May 2017 Land adjacent to Common Road, Harthill, Rotherham Construction of a well site and creation of a new access track, mobilisation of drilling, ancillary equipment and contractor welfare facilities to drill and pressure transient test a vertical hydrocarbon exploratory core well and mobilisation of workover rig, listening well operations, and retention of the site and wellhead assembly gear for a temporary period of five years on land adjacent to Common Road, near Harthill. Application Drawings 5.
24

5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

Nov 26, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

May 2017

Land adjacent to Common Road, Harthill, Rotherham

Construction of a well site and creation of a new access track, mobilisation of drilling, ancillary equipment and contractor welfare facilities to drill and pressure transient test a vertical hydrocarbon exploratory core well and mobilisation of workover rig, listening well operations, and retention of the site and wellhead assembly gear for a temporary period of five years on land adjacent to Common Road, near Harthill.

Application Drawings

5.

Page 2: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

List of Application Plans P304-S2-PA-00 Rev A Strategic Location Plan

P304-S2 -PA-01 Rev G Application Site Plan

P304-S2-PA-04 Rev C Existing Ground Plan

P304-S2-PA-05 Rev B Proposed Site Entrance & Highway works

P304-S2-PA-06 Rev C Proposed Site Layout Plan - Construction

P304-S2-PA-07 Rev F Proposed Site Layout Plan - Drilling Stage

P304-S2-PA-08 Rev B Proposed Site Layout Plan - Listening Stage

P304-S2-PA-09 Rev B Proposed Site Restoration

P304-S2-PA-10 Rev B Proposed Lighting Plan - Drilling & Coring

P304-S2-PA-11 Rev B Proposed Drainage Plan

P304-S2-PA-12 Rev B Proposed Site Layout Plan - Suspension

P304-S2-PA-13 Rev B Proposed Internal Access Plan

P304-S2-PA-16 Rev A Proposed Sections & Details

P304-S2-PA-17 Rev B Proposed Site Layout Plan - Possible workover

P304-S2-PA-21 Rev A Parameter Sections - Develop. & Establish

P304-S2-PA-22 Rev A Parameter Sections - Drilling & Coring

P304-S2-PA-23 Rev A Parameter Sections - Suspension

P304-S2-PA-24 Rev A Parameter Sections - Work over of Well

P304-S2-PA-25 Rev A Parameter Sections - Listening Stage

P304-S2-PA-26 Rev A Parameter Sections – Abandonment

P304-S2-PA-30 Rev A Heras Fence Details

P304-S2-PA-31 Lighting Examples

Page 3: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

1:10,000

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

FOR APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-00

17022

22.05.17

STRATEGIC

LOCATION PLAN

Revision:

A3

Paper Size:

Date:

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

N

A

DATEDESCRIPTIONREV

25.05.17UPDATED FOR APPROVALA

Page 4: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

P2

PROPOSED SITEACCESS(SEE DRAWING No.17022-P304-S2-PA-05)

P3

P4

P5

P6P7

P8

P1

COMMON ROAD

30m WIDEECOLOGICALBUFFER

POST AND WIRE FENCE TO RUNALONGSIDE PUBLIC RIGHT OFWAY TO BE INSTALLED UNDERPERMITTED DEVELOPMENTRIGHTS

COMMON ROAD

POSITIONNE

CO-ORDINATE

P2P3P4

P1 380433.640450563.105

P5P6P7P8

380443.608450557.370380423.029450521.599380494.708450457.289380564.023450577.773380482.371450624.748380478.028450617.200380468.060450622.934

1:2500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-01

17022

06.04.17

APPLICATION SITE PLAN

Revision:

A3

Paper Size:

Date:

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

N

G

DATEDESCRIPTIONREV

25.04.17

CO-ORDINATES UPDATED TO SUIT

BLUE LINE.

A

03.05.17

ECOLOGICAL BUFFER SHOWN.

PERIMETER FENCE SHOWN.

P4 RE-LOCATED.

