Page 1
Confidential
MMBS Installation GuideMMBS Installation GuideMMBS Installation Guide< Sprint >
MMBS Installation Guide< Sprint > Sprint Sprint
2011 3 252011 3 252011. 3. 25
H/W Infra Lab.
2011. 3. 25
H/W Infra Lab.
Annotation) This data could be revised while designing in detail.
Page 2
Confidential
1. System DescriptionConfidential
Items Specification
System Type MMBS Outdoor
Frequency 800MHz, 1.9GHz, 2.5GHz, 2.5GHz @ RRU
Sector Max. 4 RRU/ sector (Total 12 RRU max)
Channel BW (MHz) 7MHz (800M) 65MHz(1 9G) 20MHz(2 5G)Channel BW (MHz) 7MHz (800M), 65MHz(1.9G), 20MHz(2.5G)
Weight BBU Cabinet : - (kg) w/o DU shelf
- (kg) with 4 DU shelfBattery Cabinet : - (kg) w/o battery
- (kg) with battery
Network Interface T1 or M/W or optic
Physical Dimensions(H W D) 1800x700x1018(820) mm / 70.8in x 29.5in x 40.1(37.0)in(HxWxD) 800 00 0 8(8 0) / 0 8 9 5 0 (3 0)
Power Consumption220VAC (22A,max) @ w/o battery,Only CDMA220VAC (36A,max) @ w/o battery,CDMA/LTE/WiMAX220VAC (40A,max) @ with battery, Only CDMA 220VAC (80A ma ) @ ith batter CDMA/LTE/WiMAX220VAC (80A,max) @ with battery, CDMA/LTE/WiMAX
DU-RU Interface CPRI 4.0 specification (Optic)
Note Recommended NFB Capacit 100A ma 1EA
1
Note. Recommended NFB Capacity 100A,max. 1EA
Page 3
Confidential Confidential
Items Specification
Rectifier module Specification
Voltage Range 185~275VAC
Frequency 45~66 Hz(50/60 Hz)
O t t V lt 53 5 VDCOutput Voltage -53.5 VDC
Output Voltage Range -43.5~-57.6VDC
Efficienty 96% @ 2kW Output,moduley % @ p ,
Maximum Output Power 2,000W x 7 @ 25 ℃
Weight 1.950 kg (4.3lbs)
2
Page 4
Confidential Confidential Battery
3
Page 5
Confidential
1.1 System configurationConfidential
BBU cabinet Battery cabinet
BatteryRectifier
PDP
Battery
TD-LTE/FDD LTEWiMAX
CDMA/FDD LTECDMA
Old version
Battery
User SpaceUser
CDMA/FDD LTE
BatteryUser Spacespace
BatteryCabling Space
Cabling Space
4[BBU Cabinet] [Battery Cabinet]
Page 6
ConfidentialConfidential
<66Block>- Maker :
GPS portMaker :
- P/N :
Mudroom <Comseal>- Maker : Roxtec
P/N : ComSeal 16/16
2” Conduit
- P/N : ComSeal 16/16
5 4 3 2 1 0
2 Conduit
[Mudroom]
<GPS Splitter>- Maker : Symmetricom- P/N : 58536A
5Note. This data could be revised while designing in detail.[Back side of the BBU cabinet]
Page 7
Confidential
1.2 System DimensionConfidential
BBU Cabinet
00.0
1,80
1 018 0700 0
300.
0
433.
0
[Front View] [Left View]
1,018.0
6
700.0
[Rear View]
Page 8
ConfidentialConfidential Battery Cabinet
,800
.0
Old version Old version
11 022 3700 0
742.5
[Front View] [Left View]7
1,022.3700.0
Page 9
Confidential
1.3 Floor LayoutConfidential
min. distance for no colision opening
cabinets
60
1225
.5 959.
8
1,460min
8
Page 10
ConfidentialConfidential
9.5
2,20
9
959.
8 60
9
1,460 min
1,739.8 min
Page 11
ConfidentialConfidential
067
0.0
/ C
630.0
10
[Power/Battery Cabinet Anchor Location]
Page 12
Confidential
1.4 Service Area700 0700 0 60 0 Confidential700.0700.0 60.0
076
2.
Mudroom
System
61.0
743.
