D f D e s f o r d 2 0 1 2 A s 1 2 8 9 f t ² 1 1 9 m ² 4 B e d 2 S t o r y B uxton 20 12 As 147 7ft² 137.2m² 4 Bed 2Stor y Bu A sh bo u rn e 20 1 2 As 153 6ft² 142.7m² 4 B e d 2 Storey As h B u x t o n 2 0 1 2 A s 1 4 7 7 f t ² 1 3 7 . 2 m ² 4 B e d 2 S t o r y B u A s h b o u r n e 2 0 1 2 A s 1 5 3 6 f t ² 1 4 2 . 7 m ² 4 B e d 2 S t o r e y A s h A s h b o u r n e 2 0 1 2 A s 1 5 3 6 f t ² 1 4 2 . 7 m ² 4 B e d 2 S t o r e y A s h C o C o m p t o n 2 0 1 2 A s 2 0 9 0 f t ² 1 9 4 m ² 5 B e d 3 S t o r e y C o C o m p t o n 2 0 1 2 A s 2 0 9 0 f t ² 1 9 4 m ² 5 B e d 3 S t o r e y M p Y o x a ll 2 0 1 2 A s 1 3 1 3 ft² 1 2 2 m ² 4 B e d 2 S to r y Yo Y o x a ll 2 0 1 2 A s 1 3 1 3 f t² 1 2 2 m ² 4 B e d 2 S to r y Y o B u x to n 2 0 1 2 A s 1 4 7 7 ft² 1 3 7 . 2 m ² 4 B e d 2 S to ry Bu SO4 201 2 L eft As 104 6ft² 97.2m² 4 Bed 6 Person S O 4 D f Desford 2012As 1289ft² 11 9m² 4 Bed 2 S tory D f Des ford 2012 A s 1289ft² 119m² 4 Bed 2 Story D f Desford2 012As 1289ft² 119m ² 4 Bed 2 Story B e w d l y 2 0 1 2 A s 1 1 7 1 f t ² 1 0 8 . 7 m ² 4 B e d 2 S t o r y B w D f Des ford 2012 A s 1289ft² 119m² 4 Bed 2 Story D f Desf ord2012A s 1289 ft² 119m² 4 Bed 2 Story B y B r o m l e y 2 0 1 2 A s 1 7 5 9 f t ² 1 6 3 m ² 5 B e d 3 S t o r e y 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 25 24 27 28 32 31 30 29 76 75 74 73 90 89 88 87 105 106 107 108 109 91 92 93 94 95 96 97 98 99 125 126 129 130 110 111 112 113 114 115 118 Bu Bu Ab Ab Ab Bu Bu Al Al Yo Yo De De De De De De By Co Co Ha Ha Ha Mtp Ha Cr Cr Cr Cr Cr Mts Mts Mt 03 03 02 02 02 02 04 02 02 02 Bw Sub Potential Future Access Link 03 02 02 Lu Lu St St 33 34 35 77 78 79 80 116 117 120/121 122 123 124 0 2 0 2 0 2 0 8 St St St * 128 * * * * * SO SO SO SO SO SO R R R R SO SO SO R R R R V3 V8 V3 V7 V3 V3 V7 V7 V7 V3 V1 V2 as as as as as as as as as as as as as as as as as as as as as as as as as as as as as as as as op op op op op op op op op op op op op op op op op op op op op op op as op op * A s h b o u r n e 2 0 1 2 A s 1 5 3 6 f t ² 1 4 2 . 7 m ² 4 B e d 2 S t o r e y A s h Ab op A s h b o u r n e 2 0 1 2 A s 1 5 3 6 f t ² 1 4 2 . 7 m ² 4 B e d 2 S t o r e y A s h A b a s M p M a p l e t o n 2 0 1 2 A s 1 2 6 1 f t ² 1 1 7 m ² 4 B e d 2 S t o r y Mp op Y o x a l l 2 0 1 2 A s 1 3 1 3 f t ² 1 2 2 m ² 4 B e d 2 S t o r y Y o Yo as M p M a p l e t o n 2 0 1 2 A s 1 2 6 1 f t ² 1 1 7 m ² 4 B e d 2 S t o r y Mp op Y o x a l l 2 0 1 2 A s 1 3 1 3 f t ² 1 2 2 m ² 4 B e d 2 S t o r y Y o Yo as M p M a p l e t o n 2 0 1 2 A s 1 2 6 1 f t ² 1 1 7 m ² 4 B e d 2 S t o r y Mp op Mt V1 as A s h b o u r n e 2 0 1 2 A s 1 5 3 6 f t ² 1 4 2 . 7 m ² 4 B e d 2 S t o r e y A s h Ab op Ab op A s h b o u r n e 2 0 1 2 A s 1 5 3 6 f t ² 1 4 2 . 7 m ² 4 B e d 2 S t o r e y A s h An An op as 03 02 as op An An 36 119 FIRE APPLIANCE TURNING FACILITY SO SO Proposed pump stn compound. Pump stn access. Stn * Low wall. E X G F W S M H S T W R E F 16 0 1 C l - 5 1. 