Tinker Aerospace Complex (TAC)
2
Overview
• GM Plant– 3.8 M sqft of industrial/admin/storage space– 430 Acres– Ceased operations in 2006
3
GM Plant
4
TAC Future
• If GM property is made available for AF use:
• Stand-up initial production shops (FY 09)– Software Maintenance (B3333, B2122)– Commodities Maintenance (B2101, B3705, B2121)– Propulsion Maintenance (RNT workload)
• Continue relocation efforts for next 5 – 10 years
5
Benefits
• Improve work environment
• Vacate and potentially demolish buildings– Airfield clear zone– Structurally deficient & energy inefficient
• Environmental bonus (land fill gas & noise contour)
• Capability to accept future workloads
• Reduce MILCON construction requirements
6
Facilities Impacted(69 Bldgs = 2.2M SF)
CZ
CZ
CZ
CZ
Clear Zone
Deficient
Ramp Space for New Mission
..
.
.
.
.
.
.
.
.
.
.
.
.
....
.
.….
.
.
7
MILCONS Avoided ($M)
Software Support $15
Sheet Metal Phase 1 $37
Engine Test Cells Phases $76
Sheet Metal Phase 2 $57
Corrosion Control $39
Aircraft Accessories $47
Electronic & Cable $15
Fabric Support $7
Oxygen Comp Support $15
Industrial Services $8
Building Replacement $65
Facility For New Engine Workload $82
Total (Base Year 06 Dollars) $463
8
Potential New Workload
Joint Strike Fighter(Engine / Commodities)
F117
C-17 Globemaster III Engine
F119
F-22 Raptor Engine
(Jet Engine Intermediate Maintenance)
AE3007(Global Hawk Engine)
AE2100(C-130J Engine)
KC-X(Aircraft / Engine)
TEAM TINKER