5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness fo the DBD
9

5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.

Dec 14, 2015

Download

Documents

Jaime Curran
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.

5th ILD Workshop Orsay, 23rd -25th May 2011

D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC)F. Arteche, C. Esteban - ITA

Strip FTD Readiness for the DBD

Page 2: 5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.

_Outline— FTD detector Integration.— Detailed design FTD (disk 3-7):

_ Mechanics_ Power distribution system.

— Software modeling.

I. Vila, 5th ILD Workshop, Orsay May 23th 2011

Page 3: 5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.

_Detector Integration

— Integration of inner detectors: critical item.

I. Vila, 5th ILD Workshop, Orsay May 23th 2011

Page 4: 5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.

_Assembly procedure defined

I. Vila, 5th ILD Workshop, Orsay May 23th 2011

Page 5: 5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.

_Detailed mechanical designs

— Including power distribution system, r/o electronics and cables and optical links.

I. Vila, 5th ILD Workshop, Orsay May 23th 2011

Page 6: 5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.

_Power distribution system Currents consumption of Strip – FTD

MIDDLE PITCH

FTD FTD3 FTD4 FTD5 FTD6 FTD7

  TOP BOT TOP BOT TOP BOT TOP BOT TOP BOT

Nº STRIPS PER Module (2sensors) 4096 2560 4096 2560 4608 3072 4608 3584 4608 3584

Chips per petal 52 52 60 64 64

Optical links per petal 1 1 1 1 1

I2.5 (A) per Petal 2.56 2.56 2.8 2.92 2.92

I1.25 (A) per Petal 1.18 1.18 1.34 1.42 1.42

I per petal 3.74 3.74 4.14 4.34 4.34

I per disk 59.84 59.84 66.24 69.44 69.44

TOTAL Mstrip- FTD Current  649 A

I. Vila, 5th ILD Workshop, Orsay May 23th 2011

Page 7: 5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.

_Power supply topology

I. Vila, 5th ILD Workshop, Orsay May 23th 2011

Page 8: 5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.

Software modeling of strip FTD

— Implementation of the detailed detector geometry including cables and electronics in simulation.

— Cooling (air-based cooling) it is not yet decided.

— Digitization code not developed yet.

I. Vila, 5th ILD Workshop, Orsay May 23th 2011

Page 9: 5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.

Summary— Significant improvement in terms of realistic

hardware description for the strip FTD.— BUT simulation code still lacking a working digitizer

(short of manpower).— Outside the scope of this talk other inner trackers

pending issues:_ FTD disk 1 & 2 ( pixels)_ SIT ?

I. Vila, 5th ILD Workshop, Orsay May 23th 2011