宁宁宁宁宁宁宁宁宁宁宁 2.48MWp 5MWp PV System Shanghai Easyhon International Co.,LTD 2015.05 Bilal Nasir
宁宁宁宁宁宁宁宁宁宁宁 2.48MWp
Catalog
Project introduction....................................2
1.1 Location and construction scale..................2
1.2 Geography location...............................2
1.3 Grid tie voltage.................................2
Project site's solar energy resources...................2
System Design...........................................3
3.1 Grid tie solar System theory.....................3
3.2 Roof system main plan............................4
3.3System design.....................................4
3.3.1 Principles..................................4
3.3.2 System confirguration.......................4
3.3.3 System graphic..............................4
3.4 Main accessories.................................6
3.4.1 Solar panels................................6
3.4.2 Grid tie solar inverter.....................7
3.5 Panels bracket...................................8
宁宁宁宁宁宁宁宁宁宁宁 2.48MWp
3.6 Monitor system..................................10
List of items..........................................11
Generation Estimate....................................12
宁宁宁宁宁宁宁宁宁宁宁 2.48MWp
Project introduction
1.1 Location and construction scale
5 M solar plant located on the ground of ****company in
Pakistan, solar system will be installed on the ground.
Photo of geography
The solar system will be installed on the ground of ****
company, totally capacity 5000kw.
1.2 Geography location
location: *******
Latitude: north latitude 6-9 degree
Longitude: east latitude 34-40 degree
1.3 Grid tie voltage
This project will be grid tied with low-voltage 380v, and connect
with*****company’s main distribution room.
Project site's solar energy resources
According to the statistics, the total annual solar radiation
is ****kWh/m2 , daily average peak sunshine *** hours, solar
radiation per month as following table:
Table 2-1 Abyssinia solar radiation
3
宁宁宁宁宁宁宁宁宁宁宁 2.48MWp
System design
3.1Grid tie solar System theory
Solar modules will transform solar energy to electricity, via
DC combiner box and then into DC power distribution cabinet, grid
tie solar inverter transform DC power to ****v AC power and then
connect to grid.
Grid tie with 380v low-voltage,Table 3-1:
4
宁宁宁宁宁宁宁宁宁宁宁 2.48MWp
Image 3-1 Solar Grid Tie Generation
Image 3-2 Solar Grid Tie Generation
3.2 Roof system main plan
Unable to survey the scene,estimated capacity 1000kwatt;
consist of by 4000pcs 250w poly solar panels, and 50sets gird tie
solar inverter.
3.3System design
3.3.1Principles
The total installed capacity is 1000kwatt.Solar modules will
be installed on the roof of university’s building. Eacg inverter
will be connected to corresponding solar modules, grid tie solar
inverter transform DC power to 380v AC power and then connect to
the distribution room, there are two grid tie point.
3.3.2System confirguration
5
宁宁宁宁宁宁宁宁宁宁宁 2.48MWp
According to the actual sitation of solar module’s arrangement
and Electrical Characteristics, each 20pcs panels will be a
series circuit, and 4 series circuits wil be connected to a grid
tie solar inverter.
3.3.3System graphic
Image 3-7 System wiring diagram
6
宁宁宁宁宁宁宁宁宁宁宁 2.48MWp
Image 3-8 Main Electrical wiring diagram
3.4 Main accessories
3.4.1 Solar panels
Specification of solar modules:
No. Module Unit Value
1 Data Poly 250Wp
1.1 Model TPB TPB156×156-60-P
1.2 Peak power W 250
*1.3 Power tolerance W 0-+5W
1.4 conversion efficiency % 15.3
1.5 Open-circuit voltage V 37.6
1.6 Short-circuit current A 8.83
1.7 Operating Voltage V 30.3
1.8 Operating Current A 8.25
7
宁宁宁宁宁宁宁宁宁宁宁 2.48MWp
No. Module Unit Value
1.10 Series resistance Ω 0.5
*1.11 Fill factor % 75%
1.12Power Temperature
Coefficient%/K -0.42
1.13Voltage Temperature
Coefficient%/K -0.32
1.14Current Temperature
Coefficient%/K +0.05
*1.15Operating Temperature
Range ℃-40~+85
1.16 Humidity % 80
*1.17 2 year power reduction % 3.5