B

09.05.17UPDATED FOR APPROVALC

11.05.17UPDATED FOR APPROVALD

17.05.17SITE POSITION ADJUSTED.E

22.05.17F UPDATED FOR APPROVAL

25.05.17G UPDATED FOR APPROVAL

Page 5: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

135.33 135.29 135.19

134.90

135.26

135.70

134.84

136.00 135.45 135.27

134.80

135.13

135.46

135.31

135.40

1:1250

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-04

17022

06.04.17

EXISTING GROUND PLAN

Revision:

A3

Paper Size:

Date:

N

AREA WITHIN RED LINEBOUNDARY IS CURRENTLY

IN AGRICULTURAL USE

C

DATEDESCRIPTIONREV

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

10.05.17UPDATED FOR APPROVALA

18.05.17UPDATED FOR APPROVALB

22.05.17UPDATED FOR APPROVALC

Page 6: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

6m

R=16m

R=1

6m24m

4.5m

LISTENING

TRUCK

35m CRANE OR

32m WORK

OVER RIG

160m

160m

PROPOSED SITEACCESS

HEDGEROW TO BETRIMMED OR LAID TO

1m WHERE IT IS WITHINTHE VISIBILITY SPLAY

DIES

EL

TANK

32m CONDUCTOR

/ SURFACE RIG

1:1000/500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-05

17022

10.05.17

PROPOSED SITE ENTRANCE

AND HIGHWAY WORKS PLAN

Revision:

A3

Paper Size:

Date:

N

PROPOSED SITE ACCESS

VISIBILITY SPLAYS4.5m x 160m

B

DATEDESCRIPTIONREV

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

HERAS FENCINGTERMINATED ATSECURITY GATES

18.05.17UPDATED FOR APPROVALA

22.05.17UPDATED FOR APPROVALB

Page 7: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

WELL PAD

X

X

TOIL

ETB

LOC

KW

ELFA

RE

(IN

EOS)

+

YY

OFFICE(INEOS)

SUR

FAC

E W

ATE

RST

OR

AG

E TA

NK

SHO

WER

GEN

ERA

TOR

+

135.300

+

+135.300

135.300

+

+135.300

+

+135.150

135.150

135.150

135.150

+

135.150

+135.150

+

135.150

+135.150

WELLHEADCELLAR

BELOW GROUND SURFACEWATER DRAIN WITH IN-PIPESTORAGE CAPACITY

OFFICE (INEOS)

SITE

OFF

ICE

(IN

EOS)

CAR PARK

PEDESTRIANGATE

GA

TEH

OU

SE

TEMPORARY STORAGEAREA FOR CONSTRUCTION

STAGE ONLY

TEMPORARYHERAS FENCE

MATERIALSSTORAGE AREA

DIE

SEL

TAN

K

OPERATIONAL SITEFENCE POSITIONEDCENTRALLY ON TOPOF EARTH BUND

HERAS FENCE TOSITE PERIMETER

+

EMER

GEN

CY

EXIT

135.600

+

135.150+

POST AND WIRE FENCETO RUN ALONGSIDEPUBLIC RIGHT OF WAY

N

+

135.600

32m CONDUCTOR/ SURFACE RIG

135.26

134.90

134.87

134.45

135.110

134.80

135.180

135.40

MAXIMUM AREA FOR CONDUCTOR / SURFACERIG AND ANCILLARY EQUIPMENT

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-06

17022

10.05.17

PROPOSED SITE LAYOUT

PLAN

CONSTRUCTION STAGE

Revision:

A3

Paper Size:

Date:

C

DATEDESCRIPTIONREV

Development

Stage:

STAGE 1: SITE DEVELOPMENT

AND ESTABLISHMENT

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

MONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

CCTV CAMERALOCATIONS AREINDICATIVE

MOVEABLE LIGHTINGCOLUMNS

CATCH PITWITH COVER

30m WIDEECOLOGICALBUFFER

WELLHEAD CELLAR

16.05.17UPDATED FOR APPROVALA

18.05.17UPDATED FOR APPROVALB

22.05.17UPDATED FOR APPROVALC

Page 8: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

X

XSTORE

(DRILL Co.)