0
60Battery
209.
5
1,44
7.5
136 2,
11
760.01,123.4
Page 13
Confidential
1.5 Environment Control Module & SensorConfidential
Fire SensorDoor Switch
Lamp
Fire SensorDoor Switch
LampLamp
User SpaceUser Space
Cabling SpaceFlood sensor
Flood sensor
12[BBU Cabinet] [Batery Cabinet]
Page 14
Confidential
1.6 External I/F Cable(BBU cabinet)1.6 External I/F Cable(BBU cabinet)
Confidential
Item Cable Connector Terminal name Q’t Provider
Power(AC)
1P3W, L1/L2 /N AWG 2
NFB terminal L1,L2,N Conduit #1 1 STA(AC) L1/L2 /N : AWG 2
Black/Red/White
Battery Power #0a(Battery)
AWG 1/0Black/Blue
Compression terminal,1H, M8
Battery switch Conduit #0 2 Eltek
CAN bus #0(Battery) SFTP,4p RJ-45 Conduit #0 1 Eltek
DC Power #0b(Battery) AWG 12 Ferrule Conduit #0 1 Eltek
Battery Power #1a(Battery)
AWG 1/0Black/Blue
Compression terminal,1H, M8
Battery switch Conduit #5 2 Eltek( y) , ,
CAN bus #1(Battery) SFTP,4p RJ-45 Conduit #5 1 Eltek
DC Power #1b(Battery) AWG 12 Ferrule Conduit #5 1 Eltek
RRU cable Hybrid, Option Power,bare wire - Conduit # 2,3,4
3 HQ
Optic,LC
Backhaul(T1) Shield type RJ-45, wire Surge protector Mudroom, C l
16max STAComsealUser Define Alarm Shield type Bare wire 66 block 1 STA
GPS LMR-400 N-Male or N-Female GPS arrestor 1 STA
Ground AWG 2 Compression terminal 2H M6 L5/8”
Ground bus bar Conduit #1 1 STA
13
terminal,2H, M6, L5/8
Page 15
Confidential
1.7 I/F Port PositionConfidential
BatteryPowerterminal
RRU DC P
AC terminal
Battery
User Space
RRU DC Power
RRU Optic
operating power terminal
User Space
CAN BUS
CAN BUS
Cabling Space
Ground
14[BBU Cabinet] [Batery Cabinet]
Page 16
ConfidentialConfidential
GPS portUDA,Backhaul
Mudroom < Comseal >- Maker : Roxtec
P/N : ComSeal 16/16
2” Conduit
- P/N : ComSeal 16/16
5 4 3 2 1 0
2 Conduit
[Mudroom]
UDA or Link cableGPS cable
Note. This data could be revised while designing in detail. 15
[Back side of the BBU cabinet]
Page 17
Confidential
1.8 Power BlockdiagramConfidential
System Power Blockdiagram
16PE
Page 18
Confidential Confidential Battery Cabinet Power Blockdiagram
17Check power supply TN-C in USA 1P3,can it use 2 SPD(L to N) ?
Page 19
Confidential Confidential Load Breaker
No
F1
F2
F3
F4
F5
F6
F7
F8
F9
F10
F11
F12
F13
F14
F15
F16
F17
F18
F19
F20
F21
F22
F23
F24
Ca
16
16
16
16
16
16
16
16
16
20
16
16
16
20
16
16
16
20
4A
4A
2A
2A
2Aa
pacity
6A
6A
6A
6A
6A
6A
6A
6A
6A
0A
6A
6A
6A
0A
6A
6A
6A
0A
AUX UADU RRU
LLabel
AU
X0
AU
X1
DU
#0
DU
#1
DU
#2
DU
#3
RR
U#0
RR
U#1
RR
U#2
RR
U#3
RR
U#4
RR
U#5
RR
U#6
RR
U#7
RR
U#8
RR
U#9
RR
U#10
RR
U#11
FAN
#1
FAN
#2
Sm
oke
Light
EAIU
1.9
1.9
1.99GH
z
9GH
z
9GH
z
LVLD
LVBD
Coldstart contactor
18
Page 20
Confidential
Ref. Power distribution system at USRef. Power distribution system at USConfidential
19
Page 21
Confidential
2.1 SOW 2.1 SOW Confidential
Lightning rod
GPS Antenna
BBUCabinet
RRU
BackhaulMud-roomAux. Equip. UDA
AC Power Distribution
Panel
AC220VGround
BatteryCabinet
Ground
Tower
20
Page 22
Confidential
2.2 Material List 2.2 Material List Confidential
To be defined.
