Top Banner
4U ATCA Shelf October 2007 - Proprietary and Confidential -
24
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

4U ATCA Shelf October 2007

-Proprietary and Confidential-

Page 2: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

2

General description

4U ATCA Shelf 5 slot Mounting systems

19'' Cabinet 23'' Cabinet

ETSI Cabinet (600 mm width) Operating temperature from (-5°C) – (+55°C)

Altitude - 1800 meter above sea level (NEBS requirement)

Page 3: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

3

4U ATCA Shelf

Front ViewFront View

Page 4: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

4

4U ATCA Shelf

Rear ViewRear View

Page 5: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

5

MechanicalMechanical

Chassis Material Material: Steel 1010-1016, zinc plated, Painted. 90% of the parts are assembled by riveting – reduce assembly costs & complexity

Page 6: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

6

General descriptionGeneral descriptionFront view

Rear view

Shelf ID EEPROM x2

Shelf manager

x2

Page 7: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

7

MechanicalMechanical

Height: 178 mm (4U)

450 mm

38

2

mm

Page 8: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

8

MechanicalMechanical

PEMs

Front View

Rear View

Top View

Fan trays

Air FilterShelf

managers

Page 9: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

9

Components:Chassis Air filter2 Shelf managers2 PEMCable managementFan trayBackplane

MechanicalMechanicalMechanicalMechanical

Page 10: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

10

Air FilterAir Filter

Meet NEBS requirements

Filters all the air which is flowing into the shelf, both front and RTM areas.

Easy maintenance

Captive screw, locking filter to chassis

Easy to open and replace the air filter

material

Page 11: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

11

Air filter presence is detected using a switch

on the fan card

Air FilterAir Filter

Page 12: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

12

Shelf ManagerShelf Manager

Front LEDs

Ethernet Serial Alarm

Reset switch Alarm Clear

Page 13: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

13

Shelf ManagerShelf Manager

Page 14: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

14

Main functionality: Compliant with PICMG 3.0 Fan tray control Temperature monitoring Discrete alarm outputs LED Alarms display Pigeon point ShMM500 module Front and rear Ethernet connection. Application blades control and power-up Hot swappable and redundant Remote access via Web interface, SNMP, RMCP and

CLI

The Shelf manager Board The Shelf manager Board

Page 15: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

15

PEMPEM

Protective cover

EjectorContact Studs

Circuit breaker

Page 16: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

16

Main features: • Field replaceable unit• Alignment pin for smooth insertion and extraction • Insertion/extraction lever for easy replacement• Protective cover to prevent electrocution and

accidental power short.• Circuit Breaker for over current protection• Contact studs provide high current connection and

EMC protection

PEMPEM

Page 17: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

17

Cable management - optional Left Right

Cable managementCable management

Page 18: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

18

Front insertion Comfortable and rigid extraction handle Push concept for superior cooling

Fan TrayFan Tray

Locking screw

80x80x25 fan (x8)

Front View

Page 19: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

19

BackplaneBackplane

FRONT VIEW

Zone 1Zone 2

Right Shelf managerLeft Shelf manager

Page 20: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

20

BackplaneBackplane

REAR VIEW

Right PEMLeft PEM

E²prom and fan tray

connection

Page 21: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

21

Main features:Main features: Five AdvancedTCA slots Fabric interface with full mesh interconnect Dual-star Ethernet signalling environment on the

Base interface Bussed IPMI Two Hub slots; Three node slots Update channel between slots 1&2 and 3&4. Full compliance with AdvancedTCA™ electrical

and mechanical specifications

BackplaneBackplane

Page 22: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

22

E²prom’sE²prom’s

Redundant and hot-swappable.Easy access and removal.

Replaceable E²prom

Page 23: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

-Proprietary and Confidential-

23

RFI RFI

EMC sealed chassis

The RED lines represent EMC sealed areas. Sealing is being achieved by the use of EMI gaskets, springs and proper EMC design practices.

Page 24: 4U ATCA Shelf October 2007 -Proprietary and Confidential-

Thank you