50 T/H Iron Ore Crushing Production Line Date:Apr.8,2015 my skype:evitalee55 whatsapp:0086 18637192252 my email: [email protected] welcome to my website! www.hiimac.com I:Quotation for 50 T/H Iron Ore Crushing Production Line Background: The Line is designed on the following basis: 1. Capacity : 50 t/h 2. Input size:250-300mm my skype:evitalee55 whatsapp:0086 18637192252 my email: [email protected] welcome to my website! www.hiimac.com
9

50 tons per hour iron ore crushing production line to mr.aliyu

Jan 19, 2017

Download

Engineering

evita lee
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 50 tons per hour iron ore crushing production line to mr.aliyu

50 T/H Iron Ore Crushing Production Line

Date:Apr.8,2015

my skype:evitalee55

whatsapp:0086 18637192252

my email: [email protected]

welcome to my website! www.hiimac.com

I:Quotation for 50 T/H Iron Ore Crushing Production Line

Background:

The Line is designed on the following basis:1. Capacity : 50 t/h2. Input size:250-300mm3. Output Size:≤20mm4. Percentage of Final size : 0-5mm,5-10mm ,10-20mm

No.

Picture Name ModelQuantity (Se

Power(kw)

Unit Price (USD)

Total Price (USD)

my skype:evitalee55whatsapp:0086 18637192252my email: [email protected] to my website! www.hiimac.com

Page 2: 50 tons per hour iron ore crushing production line to mr.aliyu

1Vibrating Feeder

ZSW-650X20

001 3 4260 4260 4100

my skype:evitalee55whatsapp:0086 18637192252my email: [email protected] to my website! www.hiimac.com

Page 3: 50 tons per hour iron ore crushing production line to mr.aliyu

2Jaw

CrusherJCE604 1 37 18000 18000 15500

my skype:evitalee55whatsapp:0086 18637192252my email: [email protected] to my website! www.hiimac.com

Page 4: 50 tons per hour iron ore crushing production line to mr.aliyu

3Sysmons

cone Crusher

CS75B 1 75 68800 68800 60000

my skype:evitalee55whatsapp:0086 18637192252my email: [email protected] to my website! www.hiimac.com

Page 5: 50 tons per hour iron ore crushing production line to mr.aliyu

4Vibrating Screen

3YK1548

1 15 12300 12300 9800

5Belt

Conveyor

B650*15m

1 5.5 213/m 3195

B650*23m

1 7.5 213/m 4899

B500*26m

1 7.5 180/m 4680

B500*15m

3 5.5 180/m 8100

Total 6 20874

my skype:evitalee55whatsapp:0086 18637192252my email: [email protected] to my website! www.hiimac.com

Page 6: 50 tons per hour iron ore crushing production line to mr.aliyu

Total EXW Zhengzhou Price(USD) 10 124,234.00 110274

II:The Specification of the machines

1.Jaw Crusher:

my skype:evitalee55whatsapp:0086 18637192252my email: [email protected] to my website! www.hiimac.com

Page 7: 50 tons per hour iron ore crushing production line to mr.aliyu

Model

Feeding

Open Size

(mm)

Max.

Feed

Size

(mm)

Outlet

Size

(mm)

Centrifugal

Shaft

Speed

(rpm)

Capacity

(t/h)

Motor

Type

Motor

Power(kw)

Motor

Speed(rpm)

Ovenrall

Dimension(mm)

JCE604 400×600 350 38-85 250 15-70 Y225M-6 37 980 1920×1460×1840

2.CS Sysmons cone Crusher:

Model Cavity Type

Adjusting Range

Of Output Size

(mm)

Max. Feeding

Size(mm)

Capacity

(t/h)Motor Power (kw)

Overall Dimension

(L*W*H) (mm)

CS75BMedium

(Standard)9-22 102 45-91 75 2656×1636×2241

3.Vibrating Screen:

ModelScreen surface

specification(mm)Layers

Sieve

pore

size(mm)

Max feed

size(mm)Capacity(t/h)

Motor

power(kw)

Vibrating

frequency(r/min)

Double

Amplitude(mm)

3YK1548 4800×1500 3 3-100 400 30-275 15 970 5-9

4.Belt Conveyor:

Belt width(mm) Belt length (mm)/Power (kw)

Belt

speed

(m/s)

Capacity

(t/h)

Belt

width

(mm)

Belt length (mm)/Power (kw)

Belt

speed

(m/s)

Capacity

(t/h)

500 ≤12/3 12-20/4-5.5 20-30/5.5-7.5 1.3-1.6 45-100 500 ≤12/3 12-20/4-5.5 20-30/5.5-7.5 1.3-1.6 45-100

650 ≤12/4 12-20/5.5 20-30/7.5-11 1.3-1.6 70-120 500 ≤12/3 12-20/4-5.5 20-30/5.5-7.5 1.3-1.6 45-100

III:The flowchart of this line

my skype:evitalee55whatsapp:0086 18637192252my email: [email protected] to my website! www.hiimac.com

Page 8: 50 tons per hour iron ore crushing production line to mr.aliyu

Remarks:1. The prices is the EXW prices and packaging costs.2.Payment Terms

(1)Packaging standard: large bare; small pieces is wooden cases.

(2)Delivery Date: within 25 days after receipt of deposit.

(3)Payment Terms: 30% T/T deposit upon signing the contract, the balance 70%

paid by telegraphic transfer before the goods leave the factory.

(4)Guarantee: 100% brand new in the goods leave the factory.

3.If you need the detailed flowchart,our engineer can supply to you.