21
Page 23
Confidential
3. Installation Process3. Installation ProcessConfidential
Ground Cable Backhaul CableMaterial Check DU Installation
AC Power Cable UDA Cable(Option)
Ground Buss Installation
EAIU Installation
Backup Battery CableBBU Cabinet
AnchoringGPS Cable
GPS Arrestor&Splitter
RRU Cable
Check
Battery CabinetAnchoring
AUX Installation(Option)
CheckRRU
Installation
22
Page 24
ConfidentialConfidentialAntenna
Frame Ground Cable
RF Antenna
Cable
RRU
OpticGPS
PowerDC CableOptic Cable
GPSAntenna
Cable
User Space
Cabling Main Ground BarAC Distribution Panel
Power Cable(FR-8 25 mm2 × 3C, 1ea)
g Space Ground Cable(GV 25 mm2×1C)
23
Page 25
ConfidentialConfidential
Rectifier
PDP
Rectifier
PDP
TD-LTE/FDD LTE
WiMAX
CDMA/FDD LTECDMA
User Space
CDMA/FDD LTE
User Space
Cabling Space
Battery cable
AC cable
24[Front View]
hybrid cable
AC cable
Page 26
ConfidentialConfidential
Conduit No. Usage
0 Battery #0
1 AC/Ground
[Mudroom]
UDA or Link cable
GPS cable
1 AC/Ground
2 RRU Alpha
3 RRU Beta
4 RRU Gamma5 4 3 2 1 0
To RRU
25
5 Battery #1
[Rear View]
To RRU
Page 27
Confidential
3.1 AnchoringConfidential
670.
0
630.0
26
[Power/Battery Cabinet Anchor Location]
Page 28
ConfidentialConfidential
NutAnchor Bolt
Spring Washer
Plane Washer
Floor
2.76”
C f(M10 Anchor-Bolt) Completion of Anchoring(M10 Anchor-Bolt)
Each equipment requires specific bolting pattern Verify that you have the right bolt patternEach equipment requires specific bolting pattern. Verify that you have the right bolt pattern.
27
Page 29
Confidential
3.2 Ground Cable3.2 Ground CableConfidential
(Front view)
25 mm2 Pressure Terminal(ST, M6,2hole, Dist: 5/8”)User
Space
C bli
28
Cabling Space
Page 30
Confidential
3.3 AC Power Cable3.3 AC Power CableConfidential
AC(Front view)
100A, 1P3W
P C bl
L1/L2/N
Power CableAC : L1/L2/N (BLACK/RED/WHITE)
1) Through the conduit #12) Connect Ferrule to wire and Fix the cable with switch screw .
User Space
C bli
29
2) Connect Ferrule to wire and Fix the cable with switch screw . Cabling Space
Page 31
Confidential
3.4 Backup Battery Cable3.4 Backup Battery CableConfidential
Battery power switch
Batter
Routing path : Left,rear edge
Battery operating power
Battery
User Space
power terminal
(Front view)
Battery
CAN User Space
BatteryCAN BUS
CAN BUS
Cabling SpaceUser Space
C bli
Battery
30[BBU Cabinet]
Cabling Space
[Battery Cabinet]
Page 32
ConfidentialConfidential
(Front view)
User Space
C bli
31
Cabling Space
Page 33
Confidential
3.5 UADU installation3.5 UADU installationConfidential
1) Install DU shelf support bracket at 20U with cage nut(M6)cage nut(M6)
2) Install DU shelf upper side of bracket stackable
3) Tag the DU shelf label 4) Connect DU shelf cable
(power GPS Backhaul Alarm)Power switch (power,GPS,Backhaul,Alarm)
UADU
User Space
(Front view) DU shelf bracketBracket
User Space
User Space
Cabling
Cabling Space
Cabling Space
32[BBU Cabinet]
Page 34
ConfidentialConfidentialStep.1 DU Blank bracket Install
Example .