5 3 I l - 4 9 . 8 1 ( t a k e n f ro m s e w e r r e c o rd s) EXG F WS M H STW REF 2 601 Cl - 5 1. 55 I l - 49. 73 ( ta k e n fro m se we r rec ords) EX G FW S MH S T W R EF 2502 Cl - nil I l - nil (t a ken f r o m s ew er r ec ords ) E X G F W S M H S T W R E F 2 6 0 2 C l - ni l I l - n i l ( t ak e n f ro m s e w e r re c o r d s ) g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g TCB M I L L C R E S C E N T 2 9 14 1 2 0 31 1 9 2 0 1 7 +3m @1:3 WET MEADOW NEW CONNECTION TO PHASE1 SECTION104 FOUL SEWER PHASE1 FOUL PUMP STATION NEW SECTION104 FOUL SEWER IN PLOT FRONTAGES TO CREATE SPACE IN HIGHWAY FOR SURFACE WATER ATTENUATION NEW SECTION104 SURFACE WATER BOX CULVERT OR ELLIPTICAL PIPE ATTENUATION FLOW CONTROL MANHOLE NEW OUTFALL HEADWALL E X I S T I N G W A T E R C O U R S E E X I S T IN G W A T E R C O U R S E POTENTIAL LOCATIONS FOR SHALLOW SWALE STORAGE NEW TIMBER FOOTBRIDGE NEW TIMBER FOOTBRIDGE SUBJECT TO ROOT PROTETCION ZONES AND OWNERSHIP, EXISTING CHANNEL TO BE CLEARED AND REPROFILED TO IMPROVE CAPACITY 2014s1262 - 101 Providence Land Ltd Barton Park Phase2 Barton-Under-Needwood Drainage Strategy Preliminary 1 of 1 1:500 @ A1 SCH 29/10/2014 SCH 29/10/2014 DT 29/10/2014 DT 29/10/2014 Approved Digital File Name: Drawing Number: Scale: Checked: Sheet No.: Approved: Drawn: Status: This document is the property of Jeremy Benn Associates Ltd. It shall not be reproduced in whole or in part, nor disclosed to a third party, without the permission of Jeremy Benn Associates Ltd. for Rev.: Designed: Checked Designed Drawn Date Modifications Rev. General Notes 1. All dimensions shown are in metres unless otherwise stated and levels in metres to Ordnance Datum. 2. Do not scale from this drawing. All dimensions must be checked/verified on site. 3. This drawing is to be read in conjunction with JBA Project Reports. 4. All works affecting flood defences, main watercourses and/or ordinary watercourses will be subject to Consent for Permanent and Temporary Works under the Land Drainage Act 1991. The Old School House St Joseph's Street TADCASTER North Yorkshire LS24 9HA United Kingdom www.jbaconsulting.com +44 (0)1937 837900 +44 (0)845 8627772 [email protected] Offices at Atherstone, Doncaster, Edinburgh, Haywards Heath, Limerick, Newcastle upon Tyne, Newport, Saltaire, Skipton, Tadcaster, Thirsk, Wallingford and Warrington t f e Contains Ordnance Survey data © Crown copyright and database right 2014. World Imagery Source: Esri, DigitalGlobe, GeoEye, i-cubed, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community. This map is reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office © Crown copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. P/2014/01490 Received 14/11/2014