5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)
9

5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)

Mar 26, 2015

Download

Documents

Xavier Lindsay
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)

5 May 2008

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

TEAM TINKER

OKLAHOMA CITY AIR LOGISTICS CENTER

Tinker Aerospace Complex (TAC)

Page 2: 5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)

2

Overview

• GM Plant– 3.8 M sqft of industrial/admin/storage space– 430 Acres– Ceased operations in 2006

Page 3: 5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)

3

GM Plant

Page 4: 5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)

4

TAC Future

• If GM property is made available for AF use:

• Stand-up initial production shops (FY 09)– Software Maintenance (B3333, B2122)– Commodities Maintenance (B2101, B3705, B2121)– Propulsion Maintenance (RNT workload)

• Continue relocation efforts for next 5 – 10 years

Page 5: 5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)

5

Benefits

• Improve work environment

• Vacate and potentially demolish buildings– Airfield clear zone– Structurally deficient & energy inefficient

• Environmental bonus (land fill gas & noise contour)

• Capability to accept future workloads

• Reduce MILCON construction requirements

Page 6: 5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)

6

Facilities Impacted(69 Bldgs = 2.2M SF)

CZ

CZ

CZ

CZ

Clear Zone

Deficient

Ramp Space for New Mission

..

.

.

.

.

.

.

.

.

.

.

.

.

....

.

.….

.

.

Page 7: 5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)

7

MILCONS Avoided ($M)

Software Support $15

Sheet Metal Phase 1 $37

Engine Test Cells Phases $76

Sheet Metal Phase 2 $57

Corrosion Control $39

Aircraft Accessories $47

Electronic & Cable $15

Fabric Support $7

Oxygen Comp Support $15

Industrial Services $8

Building Replacement $65

Facility For New Engine Workload $82

Total (Base Year 06 Dollars) $463

Page 8: 5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)

8

Potential New Workload

Joint Strike Fighter(Engine / Commodities)

F117

C-17 Globemaster III Engine

F119

F-22 Raptor Engine

(Jet Engine Intermediate Maintenance)

AE3007(Global Hawk Engine)

AE2100(C-130J Engine)

KC-X(Aircraft / Engine)

Page 9: 5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)

TEAM TINKER