1) Fix the bracket at 20U from bottom Mounting frame with M6 Cage nuts
33
1) Fix the bracket at 20U from bottom Mounting frame with M6 Cage nuts
Page 35
ConfidentialConfidentialStep.2 UADU Install
Step 2-1 UADU Ground cable connection
DU Unit backsideM6 SEMS
Detail ‘A’
Step.2-1 UADU Ground cable connection
4 mm2 Pressure Terminal(d2: 16 mm, 2Hole)
Ground Cable
Heat Shrink Tube (Green)
Detail ‘B’
Ground Cable(AWG10, GV 4 mm2 × 1C)
※ first connect the Ground cable before install DU unit
1) Connect ground cable backside of UADU
34
) g2) Fix the UADU upper DU blank bracket with M6 floating nuts3) Connect the other ends of ground cable at ground bar of the cabinet left bottom .
Page 36
ConfidentialConfidential
Step.2-2 UADU install
M6SEMS
Cage nut
Step.2-3 Ground cable - frame
Heat Shrink Tube(Green)
Ground Cable(AWG10, GV 4 mm2 × 1C)
4 mm2 Pressure Terminal(LUg Type, 2Hole)
M6 Hex. Nut
Heat Shrink Tube(Green)
Ground Bar
35
Page 37
ConfidentialConfidential Power Cable SPEC. from Rectifier to UADU
A2: RTN
A1: -48 VDCD-Sub Plastic hood
SPEC Wire Color Maker
Cable Power Cable Color
( )
A1(-48VDC: blue)
( )(CV 2.5 mm2 × 1C-2) A2(RTN: red)
Connector D-Sub Connector(2W2C)-302W2CPXX42A10X & Hood
- CONEC
36
Page 38
Confidential
3.6 EAIU4-U Installation3.6 EAIU4-U InstallationConfidential
UDA
Ethernet
(Front view)
Switch
Ethernet
User Space
Cabling1) Re-assemble the wing brackets of EAIU as picture. 2) Fix EAIU at the right frame with M6 SEMS 2ea as picture
PowerUDE
37
Cabling Space
2) Fix EAIU at the right frame with M6,SEMS 2ea as picture
Page 39
ConfidentialConfidential Cable SPEC. from Rectifier to EAIU
SPEC Wire Color Maker
Cable UL2464 AWG20 2C BLK Black Korea Maker
SEC CODE : EP39-01736A
Cable UL2464, AWG20, 2C BLK Black Korea Maker
Connector 51067-0300 - MOLEX
38
Page 40
Confidential
3.7 Surge protector Installation3.7 Surge protector InstallationConfidential
GPS arrestorGPS splitter
(Rear view)
[Mudroom]
Roxtec ComsealMudroom
39Note. It will add the surge protector for T1 .
Page 41
Confidential
3.8 Auxillary Unit Installation3.8 Auxillary Unit InstallationConfidential
* To be defined.
Power switch
UADU
User Space
(Front view) DU shelf bracketBracket
User Space
User Space
Cabling
Cabling Space
Cabling Space
40[BBU Cabinet]
Page 42
Confidential
3.9 Backhaul – When T13.9 Backhaul – When T1Confidential
GPS arrestor66 Block GPS splitter
(Rear view)
[Mudroom]
Roxtec ComsealUDA or Link cableMudroom
41Note. It will add the surge protector for T1 .
Page 43
ConfidentialConfidential
Note. BH did not Final Confirmed
(Front view)BH
T1 (from Cell Site Router. Install at User space )User
Space
Cabling1) Link the cable from UDE port of UADU to CSR. 2) Link T1 cable from CSR to surge protector at mudroom
42
Cabling Space
2) Link T1 cable from CSR to surge protector at mudroom.
Page 44
ConfidentialConfidential T1 cable SPEC. from DU to CSR
RJ45 PLUGShield type
S-FTP
Pin No.