1.1810 year power
reduction% 10
1.1925 year power
reduction %20
*1.20 Hail resistance m/s 25mm@23 m/s
*1.21 Wind resistance Pa 2400
*1.22 Loads Pa 5400
1.23 Size mm 1642×992×40
2 Glass Data
2.1 Thickness mm 3.2
2.2 Transmittance % ≥91.6
3 Module Data
3.1 Conversion rate % ≥17.2
3.2 Short-circuit current A 8.64
3.4 Open-circuit voltage mV 626
*3.5Minority carrier
lifetimeμs ≥10
3.6 Oxygen concentration atoms/cm3 ≤8×10E17
3.7 Carbon concentration atoms/cm3 ≤1×10E18
4 EVA Data
4.1 Density g/cm3 0.96
4.2 Crosslinking degree % ≥80
8
宁宁宁宁宁宁宁宁宁宁宁 2.48MWp
No. Module Unit Value
4.3 Peel strength to glass N/cm2 ≥60
4.4Peel strength to
backplateN/cm2 ≥40
5 Backplate data
*5.1 Structure type TPE
5.2 Thickness mm 0.368
5.3 Delamination strength N/cm ≥6.0
5.4 WVTR g/ m2d ≤3.0
6 Junction box data
*6.1 Maximum load operatingcurrent A 12
*6.2 Maximum voltage V 1000
6.3 Operationg Temperature ℃ -40~+85
6.4Maximum Operating
Humidity% 80
*6.5 Protection Degree IP65
6.6 Cable Specifications mm 1 X 4,0mm2 ,1000mm
3.4.2 Grid tie solar inverter
Specification of grid tie solar inverter:
9
宁宁宁宁宁宁宁宁宁宁宁 2.48MWp
3.5 Panels bracket
Roof structure is cast cement,bracket will be installed on
the cement,as image 3-9:
12
宁宁宁宁宁宁宁宁宁宁宁 2.48MWp
Image3-9 Bracket on ground
3.6 Monitor system
Using an independent monitoring system to monitor the power
generation systems, using the IPC for data acquisition, 24-hour
continuous monitoring and recording the operationg of all grid-13
宁宁宁宁宁宁宁宁宁宁宁 2.48MWp
tie inverter , and display by large-screen LCD TV:
Large-screen LCD TV;
Monitoring and recording environment factors——
temperature、solar radiation;
Monitoring system’s operationg
parameter ( voltage 、 current 、 power 、 frequency 、 power
generation、CO2reduction).
Image 3-10 Monitoring Figure
List of items
Main item:
Table 4-1 Equipment list
No. Item Specification Unit Quantity
PV 1.1 Solar modules 250Wp poly piece 200001.2 bracket Concrete roof backet kW 5000
1.3AC pv combiner box
with ligtingprotection
5 “in” 1 “out” set 50
1.4 Solar grid tieinverter
20KW solar grid tieinverter set 250
1.5 Grid tie cabinet 500KW set 10Monitoring system
2.1 Monitoring system monitoring host, display, monitoring software set 5
14
宁宁宁宁宁宁宁宁宁宁宁 2.48MWp
2.2 Mark meter 0.2s piece 10
2.3 EnvironmentalMonitors set
10
Cable and etc..
3.1Photovoltaicwaterproofconnector
MC4 couple 35000
3.2 DC cable PV 1*4mm² m 680003.3 AC cable ZRC-YJV22-0.6/1KV-3*70mm² m 120003.4 AC cable ZRC-YJV22-0.6/1KV-3*10mm² m 45003.5 Contril cable ZRC-KVVP2-22-500 4*2.5mm² m 1500
3.6 Cable tray Galvanized bridge200*100mm m 1550Galvanized bridge100*50mm m 3000
3.7 Protective hose DN25mm m 5000Lighting protection
5.1 Hot-dip galvanizedflat steel 40*4mm² m 8500
5.2 Groundingcable(yellow green) YJVR-1*4mm² m 8000
5.3 Groundingcable(yellow green) YJVR-1*16mm² m 2500
Generation Estimate
The power generation of first year is 707.85 million
kWh,average power generation in 25 years is 638.2563million kWh。
In 25 years of system’s operating time, the loss of generation
should not exceed 20% of generation of first year,as table 6:
Table 6 25years power generation estimate
Years Power
Generation(Million kWh)
yearActual Power
Generation(million kWh)
1 707.8500 15 637.0652 697.2323 16 627.5090253 687.4710 17 618.72389874 678.5339 18 610.6804885 670.3915 19 603.35232216 663.0172 20 596.7154466
15
宁宁宁宁宁宁宁宁宁宁宁 2.48MWp
7 656.3870 21 590.74829218 650.4795 22 585.43155759 645.2757 23 580.74810510 640.7587 24 576.682868311 636.9142 25 573.222771112 633.7296 26 570.356657213 631.1947 27 568.075230614 629.3011 28 566.371004915 628.0425 29 565.238262916 627.4145 30 564.673024617 626.7871 31 564.108351618 624.9067 32 562.416026519 621.7822 33 559.603946420 617.4297 34 555.686718821 611.8728 35 550.685538322 605.1422 36 544.627997423 597.2754 37 537.547833424 588.3162 38 529.484615925 578.9032 39 521.0128621
25 yearsgeneration 15956.4087 14360.7678
25 yearsaverage
generation638.2563 574.4307
16