CA

SIN

G &

DR

ILL

PIPE

STO

RA

GE

AR

EA

WASTE AREA

TOIL

ETB

LOC

KW

ELFA

RE

(IN

EOS)

YY

MU

D

CH

EMIC

AL

STO

RE

WELFARE(DRILL Co.)

OFFICE(DRILL Co.)

BIT STORE(DRILL Co.)

CEMENT

WATEROFFICE(INEOS)

SUR

FAC

E W

ATE

RST

OR

AG

E TA

NK

SHO

WER

GEN

ERA

TOR

MU

D

MU

D

WATER

DIE

SEL

TAN

K

CASING & DRILL PIPESTORAGE AREA

OFFICE (INEOS)

SITE

OFF

ICE

(IN

EOS)

CABIN CABINCABIN

COMP HSE

DIE

SEL

DIE

SEL

GEN

ERA

TOR

GEN

ERA

TOR

GEN

ERA

TOR

SCR

BA

CK

UP

GEN

ERA

TOR

VA

RC

O E

LEC

HSE

DOG HOUSE

CHOKE

MU

D M

IX A

REA

MU

D P

UM

P 2

MU

D P

UM

P 1

MUD TANK SETTLING TANK SHAKER TANK

CUTTINGS HANDLING

EMERGENCY VENT

SURGE TANK

KO

OM

EY

BOP AREA

DERRICK IN TEMPORARYLAIN DOWN POSITION

CAR PARK PEDESTRIANGATE

GA

TEH

OU

SE

OPERATIONAL SITEFENCE POSITIONEDCENTRALLY ON TOPOF EARTH BUND

HERAS FENCE TOSITE PERIMETER

EMER

GEN

CY

EXIT

POST AND WIRE FENCETO RUN ALONGSIDEPUBLIC RIGHT OF WAY

N

MAXIMUM AREA FOR DRILLING RIGAND ANCILLARY DRILLING EQUIPMENT

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-07

17022

13.04.17

PROPOSED SITE LAYOUT

PLAN

DRILLING STAGE

Revision:

A3

Paper Size:

Date:

F

DATEDESCRIPTIONREV

Development

Stage:

STAGE 2: DRILLING, CORING

AND SUSPENSION

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

MONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

CCTV CAMERALOCATIONS AREINDICATIVE

MOVEABLE LIGHTINGCOLUMNS

CATCH PITWITH COVER

25.04.17UPDATED FOR COMMENTA

03.05.17UPDATED FOR COMMENTB

30m WIDEECOLOGICALBUFFER

ALL CABINS TO BESTACKED DOUBLE

HEIGHT

09.05.17UPDATED FOR APPROVALC

WELLHEAD CELLAR

FENCING AROUNDTEMPORARY STORAGEAREA REMOVED

10.05.17UPDATED FOR APPROVALD

17.05.17UPDATED FOR APPROVALE

22.05.17UPDATED FOR APPROVALF

Page 9: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

X

X

YY

TOIL

ETB

LOC

KG

ENER

ATO

RSI

TE O

FFIC

E

LISTENINGTRUCK

35m CRANE OR32m WORKOVER RIG

CAR PARK PEDESTRIANGATE

GA

TEH

OU

SE

DIE

SEL

TAN

K

NW

ELFA

RE

(IN

EOS)

SUR

FAC

E W

ATE

RST

OR

AG

E TA

NK

MAXIMUM AREA FOR POSITIONINGOF LISTENING EQUIPMENT

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-08

17022

10.05.17

PROPOSED SITE LAYOUT

PLAN

LISTENING STAGE

Revision:

A3

Paper Size:

Date:

B

DATEDESCRIPTIONREV

Development

Stage:

STAGE 4: LISTENING STAGE

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

MONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

CCTV CAMERALOCATIONS AREINDICATIVE

MOVEABLE LIGHTINGCOLUMNS

CATCH PITWITH COVER

30m WIDEECOLOGICALBUFFER

WELLHEAD CELLAR

18.05.17UPDATED FOR APPROVALA

22.05.17UPDATED FOR APPROVALB

Page 10: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

WELL CASTINGS CUTDOWN TO 2m BELOWORIGINAL GROUNDLEVEL

HEDGE TO BE RE-PLANTEDVERGE REINSTATED ASEXISTING

1:1250

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-09

17022

10.05.17

PROPOSED

SITE RESTORATION

Revision:

A3

Paper Size:

Date:

N

B

DATEDESCRIPTIONREV

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

Development

Stage:

STAGE 5: ABANDONMENT

AND RESTORATION

SITE TO BE RESTOREDTO AGRICULTURAL USE

ALL IMPORTED MATERIALTO BE TAKEN OFF SITE WITHEXISTING GROUND LEVELS

REINSTATED USING STOREDHARDCORE AND TOPSOIL.

SITE SHOWN IN THEFINAL STAGES

18.05.17UPDATED FOR APPROVALA

22.05.17UPDATED FOR APPROVALB

Page 11: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

X

XSTORE

(DRILL Co.)

CA

SIN

G &

DR

ILL

PIPE

STO

RA

GE

AR

EA

WASTE AREA

TOIL

ETB

LOC

KW

ELFA

RE

(IN

EOS)

YY

CH

EMIC

AL

STO

RE

WELFARE(DRILL Co.)

OFFICE(DRILL Co.)

BIT STORE(DRILL Co.)WATER

OFFICE(INEOS)

SUR

FAC

E W

ATE

RST

OR

AG

E TA

NK

SHO

WER

GEN

ERA

TOR

DIE

SEL

TAN

K

CASING & DRILL PIPESTORAGE AREA

OFFICE (INEOS)

SITE

OFF

ICE

(IN

EOS)

CABIN CABINCABIN

2

2

1

1

1

11111

PEDESTRIANGATE

GA

TEH

OU

SE

1

N

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-10

17022

10.05.17

PROPOSED LIGHTING PLAN

STAGE 2 DRILLING, CORING

AND SUSPENSION

Revision:

A3

Paper Size:

Date:

B

DATEDESCRIPTIONREV

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

MONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

CCTV CAMERALOCATIONS AREINDICATIVE

MOVEABLE LIGHTINGCOLUMNS

CATCH PITWITH COVER

WELLHEAD CELLAR

1

FOR EXAMPLES OF LIGHTINGSEE DRAWING No. P304-S2-PA-31.

1 LIGHT OVER DOOR:1 LIGHT OVER DOORAT BOTH LEVELS: 2

18.05.17UPDATED FOR APPROVALA

22.05.17UPDATED FOR APPROVALB

Page 12: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

X

X

CA

SIN

G &

DR

ILL

PIPE

STO

RA

GE

AR

EA

+

YY

FALL FALL FALLFALL

+

FALL

FALL

FALL

FALL

135.300

+

+135.300

135.300

+

+135.300

+

+135.150

135.150

135.150

135.150

+

135.150

+135.150

+

135.150

+135.150

CASING & DRILL PIPESTORAGE AREA

SUR

FAC

E W

ATE

RST

OR

AG

E TA

NK

PEDESTRIANGATE

+

135.600

+

135.150+

N

BELOW GROUNDSURFACE WATERDRAIN WITH IN-PIPESTORAGE CAPACITY(POLYPIPE ORSIMILAR) I.L.= 133.500

CATCH PIT FORMEDUSING 900 Ø 'T'SECTION POLYPIPEOR SIMILAR WITHCONTENTS PUMPEDINTO WATER TANK

+

135.600

135.26

134.90

134.87

134.45

135.110

134.80

135.180

135.40

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-11

17022

10.05.17

PROPOSED DRAINAGE PLAN

STAGES 1 - 4

Revision:

A3

Paper Size:

Date:

B

DATEDESCRIPTIONREV

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

MONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

18.05.17UPDATED FOR APPROVALA

22.05.17UPDATED FOR APPROVALB

Page 13: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

X

X

YY

TOIL

ETB

LOC

KG

ENER

ATO

RSI

TE O

FFIC

E

CAR PARK PEDESTRIANGATE

GA

TEH

OU

SE

DIE

SEL

TAN

K

NW

ELFA

RE

(IN

EOS)

SUR

FAC

E W

ATE

RST

OR

AG

E TA

NK

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-12

17022

10.05.17

PROPOSED SITE LAYOUT

PLAN

SUSPENSION STAGE

Revision:

A3

Paper Size:

Date:

B

DATEDESCRIPTIONREV

Development

Stage:

STAGE 3: SUSPENSION

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

MONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

CCTV CAMERALOCATIONS AREINDICATIVE

MOVEABLE LIGHTINGCOLUMNS

30m WIDEECOLOGICALBUFFER

18.05.17UPDATED FOR APPROVALA

22.05.17UPDATED FOR APPROVALB

Page 14: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

X

X

YY

CAR PARK PEDESTRIANGATE

N

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-13

17022

10.05.17

PROPOSED INTERNAL

ACCESS PLAN

Revision:

A3

Paper Size:

Date:

B

DATEDESCRIPTIONREV

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

MONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

18.05.17UPDATED FOR APPROVALA

UPDATED FOR APPROVALB

SWEPT PATH PROVIDED BYCURTINS CONSULTING LTD.USING A 16.5m ARTICULATEDVEHICLE(FOR DETAILS SEE CURTINSDRAWING No. TPMA1529-126)

23.05.17

Page 15: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

900 Ø DRAIN & STORAGEPIPE OR SIMILARI.L.= 133.650

OPERATIONALSITE FENCE

HERAS FENCE

CAR PARK

PROFILE OF EXISTINGGROUND

PERMEABLE FINISH COMPRISING150mm TYPE 1 STONE ON 300mmRECYCLED AGGREGATE

TOP SOIL REMOVED AND REPLACEDWITH COMPACTED GRANULAR FILLTO MAKE UP LEVELS

TEMPORARY SOILSTORAGE AREAAPPROXIMATELY2m HIGH

HDPE LINER TERMINATEDAT GROUND LEVELBETWEEN 2 P.C.C. KERBS

900 Ø DRAIN & STORAGEPIPE OR SIMILARI.L.= 133.650

TEMPORARY SOILSTORAGE AREAAPPROXIMATELY3m HIGH

PERMEABLE FINISH COMPRISING150mm TYPE 1 STONE ON 300mmRECYCLED AGGREGATE

OPERATIONALSITE FENCE

HERAS FENCE

TOP SOIL REMOVED AND REPLACEDWITH COMPACTED GRANULAR FILLTO MAKE UP LEVELS

PROFILE OF EXISTINGGROUND

TEMPORARY SOILSTORAGE AREAAPPROXIMATELY3m HIGH

HDPE LINER INSTALLED ACROSS THESITE TO PROVIDE IMPERMEABLEBARRIER TAKEN UP FACE OF BUND

900 Ø DRAIN & STORAGEPIPE OR SIMILARI.L.= 133.650

OPERATIONALSITE FENCE

HERAS FENCE

Y - Y

EXTENT OF WELL PAD

CONCRETE SUPPORTSFOR SKID BEAMS

HDPE LINER

PERMEABLE FINISH COMPRISING150mm TYPE 1 STONE ON 300mmRECYCLED AGGREGATE

(1:200)

300mm COMPACTED RECYCLED AGGREGATEBELOW LINER ON TERRAM GEOTEXTILEMEMBRANE (OR SIMILAR)

X - X

EXTENT OF WELL PAD

CONCRETE SURROUNDTO WELL CELLAR

HDPE LINER

PERMEABLE FINISH COMPRISING150mm TYPE 1 STONE ON 300mmRECYCLED AGGREGATE

300mm COMPACTED RECYCLEDAGGREGATE BELOW LINER ONTERRAM GEOTEXTILEMEMBRANE (OR SIMILAR)

(1:200)