Pair Description COLOR MAP
1 Tip Rx+WHITE
* Pin MAP
1 Tip Rx+/ORANGE
2 Ring Rx- ORANGE
3WHITE/GREEN
4 Ti T BLUE4 Tip Tx+ BLUE
5 Rimg Tx-WHITE/BLUE
6 GREENWHITE
7WHITE/BROWN
8 BROWN
SPEC Wire Color Maker
Cable S-FTP, CAT5e - -
C t RJ45 PLUG (Shi ld)
SEC CODE : EP39-
Connector RJ45 PLUG (Shield) - -
43
Page 45
Confidential
3.10 UDA cable3.10 UDA cableConfidential
UDA_EAIU ALARM_CABINET
66 Block
(Rear view)
[Mudroom]
Roxtec ComsealUDA or Link cableMudroom
44
1) Pin map is not defined.2) T1 surge protector spec. is not confirmed.
Page 46
ConfidentialConfidential
SMART PACK RECSMART PACK_REC
Mudroom
UDE
UDE
(Front view)
UDE
UDE
User Space
Cabling
UDE2A_PDP
[EAIU4-U]Cabling Space
45
Page 47
ConfidentialConfidential
Conne Pin Primary Color Map Secondary Pin Primary Color Map Secondary
66 Block Pin Map
ctor No. Primary Color Map Secondary No. Primary Color Map Secondary
1 262 273 284 294 295 306 317 328 339 34
66Block
9 3410 3511 3612 3713 38
To be defined.
Block 14 3915 4016 4117 4218 4318 4319 4420 4521 4622 4723 4823 4824 4925 50
46
Page 48
ConfidentialConfidential Cable SPEC. from EAIU to 66 block
SPEC Wire Color Maker
Cable UL2919 AWG24 20PR - -
47SEC CODE : EP39-01555A
Cable UL2919, AWG24, 20PR
②Connector 10136-3000ve - 3M
Page 49
ConfidentialConfidential Cable SPEC. from DU to EAIU/SpartPack
RJ45 PLUGShield type
S-FTP
Pin No. Pair Description COLOR MAP
WHITE
* Pin MAP
1 TX0+ Ethernet TX Positive signalWHITE/ORANGE
2 TX0- Ethernet TX Negative signal ORANGE
3 RX0+ Ethernet RX Positive signalWHITE/GREEN
4 TX1+ Ethernet TX Positive signal(Gigabit) BLUE
5 TX1- Ethernet TX Negative signal(Gigabit)WHITE/BLUE
6 RX0- Ethernet RX Negative signal GREENWHITE
7 RX1+ Ethernet RX Positive signal(Gigabit)WHITE/BROWN
8 RX1- Ethernet RX Negative signal(Gigabit) BROWN
SPEC Wire Color Maker
Cable S-FTP, CAT5e - -
48SEC CODE : EP39-01342B
Cable S FTP, CAT5e
Connector RJ45 PLUG (Shield) - -
Page 50
ConfidentialConfidential Cable SPEC. from SpartPack to Mudroom
Pin No. Pair Description COLOR MAP
1
* Pin MAP
1
2
3
455
6
7
8
To be defined
SPEC Wire Color Maker
Cable S-FTP, CAT5e - -
49SEC CODE : EP39-
Cable S FTP, CAT5e
Connector - - -
Page 51
Confidential
3.11 GPS Cable3.11 GPS CableConfidential
GPS arrestorGPS plitter
(Rear view)
[Mudroom]
Roxtec ComsealMudroom
50
1) GPS surge protector spec. is not confirmed.
Page 52
ConfidentialConfidential GPS Cable at UADU
WiMAX Only
LTE Only
(Front view)
CDMA Only
CDMA + LTE
User Space
Cabling
CDMA LTE
Cabling Space
51
1) Cable route GPS Splitter from Mudroom
Page 53
ConfidentialConfidential Cable SPEC. from GPS Arrestor to Splitter
To be defined
SPEC Wire Color Maker
Cable - -
Connector - -
Cable SPEC. from Splitter to UADU
Connector
SEC CODE : EP39-A
To be defined
SPEC Wire Color Maker
Cable - -
SEC CODE : EP39-A
Cable
Connector - -
52
Page 54
Confidential
3.12 RRU Cable3.12 RRU CableConfidential
RRU Power(Lab. Certi.)
