- -L- 10 PI Sta 10+66.76 D L = 94.07' T = 47.13' R = 600.00' PI Sta 12+27.91 D L = 46.15' T = 23.26' R = 150.00' - L - -Y1- PC Sta. 10+19.62 - Y 1 - - L - - L - - L - - L - -Y2- POC Sta. 10+80.00 BEGIN CONSTRUCTION SE = 0.03 SE = 0.03 SE = EXIST LR = 78 LR = EXIST -Y3- POT Sta. 14+30.00 END CONSTRUCTION LR = 90' - Y 3 - SE = EXIST LR = EXIST -Y2- -Y3- LR = N/A SE = NC P I S t a 14 + 02 . 99 D L= 1 9 5 . 83 ' T = 98 . 57 ' R = 695 . 00 ' PI Sta 15+97.22 D L = 143.96' T = 72.22' R = 730.00' P I S t a 45 + 28 . 82 D L = 1,188.36' T = 612.30' R = 2,000.00' PI Sta 10+52.90 D L = 97.02' T = 48.55' R = 955.00' PI Sta 12+96.49 D L = 115.15' T = 57.57' R = 11,460.00' -Y2- PT Sta. 13+54.06 -Y2- PC Sta. 12+38.92 -Y2- PC Sta. 10+04.35 -Y2- POT Sta. 10+00.00 -Y2- POT Sta. 15+22.01 -L- POC Sta. 22+77.41 = -Y2- PT Sta. 11+01.37 -Y3- POT Sta. 10+00.00 -L- POT Sta. 28+83.49 = -Y3- PC Sta. 11+93.22 -Y3- PT Sta. 14+24.62 -Y3- POT Sta. 14+55.00 P I S t a 24 + 35 . 77 L= 783 . 74 ' T = 398 . 80 ' R = 1 , 720 . 00 ' D -Y1- POT Sta. 12+70.00 -L- POC Sta. 16+22.96 = -L- POT Sta. 12+90.00 -L- PC Sta. 13+04.43 -L- PC Sta. 15+25.00 -L- PT Sta. 16+68.96 PI Sta 13+08.93 D L = 231.40' T = 115.72' R = 5,730.00' -Y1- POC Sta. 12+20.46 BEGIN CONSTRUCTION -BY-17 BM#1 -BY1-18 -BY2-19 -BY3-20 -BL-5 BM#2 -BL- -BL-7 -BL-8 -BL-9 -BL-6 M A R Y P A TT I S HA LL A L S T ON F R ANK H A L S T ON a n d w i f e , P A TT I S A LL W I LL I E M A E A L I C E F . LL OYD W I LL I A M GA RR ETT P A R K S w i f e , KAY V HUD S ON W I LL I A M C HUD S ON a nd P A M EL A J S M I T H SMITH AND THOMAS L T HO M A S F P A R K S II J E SS I C A P A R K S DO M I NGO P E R EZ DOUG L A S R O BB I N S P A T R I C I A M HA RR I S W D HA R R I S a nd w i f e , P A T R I C I A M HA R R I S W D HA RR I S a nd w i f e , REALTY LLC HOMEPLATE L I L L I AN P L U MM E R J A M E S W E B S TE R , J R . V E O L OG I C A LL C C YGNU S N C L O T S LL C SCURLOCK R O B E R T L OU I S SCURLOCK ROBERT L SCURLOCK w i f e , R U B Y M AY S C U R L O C K a nd G E O R G E C L I F T ON AND R E F A R R A R C H R I S T O P H E R PATTISALL WILLIE MAE C A T H E R I N E D R OG E R S G E O R G E S AND E R S , a nd B U R T ON T M OO R E , R ON E L C H E R R Y B ETT Y C H E R R Y a nd LLOYD A L I C E F A RR A R C L A R A B DA R K H E I R S a nd M A R T HA L U C I L E R ODG E R S G R A F F R EE M AN T HO M A S R ODG E R S , L U C I NDA R ODG E R S J ON E S , GA T H I E R R ODG E R S , J R ., a nd M A R T HA L U C I LE R ODG E R S G R A F F R EE M AN T HO M A S R ODG E R S , L U C I NDA R ODG E R S J ON E S , GA T H I E R R ODG E R S , J R ., P H I LL I P T Y R ON E C L A R K C A L V I N W AYN E F R EE M AN B I L L Y J O E A L S T ON B R U C E T . S TE W A R T , S R . T R U S T T R U S T E E S O F T H E W I LL A R D S TE W A R T , BR U C E T . S T E W A R T , III AND BALDWIN W AY B E LL E QU I N C E C H E E K S UN I TE D , L L C HADLEY MASIE GRAY and wife, C L YD E HAD LE Y HUN T D V I N C E N T HEIRS A L I C E P A T T I S A L L R O B I N G LE E W I L L I A M HUN E Y C U T T , II ZAR WIN a nd w i f e , P HYU Z A W M I N T HU FARRAR M A R Y EL I Z A B ET H DONNA LOYD C HA T HA M M I L L S D E V EL O P M E N T C O R P PITTSBORO TOWN OF E L I Z A B E T H AND E R S ON P A T R I C I A P W R I GH T P H I L L I P W W R I GH T a nd P A T R I C I A P W R I GH T P H I LL I P W W R I GH T a nd P A T R I C I A P W R I GH T P H I L L I P W W R I GH T a nd P H I L L I P W R I GH T KEITH ROTEN D PAIGE MARINETTA MARLOWE JOSEPH MARSH BRENDA F and wife, MARSH FRANK W HEIRS SCURLOCK BESSIE MAE McLEAN LOURAY G. and wife, McLEAN W I LL I A M G E N E FARRAR MARY ALICE and wife, F R ANK J . F A R R A R M A R T HA L U C I LE R ODG E R S G R A F F R EE M AN T HO M A S R ODG E R S , a nd L U C I NDA R ODG E R S J ON E S , GA T H I E R R ODG E R S , J R , P A TT I S A LL W I LL I A M S a nd W I LL I E M A E P A TT I S A LL W I LL I E ANN EMGEE LLC 15 501 50 1 15 CHATHAM COUNTY STATE PROJECT 50217.1.1 (R-5724) PUBLIC MEETING MAP MAP 1 OF 2 IN THE TOWN OF PITTSBORO PLACE LANE US 15/501 FROM LAUNIS ST TO POWELL P U B L I C M EET I NG M A P C HA T HA M C OUNT Y S T ATE P ROJ E C T 50217 . 1 . 1( R- 5724 ) M AP 1OF 2 P U B L I C M EET I NG M A P C HA T HA M C OUNT Y S T ATE P ROJ E C T 50217 . 1 . 1( R- 5724 ) M AP 1OF 2 I N T H E T OW N OF P I TT S BORO P L AC E L ANE US 15 / 501F ROM L AUNI S S T T O P OW ELL I N T H E T OW N OF P I TT S BORO P L AC E L ANE US 15 / 501F ROM L AUNI S S T T O P OW ELL