PROFILE OF EXISTINGGROUND

HERAS FENCE

TEMPORARY SOILSTORAGE AREAAPPROXIMATELY2m HIGH

HDPE LINER INSTALLEDACROSS THE SITE TOPROVIDE IMPERMEABLEBARRIER

OPERATIONALSITE FENCE

900 Ø DRAIN & STORAGEPIPE OR SIMILARI.L.= 133.650

(1:50)

450

2mm HDPE LINER TAKEN UP THE INSIDEFACE OF THE BUND AND TUCKED INWITH ADDITIONAL SOIL OVER TOPROVIDE FIXING FOR COVAMAT

150

GREENFIX COVAMAT - PLUS TYPE 3OR SIMILAR APPROVED FIXED TOFACE OF BUND

300mm THICKNESS OFRECYCLED AGGREGATE

150mm TYPE 1 STONE FINISH

300mm COMPACTEDRECYCLED AGGREGATE

TYPE1 STONE FINISH

TERRAM GEOTEXTILEMEMBRANE (OR SIMILAR)

6000

TYPICAL SECTION THROUGH ACCESS TRACK(1:50)

150

FALLFALL

HERAS FENCE

SECTION THROUGH WELL CELLAR(1:25)

SKID SUPPORT COMPRISING300 DEEP REINFORCEDCONCRETE STRIP

135.150

REMOVABLE ACCESSCOVER

150 TYPE 1 STONEDRESSING

DRILL PIPE CASING

300mm THICKNESSOF RECYCLEDAGGREGATE

2mm HDPE LINER INSTALLEDTO MANUFACTURERSSPECIFICATION WITH 1000GSM NEEDLE PUNCHEDGEOTEXTILE MEMBRANEABOVE AND BELOW FORPROTECTION

MASS CONCRETESURROUND

HDPE LINER SEALEDAGAINST DRILL PIPECASING

MIN 600 DEEP MASSCONCRETE POUREDAGAINST DRILL PIPECASING

2.4m Ø MANHOLE RINGSSUPPORTED ON MASSCONCRETE

300mm THICKNESSOF RECYCLEDAGGREGATE

1:200/50/25

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-16

17022

10.05.17

PROPOSED SECTIONS

& DETAILS STAGE 1

SITE DEVELOPMENT

& ESTABLISHMENT

Revision:

A3

Paper Size:

Date:

A

DATEDESCRIPTIONREV

BUNDS FORMED USING GRANULAR SUB-SOIL EXCAVATEDFROM SITE WITH A TOP SOIL FINISH TO PROVIDE A GROWING

MEDIUM FOR COVAMATS.TERRAM GEOTEXTILE MEMBRANE (OR SIMILAR) TO BE USEDAS A SEPARATION LAYER BETWEEN IMPORTED GRANULAR

MATERIALS AND EXCAVATED SITE MATERIALS

TEMPORARY SOIL STORAGE AREAS

18.05.17UPDATED FOR APPROVALA

Page 16: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

X

X

YY

TOIL

ETB

LOC

KG

ENER

ATO

RSI

TE O

FFIC

E

PEDESTRIANGATE

GA

TEH

OU

SE

DIE

SEL

TAN

K

NW

ELFA

RE

(IN

EOS)

SUR

FAC

E W

ATE

RST

OR

AG

E TA

NK32m WORK

OVER RIG

MAXIMUM AREA FOR POSITIONINGOF WORK OVER EQUIPMENT

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-17

17022

10.05.17

PROPOSED SITE LAYOUT

PLAN

POSSIBLE WORK OVER

Revision:

A3

Paper Size:

Date:

B

DATEDESCRIPTIONREV

Development

Stage:

STAGE 3a:

POSSIBLE WORK OVER

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

MONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

CCTV CAMERALOCATIONS AREINDICATIVE

MOVEABLE LIGHTINGCOLUMNS

30m WIDEECOLOGICALBUFFER

CATCH PITWITH COVER

WELLHEAD CELLAR

18.05.17UPDATED FOR APPROVALA

22.05.17UPDATED FOR APPROVALB

Page 17: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

5.5m

9m WELL PAD LEVEL

GROUND LEVEL VARIES

2m

5.5m

2m

X - X

32m

WELL PAD LEVEL

GROUND LEVEL VARIES

5.5m

2m 9m 2m

Y - Y

32m

KEY:

ZONE FOR HERAS FENCINGMAXIMUM HEIGHT 2m

MAXIMUM HEIGHT OF DOUBLESTACKED CABINS 5.5m

ZONE FOR OPERATIONAL SITEFENCING MAXIMUM HEIGHT 7mLIGHTING & CCTV COLUMNSMAXIMUM HEIGHT 9m

ZONE FOR CONDUCTOR /SURFACING RIGMAXIMUM HEIGHT 32m

1:500

Project Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-21

17022

10.05.17

Revision:

A3

Paper Size:

Date:

A

DATEDESCRIPTIONREV

Drawing Title:

PARAMETER SECTIONS

Development

Stage:

STAGE 1: SITE DEVELOPMENT

AND ESTABLISHMENT

18.05.17UPDATED FOR APPROVALA

Page 18: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

60m

15m

5.5m

9m WELL PAD LEVEL

GROUND LEVEL VARIES

2m

5.5m

2m

X - X

WELL PAD LEVEL

GROUND LEVEL VARIES

60m

15m

5.5m

2m 9m 2m

Y - Y

KEY:

ZONE FOR HERAS FENCINGMAXIMUM HEIGHT 2m

MAXIMUM HEIGHT OF DOUBLESTACKED CABINS 5.5m

ZONE FOR OPERATIONAL SITEFENCING MAXIMUM HEIGHT 7mLIGHTING & CCTV COLUMNSMAXIMUM HEIGHT 9m

ZONE FOR SUBSTRUCTURE &ANCILLARY DRILLING EQUIPMENTMAXIMUM HEIGHT 15m

ZONE FOR DRILLING RIGMAXIMUM HEIGHT 60m

1:500

Project Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-22

17022

10.05.17

Revision:

A3

Paper Size:

Date:

A

DATEDESCRIPTIONREV

Drawing Title:

PARAMETER SECTIONS

Development

Stage:

STAGE 2: DRILLING, CORING

AND SUSPENSION

18.05.17APPROVALA

Page 19: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

5.5m

9m WELL PAD LEVEL

GROUND LEVEL VARIES

2m

5.5m

2m

X - X

WELL PAD LEVEL

GROUND LEVEL VARIES

5.5m

2m 9m 2m

Y - Y

KEY:

ZONE FOR HERAS FENCINGMAXIMUM HEIGHT 2m

MAXIMUM HEIGHT OF DOUBLESTACKED CABINS 5.5m

ZONE FOR OPERATIONAL SITEFENCING MAXIMUM HEIGHT 7mLIGHTING & CCTV COLUMNSMAXIMUM HEIGHT 9m

1:500

Project Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-23

17022

10.05.17

Revision:

A3

Paper Size:

Date:

A

DATEDESCRIPTIONREV

Drawing Title:

PARAMETER SECTIONS

Development

Stage:

STAGE 3: MAINTENANCE

AND SUSPENSION WELL

18.05.17UPDATED FOR APPROVALA

Page 20: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

5.5m

9m WELL PAD LEVEL

GROUND LEVEL VARIES

2m

5.5m

2m

32m

X - X

WELL PAD LEVEL

GROUND LEVEL VARIES

5.5m

2m 9m

32m

2m

Y - Y

KEY:

ZONE FOR HERAS FENCINGMAXIMUM HEIGHT 2m

MAXIMUM HEIGHT OF DOUBLESTACKED CABINS 5.5m

ZONE FOR OPERATIONAL SITEFENCING MAXIMUM HEIGHT 7mLIGHTING & CCTV COLUMNSMAXIMUM HEIGHT 9m

ZONE FOR WORK OVER RIGMAXIMUM HEIGHT 32m

1:500

Project Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-24

17022

10.05.17

Revision:

A3

Paper Size:

Date:

A

DATEDESCRIPTIONREV

Drawing Title:

PARAMETER SECTIONS

Development

Stage:

STAGE 3a: POTENTIAL

WORK OVER OF WELL

18.05.17UPDATED FOR APPROVALA

Page 21: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

5.5m

9m WELL PAD LEVEL

GROUND LEVEL VARIES

2m

5.5m

2m

35m

X - X

WELL PAD LEVEL

GROUND LEVEL VARIES

5.5m

2m 9m

35m

2m

Y - Y

KEY:

ZONE FOR HERAS FENCINGMAXIMUM HEIGHT 2m

MAXIMUM HEIGHT OF DOUBLESTACKED CABINS 5.5m

ZONE FOR OPERATIONAL SITEFENCING MAXIMUM HEIGHT 7mLIGHTING & CCTV COLUMNSMAXIMUM HEIGHT 9m

ZONE FOR CRANE AND LISTENINGEQUIPMENT MAXIMUM HEIGHT 35m

1:500

Project Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-25

17022

10.05.17

Revision:

A3

Paper Size:

Date:

A

DATEDESCRIPTIONREV

Drawing Title:

PARAMETER SECTIONS

Development

Stage:

STAGE 4: LISTENING STAGE

18.05.17UPDATED FOR APPROVALA

Page 22: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

X - X

Y - Y

1:500

Project Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-26

17022

10.05.17

Revision:

A3

Paper Size:

Date:

A

DATEDESCRIPTIONREV

Drawing Title:

PARAMETER SECTIONS

Development

Stage:

STAGE 5: ABANDONMENT

AND RESTORATION

SITE TO BE RESTORED TOORIGINAL LAND PROFILE

SITE TO BE RESTORED TOORIGINAL LAND PROFILE

18.05.17UPDATED FOR APPROVALA

Page 23: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

2000

3500

HERAS ROUND TOP PANEL

HERAS PANEL SPECIFICATIONS

PANEL DIMENSIONS 2000mm (H) 3500mm (W)HORIZONTAL TUBE 38.1mmVERTICAL TUBE 38.1mmREINFORCED CORNERS YESWEIGHT 17kgFINISH COLOUR TO BE AGREED WITH MINERALS PLANNING AUTHORITY

POST AND WIRE FENCE SPECIFICATIONS

POSTS MIN 1500mm (L) 75mmØ TREATED SOFTWOODPOST CENTRES 2000mm - 3000mm

WIRE TYPE COLOUR AND MATERIAL TO BE AGREED WITH MINERALS PLANNING AUTHORITY

POST AND WIRE FENCE

1000

MA

X50

0A

PPR

OX

1:20

Project Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-30

17022

10.05.17

Revision:

A3

Paper Size:

Date:

A

DATEDESCRIPTIONREV

Drawing Title:

FENCE DETAILS

18.05.17UPDATED FOR APPROVALA

Page 24: 5. Application Drawings - Ineos...cctv camera locations are indicative moveable lighting columns catch pit with cover a updated for comment 25.04.17 b updated for comment 03.05.17

N.T.S.

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

APPROVAL

P304 - S2

COMPOUND

P304-S2-PA-31

17022

10.05.17

LIGHTING EXAMPLES

Revision:

A3

Paper Size:

Date:

DATEDESCRIPTIONREV

EXAMPLES OF THE PROPOSED LIGHTING UNITS ARE:

TOWARDS TOMORROWENERGY - TTE-FL-80

80W LED FLOODLIGHTSILVER POWDER COATED ALLOYSENSOR COMPATIBLESIZE 365mm x 285mm x 120mm

DESIGNPLAN LIGHTING -QUADRATO

22W LEDBLACK POWDER COATED DIECAST ALUMINIUM BODYSENSOR COMPATIBLESIZE 305mm x 305mm x 145mm

DESIGNPLAN LIGHTING -BERGEN

21W LEDTITANIUM POWDER COATED STEELSIZE 400mm x 200mm x 100mm

VT1 ECO LIGHTINGTOWER 9m

10kva MOVABLE UNITWITH 360° ROTATION