2 5GHz 2 5GHz 800MHz 1 9GHz
Table. Pin map2.5GHz 2.5GHz 800MHz 1.9GHz
gam
-48V
RTN
-48V
RTN
-48V
RTN
-48V
RTN
beta
-48V
RTN
-48V
RTN
-48V
RTN
-48V
RTN
-48V
(Front view)
a V N V N V N V N
ahph
-48V
RTN
-48V
RTN
-48V
RTN
-48V
RTN
Power Cable(AWG 6~10)-48V : Blue
User Space
Cabling
-48V : BlueRTN : Black
1) Through the conduit #2, #3, #42) Connect Ferrule to wire and Fix the cable with switch screw.Cabling
Space
53
2) Connect Ferrule to wire and Fix the cable with switch screw.
Page 55
ConfidentialConfidential
Table. Pin map
RRU Modified Power Cable (FIT&Commercial)
2.5GHz
2.5GHz
800MHz
1.9GHz
2.5GHz
2.5GHz
800MHz
1.9GHz
2.5GHz
2.5GHz
800MHz
1.9GHz
-48V
RTN
-48V
RTN
-48V
RTN
-48V
RTN
-48V
RTN
-48V
RTN
-48V
RTN
-48V
RTN
-48V
RTN
-48V
RTN
-48V
RTN
-48V
RTN
p
alpha beta gamma
Power Cable(AWG 6~10)-48V : BlueRTN : Black
(Front view)
Move SPD positionChanging
DC SPD Block
Changing..
User Space
Cabling
DC SPD Block
Cabling Space
54
1) Through the conduit #2, #3, #42) Connect Ferrule to wire and Fix the cable with switch screw
Page 56
ConfidentialConfidential Optic cable
WiMAX Only
LTE Only
(Front view)
CDMA Only
CDMA + LTE
User Space
CablingCabling Space
55
1) Through the conduit #2, #3, #42) Connect suitable optic cable
Page 57
Confidential
Ref. Conduit finishing methodRef. Conduit finishing methodConfidential
[Optic cable storage box]
It can use storage box when the Optic cable is long
If Power cable is long , Cut the power cable. And Connect Ferrule to wire
Cable glandor Butyl
2” Conduitor Butyl
< 1m
Power cable
Optic cable
Hybrid cable
56
[BBU Cabinet Right view] Flexible pipe length can be changeable. It is why waterproof .
Page 58
Confidential
Ref. Hybrid cable type (sort by length)Ref. Hybrid cable type (sort by length)Confidential
T 1 T 2 T 3
Table. Cable TypeType 1 Type 2 Type 3
Total Length ~40m ~70m ~120m(requirement is 300feet = 91.4m)
H b id P C bl AWG 8 1 i AWG 6 1 i AWG 4 1 iHybrid Power Cableconfiguration
AWG 8 1 pair,AWG 10 3 pair
AWG 6 1 pair,AWG 8 3 pair
AWG 4 1 pair,AWG 6 3 pair
Cable diameter 32mm 32mm 36mm
Bending radius 800mm 800mm 900mm
Optic cable LC/PC-to-LC/PCSingle mode
LC/PC-to-LC/PCSingle mode
LC/PC-to-LC/PCSingle mode
BBU cabinet (power cable terminal max
size AWG 6 )
- - AWG 4 -> AWG 6 conversion kit need
RRU Power cable Spec AWG 10, 4 pair AWG 10, 4 pair AWG 10, 4 pair
Non use Power and optic cable protection
2 pair power and optic cable With PE pipe
2 pair power and optic cable With PE pipe
2 pair power and optic cable With PE pipe
57
Note. SAMSUNG FIBEROPTICS.
Page 59
Confidential
[Type 1] 30m Hybrid Cable
Confidential[1.9Mhz] Power cable AWG #8, 2C
Optic cable LC/PC * 4ea + spare 1ealength : 2.5m 1900MHzAWG #8
AWG #10
Max : 41mm 5 core optic
5.5mm
AWG #10
800MHz& 2.5GhzTo BBU
CabinetAWG #10
Break out pointC bl AWG #6 #8
800MHz& 2.5Ghz[800Mhz & 2.5Ghz]
Power cable : AWG #10 , 2C
Cable AWG #6, #8converte AWG #10
800MH
Optic cable : LC/PC * 4ea + spare 1ea
[Future Used]
Water-proof C 800MHz
& 2.5Ghz
[Future Used]
length : 5m
Cap
[ Cable AWG convertor] All Power cable : AWG #10 , 2C * 4ea
Page 60
Confidential
[Type 2] 60m Hybrid Cable
Confidential
length : 2.5m 1900MHz
[1.9Mhz] Power cable AWG #6, 2COptic cable LC/PC * 4ea + spare 1ea
AWG #6AWG #10
5 core optic Max : 41mm
5.5mm
AWG #10
800MHz& 2.5GhzTo BBU
CabinetAWG #8
Break out pointC bl AWG #6 #8
[800Mhz & 2.5Ghz] Power cable : AWG #8 , 2C
800MHz& 2.5Ghz
Cable AWG #6, #8converte AWG #10
Water-proof C
Optic cable : LC/PC * 4ea + spare 1ea
800MH
[Future Used]
Cap
length : 5m
800MHz& 2.5Ghz
[Future Used]
[ Cable AWG convertor] All Power cable : AWG #10 , 2C * 4ea
Page 61
Confidential
[Type 3] 90m Hybrid Cable
Confidential
length : 2.5m 1900MHzAWG #4
AWG #4 -> #6ferulle * 2ea [1.9Mhz] Power cable AWG #4, 2C
Optic cable LC/PC * 4ea + spare 1ea
5.5mm
5 core optic Max : 41mm
800MHz& 2.5Ghz
Break out pointC bl AWG #4 #6
To BBUCabinet
AWG #6
x 3[800Mhz & 2.5Ghz]
Power cable : AWG #6 , 2C
Cable AWG #4 , #6converte AWG #10
800MHz& 2.5Ghz
Optic cable : LC/PC * 4ea + spare 1ea
800MH
[Future Used]
Water-proof C
length : 5m
800MHz& 2.5Ghz
[Future Used]
Cap
[ Cable AWG convertor] All Power cable : AWG #10 , 2C * 4ea
Page 62
Confidential
Ref. Hybrid cable lengthRef. Hybrid cable lengthConfidential
2 t
1sector
2sector
5.0m
Cable length is changed by the RRU location.
Y
2 5m
User Space
3sector
X2
2.5m
Grounding Need the RRU height but Tower
height.
Cabling Space
X1
61Cable length = X1 + X2
Page 63
Confidential
RRU cable connection (example)Confidential
Unit: mmThere are 3 Type RRU .
RU cabling window Figure differ 3RRU .
Depending RRUs
Depending RRUs
< Cable Gland >D di RRU • Maker : PFLITSCH http://www.pflitsch.de/
• P/N : 22052y, 13 (M20, 13 ~ 9mm)
SHOT BOOT
200(Max)5~6
AWG10
< RRU >
Depending RRUs
Bending radius
Insulator color
“-48V”→( blue )
“GND”→( red )
20(max)insulator
Optic core No. :5
Φ5.5±0.5
=R 20
Φ12±0.5
< Power Cable >Note. This picture is similar sample
< Optic Cable >62
Page 64
Confidential
Ref. UADUConfidential
WiMAX Only
LTE Only
CDMA Only
CDMA + LTE
63
Page 65
ConfidentialConfidential
Power
CDMA Only
OPTIC(L0~L5)
GPSUDABH0BH1
OPTICPower
OPTIC(L0 L5)BH1UDE
EDSG
LTE Only
UDABH0
GPSBH2
64
BH1UDE0UDE1
BH1RECEDGB
Page 66
ConfidentialConfidential
OPTICPower
WiMAX Only
UDABH0BH1
GPSBH2BH1BH1
UDE0UDE1
OPTIC
BH1RECEDGB
Power
CDMA + LTE
GPSUDABH0
65
OPTIC(L0~L5)BH1UDE
EDSG
Page 67
Confidential
Ref. Single Solution CabinetConfidential
PDP
Battery Circuit Breaker
Rectifier
WiMAXTD LTE/FDD LTETD-LTE/FDD LTE
CDMACDMA/FDD LTE
AC circuit
12 DC Circuit Breaker
User Space
User space
AC circuit breaker
Cabling Space
Cabling Space6 Conduits
66
[BBU Single Cabinet]
Note. This data could be revised while designing in detail.